WIDNR on FaceBook  WIDNR on Twitter  WIDNR on YouTube  WIDNR on Instagram  WIDNR on LinkedIn  WIDNR Podcast  WIDNR on Pinterest

ENVIRONMENTAL CLEANUP & BROWNFIELDS REDEVELOPMENT
BRRTS on the Web

Click the Location Name or FID below to view the Location Details page. If additional Activities are present at this location, they may be accessed from Location Details.

ACTIVITY DETAILS

 
02-41-594249 BARREL PLATING SERVICES FMR
Activity Type / Status Jurisdiction
ERP  OPEN DNR RR
Location Name County DNR Region
BARREL PLATING FMR MILWAUKEE SOUTHEAST
Address Municipality
325-327 E RESERVOIR AVE MILWAUKEE
PLSS Description Latitude (WGS84) Longitude (WGS84) Google Maps RR Sites Map
SW 1/4 of the NW 1/4 of Sec 21, T07N, R22E 43.0548068 -87.9075705 Click to view on Google Maps using Lat/Long Click to View RR Sites Map
Additional Activity Details Acres
UNKNOWN
Facility ID PECFA No. EPA ID Start Date End Date
341369710 2024-03-18
Characteristics
Above Ground
Petrol Tank

Drycleaner
PECFA Funds
Eligible

PFAS

ROW Impact

Sediments
Superfund
NPL Site
Underground
Petrol Tank
WI DOT
Site
  PFAS flag
Actions and Documents
Date Code Name File Comment
2025-04-03 805 Historical Waste Site FILL INCLUDES SLAG, COAL, GLASS, BRICK, METAL, WOOD, TILES, POLYSTYRENE FOAM, CINDERS & CONCRETE
2025-04-03 140 Site Investigation Report (SIR) Not Approved Download PDF file ADD'L SOIL, GW AND VAPOR SI NEEDED
2025-02-06 137 Site Investigation Report (SIR) Received (fee) RECVD CK #236988 $1050.00
2025-02-06 39 Remedial Action Options Report (RAOR) Received (non-fee) SEE 137 SAME DATE
2025-02-04 120 PFAS Sampling Completed - Actionable Levels Detected
2025-01-09 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2024 - 12/31/2024
2025-01-03 43 Site Activity Status Update Received Download PDF file SAMPLE RESULTS NOTIFICATION
2024-10-04 43 Site Activity Status Update Received Download PDF file SAMPLE RESULTS NOTIFICATION LETTER
2024-08-09 43 Site Activity Status Update Received Download PDF file SAMPLE RESULTS NOTIFICATION LETTER
2024-06-29 35 Site Investigation Workplan (SIWP) Received (non-fee) Download PDF file
2024-06-29 114 PFAS Scoping Statement Received PFAS SCOPING STATEMENT IN 6/29/2024 SIWP
2024-06-03 99 Miscellaneous INFO REQUESTED & PROVIDED, DRAFT 1999 RPT; RPT ADDED TO BRRTS SEPARATELY
2024-05-29 7 Environmental Consultant Hired Download PDF file TERRACON HIRED AS CONSULTANT, SIWP TO BE SUBMITTED
2024-04-17 99 Miscellaneous Download PDF file DELAY IN RESPONSE TO RP LTR DUE TO POTENTIAL PROPERTY SALE. RESPONSE BY JUNE 1, 2024 OKAY.
2024-03-20 2 Responsible Party (RP) letter sent Download PDF file PROPERTIES DIVIDED WHERE FORMER BARREL PLATING FACILITY WAS LOCATED. NEW RP FOR THIS PROPERTY.
2024-03-20 99 Miscellaneous Download PDF file DISCUSSION WITH RP IN RESPONSE TO RP LTR
2024-03-18 1 Notification of Hazardous Substance Discharge
1999-11-23 43 Site Activity Status Update Received Download PDF file DRAFT SI DATA AND FIGURES
Substances
Substance Type Amt Released Units
Arsenic Metals
Lead (Pb) Metals
Metals (CADMIUM) Metals
Per- and Polyfluoroalkyl Substances (PFAS ADDED FROM AC120) Industrial Chem
Polynuclear Aromatic Hydrocarbons Petroleum
Trichloroethylene Industrial Chem
Volatile Organic Compounds VOC
DNR Project Manager
LINDA MICHALETS  linda.michalets@wisconsin.gov
594249 | 02-41-594249
BOTW Release 4.5 | 5/07/2025 | Release Notes  Help  Disclaimers  Glossary of Terms  Supplemental Pages