Lakes Grant
Large Scale Lake Planning
LPL-1035-05
2005
Complete
Lakes Planning Grant
Grant Awarded
The Village of East Troy will study the East Troy impoundment. A report will be produced containing the following elements: 1) bathymetric survey map; 2) results of the sediment depth testing and a sediment depth map; 3) results of two sediment core samples tested for all the standard parameters listed in NR 347; 4) estimation of sediment/contaminant loading with the use of WILMS modeling; 5) results of the wetland delineation; 6) a survey map of the wetland boundaries; 7) evaluation of public access and 8) minutes from two public informational meetings. The report will be the project deliverable.
Project Deliverable
1) bathymetric survey map; 2) results of the sediment depth testing and a sediment depth map; 3) results of two sediment core samples tested for all the standard parameters listed in NR 347; 4) estimation of sediment/contaminant loading with the use of WILMS modeling; 5) results of the wetland delineation; 6) a survey map of the wetland boundaries; 7) evaluation of public access and 8) minutes from two public informational meetings. The report will be the project deliverable.
Informational Meetings
Monitor Water Quality or Sediment
Map Depth of Lake (Bathymetry)