2024-04-05
|
43
|
Site Activity Status Update Received
|
|
DATA TRANSMITTAL MARCH 2024
|
|
2024-01-18
|
366
|
VAL and/or VRSL Exceeded at Off-Site Property or ROW
|
|
|
|
2024-01-02
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 7/1/2023 - 12/31/2023
|
|
2023-10-02
|
43
|
Site Activity Status Update Received
|
|
GROUNDWATER
|
|
2023-07-10
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 01/01/2023 - 06/30/2023
|
|
2023-06-30
|
43
|
Site Activity Status Update Received
|
|
DATA TRANSMITTAL JUNE 2023
|
|
2023-01-09
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 7/1/2022 - 12/31/2022
|
|
2022-10-28
|
43
|
Site Activity Status Update Received
|
|
REVISED INJECTION SUMMARY REPORT
|
|
2022-10-27
|
43
|
Site Activity Status Update Received
|
|
GROUNDWATER SAMPLING OCTOBER 2022
|
|
2022-07-28
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 1/1/2022 - 6/30/2022
|
|
2022-01-04
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 7/1/2021 - 12/31/2021
|
|
2021-12-14
|
64
|
Inject/Infiltrate Request Approved
|
|
INJECT/INFILTRATE APPROVED
|
|
2021-12-09
|
99
|
Miscellaneous
|
|
WPDES PERMIT GENERAL COVERAGE LETTER
|
|
2021-11-15
|
199
|
Additional Information Received (Fee-Based or Closure)
|
|
REFER TO INJECT/INFILTRATE DOCUMENT RECEIVED 11/14/2021.
|
|
2021-11-14
|
99
|
Miscellaneous
|
|
INJECT RPT
|
|
2021-10-26
|
63
|
Inject/Infiltrate Request Received (fee)
|
|
REC'D CK #19699 $700.00, GW INJECTION WORK PLAN AND ADDITIONAL GW REMEDIATION
|
|
2021-10-26
|
198
|
Request for Additional Information (Fee-Based or Closure)
|
|
WORK PLAN RECEIVED11/26/2021. PAUSED UNTIL INJECT/INFILTRATION EXEMPTION REQUEST IS RECEIVED.
|
|
2021-10-04
|
99
|
Miscellaneous
|
|
DERF PACKET
|
|
2021-10-04
|
217
|
DERF - Cost Reimbursement Application Received
|
|
|
|
2021-09-14
|
43
|
Site Activity Status Update Received
|
|
SI SAMPLE RESULTS NOTIFICATION
|
|
2021-07-26
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 1/1/2021 - 6/30/2021
|
|
2021-07-15
|
43
|
Site Activity Status Update Received
|
|
AMBIENT AIR AND SUB-SLAB SAMPLING - 2159 LAURA LANE
|
|
2021-07-06
|
43
|
Site Activity Status Update Received
|
|
SI SAMPLE RESULTS NOTIFICATION
|
|
2021-06-17
|
121
|
PFAS Sampling Completed - Non-Actionable Levels Detected
|
|
|
|
2021-06-14
|
43
|
Site Activity Status Update Received
|
|
SI SAMPLE RESULTS NOTIF - AMBIENT AIR SAMPLING AND SUB-SLAB DEPRESSURIZATION RPT - 2008 CAPELLA CT
|
|
2021-05-27
|
43
|
Site Activity Status Update Received
|
|
APRIL 2021 GW SAMPLE RESULTS
|
|
2021-05-24
|
43
|
Site Activity Status Update Received
|
|
PFAS SAMPLING
|
|
2021-05-17
|
43
|
Site Activity Status Update Received
|
|
SI SAMPLE RESULTS NOTIFICATION
|
|
2021-05-10
|
43
|
Site Activity Status Update Received
|
|
SI SAMPLE RESULTS NOTIFICATION - AMBIENT AIR AND SUB-SLAB SAMPLING FOR 2122 AND 2126 RUBEN DR
|
|
2021-04-06
|
130
|
DNR Regulatory Reminder Sent
|
|
VAPOR INTRUSION AND TCE REMINDER LETTER
|
|
2021-03-16
|
43
|
Site Activity Status Update Received
|
|
FEBRUARY 2021 SI SAMPLE RESULTS NOTIFICATION
|
|
2021-03-01
|
43
|
Site Activity Status Update Received
|
|
SI SAMPLE RESULTS NOTIFICATION & PFAS RESAMPLE GW DATA TRANSMITTAL
|
|
2021-02-15
|
43
|
Site Activity Status Update Received
|
|
SITE ACTIVITY STATUS UPDATE RECEIVED
|
|
2021-02-03
|
99
|
Miscellaneous
|
|
EFFORTS TO ACCESS 2135 LAURA LN DOCUMENTED IN JUNE 2019 STATUS RPT
|
|
2021-02-03
|
99
|
Miscellaneous
|
|
PROPERTY ACCESS REQUESTS FOR 2124 LAURA LN
|
|
2021-02-02
|
99
|
Miscellaneous
|
|
REQUEST FOR WDNR ACCESS ASSISTANCE
|
|
2021-01-29
|
43
|
Site Activity Status Update Received
|
|
MW-24 INSTALLATION AND GW SAMPLE RESULTS
|
|
2021-01-25
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 7/1/2020 - 12/31/2020
|
|
2020-12-22
|
99
|
Miscellaneous
|
|
PFAS SAMPLING REQUIREMENTS
|
|
2020-11-03
|
43
|
Site Activity Status Update Received
|
|
OCTOBER 2020 SI SAMPLE RESULTS NOTIFICATION
|
|
2020-10-30
|
43
|
Site Activity Status Update Received
|
|
OCTOBER VAPOR INTRUSION RESULTS
|
|
2020-10-29
|
43
|
Site Activity Status Update Received
|
|
OCTOBER VAPOR INTRUSION RESULTS
|
|
2020-10-27
|
130
|
DNR Regulatory Reminder Sent
|
|
DERF FUNDING STATUS LTR
|
|
2020-08-25
|
43
|
Site Activity Status Update Received
|
|
PFAS GW SAMPLING SUMMARY RPT
|
|
2020-08-17
|
130
|
DNR Regulatory Reminder Sent
|
|
EMERGING CONTAMINANTS REMINDER LETTER
|
|
2020-07-22
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 1/1/2020 - 6/30/2020
|
|
2020-07-13
|
36
|
Site Investigation Workplan (SIWP) Approved
|
|
PFAS SIWP APPR
|
|
2020-07-08
|
43
|
Site Activity Status Update Received
|
|
JUNE 2020 SI SAMPLE RESULTS, SOIL VAPOR INTRUSION STUDY
|
|
2020-07-02
|
43
|
Site Activity Status Update Received
|
|
SI SAMPLE RESULTS NOTIFICATION
|
|
2020-06-25
|
43
|
Site Activity Status Update Received
|
|
SI SAMPLE RESULTS NOTIFICATION
|
|
2020-06-18
|
43
|
Site Activity Status Update Received
|
|
SI SAMPLE RESULTS NOTIFICATION
|
|
2020-05-01
|
43
|
Site Activity Status Update Received
|
|
SUB-SLAB VAPOR DATA TRANSMITTAL
|
|
2020-04-21
|
43
|
Site Activity Status Update Received
|
|
MARCH 2020 OFFSITE VAPOR SAMPLING FOR 2122 RUBEN DR
|
|
2020-04-14
|
35
|
Site Investigation Workplan (SIWP) Received (non-fee)
|
|
REC'D ADDL SIWP - PFAS
|
|
2020-03-03
|
116
|
PFAS Sampling Required
|
|
|
|
2020-01-17
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 7/1/2019 - 12/31/2019
|
|
2020-01-07
|
99
|
Miscellaneous
|
|
APPROVAL OF ADDITIONAL SITE INVESTIGATION WORK PLAN AND BUDGET REQUEST
|
|
2019-12-17
|
35
|
Site Investigation Workplan (SIWP) Received (non-fee)
|
|
ADDITIONAL SITE INVESTIGATION WORK PLAN AND BUDGET REQUEST.
|
|
2019-12-17
|
112
|
DERF - Change Order Received
|
|
ADDITIONAL SITE INVESTIGATION WORK PLAN AND BUDGET REQUEST. SEE AC 35 FOR DOCUMENT.
|
|
2019-07-15
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 1/1/2019 - 6/30/2019
|
|
2019-06-17
|
43
|
Site Activity Status Update Received
|
|
STATUS REPORT JUNE 2019
|
|
2019-06-17
|
-
|
Dry Cleaner Response Fund
|
|
|
|
2019-06-11
|
288
|
DERF - Cost Reimbursement Paid
|
|
|
|
2019-01-25
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 7/1/2018 - 12/31/2018
|
|
2018-07-18
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 1/1/2018 - 6/30/2018
|
|
2018-05-18
|
99
|
Miscellaneous
|
|
APPROVED MODIFICATION TO ADDITIONAL WORK PLAN AND BUDGET REQUEST
|
|
2018-04-03
|
112
|
DERF - Change Order Received
|
|
REC'D MODIFICATION TO ADDITIONAL WORK PLAN AND BUDGET REQUEST
|
|
2018-02-06
|
81
|
Site Investigation Workplan (SIWP) Not Approved
|
|
REQUEST REVISION OF WORK PLAN, NEED ADD'L VAPOR SAMPLING
|
|
2018-01-06
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 7/1/2017 - 12/31/2017
|
|
2017-11-16
|
112
|
DERF - Change Order Received
|
|
REC'D STATUS RPT, ADD'L WK PLAN AND BUDGET REQUEST
|
|
2017-11-16
|
35
|
Site Investigation Workplan (SIWP) Received (non-fee)
|
|
|
|
2017-07-17
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 1/1/2017 - 6/30/2017
|
|
2017-02-16
|
43
|
Site Activity Status Update Received
|
|
STATUS UPDATE, WORK PLAN, AND BUDGET ESTIMATE
|
|
2017-02-10
|
217
|
DERF - Cost Reimbursement Application Received
|
|
REC'D REM ACTION REQ. 4 - DV FORWARDED TO CO 2/28/17
|
|
2017-01-18
|
112
|
DERF - Change Order Received
|
|
REC'D WORK PLAN/COST ESTIMATE FOR INSTALLATION OF 3 MWS
|
|
2017-01-09
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 7/1/2016 - 12/31/2016
|
|
2016-10-26
|
99
|
Miscellaneous
|
|
DISCUSSED POTENTIAL ADDITIONAL MW LOCATIONS WITH CONSULTANT.
|
|
2016-10-05
|
99
|
Miscellaneous
|
|
REC'D RECENT GW SAMPLING RESULTS AND GW FLOW MAP BY E-MAIL
|
|
2016-07-11
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 1/1/2016 - 6/30/2016
|
|
2016-05-12
|
99
|
Miscellaneous
|
|
REC'D RECENT SOIL VAPOR DATA
|
|
2016-01-06
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 7/1/2015 - 12/31/2015
|
|
2015-12-18
|
99
|
Miscellaneous
|
|
REC'D INDOOR AIR SAMPLING RESULTS
|
|
2015-10-01
|
99
|
Miscellaneous
|
|
DV. APPROVED REVISED WORK PLAN/COST ESTIMATE
|
|
2015-09-25
|
99
|
Miscellaneous
|
|
REC'D REVISED STATUS REPORT/WORK PLAN/COST ESTIMATE
|
|
2015-09-02
|
112
|
DERF - Change Order Received
|
|
REC'D STATUS REPORT/WORK PLAN/COST ESTIMATE
|
|
2015-07-16
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 1/1/2015 - 6/30/2015
|
|
2015-03-05
|
99
|
Miscellaneous
|
|
DV. CONDITIONALLY APPROVED COSTS AND WORK FOR NEXT PHASE
|
|
2015-03-04
|
30
|
Site Investigation Workplan (SIWP) Notice to Proceed (NTP)
|
|
REC
|
|
2015-03-04
|
112
|
DERF - Change Order Received
|
|
REC'D REVISED WK PLAN/COST ESTIMATE
|
|
2015-02-23
|
99
|
Miscellaneous
|
|
CONTACTED CONSULTANT REQUESTED MODIFICATION TO WK PLAN
|
|
2015-02-18
|
112
|
DERF - Change Order Received
|
|
REC'D WORK PLAN FOR ADD'L SOIL VAPOR PROBE & ADD'L VAPOR MITIGATION SYSTEMS
|
|
2015-01-06
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 7/1/2014 - 12/31/2014
|
|
2015-01-06
|
43
|
Site Activity Status Update Received
|
|
REC'D RESULTS FROM ADD'L SOIL VAPOR SAMPLING
|
|
2014-11-06
|
99
|
Miscellaneous
|
|
DV. APPROVED COSTS AND WORK FOR NEXT PHASE
|
|
2014-11-05
|
112
|
DERF - Change Order Received
|
|
REC'D REVISED WORK PLAN FOR ADD. SOIL VAPOR PROBES
|
|
2014-10-29
|
99
|
Miscellaneous
|
|
REC'D WORK PLAN FOR ADD'L SOIL VAPOR PROBES
|
|
2014-10-17
|
99
|
Miscellaneous
|
|
DV. REQ. INSTALLATION OF ADD'L VAPOR MITIGATION SYSTEMS
|
|
2014-10-16
|
43
|
Site Activity Status Update Received
|
|
REC'D RESULTS FROM 1ST SOIL VAPOR SAMPLING EVENT
|
|
2014-09-09
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 1/1/2014 - 6/30/2014
|
|
2014-05-16
|
99
|
Miscellaneous
|
|
DV.CONDITIONALLY APPROVED COSTS AND WORK FOR NEXT PHASE.
|
|
2014-05-12
|
112
|
DERF - Change Order Received
|
|
REC'D REVISED WORK PLAN FOR ADD SOIL VAPORT SAMPKING AND INSTALLATION OF SUB-SLAB DEPRESSURIZ, SYSTE
|
|
2014-02-19
|
99
|
Miscellaneous
|
|
REQUESTED REVISION OF WORK PLAN AND COST ESTIMATE SUBMITTED 01/28/14.
|
|
2014-02-19
|
99
|
Miscellaneous
|
|
DV. REQUESTED CHANGES TO CHANGE ORDER/WORK PLAN
|
|
2014-01-30
|
130
|
DNR Regulatory Reminder Sent
|
|
DERF FUNDING STATUS LTR
|
|
2014-01-28
|
112
|
DERF - Change Order Received
|
|
REC'D WORK PLAN FOR ADD SOIL VAPOR SAMPLING AND INSTALLATION OF SUB-SLAB DEPRESSURIZATION SYSTEMS
|
|
2013-11-12
|
99
|
Miscellaneous
|
|
DV - SENT LTR TO RP ABOUT VI ISSUE
|
|
2013-10-30
|
43
|
Site Activity Status Update Received
|
|
REC'D UPDATE
|
|
2013-09-20
|
99
|
Miscellaneous
|
|
DV REQUESTED SUB-SLAB & AIR SAMPLES
|
|
2013-03-25
|
43
|
Site Activity Status Update Received
|
|
REC'D PROJECT STATUS REPORT
|
|
2013-02-28
|
99
|
Miscellaneous
|
|
DV. CONTACTED CONSULTANT, REQUESTED STATUS UPDATE
|
|
2012-06-14
|
218
|
DERF - Cost Reimbursement Application Approved
|
|
DC-472 APPROVED, CHECK BEING PROCESSED
|
|
2012-05-15
|
99
|
Miscellaneous
|
|
DV. APPROVED COSTS FOR ADDITIONAL SOIL VAPOR SAMPLING AND GW MONITORING
|
|
2012-05-11
|
112
|
DERF - Change Order Received
|
|
REC'D COST EST FOR SIL VAPOR SAMPLING
|
|
2012-03-14
|
217
|
DERF - Cost Reimbursement Application Received
|
|
REC'D REM ACTION REQ. 3 (1ST OF 2ND REM PHASE) DV FORWARDED TO CO 3/19/12
|
|
2011-10-17
|
43
|
Site Activity Status Update Received
|
|
|
|
2011-09-07
|
130
|
DNR Regulatory Reminder Sent
|
|
Vapor Intrusion (VI) Assessment Notification Ltr Sent
|
|
2010-08-25
|
43
|
Site Activity Status Update Received
|
|
TRANSMITTAL OF ANNUAL STATUS REPORT
|
|
2009-11-20
|
99
|
Miscellaneous
|
|
DV. APPROVED $1,825 FOR DRUM DISPOSAL
|
|
2009-11-19
|
99
|
Miscellaneous
|
|
REC'D REQ. FOR APPROVAL OF DRUM DISPOSAL
|
|
2009-08-25
|
147
|
Remedial Action (RA) Design Report Received (non-fee)
|
|
|
|
2009-08-25
|
99
|
Miscellaneous
|
|
DERF REIMBURSEMENT CHECK FOR 2ND RA CLAIM (DC-307 RCVD APRIL 2009) MAILED TODAY
|
|
2009-06-05
|
218
|
DERF - Cost Reimbursement Application Approved
|
|
AUDIT OF RA #2 (4/09) COMPLETE. REIMB CHECK NOT YET SENT, NO FUNDS AVAILABLE. WILL BE ISSUED ASAP.
|
|
2009-04-23
|
99
|
Miscellaneous
|
|
DV. AFTER REQ. ADD. GW MONITORING, APPROVED COSTS FOR 2ND REMEDIATION PHASE
|
|
2009-04-07
|
112
|
DERF - Change Order Received
|
|
REC'D REVISED COST EST. FOR GW REMEDIAL ACTION
|
|
2009-04-06
|
217
|
DERF - Cost Reimbursement Application Received
|
|
DV. FORWARDED TO CO 4/23/09. REC'D REMEDIAL ACTION - PARTIAL 2
|
|
2009-02-25
|
99
|
Miscellaneous
|
|
DV. APPV'D KPRG AS CONSULTANT- 2ND PHASE OF REMEDIAL ACTION. REQ. COST EST. FOR ADD. REQ. WORK
|
|
2009-02-10
|
99
|
Miscellaneous
|
|
REC'D LTR RE CONSULTANT SELECTION & ADD'L GW REMEDIATION INF
|
|
2009-01-13
|
99
|
Miscellaneous
|
|
REC'D DERF RA BID
|
|
2009-01-12
|
99
|
Miscellaneous
|
|
REC'D DERF RA BID
|
|
2008-11-25
|
99
|
Miscellaneous
|
|
DV. REQ. SITE TO BID FOR CHANGE IN GW REMEDIATION
|
|
2008-11-11
|
99
|
Miscellaneous
|
|
CHECK FOR 2ND OVERALL CLAIM (RCVD 9/20/07) CUT TODAY
|
|
2008-10-02
|
99
|
Miscellaneous
|
|
REC'D 9/30/08 REPORT OF GW RESULTS FROM AUGUST 2008
|
|
2008-09-02
|
99
|
Miscellaneous
|
|
DV. APPROVED $5913 ADD. REM. COST FOR DNR REQ. GW MONIT. RD. & EVAL. TOTAL REM CAP $106,733.
|
|
2008-08-29
|
99
|
Miscellaneous
|
|
REC'D REQUESTED COST EST. FOR ADDITIONAL GW MONITORING EVENT.
|
|
2008-08-19
|
99
|
Miscellaneous
|
|
DV. REQUESTED ADD. GW MONITORING BEFORE DECIDING ON ALTERNATIVE GW REMEDIAL METHOD
|
|
2008-08-12
|
99
|
Miscellaneous
|
|
REC'D REMEDIAL PROGRESS REPORT & PILOT TEST WORK PLAN
|
|
2007-12-18
|
218
|
DERF - Cost Reimbursement Application Approved
|
|
AUDIT OF RA CLAIM (9/20) COMPLETE. REIMB CHECK NOT YET SENT, NO FUNDS AVAILABLE. WILL BE ISSUED ASAP
|
|
2007-11-02
|
99
|
Miscellaneous
|
|
NOTIFICATION TO TREAT OR DISPOSE OF PETROLEUM CONTAMINATED SOIL
|
|
2007-09-20
|
217
|
DERF - Cost Reimbursement Application Received
|
|
DV. 11/13/07 FIRST REMEDIAL ACTION
|
|
2006-11-08
|
218
|
DERF - Cost Reimbursement Application Approved
|
|
SEVERAL DELAYS ADDED TIME TO THIS TIME TO GET THIS PAID. I WORKED WITH SIGMA TO REDO SOME NUMBERS.
|
|
2006-08-17
|
99
|
Miscellaneous
|
|
DV. APPROVAL OF ARCADIS AS CONSULTANT FOR REMEDIAL WORK PHASE
|
|
2006-08-10
|
99
|
Miscellaneous
|
|
REC'D RECOMMENDATIONS FOR CONSULTANT SELECTION BASED ON REMEDIAL PHASE BIDS
|
|
2006-06-16
|
217
|
DERF - Cost Reimbursement Application Received
|
|
SITE INVESTIGATION FINAL
|
|
2006-02-17
|
38
|
Site Investigation Report (SIR) Approved
|
|
DV.
|
|
2005-12-08
|
37
|
Site Investigation Report (SIR) Received (non-fee)
|
|
|
|
2005-09-14
|
36
|
Site Investigation Workplan (SIWP) Approved
|
|
DV. APP'D SI REQUEST FOR $11,708-TOTAL CAP FOR SI FOR SITE IS $101,905
|
|
2005-09-08
|
35
|
Site Investigation Workplan (SIWP) Received (non-fee)
|
|
REC'D ADD. SI WORK PLAN
|
|
2005-08-04
|
140
|
Site Investigation Report (SIR) Not Approved
|
|
DV. REQUESTED ADD. INVESTIGATIVE WORK
|
|
2005-06-17
|
37
|
Site Investigation Report (SIR) Received (non-fee)
|
|
|
|
2005-06-17
|
29
|
Phase II Environmental Site Assessment (ESA) Rpt Received
|
|
|
|
2004-09-27
|
214
|
DERF - Interim Action Workplan Approved
|
|
APP'D SI REQUEST FOR $16,060-TOTAL CAP FOR SI FOR SITE IS $90,197.
|
|
2004-09-08
|
90
|
SER First In/First Out (FIFO) Review Process Started
|
|
REC'D ADDENDUM C WORKPLAN
|
|
2004-09-08
|
99
|
Miscellaneous
|
|
REC'D ADDENDUM C WORKPLAN
|
|
2004-05-18
|
99
|
Miscellaneous
|
|
CONTAINED-OUT RULING GRANTED. GK.
|
|
2004-04-20
|
36
|
Site Investigation Workplan (SIWP) Approved
|
|
APP'D SI REQUEST FOR $39,579-TOTAL CAP FOR SI FOR SITE IS $74,137. GK.
|
|
2004-03-18
|
35
|
Site Investigation Workplan (SIWP) Received (non-fee)
|
|
REC'D SI REQUEST. GK.
|
|
2004-01-15
|
216
|
DERF - Contained-in Rulings Review Request Received
|
|
|
|
2003-05-18
|
36
|
Site Investigation Workplan (SIWP) Approved
|
|
INSTALLATION OF PIEZOMETER APPR'D-LESS THAN $3000 OVER INITIAL SI COSTS. GK.
|
|
2003-04-08
|
35
|
Site Investigation Workplan (SIWP) Received (non-fee)
|
|
ADD'L SI REPORT ADDENDUM REC'D. GK.
|
|
2003-02-18
|
36
|
Site Investigation Workplan (SIWP) Approved
|
|
ADD'L INV. APPR'D FOR PROJECTED SI OF $32,598. GK.
|
|
2002-12-31
|
35
|
Site Investigation Workplan (SIWP) Received (non-fee)
|
|
|
|
2002-03-27
|
110
|
DERF - Potential Claim Form Approved
|
|
RECEIPT OF POTENTIAL CLAIM NOTIFICATION. GK.
|
|
2002-03-25
|
36
|
Site Investigation Workplan (SIWP) Approved
|
|
DERP WP & COST ($25,065) APP'D. GK.
|
|
2002-03-07
|
35
|
Site Investigation Workplan (SIWP) Received (non-fee)
|
|
DERP WP REC'D. GK.
|
|
2002-02-25
|
2
|
Responsible Party (RP) letter sent
|
|
|
|
2002-02-18
|
1
|
Notification of Hazardous Substance Discharge
|
|
|