TMDL/303d Projects
Approved TMDL
Wisconsin TMDL
2012
Complete
U.S. EPA approval letter for the Wisconsin River Basin TMDL
U.S. EPA Decision Document for the Wisconsin River Basin TMDL
Approved TMDLs for TP and TSS listings in the Upper and Central Wisconsin River Basins.
Nov 2015 newsletter for the Wisconsin TMDL project.
May newsletter for the Wisconsin TMDL project.
February newsletter for the Wisconsin TMDL project.
November 2014 newsletter for the Wisconsin TMDL project.
Dam on the Wisconsin River below Stevens Point, 1973.
Rock formations along the upper Wisconsin River at Wisconsin Dells.
Wisconsin River from Wyalusing State Park - Taken May 19, 2012.
Photo by the River Alliance of Wisconsin for the RIVER ALLIANCE OF WISCONSIN: Project RED Prevent the Spread & Lwr WI AIS Plan
List of USGS gauging stations funded by this project.
Summer scene along the Lower Wisconsin River. This photo was taken on October 30, 2010 in Helena, Wisconsin, US.
Backwaters of the Lower Wisconsin River.This photo was taken on October 30, 2010 in Lone Rock, Wisconsin, US.
The Wisconsin River near Dekorra, upriver from Lake Wisconsin, 1953.
A winter scene along the Lower Wisconsin River.
Eagles fishing open water on the lower Wisconsin River in winter. This photo was taken on October 30, 2010 in Helena, Wisconsin, US.
This photo was taken on October 30, 2010 in Helena, Wisconsin, US.
Lower Wisconsin River near Muscoda. This photo was taken on October 30, 2010 in Muscoda, Wisconsin, US.
This photo was taken on October 30, 2010 in Helena, Wisconsin, US.
This report is the culmination of several years of effort to develop wasteload allocations for water quality limited segments and seasons on Segment D of the Wisconsin River. The report is structured to give an overview of the segment of river modeled, a general description of the model, the calibration, the verification, and a sensitivity analysis of the verified model.
This report is the culmination of ten years of effort to develop wasteload allocations for water quality limited segments and seasons on Segment BC of the Wisconsin River. The report is structured to give an overview of the segment of river modeled, a general description of the model, the calibration and verification of the model, and a sensitivity analysis of the calibrated model.
Methods and Results of Field Surveys Collected in 1977 and 1978 on the Upper Wisconsin River for the Development of a water quality computer model-Water Quality Modeling of the Upper Wisconsin River for Wasteload Allocation Development
TMDL Development
The Wisconsin TMDL is in development. This large, multi-basin project involves a tremendous effort to gather loading and impact data and modeling to determine sustainable loading rates.
TMDL Development
The Wisconsin TMDL is in development. This large, multi-basin project involves a tremendous effort to gather loading and impact data and modeling to determine sustainable loading rates.
TMDL Actions in Wisconsin
Waters covered by allocations in the Wisconsin River TMDL area that are not impaired. These waters are considered covered by a protection plan because they will become part of the TMDL if ever listed as impaired.