Competitive Projects
Impaired Water Assessment
NER_07_CMP13B
2013
Complete
Monitor or Propose 303(d) Listing
NER proposes to monitor 6 streams and 1 lake which are tributaries to Shawano Lake during the 2013 project cycle for impaired waters identification. Historic water quality data from the UWSP- Center for Watershed Science and Education in their Shawano Lake Watershed Assessment (2008) indicates that Total Phosphorous samples have exceeded the listing threshold in these streams. The 6 streams will be monitored for biological impairments by conducting fish and qualitative habitat surveys, collecting macroinvertabrate samples, and continuous water temperatures. Chemistry samples will be taken on Mud Lake for chlorophyll A and total phosphorous. Flow and basic Water quality parameters will also be collected during each field visit. It is anticipated that this will be a 2-year project so that 2012 WisCalm Guidance can be followed for Total P listing with biological impairements. The 6 monthly TP samples will be proposed on those stream segments in 2014 that show biological impairments from 2013 monitoring to fill remaining data gaps. The second year will also include th remainder of growing season lake monitoring for TP and Chl A.
Monitor or Propose 303(d) Listing
NER proposes to monitor 6 streams and 1 lake which are tributaries to Shawano Lake during the 2013 project cycle for impaired waters identification. Historic water quality data from the UWSP- Center for Watershed Science and Education in their Shawano Lake Watershed Assessment (2008) indicates that Total Phosphorous samples have exceeded the listing threshold in these streams. The 6 streams will be monitored for biological impairments by conducting fish and qualitative habitat surveys, collecting macroinvertabrate samples, and continuous water temperatures. Chemistry samples will be taken on Mud Lake for chlorophyll A and total phosphorous. Flow and basic Water quality parameters will also be collected during each field visit. It is anticipated that this will be a 2-year project so that 2012 WisCalm Guidance can be followed for Total P listing with biological impairements. The 6 monthly TP samples will be proposed on those stream segments in 2014 that show biological impairments from 2013 monitoring to fill remaining data gaps. The second year will also include th remainder of growing season lake monitoring for TP and Chl A.