Click the Location Name or FID below to view the Location Details
page. If additional Activities are present at this location, they may
be accessed from Location Details.
ACTIVITY DETAILS
*** CONTINUING
OBLIGATIONS APPLY ***
Continuing obligations apply to
one or more properties due to remaining contamination. For
information specific to the continuing obligations, review the
documentation below. Before constructing or reconstructing a
water supply well, you need to contact DNR for approval of
well construction specifications.
Records related to the site are
documents that were available at the time the scanned paper or
electronic file was uploaded. Records withheld by the
department due to confidentiality, attorney-client privilege,
and other sensitive records, as well as lab data, may not be
included. Additional records associated with the site may or
may not be accessible through an open records request through
DNR or another state agency (see Jurisdiction above).
Preventive Action Limit (PAL) NR140 Exemption at Closure
2024-12-10
710
Database Fee Paid for Soil Continuing Obligation(s)
REC'D CC PAYMENT $300
2024-12-04
99
Miscellaneous
REVISIONS
2024-12-04
99
Miscellaneous
MW ABANDONMENT FORM
2024-11-26
199
Info. Received or Request Ended (Fee-Based or Closure)
AR Restart
2024-11-25
99
Miscellaneous
REVISIONS
2024-11-19
700
Database Fee Paid for Groundwater Continuing Obligation(s)
REC'D CC PAYMENT $350, FUTURE VAPOR RISK CO
2024-11-08
79
Case Closure Review Request Received
AUTO-ENTERED
20241108_79_Closure_Submit.zip
CompleteNotificationEmail.txt
IncompleteNotificationEmail.txt
2024-11-08
198
Request for Additional Information (Fee-Based or Closure)
AR Pause
2024-10-28
779
Case Closure Review Fee Received
REC'D CK #128322 $1050
2024-09-27
38
Site Investigation Report (SIR) Approved
2024-09-27
118
PFAS Sampling Not Required At This Time
2024-08-30
114
PFAS Scoping Statement Received
2024-07-03
99
Miscellaneous
EMAIL WITH REVISIONS
2024-06-25
99
Miscellaneous
EMAIL
2024-06-04
99
Miscellaneous
NFA REQ
2024-06-04
151
Remedial Action (RA) Documentation Report Received (non-fee)
REMEDIAL ACTION DOCUMENTATION REPORT (NR 724)
2024-04-17
99
Miscellaneous
EMAIL CORRESPONDENCE RE EXCAVATION PROPOSAL
2024-04-12
99
Miscellaneous
DNR COMMENTS ON EXCAVATION PROPOSAL
2024-02-27
99
Miscellaneous
FIGURES
2024-02-20
198
Request for Additional Information (Fee-Based or Closure)
SI REPORT QUESTIONS
2024-02-08
2
Responsible Party (RP) letter sent
RP LETTER SENT
2024-01-18
29
Phase II Environmental Site Assessment (ESA) Rpt Received
SEE AC 137 FOR RPT
2024-01-18
137
Site Investigation Report (SIR) Received (fee)
REC'D CK #1432 $1050, SIR & PHASE II
2024-01-16
1
Notification of Hazardous Substance Discharge
Substances
Substance
Type
Amt Released
Units
Tetrachloroethene (Perchloroethylene)
VOC
Vapor Intrusion Continuing Obligation(s)
(E) Future Redevelopment of Property – Vapor Control Technology Required for Construction: DNR requires notification prior to new building construction or building modifications. Potential for vapor intrusion exists due to residual contamination. Vapor control technologies are required to be installed or modified, and verified protective unless a vapor evaluation is accepted by DNR.
BRRTS data comes from various sources, both internal and external to DNR. There may be omissions and errors in the data and delays in updating new information.