Watershed - Mill and Indian Creeks (LW10)
Mill and Indian Creeks Watershed

Details

This watershed is located in the unglaciated, or driftless, area of the state. Most of the streams in the watershed are tributary to Mill Creek, which flows into the Wisconsin River by Muscoda. Many of these tributaries, particularly above Boaz, are trout streams. As with other watersheds in the basin, land use is predominately agricultural. Away from the Wisconsin River, wetlands are few and many of them have been grazed or cultivated.

Date  2002

Population, Land Use

Population projections for the Mill and Indian Creeks Watershed predicted the watershed to have a total population of approximately 2,200 people in 2000. The only municipality in the watershed is the village of Boaz. Boaz had a 1990 population of 131 and a 2000 population of 137, which is a 4.6% overall increase in population.

Date  2002

Nonpoint and Point Sources

There are two industrial permitted point source discharges in the watershed. These point sources discharge to groundwater. There are no municipal wastewater discharges in this watershed. The main issue of concern to surface water quality in the watershed is from nonpoint source pollution. As a result of its historical and current problems with nonpoint source pollution, the watershed has been given a high priority ranking for nonpoint source pollution reduction projects. In addition, a portion of the watershed on the Lower Wisconsin River Valley is in an atrazine prohibition area. These areas indicate that elevated levels of atrazine, an herbicide used on corn, have been found in some tested private water wells. Soils are permeable which has allowed atrazine to reach groundwater in some locations.

Date  2002

Ecological Landscapes for Mill and Indian Creeks Watershed

Ecological Landscapes

The Western Coulee and Ridges Ecological Landscape in southwestern and west central Wisconsin is characterized by its highly eroded, driftless topography and relatively extensive forested landscape. Soils are silt loams (loess) and sandy loams over sandstone residuum over dolomite. Several large rivers including the Wisconsin, Mississippi, Chippewa, Kickapoo and Black flow through or border the Ecological Landscape. Historical vegetation consisted of southern hardwood forests, oak savanna, scattered prairies, and floodplain forests and marshes along the major rivers. With Euro-American settlement, most of the land on ridgetops and valley bottoms was cleared of oak savanna, prairie, and level forest for agriculture. The steep slopes between valley bottom and ridgetop, unsuitable for raising crops, grew into oak-dominated forests after the ubiquitous presettlement wildfires were suppressed. Current vegetation is a mix of forest (40%), agriculture, and grassland with some wetlands in the river valleys. The primary forest cover is oak-hickory (51%) dominated by oak species and shagbark hickory. Maple-basswood forests (28%), dominated by sugar maple, basswood and red maple, are common in areas that were not subjected to repeated presettlement wildfires. Bottomland hardwoods (10%) are common in the valley bottoms of major rivers and are dominated by silver maple, ashes, elms, cottonwood, and red maple. Relict conifer forests including white pine, hemlock and yellow birch are a rarer natural community in the cooler, steep, north slope microclimates. The Mill and Indian Creeks Watershed has a variety of good quality habitats and rare plant communities that are listed on the state's Natural Heritage Inventory, (NHI), kept by the Bureau of Endangered Resources. These communities include: dry cliff, dry prairie, pine relict, moist cliff, sand barrens, southern dry-mesic forest, southern mesic forest, emergent aquatic, ephemeral pond, floodplain forest, oxbow lake, and southern sedge meadow.

Date  2002

Wildlife and Habitat

The watershed is home for a variety of rare plant and animal species including; 1 species of beetle, 4 species of dragonflies, 12 species of fish, 2 species of mayflies, 12 species of mussels, 10 plant species, and 1 mammal species. These plants and animals are listed on the state's Natural Heritage Inventory (NHI).

Date  2002

Watershed Grants
Grant Details
Large Scale Lake Planning
Date
4/1/2010
Waters Involved
Castle Rock Ditch
Status
Complete

Lake Alice Association, Inc: Lake Alice Stewardship Program Phase Ii - Understanding The Biota Of Lake Alice: Lake Alice Association is sponsoring phased large scale lake planning grants to study Lake Alice, in Lincoln County. The project will focus on developing and updating an Adaptive Lake Management Plan (LMP) for Lake Alice. Phase 2 was funded in this grant cycle and Phases 3-5 will be submitted for funding starting in 2011.

Project activities for Phase 2 include: 1) Educational program, meetings and educational events with lake association and Tomahawk High School students, written educational materials, news releases, and website updates; 2) Point-intercept (PI) aquatic plant survey; 3) Aquatic plant community and substrate mapping; 4) Water quality assessment; 5) Volunteer amphibian monitoring and angler survey; 6) Update LMP.

Project deliverables include: 1) Educational materials and news releases; 2) Aquatic plant community and substrate maps; 3) PI, water quality, amphibian, and angler data; 4) LMP.

Specific conditions for this project: LMP needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP, news releases, any other educational materials/products, all data, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
4/1/2010
Waters Involved
Cruson Slough
Status
Complete

Lake Alice Association, Inc: Lake Alice Stewardship Program Phase Ii - Understanding The Biota Of Lake Alice: Lake Alice Association is sponsoring phased large scale lake planning grants to study Lake Alice, in Lincoln County. The project will focus on developing and updating an Adaptive Lake Management Plan (LMP) for Lake Alice. Phase 2 was funded in this grant cycle and Phases 3-5 will be submitted for funding starting in 2011.

Project activities for Phase 2 include: 1) Educational program, meetings and educational events with lake association and Tomahawk High School students, written educational materials, news releases, and website updates; 2) Point-intercept (PI) aquatic plant survey; 3) Aquatic plant community and substrate mapping; 4) Water quality assessment; 5) Volunteer amphibian monitoring and angler survey; 6) Update LMP.

Project deliverables include: 1) Educational materials and news releases; 2) Aquatic plant community and substrate maps; 3) PI, water quality, amphibian, and angler data; 4) LMP.

Specific conditions for this project: LMP needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP, news releases, any other educational materials/products, all data, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
4/1/2010
Waters Involved
Lake Du Bay
Status
Complete

Lake Alice Association, Inc: Lake Alice Stewardship Program Phase Ii - Understanding The Biota Of Lake Alice: Lake Alice Association is sponsoring phased large scale lake planning grants to study Lake Alice, in Lincoln County. The project will focus on developing and updating an Adaptive Lake Management Plan (LMP) for Lake Alice. Phase 2 was funded in this grant cycle and Phases 3-5 will be submitted for funding starting in 2011.

Project activities for Phase 2 include: 1) Educational program, meetings and educational events with lake association and Tomahawk High School students, written educational materials, news releases, and website updates; 2) Point-intercept (PI) aquatic plant survey; 3) Aquatic plant community and substrate mapping; 4) Water quality assessment; 5) Volunteer amphibian monitoring and angler survey; 6) Update LMP.

Project deliverables include: 1) Educational materials and news releases; 2) Aquatic plant community and substrate maps; 3) PI, water quality, amphibian, and angler data; 4) LMP.

Specific conditions for this project: LMP needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP, news releases, any other educational materials/products, all data, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
4/1/2010
Waters Involved
Little Pine Creek
Status
Complete

Lake Alice Association, Inc: Lake Alice Stewardship Program Phase Ii - Understanding The Biota Of Lake Alice: Lake Alice Association is sponsoring phased large scale lake planning grants to study Lake Alice, in Lincoln County. The project will focus on developing and updating an Adaptive Lake Management Plan (LMP) for Lake Alice. Phase 2 was funded in this grant cycle and Phases 3-5 will be submitted for funding starting in 2011.

Project activities for Phase 2 include: 1) Educational program, meetings and educational events with lake association and Tomahawk High School students, written educational materials, news releases, and website updates; 2) Point-intercept (PI) aquatic plant survey; 3) Aquatic plant community and substrate mapping; 4) Water quality assessment; 5) Volunteer amphibian monitoring and angler survey; 6) Update LMP.

Project deliverables include: 1) Educational materials and news releases; 2) Aquatic plant community and substrate maps; 3) PI, water quality, amphibian, and angler data; 4) LMP.

Specific conditions for this project: LMP needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP, news releases, any other educational materials/products, all data, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
4/1/2010
Waters Involved
Unnamed
Status
Complete

Lake Alice Association, Inc: Lake Alice Stewardship Program Phase Ii - Understanding The Biota Of Lake Alice: Lake Alice Association is sponsoring phased large scale lake planning grants to study Lake Alice, in Lincoln County. The project will focus on developing and updating an Adaptive Lake Management Plan (LMP) for Lake Alice. Phase 2 was funded in this grant cycle and Phases 3-5 will be submitted for funding starting in 2011.

Project activities for Phase 2 include: 1) Educational program, meetings and educational events with lake association and Tomahawk High School students, written educational materials, news releases, and website updates; 2) Point-intercept (PI) aquatic plant survey; 3) Aquatic plant community and substrate mapping; 4) Water quality assessment; 5) Volunteer amphibian monitoring and angler survey; 6) Update LMP.

Project deliverables include: 1) Educational materials and news releases; 2) Aquatic plant community and substrate maps; 3) PI, water quality, amphibian, and angler data; 4) LMP.

Specific conditions for this project: LMP needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP, news releases, any other educational materials/products, all data, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
4/1/2010
Waters Involved
Wisconsin River
Status
Complete

Lake Alice Association, Inc: Lake Alice Stewardship Program Phase Ii - Understanding The Biota Of Lake Alice: Lake Alice Association is sponsoring phased large scale lake planning grants to study Lake Alice, in Lincoln County. The project will focus on developing and updating an Adaptive Lake Management Plan (LMP) for Lake Alice. Phase 2 was funded in this grant cycle and Phases 3-5 will be submitted for funding starting in 2011.

Project activities for Phase 2 include: 1) Educational program, meetings and educational events with lake association and Tomahawk High School students, written educational materials, news releases, and website updates; 2) Point-intercept (PI) aquatic plant survey; 3) Aquatic plant community and substrate mapping; 4) Water quality assessment; 5) Volunteer amphibian monitoring and angler survey; 6) Update LMP.

Project deliverables include: 1) Educational materials and news releases; 2) Aquatic plant community and substrate maps; 3) PI, water quality, amphibian, and angler data; 4) LMP.

Specific conditions for this project: LMP needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP, news releases, any other educational materials/products, all data, all maps from project, and all GIS data.


Grant Details
River Planning Grant
Date
7/1/2007
Waters Involved
Mill Creek
Status
Complete

Village Of Muscoda: Balmoral Dam Removal & Mill Creek Restoration: This project will provide necessary planning and educational/partnership activities for the removal of Balmoral Dam. Eventual restoration of the a section of Mill Creek will happen to allow for fish migration both upstream and downstream.

Please note: Final report deliverables help us ensure that the grant has been satisfactorily completed, and that state dollars are being spent wisely. Every deliverable, no matter how minor, must be completed in order to receive full reimbursement for the state share of costs. Ranking questions used to obtain this award, and specific deliverables mentioned in your grant description, constitute final report deliverables. If any deliverable is not adequately provided in the final report, only partial reimbursement, at the department's discretion, will be made. The only exception will be if there is a well-justified and department-approved scope amendment. If you have any question about what a specific ranking question or other deliverable means, please contact your river coordinator BEFORE you sign this agreement.


Grant Details
River Planning Grant
Date
3/15/2023
Waters Involved
Unnamed
Status
Complete

Friends Of The Lower Wi Riverway (Flow): Swe - Lower Wisconsin River Basin Symposium: Friends of the Lower Wisconsin Riverway (FLOW) is sponsoring a project to hold a Lower Wisconsin River Basin Symposium in 2023.

Project final deliverables include:

Press releases and articles about the event will be copied for inclusion in the final report. The meeting agenda and program will be included, along with a list of land/watershed conservation organizations. A final symposium report will include information on symposium attendance, attendee survey rating responses and comments on the success or limitations of the symposium. The report will also include a compilation of presentations summaries/abstracts. Photographs of the event will be delivered with the final report and include file names and attribution information.

Specific project activities include:

FLOW will plan a one day educational symposium in fall of 2023, to include technical - scientific presentations and citizen - organization watershed restoration and aquatic monitoring presentations. To give greater understanding of the connection between land and water quality, land/waterway restoration strategies for wetland and water quality improvement, and inform people about the unique biological, physical and cultural features of the LWR Basin. A web page will promote the event and invitations will be sent to NGO's, NRCS and LWCD in the basin.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Stream Biologist.


Grant Details
River Planning Grant
Date
3/15/2023
Waters Involved
Wisconsin River
Status
Complete

Friends Of The Lower Wi Riverway (Flow): Swe - Lower Wisconsin River Basin Symposium: Friends of the Lower Wisconsin Riverway (FLOW) is sponsoring a project to hold a Lower Wisconsin River Basin Symposium in 2023.

Project final deliverables include:

Press releases and articles about the event will be copied for inclusion in the final report. The meeting agenda and program will be included, along with a list of land/watershed conservation organizations. A final symposium report will include information on symposium attendance, attendee survey rating responses and comments on the success or limitations of the symposium. The report will also include a compilation of presentations summaries/abstracts. Photographs of the event will be delivered with the final report and include file names and attribution information.

Specific project activities include:

FLOW will plan a one day educational symposium in fall of 2023, to include technical - scientific presentations and citizen - organization watershed restoration and aquatic monitoring presentations. To give greater understanding of the connection between land and water quality, land/waterway restoration strategies for wetland and water quality improvement, and inform people about the unique biological, physical and cultural features of the LWR Basin. A web page will promote the event and invitations will be sent to NGO's, NRCS and LWCD in the basin.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Stream Biologist.


Monitoring & Projects

Projects including grants, restoration work and studies shown below have occurred in this watershed. Click the links below to read through the text. While these are not an exhaustive list of activities, they provide insight into the management activities happening in this watershed.

Mill and Indian Creeks Watershed
Watershed Recommendations
TMDL (USEPA) Approved
Snowden (Big Patch) Branch TMDL
Date
Status
The sediment TMDL was approved September 12, 2006.
5/1/2010
In Progress
Projects
Documents
 
TMDL Implementation
Otter Creek (1237100) TMDL
Date
Status
Otter Creek is impaired due to degraded habitat because of excessive sediment loading from surrounding agricultural lands to the Creek. Otter Creek is currently not meeting the applicable narrative water quality standard (WQS) that prohibits objectionable deposits on the shore or in the bed of a water in amounts that interfere with public rights in the water. To address the degraded habitat impairments, Wisconsin Department of Natural Resources (WDNR) determined that sediment, specifically TSS, is the pollutant that must be addressed to attain designated uses and meet WQS.
9/22/2012
In Progress
Projects
Documents
 
TMDL Implementation
Castle Rock & Gunderson Creek TMDL
Date
Status
The Castle Rock and Gunderson Creek TMDL was created to address phosphorus, sediment, and for at least one creek biological oxygen demand. The TMDL was approved and is in implementation through projects funded by the Clean Water Act Section 319 Program.
6/28/2004
In Progress
Projects
Documents
 
Mill and Indian Creeks WatershedWatershed History Note

The Village of Boaz in Richland County is located in the Mill and Indian Creeks Watershed. In 1897, after a severe rainstorm in Richland County, boys from the Dosch farm found large bones sticking out of an eroded bank on a tributary of Mill Creek near Boaz. The bones were later identified as those of the extinct American Mastodon, a large, hairy animal, nine feet tall and weighing eight tons, related to modern elephants. This was the first recorded discovery of mastodon bones in Wisconsin. Mastodons lived in North America from Florida to Alaska during cool, wet times dominated by spruce forests. They had moved into Wisconsin after the last glacial retreat about 13,000 years ago and lived here for the next 4,000 years, when they became extinct. A fluted quartzite spear point found near the bones suggests that humans also arrived in Wisconsin shortly after the glacial retreat and may have hunted these animals for food. The assembled Boaz Mastodon skeleton is on exhibit at the Geology Museum at the University of Wisconsin - Madison.

Date  2010