TOWN OF WHEATLAND: Lilly Lake APM

Purpose

The Town of Wheatland will hire a contractor to conduct a plant survey and develop an aquatic plant management plan for Lily Lake. The plant survey will be a point intercept survey with 225 points. The lake will be sampled in mid-summer. The final report will contain the following elements: 1)Results of the points sampled, including sediment type found and maximum rooting depth 2)Results of a general lake survey to map general plant beds, map localized plant beds, map species distribution and a list of plant species found 3)An aquatic plant management plan that meets the requirements of NR 109.09 4)Minutes from the public meeting regarding aquatic plant issues 5)Plants not collected in earlier survey will be collected 6)Lake ordinances will be reviewed and recommendations for plant control activities will be made 7)10 copies of the report will be provided to the District and a summary of the results will be mailed by the Town to the District residents Two paper copies and one electronic copy of the final plan will be provided to the department. Exact details for all deliverables are described in the project description of the grant application.

Related Reports

Run Project Summary Report
View Umbrella-Projects
View Related-Projects

Aquatic Invasives Grant
Aquatic Invasives Education
AEPP-167-08
2008
Complete
 
Activities & Recommendations
Grant Awarded
AEPP-167-08Lilly Lake APM
Grant Awarded
AEPP-167-08
Aquatic Plant Monitoring or Survey
23055688
 
Watershed
 
Waters