VILLAGE OF EAST TROY: Planning Program for East Troy Pond

Purpose

The Village of East Troy will study the East Troy impoundment. A report will be produced containing the following elements: 1) bathymetric survey map; 2) results of the sediment depth testing and a sediment depth map; 3) results of two sediment core samples tested for all the standard parameters listed in NR 347; 4) estimation of sediment/contaminant loading with the use of WILMS modeling; 5) results of the wetland delineation; 6) a survey map of the wetland boundaries; 7) evaluation of public access and 8) minutes from two public informational meetings. The report will be the project deliverable.

Related Reports

Run Project Summary Report
View Umbrella-Projects
View Related-Projects

Lakes Grant
Large Scale Lake Planning
LPL-1035-05
2005
Complete
 
Reports and Documents
 
Activities & Recommendations
Grant Awarded
The Village of East Troy will study the East Troy impoundment. A report will be produced containing the following elements: 1) bathymetric survey map; 2) results of the sediment depth testing and a sediment depth map; 3) results of two sediment core samples tested for all the standard parameters listed in NR 347; 4) estimation of sediment/contaminant loading with the use of WILMS modeling; 5) results of the wetland delineation; 6) a survey map of the wetland boundaries; 7) evaluation of public access and 8) minutes from two public informational meetings. The report will be the project deliverable.
Lakes Planning Grant
Map Depth of Lake (Bathymetry)
Monitor Water Quality or Sediment
Informational Meetings
Project Deliverable
1) bathymetric survey map; 2) results of the sediment depth testing and a sediment depth map; 3) results of two sediment core samples tested for all the standard parameters listed in NR 347; 4) estimation of sediment/contaminant loading with the use of WILMS modeling; 5) results of the wetland delineation; 6) a survey map of the wetland boundaries; 7) evaluation of public access and 8) minutes from two public informational meetings. The report will be the project deliverable.
 
Watershed