NESHONOC P & R DISTRICT: Lake Neshonoc Sediment Trap Evaluation Study

Purpose

The consultant will evaluate two sediment trap locations. Preliminary designs for each trp, including size, depth, volume, and location of each trap, shall be provided on engineering drawings. The two sediment cores and four sediment analyses must betaken from the sediment trap location that will be constructed by the lake district. Sediment analyses parameters which have been provided to the consultant will be included in the analyses. Evaluate spoil areas for the dredged and excavated materials.Preliminary engineering designs shall be provided for the dredge spoil area. An interim report shall be provided to the lake district and DNR providing all information necessary for the lake district to evaluate which sediment trap alternative providesthe most benefit. This report will be due 5/1/92. Estimate cost of constructing traps in two locations. Information will be disseminated to the public by public meetings, summary report mailings, and local newspaper articles. Project results will bereposited at: None provided.

Related Reports

Run Project Summary Report
View Umbrella-Projects
View Related-Projects

Lakes Grant
Large Scale Lake Planning
LPL-121 (3009-02)
1992
Complete
 
Reports and Documents
Lakes Planning Report
 
Activities & Recommendations
Grant Awarded
The consultant will evaluate two sediment trap locations. Preliminary designs for each trp, including size, depth, volume, and location of each trap, shall be provided on engineering drawings. The two sediment cores and four sediment analyses must betaken from the sediment trap location that will be constructed by the lake district. Sediment analyses parameters which have been provided to the consultant will be included in the analyses. Evaluate spoil areas for the dredged and excavated materials.Preliminary engineering designs shall be provided for the dredge spoil area. An interim report shall be provided to the lake district and DNR providing all information necessary for the lake district to evaluate which sediment trap alternative providesthe most benefit.
Lakes Planning Grant
Monitor Water Quality or Sediment
Retention Basin - Create or Improve
Informational Meetings
Develop/Distribute Brochures/Literature
Issue News/Media Release
Project Deliverable
Preliminary engineering designs shall be provided for the dredge spoil area. An interim report shall be provided to the lake district and DNR providing all information necessary for the lake district to evaluate which sediment trap alternative providesthe most benefit. This report will be due 5/1/92. Estimate cost of constructing traps in two locations. Information will be disseminated to the public by public meetings, summary report mailings, and local newspaper articles.
 
Watershed