02-36-589295
BRIGHT HORIZON PROPERTIES LLC (FORMER)
|
Activity Type / Status | Jurisdiction |
---|---|
ERP / OPEN | DNR RR |
Location Name | County | DNR Region |
---|---|---|
EGGERS INDUSTRIES WEST PLANT | MANITOWOC | NORTHEAST |
Address | Municipality |
---|---|
1702 13TH ST | TWO RIVERS |
PLSS Description | Latitude (WGS84) | Longitude (WGS84) | Google Maps | RR Sites Map |
---|---|---|---|---|
NE 1/4 of the SW 1/4 of Sec 01, T19N, R24E | 44.1456735 | -87.5709106 |
![]() |
![]() |
Additional Location Description |
---|
1621 14TH ST |
Additional Activity Details | Acres |
---|---|
UNKNOWN |
Facility ID | PECFA No. | EPA ID | Start Date | End Date |
---|---|---|---|---|
436010300 | 2022-02-22 |
Above Ground Petrol Tank |
Drycleaner |
EPA NPL Site |
EPA Superfund |
PECFA Funds Eligible |
PFAS |
ROW Impact |
Sediments |
Underground Petrol Tank |
WI DOT Site |
---|---|---|---|---|---|---|---|---|---|
![]() |
Date | Code | Name | File | Comment | |
---|---|---|---|---|---|
2024-06-11 | 99 | Miscellaneous |
![]() |
CREATION OF NEW BRRTS CASE LETTER ISSUED TO NEWELL OPERATING COMPANY AND WEST RIVER LOFTS, LLC | |
2024-05-16 | 43 | Site Activity Status Update Received |
![]() |
NOTIFICATION OF PFAS SAMPLING RESULTS IN GROUNDWATER | |
2024-04-18 | 43 | Site Activity Status Update Received |
![]() |
NOTIFICATION OF PFAS SAMPLING RESULTS IN SOIL | |
2024-03-08 | 36 | Site Investigation Workplan (SIWP) Approved |
![]() |
||
2024-03-06 | 43 | Site Activity Status Update Received |
![]() |
INFORMATION ABOUT STATUS OF MW-1 AND TW-82 ON-SITE | |
2024-02-27 | 135 | Site Investigation Workplan (SIWP) Received (fee) |
![]() |
PFAS FOCUSED WORK PLAN SUBMITTED BY RAMBOLL ON BEHALF OF NEWELL | |
2024-02-07 | 43 | Site Activity Status Update Received |
![]() |
DNR REQUEST AND NEWELL/RAMBOLL RESPONSE THAT SI WORK PLAN FOR PFAS WILL BE SUBMITTED WITHIN 30 DAYS | |
2024-01-29 | 43 | Site Activity Status Update Received |
![]() |
RAMBOLL, ON BEHALF OF NOC, UPDATE ON TIMELINE OF SITE INVESTIGATION WORK PLAN SUBMITTAL | |
2024-01-22 | 43 | Site Activity Status Update Received |
![]() |
SEMI-ANNUAL REPORTING FROM RAMBOLL ON BEHALF OF NEWELL OPERATING CO | |
2024-01-19 | 43 | Site Activity Status Update Received |
![]() |
REVISION TO SEMI-ANNUAL REPORT TO CORRECT 1/15/2024 SEMI-ANNUAL REPORT | |
2024-01-15 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 7/1/2023 - 12/31/2023 | |
2023-12-01 | 99 | Miscellaneous |
![]() |
REQUEST FOR STATUS UPDATE FROM NEWELL FOR NEXT STEPS & SCHEDULE OF WORK PLAN SUBMITTAL BY 1/30/2024 | |
2023-10-30 | 43 | Site Activity Status Update Received |
![]() |
GROUNDWATER SAMPLING FOR PFAS | |
2023-10-30 | 120 | PFAS Sampling Completed - Actionable Levels Detected | |||
2023-07-28 | 43 | Site Activity Status Update Received |
![]() |
SEMI-ANNUAL REPORTING FROM RAMBOLL ON BEHALF OF NEWELL OPERATING CO | |
2023-07-20 | 99 | Miscellaneous |
![]() |
DNR UPDATES TO DHS FOR REMEDIATION, VAPOR SAMPLING, AND MITIGATION FOR UPCOMING REDEVELOPMENT | |
2023-07-17 | 99 | Miscellaneous |
![]() |
CLARIFICATION FOR COPIED CONTACTS ON THE DNR LETTERS | |
2023-07-14 | 98 | Technical Assistance Provided |
![]() |
FOR CONCURRENCE WITH SUB-SLAB VAPOR MITIGATION SYSTEM DESIGN AND VAPOR SAMPLING PLAN | |
2023-07-12 | 37 | Site Investigation Report (SIR) Received (non-fee) |
![]() |
ADDENDUM, SAMPLING COMPLETED UNDER EPA COMMUNITY WIDE ASSESSMENT GRANT TO PREP FOR REDEVELOPMENT | |
2023-07-10 | 199 | Additional Information Received (Fee-Based or Closure) |
![]() |
COPY OF SUB-SLAB VAPOR MITIGATION SYSTEM DESIGN AND VAPOR SAMPLING PLAN IN LETTER FORMAT | |
2023-06-30 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 01/01/2023 - 06/30/2023 | |
2023-06-29 | 857 | Materials Management Plan Approved | MATERIAL MOVED ON-SITE, SEE AC 149 OF SAME DATE FOR DOCUMENTATION | ||
2023-06-29 | 149 | Remedial Action (RA) Design Report Approved |
![]() |
FOR RESIDENTIAL REDEVELOPMENT | |
2023-06-29 | 56 | Continuing Obligation(s) Applied | |||
2023-06-29 | 222 | Continuing Obligation - Maintain Cap Over Contaminated Area | BUILDING, PAVEMENT, CONCRETE, & GREENSPACE | ||
2023-06-29 | 226 | Continuing Obligation - Vapor Intrusion Response | |||
2023-06-29 | 232 | Continuing Obligation - Residual Soil Contamination | |||
2023-06-29 | 99 | Miscellaneous |
![]() |
JUNE 22, 2023 AND JUNE 29, 2023 DNR REVISIONS TO VAPOR MITIGATION SYSTEM AND VAPOR SAMPLING PLAN | |
2023-06-29 | 43 | Site Activity Status Update Received |
![]() |
FINAL VAPOR MITIGATION SYSTEM & VAPOR PORT DESIGN AND FINAL VAPOR SAMPLING PLAN | |
2023-06-29 | 99 | Miscellaneous |
![]() |
CONDITIONAL APPROVAL FOR VMS DESIGN AND VAPOR SAMPLING PLAN, FORMAL APPROVAL LETTER TO FOLLOW | |
2023-06-21 | 43 | Site Activity Status Update Received |
![]() |
ADDENDUM TO REMEDIAL ACTION AND MATERIALS MANAGMENT PLAN (AC 148, DATED 6/12/2023) | |
2023-06-21 | 99 | Miscellaneous |
![]() |
DNR CORRESPONDENCE WITH CONSULANT AND WITH EPA REGARDING PCB CONTAMINATED SOIL REMOVAL | |
2023-06-12 | 148 | Remedial Action Design Report Received (fee) |
![]() |
FOR RESIDENTIAL REDEVELOPMENT | |
2023-06-12 | 854 | Materials Management Plan Request Recvd with Fee | MOVED ON-SITE; PAID THROUGH AC148 OF THE SAME DATE. DOCUMENTATION INCLUDED WITH AC 148 OF SAME DATE | ||
2023-06-12 | 710 | Database Fee Paid for Soil Continuing Obligation(s) | |||
2023-06-09 | 43 | Site Activity Status Update Received |
![]() |
REVISED SUB-SLAB VAPOR MITIGATION SYSTEM & VAPOR PORT DESIGN AND VAPOR SAMPLING PROPOSAL | |
2023-05-03 | 99 | Miscellaneous |
![]() |
DNR COMMENTS FOR VAPOR PORTS AND MITIGATION SYSTEM DESIGN | |
2023-01-05 | 43 | Site Activity Status Update Received |
![]() |
SEMI-ANNUAL REPORT FROM OTHER RP-NEWELL OPERATING CO | |
2023-01-03 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 7/1/2022 - 12/31/2022 | |
2022-09-30 | 35 | Site Investigation Workplan (SIWP) Received (non-fee) |
![]() |
SITE-SPECIFIC SAMPLING AND ANALYSIS PLAN FOR ADDITIONAL SI VIA AN EPA COMMUNITY ASSESSMENT GRANT | |
2022-07-29 | 36 | Site Investigation Workplan (SIWP) Approved |
![]() |
||
2022-07-29 | 116 | PFAS Sampling Required | DOCUMENTATION INCLUDED IN AC 36 OF SAME DATE | ||
2022-07-15 | 99 | Miscellaneous |
![]() |
CLARIFICATION ON DEFERRING WORK PLAN UNTIL PROPOSED INVESTIGATION WORK IS COMPLETED | |
2022-07-12 | 43 | Site Activity Status Update Received |
![]() |
SEMI-ANNUAL REPORT FROM RAMBOLL ON BEHALF OF NEWELL | |
2022-07-05 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 1/1/2022 - 6/30/2022 | |
2022-06-23 | 135 | Site Investigation Workplan (SIWP) Received (fee) |
![]() |
||
2022-06-23 | 114 | PFAS Scoping Statement Received | INCLUDED IN SITE INVESTIGATION WORK PLAN OF SAME DATE | ||
2022-06-14 | 7 | Environmental Consultant Hired |
![]() |
RAMBOLL ON BEHALF OF NEWELL OPERATING COMPANY | |
2022-04-25 | 43 | Site Activity Status Update Received |
![]() |
ENVIRONMENTAL WORK TASKS PROPOSAL | |
2022-04-22 | 43 | Site Activity Status Update Received |
![]() |
RESPONSE TO RESPONSIBLE PARTY LETTER | |
2022-04-19 | 99 | Miscellaneous |
![]() |
CLARIFICATIONS ON RESPONSIBLE PARTY AND WIS. ADMIN. CODE NR 700 PROCESS | |
2022-04-07 | 198 | Request for Additional Information (Fee-Based or Closure) |
![]() |
DOCUMENTATION OF VAPOR MITIGATION DESIGN NEEDED FOR THE PROPOSED ELEVATOR | |
2022-03-25 | 2 | Responsible Party (RP) letter sent |
![]() |
NEWELL OPERATING COMPANY | |
2022-03-16 | 7 | Environmental Consultant Hired |
![]() |
FEHR GRAHAM | |
2022-03-11 | 43 | Site Activity Status Update Received |
![]() |
HISTORICAL USE AND OWNERSHIP ASSESSMENT TO DETERMINE POTENTIALLY RESPONSIBLE PARTIES | |
2022-03-08 | 97 | Technical Assistance Request Received (fee) |
![]() |
REVIEW OF SUB-SLAB VAPOR MITIGATION SYSTEM DESIGN FOR NEW BUILDING CONSTRUCTION | |
2022-03-04 | 2 | Responsible Party (RP) letter sent |
![]() |
FOR POSSESSOR WEST RIVER LOFTS, LLC | |
2022-03-01 | 43 | Site Activity Status Update Received |
![]() |
WARRANTY DEED FOR ACQUISITION OF PROPERTY BY WEST RIVER LOFTS LLC | |
2022-03-01 | 28 | Phase I Environmental Site Assessment (ESA) Rpt Received |
![]() |
PART 1 OF 2; BY FEHR GRAHAM ON BEHALF OF SCOTT CRAWFORD INC | |
2022-03-01 | 29 | Phase II Environmental Site Assessment (ESA) Rpt Received |
![]() |
AUTOPOPULATED FROM 28 ENTRY | |
2022-03-01 | 28 | Phase I Environmental Site Assessment (ESA) Rpt Received |
![]() |
PART 2 OF 2 | |
2022-03-01 | 99 | Miscellaneous |
![]() |
PROPERTY OWNER CLARIFICATIONS | |
2022-02-22 | 1 | Notification of Hazardous Substance Discharge |
![]() |
Type | Related Activity |
---|---|
ERP to General Property | 07-36-593045 CITY OF TWO RIVERS |
Substance | Type | Amt Released | Units |
---|---|---|---|
Metals | Metals | ||
Per- and Polyfluoroalkyl Substances (PFAS ADDED FROM AC120) | Industrial Chem | ||
Polychlorinated Biphenyl | PCB | ||
Polynuclear Aromatic Hydrocarbons | Petroleum | ||
Tetrachloroethene (Perchloroethylene) | VOC | ||
Trichloroethylene | Industrial Chem | ||
Volatile Organic Compounds | VOC |
(E) Future Redevelopment of Property – Vapor Control Technology Required for Construction: DNR requires notification prior to new building construction or building modifications. Potential for vapor intrusion exists due to residual contamination. Vapor control technologies are required to be installed or modified, and verified protective unless a vapor evaluation is accepted by DNR. |
NEWELL OPERATING CO 6655 PEACHTREE DUNWOODY RD, ATLANTA, GA 30328 |
WEST RIVER LOFTS LLC 4201 N 27TH ST, MILWAUKEE, WI 53216 |
TAUREN BEGGS tauren.beggs@wisconsin.gov |