Grant Details
Lake Protection Grant
Date
9/1/2010
Waters Involved
Eau Claire Lake
Status
Complete
Eau Claire County: Lco-Shoreland Ordinance Rev.: Eau Claire County proposes to amend or create a shoreland zoning ordinance that complies with the requirements of NR 115, Wisconsin Administrative Code (as revised effective February 1, 2010) and retain existing regulations that exceed the water resource protections of NR 115 or are specific or unique to local needs.
Project deliverables include: 1. Copies of any fact sheets or handouts created for public hearings. 2. A summary of the comments received at public hearings. 3. A certified copy of the County Board-approved updated shoreland ordinance or ordinance language (if integrated into other codes). 4. Any GIS maps of the shoreland zone or shoreland condition surveys related to the project.
Specific conditions for this Project: 1. The WDNR will be provided electronic and hard copies of all data and or reports or surveys generated as a result of this project.
Grant Details
Lake Protection Grant
Date
9/1/2012
Waters Involved
Eau Claire Lake
Status
Complete
Lake Eau Claire Association, Inc.: Lmi-Lake Eau Claire Implement.: The Lake Eau Claire Association proposes to implement practices called for in the lake management plan developed for Lake Eau Claire in Eau Claire County. Major project elements to include: a) establishment of sediment traps, b) installation of aerator, c) re-establishment of habitat including course woody debris d) water quality sampling and analysis.
Grant Details
Lake Protection Grant
Date
9/1/2010
Waters Involved
Eau Claire River
Status
Complete
Eau Claire County: Lco-Shoreland Ordinance Rev.: Eau Claire County proposes to amend or create a shoreland zoning ordinance that complies with the requirements of NR 115, Wisconsin Administrative Code (as revised effective February 1, 2010) and retain existing regulations that exceed the water resource protections of NR 115 or are specific or unique to local needs.
Project deliverables include: 1. Copies of any fact sheets or handouts created for public hearings. 2. A summary of the comments received at public hearings. 3. A certified copy of the County Board-approved updated shoreland ordinance or ordinance language (if integrated into other codes). 4. Any GIS maps of the shoreland zone or shoreland condition surveys related to the project.
Specific conditions for this Project: 1. The WDNR will be provided electronic and hard copies of all data and or reports or surveys generated as a result of this project.
Grant Details
Lake Protection Grant
Date
4/15/2017
Waters Involved
Halfmoon Lake
Status
Complete
City Of Eau Claire: Lmi-Alum Treatment Half Moon Lake: The City of Eau Claire is sponsoring a Lake Management Planning Implementation project aimed to control internal sediment phosphorus loading in Halfmoon Lake by applying alum. The lake received an initial AL treatment in 2011 and was effective at maintaining TP WQ goals for three years, however after five years the effects have diminished. The initial alum treatment dosage was adequate however the floc did not sink into the upper sediment due to higher bulk density characteristics allowing upward P diffusion and decreasing binding efficiency of phosphorus. The second treatment is needed to bind available TP limiting the amount available to algae uptake. The City continues to address other sources of TP including stormwater management, rain gardens etc.
Project activities include: Apply a buffered AL dose to the western arm of Half Moon Lake that is encompassed by the 10 foot contour in late May or early June 2017. Dosage is based on sequestering the annual sediment P flux rate of 0.4g/m2 for 2 to 3 years and factors in an Al binding efficiency of 60% (James 2016 and 2017).
Project deliverables: The outcome of AL treatment to the western arm will be control of internal P loading and reduction of cyanobaceterial biomanss and chlorophyll to target levels. Limnological monitoring will be conducted to verify outcomes.
Special conditions:
1. The Half moon lake Team consisting of DNR, UW Stout, City of EC and Friends of Halfmoon Lake meet quarterly to assess current lake management actions. There continues to be open and ongoing communication with the group to inform residents on current lake conditions and management decisions.
2. All necessary permits must be issued prior to the project being implemented.
Grant Details
Lake Protection Grant
Date
9/1/2010
Waters Involved
Unnamed
Status
Complete
Eau Claire County: Lco-Shoreland Ordinance Rev.: Eau Claire County proposes to amend or create a shoreland zoning ordinance that complies with the requirements of NR 115, Wisconsin Administrative Code (as revised effective February 1, 2010) and retain existing regulations that exceed the water resource protections of NR 115 or are specific or unique to local needs.
Project deliverables include: 1. Copies of any fact sheets or handouts created for public hearings. 2. A summary of the comments received at public hearings. 3. A certified copy of the County Board-approved updated shoreland ordinance or ordinance language (if integrated into other codes). 4. Any GIS maps of the shoreland zone or shoreland condition surveys related to the project.
Specific conditions for this Project: 1. The WDNR will be provided electronic and hard copies of all data and or reports or surveys generated as a result of this project.
Grant Details
Urban Nonpoint - Stormwater Planning
Date
1/1/2004
Waters Involved
Otter Creek
Status
Complete
City Of Altoona: Ordinance & Utility Analysis: to costshare at 63% development of stormwater ordinances & analysis of stormwater utility district
Grant Details
River Planning Grant
Date
7/1/2004
Waters Involved
Beaver Creek
Status
Complete
Friends Of Beaver Creek Reserve, Inc.: Beaver Creek Study-Outreach: Friends of Beaver Creek Reserve, Inc. proposes to enhance its organizational capacity by developing a base of volunteers and training them through its newly established Citizen's Science Center.
Major project elements include: 1) employment of CSC Coordinator, 2) hiring a summer intern, 3) recruitment and training of volunteers, 4) formation and steering committee, 5) stream monitoring, 6) website development, 7) development of database, newsletter and brochures, 8) organizational assessment.
Grant Details
River Planning Grant
Date
10/18/2000
Waters Involved
Otter Creek
Status
Complete
Eau Claire County: Otter Creek: The main goal with the project is to inventory, assess, and develop a plan of action to address water quality in Otter Creek. Use county funding to install rural BMPs to address cropland erosion, animal waste, nutrient managment plans, streambank erosion and gully erosion. Propose to develop an implementation plan that will accomplish their goals.