Marathon County: Lco-Marathon Class 7: Marathon County proposes to continue toward completion of its Phase II efforts to classify 11 lakes in eastern Marathon County. Major project elements to include: 1) Develop lake management plans, 2) Establish planning committees, 3) Review and revise shoreland zoning ordinance, 4) Hold one-day water forum, and 5) Develop guide for Zoning Board of Adjustment members.
Grant Details
Lake Protection Grant
Date
9/1/2010
Waters Involved
Big Eau Pleine Reservoir
Status
Complete
Marathon County: Lco-Shoreland Ordinance Rev.: Marathon County proposes to amend or create a shoreland zoning ordinance that complies with the requirements of NR 115, Wisconsin Administrative Code (as revised effective February 1, 2010) and retain existing regulations that exceed the water resource protections of NR 115 or are specific or unique to local needs.
Project deliverables include: 1. Copies of any fact sheets or handouts created for public hearings. 2. A summary of the comments received at public hearings. 3. A certified copy of the County Board-approved updated shoreland ordinance or ordinance language (if integrated into other codes). 4. Any GIS maps of the shoreland zone or shoreland condition surveys related to the project.
Specific conditions for this Project: 1. The WDNR will be provided electronic and hard copies of all data and or reports or surveys generated as a result of this project.
Grant Details
Lake Protection Grant
Date
9/1/2010
Waters Involved
Big Eau Pleine River
Status
Complete
Marathon County: Lco-Shoreland Ordinance Rev.: Marathon County proposes to amend or create a shoreland zoning ordinance that complies with the requirements of NR 115, Wisconsin Administrative Code (as revised effective February 1, 2010) and retain existing regulations that exceed the water resource protections of NR 115 or are specific or unique to local needs.
Project deliverables include: 1. Copies of any fact sheets or handouts created for public hearings. 2. A summary of the comments received at public hearings. 3. A certified copy of the County Board-approved updated shoreland ordinance or ordinance language (if integrated into other codes). 4. Any GIS maps of the shoreland zone or shoreland condition surveys related to the project.
Specific conditions for this Project: 1. The WDNR will be provided electronic and hard copies of all data and or reports or surveys generated as a result of this project.
Grant Details
Lake Protection Grant
Date
4/15/2015
Waters Involved
Grass Lake
Status
Complete
Town Of Belle Plaine: Hlk-Clover Leaf Healthy Lakes: The Town of Belle Plaine will implement best practices described in Wisconsin\2019s 2014-2017 Healthy Lakes Implementation Plan on the Cloverleaf Lakes. Practices include: fish sticks, 350 ft2 native plantings, and rain gardens on at least 12 properties, including the Gibson Island and Round Lake Park demonstration sites.
The best practices require a contract to remain in effect for 10 years and must include minimum operation and maintenance requirements and data collection as described in grant condition #16. If best practice(s) are implemented on land owned by the grant Sponsor, this Lake Protection Grant Agreement serves as the contract. If best practice(s) are implemented on land other than the sponsor\2019s, a contract between the sponsor and landowner that abides by grant condition #16 is required.
The Department may require re-payment of project installation costs if the best practice is disturbed or removed. The Sponsor and/or the Department may perform site inspections and/or monitoring to ensure project success.
Deliverables: Best practice location and design information, if not included in the application; signed 10-year landowner contract; pre and post project installation photographs; summary of education activities and publicity/promotion of Healthy Lakes initiative, if applicable.
Special conditions: The state share of each best practice cannot exceed $1,000. The state share of grant administration and technical assistance costs may not exceed 10% of the grant award; technical assistance does not include implementation labor. Funding cannot be used for mitigation or regulatory compliance activities. Water regulation and/or county zoning permits must be issued before construction. The Healthy Lakes logo should be used for promotion and publicity, and DNR recognized as a funding source.
Grant Details
Lake Protection Grant
Date
9/1/2002
Waters Involved
Lawrence Lake
Status
Complete
Langlade County: Acq-Langlade County-Lawrence Lake Acquisition: Langlade County shall participate in the Lakes Protection Program by purchasing approximately 320 acres of land including frontage on Lawrence Lake.
Grant Details
Lake Protection Grant
Date
2/27/1996
Waters Involved
Loon Lake
Status
Complete
Loon Lake Management District: Acq-Loon Lake Land Acquisition - Bertrand Property: The Loon Lake Wescott Management District will acquire 89.25 acres of primarily lowland with approximately 1/2 mile of frontage on Loon Lake. The district will maintain the land in a wild and natural condition to protect the water quality of Loon Lake. Eligible costs include acuqisition of the parcel, appraisal, and recording fees.
Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Loon Lake
Status
Complete
Loon Lake Management District: Acq-Loon Lake Land Acquisition: The Loon Lake Wescott Management District proposes to purchase 32.1 acres of vacantland with approximately 1/4 mile of frontage on Loon Lake. The Management District will keep it in its naturally landscaped state for conservancy purposes.
Grant Details
Lake Protection Grant
Date
7/12/2010
Waters Involved
Mission Lake
Status
Complete
Marathon County: Lco-Marathon Class 2: Marathon County proposes to conduct detailed studies of 11 lakes in the Eastern part of Marathon County for the purpose of classifying them and developing plans for their future management. major project elements in this phased project include: 1) data collection, 2) outreach, 3) management planning and 4) plan implementation.
Grant Details
Lake Protection Grant
Date
4/15/2017
Waters Involved
Mission Lake
Status
Complete
Deer Lake Conservancy Inc: Lower Rock Creek Acquisition: The Deer Lake Conservancy has purchased 32.10 acres of undeveloped property on Deer Lake in Polk County. The parcel includes approximately 500 feet of shoreline, a riparian wetland and has Rock Creek flowing through the property. The property is adjacent to existing Conservancy owned property. Trails will be developed connecting with existing trails of the adjacent property.
Grant Details
Lake Protection Grant
Date
9/1/2012
Waters Involved
Mud Lake
Status
Complete
Marathon County: Lco-Marathon Class 5: Marathon County proposes to continue toward completion of its Phase _ efforts to classify 11 lakes in eastern Marathon County. Major project elements to include: 1) Water quality sampling and analysis, 2) Fisheries and aquatic species analysis, 3) Habitat, shoreland and paleolimnological surveys, 4) cultural surveys and outreach, 5) build-out assessment and monitoring.
Grant Details
Lake Protection Grant
Date
9/1/2012
Waters Involved
Mud Lake
Status
Complete
Marathon County: Lco-Marathon Class 6: Marathon County proposes to continue toward completion of its Phase 1 efforts to classify 11 lakes in eastern Marathon County. Major project elements to include: 1) Water quality sampling and analysis, 2) Fisheries and aquatic species analysis, 3) Habitat, shoreland and paleolimnological surveys, 4) Cultural surveys and outreach, 5) Build-out assessment and monitoring.
Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Pickerel Lake
Status
Complete
Pickerel/Crane Lake Prot & Rehab District: Res-Pickerell Lake Aeration System: The project will install an aeration system, monitor Dissolved Oxygen throughout the winter, and provide education on sources of nutrient loading into Pickerel Lake. The project will also include an education effort for safety of open water and sources of the problem which have lead to the need for lake aeration.
All required permits will be received prior to equipment installation.
Specific deliverables for this grant project include a final report describing project accomplishments.
The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.
Grant Details
Lake Protection Grant
Date
4/15/2015
Waters Involved
Pine Lake
Status
Complete
Town Of Belle Plaine: Hlk-Clover Leaf Healthy Lakes: The Town of Belle Plaine will implement best practices described in Wisconsin\2019s 2014-2017 Healthy Lakes Implementation Plan on the Cloverleaf Lakes. Practices include: fish sticks, 350 ft2 native plantings, and rain gardens on at least 12 properties, including the Gibson Island and Round Lake Park demonstration sites.
The best practices require a contract to remain in effect for 10 years and must include minimum operation and maintenance requirements and data collection as described in grant condition #16. If best practice(s) are implemented on land owned by the grant Sponsor, this Lake Protection Grant Agreement serves as the contract. If best practice(s) are implemented on land other than the sponsor\2019s, a contract between the sponsor and landowner that abides by grant condition #16 is required.
The Department may require re-payment of project installation costs if the best practice is disturbed or removed. The Sponsor and/or the Department may perform site inspections and/or monitoring to ensure project success.
Deliverables: Best practice location and design information, if not included in the application; signed 10-year landowner contract; pre and post project installation photographs; summary of education activities and publicity/promotion of Healthy Lakes initiative, if applicable.
Special conditions: The state share of each best practice cannot exceed $1,000. The state share of grant administration and technical assistance costs may not exceed 10% of the grant award; technical assistance does not include implementation labor. Funding cannot be used for mitigation or regulatory compliance activities. Water regulation and/or county zoning permits must be issued before construction. The Healthy Lakes logo should be used for promotion and publicity, and DNR recognized as a funding source.
Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Round Lake
Status
Complete
Town Of Belle Plaine: Acq-Town Of Belle Plaine Land Acquisition (Stieg): The Town of Belle Plaine proposes to purchase 10 acres of land known as the Stieg parcel.
Grant Details
Lake Protection Grant
Date
4/15/2015
Waters Involved
Round Lake
Status
Complete
Town Of Belle Plaine: Hlk-Clover Leaf Healthy Lakes: The Town of Belle Plaine will implement best practices described in Wisconsin\2019s 2014-2017 Healthy Lakes Implementation Plan on the Cloverleaf Lakes. Practices include: fish sticks, 350 ft2 native plantings, and rain gardens on at least 12 properties, including the Gibson Island and Round Lake Park demonstration sites.
The best practices require a contract to remain in effect for 10 years and must include minimum operation and maintenance requirements and data collection as described in grant condition #16. If best practice(s) are implemented on land owned by the grant Sponsor, this Lake Protection Grant Agreement serves as the contract. If best practice(s) are implemented on land other than the sponsor\2019s, a contract between the sponsor and landowner that abides by grant condition #16 is required.
The Department may require re-payment of project installation costs if the best practice is disturbed or removed. The Sponsor and/or the Department may perform site inspections and/or monitoring to ensure project success.
Deliverables: Best practice location and design information, if not included in the application; signed 10-year landowner contract; pre and post project installation photographs; summary of education activities and publicity/promotion of Healthy Lakes initiative, if applicable.
Special conditions: The state share of each best practice cannot exceed $1,000. The state share of grant administration and technical assistance costs may not exceed 10% of the grant award; technical assistance does not include implementation labor. Funding cannot be used for mitigation or regulatory compliance activities. Water regulation and/or county zoning permits must be issued before construction. The Healthy Lakes logo should be used for promotion and publicity, and DNR recognized as a funding source.
Grant Details
Lake Protection Grant
Date
7/1/2005
Waters Involved
Shawano Lake
Status
Complete
Shawano County: Lmi-Shawano Lake Diagnostic Feasibility Study: Shawano County proposes to conduct a diagnostic and feasibility study to better understand the ecosystem of Shawano Lake and its watershed, to educate and inform the public about this ecosystem, to establish a management partnership to identify appropriate management options, and to implement a management strategy. The objectives of the study include: determine the current water quality in Shawano Lake, understand how/where watershed land uses impact water quality, identify the importance of internal sources of phosphorus, assess the influence of aquatic plants on lake water quality, foster a cooperative and active community focused on Shawano Lake and its watershed, develop community and agency agreement on effective management options, and implement the management strategy. The project elements and deliverables will be completed as described in the project proposal submitted to the Department and dated April 28, 2005.
Grant Details
Lake Protection Grant
Date
7/12/2010
Waters Involved
Unnamed
Status
Complete
Marathon County: Lco-Marathon Class 2: Marathon County proposes to conduct detailed studies of 11 lakes in the Eastern part of Marathon County for the purpose of classifying them and developing plans for their future management. major project elements in this phased project include: 1) data collection, 2) outreach, 3) management planning and 4) plan implementation.
Grant Details
Lake Protection Grant
Date
4/15/2017
Waters Involved
Unnamed
Status
Complete
Deer Lake Conservancy Inc: Lower Rock Creek Acquisition: The Deer Lake Conservancy has purchased 32.10 acres of undeveloped property on Deer Lake in Polk County. The parcel includes approximately 500 feet of shoreline, a riparian wetland and has Rock Creek flowing through the property. The property is adjacent to existing Conservancy owned property. Trails will be developed connecting with existing trails of the adjacent property.
Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Wilson Lake
Status
Complete
Shawano County: Acq-Kluck Land Acquisition On Wilson Lake: Shawano County proposes to purchase 71 acres of land known as the Kluck parcel on Wilson Lake for conservancy purposes.
Grant Details
Small Scale Lake Planning
Date
10/1/2010
Waters Involved
Mayflower Lake
Status
Complete
Mayflower Lake District: Mayflower Do Meter: The Mayflower Lake District proposes to purchase a dissolved oxygen meter to monitor dissolved oxygen levels in Mayflower Lake in Marathon County, and to facilitate the entering of this data into the SWIMS database.
Grant Details
Targeted Runoff - Rural Construction
Date
1/1/2004
Waters Involved
McVay Brook
Status
Complete
Marathon County Lcd: Peterson Farm Noi: to costshare NOI at 70%
Grant Details
Targeted Runoff - Rural Construction
Date
1/1/2004
Waters Involved
Norrie Brook
Status
Complete
Marathon County: Buss Farm Noi: to costshare at 70% NOI
Grant Details
Targeted Runoff - Rural Construction
Date
9/1/2002
Waters Involved
Unnamed
Status
Complete
Marathon County: Ostrowski Farms Nod: To cost-share landowner installation of BMPs mandated by NOD & by special statute provision