02-30-000327
CHRYSLER KENOSHA MAIN PLT
|
Activity Type / Status | Jurisdiction |
---|---|
ERP / OPEN | DNR RR |
Location Name | County | DNR Region |
---|---|---|
FORMER KENOSHA ENGINE PLANT | KENOSHA | SOUTHEAST |
Address | Municipality |
---|---|
5555 30TH AVE | KENOSHA |
PLSS Description | Latitude (WGS84) | Longitude (WGS84) | Google Maps | RR Sites Map |
---|---|---|---|---|
SW 1/4 of the SE 1/4 of Sec 36, T02N, R22E | 42.5827671 | -87.843962 |
![]() |
![]() |
Additional Activity Details | Acres |
---|---|
UNKNOWN |
Facility ID | PECFA No. | EPA ID | Start Date | End Date |
---|---|---|---|---|
230004500 | 1989-08-17 |
Above Ground Petrol Tank |
Drycleaner |
EPA NPL Site |
EPA Superfund |
PECFA Funds Eligible |
PFAS |
ROW Impact |
Sediments |
Underground Petrol Tank |
WI DOT Site |
---|---|---|---|---|---|---|---|---|---|
Date | Code | Name | File | Comment | |
---|---|---|---|---|---|
2024-07-15 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 1/1/2024 - 6/30/2024 | |
2024-04-26 | 198 | Request for Additional Information (Fee-Based or Closure) | REQUESTED CLARIFICATIONS AND PLAN MODIFICATION | ||
2024-04-26 | 198 | Request for Additional Information (Fee-Based or Closure) |
![]() |
REQUESTED CLARIFICATIONS AND PLAN MODIFICATION | |
2024-04-11 | 43 | Site Activity Status Update Received |
![]() |
ANNUAL GROUNDWATER MONITORING REPORT | |
2024-03-12 | 854 | Materials Management Plan Request Recvd with Fee |
![]() |
REC'D CK #217953 $700, KENOSHA INNOVATION CENTER | |
2024-03-12 | 710 | Database Fee Paid for Soil Continuing Obligation(s) | REC'D CK #217953 $300, KENOSHA INNOVATION CENTER | ||
2024-03-12 | 854 | Materials Management Plan Request Recvd with Fee |
![]() |
REC'D CK #217953 $700, REUSE OF SOIL - KENOSHA INNOVATION NEIGHBORHOOD INFRASTRUCTURE CONSTRUCTION | |
2024-03-12 | 710 | Database Fee Paid for Soil Continuing Obligation(s) | REC'D CK #217953 $300, REUSE OF SOIL | ||
2024-01-09 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 7/1/2023 - 12/31/2023 | |
2023-12-15 | 43 | Site Activity Status Update Received |
![]() |
KEP GROUNDWATER POST-REMEDIATION SAMPLE RESULTS – OCTOBER 2023 | |
2023-10-12 | 43 | Site Activity Status Update Received |
![]() |
KEP GROUNDWATER POST-REMEDIATION SAMPLE RESULTS – JULY 2023 | |
2023-07-24 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 01/01/2023 - 06/30/2023 | |
2023-06-20 | 43 | Site Activity Status Update Received |
![]() |
GROUNDWATER POST-REMEDIATION SAMPLE RESULTS - APRIL 2023 | |
2023-05-31 | 81 | Site Investigation Workplan (SIWP) Not Approved |
![]() |
DNR CANNOT PROVIDE RESPONSE - NEED TO CONSULT WITH EPA INSTEAD. | |
2023-05-02 | 135 | Site Investigation Workplan (SIWP) Received (fee) |
![]() |
RECV'D CK #211950 $700.00 | |
2023-03-14 | 43 | Site Activity Status Update Received |
![]() |
ANNUAL GROUNDWATER MONITORING REPORT | |
2023-01-26 | 43 | Site Activity Status Update Received |
![]() |
KEP GROUNDWATER POST-REMEDIATION SAMPLE RESULTS - OCTOBER 2022 | |
2023-01-23 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 7/1/2022 - 12/31/2022 | |
2022-11-08 | 98 | Technical Assistance Provided |
![]() |
||
2022-10-18 | 97 | Technical Assistance Request Received (fee) |
![]() |
RECVD CK #207846 $700.00REDEVELOPMENT PLAN - PHASE I INFRASTRUCTURE CONSTRUCTION | |
2022-10-12 | 43 | Site Activity Status Update Received |
![]() |
KEP GROUNDWATER POST-REMEDIATION SAMPLE RESULTS - JULY 2022 | |
2022-08-01 | 99 | Miscellaneous |
![]() |
CONSTRUCTION DOCUMENTS | |
2022-07-18 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 1/1/2022 - 6/30/2022 | |
2022-01-12 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 7/1/2021 - 12/31/2021 | |
2022-01-12 | 43 | Site Activity Status Update Received |
![]() |
KEP PERIMETER GW SAMPLE RESULTS OCT 2021 | |
2021-08-31 | 64 | Inject/Infiltrate Request Approved |
![]() |
||
2021-08-20 | 99 | Miscellaneous |
![]() |
REC'D ADD'L INFO FOR INJECTION APPROVAL | |
2021-08-18 | 99 | Miscellaneous |
![]() |
REC'D ADD'L INFO FOR INJECTION APPROVAL | |
2021-08-17 | 63 | Inject/Infiltrate Request Received (fee) |
![]() |
REC'D CK #003153 $700.00 | |
2021-08-03 | 99 | Miscellaneous |
![]() |
REQUESTED ADD'L INFO FOR INJECTION APPROVAL | |
2021-07-20 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 1/1/2021 - 6/30/2021 | |
2021-04-06 | 130 | DNR Regulatory Reminder Sent |
![]() |
VAPOR INTRUSION AND TCE REMINDER LETTER | |
2021-01-19 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 7/1/2020 - 12/31/2020 | |
2021-01-12 | 43 | Site Activity Status Update Received |
![]() |
DECEMBER 2020 GW SAMPLE RESULTS - KEP WELLS AND PIEXOMETERS INSTALLED, BASELINE EVENT | |
2020-12-03 | 43 | Site Activity Status Update Received |
![]() |
NOVEMBER 2020 SEMI-ANNUAL PERIMETER GROUNDWATER MONITORING REPORT | |
2020-10-21 | 151 | Remedial Action (RA) Documentation Report Received (non-fee) |
![]() |
||
2020-08-17 | 130 | DNR Regulatory Reminder Sent |
![]() |
EMERGING CONTAMINANTS REMINDER LETTER | |
2020-07-17 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 1/1/2020 - 6/30/2020 | |
2020-07-16 | 92 | Operation & Maintenance (O&M) Report Received (non-fee) |
![]() |
SEMI-ANNUAL OPERATION, MAINTENANCE AND MONITORING REPORT, JULY - DECEMBER 2019 | |
2020-07-16 | 43 | Site Activity Status Update Received |
![]() |
APRIL 2020 SEMI-ANNUAL PERIMETER GROUNDWATER MONITORING REPORT | |
2020-06-29 | 99 | Miscellaneous |
![]() |
PROJECT UPDATE RECEIVED | |
2020-06-11 | 857 | Materials Management Plan Approved |
![]() |
718.12 AND 718.15 EXEMPTION GRANTED FOR ON-SITE SOIL MANAGEMENT | |
2020-06-11 | 56 | Continuing Obligation(s) Applied | |||
2020-06-11 | 222 | Continuing Obligation - Maintain Cap Over Contaminated Area | |||
2020-06-11 | 226 | Continuing Obligation - Vapor Intrusion Response | FUTURE REDEVELOPMENT - NOTIFICATION REQUIRED | ||
2020-06-11 | 232 | Continuing Obligation - Residual Soil Contamination | |||
2020-06-08 | 199 | Additional Information Received (Fee-Based or Closure) |
![]() |
REC'D REQUESTED INFO | |
2020-06-04 | 99 | Miscellaneous |
![]() |
FOLLOW-UP REQUEST FOR INFO ON ON-SITE MATERIAL MANAGEMENT | |
2020-05-28 | 99 | Miscellaneous |
![]() |
REC'D ADD'L INFORMATION REGARDING ON-SITE MATERIAL MANAGEMENT | |
2020-05-18 | 198 | Request for Additional Information (Fee-Based or Closure) |
![]() |
REQ ADDITIONAL INFO REGARDING MATERIAL MANAGEMENT PLAN | |
2020-04-14 | 854 | Materials Management Plan Request Recvd with Fee |
![]() |
REC'D CK #14520582 $700.00 | |
2020-04-14 | 710 | Database Fee Paid for Soil Continuing Obligation(s) | REC'D CK #14520582 $300.00, MMP | ||
2020-02-12 | 99 | Miscellaneous |
![]() |
CONDITIONAL APPROVAL OF REMEDIAL DESIGN REPORT (GROUNDWATER) | |
2020-01-17 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 7/1/2019 - 12/31/2019 | |
2019-12-30 | 99 | Miscellaneous |
![]() |
RESPONSE TO COMMENTS LTR AND GW REMEDIAL DESIGN RPT REVISIONS | |
2019-12-03 | 43 | Site Activity Status Update Received |
![]() |
REC'D OCTOBER 2019 SEMI ANNUAL PERIMETER GW MONITORING RPT | |
2019-10-16 | 92 | Operation & Maintenance (O&M) Report Received (non-fee) |
![]() |
REC'D SEMI-ANNUAL OPERATION AND MONITORING RPT JANUARY - JUNE 2019 | |
2019-09-23 | 99 | Miscellaneous |
![]() |
REVIEW OF REMEDIAL DESIGN REPORT (GROUNDWATER) | |
2019-07-25 | 147 | Remedial Action (RA) Design Report Received (non-fee) |
![]() |
REMEDIAL DESIGN REPORT (GROUNDWATER) | |
2019-07-25 | 99 | Miscellaneous | KEP SITEWIDE GROUNDWATER REMEDIATION: TECHNICAL SPECIFICATIONS AND PLANS | ||
2019-07-25 | 99 | Miscellaneous | PUBLIC NOTICE REGARDING ENVIRONMENTAL CLEANUP WISCONSIN READY FOR REUSE PROGRAM | ||
2019-07-25 | 99 | Miscellaneous | ANALYSIS OF BROWNFIELD CLEANUP ALTERNATIVES, GROUNDWATER REMEDIATION | ||
2019-07-12 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 1/1/2019 - 6/30/2019 | |
2019-06-07 | 92 | Operation & Maintenance (O&M) Report Received (non-fee) |
![]() |
JULY-DEC 2018 O&M REPORT | |
2019-06-07 | 43 | Site Activity Status Update Received |
![]() |
APRIL 2019 PERIMETER GW SAMPLING SUMMARY | |
2019-03-14 | 99 | Miscellaneous |
![]() |
APPROVAL OF 2019 REMEDIATION SYSTEM MAINTENANCE COST | |
2019-02-08 | 43 | Site Activity Status Update Received |
![]() |
OCT 2018 PERIMETER GW SAMPLING SUMMARY | |
2019-02-06 | 99 | Miscellaneous |
![]() |
SUPPLEMENT TO KEP SMP; REQUEST FOR APPROVAL OF AN ADDITIONAL SOURCE OF TOPSOIL | |
2019-01-02 | 92 | Operation & Maintenance (O&M) Report Received (non-fee) |
![]() |
JULY-DEC 2017 O&M REPORT | |
2019-01-02 | 92 | Operation & Maintenance (O&M) Report Received (non-fee) |
![]() |
JAN-JUNE 2018 O&M REPORT | |
2018-11-28 | 92 | Operation & Maintenance (O&M) Report Received (non-fee) |
![]() |
O&M RPT, JAN-JUNE 2017 | |
2018-10-08 | 43 | Site Activity Status Update Received |
![]() |
ENHANCED REDUCTIVE DECHLORINATION PILOT TEST DOCUMENTATION REPORT | |
2018-09-20 | 43 | Site Activity Status Update Received |
![]() |
REC'D MAY 2018 PERIMETER GW SAMPLING SUMMARY | |
2018-07-30 | 151 | Remedial Action (RA) Documentation Report Received (non-fee) |
![]() |
REC'D REM DOC RPT FOR GROUP AREAS A, B, C, E, J & K | |
2018-05-31 | 43 | Site Activity Status Update Received |
![]() |
REC'D SEMI-ANNUAL O&M REPORT, JULY TO DECEMBER 2016 | |
2018-04-04 | 99 | Miscellaneous | APPROVED USE OF BANK. ESCROW FUNDS FOR KEP SOIL REMED.-CONTINUATION. | ||
2018-04-04 | 99 | Miscellaneous | APPROVED FUNDING CHANGE FOR 2018 O&M OF GW RECOVERY SYSTEMS. | ||
2018-04-03 | 99 | Miscellaneous | REC'D REQ. FOR KEP SOIL REMEDIATION - CONTINUATION USING BANKRUPTCY ESCROW ACCT. | ||
2018-03-28 | 99 | Miscellaneous |
![]() |
APPROVED R4R FUNDING APPR REQ FOR GW RECOVERY SYSTEMS O&M AND FOR GW REMEDIATION | |
2018-03-27 | 43 | Site Activity Status Update Received |
![]() |
REC'D IN-SITU CHEM. OXIDATION PILOT TEST DOCUMENTATION REPORT | |
2018-01-31 | 99 | Miscellaneous |
![]() |
REC'D R4R FUNDING APPR REQ FOR GW RECOVERY SYSTEMS O&M AND FOR GW REMEDIATION | |
2017-11-28 | 151 | Remedial Action (RA) Documentation Report Received (non-fee) |
![]() |
REC'D PCB TRANSFORMER PAD AND SOIL REMOVAL DOCUMENTATION REPORT | |
2017-04-11 | 99 | Miscellaneous | REC'D PCB TRANSFORMER PAD & SOIL REMOVAL WORK PLAN | ||
2017-04-10 | 43 | Site Activity Status Update Received | REC'D NOV. 2016 PERIMETER GW SAMPLING SUMMARY | ||
2017-02-24 | 99 | Miscellaneous | DNR APPROVES WK. PLAN FOR AUTHORIZATION OF EXPENDITURE - GW RECOVERY SYSTEMS O&M | ||
2017-02-22 | 99 | Miscellaneous | REC'D WK. PLAN FOR AUTHORIZATION OF EXPENDITURE - GW RECOVERY SYSTEMS O&M | ||
2016-12-02 | 64 | Inject/Infiltrate Request Approved |
![]() |
||
2016-11-15 | 43 | Site Activity Status Update Received | REC'D SEMI-ANNUAL OPERATION AND MONITORING REPORT, JAN - JUNE 2016 | ||
2016-10-24 | 63 | Inject/Infiltrate Request Received (fee) | REC'D CK#162289 $700.00 | ||
2016-10-20 | 99 | Miscellaneous | APPROVED WORK AUTHORIZATION REQUEST FOR KEP GROUNDWATER MONITORING PLAN 2016-17 | ||
2016-10-07 | 99 | Miscellaneous |
![]() |
APPROVED REV. SOIL MANAGEMENT PLAN & NR718.12 EXEMPT REQ. | |
2016-09-30 | 99 | Miscellaneous |
![]() |
REC'D SOLID WASTE DISPOSAL LOCATION FOR KEP CONT. SOIL | |
2016-09-28 | 99 | Miscellaneous |
![]() |
REC'D OFFSITE BACKFILL & TOPSOIL WASTE DETERMINATION | |
2016-09-16 | 99 | Miscellaneous |
![]() |
CONDITIONAL APPROVAL OF AUTH. REQ. - KEP SOIL REMEDIATION | |
2016-09-16 | 99 | Miscellaneous | REC'D SOIL & MATERIAL MANAGEMENT PLAN - REVISION 1 | ||
2016-09-16 | 99 | Miscellaneous | REC'D NR 718 EXEMPTION REQUEST FOR KEP | ||
2016-09-14 | 99 | Miscellaneous | REC'D WORK AUTHORIZATION REQUEST FOR KEP GROUNDWATER MONITORING PLAN 2016-17 | ||
2016-08-29 | 99 | Miscellaneous | REC'D WK AUTHORIZATION REQ. - KEP SOIL REMEDIATION | ||
2016-07-20 | 43 | Site Activity Status Update Received |
![]() |
REC'D APRIL 2016, GW SAMPLING SUMMARY | |
2016-07-20 | 99 | Miscellaneous | REC'D RESPONSE TO WDNR COMMENTS DATED 5-17-16, & SOILS AND MATERIALS MNGMT WK. PLAN ADDENDUM | ||
2016-07-18 | 99 | Miscellaneous | REC'D RESPONSE TO EPA MEMO (TECH REV. COMMENTS ON PROPOSED PILOT TEST) & REVISED FUNDING REQUEST | ||
2016-05-17 | 99 | Miscellaneous |
![]() |
DNR REQUESTS REVISION OF SOIL & MATERIAL MANAGEMENT PLAN | |
2016-03-29 | 99 | Miscellaneous | REC'D SOIL & MATERIAL MANAGEMENT PLAN | ||
2016-02-22 | 43 | Site Activity Status Update Received | REC'D SEMI-ANN. O&M REPORT, JULY-DEC. 2015 | ||
2016-02-19 | 99 | Miscellaneous | DNR APPROVES WASTE CHARACTERIZATION S&A PLAN FOR SOIL REMEDIATION | ||
2016-02-19 | 99 | Miscellaneous | DNR APPROVES AUTH. REQ. - RESPONSE TO COMMENTS &/OR WK. PLAN REVISION OF GW PILOT TESTS | ||
2016-02-19 | 151 | Remedial Action (RA) Documentation Report Received (non-fee) |
![]() |
REC'D CS2 REMEDIAL ACTION DOCUMENTATION REPORT | |
2016-02-10 | 99 | Miscellaneous | REC'D WK. AUTHORIZATION REQ. - RESPONSE TO COMMENTS AND/OR WK. PLAN REVISION OF GW PILOT TESTS | ||
2016-02-05 | 99 | Miscellaneous | REC'D WK. AUTHORIZATION REQ. - WASTE CHARACTERIZATION SAMPLING & ANALYSIS PLAN FOR SOIL REMEDIATION | ||
2016-01-27 | 99 | Miscellaneous | REQUESTED REVISION OF WK. PLAN FOR INVESTIGATION OF TRIBUTARY TO PIKE CREEK | ||
2016-01-18 | 99 | Miscellaneous | REC'D EPA TECH. REVIEW COMMENTS ON PROPOSED PILOT TEST FOR KEP SITE | ||
2016-01-08 | 99 | Miscellaneous | DNR APPROVES WK. PLAN FOR AUTHORIZATION OF EXPENDITURE - GW RECOVERY SYSTEMS O&M | ||
2015-12-18 | 99 | Miscellaneous | REC'D SITE WIDE STORM AND SANITARY SEWER EVALUATION AND SUMMARY REPORT | ||
2015-12-18 | 99 | Miscellaneous | REC'D TRANSFORMER PAD PCB SAMPLING RESULTS | ||
2015-12-18 | 99 | Miscellaneous | REC'D PCB NOTICE OF RELEASE & REQUEST FOR A TSCA-COORDINATED APPROVAL UNDER 40CFR 761.77(A)(1) | ||
2015-12-17 | 99 | Miscellaneous | REC'D WK. PLAN FOR AUTHORIZATION OF EXPENDITURE - GW RECOVERY SYSTEMS O&M | ||
2015-12-11 | 99 | Miscellaneous | DNR APPROVES REVISED PLAN FOR PZ IN JOCKEY AREA | ||
2015-12-03 | 99 | Miscellaneous | REC'D REVISED PLAN FOR PZ IN JOCKEY AREA | ||
2015-11-25 | 99 | Miscellaneous | DNR APPROVES 11/24/15 WORK PLAN - KEP SOIL REMEDIATION | ||
2015-11-25 | 99 | Miscellaneous | DNR APPROVES PART OF WORK PLAN TO ADDRESS VPLE INVEST. ADDITIONS, REQUESTS REVISION ON 2 ITEMS. | ||
2015-11-24 | 99 | Miscellaneous | WORK PLAN - KEP SOIL REMEDIATION | ||
2015-11-17 | 99 | Miscellaneous | WORK PLAN - FUNDING AUTHORIZATION REQUEST FOR FEASIBILITY STUDY - GW PILOT TESTING | ||
2015-11-02 | 99 | Miscellaneous | REC'D DOCUMENTATION OF BERM SOIL FROM CS7 QUALITY AT KEP USED AS EXCAVATION BACKFILL (CS2) | ||
2015-10-21 | 99 | Miscellaneous | REC'D GW PILOT TEST WORK PLAN | ||
2015-10-06 | 99 | Miscellaneous | REC'D WORK PLAN TO ADDRESS VPLE INVESTIGATION ADDITIONS | ||
2015-09-25 | 43 | Site Activity Status Update Received | REC'D JAN-JUNE 2015 SEMI-ANNUAL O&M REPORT | ||
2015-09-25 | 99 | Miscellaneous | REC'D LABORATORY SCALE TREATABILITY STUDY RESULTS FOR GW REMEDIATION | ||
2015-08-03 | 99 | Miscellaneous | REC'D ADD. SAMPLING RESULTS OF SOUTHPORT PARK SOILS | ||
2015-07-27 | 99 | Miscellaneous | APPROVED WK. PLAN FOR CS2 SOIL REMEDIATION | ||
2015-07-27 | 99 | Miscellaneous | APPROVED WK. PLAN FOR GW MONITORING - REVISION OF MARCH 12, 2015 WK. PLAN | ||
2015-07-22 | 99 | Miscellaneous | REC'D WK. PLAN FOR CS2 SOIL REMEDIATION | ||
2015-07-22 | 99 | Miscellaneous | REC'D WK. PLAN FOR GW MONITORING - REVISION OF MARCH 12, 2015 WK. PLAN | ||
2015-07-17 | 99 | Miscellaneous | REQUESTED ADDITIONAL SAMPLING OF SOUTHPORT PARK SOILS | ||
2015-07-07 | 99 | Miscellaneous | REC'D REQUEST TO USE SOUTHPORT PARK SOILS AS FILL FOR CS 2 REMEDIAL EXCAVATIONS | ||
2015-06-18 | 40 | Remedial Action Options Report (RAOR) Approved | |||
2015-06-18 | 99 | Miscellaneous |
![]() |
REC'D DESIGN REPORT FOR ONLY SOIL REMEDIATION | |
2015-06-15 | 43 | Site Activity Status Update Received | REC'D MARCH 2015 GW SAMPLING SUMMARY | ||
2015-05-12 | 140 | Site Investigation Report (SIR) Not Approved | MET WITH CITY TO DISCUSS ADDITIONAL WORK REQUIRED TO COMPLETE SI, AND POTENTIAL ENTRY INTO VPLE | ||
2015-04-23 | 99 | Miscellaneous | APPROVED WK. PLAN FOR GW RECOVERY SYSTEMS O&M | ||
2015-04-23 | 99 | Miscellaneous | APPROVED REQUEST TO TEMPORARILY SUSPEND THE OPERATION OF 2 GW RECOVERY SYSTEMS | ||
2015-04-22 | 99 | Miscellaneous | APPROVED WK. PLAN FOR PRE-DESIGN STUDIES FOR GW TREATMENT, FOR PREP. OF REMED. DSGN. RPT. & BID DOCS | ||
2015-04-13 | 99 | Miscellaneous | REC'D WK. PLAN FOR GW RECOVERY SYSTEMS O&M | ||
2015-04-13 | 99 | Miscellaneous | REC'D WK. PLAN FOR PRE-DESIGN STUDIES FOR GW TREATMENT, FOR PREP. OF REMEDIAL DESIGN RPT. & BID DOCS | ||
2015-04-13 | 99 | Miscellaneous | REC'D RPT. DOCUMENTING SOIL REMOVAL UNDER FMR. BUILDING 53 | ||
2015-04-10 | 43 | Site Activity Status Update Received | REC'D JULY-DEC. 2014 SEMI-ANNUAL O&M REPORT | ||
2015-04-10 | 99 | Miscellaneous | REC'D GW RECOVERY SYSTEM PERMIT MODIFICATION REQUEST | ||
2015-04-09 | 39 | Remedial Action Options Report (RAOR) Received (non-fee) |
![]() |
||
2015-03-17 | 99 | Miscellaneous | APPROVED ONLY THE MARCH 2015 GW MONITORING NOT THE ENTIRE YEAR. | ||
2015-03-17 | 43 | Site Activity Status Update Received | REC'D DECEMBER 2014 GW SAMPLING SUMMARY | ||
2015-03-12 | 99 | Miscellaneous | REC'D WK. PLAN FOR 2015 GW MONITORING, ANALYSES & REPORTING | ||
2015-02-24 | 37 | Site Investigation Report (SIR) Received (non-fee) | |||
2015-01-15 | 99 | Miscellaneous | REC'D WK. PLAN FOR MW NETWORK REVIEW & 2015 GW MONITORING PLAN PREPARATION | ||
2014-11-26 | 43 | Site Activity Status Update Received | REC'D SEMI ANNUAL OPERATION AND MONITORING REPORT | ||
2014-10-06 | 99 | Miscellaneous | APPROVED WK. PLANS FOR UPSTREAM STORM & SANITARY SEWER SAMPLING & FOR TRANSF. PAD CONCRETE SAMPLING | ||
2014-09-22 | 99 | Miscellaneous | REC'D WK. PLANS FOR UPSTREAM STORM & SANITARY SEWER SAMPLING & FOR TRANSFORMER PAD CONCRETE SAMPLING | ||
2014-09-12 | 99 | Miscellaneous | APPROVED WK. PLAN FOR 2 QTRS OF GW SAMPLING & FOR HYDRAULIC CONDUCTIVITY TESTING | ||
2014-09-08 | 99 | Miscellaneous | APPROVED WK. PLAN FOR PRELIMINARY REMEDIAL ACTION OF PB-IMPACTED SOIL IN BUILDING 53 AREA | ||
2014-09-08 | 99 | Miscellaneous | REC'D WK. PLAN FOR HYDRAULIC CONDUCTIVITY TESTING | ||
2014-08-28 | 99 | Miscellaneous | REC'D WK. PLAN FOR 2 QTRS OF GW SAMPLING | ||
2014-07-23 | 99 | Miscellaneous | REC'D WK. PLAN FOR EXCAVATION, PRE-TREATMENT & DISPOSAL OF PB-IMPACTED SOIL IN BUILDING 53 AREA | ||
2014-07-22 | 99 | Miscellaneous | APPROVED WK. PLAN FOR PREP. OF PRELIM. RAOR | ||
2014-07-18 | 99 | Miscellaneous | REC'D WK. PLAN FOR PREP. OF PRELIM. RAOR | ||
2014-06-24 | 99 | Miscellaneous | REC'D POST-EXCAVATION SOIL SAMPLING PLAN FOR PETROLEUM-IMPACTED SOILS (LNAPL EXCAVATIONS) | ||
2014-06-24 | 99 | Miscellaneous | APPROVED POST-EXCAVATION SOIL SAMPLING PLAN | ||
2014-01-22 | 43 | Site Activity Status Update Received | REC'D PROGRESS RPT 4TH QTR 2013 | ||
2014-01-13 | 43 | Site Activity Status Update Received | REC'D PROGRESS RPT 3RD QTR 2013 | ||
2013-10-18 | 43 | Site Activity Status Update Received | REC'D PROGRESS RPT 2ND QTR 2013 | ||
2013-06-19 | 43 | Site Activity Status Update Received | REC'D REM PERFORMANCE & MONITOR. PROGRESS REPT FIRST QTR 2013 | ||
2013-06-19 | 30 | Site Investigation Workplan (SIWP) Notice to Proceed (NTP) | APPROVED REVISED SI WORK PLAN | ||
2013-05-29 | 35 | Site Investigation Workplan (SIWP) Received (non-fee) | REC'D REVISED SI WORK PLAN | ||
2013-02-11 | 43 | Site Activity Status Update Received | REC'D PROGRESS RPT 4TH QTR 2012 | ||
2013-01-23 | 43 | Site Activity Status Update Received | REC'D PROGRESS RPT 3RD QTR 2012 | ||
2012-08-02 | 43 | Site Activity Status Update Received | SEE 02-30-108645 02-30-287532 | ||
2012-06-22 | 43 | Site Activity Status Update Received | REC'D COMPLETION RPT-INTERIM ACTIONS, ETC | ||
2012-03-01 | 43 | Site Activity Status Update Received | |||
2011-11-17 | 43 | Site Activity Status Update Received | PROGRESS REPT 3RD QTR 2011 | ||
2011-09-22 | 43 | Site Activity Status Update Received | ADDTNL GW DOC REC'D, ALSO APPLY TO BRRTS# 02-30-108645, 02-30-287532, 02-30-000625, 03-30-261138 | ||
2011-09-07 | 130 | DNR Regulatory Reminder Sent | Vapor Intrusion (VI) Assessment Notification Ltr Sent | ||
2011-08-17 | 43 | Site Activity Status Update Received | GW SMPLG RPT REC'D FOR BRRTS# 03-30-000625, 02-30-000983, 03-30-167597, 03-30-000106, 02-30-000108 | ||
2011-06-02 | 43 | Site Activity Status Update Received | SEE BRRT'S #02-03-00147 - 02-03-108645 - 02-30-0287532 -03-30-000625 -03-30-261138 | ||
2011-05-18 | 43 | Site Activity Status Update Received | |||
2011-03-16 | 43 | Site Activity Status Update Received | SUPPLEMENTAL SAMP RPT SEE BRRTS # 02-30-00147, 02-30-108645, 02-30-287532, 03-30-000625,03-30-261138 | ||
2011-03-04 | 28 | Phase I Environmental Site Assessment (ESA) Rpt Received |
![]() |
MARCH 2011 PHASE I ESA | |
2011-02-04 | 43 | Site Activity Status Update Received | SEE 02-30-001147, 108645, 287532, 03-30-000625, 261138, 04-30-048728 | ||
2010-12-17 | 99 | Miscellaneous | DOJ SENT LETTERS TO LIQ. TRUST & CHRYSLER GP. LLC NOTIFYING THEM OF THEIR RESPONSIBILITIES | ||
2010-11-04 | 43 | Site Activity Status Update Received | SEE 02-30-001147, 108645, 287532, 03-30-000625, 261138, 04-30-048728 | ||
2010-07-26 | 43 | Site Activity Status Update Received | REM. PERF./MON.PROG.REPT. SEE 02-30-001147, 108645, 287532, 03-30-000625, 261138 | ||
2010-07-16 | 99 | Miscellaneous | REC'D NOTIFICATION OF HIRING ENV. CONSULTANT | ||
2010-06-16 | 2 | Responsible Party (RP) letter sent | DV. SENT RP LETTER TO LIQUIDATION TRUST | ||
2010-06-03 | 151 | Remedial Action (RA) Documentation Report Received (non-fee) | REC'D AS-BUILT DRAWINGS FOR SOUTHERN & CENTRAL REMEDIATION SYSTEMS. | ||
2010-05-07 | 99 | Miscellaneous | DV. REQUEST FOR REMED. SYSTEM AS BUILT REPORTS & CHANGE IN GW P&T REPORTING FROM ANN. TO 1/4LY | ||
2010-05-07 | 99 | Miscellaneous | DV. SENT COPY OF 5/5/10 SITE VISIT PHOTOS TO JONES DAY | ||
2010-03-11 | 43 | Site Activity Status Update Received | DV. 3.15.10 REC'D ANNUAL REM. PERFORMANCE MONITORING REPORT | ||
2008-03-24 | 43 | Site Activity Status Update Received | REC'D ANNUAL REM. PERFORMANCE MONITORING REPT | ||
2008-03-19 | 43 | Site Activity Status Update Received | REC'D UPDATE REPT | ||
2007-03-30 | 43 | Site Activity Status Update Received | REC'D ANNUAL REM PERF. MONITORING REPT 10/1 - 09/30/06 | ||
2006-06-30 | 43 | Site Activity Status Update Received | |||
2001-09-14 | 43 | Site Activity Status Update Received | SEE GENERAL FILE FOR GW REPORT FOR SITE | ||
1999-03-30 | 92 | Operation & Maintenance (O&M) Report Received (non-fee) | mw | ||
1998-10-29 | 151 | Remedial Action (RA) Documentation Report Received (non-fee) | N AREA GW RECOV/TREAT SYS & IMMED ACTION RPT;60TH ST SEWER EXCAV | ||
1998-09-17 | 35 | Site Investigation Workplan (SIWP) Received (non-fee) |
![]() |
||
1998-09-08 | 99 | Miscellaneous |
![]() |
REMEDIAL WORK PLAN | |
1998-03-11 | 92 | Operation & Maintenance (O&M) Report Received (non-fee) | |||
1997-09-03 | 43 | Site Activity Status Update Received | |||
1996-10-15 | 99 | Miscellaneous |
![]() |
AIR EMISSIONS CALCULATIONS FOR SOIL AND GW REMEDIATION | |
1996-06-27 | 99 | Miscellaneous |
![]() |
EXISTING PROFILE EXTENSION REQ #4 | |
1996-06-14 | 43 | Site Activity Status Update Received |
![]() |
GW MONITORING RPT MARCH 1996 QUARTERLY SAMPLING | |
1996-06-07 | 99 | Miscellaneous |
![]() |
PRELIMINARY REMEDIAL INVESTIGATION WORKPLAN | |
1996-05-16 | 99 | Miscellaneous |
![]() |
AIR EMISSIONS CALCULATIONS FOR SOIL AND GW REMEDIATION | |
1996-03-19 | 99 | Miscellaneous |
![]() |
ADDL DATA FOR EXISTING PROFILE EXTENSION REQ #3 | |
1996-02-02 | 99 | Miscellaneous |
![]() |
EXISTING PROFILE EXTENSION REQ #3 | |
1996-01-22 | 43 | Site Activity Status Update Received |
![]() |
GW MONITORING RPT DECEMBER 1995 QUARTERLY SAMPLING RPT | |
1996-01-15 | 99 | Miscellaneous |
![]() |
AIR EMISSIONS CALCULATIONS FOR SOIL AND GW REMEDIATION SYSTEMS | |
1995-12-19 | 43 | Site Activity Status Update Received |
![]() |
GW MONITORING RPT SEPT 19995 QUARTERLY SAMPLING | |
1995-10-16 | 99 | Miscellaneous |
![]() |
AIR EMISSIONS CALCULATIONS FOR SOIL AND GW REMEDIATION | |
1995-10-01 | 99 | Miscellaneous |
![]() |
INTERIM REMEDIAL ACTION EVALUATION RPT | |
1995-06-06 | 99 | Miscellaneous |
![]() |
SOLID WASTE STORAGE EXEMPTION | |
1995-05-04 | 43 | Site Activity Status Update Received |
![]() |
MARCH 1995 QUARTERLY | |
1995-03-27 | 99 | Miscellaneous |
![]() |
SOIL VAPOR EXTRACTION PROPOSAL | |
1995-02-24 | 99 | Miscellaneous |
![]() |
PHONE CALL ENCOUNTERED FREE PRODUCT DURING CONSTRUCTION | |
1995-01-26 | 99 | Miscellaneous |
![]() |
AIR EMISSIONS CALCULATIONS FROM GW TREATMENT SYSTEMS | |
1995-01-24 | 43 | Site Activity Status Update Received |
![]() |
DECEMBER 1994 QUARTERLY | |
1994-12-20 | 43 | Site Activity Status Update Received |
![]() |
GW MONITORING UPDATE | |
1994-11-17 | 99 | Miscellaneous |
![]() |
VARIANCE SOIL DISPOSAL REQ | |
1994-10-31 | 43 | Site Activity Status Update Received |
![]() |
SEPT 1994 QUARTERLY | |
1994-08-16 | 43 | Site Activity Status Update Received |
![]() |
JUNE QUARTERLY 1994 | |
1994-07-14 | 99 | Miscellaneous |
![]() |
MEETING | |
1994-07-05 | 99 | Miscellaneous |
![]() |
VARIANCE SOIL DISPOSAL APPR | |
1994-06-23 | 99 | Miscellaneous |
![]() |
REQ FOR VARIANCE SOIL DISPOSAL | |
1994-06-20 | 147 | Remedial Action (RA) Design Report Received (non-fee) |
![]() |
SOIL REMEDIAL ACTION WP | |
1994-06-01 | 43 | Site Activity Status Update Received |
![]() |
MARCH QUARTERLY | |
1994-06-01 | 99 | Miscellaneous |
![]() |
SITE VISIT | |
1994-02-28 | 99 | Miscellaneous |
![]() |
INVESTIGATION AND REMEDIATION REVIEW | |
1994-02-17 | 99 | Miscellaneous |
![]() |
SUMMARY OF 2/15 MEETING | |
1994-01-25 | 99 | Miscellaneous |
![]() |
GW RESULTS | |
1994-01-20 | 43 | Site Activity Status Update Received |
![]() |
DECEMBER 1993 QUARTERLY | |
1994-01-06 | 99 | Miscellaneous |
![]() |
BOREHOLE/GEOPROBE INVESTIGATION | |
1994-01-01 | 99 | Miscellaneous |
![]() |
SUBSURFACE INVESTIGATION AND REMEDIATION PLAN | |
1993-12-01 | 99 | Miscellaneous |
![]() |
GW ANALYTICAL RESULTS | |
1993-11-19 | 99 | Miscellaneous |
![]() |
UST CLOSURE | |
1993-11-12 | 43 | Site Activity Status Update Received |
![]() |
SEPT 1993 QUARTERLY RPT | |
1993-11-01 | 33 | Tank System Site Assessment (TSSA) Report Received |
![]() |
TSSA | |
1993-08-13 | 43 | Site Activity Status Update Received |
![]() |
JUNE 1993 QUARTERLY | |
1993-07-29 | 99 | Miscellaneous |
![]() |
SOILS TREATMENT PLAN | |
1993-07-26 | 99 | Miscellaneous |
![]() |
GW TREATMENT PLAN | |
1993-07-19 | 998 | Activity Transferred from Spill Activity | 04-30-048728 | ||
1993-07-07 | 99 | Miscellaneous |
![]() |
ADDL INFO RECD | |
1993-06-10 | 43 | Site Activity Status Update Received |
![]() |
MARCH 1993 QUARTERLY | |
1993-04-02 | 43 | Site Activity Status Update Received |
![]() |
DEC 1992 QUARTERLY | |
1992-11-05 | 43 | Site Activity Status Update Received |
![]() |
JULY 1992 GWM RPT | |
1992-11-01 | 147 | Remedial Action (RA) Design Report Received (non-fee) |
![]() |
RADR NORTH AREA | |
1989-08-17 | 1 | Notification of Hazardous Substance Discharge |
Substance | Type | Amt Released | Units |
---|---|---|---|
Petroleum - Unknown Type | Petroleum | ||
Trichloroethylene | Industrial Chem |
CHRYSLER GROUP LLC 800 CHRYSLER DRIVE, AUBURN HILLS, MI 48326 |
PAUL GRITTNER paul.grittner@wisconsin.gov |