ACTIVITY DETAILS

 
02-36-589295 BRIGHT HORIZON PROPERTIES LLC (FORMER)
Activity Type / Status Jurisdiction
ERP  OPEN DNR RR
Location Name County DNR Region
EGGERS INDUSTRIES WEST PLANT MANITOWOC NORTHEAST
Address Municipality
1702 13TH ST TWO RIVERS
PLSS Description Latitude (WGS84) Longitude (WGS84) Google Maps RR Sites Map
NE 1/4 of the SW 1/4 of Sec 01, T19N, R24E 44.1456735 -87.5709106 Click to view on Google Maps using Lat/Long Click to View RR Sites Map
Additional Location Description
1621 14TH ST
Additional Activity Details Acres
UNKNOWN
Facility ID PECFA No. EPA ID Start Date End Date
436010300 2022-02-22
Characteristics
Above Ground
Petrol Tank

Drycleaner
EPA
NPL Site
EPA
Superfund
PECFA Funds
Eligible

PFAS

ROW Impact

Sediments
Underground
Petrol Tank
WI DOT
Site
  PFAS flag
Actions and Documents
Date Code Name File Comment
2024-06-11 99 Miscellaneous Download PDF file CREATION OF NEW BRRTS CASE LETTER ISSUED TO NEWELL OPERATING COMPANY AND WEST RIVER LOFTS, LLC
2024-05-16 43 Site Activity Status Update Received Download PDF file NOTIFICATION OF PFAS SAMPLING RESULTS IN GROUNDWATER
2024-04-18 43 Site Activity Status Update Received Download PDF file NOTIFICATION OF PFAS SAMPLING RESULTS IN SOIL
2024-03-08 36 Site Investigation Workplan (SIWP) Approved Download PDF file
2024-03-06 43 Site Activity Status Update Received Download PDF file INFORMATION ABOUT STATUS OF MW-1 AND TW-82 ON-SITE
2024-02-27 135 Site Investigation Workplan (SIWP) Received (fee) Download PDF file PFAS FOCUSED WORK PLAN SUBMITTED BY RAMBOLL ON BEHALF OF NEWELL
2024-02-07 43 Site Activity Status Update Received Download PDF file DNR REQUEST AND NEWELL/RAMBOLL RESPONSE THAT SI WORK PLAN FOR PFAS WILL BE SUBMITTED WITHIN 30 DAYS
2024-01-29 43 Site Activity Status Update Received Download PDF file RAMBOLL, ON BEHALF OF NOC, UPDATE ON TIMELINE OF SITE INVESTIGATION WORK PLAN SUBMITTAL
2024-01-22 43 Site Activity Status Update Received Download PDF file SEMI-ANNUAL REPORTING FROM RAMBOLL ON BEHALF OF NEWELL OPERATING CO
2024-01-19 43 Site Activity Status Update Received Download PDF file REVISION TO SEMI-ANNUAL REPORT TO CORRECT 1/15/2024 SEMI-ANNUAL REPORT
2024-01-15 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2023 - 12/31/2023
2023-12-01 99 Miscellaneous Download PDF file REQUEST FOR STATUS UPDATE FROM NEWELL FOR NEXT STEPS & SCHEDULE OF WORK PLAN SUBMITTAL BY 1/30/2024
2023-10-30 43 Site Activity Status Update Received Download PDF file GROUNDWATER SAMPLING FOR PFAS
2023-10-30 120 PFAS Sampling Completed - Actionable Levels Detected
2023-07-28 43 Site Activity Status Update Received Download PDF file SEMI-ANNUAL REPORTING FROM RAMBOLL ON BEHALF OF NEWELL OPERATING CO
2023-07-20 99 Miscellaneous Download PDF file DNR UPDATES TO DHS FOR REMEDIATION, VAPOR SAMPLING, AND MITIGATION FOR UPCOMING REDEVELOPMENT
2023-07-17 99 Miscellaneous Download PDF file CLARIFICATION FOR COPIED CONTACTS ON THE DNR LETTERS
2023-07-14 98 Technical Assistance Provided Download PDF file FOR CONCURRENCE WITH SUB-SLAB VAPOR MITIGATION SYSTEM DESIGN AND VAPOR SAMPLING PLAN
2023-07-12 37 Site Investigation Report (SIR) Received (non-fee) Download PDF file ADDENDUM, SAMPLING COMPLETED UNDER EPA COMMUNITY WIDE ASSESSMENT GRANT TO PREP FOR REDEVELOPMENT
2023-07-10 199 Additional Information Received (Fee-Based or Closure) Download PDF file COPY OF SUB-SLAB VAPOR MITIGATION SYSTEM DESIGN AND VAPOR SAMPLING PLAN IN LETTER FORMAT
2023-06-30 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 01/01/2023 - 06/30/2023
2023-06-29 857 Materials Management Plan Approved MATERIAL MOVED ON-SITE, SEE AC 149 OF SAME DATE FOR DOCUMENTATION
2023-06-29 149 Remedial Action (RA) Design Report Approved Download PDF file FOR RESIDENTIAL REDEVELOPMENT
2023-06-29 56 Continuing Obligation(s) Applied
2023-06-29 222 Continuing Obligation - Maintain Cap Over Contaminated Area BUILDING, PAVEMENT, CONCRETE, & GREENSPACE
2023-06-29 226 Continuing Obligation - Vapor Intrusion Response
2023-06-29 232 Continuing Obligation - Residual Soil Contamination
2023-06-29 99 Miscellaneous Download PDF file JUNE 22, 2023 AND JUNE 29, 2023 DNR REVISIONS TO VAPOR MITIGATION SYSTEM AND VAPOR SAMPLING PLAN
2023-06-29 43 Site Activity Status Update Received Download PDF file FINAL VAPOR MITIGATION SYSTEM & VAPOR PORT DESIGN AND FINAL VAPOR SAMPLING PLAN
2023-06-29 99 Miscellaneous Download PDF file CONDITIONAL APPROVAL FOR VMS DESIGN AND VAPOR SAMPLING PLAN, FORMAL APPROVAL LETTER TO FOLLOW
2023-06-21 43 Site Activity Status Update Received Download PDF file ADDENDUM TO REMEDIAL ACTION AND MATERIALS MANAGMENT PLAN (AC 148, DATED 6/12/2023)
2023-06-21 99 Miscellaneous Download PDF file DNR CORRESPONDENCE WITH CONSULANT AND WITH EPA REGARDING PCB CONTAMINATED SOIL REMOVAL
2023-06-12 148 Remedial Action Design Report Received (fee) Download PDF file FOR RESIDENTIAL REDEVELOPMENT
2023-06-12 854 Materials Management Plan Request Recvd with Fee MOVED ON-SITE; PAID THROUGH AC148 OF THE SAME DATE. DOCUMENTATION INCLUDED WITH AC 148 OF SAME DATE
2023-06-12 710 Database Fee Paid for Soil Continuing Obligation(s)
2023-06-09 43 Site Activity Status Update Received Download PDF file REVISED SUB-SLAB VAPOR MITIGATION SYSTEM & VAPOR PORT DESIGN AND VAPOR SAMPLING PROPOSAL
2023-05-03 99 Miscellaneous Download PDF file DNR COMMENTS FOR VAPOR PORTS AND MITIGATION SYSTEM DESIGN
2023-01-05 43 Site Activity Status Update Received Download PDF file SEMI-ANNUAL REPORT FROM OTHER RP-NEWELL OPERATING CO
2023-01-03 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2022 - 12/31/2022
2022-09-30 35 Site Investigation Workplan (SIWP) Received (non-fee) Download PDF file SITE-SPECIFIC SAMPLING AND ANALYSIS PLAN FOR ADDITIONAL SI VIA AN EPA COMMUNITY ASSESSMENT GRANT
2022-07-29 36 Site Investigation Workplan (SIWP) Approved Download PDF file
2022-07-29 116 PFAS Sampling Required DOCUMENTATION INCLUDED IN AC 36 OF SAME DATE
2022-07-15 99 Miscellaneous Download PDF file CLARIFICATION ON DEFERRING WORK PLAN UNTIL PROPOSED INVESTIGATION WORK IS COMPLETED
2022-07-12 43 Site Activity Status Update Received Download PDF file SEMI-ANNUAL REPORT FROM RAMBOLL ON BEHALF OF NEWELL
2022-07-05 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2022 - 6/30/2022
2022-06-23 135 Site Investigation Workplan (SIWP) Received (fee) Download PDF file
2022-06-23 114 PFAS Scoping Statement Received INCLUDED IN SITE INVESTIGATION WORK PLAN OF SAME DATE
2022-06-14 7 Environmental Consultant Hired Download PDF file RAMBOLL ON BEHALF OF NEWELL OPERATING COMPANY
2022-04-25 43 Site Activity Status Update Received Download PDF file ENVIRONMENTAL WORK TASKS PROPOSAL
2022-04-22 43 Site Activity Status Update Received Download PDF file RESPONSE TO RESPONSIBLE PARTY LETTER
2022-04-19 99 Miscellaneous Download PDF file CLARIFICATIONS ON RESPONSIBLE PARTY AND WIS. ADMIN. CODE NR 700 PROCESS
2022-04-07 198 Request for Additional Information (Fee-Based or Closure) Download PDF file DOCUMENTATION OF VAPOR MITIGATION DESIGN NEEDED FOR THE PROPOSED ELEVATOR
2022-03-25 2 Responsible Party (RP) letter sent Download PDF file NEWELL OPERATING COMPANY
2022-03-16 7 Environmental Consultant Hired Download PDF file FEHR GRAHAM
2022-03-11 43 Site Activity Status Update Received Download PDF file HISTORICAL USE AND OWNERSHIP ASSESSMENT TO DETERMINE POTENTIALLY RESPONSIBLE PARTIES
2022-03-08 97 Technical Assistance Request Received (fee) Download PDF file REVIEW OF SUB-SLAB VAPOR MITIGATION SYSTEM DESIGN FOR NEW BUILDING CONSTRUCTION
2022-03-04 2 Responsible Party (RP) letter sent Download PDF file FOR POSSESSOR WEST RIVER LOFTS, LLC
2022-03-01 43 Site Activity Status Update Received Download PDF file WARRANTY DEED FOR ACQUISITION OF PROPERTY BY WEST RIVER LOFTS LLC
2022-03-01 28 Phase I Environmental Site Assessment (ESA) Rpt Received Download PDF file PART 1 OF 2; BY FEHR GRAHAM ON BEHALF OF SCOTT CRAWFORD INC
2022-03-01 29 Phase II Environmental Site Assessment (ESA) Rpt Received Download PDF file AUTOPOPULATED FROM 28 ENTRY
2022-03-01 28 Phase I Environmental Site Assessment (ESA) Rpt Received Download PDF file PART 2 OF 2
2022-03-01 99 Miscellaneous Download PDF file PROPERTY OWNER CLARIFICATIONS
2022-02-22 1 Notification of Hazardous Substance Discharge Download PDF file
Relationships to Other Activities
Click Activity Below to View Details
Type Related Activity
ERP to General Property 07-36-593045 CITY OF TWO RIVERS
Substances
Substance Type Amt Released Units
Metals Metals
Per- and Polyfluoroalkyl Substances (PFAS ADDED FROM AC120) Industrial Chem
Polychlorinated Biphenyl PCB
Polynuclear Aromatic Hydrocarbons Petroleum
Tetrachloroethene (Perchloroethylene) VOC
Trichloroethylene Industrial Chem
Volatile Organic Compounds VOC
Vapor Intrusion Continuing Obligation(s)
(E) Future Redevelopment of Property – Vapor Control Technology Required for Construction: DNR requires notification prior to new building construction or building modifications. Potential for vapor intrusion exists due to residual contamination. Vapor control technologies are required to be installed or modified, and verified protective unless a vapor evaluation is accepted by DNR.
Responsible Party
NEWELL OPERATING CO 6655 PEACHTREE DUNWOODY RD, ATLANTA, GA 30328
WEST RIVER LOFTS LLC 4201 N 27TH ST, MILWAUKEE, WI 53216
DNR Project Manager
TAUREN BEGGS  tauren.beggs@wisconsin.gov
589295 | 02-36-589295