Grant Details
Lake Protection Grant
Date
9/1/2010
Waters Involved
Coe Hollow Creek
Status
Complete
Vernon County: Lco-Shoreland Ordinance Rev.: Vernon County proposes to amend or create a shoreland zoning ordinance that complies with the requirements of NR 115, Wisconsin Administrative Code (as revised effective February 1, 2010) and retain existing regulations that exceed the water resource protections of NR 115 or are specific or unique to local needs.
Project deliverables include: 1. Copies of any fact sheets or handouts created for public hearings. 2. A summary of the comments received at public hearings. 3. A certified copy of the County Board-approved updated shoreland ordinance or ordinance language (if integrated into other codes). 4. Any GIS maps of the shoreland zone or shoreland condition surveys related to the project.
Specific conditions for this Project: The WDNR will be provided electronic and hard copies of all data and or reports or surveys generated as a result of this project.
Grant Details
Lake Protection Grant
Date
2/1/1999
Waters Involved
Field Veterans Memorial Lake
Status
Complete
Vernon County: Lmi-Hillsboro Lake Improvement: The Vernon County Land Conservation Department proposes to reduce sedimentation to Hillsboro Lake by 1404 tons over a five year period through implementation of Best Management Practices approved, but unlikely to be funded at any time soon, by the state's Nonpoint Source Program. High Residue Management, Conservation Cropping Plans, Grassed Waterway, Critical Area Stabalization, Grade Stabalization Structures, Streambank Riprapping, Streambank Fencing, Stream Crossings and Streambank Shaping and Seeding.
Grant Details
Lake Protection Grant
Date
9/1/2010
Waters Involved
Sidie Hollow Lake
Status
Complete
Vernon County: Lco-Shoreland Ordinance Rev.: Vernon County proposes to amend or create a shoreland zoning ordinance that complies with the requirements of NR 115, Wisconsin Administrative Code (as revised effective February 1, 2010) and retain existing regulations that exceed the water resource protections of NR 115 or are specific or unique to local needs.
Project deliverables include: 1. Copies of any fact sheets or handouts created for public hearings. 2. A summary of the comments received at public hearings. 3. A certified copy of the County Board-approved updated shoreland ordinance or ordinance language (if integrated into other codes). 4. Any GIS maps of the shoreland zone or shoreland condition surveys related to the project.
Specific conditions for this Project: The WDNR will be provided electronic and hard copies of all data and or reports or surveys generated as a result of this project.
Grant Details
Targeted Runoff - Rural Construction
Date
1/1/2007
Waters Involved
Melancthon Creek
Status
Complete
Richland County: Melancthon Creek: To cost-share installation of erosion control best management practices (BMPs) to reduce sediment delivery and sedimentation along Melancthon Creek, including measures to prevent unlimited livestock access to waters of the state.
Grant Details
River Planning Grant
Date
3/15/2022
Waters Involved
Fancy Creek
Status
Complete
Southwestern Wisconsin Regional Planning Com: Fancy Creek Floodplain Reconnection:
SWRPC is sponsoring a plan to restore a 1-mile stretch of Fancy Creek. This will include site assessment & hydrologic modeling to develop options to restore flow to the Fancy Creek channel & reconnect the floodplain.
Deliverables-per application:
Comparison of profile & elevations in the ditch & meander channel to be used in hydraulic modeling, geomorphic assessments, & conceptual design.
Data collected: longitudinal profiles, channel cross-sectional areas, & in-stream & floodplain sediment descriptions.
.csv file with all project survey data delivered.
Table with estimates for baseflow conditions & flood discharges (1.5yr, 10-yr, 100-yr, etc.) will be used in hydraulic modeling & conceptual design. An excel file with this data will be submitted.
conceptual model will assess project impact on 100-yr flood elevations & extent & determine project design (e.g. flood velocities & shear stress). The HEC-RAS model files & output
summaries delivered.
Site soils data will be used to determine stability of potential grade control structures & the erosion potential. Understanding of groundwater-surface water interactions will be used to design long-term monitoring. Investigation summaries delivered.
A plan for implementation will be created & summary delivered.
Project will deliver a conceptual plan of sufficient detail to describe the project to partners, permitting agencies, potential funding sources, & streams biologist. Estimate of project implementation costs and GIS figures included in conceptual plan.
Activities:
Topographic & Geomorphic Survey
Hydrology Assessment
Hydraulics Assessment
Hydrogeological Investigation
Coordination Meetings
Conceptual Design
This scope summarizes the project detail provided in the application & does not negate tasks/deliverables described therein. Data, records, & reports, including GIS-based maps, & digital images, must be submitted to the Department in a format specified by the regional Streams Biologist.
Grant Details
River Planning Grant
Date
7/1/2001
Waters Involved
Pine River
Status
Complete
Richland County: Pine River Organizational Development & Education: Richland County Land Conservation Department will organize the Pine River Study and Information Network (PRISTINE) and develop PRISTINE's ability to collect information and educate the public about the unique character of the Upper Pine River Watershed.
A full description of project scope and deliverables is available in the grant application, which is part of this agreement. The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.
Grant Details
River Planning Grant
Date
3/15/2022
Waters Involved
Unnamed
Status
Complete
Southwestern Wisconsin Regional Planning Com: Fancy Creek Floodplain Reconnection:
SWRPC is sponsoring a plan to restore a 1-mile stretch of Fancy Creek. This will include site assessment & hydrologic modeling to develop options to restore flow to the Fancy Creek channel & reconnect the floodplain.
Deliverables-per application:
Comparison of profile & elevations in the ditch & meander channel to be used in hydraulic modeling, geomorphic assessments, & conceptual design.
Data collected: longitudinal profiles, channel cross-sectional areas, & in-stream & floodplain sediment descriptions.
.csv file with all project survey data delivered.
Table with estimates for baseflow conditions & flood discharges (1.5yr, 10-yr, 100-yr, etc.) will be used in hydraulic modeling & conceptual design. An excel file with this data will be submitted.
conceptual model will assess project impact on 100-yr flood elevations & extent & determine project design (e.g. flood velocities & shear stress). The HEC-RAS model files & output
summaries delivered.
Site soils data will be used to determine stability of potential grade control structures & the erosion potential. Understanding of groundwater-surface water interactions will be used to design long-term monitoring. Investigation summaries delivered.
A plan for implementation will be created & summary delivered.
Project will deliver a conceptual plan of sufficient detail to describe the project to partners, permitting agencies, potential funding sources, & streams biologist. Estimate of project implementation costs and GIS figures included in conceptual plan.
Activities:
Topographic & Geomorphic Survey
Hydrology Assessment
Hydraulics Assessment
Hydrogeological Investigation
Coordination Meetings
Conceptual Design
This scope summarizes the project detail provided in the application & does not negate tasks/deliverables described therein. Data, records, & reports, including GIS-based maps, & digital images, must be submitted to the Department in a format specified by the regional Streams Biologist.
Grant Details
River Protection Grant
Date
7/1/2004
Waters Involved
Bishop Br
Status
Complete
Vernon County Lwcd: Bishops Branch Restoration: Vernon County proposes to restore some 2600 linear feet of Bishops Branch, a tributary to the West Fork of the Kickapoo River, in the Town of Liberty.
Major project elements to include 1) placement of lunker structures, boulders, and rock weirs in the stream, 2) deepening of pools, 3) placement of riprap, and 4) revegitation of the streambank.