Grant Details
Aquatic Invasives Control
Date
3/15/2022
Waters Involved
Lilly Lake
Status
Complete
Lily Lake Protection & Rehabilitation Dist: Lilly Lake Hybrid Watermilfoil Control Project: The Lilly Lake Protection and Rehabilitation District is sponsoring a project to conduct a whole lake chemical treatment on Lilly Lake and associated monitoring.
Project final deliverables include: All data collected, treatment records and a final Hybrid Watermilfoil Management and Control Strategy Assessment Report.
Specific project activities include: 1) Pre Treatment meander survey and temperature monitoring; 2) Whole Lake treatment with ProCellaCOR; 3) residual monitoring; 4) full lake P/I surveys in 2022 and 2023; 5) late season bed mapping survey in 2022 and 2023; 6) annual project reports in 2022 and 2023; 6) virtual pre treatment conference with Town of Wheatland in 2022; 7) development of e-mail style annual reports for stakeholders; and 8) development of an assessment report.
Special Conditions: 1) All data shall be entered into the SWIMS database
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.
If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Aquatic Invasives Control
Date
10/1/2013
Waters Involved
Silver Lake
Status
Complete
Silver Lake Protection Association: Ewm Control Project: The Silver Lake Prot. Assoc. will conduct a 3 year aquatic chemical treatment plan. The plan's goal is to greatly reduce the frequency of occurrence of Eurasian water milfoil, an established aquatic invasive plant and to eliminate Curly Leaf Pondweed. Chemical treatment will take place in spring 2014, 2015 and 2016. Point intercept plant surveys (following WDNR Hauxwell protocols) will be conducted both pre and post chemical treatment each year. Water quality monitoring, native plantings, CBCW, educational mailings and meetings and installation of boat trailer cleaning equip.and signage will also be part of the project. Chemical treatment areas will be determined each year based on the previous year\2019s plant surveys. The project deliverable is a report that includes 1) all raw plant survey data; 2) yearly maps of proposed and actual treatment areas; 3) density/distribution maps for EWM, CLP and the top 5 native plants found each year in the plant surveys; 4) statistical analysis of the plant survey data each year and a comparison between years, to include freq. of occurrence, actual density, relative density as described in the Hauxwell protocol; 5) a written assess. of the success of the chemical treatment plan implementation; 6) a written assess. of the shifts in the plant community over the 3 years of the project; 7) recommendations for future management; 8) entry of all watercraft inspection data into SWIMS; 9) installation of boat trailer cleaning equip.and signage; 10) a short report summarizing the 2014, 2015 and 2016 CBCW inspection prog. (# of boats inspected, any difficulties encountered, and a log of the dates/times/hours worked); 10) summary and analysis of the water quality data; and 11) a description of the chara redistribution native plantings project. 2 paper copies and 1 electronic copy of the final plan will be provided to the department. Exact details for all deliverables are described in the grant application project description.
Grant Details
Aquatic Invasives Education
Date
3/15/2023
Waters Involved
Bohner Lake
Status
Complete
Bohners Lake Sanitary District: Baumeister Mitigation Site: The Bohner\2019s Lake Sanitary District is sponsoring a project to develop a focused management plan for restoring the Baumeister wetland mitigation site located along Spring Brook, a tributary to Bohner\2019s Lake.
Project final deliverables include: a final report/focused management plan that contains all data compiled and collected, the IPM plan, the alternatives analysis, the long term monitoring plan and all comments from the 21 day public comment period.
Specific project activities include: 1) Compilation of existing WISCALM data for Spring Brook; 2) Compilation of existing vegetation monitoring data on the Baumeister site; 3) Development of an IPM plan for the Baumeister site including chemical treatment, burning, mowing and seeding; 4) Development of an alternatives analysis and a discussion of methods rejected for the project; 5) participation in a 21 day public comment period for the focused management plan and 6) outline of a monitoring strategy to measure long term success of the project.
Special Conditions: 1) The focused management plan document shall be entered into the SWIMS database; 2) Wetland monitoring shall follow DNR approved protocols.
If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.
Grant Details
Aquatic Invasives Education
Date
4/1/2004
Waters Involved
Camp Lake
Status
Complete
Camp & Center Lakes Rehabilitation District: Apm Plan-Camp & Center Lakes: A consultant hired by the Camp and Center Lake Management District will conduct a transect plant survey in mid summer 2004. The consultant will follow the methodology for the plant survey as outlined in the grant application narrative. The project deliverable for this grant will be submittal of two paper copies and one electronic copy (on a CD_ROM) of the final report to the WDNR. The final report will contain the following elements: 1) results from the plant survey; 2) Maps of plant beds, lake morphology and ecologically important areas; 3) Plant list 4) Plant management goals, objectives, alternatives and management recommendations; 5) GPS transect data and 6) Mapping the aerial extent of nuisance and exotic species on the lake.
Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Lilly Lake
Status
Complete
Town Of Wheatland: Lilly Lake Apm: The Town of Wheatland will hire a contractor to conduct a plant survey and develop an aquatic plant management plan for Lily Lake. The plant survey will be a point intercept survey with 225 points. The lake will be sampled in mid-summer. The final report will contain the following elements: 1)Results of the points sampled, including sediment type found and maximum rooting depth 2)Results of a general lake survey to map general plant beds, map localized plant beds, map species distribution and a list of plant species found 3)An aquatic plant management plan that meets the requirements of NR 109.09 4)Minutes from the public meeting regarding aquatic plant issues 5)Plants not collected in earlier survey will be collected 6)Lake ordinances will be reviewed and recommendations for plant control activities will be made 7)10 copies of the report will be provided to the District and a summary of the results will be mailed by the Town to the District residents
Two paper copies and one electronic copy of the final plan will be provided to the department. Exact details for all deliverables are described in the project description of the grant application.
Grant Details
Aquatic Invasives Education
Date
3/15/2023
Waters Involved
Silver Lake
Status
Complete
Silver Lake Management District: Silver Lake - Aquatic Plant Management Plan Update: The Silver Lake Management District is sponsoring a project to update the Aquatic Plant Management (APM) Plan and conduct a lake user survey for Silver Lake in Kenosha County, WI.
Project final deliverables include: all data collected, agendas and minutes for planning meetings, and an APM plan that includes methodologies, results, and management alternatives discussion with an implementation plan.
Specific project activities include: 1) Aquatic plant monitoring; 2) Lake User Survey; 3) Project Reports; 4) Aquatic Plant Management Plan.
Special Conditions: 1) Point Intercept surveys shall be conducted according to: Baseline Monitoring of Aquatic Plants in Wisconsin: Sampling Design, Field and Laboratory Procedures, Data Entry and Analysis Lakes, Publication number PUB-SS-1068 2010; 2) All data shall be entered into the SWIMS database; 3) Draft user surveys must be reviewed and approved by the Department before being initiated; 4) WDNR\2019s Aquatic Plant Management in Wisconsin guidance shall be followed for aquatic plant management plan development.
If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.
Grant Details
Aquatic Invasives Education
Date
3/15/2023
Waters Involved
Spring Brook
Status
Complete
Bohners Lake Sanitary District: Baumeister Mitigation Site: The Bohner\2019s Lake Sanitary District is sponsoring a project to develop a focused management plan for restoring the Baumeister wetland mitigation site located along Spring Brook, a tributary to Bohner\2019s Lake.
Project final deliverables include: a final report/focused management plan that contains all data compiled and collected, the IPM plan, the alternatives analysis, the long term monitoring plan and all comments from the 21 day public comment period.
Specific project activities include: 1) Compilation of existing WISCALM data for Spring Brook; 2) Compilation of existing vegetation monitoring data on the Baumeister site; 3) Development of an IPM plan for the Baumeister site including chemical treatment, burning, mowing and seeding; 4) Development of an alternatives analysis and a discussion of methods rejected for the project; 5) participation in a 21 day public comment period for the focused management plan and 6) outline of a monitoring strategy to measure long term success of the project.
Special Conditions: 1) The focused management plan document shall be entered into the SWIMS database; 2) Wetland monitoring shall follow DNR approved protocols.
If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.
Grant Details
Aquatic Invasives Education
Date
4/1/2004
Waters Involved
Unnamed
Status
Complete
Camp & Center Lakes Rehabilitation District: Apm Plan-Camp & Center Lakes: A consultant hired by the Camp and Center Lake Management District will conduct a transect plant survey in mid summer 2004. The consultant will follow the methodology for the plant survey as outlined in the grant application narrative. The project deliverable for this grant will be submittal of two paper copies and one electronic copy (on a CD_ROM) of the final report to the WDNR. The final report will contain the following elements: 1) results from the plant survey; 2) Maps of plant beds, lake morphology and ecologically important areas; 3) Plant list 4) Plant management goals, objectives, alternatives and management recommendations; 5) GPS transect data and 6) Mapping the aerial extent of nuisance and exotic species on the lake.
Grant Details
Aquatic Invasives Education
Date
3/15/2023
Waters Involved
Unnamed
Status
Complete
Bohners Lake Sanitary District: Baumeister Mitigation Site: The Bohner\2019s Lake Sanitary District is sponsoring a project to develop a focused management plan for restoring the Baumeister wetland mitigation site located along Spring Brook, a tributary to Bohner\2019s Lake.
Project final deliverables include: a final report/focused management plan that contains all data compiled and collected, the IPM plan, the alternatives analysis, the long term monitoring plan and all comments from the 21 day public comment period.
Specific project activities include: 1) Compilation of existing WISCALM data for Spring Brook; 2) Compilation of existing vegetation monitoring data on the Baumeister site; 3) Development of an IPM plan for the Baumeister site including chemical treatment, burning, mowing and seeding; 4) Development of an alternatives analysis and a discussion of methods rejected for the project; 5) participation in a 21 day public comment period for the focused management plan and 6) outline of a monitoring strategy to measure long term success of the project.
Special Conditions: 1) The focused management plan document shall be entered into the SWIMS database; 2) Wetland monitoring shall follow DNR approved protocols.
If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.
Grant Details
Clean Boats, Clean Waters
Date
2/15/2019
Waters Involved
Browns Lake
Status
Complete
Browns Lake Sanitary District: Browns Lake Sanitary District 2019 Cbcw: Browns Lake Sanitary District is sponsoring a Clean Boats Clean Waters project in 2019 at 1 single public boat landings and 0 public boat landing pairs on BROWNS LAKE (FISCHER PARK).
Grant Details
Lake Protection Grant
Date
1/1/2001
Waters Involved
Army Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Res-Walworth County Shoreland Protection Initiative: Walworth County will implement the Shoreland Protection Initiative project that includes:
1. A baseline lakeshore inventory; 2. ten lakshore demonstration sites; 3. the preparation of lake lawn and yard nutrient management plans; 4. fact sheets on lakeshore stabilization, shoreland buffers, shoreland regulations and lawn care; 5. an annual lakeshore inventory and distribution of shoreland regulation materials; 6. formation of a Walworth Co. Lakes Association and meetings with and newsletter pertaining to Walworth Co. lakes; 7. Workshops, information packets and news articles pertaining to the Fox river Basin Partnership Team Lakes Initiative; and 8. the formation of the Walworth County Land Conservancy.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Army Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Res-Shoreline Habitat Restoration-Walworth Co.: Walworth County will continue the Walworth County Lakes Specialist position for one year. The Lakes Specialist will provide educational information to lake residents regarding shoreline stabilization and shoreline restoration. The Lakes Specialist will also design shoreline restoration projects for interested landowners, provide technical assistance to contractors and hold workshops on shoreland restoration. The project deliverable will be a report containing the following: 1) copies of the shoreland restoration designs; 2) copies of the fliers for each restoration workshop and 3) details regarding the accomplishments of the Lakes Specialist over the year of the grant. Two paper copies and one electronic copy of the report will be provided to the Department of Natural Resources
Grant Details
Lake Protection Grant
Date
1/1/2001
Waters Involved
Benedict Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Res-Walworth County Shoreland Protection Initiative: Walworth County will implement the Shoreland Protection Initiative project that includes:
1. A baseline lakeshore inventory; 2. ten lakshore demonstration sites; 3. the preparation of lake lawn and yard nutrient management plans; 4. fact sheets on lakeshore stabilization, shoreland buffers, shoreland regulations and lawn care; 5. an annual lakeshore inventory and distribution of shoreland regulation materials; 6. formation of a Walworth Co. Lakes Association and meetings with and newsletter pertaining to Walworth Co. lakes; 7. Workshops, information packets and news articles pertaining to the Fox river Basin Partnership Team Lakes Initiative; and 8. the formation of the Walworth County Land Conservancy.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Benedict Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Res-Shoreline Habitat Restoration-Walworth Co.: Walworth County will continue the Walworth County Lakes Specialist position for one year. The Lakes Specialist will provide educational information to lake residents regarding shoreline stabilization and shoreline restoration. The Lakes Specialist will also design shoreline restoration projects for interested landowners, provide technical assistance to contractors and hold workshops on shoreland restoration. The project deliverable will be a report containing the following: 1) copies of the shoreland restoration designs; 2) copies of the fliers for each restoration workshop and 3) details regarding the accomplishments of the Lakes Specialist over the year of the grant. Two paper copies and one electronic copy of the report will be provided to the Department of Natural Resources
Grant Details
Lake Protection Grant
Date
1/1/2001
Waters Involved
Booth Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Res-Walworth County Shoreland Protection Initiative: Walworth County will implement the Shoreland Protection Initiative project that includes:
1. A baseline lakeshore inventory; 2. ten lakshore demonstration sites; 3. the preparation of lake lawn and yard nutrient management plans; 4. fact sheets on lakeshore stabilization, shoreland buffers, shoreland regulations and lawn care; 5. an annual lakeshore inventory and distribution of shoreland regulation materials; 6. formation of a Walworth Co. Lakes Association and meetings with and newsletter pertaining to Walworth Co. lakes; 7. Workshops, information packets and news articles pertaining to the Fox river Basin Partnership Team Lakes Initiative; and 8. the formation of the Walworth County Land Conservancy.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Booth Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Res-Shoreline Habitat Restoration-Walworth Co.: Walworth County will continue the Walworth County Lakes Specialist position for one year. The Lakes Specialist will provide educational information to lake residents regarding shoreline stabilization and shoreline restoration. The Lakes Specialist will also design shoreline restoration projects for interested landowners, provide technical assistance to contractors and hold workshops on shoreland restoration. The project deliverable will be a report containing the following: 1) copies of the shoreland restoration designs; 2) copies of the fliers for each restoration workshop and 3) details regarding the accomplishments of the Lakes Specialist over the year of the grant. Two paper copies and one electronic copy of the report will be provided to the Department of Natural Resources
Grant Details
Lake Protection Grant
Date
9/1/1999
Waters Involved
Camp Lake
Status
Complete
Camp & Center Lakes Rehabilitation District: Res-Camp And Center Lake Bmps, Shoreline Restoration: Camp and Center P & R District intends to install a number of shoreland stabilizations measures on multiple properties on both Camp and Center lakes. The District also intends to install a number of BMP's on multiple properties draining to Camp and Center Lakes.
Grant Details
Lake Protection Grant
Date
1/1/2001
Waters Involved
Cedar Grove Pond
Status
Complete
Walworth Cnty Land Use & Res Mgt: Res-Walworth County Shoreland Protection Initiative: Walworth County will implement the Shoreland Protection Initiative project that includes:
1. A baseline lakeshore inventory; 2. ten lakshore demonstration sites; 3. the preparation of lake lawn and yard nutrient management plans; 4. fact sheets on lakeshore stabilization, shoreland buffers, shoreland regulations and lawn care; 5. an annual lakeshore inventory and distribution of shoreland regulation materials; 6. formation of a Walworth Co. Lakes Association and meetings with and newsletter pertaining to Walworth Co. lakes; 7. Workshops, information packets and news articles pertaining to the Fox river Basin Partnership Team Lakes Initiative; and 8. the formation of the Walworth County Land Conservancy.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Cedar Grove Pond
Status
Complete
Walworth Cnty Land Use & Res Mgt: Res-Shoreline Habitat Restoration-Walworth Co.: Walworth County will continue the Walworth County Lakes Specialist position for one year. The Lakes Specialist will provide educational information to lake residents regarding shoreline stabilization and shoreline restoration. The Lakes Specialist will also design shoreline restoration projects for interested landowners, provide technical assistance to contractors and hold workshops on shoreland restoration. The project deliverable will be a report containing the following: 1) copies of the shoreland restoration designs; 2) copies of the fliers for each restoration workshop and 3) details regarding the accomplishments of the Lakes Specialist over the year of the grant. Two paper copies and one electronic copy of the report will be provided to the Department of Natural Resources
Grant Details
Lake Protection Grant
Date
1/1/2001
Waters Involved
Ceylon Lagoon
Status
Complete
Walworth Cnty Land Use & Res Mgt: Res-Walworth County Shoreland Protection Initiative: Walworth County will implement the Shoreland Protection Initiative project that includes:
1. A baseline lakeshore inventory; 2. ten lakshore demonstration sites; 3. the preparation of lake lawn and yard nutrient management plans; 4. fact sheets on lakeshore stabilization, shoreland buffers, shoreland regulations and lawn care; 5. an annual lakeshore inventory and distribution of shoreland regulation materials; 6. formation of a Walworth Co. Lakes Association and meetings with and newsletter pertaining to Walworth Co. lakes; 7. Workshops, information packets and news articles pertaining to the Fox river Basin Partnership Team Lakes Initiative; and 8. the formation of the Walworth County Land Conservancy.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Ceylon Lagoon
Status
Complete
Walworth Cnty Land Use & Res Mgt: Res-Shoreline Habitat Restoration-Walworth Co.: Walworth County will continue the Walworth County Lakes Specialist position for one year. The Lakes Specialist will provide educational information to lake residents regarding shoreline stabilization and shoreline restoration. The Lakes Specialist will also design shoreline restoration projects for interested landowners, provide technical assistance to contractors and hold workshops on shoreland restoration. The project deliverable will be a report containing the following: 1) copies of the shoreland restoration designs; 2) copies of the fliers for each restoration workshop and 3) details regarding the accomplishments of the Lakes Specialist over the year of the grant. Two paper copies and one electronic copy of the report will be provided to the Department of Natural Resources
Grant Details
Lake Protection Grant
Date
1/1/2001
Waters Involved
Como Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Res-Walworth County Shoreland Protection Initiative: Walworth County will implement the Shoreland Protection Initiative project that includes:
1. A baseline lakeshore inventory; 2. ten lakshore demonstration sites; 3. the preparation of lake lawn and yard nutrient management plans; 4. fact sheets on lakeshore stabilization, shoreland buffers, shoreland regulations and lawn care; 5. an annual lakeshore inventory and distribution of shoreland regulation materials; 6. formation of a Walworth Co. Lakes Association and meetings with and newsletter pertaining to Walworth Co. lakes; 7. Workshops, information packets and news articles pertaining to the Fox river Basin Partnership Team Lakes Initiative; and 8. the formation of the Walworth County Land Conservancy.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Como Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Res-Shoreline Habitat Restoration-Walworth Co.: Walworth County will continue the Walworth County Lakes Specialist position for one year. The Lakes Specialist will provide educational information to lake residents regarding shoreline stabilization and shoreline restoration. The Lakes Specialist will also design shoreline restoration projects for interested landowners, provide technical assistance to contractors and hold workshops on shoreland restoration. The project deliverable will be a report containing the following: 1) copies of the shoreland restoration designs; 2) copies of the fliers for each restoration workshop and 3) details regarding the accomplishments of the Lakes Specialist over the year of the grant. Two paper copies and one electronic copy of the report will be provided to the Department of Natural Resources
Grant Details
Lake Protection Grant
Date
1/1/2001
Waters Involved
Comus Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Res-Walworth County Shoreland Protection Initiative: Walworth County will implement the Shoreland Protection Initiative project that includes:
1. A baseline lakeshore inventory; 2. ten lakshore demonstration sites; 3. the preparation of lake lawn and yard nutrient management plans; 4. fact sheets on lakeshore stabilization, shoreland buffers, shoreland regulations and lawn care; 5. an annual lakeshore inventory and distribution of shoreland regulation materials; 6. formation of a Walworth Co. Lakes Association and meetings with and newsletter pertaining to Walworth Co. lakes; 7. Workshops, information packets and news articles pertaining to the Fox river Basin Partnership Team Lakes Initiative; and 8. the formation of the Walworth County Land Conservancy.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Comus Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Res-Shoreline Habitat Restoration-Walworth Co.: Walworth County will continue the Walworth County Lakes Specialist position for one year. The Lakes Specialist will provide educational information to lake residents regarding shoreline stabilization and shoreline restoration. The Lakes Specialist will also design shoreline restoration projects for interested landowners, provide technical assistance to contractors and hold workshops on shoreland restoration. The project deliverable will be a report containing the following: 1) copies of the shoreland restoration designs; 2) copies of the fliers for each restoration workshop and 3) details regarding the accomplishments of the Lakes Specialist over the year of the grant. Two paper copies and one electronic copy of the report will be provided to the Department of Natural Resources
Grant Details
Lake Protection Grant
Date
1/1/2001
Waters Involved
Congdon Park Pond
Status
Complete
Walworth Cnty Land Use & Res Mgt: Res-Walworth County Shoreland Protection Initiative: Walworth County will implement the Shoreland Protection Initiative project that includes:
1. A baseline lakeshore inventory; 2. ten lakshore demonstration sites; 3. the preparation of lake lawn and yard nutrient management plans; 4. fact sheets on lakeshore stabilization, shoreland buffers, shoreland regulations and lawn care; 5. an annual lakeshore inventory and distribution of shoreland regulation materials; 6. formation of a Walworth Co. Lakes Association and meetings with and newsletter pertaining to Walworth Co. lakes; 7. Workshops, information packets and news articles pertaining to the Fox river Basin Partnership Team Lakes Initiative; and 8. the formation of the Walworth County Land Conservancy.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Congdon Park Pond
Status
Complete
Walworth Cnty Land Use & Res Mgt: Res-Shoreline Habitat Restoration-Walworth Co.: Walworth County will continue the Walworth County Lakes Specialist position for one year. The Lakes Specialist will provide educational information to lake residents regarding shoreline stabilization and shoreline restoration. The Lakes Specialist will also design shoreline restoration projects for interested landowners, provide technical assistance to contractors and hold workshops on shoreland restoration. The project deliverable will be a report containing the following: 1) copies of the shoreland restoration designs; 2) copies of the fliers for each restoration workshop and 3) details regarding the accomplishments of the Lakes Specialist over the year of the grant. Two paper copies and one electronic copy of the report will be provided to the Department of Natural Resources
Grant Details
Lake Protection Grant
Date
1/1/2001
Waters Involved
Cravath Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Res-Walworth County Shoreland Protection Initiative: Walworth County will implement the Shoreland Protection Initiative project that includes:
1. A baseline lakeshore inventory; 2. ten lakshore demonstration sites; 3. the preparation of lake lawn and yard nutrient management plans; 4. fact sheets on lakeshore stabilization, shoreland buffers, shoreland regulations and lawn care; 5. an annual lakeshore inventory and distribution of shoreland regulation materials; 6. formation of a Walworth Co. Lakes Association and meetings with and newsletter pertaining to Walworth Co. lakes; 7. Workshops, information packets and news articles pertaining to the Fox river Basin Partnership Team Lakes Initiative; and 8. the formation of the Walworth County Land Conservancy.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Cravath Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Res-Shoreline Habitat Restoration-Walworth Co.: Walworth County will continue the Walworth County Lakes Specialist position for one year. The Lakes Specialist will provide educational information to lake residents regarding shoreline stabilization and shoreline restoration. The Lakes Specialist will also design shoreline restoration projects for interested landowners, provide technical assistance to contractors and hold workshops on shoreland restoration. The project deliverable will be a report containing the following: 1) copies of the shoreland restoration designs; 2) copies of the fliers for each restoration workshop and 3) details regarding the accomplishments of the Lakes Specialist over the year of the grant. Two paper copies and one electronic copy of the report will be provided to the Department of Natural Resources
Grant Details
Lake Protection Grant
Date
1/1/2001
Waters Involved
Delavan Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Res-Walworth County Shoreland Protection Initiative: Walworth County will implement the Shoreland Protection Initiative project that includes:
1. A baseline lakeshore inventory; 2. ten lakshore demonstration sites; 3. the preparation of lake lawn and yard nutrient management plans; 4. fact sheets on lakeshore stabilization, shoreland buffers, shoreland regulations and lawn care; 5. an annual lakeshore inventory and distribution of shoreland regulation materials; 6. formation of a Walworth Co. Lakes Association and meetings with and newsletter pertaining to Walworth Co. lakes; 7. Workshops, information packets and news articles pertaining to the Fox river Basin Partnership Team Lakes Initiative; and 8. the formation of the Walworth County Land Conservancy.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Delavan Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Res-Shoreline Habitat Restoration-Walworth Co.: Walworth County will continue the Walworth County Lakes Specialist position for one year. The Lakes Specialist will provide educational information to lake residents regarding shoreline stabilization and shoreline restoration. The Lakes Specialist will also design shoreline restoration projects for interested landowners, provide technical assistance to contractors and hold workshops on shoreland restoration. The project deliverable will be a report containing the following: 1) copies of the shoreland restoration designs; 2) copies of the fliers for each restoration workshop and 3) details regarding the accomplishments of the Lakes Specialist over the year of the grant. Two paper copies and one electronic copy of the report will be provided to the Department of Natural Resources
Grant Details
Lake Protection Grant
Date
10/1/2013
Waters Involved
Delavan Lake
Status
Complete
Delavan Lake Sd: Lmi-Permeable Paver Roadway - Delavan Lake Association, Inc.: The Delavan Lake Sanitary District will partner with the Assembly Park subdivision to facilitate the installation of 243,000 square feet of permeable pavers for a 25.4 acre subdivision. Approximately 5 acres of local paved roads will be removed and replaced with permeable pavers. Assembly Park will enter into a 10 year maintenance agreement with the Delavan Lake Sanitary District to retain the pavers. The project deliverables include a narrative detailing the installation of the pavers and a photo essay documenting each step of the construction project.
Grant Details
Lake Protection Grant
Date
4/15/2015
Waters Involved
Delavan Lake
Status
Complete
Delavan Lake Sd: Acq-Brown'S Channel Watershed Land Acquisition #1: The Delavan Lake Sanitary District (DLSD) will use this grant to pay for part of the purchase of 18 lots along Browns Channel, part of Delavan Lake, located in the Town of Delavan. The project includes the Brown parcel (1.38 acres) and the Odling Parcel (0.30 acre), zoned Lowland Conservation District (C4). The parcel borders other DLSD lands under protection.
The DLSD will manage two invasive species, buckthorn and bush honeysuckle and other woody vegetation through yearly removal or cutting, with the goal of removing 80% within three years of property purchase. Native species will be planted in areas that non- native species are removed. Bank stabilization and stream channel habitat improvement projects will also take place.
All maintenance and improvement activities will be the responsibility of the DLSD in accordance with the Land Management Plan, dated January 22nd, 2015.
The project deliverable is the completed land purchase of 1.68 acres of land (the Brown and Odling parcels) in South Shore Manor 1st Addition.
Grant Details
Lake Protection Grant
Date
4/15/2017
Waters Involved
Delavan Lake
Status
Complete
Town Of Delavan: Lmi - Delavan Town Park Bmp Project: The Town of Delavan is sponsoring a project to install Best Management Practices along an unnamed tributary to Delavan Lake that terminates in the Town Park.
Project final deliverables include: a copy of the final plans and specifications and a photo essay showing before and after pictures of each BMP element.
Specific project activities include: 1) development of design and final plans for the project; 2) installation of approximately 10 BMP elements along the unnamed tributary to Delavan Lake.
Special Conditions: 1) All data shall be entered into the SWIMS database; 2) Volunteer lists, equipment use lists and signatures shall be maintained for reporting in kind volunteer labor and equipment.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.
The Grantee should provide the DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Lake Protection Grant
Date
1/1/2001
Waters Involved
Eagle Spring Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Res-Walworth County Shoreland Protection Initiative: Walworth County will implement the Shoreland Protection Initiative project that includes:
1. A baseline lakeshore inventory; 2. ten lakshore demonstration sites; 3. the preparation of lake lawn and yard nutrient management plans; 4. fact sheets on lakeshore stabilization, shoreland buffers, shoreland regulations and lawn care; 5. an annual lakeshore inventory and distribution of shoreland regulation materials; 6. formation of a Walworth Co. Lakes Association and meetings with and newsletter pertaining to Walworth Co. lakes; 7. Workshops, information packets and news articles pertaining to the Fox river Basin Partnership Team Lakes Initiative; and 8. the formation of the Walworth County Land Conservancy.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Eagle Spring Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Res-Shoreline Habitat Restoration-Walworth Co.: Walworth County will continue the Walworth County Lakes Specialist position for one year. The Lakes Specialist will provide educational information to lake residents regarding shoreline stabilization and shoreline restoration. The Lakes Specialist will also design shoreline restoration projects for interested landowners, provide technical assistance to contractors and hold workshops on shoreland restoration. The project deliverable will be a report containing the following: 1) copies of the shoreland restoration designs; 2) copies of the fliers for each restoration workshop and 3) details regarding the accomplishments of the Lakes Specialist over the year of the grant. Two paper copies and one electronic copy of the report will be provided to the Department of Natural Resources
Grant Details
Lake Protection Grant
Date
1/1/2001
Waters Involved
East Troy Pond (Trent)
Status
Complete
Walworth Cnty Land Use & Res Mgt: Res-Walworth County Shoreland Protection Initiative: Walworth County will implement the Shoreland Protection Initiative project that includes:
1. A baseline lakeshore inventory; 2. ten lakshore demonstration sites; 3. the preparation of lake lawn and yard nutrient management plans; 4. fact sheets on lakeshore stabilization, shoreland buffers, shoreland regulations and lawn care; 5. an annual lakeshore inventory and distribution of shoreland regulation materials; 6. formation of a Walworth Co. Lakes Association and meetings with and newsletter pertaining to Walworth Co. lakes; 7. Workshops, information packets and news articles pertaining to the Fox river Basin Partnership Team Lakes Initiative; and 8. the formation of the Walworth County Land Conservancy.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
East Troy Pond (Trent)
Status
Complete
Walworth Cnty Land Use & Res Mgt: Res-Shoreline Habitat Restoration-Walworth Co.: Walworth County will continue the Walworth County Lakes Specialist position for one year. The Lakes Specialist will provide educational information to lake residents regarding shoreline stabilization and shoreline restoration. The Lakes Specialist will also design shoreline restoration projects for interested landowners, provide technical assistance to contractors and hold workshops on shoreland restoration. The project deliverable will be a report containing the following: 1) copies of the shoreland restoration designs; 2) copies of the fliers for each restoration workshop and 3) details regarding the accomplishments of the Lakes Specialist over the year of the grant. Two paper copies and one electronic copy of the report will be provided to the Department of Natural Resources
Grant Details
Lake Protection Grant
Date
1/1/2001
Waters Involved
Elkhorn Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Res-Walworth County Shoreland Protection Initiative: Walworth County will implement the Shoreland Protection Initiative project that includes:
1. A baseline lakeshore inventory; 2. ten lakshore demonstration sites; 3. the preparation of lake lawn and yard nutrient management plans; 4. fact sheets on lakeshore stabilization, shoreland buffers, shoreland regulations and lawn care; 5. an annual lakeshore inventory and distribution of shoreland regulation materials; 6. formation of a Walworth Co. Lakes Association and meetings with and newsletter pertaining to Walworth Co. lakes; 7. Workshops, information packets and news articles pertaining to the Fox river Basin Partnership Team Lakes Initiative; and 8. the formation of the Walworth County Land Conservancy.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Elkhorn Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Res-Shoreline Habitat Restoration-Walworth Co.: Walworth County will continue the Walworth County Lakes Specialist position for one year. The Lakes Specialist will provide educational information to lake residents regarding shoreline stabilization and shoreline restoration. The Lakes Specialist will also design shoreline restoration projects for interested landowners, provide technical assistance to contractors and hold workshops on shoreland restoration. The project deliverable will be a report containing the following: 1) copies of the shoreland restoration designs; 2) copies of the fliers for each restoration workshop and 3) details regarding the accomplishments of the Lakes Specialist over the year of the grant. Two paper copies and one electronic copy of the report will be provided to the Department of Natural Resources
Grant Details
Lake Protection Grant
Date
4/1/1997
Waters Involved
Geneva Lake
Status
Complete
Geneva Lake Environmental Agency: Lmi-Fd-Lake Geneva Diagnostic Feasibility Study: The Geneva Lake Environmental Agency proposes to conduct a diagnostic feasibility study for Lake Geneva in Walworth County. Project activities include 1) 3 year water quality monitoring program, 2) lake sediment core collection and analysis, 3) evaluation of the hydrological regime of and pollutant loading potential of selected streams draining into the lake, 4) quantification and assessment of the quality and status of biological communities in the lake, 5) public information and issues surveys, and 6) preparation and refinement of comprehensive watershed and lake management plans for the lake. This grant covers the first year of project costs.
Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Geneva Lake
Status
Complete
City Of Lake Geneva: Lmi-Stormwater Management Study Implementation-Geneva: The City of Lake Geneva will implement a stormwater management plan. As part of this stormwater management plan implementation, the city will construct 2 strormwater detention ponds with LPT program funding.
Grant Details
Lake Protection Grant
Date
1/1/2001
Waters Involved
Geneva Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Res-Walworth County Shoreland Protection Initiative: Walworth County will implement the Shoreland Protection Initiative project that includes:
1. A baseline lakeshore inventory; 2. ten lakshore demonstration sites; 3. the preparation of lake lawn and yard nutrient management plans; 4. fact sheets on lakeshore stabilization, shoreland buffers, shoreland regulations and lawn care; 5. an annual lakeshore inventory and distribution of shoreland regulation materials; 6. formation of a Walworth Co. Lakes Association and meetings with and newsletter pertaining to Walworth Co. lakes; 7. Workshops, information packets and news articles pertaining to the Fox river Basin Partnership Team Lakes Initiative; and 8. the formation of the Walworth County Land Conservancy.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Geneva Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Res-Shoreline Habitat Restoration-Walworth Co.: Walworth County will continue the Walworth County Lakes Specialist position for one year. The Lakes Specialist will provide educational information to lake residents regarding shoreline stabilization and shoreline restoration. The Lakes Specialist will also design shoreline restoration projects for interested landowners, provide technical assistance to contractors and hold workshops on shoreland restoration. The project deliverable will be a report containing the following: 1) copies of the shoreland restoration designs; 2) copies of the fliers for each restoration workshop and 3) details regarding the accomplishments of the Lakes Specialist over the year of the grant. Two paper copies and one electronic copy of the report will be provided to the Department of Natural Resources
Grant Details
Lake Protection Grant
Date
1/1/2001
Waters Involved
Goose Pond
Status
Complete
Walworth Cnty Land Use & Res Mgt: Res-Walworth County Shoreland Protection Initiative: Walworth County will implement the Shoreland Protection Initiative project that includes:
1. A baseline lakeshore inventory; 2. ten lakshore demonstration sites; 3. the preparation of lake lawn and yard nutrient management plans; 4. fact sheets on lakeshore stabilization, shoreland buffers, shoreland regulations and lawn care; 5. an annual lakeshore inventory and distribution of shoreland regulation materials; 6. formation of a Walworth Co. Lakes Association and meetings with and newsletter pertaining to Walworth Co. lakes; 7. Workshops, information packets and news articles pertaining to the Fox river Basin Partnership Team Lakes Initiative; and 8. the formation of the Walworth County Land Conservancy.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Goose Pond
Status
Complete
Walworth Cnty Land Use & Res Mgt: Res-Shoreline Habitat Restoration-Walworth Co.: Walworth County will continue the Walworth County Lakes Specialist position for one year. The Lakes Specialist will provide educational information to lake residents regarding shoreline stabilization and shoreline restoration. The Lakes Specialist will also design shoreline restoration projects for interested landowners, provide technical assistance to contractors and hold workshops on shoreland restoration. The project deliverable will be a report containing the following: 1) copies of the shoreland restoration designs; 2) copies of the fliers for each restoration workshop and 3) details regarding the accomplishments of the Lakes Specialist over the year of the grant. Two paper copies and one electronic copy of the report will be provided to the Department of Natural Resources
Grant Details
Lake Protection Grant
Date
1/1/2001
Waters Involved
Green Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Res-Walworth County Shoreland Protection Initiative: Walworth County will implement the Shoreland Protection Initiative project that includes:
1. A baseline lakeshore inventory; 2. ten lakshore demonstration sites; 3. the preparation of lake lawn and yard nutrient management plans; 4. fact sheets on lakeshore stabilization, shoreland buffers, shoreland regulations and lawn care; 5. an annual lakeshore inventory and distribution of shoreland regulation materials; 6. formation of a Walworth Co. Lakes Association and meetings with and newsletter pertaining to Walworth Co. lakes; 7. Workshops, information packets and news articles pertaining to the Fox river Basin Partnership Team Lakes Initiative; and 8. the formation of the Walworth County Land Conservancy.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Green Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Res-Shoreline Habitat Restoration-Walworth Co.: Walworth County will continue the Walworth County Lakes Specialist position for one year. The Lakes Specialist will provide educational information to lake residents regarding shoreline stabilization and shoreline restoration. The Lakes Specialist will also design shoreline restoration projects for interested landowners, provide technical assistance to contractors and hold workshops on shoreland restoration. The project deliverable will be a report containing the following: 1) copies of the shoreland restoration designs; 2) copies of the fliers for each restoration workshop and 3) details regarding the accomplishments of the Lakes Specialist over the year of the grant. Two paper copies and one electronic copy of the report will be provided to the Department of Natural Resources
Grant Details
Lake Protection Grant
Date
1/1/2001
Waters Involved
Hilburn Pond
Status
Complete
Walworth Cnty Land Use & Res Mgt: Res-Walworth County Shoreland Protection Initiative: Walworth County will implement the Shoreland Protection Initiative project that includes:
1. A baseline lakeshore inventory; 2. ten lakshore demonstration sites; 3. the preparation of lake lawn and yard nutrient management plans; 4. fact sheets on lakeshore stabilization, shoreland buffers, shoreland regulations and lawn care; 5. an annual lakeshore inventory and distribution of shoreland regulation materials; 6. formation of a Walworth Co. Lakes Association and meetings with and newsletter pertaining to Walworth Co. lakes; 7. Workshops, information packets and news articles pertaining to the Fox river Basin Partnership Team Lakes Initiative; and 8. the formation of the Walworth County Land Conservancy.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Hilburn Pond
Status
Complete
Walworth Cnty Land Use & Res Mgt: Res-Shoreline Habitat Restoration-Walworth Co.: Walworth County will continue the Walworth County Lakes Specialist position for one year. The Lakes Specialist will provide educational information to lake residents regarding shoreline stabilization and shoreline restoration. The Lakes Specialist will also design shoreline restoration projects for interested landowners, provide technical assistance to contractors and hold workshops on shoreland restoration. The project deliverable will be a report containing the following: 1) copies of the shoreland restoration designs; 2) copies of the fliers for each restoration workshop and 3) details regarding the accomplishments of the Lakes Specialist over the year of the grant. Two paper copies and one electronic copy of the report will be provided to the Department of Natural Resources
Grant Details
Lake Protection Grant
Date
3/22/1996
Waters Involved
Honey Lake (Vienna)
Status
Complete
Walworth County: Acq-Honey Lake Land Acquisition - Lin Property: Walworth County will acquire approximately 123 acres of land to preserve and enhance the water quality of the downstream lake, Honey Lake. The goals of the property's management plan are to permanently preserve and protect the diversity and uniqueness of the existing land covering the Sugar Creek floodlands and shorelines, various wetland plan communities, uplands, and open field grasslands and to provide passive recreational opportunities such as hiking, natura study, and cross country skiing.
Grant Details
Lake Protection Grant
Date
1/1/2001
Waters Involved
Honey Lake (Vienna)
Status
Complete
Walworth Cnty Land Use & Res Mgt: Res-Walworth County Shoreland Protection Initiative: Walworth County will implement the Shoreland Protection Initiative project that includes:
1. A baseline lakeshore inventory; 2. ten lakshore demonstration sites; 3. the preparation of lake lawn and yard nutrient management plans; 4. fact sheets on lakeshore stabilization, shoreland buffers, shoreland regulations and lawn care; 5. an annual lakeshore inventory and distribution of shoreland regulation materials; 6. formation of a Walworth Co. Lakes Association and meetings with and newsletter pertaining to Walworth Co. lakes; 7. Workshops, information packets and news articles pertaining to the Fox river Basin Partnership Team Lakes Initiative; and 8. the formation of the Walworth County Land Conservancy.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Honey Lake (Vienna)
Status
Complete
Walworth Cnty Land Use & Res Mgt: Res-Shoreline Habitat Restoration-Walworth Co.: Walworth County will continue the Walworth County Lakes Specialist position for one year. The Lakes Specialist will provide educational information to lake residents regarding shoreline stabilization and shoreline restoration. The Lakes Specialist will also design shoreline restoration projects for interested landowners, provide technical assistance to contractors and hold workshops on shoreland restoration. The project deliverable will be a report containing the following: 1) copies of the shoreland restoration designs; 2) copies of the fliers for each restoration workshop and 3) details regarding the accomplishments of the Lakes Specialist over the year of the grant. Two paper copies and one electronic copy of the report will be provided to the Department of Natural Resources
Grant Details
Lake Protection Grant
Date
1/1/2001
Waters Involved
La Grange Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Res-Walworth County Shoreland Protection Initiative: Walworth County will implement the Shoreland Protection Initiative project that includes:
1. A baseline lakeshore inventory; 2. ten lakshore demonstration sites; 3. the preparation of lake lawn and yard nutrient management plans; 4. fact sheets on lakeshore stabilization, shoreland buffers, shoreland regulations and lawn care; 5. an annual lakeshore inventory and distribution of shoreland regulation materials; 6. formation of a Walworth Co. Lakes Association and meetings with and newsletter pertaining to Walworth Co. lakes; 7. Workshops, information packets and news articles pertaining to the Fox river Basin Partnership Team Lakes Initiative; and 8. the formation of the Walworth County Land Conservancy.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
La Grange Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Res-Shoreline Habitat Restoration-Walworth Co.: Walworth County will continue the Walworth County Lakes Specialist position for one year. The Lakes Specialist will provide educational information to lake residents regarding shoreline stabilization and shoreline restoration. The Lakes Specialist will also design shoreline restoration projects for interested landowners, provide technical assistance to contractors and hold workshops on shoreland restoration. The project deliverable will be a report containing the following: 1) copies of the shoreland restoration designs; 2) copies of the fliers for each restoration workshop and 3) details regarding the accomplishments of the Lakes Specialist over the year of the grant. Two paper copies and one electronic copy of the report will be provided to the Department of Natural Resources
Grant Details
Lake Protection Grant
Date
1/1/2001
Waters Involved
Lake Beulah
Status
Complete
Walworth Cnty Land Use & Res Mgt: Res-Walworth County Shoreland Protection Initiative: Walworth County will implement the Shoreland Protection Initiative project that includes:
1. A baseline lakeshore inventory; 2. ten lakshore demonstration sites; 3. the preparation of lake lawn and yard nutrient management plans; 4. fact sheets on lakeshore stabilization, shoreland buffers, shoreland regulations and lawn care; 5. an annual lakeshore inventory and distribution of shoreland regulation materials; 6. formation of a Walworth Co. Lakes Association and meetings with and newsletter pertaining to Walworth Co. lakes; 7. Workshops, information packets and news articles pertaining to the Fox river Basin Partnership Team Lakes Initiative; and 8. the formation of the Walworth County Land Conservancy.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Lake Beulah
Status
Complete
Walworth Cnty Land Use & Res Mgt: Res-Shoreline Habitat Restoration-Walworth Co.: Walworth County will continue the Walworth County Lakes Specialist position for one year. The Lakes Specialist will provide educational information to lake residents regarding shoreline stabilization and shoreline restoration. The Lakes Specialist will also design shoreline restoration projects for interested landowners, provide technical assistance to contractors and hold workshops on shoreland restoration. The project deliverable will be a report containing the following: 1) copies of the shoreland restoration designs; 2) copies of the fliers for each restoration workshop and 3) details regarding the accomplishments of the Lakes Specialist over the year of the grant. Two paper copies and one electronic copy of the report will be provided to the Department of Natural Resources
Grant Details
Lake Protection Grant
Date
1/1/2001
Waters Involved
Lake Ivanhoe
Status
Complete
Walworth Cnty Land Use & Res Mgt: Res-Walworth County Shoreland Protection Initiative: Walworth County will implement the Shoreland Protection Initiative project that includes:
1. A baseline lakeshore inventory; 2. ten lakshore demonstration sites; 3. the preparation of lake lawn and yard nutrient management plans; 4. fact sheets on lakeshore stabilization, shoreland buffers, shoreland regulations and lawn care; 5. an annual lakeshore inventory and distribution of shoreland regulation materials; 6. formation of a Walworth Co. Lakes Association and meetings with and newsletter pertaining to Walworth Co. lakes; 7. Workshops, information packets and news articles pertaining to the Fox river Basin Partnership Team Lakes Initiative; and 8. the formation of the Walworth County Land Conservancy.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Lake Ivanhoe
Status
Complete
Walworth Cnty Land Use & Res Mgt: Res-Shoreline Habitat Restoration-Walworth Co.: Walworth County will continue the Walworth County Lakes Specialist position for one year. The Lakes Specialist will provide educational information to lake residents regarding shoreline stabilization and shoreline restoration. The Lakes Specialist will also design shoreline restoration projects for interested landowners, provide technical assistance to contractors and hold workshops on shoreland restoration. The project deliverable will be a report containing the following: 1) copies of the shoreland restoration designs; 2) copies of the fliers for each restoration workshop and 3) details regarding the accomplishments of the Lakes Specialist over the year of the grant. Two paper copies and one electronic copy of the report will be provided to the Department of Natural Resources
Grant Details
Lake Protection Grant
Date
1/1/2001
Waters Involved
Lake Lorraine
Status
Complete
Walworth Cnty Land Use & Res Mgt: Res-Walworth County Shoreland Protection Initiative: Walworth County will implement the Shoreland Protection Initiative project that includes:
1. A baseline lakeshore inventory; 2. ten lakshore demonstration sites; 3. the preparation of lake lawn and yard nutrient management plans; 4. fact sheets on lakeshore stabilization, shoreland buffers, shoreland regulations and lawn care; 5. an annual lakeshore inventory and distribution of shoreland regulation materials; 6. formation of a Walworth Co. Lakes Association and meetings with and newsletter pertaining to Walworth Co. lakes; 7. Workshops, information packets and news articles pertaining to the Fox river Basin Partnership Team Lakes Initiative; and 8. the formation of the Walworth County Land Conservancy.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Lake Lorraine
Status
Complete
Walworth Cnty Land Use & Res Mgt: Res-Shoreline Habitat Restoration-Walworth Co.: Walworth County will continue the Walworth County Lakes Specialist position for one year. The Lakes Specialist will provide educational information to lake residents regarding shoreline stabilization and shoreline restoration. The Lakes Specialist will also design shoreline restoration projects for interested landowners, provide technical assistance to contractors and hold workshops on shoreland restoration. The project deliverable will be a report containing the following: 1) copies of the shoreland restoration designs; 2) copies of the fliers for each restoration workshop and 3) details regarding the accomplishments of the Lakes Specialist over the year of the grant. Two paper copies and one electronic copy of the report will be provided to the Department of Natural Resources
Grant Details
Lake Protection Grant
Date
1/1/2001
Waters Involved
Lake Wandawega
Status
Complete
Walworth Cnty Land Use & Res Mgt: Res-Walworth County Shoreland Protection Initiative: Walworth County will implement the Shoreland Protection Initiative project that includes:
1. A baseline lakeshore inventory; 2. ten lakshore demonstration sites; 3. the preparation of lake lawn and yard nutrient management plans; 4. fact sheets on lakeshore stabilization, shoreland buffers, shoreland regulations and lawn care; 5. an annual lakeshore inventory and distribution of shoreland regulation materials; 6. formation of a Walworth Co. Lakes Association and meetings with and newsletter pertaining to Walworth Co. lakes; 7. Workshops, information packets and news articles pertaining to the Fox river Basin Partnership Team Lakes Initiative; and 8. the formation of the Walworth County Land Conservancy.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Lake Wandawega
Status
Complete
Walworth Cnty Land Use & Res Mgt: Res-Shoreline Habitat Restoration-Walworth Co.: Walworth County will continue the Walworth County Lakes Specialist position for one year. The Lakes Specialist will provide educational information to lake residents regarding shoreline stabilization and shoreline restoration. The Lakes Specialist will also design shoreline restoration projects for interested landowners, provide technical assistance to contractors and hold workshops on shoreland restoration. The project deliverable will be a report containing the following: 1) copies of the shoreland restoration designs; 2) copies of the fliers for each restoration workshop and 3) details regarding the accomplishments of the Lakes Specialist over the year of the grant. Two paper copies and one electronic copy of the report will be provided to the Department of Natural Resources
Grant Details
Lake Protection Grant
Date
1/1/2001
Waters Involved
Lulu Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Res-Walworth County Shoreland Protection Initiative: Walworth County will implement the Shoreland Protection Initiative project that includes:
1. A baseline lakeshore inventory; 2. ten lakshore demonstration sites; 3. the preparation of lake lawn and yard nutrient management plans; 4. fact sheets on lakeshore stabilization, shoreland buffers, shoreland regulations and lawn care; 5. an annual lakeshore inventory and distribution of shoreland regulation materials; 6. formation of a Walworth Co. Lakes Association and meetings with and newsletter pertaining to Walworth Co. lakes; 7. Workshops, information packets and news articles pertaining to the Fox river Basin Partnership Team Lakes Initiative; and 8. the formation of the Walworth County Land Conservancy.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Lulu Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Res-Shoreline Habitat Restoration-Walworth Co.: Walworth County will continue the Walworth County Lakes Specialist position for one year. The Lakes Specialist will provide educational information to lake residents regarding shoreline stabilization and shoreline restoration. The Lakes Specialist will also design shoreline restoration projects for interested landowners, provide technical assistance to contractors and hold workshops on shoreland restoration. The project deliverable will be a report containing the following: 1) copies of the shoreland restoration designs; 2) copies of the fliers for each restoration workshop and 3) details regarding the accomplishments of the Lakes Specialist over the year of the grant. Two paper copies and one electronic copy of the report will be provided to the Department of Natural Resources
Grant Details
Lake Protection Grant
Date
1/1/2001
Waters Involved
Lyons Millpond
Status
Complete
Walworth Cnty Land Use & Res Mgt: Res-Walworth County Shoreland Protection Initiative: Walworth County will implement the Shoreland Protection Initiative project that includes:
1. A baseline lakeshore inventory; 2. ten lakshore demonstration sites; 3. the preparation of lake lawn and yard nutrient management plans; 4. fact sheets on lakeshore stabilization, shoreland buffers, shoreland regulations and lawn care; 5. an annual lakeshore inventory and distribution of shoreland regulation materials; 6. formation of a Walworth Co. Lakes Association and meetings with and newsletter pertaining to Walworth Co. lakes; 7. Workshops, information packets and news articles pertaining to the Fox river Basin Partnership Team Lakes Initiative; and 8. the formation of the Walworth County Land Conservancy.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Lyons Millpond
Status
Complete
Walworth Cnty Land Use & Res Mgt: Res-Shoreline Habitat Restoration-Walworth Co.: Walworth County will continue the Walworth County Lakes Specialist position for one year. The Lakes Specialist will provide educational information to lake residents regarding shoreline stabilization and shoreline restoration. The Lakes Specialist will also design shoreline restoration projects for interested landowners, provide technical assistance to contractors and hold workshops on shoreland restoration. The project deliverable will be a report containing the following: 1) copies of the shoreland restoration designs; 2) copies of the fliers for each restoration workshop and 3) details regarding the accomplishments of the Lakes Specialist over the year of the grant. Two paper copies and one electronic copy of the report will be provided to the Department of Natural Resources
Grant Details
Lake Protection Grant
Date
1/1/2001
Waters Involved
Middle Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Res-Walworth County Shoreland Protection Initiative: Walworth County will implement the Shoreland Protection Initiative project that includes:
1. A baseline lakeshore inventory; 2. ten lakshore demonstration sites; 3. the preparation of lake lawn and yard nutrient management plans; 4. fact sheets on lakeshore stabilization, shoreland buffers, shoreland regulations and lawn care; 5. an annual lakeshore inventory and distribution of shoreland regulation materials; 6. formation of a Walworth Co. Lakes Association and meetings with and newsletter pertaining to Walworth Co. lakes; 7. Workshops, information packets and news articles pertaining to the Fox river Basin Partnership Team Lakes Initiative; and 8. the formation of the Walworth County Land Conservancy.
Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Middle Lake
Status
Complete
Lauderdale Lakes Conservancy, Inc: Acq-Middle Marsh Acquisition: This grant is to aquire the Comar Property of 4.54 acres of upland and marsh property. With this acquistion there will be an easement aquired of 50 foot wide for access to the property purchased.
The closing statement and recording of grant agreement will have to be finalized before issuing payment of grant amount.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Middle Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Res-Shoreline Habitat Restoration-Walworth Co.: Walworth County will continue the Walworth County Lakes Specialist position for one year. The Lakes Specialist will provide educational information to lake residents regarding shoreline stabilization and shoreline restoration. The Lakes Specialist will also design shoreline restoration projects for interested landowners, provide technical assistance to contractors and hold workshops on shoreland restoration. The project deliverable will be a report containing the following: 1) copies of the shoreland restoration designs; 2) copies of the fliers for each restoration workshop and 3) details regarding the accomplishments of the Lakes Specialist over the year of the grant. Two paper copies and one electronic copy of the report will be provided to the Department of Natural Resources
Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Mill Lake
Status
Complete
Lauderdale Lakes Management District: Res-Lauderdale Lakes Watershed Protection Project: The Lauderdale Lakes Management District will implement a comprehensive wetland restoration project throughout the watershed.
12/01/99 Scope Change. Wants to acquire land to create a recommended stormwater pond. Money that had been slated to install some BMP's will be shifted to the land acquisition and stormwater pond construction. The BMP's will be installed under the nonpoint program.
03/22/04 Scope Change. Wants to remove Wetland restoration from the project and add Shoreland Stabilization as one of the activities.
Grant Details
Lake Protection Grant
Date
1/1/2001
Waters Involved
Mill Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Res-Walworth County Shoreland Protection Initiative: Walworth County will implement the Shoreland Protection Initiative project that includes:
1. A baseline lakeshore inventory; 2. ten lakshore demonstration sites; 3. the preparation of lake lawn and yard nutrient management plans; 4. fact sheets on lakeshore stabilization, shoreland buffers, shoreland regulations and lawn care; 5. an annual lakeshore inventory and distribution of shoreland regulation materials; 6. formation of a Walworth Co. Lakes Association and meetings with and newsletter pertaining to Walworth Co. lakes; 7. Workshops, information packets and news articles pertaining to the Fox river Basin Partnership Team Lakes Initiative; and 8. the formation of the Walworth County Land Conservancy.
Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Mill Lake
Status
Complete
Lauderdale Lakes Management District: Lauderdale Lakes Wetland Restoration-Mill: The Lauderdale Lakes Management District will continue wetland/shoreland restoration activities on a property they own. 100 feet of shoreline will be stabilized with a combination of deltalock and biolog and planted with native aquatic plants. The approximately 7 acre wetland property will be restored where necessary. Approximately half of the wetland property needs enhancement. Invasive species will be removed. The site will be prepared and planted with native wetland plants. The project deliverable will be a short report detailing the restoration methods used. The report should contain a few before/after pictures. Department staff will tour the completed restoration site before closing the grant and issuing the final grant payment.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Mill Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Res-Shoreline Habitat Restoration-Walworth Co.: Walworth County will continue the Walworth County Lakes Specialist position for one year. The Lakes Specialist will provide educational information to lake residents regarding shoreline stabilization and shoreline restoration. The Lakes Specialist will also design shoreline restoration projects for interested landowners, provide technical assistance to contractors and hold workshops on shoreland restoration. The project deliverable will be a report containing the following: 1) copies of the shoreland restoration designs; 2) copies of the fliers for each restoration workshop and 3) details regarding the accomplishments of the Lakes Specialist over the year of the grant. Two paper copies and one electronic copy of the report will be provided to the Department of Natural Resources
Grant Details
Lake Protection Grant
Date
1/1/2001
Waters Involved
Millpond Park Pond
Status
Complete
Walworth Cnty Land Use & Res Mgt: Res-Walworth County Shoreland Protection Initiative: Walworth County will implement the Shoreland Protection Initiative project that includes:
1. A baseline lakeshore inventory; 2. ten lakshore demonstration sites; 3. the preparation of lake lawn and yard nutrient management plans; 4. fact sheets on lakeshore stabilization, shoreland buffers, shoreland regulations and lawn care; 5. an annual lakeshore inventory and distribution of shoreland regulation materials; 6. formation of a Walworth Co. Lakes Association and meetings with and newsletter pertaining to Walworth Co. lakes; 7. Workshops, information packets and news articles pertaining to the Fox river Basin Partnership Team Lakes Initiative; and 8. the formation of the Walworth County Land Conservancy.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Millpond Park Pond
Status
Complete
Walworth Cnty Land Use & Res Mgt: Res-Shoreline Habitat Restoration-Walworth Co.: Walworth County will continue the Walworth County Lakes Specialist position for one year. The Lakes Specialist will provide educational information to lake residents regarding shoreline stabilization and shoreline restoration. The Lakes Specialist will also design shoreline restoration projects for interested landowners, provide technical assistance to contractors and hold workshops on shoreland restoration. The project deliverable will be a report containing the following: 1) copies of the shoreland restoration designs; 2) copies of the fliers for each restoration workshop and 3) details regarding the accomplishments of the Lakes Specialist over the year of the grant. Two paper copies and one electronic copy of the report will be provided to the Department of Natural Resources
Grant Details
Lake Protection Grant
Date
1/1/2001
Waters Involved
Moelter Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Res-Walworth County Shoreland Protection Initiative: Walworth County will implement the Shoreland Protection Initiative project that includes:
1. A baseline lakeshore inventory; 2. ten lakshore demonstration sites; 3. the preparation of lake lawn and yard nutrient management plans; 4. fact sheets on lakeshore stabilization, shoreland buffers, shoreland regulations and lawn care; 5. an annual lakeshore inventory and distribution of shoreland regulation materials; 6. formation of a Walworth Co. Lakes Association and meetings with and newsletter pertaining to Walworth Co. lakes; 7. Workshops, information packets and news articles pertaining to the Fox river Basin Partnership Team Lakes Initiative; and 8. the formation of the Walworth County Land Conservancy.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Moelter Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Res-Shoreline Habitat Restoration-Walworth Co.: Walworth County will continue the Walworth County Lakes Specialist position for one year. The Lakes Specialist will provide educational information to lake residents regarding shoreline stabilization and shoreline restoration. The Lakes Specialist will also design shoreline restoration projects for interested landowners, provide technical assistance to contractors and hold workshops on shoreland restoration. The project deliverable will be a report containing the following: 1) copies of the shoreland restoration designs; 2) copies of the fliers for each restoration workshop and 3) details regarding the accomplishments of the Lakes Specialist over the year of the grant. Two paper copies and one electronic copy of the report will be provided to the Department of Natural Resources
Grant Details
Lake Protection Grant
Date
1/1/2001
Waters Involved
North Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Res-Walworth County Shoreland Protection Initiative: Walworth County will implement the Shoreland Protection Initiative project that includes:
1. A baseline lakeshore inventory; 2. ten lakshore demonstration sites; 3. the preparation of lake lawn and yard nutrient management plans; 4. fact sheets on lakeshore stabilization, shoreland buffers, shoreland regulations and lawn care; 5. an annual lakeshore inventory and distribution of shoreland regulation materials; 6. formation of a Walworth Co. Lakes Association and meetings with and newsletter pertaining to Walworth Co. lakes; 7. Workshops, information packets and news articles pertaining to the Fox river Basin Partnership Team Lakes Initiative; and 8. the formation of the Walworth County Land Conservancy.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
North Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Res-Shoreline Habitat Restoration-Walworth Co.: Walworth County will continue the Walworth County Lakes Specialist position for one year. The Lakes Specialist will provide educational information to lake residents regarding shoreline stabilization and shoreline restoration. The Lakes Specialist will also design shoreline restoration projects for interested landowners, provide technical assistance to contractors and hold workshops on shoreland restoration. The project deliverable will be a report containing the following: 1) copies of the shoreland restoration designs; 2) copies of the fliers for each restoration workshop and 3) details regarding the accomplishments of the Lakes Specialist over the year of the grant. Two paper copies and one electronic copy of the report will be provided to the Department of Natural Resources
Grant Details
Lake Protection Grant
Date
1/1/2001
Waters Involved
Pell Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Res-Walworth County Shoreland Protection Initiative: Walworth County will implement the Shoreland Protection Initiative project that includes:
1. A baseline lakeshore inventory; 2. ten lakshore demonstration sites; 3. the preparation of lake lawn and yard nutrient management plans; 4. fact sheets on lakeshore stabilization, shoreland buffers, shoreland regulations and lawn care; 5. an annual lakeshore inventory and distribution of shoreland regulation materials; 6. formation of a Walworth Co. Lakes Association and meetings with and newsletter pertaining to Walworth Co. lakes; 7. Workshops, information packets and news articles pertaining to the Fox river Basin Partnership Team Lakes Initiative; and 8. the formation of the Walworth County Land Conservancy.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Pell Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Res-Shoreline Habitat Restoration-Walworth Co.: Walworth County will continue the Walworth County Lakes Specialist position for one year. The Lakes Specialist will provide educational information to lake residents regarding shoreline stabilization and shoreline restoration. The Lakes Specialist will also design shoreline restoration projects for interested landowners, provide technical assistance to contractors and hold workshops on shoreland restoration. The project deliverable will be a report containing the following: 1) copies of the shoreland restoration designs; 2) copies of the fliers for each restoration workshop and 3) details regarding the accomplishments of the Lakes Specialist over the year of the grant. Two paper copies and one electronic copy of the report will be provided to the Department of Natural Resources
Grant Details
Lake Protection Grant
Date
1/1/2001
Waters Involved
Peterkin Pond
Status
Complete
Walworth Cnty Land Use & Res Mgt: Res-Walworth County Shoreland Protection Initiative: Walworth County will implement the Shoreland Protection Initiative project that includes:
1. A baseline lakeshore inventory; 2. ten lakshore demonstration sites; 3. the preparation of lake lawn and yard nutrient management plans; 4. fact sheets on lakeshore stabilization, shoreland buffers, shoreland regulations and lawn care; 5. an annual lakeshore inventory and distribution of shoreland regulation materials; 6. formation of a Walworth Co. Lakes Association and meetings with and newsletter pertaining to Walworth Co. lakes; 7. Workshops, information packets and news articles pertaining to the Fox river Basin Partnership Team Lakes Initiative; and 8. the formation of the Walworth County Land Conservancy.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Peterkin Pond
Status
Complete
Walworth Cnty Land Use & Res Mgt: Res-Shoreline Habitat Restoration-Walworth Co.: Walworth County will continue the Walworth County Lakes Specialist position for one year. The Lakes Specialist will provide educational information to lake residents regarding shoreline stabilization and shoreline restoration. The Lakes Specialist will also design shoreline restoration projects for interested landowners, provide technical assistance to contractors and hold workshops on shoreland restoration. The project deliverable will be a report containing the following: 1) copies of the shoreland restoration designs; 2) copies of the fliers for each restoration workshop and 3) details regarding the accomplishments of the Lakes Specialist over the year of the grant. Two paper copies and one electronic copy of the report will be provided to the Department of Natural Resources
Grant Details
Lake Protection Grant
Date
1/1/2001
Waters Involved
Peters Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Res-Walworth County Shoreland Protection Initiative: Walworth County will implement the Shoreland Protection Initiative project that includes:
1. A baseline lakeshore inventory; 2. ten lakshore demonstration sites; 3. the preparation of lake lawn and yard nutrient management plans; 4. fact sheets on lakeshore stabilization, shoreland buffers, shoreland regulations and lawn care; 5. an annual lakeshore inventory and distribution of shoreland regulation materials; 6. formation of a Walworth Co. Lakes Association and meetings with and newsletter pertaining to Walworth Co. lakes; 7. Workshops, information packets and news articles pertaining to the Fox river Basin Partnership Team Lakes Initiative; and 8. the formation of the Walworth County Land Conservancy.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Peters Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Res-Shoreline Habitat Restoration-Walworth Co.: Walworth County will continue the Walworth County Lakes Specialist position for one year. The Lakes Specialist will provide educational information to lake residents regarding shoreline stabilization and shoreline restoration. The Lakes Specialist will also design shoreline restoration projects for interested landowners, provide technical assistance to contractors and hold workshops on shoreland restoration. The project deliverable will be a report containing the following: 1) copies of the shoreland restoration designs; 2) copies of the fliers for each restoration workshop and 3) details regarding the accomplishments of the Lakes Specialist over the year of the grant. Two paper copies and one electronic copy of the report will be provided to the Department of Natural Resources
Grant Details
Lake Protection Grant
Date
1/1/2001
Waters Involved
Pickerel Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Res-Walworth County Shoreland Protection Initiative: Walworth County will implement the Shoreland Protection Initiative project that includes:
1. A baseline lakeshore inventory; 2. ten lakshore demonstration sites; 3. the preparation of lake lawn and yard nutrient management plans; 4. fact sheets on lakeshore stabilization, shoreland buffers, shoreland regulations and lawn care; 5. an annual lakeshore inventory and distribution of shoreland regulation materials; 6. formation of a Walworth Co. Lakes Association and meetings with and newsletter pertaining to Walworth Co. lakes; 7. Workshops, information packets and news articles pertaining to the Fox river Basin Partnership Team Lakes Initiative; and 8. the formation of the Walworth County Land Conservancy.
Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Pickerel Lake
Status
Complete
The Nature Conservancy: Acq-Pickerel Lake Fen-Campbell: Purchase of approximately 39 acres of the Campbell property with 1500 feet of lake frontage. This will help to facilitate land management, maintain high water quality, and provide a link to high quality natural areas.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Pickerel Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Res-Shoreline Habitat Restoration-Walworth Co.: Walworth County will continue the Walworth County Lakes Specialist position for one year. The Lakes Specialist will provide educational information to lake residents regarding shoreline stabilization and shoreline restoration. The Lakes Specialist will also design shoreline restoration projects for interested landowners, provide technical assistance to contractors and hold workshops on shoreland restoration. The project deliverable will be a report containing the following: 1) copies of the shoreland restoration designs; 2) copies of the fliers for each restoration workshop and 3) details regarding the accomplishments of the Lakes Specialist over the year of the grant. Two paper copies and one electronic copy of the report will be provided to the Department of Natural Resources
Grant Details
Lake Protection Grant
Date
1/1/2001
Waters Involved
Pleasant Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Res-Walworth County Shoreland Protection Initiative: Walworth County will implement the Shoreland Protection Initiative project that includes:
1. A baseline lakeshore inventory; 2. ten lakshore demonstration sites; 3. the preparation of lake lawn and yard nutrient management plans; 4. fact sheets on lakeshore stabilization, shoreland buffers, shoreland regulations and lawn care; 5. an annual lakeshore inventory and distribution of shoreland regulation materials; 6. formation of a Walworth Co. Lakes Association and meetings with and newsletter pertaining to Walworth Co. lakes; 7. Workshops, information packets and news articles pertaining to the Fox river Basin Partnership Team Lakes Initiative; and 8. the formation of the Walworth County Land Conservancy.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Pleasant Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Res-Shoreline Habitat Restoration-Walworth Co.: Walworth County will continue the Walworth County Lakes Specialist position for one year. The Lakes Specialist will provide educational information to lake residents regarding shoreline stabilization and shoreline restoration. The Lakes Specialist will also design shoreline restoration projects for interested landowners, provide technical assistance to contractors and hold workshops on shoreland restoration. The project deliverable will be a report containing the following: 1) copies of the shoreland restoration designs; 2) copies of the fliers for each restoration workshop and 3) details regarding the accomplishments of the Lakes Specialist over the year of the grant. Two paper copies and one electronic copy of the report will be provided to the Department of Natural Resources
Grant Details
Lake Protection Grant
Date
8/25/1993
Waters Involved
Potter Lake
Status
Complete
Town Of East Troy: Acq-Potter'S Lake Wetland Acquisition-Torp Property: The Town of East Troy will acquire approximately 24 acres west of Potter's Lake for lake protection and outdoor recreation purposes. Eligible costs include the acquisition of the parcel, appraisal fee and survey costs.
Grant Details
Lake Protection Grant
Date
1/1/2001
Waters Involved
Potter Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Res-Walworth County Shoreland Protection Initiative: Walworth County will implement the Shoreland Protection Initiative project that includes:
1. A baseline lakeshore inventory; 2. ten lakshore demonstration sites; 3. the preparation of lake lawn and yard nutrient management plans; 4. fact sheets on lakeshore stabilization, shoreland buffers, shoreland regulations and lawn care; 5. an annual lakeshore inventory and distribution of shoreland regulation materials; 6. formation of a Walworth Co. Lakes Association and meetings with and newsletter pertaining to Walworth Co. lakes; 7. Workshops, information packets and news articles pertaining to the Fox river Basin Partnership Team Lakes Initiative; and 8. the formation of the Walworth County Land Conservancy.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Potter Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Res-Shoreline Habitat Restoration-Walworth Co.: Walworth County will continue the Walworth County Lakes Specialist position for one year. The Lakes Specialist will provide educational information to lake residents regarding shoreline stabilization and shoreline restoration. The Lakes Specialist will also design shoreline restoration projects for interested landowners, provide technical assistance to contractors and hold workshops on shoreland restoration. The project deliverable will be a report containing the following: 1) copies of the shoreland restoration designs; 2) copies of the fliers for each restoration workshop and 3) details regarding the accomplishments of the Lakes Specialist over the year of the grant. Two paper copies and one electronic copy of the report will be provided to the Department of Natural Resources
Grant Details
Lake Protection Grant
Date
9/1/2000
Waters Involved
Powers Lake
Status
Complete
Powers Lake Protection And Rehab. District: Acq-Wetland Acquisition-Powers Lake: This wetland acquisition project includes the following: 1)Acquire through fee simple purchase wetlands reparian to the unnamed stream discharging into Powers Lake; 2)Promote the essential sturcture and function of these wetland areas to ensure positive water quality benefit to the downstream Powers Lake; 3)Facilitate the maintenance of wetland and wildlife habitat within the designated primary environmental corridor tributary to Powers Lake; 4)Encourage public knowledge and understanding of wetland ecosystems through programming in consultation with relevant institutions and agencies.
Grant Details
Lake Protection Grant
Date
1/1/2001
Waters Involved
Powers Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Res-Walworth County Shoreland Protection Initiative: Walworth County will implement the Shoreland Protection Initiative project that includes:
1. A baseline lakeshore inventory; 2. ten lakshore demonstration sites; 3. the preparation of lake lawn and yard nutrient management plans; 4. fact sheets on lakeshore stabilization, shoreland buffers, shoreland regulations and lawn care; 5. an annual lakeshore inventory and distribution of shoreland regulation materials; 6. formation of a Walworth Co. Lakes Association and meetings with and newsletter pertaining to Walworth Co. lakes; 7. Workshops, information packets and news articles pertaining to the Fox river Basin Partnership Team Lakes Initiative; and 8. the formation of the Walworth County Land Conservancy.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Powers Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Res-Shoreline Habitat Restoration-Walworth Co.: Walworth County will continue the Walworth County Lakes Specialist position for one year. The Lakes Specialist will provide educational information to lake residents regarding shoreline stabilization and shoreline restoration. The Lakes Specialist will also design shoreline restoration projects for interested landowners, provide technical assistance to contractors and hold workshops on shoreland restoration. The project deliverable will be a report containing the following: 1) copies of the shoreland restoration designs; 2) copies of the fliers for each restoration workshop and 3) details regarding the accomplishments of the Lakes Specialist over the year of the grant. Two paper copies and one electronic copy of the report will be provided to the Department of Natural Resources
Grant Details
Lake Protection Grant
Date
1/1/2001
Waters Involved
Rice Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Res-Walworth County Shoreland Protection Initiative: Walworth County will implement the Shoreland Protection Initiative project that includes:
1. A baseline lakeshore inventory; 2. ten lakshore demonstration sites; 3. the preparation of lake lawn and yard nutrient management plans; 4. fact sheets on lakeshore stabilization, shoreland buffers, shoreland regulations and lawn care; 5. an annual lakeshore inventory and distribution of shoreland regulation materials; 6. formation of a Walworth Co. Lakes Association and meetings with and newsletter pertaining to Walworth Co. lakes; 7. Workshops, information packets and news articles pertaining to the Fox river Basin Partnership Team Lakes Initiative; and 8. the formation of the Walworth County Land Conservancy.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Rice Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Res-Shoreline Habitat Restoration-Walworth Co.: Walworth County will continue the Walworth County Lakes Specialist position for one year. The Lakes Specialist will provide educational information to lake residents regarding shoreline stabilization and shoreline restoration. The Lakes Specialist will also design shoreline restoration projects for interested landowners, provide technical assistance to contractors and hold workshops on shoreland restoration. The project deliverable will be a report containing the following: 1) copies of the shoreland restoration designs; 2) copies of the fliers for each restoration workshop and 3) details regarding the accomplishments of the Lakes Specialist over the year of the grant. Two paper copies and one electronic copy of the report will be provided to the Department of Natural Resources
Grant Details
Lake Protection Grant
Date
1/1/2001
Waters Involved
Silver Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Res-Walworth County Shoreland Protection Initiative: Walworth County will implement the Shoreland Protection Initiative project that includes:
1. A baseline lakeshore inventory; 2. ten lakshore demonstration sites; 3. the preparation of lake lawn and yard nutrient management plans; 4. fact sheets on lakeshore stabilization, shoreland buffers, shoreland regulations and lawn care; 5. an annual lakeshore inventory and distribution of shoreland regulation materials; 6. formation of a Walworth Co. Lakes Association and meetings with and newsletter pertaining to Walworth Co. lakes; 7. Workshops, information packets and news articles pertaining to the Fox river Basin Partnership Team Lakes Initiative; and 8. the formation of the Walworth County Land Conservancy.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Silver Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Res-Shoreline Habitat Restoration-Walworth Co.: Walworth County will continue the Walworth County Lakes Specialist position for one year. The Lakes Specialist will provide educational information to lake residents regarding shoreline stabilization and shoreline restoration. The Lakes Specialist will also design shoreline restoration projects for interested landowners, provide technical assistance to contractors and hold workshops on shoreland restoration. The project deliverable will be a report containing the following: 1) copies of the shoreland restoration designs; 2) copies of the fliers for each restoration workshop and 3) details regarding the accomplishments of the Lakes Specialist over the year of the grant. Two paper copies and one electronic copy of the report will be provided to the Department of Natural Resources
Grant Details
Lake Protection Grant
Date
1/1/2001
Waters Involved
Swan Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Res-Walworth County Shoreland Protection Initiative: Walworth County will implement the Shoreland Protection Initiative project that includes:
1. A baseline lakeshore inventory; 2. ten lakshore demonstration sites; 3. the preparation of lake lawn and yard nutrient management plans; 4. fact sheets on lakeshore stabilization, shoreland buffers, shoreland regulations and lawn care; 5. an annual lakeshore inventory and distribution of shoreland regulation materials; 6. formation of a Walworth Co. Lakes Association and meetings with and newsletter pertaining to Walworth Co. lakes; 7. Workshops, information packets and news articles pertaining to the Fox river Basin Partnership Team Lakes Initiative; and 8. the formation of the Walworth County Land Conservancy.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Swan Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Res-Shoreline Habitat Restoration-Walworth Co.: Walworth County will continue the Walworth County Lakes Specialist position for one year. The Lakes Specialist will provide educational information to lake residents regarding shoreline stabilization and shoreline restoration. The Lakes Specialist will also design shoreline restoration projects for interested landowners, provide technical assistance to contractors and hold workshops on shoreland restoration. The project deliverable will be a report containing the following: 1) copies of the shoreland restoration designs; 2) copies of the fliers for each restoration workshop and 3) details regarding the accomplishments of the Lakes Specialist over the year of the grant. Two paper copies and one electronic copy of the report will be provided to the Department of Natural Resources
Grant Details
Lake Protection Grant
Date
1/1/2001
Waters Involved
Swift Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Res-Walworth County Shoreland Protection Initiative: Walworth County will implement the Shoreland Protection Initiative project that includes:
1. A baseline lakeshore inventory; 2. ten lakshore demonstration sites; 3. the preparation of lake lawn and yard nutrient management plans; 4. fact sheets on lakeshore stabilization, shoreland buffers, shoreland regulations and lawn care; 5. an annual lakeshore inventory and distribution of shoreland regulation materials; 6. formation of a Walworth Co. Lakes Association and meetings with and newsletter pertaining to Walworth Co. lakes; 7. Workshops, information packets and news articles pertaining to the Fox river Basin Partnership Team Lakes Initiative; and 8. the formation of the Walworth County Land Conservancy.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Swift Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Res-Shoreline Habitat Restoration-Walworth Co.: Walworth County will continue the Walworth County Lakes Specialist position for one year. The Lakes Specialist will provide educational information to lake residents regarding shoreline stabilization and shoreline restoration. The Lakes Specialist will also design shoreline restoration projects for interested landowners, provide technical assistance to contractors and hold workshops on shoreland restoration. The project deliverable will be a report containing the following: 1) copies of the shoreland restoration designs; 2) copies of the fliers for each restoration workshop and 3) details regarding the accomplishments of the Lakes Specialist over the year of the grant. Two paper copies and one electronic copy of the report will be provided to the Department of Natural Resources
Grant Details
Lake Protection Grant
Date
1/1/2001
Waters Involved
Tombeau Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Res-Walworth County Shoreland Protection Initiative: Walworth County will implement the Shoreland Protection Initiative project that includes:
1. A baseline lakeshore inventory; 2. ten lakshore demonstration sites; 3. the preparation of lake lawn and yard nutrient management plans; 4. fact sheets on lakeshore stabilization, shoreland buffers, shoreland regulations and lawn care; 5. an annual lakeshore inventory and distribution of shoreland regulation materials; 6. formation of a Walworth Co. Lakes Association and meetings with and newsletter pertaining to Walworth Co. lakes; 7. Workshops, information packets and news articles pertaining to the Fox river Basin Partnership Team Lakes Initiative; and 8. the formation of the Walworth County Land Conservancy.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Tombeau Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Res-Shoreline Habitat Restoration-Walworth Co.: Walworth County will continue the Walworth County Lakes Specialist position for one year. The Lakes Specialist will provide educational information to lake residents regarding shoreline stabilization and shoreline restoration. The Lakes Specialist will also design shoreline restoration projects for interested landowners, provide technical assistance to contractors and hold workshops on shoreland restoration. The project deliverable will be a report containing the following: 1) copies of the shoreland restoration designs; 2) copies of the fliers for each restoration workshop and 3) details regarding the accomplishments of the Lakes Specialist over the year of the grant. Two paper copies and one electronic copy of the report will be provided to the Department of Natural Resources
Grant Details
Lake Protection Grant
Date
1/1/2001
Waters Involved
Tripp Lake (Trapp)
Status
Complete
Walworth Cnty Land Use & Res Mgt: Res-Walworth County Shoreland Protection Initiative: Walworth County will implement the Shoreland Protection Initiative project that includes:
1. A baseline lakeshore inventory; 2. ten lakshore demonstration sites; 3. the preparation of lake lawn and yard nutrient management plans; 4. fact sheets on lakeshore stabilization, shoreland buffers, shoreland regulations and lawn care; 5. an annual lakeshore inventory and distribution of shoreland regulation materials; 6. formation of a Walworth Co. Lakes Association and meetings with and newsletter pertaining to Walworth Co. lakes; 7. Workshops, information packets and news articles pertaining to the Fox river Basin Partnership Team Lakes Initiative; and 8. the formation of the Walworth County Land Conservancy.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Tripp Lake (Trapp)
Status
Complete
Walworth Cnty Land Use & Res Mgt: Res-Shoreline Habitat Restoration-Walworth Co.: Walworth County will continue the Walworth County Lakes Specialist position for one year. The Lakes Specialist will provide educational information to lake residents regarding shoreline stabilization and shoreline restoration. The Lakes Specialist will also design shoreline restoration projects for interested landowners, provide technical assistance to contractors and hold workshops on shoreland restoration. The project deliverable will be a report containing the following: 1) copies of the shoreland restoration designs; 2) copies of the fliers for each restoration workshop and 3) details regarding the accomplishments of the Lakes Specialist over the year of the grant. Two paper copies and one electronic copy of the report will be provided to the Department of Natural Resources
Grant Details
Lake Protection Grant
Date
1/1/2001
Waters Involved
Trout Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Res-Walworth County Shoreland Protection Initiative: Walworth County will implement the Shoreland Protection Initiative project that includes:
1. A baseline lakeshore inventory; 2. ten lakshore demonstration sites; 3. the preparation of lake lawn and yard nutrient management plans; 4. fact sheets on lakeshore stabilization, shoreland buffers, shoreland regulations and lawn care; 5. an annual lakeshore inventory and distribution of shoreland regulation materials; 6. formation of a Walworth Co. Lakes Association and meetings with and newsletter pertaining to Walworth Co. lakes; 7. Workshops, information packets and news articles pertaining to the Fox river Basin Partnership Team Lakes Initiative; and 8. the formation of the Walworth County Land Conservancy.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Trout Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Res-Shoreline Habitat Restoration-Walworth Co.: Walworth County will continue the Walworth County Lakes Specialist position for one year. The Lakes Specialist will provide educational information to lake residents regarding shoreline stabilization and shoreline restoration. The Lakes Specialist will also design shoreline restoration projects for interested landowners, provide technical assistance to contractors and hold workshops on shoreland restoration. The project deliverable will be a report containing the following: 1) copies of the shoreland restoration designs; 2) copies of the fliers for each restoration workshop and 3) details regarding the accomplishments of the Lakes Specialist over the year of the grant. Two paper copies and one electronic copy of the report will be provided to the Department of Natural Resources
Grant Details
Lake Protection Grant
Date
1/1/2001
Waters Involved
Turtle Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Res-Walworth County Shoreland Protection Initiative: Walworth County will implement the Shoreland Protection Initiative project that includes:
1. A baseline lakeshore inventory; 2. ten lakshore demonstration sites; 3. the preparation of lake lawn and yard nutrient management plans; 4. fact sheets on lakeshore stabilization, shoreland buffers, shoreland regulations and lawn care; 5. an annual lakeshore inventory and distribution of shoreland regulation materials; 6. formation of a Walworth Co. Lakes Association and meetings with and newsletter pertaining to Walworth Co. lakes; 7. Workshops, information packets and news articles pertaining to the Fox river Basin Partnership Team Lakes Initiative; and 8. the formation of the Walworth County Land Conservancy.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Turtle Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Res-Shoreline Habitat Restoration-Walworth Co.: Walworth County will continue the Walworth County Lakes Specialist position for one year. The Lakes Specialist will provide educational information to lake residents regarding shoreline stabilization and shoreline restoration. The Lakes Specialist will also design shoreline restoration projects for interested landowners, provide technical assistance to contractors and hold workshops on shoreland restoration. The project deliverable will be a report containing the following: 1) copies of the shoreland restoration designs; 2) copies of the fliers for each restoration workshop and 3) details regarding the accomplishments of the Lakes Specialist over the year of the grant. Two paper copies and one electronic copy of the report will be provided to the Department of Natural Resources
Grant Details
Lake Protection Grant
Date
1/1/2001
Waters Involved
Unnamed
Status
Complete
Walworth Cnty Land Use & Res Mgt: Res-Walworth County Shoreland Protection Initiative: Walworth County will implement the Shoreland Protection Initiative project that includes:
1. A baseline lakeshore inventory; 2. ten lakshore demonstration sites; 3. the preparation of lake lawn and yard nutrient management plans; 4. fact sheets on lakeshore stabilization, shoreland buffers, shoreland regulations and lawn care; 5. an annual lakeshore inventory and distribution of shoreland regulation materials; 6. formation of a Walworth Co. Lakes Association and meetings with and newsletter pertaining to Walworth Co. lakes; 7. Workshops, information packets and news articles pertaining to the Fox river Basin Partnership Team Lakes Initiative; and 8. the formation of the Walworth County Land Conservancy.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Unnamed
Status
Complete
Walworth Cnty Land Use & Res Mgt: Res-Shoreline Habitat Restoration-Walworth Co.: Walworth County will continue the Walworth County Lakes Specialist position for one year. The Lakes Specialist will provide educational information to lake residents regarding shoreline stabilization and shoreline restoration. The Lakes Specialist will also design shoreline restoration projects for interested landowners, provide technical assistance to contractors and hold workshops on shoreland restoration. The project deliverable will be a report containing the following: 1) copies of the shoreland restoration designs; 2) copies of the fliers for each restoration workshop and 3) details regarding the accomplishments of the Lakes Specialist over the year of the grant. Two paper copies and one electronic copy of the report will be provided to the Department of Natural Resources
Grant Details
Lake Protection Grant
Date
4/15/2017
Waters Involved
Unnamed
Status
Complete
Town Of Delavan: Lmi - Delavan Town Park Bmp Project: The Town of Delavan is sponsoring a project to install Best Management Practices along an unnamed tributary to Delavan Lake that terminates in the Town Park.
Project final deliverables include: a copy of the final plans and specifications and a photo essay showing before and after pictures of each BMP element.
Specific project activities include: 1) development of design and final plans for the project; 2) installation of approximately 10 BMP elements along the unnamed tributary to Delavan Lake.
Special Conditions: 1) All data shall be entered into the SWIMS database; 2) Volunteer lists, equipment use lists and signatures shall be maintained for reporting in kind volunteer labor and equipment.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.
The Grantee should provide the DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Lake Protection Grant
Date
1/1/2001
Waters Involved
Whitewater Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Res-Walworth County Shoreland Protection Initiative: Walworth County will implement the Shoreland Protection Initiative project that includes:
1. A baseline lakeshore inventory; 2. ten lakshore demonstration sites; 3. the preparation of lake lawn and yard nutrient management plans; 4. fact sheets on lakeshore stabilization, shoreland buffers, shoreland regulations and lawn care; 5. an annual lakeshore inventory and distribution of shoreland regulation materials; 6. formation of a Walworth Co. Lakes Association and meetings with and newsletter pertaining to Walworth Co. lakes; 7. Workshops, information packets and news articles pertaining to the Fox river Basin Partnership Team Lakes Initiative; and 8. the formation of the Walworth County Land Conservancy.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Whitewater Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Res-Shoreline Habitat Restoration-Walworth Co.: Walworth County will continue the Walworth County Lakes Specialist position for one year. The Lakes Specialist will provide educational information to lake residents regarding shoreline stabilization and shoreline restoration. The Lakes Specialist will also design shoreline restoration projects for interested landowners, provide technical assistance to contractors and hold workshops on shoreland restoration. The project deliverable will be a report containing the following: 1) copies of the shoreland restoration designs; 2) copies of the fliers for each restoration workshop and 3) details regarding the accomplishments of the Lakes Specialist over the year of the grant. Two paper copies and one electronic copy of the report will be provided to the Department of Natural Resources
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Army Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Lake Community Planning Inventory-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to 99 units of government and lake associations in Walworth County that are directly involved with the 36 lakes in Walworth County. The survey will inquire about institutional tools, laws, ordinances, studies and educational programs that currently exist or are needed. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.
Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Army Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Lakehore Landowners Survey Grant-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to approximately 6000 lakeshore landowners. The survey will inquire about landowner knowledge, views, perceptions and interest in water quality problems and water quality protection measures. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.
Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Benedict Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Lake Community Planning Inventory-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to 99 units of government and lake associations in Walworth County that are directly involved with the 36 lakes in Walworth County. The survey will inquire about institutional tools, laws, ordinances, studies and educational programs that currently exist or are needed. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.
Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Benedict Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Lakehore Landowners Survey Grant-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to approximately 6000 lakeshore landowners. The survey will inquire about landowner knowledge, views, perceptions and interest in water quality problems and water quality protection measures. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.
Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
12/20/1990
Waters Involved
Bohner Lake
Status
Complete
Bohners Lake Improvement Association: Bohners Lake Data Collection And Erosion Reduction Analysis: Determine and delineate watershed boundary; map land use, land cover, slopes, soils, and rainfall data; take 2 upland soil samples and 4 lake sediment samples; estimate voulume and characteristics of sediment entering the lake; develop recommendations forfor erosion reduction; determine trap efficiency of the inlet area; analyze the inlet through Corp of Engineer's 'SETTLE' computer program. Project information will be distributed through newsletter, public meeting, local newspaper article,poster display, and entire report mailing.
Grant Details
Large Scale Lake Planning
Date
3/31/1995
Waters Involved
Bohner Lake
Status
Complete
Bohners Lake Improvement Association: Bohner Lake Aquatic Plant Study And Management Plan: Determine the composition of aquatic plant communities and their distribution to Bohners Lake. Identify present and planned lake use and identify any potential conflict related to the current population of aquatic plant growth. Develop an aquatic plantmanagement plan which includes a summary review of alternative measures for plant management. Discuss the importance of native aquatic plants and the problem associated with exotic plant species. Educate the community about the role of aquatic plantsthrough the process of the plan development. The grantee will disseminate information to the public by newsletter mailings, fact sheet distributions, public meetings and local newspaper articles. Project results will be reposited in local mail boxes.
Grant Details
Large Scale Lake Planning
Date
4/1/2003
Waters Involved
Bohner Lake
Status
Complete
Bohners Lake Sanitary District: Bohners Lake Apm Plan: This project will complete a 20 line transect survey and develop an aquatic plant management plan. Project deliverable will be the aquatic plant managmenet plan which will include the following:
1) Plant transect survey results
2) Maps of plant beds and lake morphology
3) Identification of ecologically sensitive areas
4) Historical aquatic plant management techniques used on the lake
5) Discussion of plant management alternatives
6) Recommendations for appropriate plant management activities
The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.
Grant Details
Large Scale Lake Planning
Date
10/1/2005
Waters Involved
Bohner Lake
Status
Complete
Bohners Lake Sanitary District: Sediment Movement Study: Eight sets of samples will be taken at the Bohners Lake inlet. Samples will be analyzed for total mass weight, particle size analysis and percent organic matter. A stream flow measurement will be taken on each of the eight sampling dates. The samples will be taken with a Helley Smith Sampler. Three sets of samples will be taken under baseflow conditions and five will be taken during storm events. The project deliverable will be a report containing 1) all of the data collected (flow, total mass weight, particle size analysis and percent organic matter) for each of the eight sampling dates and 2) calculations and discussion of the total mass of material moving down the stream on an annual basis. Two paper copies and one electronic copy of the report will be provided to the DNR before the project can be closed out.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Booth Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Lake Community Planning Inventory-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to 99 units of government and lake associations in Walworth County that are directly involved with the 36 lakes in Walworth County. The survey will inquire about institutional tools, laws, ordinances, studies and educational programs that currently exist or are needed. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.
Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Booth Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Lakehore Landowners Survey Grant-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to approximately 6000 lakeshore landowners. The survey will inquire about landowner knowledge, views, perceptions and interest in water quality problems and water quality protection measures. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.
Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
12/20/1991
Waters Involved
Camp Lake
Status
Complete
Camp & Center Lakes Rehabilitation District: Camp Lake Water Quality Monitoring: Water quality monitoring during 1992-96, on schedule, at depths, and for parameters, as described in Tables titled 'Proposed Water quality monitoring and Watershed Water quality Monitorings' as amended in letter dated August 15, 1991 from Mark Doneux toRobert Wakeman. Tables and letter are attached to the application. A final report shall be produced which summarizes the data described in 1 above and identifies water quality trends. DNR shall receive copies of the final report.Information shall be disseminated to the public by newsletter mailings, local newspaper articles, public meetings, and summary report mailings. Project reposited at the Town od Salem, Kenosha County LCD, Lake District, DNR-SED, R. A. Smith & Assoc. Inc.
Grant Details
Large Scale Lake Planning
Date
10/18/1993
Waters Involved
Camp Lake
Status
Complete
Camp & Center Lakes Rehabilitation District: Camp Lake Aquatic Plant Mgmt Plan & Hydrologic Study: Develop an aquatic plant management plan. Conduct a hydrology and hydraulic study. Information will be disseminated to the public by newsletter, local newspaper articles and public meetings. Project results will be reposited at Local Library and SalemTown Hall.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Cedar Grove Pond
Status
Complete
Walworth Cnty Land Use & Res Mgt: Lake Community Planning Inventory-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to 99 units of government and lake associations in Walworth County that are directly involved with the 36 lakes in Walworth County. The survey will inquire about institutional tools, laws, ordinances, studies and educational programs that currently exist or are needed. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.
Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Cedar Grove Pond
Status
Complete
Walworth Cnty Land Use & Res Mgt: Lakehore Landowners Survey Grant-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to approximately 6000 lakeshore landowners. The survey will inquire about landowner knowledge, views, perceptions and interest in water quality problems and water quality protection measures. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.
Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
12/20/1991
Waters Involved
Center Lake
Status
Complete
Camp & Center Lakes Rehabilitation District: Center Lake Water Quality Monitoring: Water quality monitoring during 1992-96, on schedule, at depths, and for parameters, as described in Tables titled 'Proposed Water quality monitoring and Watershed Water Quality Monitorings' as amended in letter dated August 15, 1991 from Mark Doneux toRobert Wakeman. Tables and letter are attached to the application. A final report shall be produced which summarizes the data described in 1 above and identifies water quality trends. DNR shall receive copies of the final report.Information shall be disseminated to the public by newsletter mailings, local newspaper articles, public meetings, and summary report mailings. Project reposited at the Town od Salem, Kenosha County LCD, Lake District, DNR-SED, R. A. Smith & Assoc. Inc.
Grant Details
Large Scale Lake Planning
Date
10/18/1993
Waters Involved
Center Lake
Status
Complete
Camp & Center Lakes Rehabilitation District: Center Lake Aquatic Plant Management Plan: Develop an aquatic plant management plan. Information will be disseminated to the public by newsletter, local newspaper articles and public meetings. Project results will be reposited at Local Library and Salem Town Hall.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Ceylon Lagoon
Status
Complete
Walworth Cnty Land Use & Res Mgt: Lake Community Planning Inventory-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to 99 units of government and lake associations in Walworth County that are directly involved with the 36 lakes in Walworth County. The survey will inquire about institutional tools, laws, ordinances, studies and educational programs that currently exist or are needed. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.
Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Ceylon Lagoon
Status
Complete
Walworth Cnty Land Use & Res Mgt: Lakehore Landowners Survey Grant-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to approximately 6000 lakeshore landowners. The survey will inquire about landowner knowledge, views, perceptions and interest in water quality problems and water quality protection measures. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.
Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Como Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Lake Community Planning Inventory-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to 99 units of government and lake associations in Walworth County that are directly involved with the 36 lakes in Walworth County. The survey will inquire about institutional tools, laws, ordinances, studies and educational programs that currently exist or are needed. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.
Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Como Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Lakehore Landowners Survey Grant-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to approximately 6000 lakeshore landowners. The survey will inquire about landowner knowledge, views, perceptions and interest in water quality problems and water quality protection measures. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.
Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Comus Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Lake Community Planning Inventory-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to 99 units of government and lake associations in Walworth County that are directly involved with the 36 lakes in Walworth County. The survey will inquire about institutional tools, laws, ordinances, studies and educational programs that currently exist or are needed. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.
Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Comus Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Lakehore Landowners Survey Grant-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to approximately 6000 lakeshore landowners. The survey will inquire about landowner knowledge, views, perceptions and interest in water quality problems and water quality protection measures. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.
Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Congdon Park Pond
Status
Complete
Walworth Cnty Land Use & Res Mgt: Lake Community Planning Inventory-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to 99 units of government and lake associations in Walworth County that are directly involved with the 36 lakes in Walworth County. The survey will inquire about institutional tools, laws, ordinances, studies and educational programs that currently exist or are needed. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.
Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Congdon Park Pond
Status
Complete
Walworth Cnty Land Use & Res Mgt: Lakehore Landowners Survey Grant-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to approximately 6000 lakeshore landowners. The survey will inquire about landowner knowledge, views, perceptions and interest in water quality problems and water quality protection measures. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.
Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Cravath Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Lake Community Planning Inventory-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to 99 units of government and lake associations in Walworth County that are directly involved with the 36 lakes in Walworth County. The survey will inquire about institutional tools, laws, ordinances, studies and educational programs that currently exist or are needed. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.
Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Cravath Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Lakehore Landowners Survey Grant-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to approximately 6000 lakeshore landowners. The survey will inquire about landowner knowledge, views, perceptions and interest in water quality problems and water quality protection measures. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.
Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Delavan Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Lake Community Planning Inventory-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to 99 units of government and lake associations in Walworth County that are directly involved with the 36 lakes in Walworth County. The survey will inquire about institutional tools, laws, ordinances, studies and educational programs that currently exist or are needed. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.
Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Delavan Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Lakehore Landowners Survey Grant-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to approximately 6000 lakeshore landowners. The survey will inquire about landowner knowledge, views, perceptions and interest in water quality problems and water quality protection measures. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.
Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Eagle Spring Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Lake Community Planning Inventory-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to 99 units of government and lake associations in Walworth County that are directly involved with the 36 lakes in Walworth County. The survey will inquire about institutional tools, laws, ordinances, studies and educational programs that currently exist or are needed. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.
Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Eagle Spring Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Lakehore Landowners Survey Grant-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to approximately 6000 lakeshore landowners. The survey will inquire about landowner knowledge, views, perceptions and interest in water quality problems and water quality protection measures. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.
Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
East Troy Pond (Trent)
Status
Complete
Walworth Cnty Land Use & Res Mgt: Lake Community Planning Inventory-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to 99 units of government and lake associations in Walworth County that are directly involved with the 36 lakes in Walworth County. The survey will inquire about institutional tools, laws, ordinances, studies and educational programs that currently exist or are needed. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.
Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
East Troy Pond (Trent)
Status
Complete
Walworth Cnty Land Use & Res Mgt: Lakehore Landowners Survey Grant-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to approximately 6000 lakeshore landowners. The survey will inquire about landowner knowledge, views, perceptions and interest in water quality problems and water quality protection measures. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.
Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Elkhorn Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Lake Community Planning Inventory-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to 99 units of government and lake associations in Walworth County that are directly involved with the 36 lakes in Walworth County. The survey will inquire about institutional tools, laws, ordinances, studies and educational programs that currently exist or are needed. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.
Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Elkhorn Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Lakehore Landowners Survey Grant-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to approximately 6000 lakeshore landowners. The survey will inquire about landowner knowledge, views, perceptions and interest in water quality problems and water quality protection measures. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.
Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Geneva Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Lake Community Planning Inventory-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to 99 units of government and lake associations in Walworth County that are directly involved with the 36 lakes in Walworth County. The survey will inquire about institutional tools, laws, ordinances, studies and educational programs that currently exist or are needed. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.
Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Geneva Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Lakehore Landowners Survey Grant-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to approximately 6000 lakeshore landowners. The survey will inquire about landowner knowledge, views, perceptions and interest in water quality problems and water quality protection measures. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.
Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Goose Pond
Status
Complete
Walworth Cnty Land Use & Res Mgt: Lake Community Planning Inventory-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to 99 units of government and lake associations in Walworth County that are directly involved with the 36 lakes in Walworth County. The survey will inquire about institutional tools, laws, ordinances, studies and educational programs that currently exist or are needed. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.
Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Goose Pond
Status
Complete
Walworth Cnty Land Use & Res Mgt: Lakehore Landowners Survey Grant-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to approximately 6000 lakeshore landowners. The survey will inquire about landowner knowledge, views, perceptions and interest in water quality problems and water quality protection measures. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.
Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Green Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Lake Community Planning Inventory-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to 99 units of government and lake associations in Walworth County that are directly involved with the 36 lakes in Walworth County. The survey will inquire about institutional tools, laws, ordinances, studies and educational programs that currently exist or are needed. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.
Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Green Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Lakehore Landowners Survey Grant-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to approximately 6000 lakeshore landowners. The survey will inquire about landowner knowledge, views, perceptions and interest in water quality problems and water quality protection measures. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.
Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Hilburn Pond
Status
Complete
Walworth Cnty Land Use & Res Mgt: Lake Community Planning Inventory-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to 99 units of government and lake associations in Walworth County that are directly involved with the 36 lakes in Walworth County. The survey will inquire about institutional tools, laws, ordinances, studies and educational programs that currently exist or are needed. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.
Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Hilburn Pond
Status
Complete
Walworth Cnty Land Use & Res Mgt: Lakehore Landowners Survey Grant-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to approximately 6000 lakeshore landowners. The survey will inquire about landowner knowledge, views, perceptions and interest in water quality problems and water quality protection measures. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.
Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Honey Lake (Vienna)
Status
Complete
Walworth Cnty Land Use & Res Mgt: Lake Community Planning Inventory-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to 99 units of government and lake associations in Walworth County that are directly involved with the 36 lakes in Walworth County. The survey will inquire about institutional tools, laws, ordinances, studies and educational programs that currently exist or are needed. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.
Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Honey Lake (Vienna)
Status
Complete
Walworth Cnty Land Use & Res Mgt: Lakehore Landowners Survey Grant-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to approximately 6000 lakeshore landowners. The survey will inquire about landowner knowledge, views, perceptions and interest in water quality problems and water quality protection measures. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.
Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
La Grange Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Lake Community Planning Inventory-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to 99 units of government and lake associations in Walworth County that are directly involved with the 36 lakes in Walworth County. The survey will inquire about institutional tools, laws, ordinances, studies and educational programs that currently exist or are needed. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.
Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
La Grange Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Lakehore Landowners Survey Grant-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to approximately 6000 lakeshore landowners. The survey will inquire about landowner knowledge, views, perceptions and interest in water quality problems and water quality protection measures. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.
Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Lake Beulah
Status
Complete
Walworth Cnty Land Use & Res Mgt: Lake Community Planning Inventory-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to 99 units of government and lake associations in Walworth County that are directly involved with the 36 lakes in Walworth County. The survey will inquire about institutional tools, laws, ordinances, studies and educational programs that currently exist or are needed. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.
Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Lake Beulah
Status
Complete
Walworth Cnty Land Use & Res Mgt: Lakehore Landowners Survey Grant-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to approximately 6000 lakeshore landowners. The survey will inquire about landowner knowledge, views, perceptions and interest in water quality problems and water quality protection measures. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.
Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Lake Ivanhoe
Status
Complete
Walworth Cnty Land Use & Res Mgt: Lake Community Planning Inventory-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to 99 units of government and lake associations in Walworth County that are directly involved with the 36 lakes in Walworth County. The survey will inquire about institutional tools, laws, ordinances, studies and educational programs that currently exist or are needed. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.
Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Lake Ivanhoe
Status
Complete
Walworth Cnty Land Use & Res Mgt: Lakehore Landowners Survey Grant-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to approximately 6000 lakeshore landowners. The survey will inquire about landowner knowledge, views, perceptions and interest in water quality problems and water quality protection measures. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.
Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
4/1/1996
Waters Involved
Lake Lorraine
Status
Complete
Town Of Richmond: Lorraine Lake Eurasian Watermilfoil Weevil Study: The Town of Richmond, Walworth County proposes to evaluate the effect of the supplemental enhancement of weevil populations as a selective aquatic plant management technique to control Myriophyllum spicatum. Project activities will result in a field evaluation of experimental weevil stocking, a status report and presentation to the lake group, and a final report including feasibility recommendations. The Department of Natural Resourcese will be provided with a paper copy and an electronic copy of the final report. Information about the project will be disseminiated to the public by fact sheet distribution, public meeting, and summary report mailing.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Lake Lorraine
Status
Complete
Walworth Cnty Land Use & Res Mgt: Lake Community Planning Inventory-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to 99 units of government and lake associations in Walworth County that are directly involved with the 36 lakes in Walworth County. The survey will inquire about institutional tools, laws, ordinances, studies and educational programs that currently exist or are needed. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.
Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Lake Lorraine
Status
Complete
Walworth Cnty Land Use & Res Mgt: Lakehore Landowners Survey Grant-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to approximately 6000 lakeshore landowners. The survey will inquire about landowner knowledge, views, perceptions and interest in water quality problems and water quality protection measures. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.
Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Lake Wandawega
Status
Complete
Walworth Cnty Land Use & Res Mgt: Lake Community Planning Inventory-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to 99 units of government and lake associations in Walworth County that are directly involved with the 36 lakes in Walworth County. The survey will inquire about institutional tools, laws, ordinances, studies and educational programs that currently exist or are needed. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.
Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Lake Wandawega
Status
Complete
Walworth Cnty Land Use & Res Mgt: Lakehore Landowners Survey Grant-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to approximately 6000 lakeshore landowners. The survey will inquire about landowner knowledge, views, perceptions and interest in water quality problems and water quality protection measures. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.
Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
2/15/2020
Waters Involved
Lilly Lake
Status
Complete
Lily Lake Protection & Rehabilitation Dist: Lilly Lake Aquatic Plant Management Planning: The Lilly Lake Protection and Rehabilitation District is sponsoring a project to develop an update to the Lake Management and Aquatic Plant Management Plans for Lilly Lake.
Specific project activities include: 1) conducting a P/I survey; 2) Development of an updated Lake Management Plan and Aquatic Plant Management Plan; 3) update of water quality data analysis; 4) completion of hydroacoustic survey; 5) update of watershed assessment; and 6 collection and analysis of a paleocore.
Project final deliverables include: 1) electronic copy of the P/I raw data in an excel spreadsheet; 2) electronic copy of the raw paleocore data in an excel spreadsheet and 3) an electronic copy of the final updated Lake Management and Aquatic Plant Management Plan. The updated Lake Management Plan and Aquatic Plant Management Plan will contain the following elements: 1) update of the TSI graphs and Temperature/Dissolved Oxygen trends; 2) update of the watershed using the 2016 National Land Cover database; 3) maps displaying results of the hydroacoustic data (water depth, water volume and substrate type); 4) discussion and analysis of the P/I data including summary tables and plant distribution maps; 5) discussion and figures explaining the paleocore data; 6) hand harvesting plan with lane placement and lane width and depth specifics; and 7) discussion of chemical treatment options.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.
The Grantee should provide the DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Lulu Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Lake Community Planning Inventory-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to 99 units of government and lake associations in Walworth County that are directly involved with the 36 lakes in Walworth County. The survey will inquire about institutional tools, laws, ordinances, studies and educational programs that currently exist or are needed. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.
Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Lulu Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Lakehore Landowners Survey Grant-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to approximately 6000 lakeshore landowners. The survey will inquire about landowner knowledge, views, perceptions and interest in water quality problems and water quality protection measures. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.
Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Lyons Millpond
Status
Complete
Walworth Cnty Land Use & Res Mgt: Lake Community Planning Inventory-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to 99 units of government and lake associations in Walworth County that are directly involved with the 36 lakes in Walworth County. The survey will inquire about institutional tools, laws, ordinances, studies and educational programs that currently exist or are needed. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.
Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Lyons Millpond
Status
Complete
Walworth Cnty Land Use & Res Mgt: Lakehore Landowners Survey Grant-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to approximately 6000 lakeshore landowners. The survey will inquire about landowner knowledge, views, perceptions and interest in water quality problems and water quality protection measures. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.
Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Middle Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Lake Community Planning Inventory-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to 99 units of government and lake associations in Walworth County that are directly involved with the 36 lakes in Walworth County. The survey will inquire about institutional tools, laws, ordinances, studies and educational programs that currently exist or are needed. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.
Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Middle Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Lakehore Landowners Survey Grant-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to approximately 6000 lakeshore landowners. The survey will inquire about landowner knowledge, views, perceptions and interest in water quality problems and water quality protection measures. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.
Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Mill Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Lake Community Planning Inventory-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to 99 units of government and lake associations in Walworth County that are directly involved with the 36 lakes in Walworth County. The survey will inquire about institutional tools, laws, ordinances, studies and educational programs that currently exist or are needed. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.
Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Mill Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Lakehore Landowners Survey Grant-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to approximately 6000 lakeshore landowners. The survey will inquire about landowner knowledge, views, perceptions and interest in water quality problems and water quality protection measures. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.
Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Millpond Park Pond
Status
Complete
Walworth Cnty Land Use & Res Mgt: Lake Community Planning Inventory-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to 99 units of government and lake associations in Walworth County that are directly involved with the 36 lakes in Walworth County. The survey will inquire about institutional tools, laws, ordinances, studies and educational programs that currently exist or are needed. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.
Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Millpond Park Pond
Status
Complete
Walworth Cnty Land Use & Res Mgt: Lakehore Landowners Survey Grant-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to approximately 6000 lakeshore landowners. The survey will inquire about landowner knowledge, views, perceptions and interest in water quality problems and water quality protection measures. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.
Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Moelter Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Lake Community Planning Inventory-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to 99 units of government and lake associations in Walworth County that are directly involved with the 36 lakes in Walworth County. The survey will inquire about institutional tools, laws, ordinances, studies and educational programs that currently exist or are needed. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.
Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Moelter Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Lakehore Landowners Survey Grant-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to approximately 6000 lakeshore landowners. The survey will inquire about landowner knowledge, views, perceptions and interest in water quality problems and water quality protection measures. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.
Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
North Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Lake Community Planning Inventory-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to 99 units of government and lake associations in Walworth County that are directly involved with the 36 lakes in Walworth County. The survey will inquire about institutional tools, laws, ordinances, studies and educational programs that currently exist or are needed. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.
Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
North Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Lakehore Landowners Survey Grant-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to approximately 6000 lakeshore landowners. The survey will inquire about landowner knowledge, views, perceptions and interest in water quality problems and water quality protection measures. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.
Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Pell Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Lake Community Planning Inventory-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to 99 units of government and lake associations in Walworth County that are directly involved with the 36 lakes in Walworth County. The survey will inquire about institutional tools, laws, ordinances, studies and educational programs that currently exist or are needed. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.
Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Pell Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Lakehore Landowners Survey Grant-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to approximately 6000 lakeshore landowners. The survey will inquire about landowner knowledge, views, perceptions and interest in water quality problems and water quality protection measures. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.
Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Peterkin Pond
Status
Complete
Walworth Cnty Land Use & Res Mgt: Lake Community Planning Inventory-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to 99 units of government and lake associations in Walworth County that are directly involved with the 36 lakes in Walworth County. The survey will inquire about institutional tools, laws, ordinances, studies and educational programs that currently exist or are needed. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.
Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Peterkin Pond
Status
Complete
Walworth Cnty Land Use & Res Mgt: Lakehore Landowners Survey Grant-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to approximately 6000 lakeshore landowners. The survey will inquire about landowner knowledge, views, perceptions and interest in water quality problems and water quality protection measures. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.
Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Peters Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Lake Community Planning Inventory-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to 99 units of government and lake associations in Walworth County that are directly involved with the 36 lakes in Walworth County. The survey will inquire about institutional tools, laws, ordinances, studies and educational programs that currently exist or are needed. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.
Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Peters Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Lakehore Landowners Survey Grant-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to approximately 6000 lakeshore landowners. The survey will inquire about landowner knowledge, views, perceptions and interest in water quality problems and water quality protection measures. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.
Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Pickerel Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Lake Community Planning Inventory-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to 99 units of government and lake associations in Walworth County that are directly involved with the 36 lakes in Walworth County. The survey will inquire about institutional tools, laws, ordinances, studies and educational programs that currently exist or are needed. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.
Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Pickerel Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Lakehore Landowners Survey Grant-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to approximately 6000 lakeshore landowners. The survey will inquire about landowner knowledge, views, perceptions and interest in water quality problems and water quality protection measures. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.
Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Pleasant Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Lake Community Planning Inventory-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to 99 units of government and lake associations in Walworth County that are directly involved with the 36 lakes in Walworth County. The survey will inquire about institutional tools, laws, ordinances, studies and educational programs that currently exist or are needed. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.
Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Pleasant Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Lakehore Landowners Survey Grant-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to approximately 6000 lakeshore landowners. The survey will inquire about landowner knowledge, views, perceptions and interest in water quality problems and water quality protection measures. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.
Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Potter Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Lake Community Planning Inventory-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to 99 units of government and lake associations in Walworth County that are directly involved with the 36 lakes in Walworth County. The survey will inquire about institutional tools, laws, ordinances, studies and educational programs that currently exist or are needed. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.
Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Potter Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Lakehore Landowners Survey Grant-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to approximately 6000 lakeshore landowners. The survey will inquire about landowner knowledge, views, perceptions and interest in water quality problems and water quality protection measures. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.
Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Powers Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Lake Community Planning Inventory-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to 99 units of government and lake associations in Walworth County that are directly involved with the 36 lakes in Walworth County. The survey will inquire about institutional tools, laws, ordinances, studies and educational programs that currently exist or are needed. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.
Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Powers Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Lakehore Landowners Survey Grant-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to approximately 6000 lakeshore landowners. The survey will inquire about landowner knowledge, views, perceptions and interest in water quality problems and water quality protection measures. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.
Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Rice Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Lake Community Planning Inventory-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to 99 units of government and lake associations in Walworth County that are directly involved with the 36 lakes in Walworth County. The survey will inquire about institutional tools, laws, ordinances, studies and educational programs that currently exist or are needed. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.
Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Rice Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Lakehore Landowners Survey Grant-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to approximately 6000 lakeshore landowners. The survey will inquire about landowner knowledge, views, perceptions and interest in water quality problems and water quality protection measures. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.
Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Silver Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Lake Community Planning Inventory-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to 99 units of government and lake associations in Walworth County that are directly involved with the 36 lakes in Walworth County. The survey will inquire about institutional tools, laws, ordinances, studies and educational programs that currently exist or are needed. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.
Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Silver Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Lakehore Landowners Survey Grant-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to approximately 6000 lakeshore landowners. The survey will inquire about landowner knowledge, views, perceptions and interest in water quality problems and water quality protection measures. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.
Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
10/1/2005
Waters Involved
Spring Brook
Status
Complete
Bohners Lake Sanitary District: Sediment Movement Study: Eight sets of samples will be taken at the Bohners Lake inlet. Samples will be analyzed for total mass weight, particle size analysis and percent organic matter. A stream flow measurement will be taken on each of the eight sampling dates. The samples will be taken with a Helley Smith Sampler. Three sets of samples will be taken under baseflow conditions and five will be taken during storm events. The project deliverable will be a report containing 1) all of the data collected (flow, total mass weight, particle size analysis and percent organic matter) for each of the eight sampling dates and 2) calculations and discussion of the total mass of material moving down the stream on an annual basis. Two paper copies and one electronic copy of the report will be provided to the DNR before the project can be closed out.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Swan Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Lake Community Planning Inventory-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to 99 units of government and lake associations in Walworth County that are directly involved with the 36 lakes in Walworth County. The survey will inquire about institutional tools, laws, ordinances, studies and educational programs that currently exist or are needed. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.
Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Swan Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Lakehore Landowners Survey Grant-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to approximately 6000 lakeshore landowners. The survey will inquire about landowner knowledge, views, perceptions and interest in water quality problems and water quality protection measures. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.
Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Swift Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Lake Community Planning Inventory-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to 99 units of government and lake associations in Walworth County that are directly involved with the 36 lakes in Walworth County. The survey will inquire about institutional tools, laws, ordinances, studies and educational programs that currently exist or are needed. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.
Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Swift Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Lakehore Landowners Survey Grant-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to approximately 6000 lakeshore landowners. The survey will inquire about landowner knowledge, views, perceptions and interest in water quality problems and water quality protection measures. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.
Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Tombeau Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Lake Community Planning Inventory-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to 99 units of government and lake associations in Walworth County that are directly involved with the 36 lakes in Walworth County. The survey will inquire about institutional tools, laws, ordinances, studies and educational programs that currently exist or are needed. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.
Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Tombeau Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Lakehore Landowners Survey Grant-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to approximately 6000 lakeshore landowners. The survey will inquire about landowner knowledge, views, perceptions and interest in water quality problems and water quality protection measures. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.
Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Tripp Lake (Trapp)
Status
Complete
Walworth Cnty Land Use & Res Mgt: Lake Community Planning Inventory-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to 99 units of government and lake associations in Walworth County that are directly involved with the 36 lakes in Walworth County. The survey will inquire about institutional tools, laws, ordinances, studies and educational programs that currently exist or are needed. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.
Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Tripp Lake (Trapp)
Status
Complete
Walworth Cnty Land Use & Res Mgt: Lakehore Landowners Survey Grant-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to approximately 6000 lakeshore landowners. The survey will inquire about landowner knowledge, views, perceptions and interest in water quality problems and water quality protection measures. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.
Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Trout Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Lake Community Planning Inventory-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to 99 units of government and lake associations in Walworth County that are directly involved with the 36 lakes in Walworth County. The survey will inquire about institutional tools, laws, ordinances, studies and educational programs that currently exist or are needed. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.
Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Trout Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Lakehore Landowners Survey Grant-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to approximately 6000 lakeshore landowners. The survey will inquire about landowner knowledge, views, perceptions and interest in water quality problems and water quality protection measures. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.
Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Turtle Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Lake Community Planning Inventory-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to 99 units of government and lake associations in Walworth County that are directly involved with the 36 lakes in Walworth County. The survey will inquire about institutional tools, laws, ordinances, studies and educational programs that currently exist or are needed. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.
Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Turtle Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Lakehore Landowners Survey Grant-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to approximately 6000 lakeshore landowners. The survey will inquire about landowner knowledge, views, perceptions and interest in water quality problems and water quality protection measures. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.
Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Unnamed
Status
Complete
Walworth Cnty Land Use & Res Mgt: Lake Community Planning Inventory-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to 99 units of government and lake associations in Walworth County that are directly involved with the 36 lakes in Walworth County. The survey will inquire about institutional tools, laws, ordinances, studies and educational programs that currently exist or are needed. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.
Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Unnamed
Status
Complete
Walworth Cnty Land Use & Res Mgt: Lakehore Landowners Survey Grant-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to approximately 6000 lakeshore landowners. The survey will inquire about landowner knowledge, views, perceptions and interest in water quality problems and water quality protection measures. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.
Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
12/20/1990
Waters Involved
Voltz Lake
Status
Complete
Voltz Lake Management District: Voltz Lake Watershed Data Collection & Analysis: CONDUCT A THOROUGH STUDY OF THE LAKE AND ITS WATERSHED. DEVELOP A LONG-RANGE PLAN TO IMPROVE THE CONDITION OF THE LAKE IN SUCH A WAY AS TO BENEFIT THE PROPERTY OWNERS AND THE PUBLIC. STUDY POTENTIAL IMPROVED PUBLIC ACCESS SITES. INFORM AND EDUCATE THE PUBLIC OF THE RESULTS OF THE STUDY TO ENCOURAGE THEIR COOPERATION IN PRESERVING THE LAKE AND ITS WILDLIFE.
Grant Details
Large Scale Lake Planning
Date
4/1/2000
Waters Involved
Voltz Lake
Status
Complete
Voltz Lake Management District: Voltz Lake Plant Study: Voltz Lake Management District will contract with SEWRPC to review the current lake management plan, recreational use survey, assess the lake and land use, quantify the water quality conditions, aquatic plant management and hold public information sessions about Voltz Lake .
The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.
Grant Details
Large Scale Lake Planning
Date
2/15/2019
Waters Involved
Voltz Lake
Status
Complete
Voltz Lake Management District: Voltz Lake Management District: The Voltz Lake Management District is sponsoring a project to develop a lake management plan for Voltz Lake.
Project final deliverables include: all data collected, agendas and minutes for public meetings, and a lake management plan that includes methodologies, results, and management alternatives discussion with an implementation plan.
Specific project activities include: 1) water quality and nutrient sampling at the deep hole; 2) full lake P/I survey; 3) spring and fall AIS surveys and mapping of beds of non native aquatic plants; 4) WiLMS modeling to determine sediment and phosphorus and other nutrients entering the lake annually; 5) compilation of existing fisheries data; 6) stakeholder survey; and 7) a report containing the results of all sampling, surveying, and modeling as well as analysis of the data.
Special Conditions: 1) All data shall be entered into the SWIMS database. 2) Draft sociological/user surveys and shoreline assessments must be reviewed and approved by the Department before being initiated.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.
If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Whitewater Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Lake Community Planning Inventory-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to 99 units of government and lake associations in Walworth County that are directly involved with the 36 lakes in Walworth County. The survey will inquire about institutional tools, laws, ordinances, studies and educational programs that currently exist or are needed. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.
Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Whitewater Lake
Status
Complete
Walworth Cnty Land Use & Res Mgt: Lakehore Landowners Survey Grant-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to approximately 6000 lakeshore landowners. The survey will inquire about landowner knowledge, views, perceptions and interest in water quality problems and water quality protection measures. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.
Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Small Scale Lake Planning
Date
2/15/2020
Waters Involved
Rock Lake
Status
Complete
Rock Lake Restoration Assoc. Inc.: Aquatic Plant Management Plan: The Rock Lake Restoration Association is sponsoring a project to develop an update to the Aquatic Plant Management Plan for Rock Lake.
Specific project activities include: 1) Development of an updated Aquatic Plant Management Plan and 2) Public Informational Meeting sponsored by the Rock Lake Restoration Association to present and discuss the updated Aquatic Plant Management Plan.
Project final deliverables include: 1) electronic copy of the P/I raw data in an excel spreadsheet and 2) an electronic copy of the final updated Aquatic Plant Management Plan. The updated Aquatic Plant Management Plan will contain the following elements:
1) discussion and analysis of the data including summary tables and plant distribution maps; 2) Potential chemical treatment options; 3) DASH harvesting plan with lane placement and lane width; and 4) map of disposal site with floodplain and wetland boundaries drawn.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.
The Grantee should provide the DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.