Purpose: The Town of St Joseph is sponsoring a project to complete a feasibility study to determine options, cost estimates for each option and an overall project recommendation for a system that will allow the Town and Rehabilitation District to obtain the necessary DNR permit to pump down the lake level. Project activities include: Feasibility analysis of using drawdown to lower surface water levels and remove phosphorus from the hypolimnion in Bass Lake. Feasibility study team meetings. Project deliverables: All data collected, all outreach and event materials, agendas and minutes from advisory committee and feasibility team meetings. Feasibility Study final report. Special conditions: WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of all data from the project. This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lakes Coordinator.

Related Reports

Run Project Summary Report
View Umbrella-Projects
View Related-Projects

Lakes Grant
Large Scale Lake Planning
LPL168518
2018
Complete
 
Reports and Documents
Barr was retained by the Town of St. Joseph to conduct a feasibility study for the drawdown of Bass Lake water levels in light of new discharge requirements from the Wisconsin Department of Natural Resources (WDNR), including requirements to manage aquatic invasive species (AIS), including zebra mussels, and manage the discharge water quality such that it meets the requirements established by the WDNR.
 
Activities & Recommendations
Grant Awarded
Purpose: The Town of St Joseph is sponsoring a project to complete a feasibility study to determine options, cost estimates for each option and an overall project recommendation for a system that will allow the Town and Rehabilitation District to obtain the necessary DNR permit to pump down the lake level. Project activities include: Feasibility analysis of using drawdown to lower surface water levels and remove phosphorus from the hypolimnion in Bass Lake. Feasibility study team meetings. Project deliverables: All data collected, all outreach and event materials, agendas and minutes from advisory committee and feasibility team meetings. Feasibility Study final report.
 