Grant Details
Aquatic Invasives Control
Date
4/15/2015
Waters Involved
Oak Ridge Lake
Status
Complete
Friends Of The St Croix Wetlands Mngmnt Dist: Fscwmd Cattails: The Friends of the St. Croix Wetland Management District proposes to coordinate with USFWS to reduce infestations of hybrid Cattail on Oak Ridge Lake and associated wetlands in St. Croix County. Major project elements to include: a) USFWS consulting, b) chemical treatment, c) infestation mapping, d) final report.
Grant Details
Aquatic Invasives Control
Date
4/15/2015
Waters Involved
Unnamed
Status
Complete
Friends Of The St Croix Wetlands Mngmnt Dist: Fscwmd Cattails: The Friends of the St. Croix Wetland Management District proposes to coordinate with USFWS to reduce infestations of hybrid Cattail on Oak Ridge Lake and associated wetlands in St. Croix County. Major project elements to include: a) USFWS consulting, b) chemical treatment, c) infestation mapping, d) final report.
Grant Details
Aquatic Invasives Education
Date
2/15/2018
Waters Involved
Bass Lake
Status
Complete
Town Of Saint Joseph: Zebra Mussel Prevention: Purpose: The Town of St Joseph is sponsoring a project to complete a feasibility study to determine options, cost estimates for each option and an overall project recommendation for a system that will allow the Town and Rehabilitation District to obtain the necessary DNR permit to pump down the lake level while preventing the movement of zebra mussels.
Project activities include: Feasibility analysis of removing zebra mussels from water being pumped from Bass Lake to Willow River. Update Lake Management Plan
Project deliverables: All data collected, all outreach and event materials, agendas and minutes from advisory committee and feasibility team meetings. Feasibility Study final report.
Special conditions: WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of all data and maps from the project. This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lakes Coordinator.
Grant Details
Aquatic Invasives Education
Date
3/15/2024
Waters Involved
Bass Lake
Status
Complete
Bass Lake Rehabilitation District: Bass Lake Aquatic Plant Management Plan: The Bass Lake Rehabilitation District (BLRD) is sponsoring a project to create an Aquatic Plant Management Plan (APM Plan) for Bass Lake (St. Croix County).
Activities: 1) Development of APM Plan
Deliverables: 1) APM Plan; 2) Meeting Agendas and Minutes; 3) AIS Monitoring and Results
Conditions;
1) Provide DNR Biologist with draft version of the management plan for review.
2) All monitoring shall follow DNR protocols.
3) Enter data collected into SWIMS database under the grant project number.
This scope summarizes details provided in the application and does not negate tasks and/or deliverables described therein. Data, reports, surveys, and supporting information, including photos, maps and GIS data, must be submitted to the DNR Biologist in electronic format and in any other format they specify.
If a consultant provides a final report, it is recommended that the Grantee provide the DNR Biologist with a draft for comment on report adequacy prior to making a final payment to the consultant. Include electronic copy of the final report along with or prior to submission of grantee's final payment request.
Grant Details
Aquatic Invasives Research Grant
Date
4/1/2012
Waters Involved
Perch Lake
Status
Complete
Golden Sands Rc&D: Weevil Rearing 2&3: Golden Sands RC&D proposes to continue it Milfoil Weevil Mass Rearing Study, building on past work on the Holcombe Flowage in Rusk and Chippewa Counties, and expanding its studies to Perch Lake Wissota in St. Croix County, and the Minong Flowage in Douglas and Washburn Counties. Major project elements to include: 1) Volunteer group training, 2) Weevil acquisition, rearing, and release 3) Sample collection and analysis, 4) development of a comprehensive biological control manual, and 5) Final report.
Grant Details
Clean Boats, Clean Waters
Date
2/15/2016
Waters Involved
Bass Lake
Status
Complete
Bass Lake Rehabilitation District: Bass Lake Rehabilitation District: The Bass Lake Rehabilitation District is sponsoring a Clean Boats Clean Waters project in 2016 at one public boat landing on Bass Lake.
Grant Details
Clean Boats, Clean Waters
Date
2/15/2017
Waters Involved
Bass Lake
Status
Complete
Bass Lake Rehabilitation District: Bass Lake Rehabilitation District 2017 Cbcw: Bass Lake Rehabilitation District is sponsoring a Clean Boats Clean Waters project in 2017 at 1 single public boat landings and 0 public boat landing pairs on BASS LAKE.
Grant Details
Clean Boats, Clean Waters
Date
2/15/2018
Waters Involved
Bass Lake
Status
Complete
Bass Lake Rehabilitation District: Bass Lake Rehabilitation District 2018 Cbcw: Bass Lake Rehabilitation District is sponsoring a Clean Boats Clean Waters project in 2018 at 1 single public boat landings and 0 public boat landing pairs on BASS LAKE.
Grant Details
Clean Boats, Clean Waters
Date
2/15/2019
Waters Involved
Bass Lake
Status
Complete
Bass Lake Rehabilitation District: Bass Lake Rehabilitation District 2019 Cbcw: Bass Lake Rehabilitation District is sponsoring a Clean Boats Clean Waters project in 2019 at 1 single public boat landings and 0 public boat landing pairs on BASS LAKE (BASS LAKE LANDING, N/A).
Grant Details
Clean Boats, Clean Waters
Date
2/15/2020
Waters Involved
Bass Lake
Status
Complete
Bass Lake Rehabilitation District: Bass Lake Rehabilitation District 2020 Cbcw: Bass Lake Rehabilitation District is sponsoring a Clean Boats Clean Waters project in 2020 at 1 single public boat landings and 0 public boat landing pairs on BASS LAKE (BASS LAKE LANDING, N/A).
Grant Details
Lake Protection Grant
Date
9/1/1995
Waters Involved
Bass Lake
Status
Complete
St. Croix County: Lco-Bass Lake Ordinance Enhansement - County Zoning Position: St. Croix County proposes to hire a half time staff person for five years who will be located in the County Zoning office and will perform the following zoning ordinance enhancement activities for the Bass Lake area:
1. Review and revise permits and other data gathering forms.
2. Review and revise permit issuance procedures.
3. Develop septic certification procedures for home additiond and improvements.
4. Assist the County/townships with developing and implementing tasks 1 - 3.
5. Assist the developing and implementing inspection and enforcement procedures; assist county and townships with implementation.
6. Assist the townships in improving record keeping methods in relation to land ownership changes and property development.
7. Identify and implement training needed for town and county regulators.
8. Assist with bringing sites with zoning violations into compliance with shoreland zoning regulations.
9. Assist in implementing recommendations that follow from the septic plume groundwater study.
Grant Details
Lake Protection Grant
Date
4/15/2017
Waters Involved
Bass Lake
Status
Complete
Bass Lake Rehabilitation District: Lmi-Bass Lake Management Plan Implementation: : Bass Lake Management District is sponsoring a Lake Management Planning Implementation project aimed at reducing phosphorus loads and protecting and improving diverse aquatic life through shoreland restoration projects and BMP installations.
Project activities include: Conduct site analysis and design for storm water runoff management, fisheries, and shoreland restoration practices. Provide technical assistance to develop designs and how-to information (DIY and/or landscapers). Establish and install BMP at demonstration sites. Promote installation of shoreland best management practices using demonstration sites as examples. Install 40 fish cribs.
Project deliverables: All data collected, a list and map of demonstration sites and fish cribs, before and after photos of restoration sites, individual site analysis reports, all outreach and event materials, agendas and minutes from advisory committee meetings.
Special conditions: WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of all data and maps from the project. This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lakes Coordinator.
Grant Details
Lake Protection Grant
Date
9/1/2007
Waters Involved
Cedar Lake
Status
Complete
Cedar Lake Protection & Rehabilitation Dist: Lmi-Cedar Df Study: Cedar Lake PRD proposes to contract with the U.S. Army Corps of Engineers to conduct a study of Phosphorus (P) loading within Cedar Lake in St. Croix County. Major project elements to include 1) sediment sampling and analysis, 2) water quality sampling and analysis, 3) algae collection and analysis, 4) Lake modeling, 5) study of phosphorus loading, 6) studies of aeration and alum treatment as means of controlling internal loading, 7) comprehensive watershed ag land use assessment, 8) Final report.
Grant Details
Lake Protection Grant
Date
4/15/2015
Waters Involved
Cedar Lake
Status
Complete
Cedar Lake Protection & Rehabilitation Dist: Lmi-Cedar Alum: The Cedar Lake P&RD proposes to apply an initial Alum treatment to Cedar Lake in St. Croix County to reduce phosphorus loading from in-lake sediments, thereby reducing algal blooms and allowing for restoration of the lake's native plant community. Major project elements to include a) Initial alum treatment, b) monitoring, and c) final report.
Grant Details
Lake Protection Grant
Date
4/8/2005
Waters Involved
Hatfield Lake
Status
Complete
City Of New Richmond: Acq-Hatfield Lake Acquisition: The City of New Richmond proposes to purchase the 75.67 acre Carpenter Family parcel on Hatfield Lake in St. Croix County for Lake Protection purposes. Major project elements to include 1) acquisition costs and, 2) associated acquisition costs.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Hatfield Lake
Status
Complete
City Of New Richmond: Acq-Hatfield Lake Acquisition: The City of New Richmond proposes to purchase the 75.67 acre Carpenter Family parcel on Hatfield Lake in St. Croix County for Lake Protection purposes. Major project elements to include 1) acquisition costs and, 2) associated acquisition costs.
Grant Details
Lake Protection Grant
Date
3/15/2021
Waters Involved
Hatfield Lake
Status
Complete
City Of New Richmond: Res - New Richmond-Hatfield Aeration System: Project Scope and Description of Deliverables - CAOS-2000 Character Limit
City of New Richmond is sponsoring a project to purchase and install an aeration system and monitor water quality in Hatfield Lake.
Project activities include: 1) Water quality assessment; 2) Purchase and install aeration equipment; 3) Develop annual report and final report.
Project deliverables include: 1) Water quality data entered into DNR SWIMS database; 2) Aeration equipment; 3) final report that includes final designs, map of aeration equipment, dissolved oxygen results, and pre/post site photos.
Specific project conditions: 1) All necessary permits shall be obtained prior to commencing work; 2) Final project/system designs must be approved by DNR Fish Biologist before construction begins; 3) water quality monitoring data shall be entered in SWIMS database
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of annual summary, final report, all maps, data and GIS from project.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.
If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Lake Protection Grant
Date
3/15/2022
Waters Involved
Lake Menomin
Status
Complete
Wisconsin Farmer Union: 319 Match Lmi-Farmer-Led Watershed Council Coordinator: Project Scope
Wisconsin Farmer\2019s Union is sponsoring a project to provide staffing support to farmer led councils and increase adoption of best management practices.
Project final deliverables include: Final report including maps, practices, load reductions, farmer survey results, outreach events summary.
Specific project activities include: mapping conservation practices, tracking practices and calculating load reductions, farmer survey, outreach events, press releases, funding for full time staff to coordinate farmer led councils
Special Conditions:
1) With each reimbursement request, the grantee must provide:
a. Complete Form 9300-230, titled Grant Partner Financial Data Report.
b. A list of practices to reduce nonpoint source pollution installed during the period for which you are seeking reimbursement. For each practice, include the date installed, cost and estimated load reductions for N, P, and Sediment lb/yr. Department staff may be contacted for technical assistance.
c. A 1- 2 paragraph narrative description of project status, including project milestones, accomplishments, and roadblocks encountered.
2) Draft sociological surveys must be reviewed and approved by the Department before being initiated.
3) The DNR logo shall be used for promotion and publicity and DNR recognized as a funding source.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.
Grant Details
Lake Protection Grant
Date
4/15/2019
Waters Involved
Lake Saint Croix
Status
Complete
St. Croix County: Lmi Lake St. Croix Tmdl Civic Engagement Initiative: St. Crois County is sponsoring a project to build civic engagement and coordinate local implementatin efforts and partnerships within the county.
Project Activities: 1. Hire Staff person to build organizational capacity and coordinate watershed management work in St.Croix Co. 2) Conduct trainings and education events. 3. provide incentives for cover crops and 4. promote water quality and habitat resotriation programs
Project Deliverables:
A postion description, maps and GIS fiiles produced, copies of education materials and presentations developed and an annual progress report that docments the progress towards achieving the project goals as described within the appliciation.
Specific poject conditions: This scope summarizes the project detail provided in the application and does not supersede the tasks/deliverables described therein. The grant sponsor shall submit all data, records and reports, including GIS based maps digital images, to the Department in a format specified by the regional Lakes Biologist.
Grant Details
Lake Protection Grant
Date
3/15/2022
Waters Involved
Lake Saint Croix
Status
Complete
St. Croix County: Lake St. Croix Tmdl Civic Engagement Initiative Phase Ii:
Project Scope and Description of Deliverables
St. Croix County is sponsoring a project to build civic engagement and coordinate local implementation efforts and partnerships within the county.
Project activities:
1)Hire a staff person to build organizational capacity and coordinate watershed management work in St. Croix County, 2) conduct trainings and education events, and 3) promote water quality and habitat restoration programs
Project deliverables include:
A position description, maps and GIS files produced, copies of education materials and presentations developed, and an annual progress report that documents the progress towards achieving the project goals as described within the application.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.
Grant Details
Lake Protection Grant
Date
3/15/2022
Waters Involved
Lake Saint Croix
Status
Complete
Wisconsin Farmer Union: 319 Match Lmi-Farmer-Led Watershed Council Coordinator: Project Scope
Wisconsin Farmer\2019s Union is sponsoring a project to provide staffing support to farmer led councils and increase adoption of best management practices.
Project final deliverables include: Final report including maps, practices, load reductions, farmer survey results, outreach events summary.
Specific project activities include: mapping conservation practices, tracking practices and calculating load reductions, farmer survey, outreach events, press releases, funding for full time staff to coordinate farmer led councils
Special Conditions:
1) With each reimbursement request, the grantee must provide:
a. Complete Form 9300-230, titled Grant Partner Financial Data Report.
b. A list of practices to reduce nonpoint source pollution installed during the period for which you are seeking reimbursement. For each practice, include the date installed, cost and estimated load reductions for N, P, and Sediment lb/yr. Department staff may be contacted for technical assistance.
c. A 1- 2 paragraph narrative description of project status, including project milestones, accomplishments, and roadblocks encountered.
2) Draft sociological surveys must be reviewed and approved by the Department before being initiated.
3) The DNR logo shall be used for promotion and publicity and DNR recognized as a funding source.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.
Grant Details
Lake Protection Grant
Date
1/27/1997
Waters Involved
Perch Lake
Status
Complete
St. Croix County: Acq-St. Croix County Perch Lake Acquisition: St. Croix County shall participate in the Lake Protection Grant Program by purchasing approximately 67.05 acres of land in the Perch Lake watershed for lake protection purposes.
Grant Details
Lake Protection Grant
Date
9/1/1997
Waters Involved
Perch Lake
Status
Complete
St. Croix County: Acq-St. Croix County Perch Lake Acquisitioin Ii: St. Croix County will acquire 19.8 acres with all rights to land onPerch Lake that will expsnd it's day-use park called Homestead PArklands. The county purchase of the Onstott property will include 100 feet of shoreline at the north end of the property on Perch Lake.
268 feet of shoreline on Perch Lake at the south end of the Onstott property will be protected with the purchase of a conservation easement on 9.2 acres of the property. This prroperty will be referred to as the conservation easement.
These two acquisitions will protect an additional 368 feet of lake front giving more protection to Perch Lake and better management of the ecosystem.
Grant Details
Lake Protection Grant
Date
9/1/1999
Waters Involved
Perch Lake
Status
Complete
St. Croix County: Res-St. Croix Co Homestead Parklands On Perch Lake: St. Croix Co. proposes to construct a main park entrance road, one-way park access roads to and from Perch Lake, six parking areas and two infiltration basins. Grading and erosion control measures are designed to protect the water quality of Perch Lake.
Grant Details
Lake Protection Grant
Date
3/15/2022
Waters Involved
Red Cedar River
Status
Complete
Wisconsin Farmer Union: 319 Match Lmi-Farmer-Led Watershed Council Coordinator: Project Scope
Wisconsin Farmer\2019s Union is sponsoring a project to provide staffing support to farmer led councils and increase adoption of best management practices.
Project final deliverables include: Final report including maps, practices, load reductions, farmer survey results, outreach events summary.
Specific project activities include: mapping conservation practices, tracking practices and calculating load reductions, farmer survey, outreach events, press releases, funding for full time staff to coordinate farmer led councils
Special Conditions:
1) With each reimbursement request, the grantee must provide:
a. Complete Form 9300-230, titled Grant Partner Financial Data Report.
b. A list of practices to reduce nonpoint source pollution installed during the period for which you are seeking reimbursement. For each practice, include the date installed, cost and estimated load reductions for N, P, and Sediment lb/yr. Department staff may be contacted for technical assistance.
c. A 1- 2 paragraph narrative description of project status, including project milestones, accomplishments, and roadblocks encountered.
2) Draft sociological surveys must be reviewed and approved by the Department before being initiated.
3) The DNR logo shall be used for promotion and publicity and DNR recognized as a funding source.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.
Grant Details
Lake Protection Grant
Date
4/15/2019
Waters Involved
Saint Croix River
Status
Complete
St. Croix County: Lmi Lake St. Croix Tmdl Civic Engagement Initiative: St. Crois County is sponsoring a project to build civic engagement and coordinate local implementatin efforts and partnerships within the county.
Project Activities: 1. Hire Staff person to build organizational capacity and coordinate watershed management work in St.Croix Co. 2) Conduct trainings and education events. 3. provide incentives for cover crops and 4. promote water quality and habitat resotriation programs
Project Deliverables:
A postion description, maps and GIS fiiles produced, copies of education materials and presentations developed and an annual progress report that docments the progress towards achieving the project goals as described within the appliciation.
Specific poject conditions: This scope summarizes the project detail provided in the application and does not supersede the tasks/deliverables described therein. The grant sponsor shall submit all data, records and reports, including GIS based maps digital images, to the Department in a format specified by the regional Lakes Biologist.
Grant Details
Lake Protection Grant
Date
3/15/2022
Waters Involved
Saint Croix River
Status
Complete
St. Croix County: Lake St. Croix Tmdl Civic Engagement Initiative Phase Ii:
Project Scope and Description of Deliverables
St. Croix County is sponsoring a project to build civic engagement and coordinate local implementation efforts and partnerships within the county.
Project activities:
1)Hire a staff person to build organizational capacity and coordinate watershed management work in St. Croix County, 2) conduct trainings and education events, and 3) promote water quality and habitat restoration programs
Project deliverables include:
A position description, maps and GIS files produced, copies of education materials and presentations developed, and an annual progress report that documents the progress towards achieving the project goals as described within the application.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.
Grant Details
Lake Protection Grant
Date
3/15/2022
Waters Involved
Saint Croix River
Status
Complete
Wisconsin Farmer Union: 319 Match Lmi-Farmer-Led Watershed Council Coordinator: Project Scope
Wisconsin Farmer\2019s Union is sponsoring a project to provide staffing support to farmer led councils and increase adoption of best management practices.
Project final deliverables include: Final report including maps, practices, load reductions, farmer survey results, outreach events summary.
Specific project activities include: mapping conservation practices, tracking practices and calculating load reductions, farmer survey, outreach events, press releases, funding for full time staff to coordinate farmer led councils
Special Conditions:
1) With each reimbursement request, the grantee must provide:
a. Complete Form 9300-230, titled Grant Partner Financial Data Report.
b. A list of practices to reduce nonpoint source pollution installed during the period for which you are seeking reimbursement. For each practice, include the date installed, cost and estimated load reductions for N, P, and Sediment lb/yr. Department staff may be contacted for technical assistance.
c. A 1- 2 paragraph narrative description of project status, including project milestones, accomplishments, and roadblocks encountered.
2) Draft sociological surveys must be reviewed and approved by the Department before being initiated.
3) The DNR logo shall be used for promotion and publicity and DNR recognized as a funding source.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.
Grant Details
Lake Protection Grant
Date
3/15/2022
Waters Involved
Tainter Lake
Status
Complete
Wisconsin Farmer Union: 319 Match Lmi-Farmer-Led Watershed Council Coordinator: Project Scope
Wisconsin Farmer\2019s Union is sponsoring a project to provide staffing support to farmer led councils and increase adoption of best management practices.
Project final deliverables include: Final report including maps, practices, load reductions, farmer survey results, outreach events summary.
Specific project activities include: mapping conservation practices, tracking practices and calculating load reductions, farmer survey, outreach events, press releases, funding for full time staff to coordinate farmer led councils
Special Conditions:
1) With each reimbursement request, the grantee must provide:
a. Complete Form 9300-230, titled Grant Partner Financial Data Report.
b. A list of practices to reduce nonpoint source pollution installed during the period for which you are seeking reimbursement. For each practice, include the date installed, cost and estimated load reductions for N, P, and Sediment lb/yr. Department staff may be contacted for technical assistance.
c. A 1- 2 paragraph narrative description of project status, including project milestones, accomplishments, and roadblocks encountered.
2) Draft sociological surveys must be reviewed and approved by the Department before being initiated.
3) The DNR logo shall be used for promotion and publicity and DNR recognized as a funding source.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Unnamed
Status
Complete
Star Prairie Land Preservation Trust: Acq-Cedar Lake (Menke) Acquis. Costs: The Trust seeks $11,567 in reimbursement for costs associated with the acquisition (via donation) of 63 acres on Cedar Lake In St. Croix County.
Grant Details
Lake Protection Grant
Date
9/1/2000
Waters Involved
Whitefish Lake
Status
Complete
Whitefish Lake Conservation Organization, In: Res-Renewal & Retention Of Native Vegetation: The Whitefish Lake Property Owners Association, Inc. will implement a lakewide project to renew and protect vegetation that extends landward and lakeward from the ordinary high water mark of Whitefish Lake. This program will provide for an initial site evaluation/assissment of shoreline properities with the potential for shoreline renewal and /or protection of native vegetation. Cost sharing will be provided for site assessment and evaluation, site design for restoration, and preparation/planting of vegetation. Shallow water areas contiguous with renewal sites will be protected as a "no disturbance zone". The project goal is to renew native vegetation on 45 sites (1/2 of current development) and retain and protect native vegetation on the remaining sites. A$3,000 cost share cap will be implemented per individual renewal site. All properties participating in this program will receive a departmnet approved deed restriction that permanently establishes the vegetative buffer on the parcel. Shoreland restoration projects will be designed and installed in accordance with the NRCS Best Management Practices Definition and Conditions.
Participants in this program will post their property with signs and will allow other lakeshore owners to visit their property for educational purposes. Additional activities will include an information and education program involving Whitefish Lake residents, local and county governments, other lake associations, school children, and conservation groups.
Project deliverables include a final report listing project accomplishments including the number of parcels or lots participating in the program. The Department of Natural Resources will be provided with a paper copy and an electonic copy of all project products. Project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper article(s).
Grant Details
Large Scale Lake Planning
Date
4/1/1996
Waters Involved
Bass Lake
Status
Complete
Bass Lake Rehabilitation District: Bass Lake Flood Mitigation Planning - Mapping: The Bass Lake Rehabilitation District proposes to perform the mapping phase of flood mitigation planning for Bass Lake. A map will be produced suitable for use in the plan development phase. The sponsor will disseminate information about the project results to the public by newsletter, public meeting, and local newspaper article. The sponsor will also provide the Department of Natural Resources with a paper copy and an electronic copy of the project's final report. END.
Grant Details
Large Scale Lake Planning
Date
4/1/1996
Waters Involved
Bass Lake
Status
Complete
Bass Lake Rehabilitation District: Bass Lake Flood Mitigation Planning - Plan Development: The Bass Lake Rehabilitation District proposes to prepare a flood mitigation plan for Bass Lake. Project activities include identifying structures, property, and septic systems below a set elevation, identifying acquisition and relocation costs, and identifying alternatives to maintain lake elevation above an established elevation. The sponsor will prepare a final report summarizing the project results and provide the Department of Natural Resources with a paper copy and an electronic copy of the report. The sponsor will also disseminate information to the public about the project by newsletter, public meeting, local newspaper article, and the Flood Mitigation Plan. end.
Grant Details
Large Scale Lake Planning
Date
4/1/2008
Waters Involved
Bass Lake
Status
Complete
Bass Lake Rehabilitation District: Bass Plan Update: The Bass Lake Rehabilitation District proposes to develop a plan to improve water quality, habitat and recreational use of Bass Lake in St. Croix County. Major project elements to include: 1) formation of planning team, 2) socialogical survey, 3) review of existing data and ordinances 4) land use mapping, 5) plan development.
Grant Details
Large Scale Lake Planning
Date
2/15/2015
Waters Involved
Bass Lake
Status
Complete
St. Croix County: Perch Plan, Bass Update: The St. Croix County Community Development Department proposes to create a comprehensive management plan for Perch Lake and update the management plan for Bass Lake. Major project elements to include: 1) Sociological survey, 2) Review of existing studies, 3) Updated land use mapping, 4) Ordinance review, 5) Plan development, update, 6) Final report.
Grant Details
Large Scale Lake Planning
Date
2/15/2018
Waters Involved
Bass Lake
Status
Complete
Town Of Saint Joseph: Bass Lake Groundwater Withdrawl Feasibility Study: Purpose: The Town of St Joseph is sponsoring a project to complete a feasibility study to determine options, cost estimates for each option and an overall project recommendation for a system that will allow the Town and Rehabilitation District to obtain the necessary DNR permit to lower the lake level through groundwater withdrawal.
Project activities include: Feasibility analysis of pulling groundwater to lower surface water levels on Bass Lake. Feasibility study team meetings.
Project deliverables: All data collected, all outreach and event materials, agendas and minutes from advisory committee and feasibility team meetings. Feasibility Study final report.
Special conditions: WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of all data and maps from the project. This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lakes Coordinator.
Grant Details
Large Scale Lake Planning
Date
2/15/2018
Waters Involved
Bass Lake
Status
Complete
Town Of Saint Joseph: Bass Lake Surface Water Drawdown Feasibility Study: Purpose: The Town of St Joseph is sponsoring a project to complete a feasibility study to determine options, cost estimates for each option and an overall project recommendation for a system that will allow the Town and Rehabilitation District to obtain the necessary DNR permit to pump down the lake level.
Project activities include: Feasibility analysis of using drawdown to lower surface water levels and remove phosphorus from the hypolimnion in Bass Lake. Feasibility study team meetings.
Project deliverables: All data collected, all outreach and event materials, agendas and minutes from advisory committee and feasibility team meetings. Feasibility Study final report.
Special conditions: WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of all data from the project. This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lakes Coordinator.
Grant Details
Large Scale Lake Planning
Date
3/15/2021
Waters Involved
Bass Lake
Status
Complete
Bass Lake Rehabilitation District: Bass Lake Prd-Pumping Strategy: Bass Lake Rehabilitation District is sponsoring a project to develop a water pumping strategy for Bass Lake that accounts for downstream receiving waters.
Deliverables: 1) all data collected 2) a strategy and methodology for pumping and removal of water from Bass Lake.
Activities: 1) Develop parameters, methods, timing and duration for pumping 2) list of quality testing parameters needed for a pumping strategy.
Conditions: 1) All data is entered into DNR SWIMS database 2) All sampling completed with Department approved protocols
This Scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specificd by the regional Lakes Biologist.
If a consultant is used to provide the final report, it is recommended that the Grantee provides the DNR Lake Coordinator with a draft report for review so that a determination on the adequacy of the report can be determined. This should be completed prior to making final payment to the consultant. DNR is to receive both paper and electronic .pdf copies of the final report along wiht or prior to submission of the grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Lake Saint Croix
Status
Complete
St. Croix County: St. Croix Basin Nutrient Mon. Phase 1: St. Croix County LCD proposes to contract with the US Geological Survey to measure nutrient loading in Lake St. Croix tributaries. Yhis project represents Phase One of five planned. Project activities will include 1) Measurement of nitrogen, phosphorous, chlorides and sediment loadings in the Kinnickinnic, Willow and Apple Rivers from Oct. 1, 1998 to Sept. 30, 1999. Seasonal and weekly loadings will be provided for nitrogen, phosphorous, chlorides, and sediments. The data will be distributed via internet and annual reports by the US Geological Survey, and will be made available electronically to the Department of Natural Resources and the Minnesota Pollution Control Agency.
Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Lake Saint Croix
Status
Complete
St. Croix County: St. Croix Basin Nutrient Mon. Phase 2: St. Croix County LCD proposes to contract with the US Geological Survey to measure nutrient loading in Lake St. Croix tributaries. This project represents Phase Two of five planned. Project activities will include 1) Stream flow guaging on the Kinnickinnic, Willow and Apple Rivers from Oct. 1, 1998 to Sept. 30, 1999. 2) Weekly sampling for nutrients and sedments. The data will be distributed via internet and annual reports by the US Geological Survey, and will be made available electronically to the Department of Natural Resources and the Minnesota Pollution Control Agency
Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Lake Saint Croix
Status
Complete
St. Croix County: St. Croix Basin Nutrient Mon. Phase 3: St. Croix County LCD proposes to contract with the US Geological Survey to measure nutrient loading in Lake St. Croix tributaries. This project represents Phase Three of five planned. Project activities will include 1) Stream flow guaging on the Kinnickinnic, Willow and Apple Rivers. 2) Weekly sampling for nutrients and sedments. The data will be distributed via internet and annual reports by the US Geological Survey, and will be made available electronically to the Department of Natural Resources and the Minnesota Pollution Control Agency
Grant Details
Large Scale Lake Planning
Date
10/1/1999
Waters Involved
Lake Saint Croix
Status
Complete
St. Croix County: St. Croix Basin Nutrient Monitoring, Model And Plan, Phase 5: St. Croix County LCD proposes to contract with the US Geological Survey to measure nutrient loading in Lake St. Croix tributaries. This project represents Phase Four of five planned. Project activities will include 1) Stream flow guaging on the Kinnickinnic, Willow and Apple Rivers. 2) Weekly sampling for nutrients and sedments. The data will be distributed via internet and annual reports by the US Geological Survey, and will be made available electronically to the Department of Natural Resources and the Minnesota Pollution Control Agency.
Grant Details
Large Scale Lake Planning
Date
10/1/1999
Waters Involved
Lake Saint Croix
Status
Complete
St. Croix County: St. Croix Basin Nutrient Monitoring, Modeling & Plan Phase 4: St. Croix County LCD proposes to contract with the US Geological Survey to measure nutrient loading in Lake St. Croix tributaries. This project represents Phase Four of five planned. Project activities will include 1) Stream flow guaging on the Kinnickinnic, Willow and Apple Rivers. 2) Weekly sampling for nutrients and sedments. The data will be distributed via internet and annual reports by the US Geological Survey, and will be made available electronically to the Department of Natural Resources and the Minnesota Pollution Control Agency
Grant Details
Large Scale Lake Planning
Date
10/1/2001
Waters Involved
Lake Saint Croix
Status
Complete
City Of Prescott: Lake St.Croix Planning Project- Phase Ii: The objectives of Phase II of this planning project include such things as:
1. Preserver and enhance storm water quality
2. Preserve the natural and beneficial functions of the natural drainage
3. Solve/ prevent runoff problems
4. Solve drainage problems
5. Develop City storm water management ordinance.
The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.
Grant Details
Large Scale Lake Planning
Date
10/1/2001
Waters Involved
Lake Saint Croix
Status
Complete
City Of Prescott: Lake St.Croix Planning Project-Phase 1: The primary goal of the project is to improve water in Lake St.Croix through inventory, testing, modeling, and analysis of hydrologic and biological data, which will provide a foundation for development of a lake/watershed and water quality management master plan (LWMMP) for the City of Prescott, Wisconsin. The project goals include:
1. Meetings
2. Background Data Collection
3. Field Reconnaissance Survey
4. Field Data Collection/ Inventory Work
5. Define Drainage basins
6. Categorize and Map Land Uses
7. Identify Existing Biological Communities
8. Identify Existing Biological Communities
9. Characterize the Quality of Stormwater Discharges
The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.
Grant Details
Large Scale Lake Planning
Date
4/1/2002
Waters Involved
Lake Saint Croix
Status
Complete
City Of Prescott: Lake St.Croix Planning Project - Phase Iii: The City of Prescott proposes to finsh out the work that has been done in previous grants and phases. The project activity includes the final report.
The Department will be provided with both a paper and electronic copy of the final report.
Grant Details
Large Scale Lake Planning
Date
3/15/2024
Waters Involved
Lake Saint Croix
Status
Complete
Wild Rivers Conservancy St Croix & Namekagon: Comp - Lake St. Croix 9 Key Element Plan Update: Wild Rivers Conservancy of the St. Croix & Namekagon is sponsoring a project to update the 9 Key Element Plan for Lake St. Croix TMDL.
Activities: Partnership meetings, 9 key plan development
Deliverables: 9 key element plan
Conditions: N/A
This scope summarizes details provided in the application and does not negate tasks and/or deliverables described therein. Data, reports, surveys, and supporting information, including photos, maps and GIS data, must be submitted to the DNR Biologist in electronic format and in any other format they specify.
If a consultant provides a final report, it is recommended that the Grantee provide the DNR Biologist with a draft for comment on report adequacy prior to making a final payment to the consultant. Include electronic copy of the final report along with or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
3/15/2024
Waters Involved
Lake Saint Croix
Status
Complete
Wild Rivers Conservancy St Croix & Namekagon: Comp - Lake St. Croix Tmdl Progress Report: Wild Rivers Conservancy of the St. Croix & Namekagon is sponsoring a project to develop a Lake St. Croix TMDL Progress Report
Activities: compile total phosphorus load reductions from the past 10 years, launch a campaign for clean water in the St. Croix watershed, create progress report
Deliverables: Lake St. Croix TMDL Progress Report
Conditions: N/A
This scope summarizes details provided in the application and does not negate tasks and/or deliverables described therein. Data, reports, surveys, and supporting information, including photos, maps and GIS data, must be submitted to the DNR Biologist in electronic format and in any other format they specify.
If a consultant provides a final report, it is recommended that the Grantee provide the DNR Biologist with a draft for comment on report adequacy prior to making a final payment to the consultant. Include electronic copy of the final report along with or prior to submission of grantee's final payment request
Grant Details
Large Scale Lake Planning
Date
12/20/1990
Waters Involved
Mallalieu Lake
Status
Complete
City Of Hudson: Lake Mallalieu Water Quality Data Collection & Analysis: 1) Comprehensive mapping of Lake Mallalieu drainage basin topography (including slopes analysis), soils, and land uses, (as described on pgs. 2-3 of 'professional services description' in application). 2) Update bathymetric map of lake, (map will beused as base for aquatic plant survey). 3) Research existing law and enforcement alternatives related to septic systems. 4) Pursue existing research into groundwater pollution. 5) Water quality monitoring to be conducted at one site during springturnover and five times during the summer (June - Sept.). Sampling parameters and protocol as described on pgs. 1-3 of Barr Engineering proposal in application. In addition fecal coliform sampling is to be conducted with each monitoring session (totalof 6 times). 6) Detailed macrophyte survey will be done according to DNR protocols and shall include mapping of the distribution of purple loosestrife within the lake and its riparian borders. 7) Maintain public awareness through Lakes Associationnewsletter, periodic attendance at public meetings, and newspaper and TV an/or radio press releases. 8) Prepare and distribute interim general report to include all data collected during project. Data reporting format to be worked out in consultation
Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Mallalieu Lake
Status
Complete
Lake Mallalieu Association: Lake Mallalieu Lake Management Plan: The Lake Mallalieu Association proposes to develop a comprehensive lake management plan for Lake Mallalieu in St. Croix County. The project activities include; 1) Develop lake management plan, 2) Conduct in-lake water quality assessments, and 3) Begin to develop watershed management strategies. The Department of Natural Resources will be provied with both a aperp copy and an electronic copy of the final report. The project results will be disseminated to the public by public meetings, news letters, fact sheets, public display of final report. A comprehensive management plan will be completed and available to the public for review.
Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Mallalieu Lake
Status
Complete
Lake Mallalieu Association: Lake Mallalieu Water Quality Plan: The Lake Mallalieu Association proposes to develop water quality goals and strategies for Lake Mallalieu. Major project elements to include: 1) water quality sampling and analysis, 2) sediment core sampling and analysis, 3) development of nutrient loading/water quality model for the impoundment, 4) establishment of goals and strategies, and 5) integration of report into overall lake management plan. The Department of Natural Resources will be provided both paper and electronic copies of the report. Project results will be shared with the public through newsletter mailings, public meetings and local press articles. Copies of the report will also be made available at local government offices and libraries.
Grant Details
Large Scale Lake Planning
Date
10/1/2006
Waters Involved
Mallalieu Lake
Status
Complete
City Of Hudson: Mallalieu Stormwater Assessment: The City of Hudson proposes to deliniate the storm sewershed for Lake Mallalieu in St. Croix County and to study the feasibility of stormwater treatment alternatives. Major project elements to include: 1) Storm sewer inventory and mapping, 2) Modeling, assessement and treatment selection, 3) reports and meetings to share information.
Grant Details
Large Scale Lake Planning
Date
4/1/2010
Waters Involved
Mallalieu Lake
Status
Complete
St. Croix County: Mallalieu Lake Plan 1: The St. Croix Co. Land and Water Conservation Department proposes to develop a lake management plan for Lake Mallalieu in St. Croix County. Major project elements to include:
1) Stakeholder group, 2) Surveys, 3) Soil sampling, 4) Land use inventory, 5) Plan development, 6) Ordinance development and enactment.
Grant Details
Large Scale Lake Planning
Date
4/1/2010
Waters Involved
Mallalieu Lake
Status
Complete
St. Croix County: Mallalieu Lake Plan 2: The St. Croix Co. Land and Water Conservation Department proposes to develop a storm water action plan for Lake Mallalieu in St. Croix County. Major project elements to include: 1) Stakeholders group, 2) Surveys, 3) Monitoring, 4) Outreach/Plan Implementation
Grant Details
Large Scale Lake Planning
Date
4/1/2010
Waters Involved
Mallalieu Lake
Status
Proposed
St. Croix County: Mallalieu Lake Plan 1: The St. Croix Co. Land and Water Conservation Department proposes to develop a lake management plan for Lake Mallalieu in St. Croix County. Major project elements to include:
1) Stakeholder group, 2) Surveys, 3) Soil sampling, 4) Land use inventory, 5) Plan development, 6) Ordinance development and enactment.
Grant Details
Large Scale Lake Planning
Date
4/1/2010
Waters Involved
Mallalieu Lake
Status
Proposed
St. Croix County: Mallalieu Lake Plan 2: The St. Croix Co. Land and Water Conservation Department proposes to develop a storm water action plan for Lake Mallalieu in St. Croix County. Major project elements to include: 1) Stakeholders group, 2) Surveys, 3) Monitoring, 4) Outreach/Plan Implementation
Grant Details
Large Scale Lake Planning
Date
3/15/2021
Waters Involved
Mallalieu Lake
Status
Complete
Lake Mallalieu Association: Comp - Lake Mallalieu-Lake Management Plan: Project Scope and Description of Deliverables (CAOS-2000 Character Limit)
The Lake Mallalieu Association, Incorporated is sponsoring a project to develop a Lake Management Plan for Lake Mallalieu.
Project final deliverables include: all data collected, agendas and minutes for planning meetings, and a lake management plan that includes methodologies, results, and management alternatives discussion with an implementation plan.
Specific project activities include: 1) Lake management plan development and creation.
Special Conditions: 1) Lake management plan developed with Department approved strategies and plans; 2) All data collected will be entered into Departments SWIMS database.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.
If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Perch Lake
Status
Complete
St. Croix County: Bass, Perch, Squaw, Baldwin Pine Lake Mgmt Planning-Phase 2: 1) Create display-siz plan maps and graphics. 2) Rewrite county zoning ordinances with improved administrative procedures and an expanded list of available zoning districts to match the planning policy areas established by the plan. 3) Develop newtown level zoning maps with appropriate zoning districts, in digital and hard copy format. 4) Develop a Citizen's Guide. 5) Prepare a final report which will include the tasks listed above. 6) The grantee will disseminate information to the publicby newsletter mailings, entire report mailings, public meetings, a comprehensive management plan, and a Community Workshop Series. The grantee will provide the Department of Natural Resources with a paper copy and an electronic copy of the final report.Project results will be reposited at the St. Croix Government Center and the Land Conservation Department in Baldwin.
Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Perch Lake
Status
Complete
St. Croix County: Bass, Perch, Squaw, Baldwin Pine Lakes Managemt Plan-Phase 1: Obtain data and maps in digital format for the Priority Watershed Project in St. Croix County involving Bass, Perch, Squaw, and Baldwin Pine Lakes. Complete a St. Croix County Development Management Plan Document with report level maps and graphics indigital and hard copy format. Complete Development Management Plan maps delineating the planning areas and the goals, objectives and policies for each planning area. Disseminate information to the public by newsletter mailings, entire report mailings, public meetings, a comprehensive management plan, and a Community Workshop Series.
Grant Details
Large Scale Lake Planning
Date
4/1/1997
Waters Involved
Perch Lake
Status
Complete
St. Croix County: Perch Lake Land Management Planning: St. Croix County proposes to develop a long term land management plan for 67 acres located on Perch Lake. The plan will detail the best way to protect and enhance the lake's water quality and correct existing water quality problems related to the property.
Grant Details
Large Scale Lake Planning
Date
10/1/1997
Waters Involved
Perch Lake
Status
Complete
St. Croix County: Perch Lake Land Management I-Ii: St. Croix County proposes to do a land use study to minimize any impact to Perch Lake. The plan will detail the best use of the land while protecting and enhancing water quality on the lake. The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by summary, newsletter and final full report mailing(s), public meeting(s) and local newspaper articles. A final comprehensive management plan will be completed and available to the public for view.
Grant Details
Large Scale Lake Planning
Date
2/15/2015
Waters Involved
Perch Lake
Status
Complete
St. Croix County: Perch Plan, Bass Update: The St. Croix County Community Development Department proposes to create a comprehensive management plan for Perch Lake and update the management plan for Bass Lake. Major project elements to include: 1) Sociological survey, 2) Review of existing studies, 3) Updated land use mapping, 4) Ordinance review, 5) Plan development, update, 6) Final report.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Saint Croix River
Status
Complete
River Country Rc&D Council, Inc: Green Development Conference: River Country RC&D proposes to conduct a conference entitled "The Nuts and Bolts of Green Development" in conjunction with the St. Croix Basin Partnership Team. Objective of the conference and associated bus tours will be to provide riparian owners, interested citizens, and municipal operators and engineers with information useful to the development of small-scale and community-wide stormwater management practices.
Grant Details
Large Scale Lake Planning
Date
3/15/2024
Waters Involved
Saint Croix River
Status
Complete
Wild Rivers Conservancy St Croix & Namekagon: Comp - Lake St. Croix 9 Key Element Plan Update: Wild Rivers Conservancy of the St. Croix & Namekagon is sponsoring a project to update the 9 Key Element Plan for Lake St. Croix TMDL.
Activities: Partnership meetings, 9 key plan development
Deliverables: 9 key element plan
Conditions: N/A
This scope summarizes details provided in the application and does not negate tasks and/or deliverables described therein. Data, reports, surveys, and supporting information, including photos, maps and GIS data, must be submitted to the DNR Biologist in electronic format and in any other format they specify.
If a consultant provides a final report, it is recommended that the Grantee provide the DNR Biologist with a draft for comment on report adequacy prior to making a final payment to the consultant. Include electronic copy of the final report along with or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
3/15/2024
Waters Involved
Saint Croix River
Status
Complete
Wild Rivers Conservancy St Croix & Namekagon: Comp - Lake St. Croix Tmdl Progress Report: Wild Rivers Conservancy of the St. Croix & Namekagon is sponsoring a project to develop a Lake St. Croix TMDL Progress Report
Activities: compile total phosphorus load reductions from the past 10 years, launch a campaign for clean water in the St. Croix watershed, create progress report
Deliverables: Lake St. Croix TMDL Progress Report
Conditions: N/A
This scope summarizes details provided in the application and does not negate tasks and/or deliverables described therein. Data, reports, surveys, and supporting information, including photos, maps and GIS data, must be submitted to the DNR Biologist in electronic format and in any other format they specify.
If a consultant provides a final report, it is recommended that the Grantee provide the DNR Biologist with a draft for comment on report adequacy prior to making a final payment to the consultant. Include electronic copy of the final report along with or prior to submission of grantee's final payment request
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Unnamed
Status
Complete
River Country Rc&D Council, Inc: Green Development Conference: River Country RC&D proposes to conduct a conference entitled "The Nuts and Bolts of Green Development" in conjunction with the St. Croix Basin Partnership Team. Objective of the conference and associated bus tours will be to provide riparian owners, interested citizens, and municipal operators and engineers with information useful to the development of small-scale and community-wide stormwater management practices.
Grant Details
Large Scale Lake Planning
Date
10/1/2006
Waters Involved
Willow River
Status
Complete
City Of Hudson: Mallalieu Stormwater Assessment: The City of Hudson proposes to deliniate the storm sewershed for Lake Mallalieu in St. Croix County and to study the feasibility of stormwater treatment alternatives. Major project elements to include: 1) Storm sewer inventory and mapping, 2) Modeling, assessement and treatment selection, 3) reports and meetings to share information.
Grant Details
Large Scale Lake Planning
Date
4/1/2010
Waters Involved
Willow River
Status
Complete
St. Croix County: Mallalieu Lake Plan 1: The St. Croix Co. Land and Water Conservation Department proposes to develop a lake management plan for Lake Mallalieu in St. Croix County. Major project elements to include:
1) Stakeholder group, 2) Surveys, 3) Soil sampling, 4) Land use inventory, 5) Plan development, 6) Ordinance development and enactment.
Grant Details
Large Scale Lake Planning
Date
4/1/2010
Waters Involved
Willow River
Status
Complete
St. Croix County: Mallalieu Lake Plan 2: The St. Croix Co. Land and Water Conservation Department proposes to develop a storm water action plan for Lake Mallalieu in St. Croix County. Major project elements to include: 1) Stakeholders group, 2) Surveys, 3) Monitoring, 4) Outreach/Plan Implementation
Grant Details
Large Scale Lake Planning
Date
4/1/2010
Waters Involved
Willow River
Status
Proposed
St. Croix County: Mallalieu Lake Plan 1: The St. Croix Co. Land and Water Conservation Department proposes to develop a lake management plan for Lake Mallalieu in St. Croix County. Major project elements to include:
1) Stakeholder group, 2) Surveys, 3) Soil sampling, 4) Land use inventory, 5) Plan development, 6) Ordinance development and enactment.
Grant Details
Large Scale Lake Planning
Date
4/1/2010
Waters Involved
Willow River
Status
Proposed
St. Croix County: Mallalieu Lake Plan 2: The St. Croix Co. Land and Water Conservation Department proposes to develop a storm water action plan for Lake Mallalieu in St. Croix County. Major project elements to include: 1) Stakeholders group, 2) Surveys, 3) Monitoring, 4) Outreach/Plan Implementation
Grant Details
Large Scale Lake Planning
Date
3/15/2021
Waters Involved
Willow River
Status
Complete
Lake Mallalieu Association: Comp - Lake Mallalieu-Lake Management Plan: Project Scope and Description of Deliverables (CAOS-2000 Character Limit)
The Lake Mallalieu Association, Incorporated is sponsoring a project to develop a Lake Management Plan for Lake Mallalieu.
Project final deliverables include: all data collected, agendas and minutes for planning meetings, and a lake management plan that includes methodologies, results, and management alternatives discussion with an implementation plan.
Specific project activities include: 1) Lake management plan development and creation.
Special Conditions: 1) Lake management plan developed with Department approved strategies and plans; 2) All data collected will be entered into Departments SWIMS database.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.
If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Small Scale Lake Planning
Date
2/15/2017
Waters Involved
Bass Lake
Status
Complete
Bass Lake Rehabilitation District: Bass Lake Demonstration Projects Developing Local Capacity: Bass Lake Rehabilitation District is sponsoring a Lake Management Planning project to begin the process of installing shoreland restoration demonstration sites.
Project activities include: Install stormwater runoff management; fisheries and shoreland restoration practices at demonstration site; establish demonstration site committee; site analysis for future \201CHealthy Lakes\201D practices.
Project deliverables: A list and map of demonstration sites; individual site analysis reports.
Special conditions: 1) WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of all data and maps from the project. 2) Documentation for in kind volunteer labor shall be collected and maintained in accordance with grant program guidelines for reporting in kind donations.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lakes Coordinator.
Grant Details
Small Scale Lake Planning
Date
10/1/2002
Waters Involved
Lake Saint Croix
Status
Complete
St. Croix County: St. Croix River Nutrient & Sediment Conference: A one-day educational conference on reducing and managing nutrients and sediments in Lake St. Croix is proposed for February 2003 at Trollhaugen in Dresser, WI, for a targeted audience of approximately 130-140 wastewater treatment managers, local officials and water resource professionals. The goal is to educate, network and to obtain input in pollution budgeting.
The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.
Grant Details
Small Scale Lake Planning
Date
4/1/2007
Waters Involved
Mallalieu Lake
Status
Complete
St. Croix County: St. Croix Conference '07: St. Croix County LWCD proposes to conduct its annual nutrient and sediment loading conference to protect Lake Mallalieu and others within the St. Croix Watershed. Major project elements to include guest presenters and consulting services.
Grant Details
Small Scale Lake Planning
Date
10/1/2007
Waters Involved
Mallalieu Lake
Status
Complete
St. Croix County: St. Croix Conference '08: The St. Croix County Land and Water Conservation Department proposes to sponsor an informational and educational conference to enhance lake management and watershed protection with Lake Mallalieu in St. Croix County and the St. Croix River basin. Major project elements to include: a) conference planning, b) presentation development.
Grant Details
Small Scale Lake Planning
Date
10/1/2003
Waters Involved
Saint Croix River
Status
Complete
St. Croix County: St. Croix Nutrient River Conference: St. Croix County Land and Water Conservation Department proposes to sponsor a conference in Februrary of 2004 to identify and begin to address factors contributing to the pollution of Lake St. Croix. The goal is to bring together wastewater treatment managers, local officials, water resource professionals, land developers and watershed manager to allow networking and sharing of information associated with nutrient and sediment loading in the lake. The DNR will be provided with both a paper copy and electronic copy of the final report.
Grant Details
Small Scale Lake Planning
Date
10/1/2004
Waters Involved
Saint Croix River
Status
Complete
St. Croix County: St. Croix Basin Conference: St Croix County proposes to sponsor an informational and educational conference relating to the protection and management of Lake St. Croix.
Grant Details
Small Scale Lake Planning
Date
4/1/2006
Waters Involved
Saint Croix River
Status
Complete
St. Croix County: St. Croix Conference '06: St. Croix County proposes to sponsor an informational and educational conference relating to the protection and management of Lake St. Croix. Major project elements to include: 1) conference costs associated with printing mailing, provision of lunch and transportation, 2) staff coordination.
Grant Details
Small Scale Lake Planning
Date
10/1/2003
Waters Involved
Unnamed
Status
Complete
St. Croix County: St. Croix Nutrient River Conference: St. Croix County Land and Water Conservation Department proposes to sponsor a conference in Februrary of 2004 to identify and begin to address factors contributing to the pollution of Lake St. Croix. The goal is to bring together wastewater treatment managers, local officials, water resource professionals, land developers and watershed manager to allow networking and sharing of information associated with nutrient and sediment loading in the lake. The DNR will be provided with both a paper copy and electronic copy of the final report.
Grant Details
Small Scale Lake Planning
Date
10/1/2004
Waters Involved
Unnamed
Status
Complete
St. Croix County: St. Croix Basin Conference: St Croix County proposes to sponsor an informational and educational conference relating to the protection and management of Lake St. Croix.
Grant Details
Small Scale Lake Planning
Date
4/1/2006
Waters Involved
Unnamed
Status
Complete
St. Croix County: St. Croix Conference '06: St. Croix County proposes to sponsor an informational and educational conference relating to the protection and management of Lake St. Croix. Major project elements to include: 1) conference costs associated with printing mailing, provision of lunch and transportation, 2) staff coordination.
Grant Details
Small Scale Lake Planning
Date
4/1/2007
Waters Involved
Willow River
Status
Complete
St. Croix County: St. Croix Conference '07: St. Croix County LWCD proposes to conduct its annual nutrient and sediment loading conference to protect Lake Mallalieu and others within the St. Croix Watershed. Major project elements to include guest presenters and consulting services.
Grant Details
Small Scale Lake Planning
Date
10/1/2007
Waters Involved
Willow River
Status
Complete
St. Croix County: St. Croix Conference '08: The St. Croix County Land and Water Conservation Department proposes to sponsor an informational and educational conference to enhance lake management and watershed protection with Lake Mallalieu in St. Croix County and the St. Croix River basin. Major project elements to include: a) conference planning, b) presentation development.
Grant Details
River Planning Grant
Date
2/15/2018
Waters Involved
Willow River
Status
Complete
City Of New Richmond: Willow River Water Trail Initiative: Purpose: The City of New Richmond is sponsoring a project to create a citizen/friends group for the Willow River, that has a minimum of ten active volunteers with a minimum of four volunteers who are well-trained in using chainsaws to safely remove obstacles along the Willow River. In addition, the City will work to educate more than 200 community members and students about the importance of protecting the Willow River, best management practices, and the many recreational opportunities available.
Project activities include: Trainings, administrative components, consultations with River Alliance of Wisconsin, various presentations and collaborations with the community.
Project deliverables: Attendance sheets, roster of active members, long-term vision and action plan, post-even surveys, and an active citizen/friends group that ensures the Willow river remains safely navigable, as well as engages and educates the public and community.
Special conditions: WDNR will be provided with an electronic (pdf or word) copy of all data and maps from the project. This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the WDNR.
Grant Details
River Planning Grant
Date
2/15/2018
Waters Involved
Willow River
Status
In_Progress
City Of New Richmond: Willow River Water Trail Initiative: Purpose: The City of New Richmond is sponsoring a project to create a citizen/friends group for the Willow River, that has a minimum of ten active volunteers with a minimum of four volunteers who are well-trained in using chainsaws to safely remove obstacles along the Willow River. In addition, the City will work to educate more than 200 community members and students about the importance of protecting the Willow River, best management practices, and the many recreational opportunities available.
Project activities include: Trainings, administrative components, consultations with River Alliance of Wisconsin, various presentations and collaborations with the community.
Project deliverables: Attendance sheets, roster of active members, long-term vision and action plan, post-even surveys, and an active citizen/friends group that ensures the Willow river remains safely navigable, as well as engages and educates the public and community.
Special conditions: WDNR will be provided with an electronic (pdf or word) copy of all data and maps from the project. This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the WDNR.