UNIFIED LOWER EAGLE RIVER CHAIN OF LAKES COM: Eagle River Chain of Lakes AIS Porject, Phase 5

Purpose

The Unified Lower Eagle River Chain of Lakes Commission (ULERCLC) is sponsoring an AIS grant on the Eagle River Chain of Lakes. This is the fifth phase of a project focusing on EWM management, AIS education, prevention and monitoring. The goal is to reduce the treatable EWM to half its current size and allow the ULERCLC to continue management on its own. Project activities: 1) Annual chemical treatments of EWM and residual monitoring; 2) Volunteer hand removal of EWM as an experimental control technique; 3) Annual Pre and Post treatment monitoring and analysis; 4) Annual volunteer AIS monitoring; 5) PL mapping and control; 6) PI surveys and aquatic plant community mapping; 7) Recruit volunteers and implement a CB/CW program; 8) Stakeholder participation: CB/CW training, budget and grant meeting, project status/informational meeting; 9) Entry of inspection and monitoring forms onto SWIMS; 10) Develop management strategy (working with UW Ext) to protect native plants; 11) Develop annual and final project reports. Project deliverables include: 1) Chemical and hand removal control of EWM and PL control; 2) Pre and post treatment survey and residual monitoring data; 3) Entered inspection and monitoring data into SWIMS; 4) A minimum of 400 hours of CB/CW; 5) PI data; 6) Aquatic plant community and substrate maps; 7) Aquatic plant vouchers; 8) Native plant protection strategy; 9) AIS educational, prevention and monitoring activities; 10) Final report summarizing EWM management during project and future EWM management suggestions, CB/CW activities, AIS monitoring and AIS educational activities. Specific Conditions: Final report needs Dept review and approval. WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, all annual reports, pre and post treatment survey and PI data, native plant protection strategy, samples of educational and outreach products, all maps from project, all GIS data, and aquatic plant vouchers.

Related Reports

Run Project Summary Report
View Umbrella-Projects
View Related-Projects

Aquatic Invasives Grant
Aquatic Invasives Control
ACEI-103-12
2011
Complete
 
Reports and Documents
Eagle River Chain of Lakes AIS Control & Prevention Project, Aquatic Plant Community Reassessment
 
Activities & Recommendations
Information and Education
APM Chemical Permit Request
APM Mechanical Permit Request
Grant Awarded
1603700 Catfish Lake
Grant Awarded
1599900 Duck Lake
Grant Awarded
1600200 Eagle Lake
Grant Awarded
1600000 Lynx Lake
Grant Awarded
1600300 Scattering Rice Lake
Grant Awarded
1603400 Voyageur Lake
Grant Awarded
1599400 Watersmeet Lake
Grant Awarded
1599600 Yellow Birch Lake
Grant Awarded
1603800 Cranberry Lake
Grant Awarded
1600100 Otter Lake
Watercraft Inspections Clean Boats, Clean Waters
Project Deliverable
final report
Monitor Invasive Species
Aquatic Plant Monitoring or Survey
Monitor Pre and Post Treatment
 
Watershed
 
Waters