ACTIVITY DETAILS

 
02-30-000327 CHRYSLER KENOSHA MAIN PLT
Activity Type / Status Jurisdiction
ERP  OPEN DNR RR
Location Name County DNR Region
FORMER KENOSHA ENGINE PLANT KENOSHA SOUTHEAST
Address Municipality
5555 30TH AVE KENOSHA
PLSS Description Latitude (WGS84) Longitude (WGS84) Google Maps RR Sites Map
SW 1/4 of the SE 1/4 of Sec 36, T02N, R22E 42.5827671 -87.843962 Click to view on Google Maps using Lat/Long Click to View RR Sites Map
Additional Activity Details Acres
UNKNOWN
Facility ID PECFA No. EPA ID Start Date End Date
230004500 1989-08-17
Characteristics
Above Ground
Petrol Tank

Drycleaner
EPA
NPL Site
EPA
Superfund
PECFA Funds
Eligible

PFAS

ROW Impact

Sediments
Underground
Petrol Tank
WI DOT
Site
 
Actions and Documents
Date Code Name File Comment
2024-07-15 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2024 - 6/30/2024
2024-04-26 198 Request for Additional Information (Fee-Based or Closure) REQUESTED CLARIFICATIONS AND PLAN MODIFICATION
2024-04-26 198 Request for Additional Information (Fee-Based or Closure) Download PDF file REQUESTED CLARIFICATIONS AND PLAN MODIFICATION
2024-04-11 43 Site Activity Status Update Received Download PDF file ANNUAL GROUNDWATER MONITORING REPORT
2024-03-12 854 Materials Management Plan Request Recvd with Fee Download PDF file REC'D CK #217953 $700, KENOSHA INNOVATION CENTER
2024-03-12 710 Database Fee Paid for Soil Continuing Obligation(s) REC'D CK #217953 $300, KENOSHA INNOVATION CENTER
2024-03-12 854 Materials Management Plan Request Recvd with Fee Download PDF file REC'D CK #217953 $700, REUSE OF SOIL - KENOSHA INNOVATION NEIGHBORHOOD INFRASTRUCTURE CONSTRUCTION
2024-03-12 710 Database Fee Paid for Soil Continuing Obligation(s) REC'D CK #217953 $300, REUSE OF SOIL
2024-01-09 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2023 - 12/31/2023
2023-12-15 43 Site Activity Status Update Received Download PDF file KEP GROUNDWATER POST-REMEDIATION SAMPLE RESULTS – OCTOBER 2023
2023-10-12 43 Site Activity Status Update Received Download PDF file KEP GROUNDWATER POST-REMEDIATION SAMPLE RESULTS – JULY 2023
2023-07-24 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 01/01/2023 - 06/30/2023
2023-06-20 43 Site Activity Status Update Received Download PDF file GROUNDWATER POST-REMEDIATION SAMPLE RESULTS - APRIL 2023
2023-05-31 81 Site Investigation Workplan (SIWP) Not Approved Download PDF file DNR CANNOT PROVIDE RESPONSE - NEED TO CONSULT WITH EPA INSTEAD.
2023-05-02 135 Site Investigation Workplan (SIWP) Received (fee) Download PDF file RECV'D CK #211950 $700.00
2023-03-14 43 Site Activity Status Update Received Download PDF file ANNUAL GROUNDWATER MONITORING REPORT
2023-01-26 43 Site Activity Status Update Received Download PDF file KEP GROUNDWATER POST-REMEDIATION SAMPLE RESULTS - OCTOBER 2022
2023-01-23 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2022 - 12/31/2022
2022-11-08 98 Technical Assistance Provided Download PDF file
2022-10-18 97 Technical Assistance Request Received (fee) Download PDF file RECVD CK #207846 $700.00REDEVELOPMENT PLAN - PHASE I INFRASTRUCTURE CONSTRUCTION
2022-10-12 43 Site Activity Status Update Received Download PDF file KEP GROUNDWATER POST-REMEDIATION SAMPLE RESULTS - JULY 2022
2022-08-01 99 Miscellaneous Download PDF file CONSTRUCTION DOCUMENTS
2022-07-18 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2022 - 6/30/2022
2022-01-12 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2021 - 12/31/2021
2022-01-12 43 Site Activity Status Update Received Download PDF file KEP PERIMETER GW SAMPLE RESULTS OCT 2021
2021-08-31 64 Inject/Infiltrate Request Approved Download PDF file
2021-08-20 99 Miscellaneous Download PDF file REC'D ADD'L INFO FOR INJECTION APPROVAL
2021-08-18 99 Miscellaneous Download PDF file REC'D ADD'L INFO FOR INJECTION APPROVAL
2021-08-17 63 Inject/Infiltrate Request Received (fee) Download PDF file REC'D CK #003153 $700.00
2021-08-03 99 Miscellaneous Download PDF file REQUESTED ADD'L INFO FOR INJECTION APPROVAL
2021-07-20 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2021 - 6/30/2021
2021-04-06 130 DNR Regulatory Reminder Sent Download PDF file VAPOR INTRUSION AND TCE REMINDER LETTER
2021-01-19 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2020 - 12/31/2020
2021-01-12 43 Site Activity Status Update Received Download PDF file DECEMBER 2020 GW SAMPLE RESULTS - KEP WELLS AND PIEXOMETERS INSTALLED, BASELINE EVENT
2020-12-03 43 Site Activity Status Update Received Download PDF file NOVEMBER 2020 SEMI-ANNUAL PERIMETER GROUNDWATER MONITORING REPORT
2020-10-21 151 Remedial Action (RA) Documentation Report Received (non-fee) Download PDF file
2020-08-17 130 DNR Regulatory Reminder Sent Download PDF file EMERGING CONTAMINANTS REMINDER LETTER
2020-07-17 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2020 - 6/30/2020
2020-07-16 92 Operation & Maintenance (O&M) Report Received (non-fee) Download PDF file SEMI-ANNUAL OPERATION, MAINTENANCE AND MONITORING REPORT, JULY - DECEMBER 2019
2020-07-16 43 Site Activity Status Update Received Download PDF file APRIL 2020 SEMI-ANNUAL PERIMETER GROUNDWATER MONITORING REPORT
2020-06-29 99 Miscellaneous Download PDF file PROJECT UPDATE RECEIVED
2020-06-11 857 Materials Management Plan Approved Download PDF file 718.12 AND 718.15 EXEMPTION GRANTED FOR ON-SITE SOIL MANAGEMENT
2020-06-11 56 Continuing Obligation(s) Applied
2020-06-11 222 Continuing Obligation - Maintain Cap Over Contaminated Area
2020-06-11 226 Continuing Obligation - Vapor Intrusion Response FUTURE REDEVELOPMENT - NOTIFICATION REQUIRED
2020-06-11 232 Continuing Obligation - Residual Soil Contamination
2020-06-08 199 Additional Information Received (Fee-Based or Closure) Download PDF file REC'D REQUESTED INFO
2020-06-04 99 Miscellaneous Download PDF file FOLLOW-UP REQUEST FOR INFO ON ON-SITE MATERIAL MANAGEMENT
2020-05-28 99 Miscellaneous Download PDF file REC'D ADD'L INFORMATION REGARDING ON-SITE MATERIAL MANAGEMENT
2020-05-18 198 Request for Additional Information (Fee-Based or Closure) Download PDF file REQ ADDITIONAL INFO REGARDING MATERIAL MANAGEMENT PLAN
2020-04-14 854 Materials Management Plan Request Recvd with Fee Download PDF file REC'D CK #14520582 $700.00
2020-04-14 710 Database Fee Paid for Soil Continuing Obligation(s) REC'D CK #14520582 $300.00, MMP
2020-02-12 99 Miscellaneous Download PDF file CONDITIONAL APPROVAL OF REMEDIAL DESIGN REPORT (GROUNDWATER)
2020-01-17 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2019 - 12/31/2019
2019-12-30 99 Miscellaneous Download PDF file RESPONSE TO COMMENTS LTR AND GW REMEDIAL DESIGN RPT REVISIONS
2019-12-03 43 Site Activity Status Update Received Download PDF file REC'D OCTOBER 2019 SEMI ANNUAL PERIMETER GW MONITORING RPT
2019-10-16 92 Operation & Maintenance (O&M) Report Received (non-fee) Download PDF file REC'D SEMI-ANNUAL OPERATION AND MONITORING RPT JANUARY - JUNE 2019
2019-09-23 99 Miscellaneous Download PDF file REVIEW OF REMEDIAL DESIGN REPORT (GROUNDWATER)
2019-07-25 147 Remedial Action (RA) Design Report Received (non-fee) Download PDF file REMEDIAL DESIGN REPORT (GROUNDWATER)
2019-07-25 99 Miscellaneous KEP SITEWIDE GROUNDWATER REMEDIATION: TECHNICAL SPECIFICATIONS AND PLANS
2019-07-25 99 Miscellaneous PUBLIC NOTICE REGARDING ENVIRONMENTAL CLEANUP WISCONSIN READY FOR REUSE PROGRAM
2019-07-25 99 Miscellaneous ANALYSIS OF BROWNFIELD CLEANUP ALTERNATIVES, GROUNDWATER REMEDIATION
2019-07-12 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2019 - 6/30/2019
2019-06-07 92 Operation & Maintenance (O&M) Report Received (non-fee) Download PDF file JULY-DEC 2018 O&M REPORT
2019-06-07 43 Site Activity Status Update Received Download PDF file APRIL 2019 PERIMETER GW SAMPLING SUMMARY
2019-03-14 99 Miscellaneous Download PDF file APPROVAL OF 2019 REMEDIATION SYSTEM MAINTENANCE COST
2019-02-08 43 Site Activity Status Update Received Download PDF file OCT 2018 PERIMETER GW SAMPLING SUMMARY
2019-02-06 99 Miscellaneous Download PDF file SUPPLEMENT TO KEP SMP; REQUEST FOR APPROVAL OF AN ADDITIONAL SOURCE OF TOPSOIL
2019-01-02 92 Operation & Maintenance (O&M) Report Received (non-fee) Download PDF file JULY-DEC 2017 O&M REPORT
2019-01-02 92 Operation & Maintenance (O&M) Report Received (non-fee) Download PDF file JAN-JUNE 2018 O&M REPORT
2018-11-28 92 Operation & Maintenance (O&M) Report Received (non-fee) Download PDF file O&M RPT, JAN-JUNE 2017
2018-10-08 43 Site Activity Status Update Received Download PDF file ENHANCED REDUCTIVE DECHLORINATION PILOT TEST DOCUMENTATION REPORT
2018-09-20 43 Site Activity Status Update Received Download PDF file REC'D MAY 2018 PERIMETER GW SAMPLING SUMMARY
2018-07-30 151 Remedial Action (RA) Documentation Report Received (non-fee) Download PDF file REC'D REM DOC RPT FOR GROUP AREAS A, B, C, E, J & K
2018-05-31 43 Site Activity Status Update Received Download PDF file REC'D SEMI-ANNUAL O&M REPORT, JULY TO DECEMBER 2016
2018-04-04 99 Miscellaneous APPROVED USE OF BANK. ESCROW FUNDS FOR KEP SOIL REMED.-CONTINUATION.
2018-04-04 99 Miscellaneous APPROVED FUNDING CHANGE FOR 2018 O&M OF GW RECOVERY SYSTEMS.
2018-04-03 99 Miscellaneous REC'D REQ. FOR KEP SOIL REMEDIATION - CONTINUATION USING BANKRUPTCY ESCROW ACCT.
2018-03-28 99 Miscellaneous Download PDF file APPROVED R4R FUNDING APPR REQ FOR GW RECOVERY SYSTEMS O&M AND FOR GW REMEDIATION
2018-03-27 43 Site Activity Status Update Received Download PDF file REC'D IN-SITU CHEM. OXIDATION PILOT TEST DOCUMENTATION REPORT
2018-01-31 99 Miscellaneous Download PDF file REC'D R4R FUNDING APPR REQ FOR GW RECOVERY SYSTEMS O&M AND FOR GW REMEDIATION
2017-11-28 151 Remedial Action (RA) Documentation Report Received (non-fee) Download PDF file REC'D PCB TRANSFORMER PAD AND SOIL REMOVAL DOCUMENTATION REPORT
2017-04-11 99 Miscellaneous REC'D PCB TRANSFORMER PAD & SOIL REMOVAL WORK PLAN
2017-04-10 43 Site Activity Status Update Received REC'D NOV. 2016 PERIMETER GW SAMPLING SUMMARY
2017-02-24 99 Miscellaneous DNR APPROVES WK. PLAN FOR AUTHORIZATION OF EXPENDITURE - GW RECOVERY SYSTEMS O&M
2017-02-22 99 Miscellaneous REC'D WK. PLAN FOR AUTHORIZATION OF EXPENDITURE - GW RECOVERY SYSTEMS O&M
2016-12-02 64 Inject/Infiltrate Request Approved Download PDF file
2016-11-15 43 Site Activity Status Update Received REC'D SEMI-ANNUAL OPERATION AND MONITORING REPORT, JAN - JUNE 2016
2016-10-24 63 Inject/Infiltrate Request Received (fee) REC'D CK#162289 $700.00
2016-10-20 99 Miscellaneous APPROVED WORK AUTHORIZATION REQUEST FOR KEP GROUNDWATER MONITORING PLAN 2016-17
2016-10-07 99 Miscellaneous Download PDF file APPROVED REV. SOIL MANAGEMENT PLAN & NR718.12 EXEMPT REQ.
2016-09-30 99 Miscellaneous Download PDF file REC'D SOLID WASTE DISPOSAL LOCATION FOR KEP CONT. SOIL
2016-09-28 99 Miscellaneous Download PDF file REC'D OFFSITE BACKFILL & TOPSOIL WASTE DETERMINATION
2016-09-16 99 Miscellaneous Download PDF file CONDITIONAL APPROVAL OF AUTH. REQ. - KEP SOIL REMEDIATION
2016-09-16 99 Miscellaneous REC'D SOIL & MATERIAL MANAGEMENT PLAN - REVISION 1
2016-09-16 99 Miscellaneous REC'D NR 718 EXEMPTION REQUEST FOR KEP
2016-09-14 99 Miscellaneous REC'D WORK AUTHORIZATION REQUEST FOR KEP GROUNDWATER MONITORING PLAN 2016-17
2016-08-29 99 Miscellaneous REC'D WK AUTHORIZATION REQ. - KEP SOIL REMEDIATION
2016-07-20 43 Site Activity Status Update Received Download PDF file REC'D APRIL 2016, GW SAMPLING SUMMARY
2016-07-20 99 Miscellaneous REC'D RESPONSE TO WDNR COMMENTS DATED 5-17-16, & SOILS AND MATERIALS MNGMT WK. PLAN ADDENDUM
2016-07-18 99 Miscellaneous REC'D RESPONSE TO EPA MEMO (TECH REV. COMMENTS ON PROPOSED PILOT TEST) & REVISED FUNDING REQUEST
2016-05-17 99 Miscellaneous Download PDF file DNR REQUESTS REVISION OF SOIL & MATERIAL MANAGEMENT PLAN
2016-03-29 99 Miscellaneous REC'D SOIL & MATERIAL MANAGEMENT PLAN
2016-02-22 43 Site Activity Status Update Received REC'D SEMI-ANN. O&M REPORT, JULY-DEC. 2015
2016-02-19 99 Miscellaneous DNR APPROVES WASTE CHARACTERIZATION S&A PLAN FOR SOIL REMEDIATION
2016-02-19 99 Miscellaneous DNR APPROVES AUTH. REQ. - RESPONSE TO COMMENTS &/OR WK. PLAN REVISION OF GW PILOT TESTS
2016-02-19 151 Remedial Action (RA) Documentation Report Received (non-fee) Download PDF file REC'D CS2 REMEDIAL ACTION DOCUMENTATION REPORT
2016-02-10 99 Miscellaneous REC'D WK. AUTHORIZATION REQ. - RESPONSE TO COMMENTS AND/OR WK. PLAN REVISION OF GW PILOT TESTS
2016-02-05 99 Miscellaneous REC'D WK. AUTHORIZATION REQ. - WASTE CHARACTERIZATION SAMPLING & ANALYSIS PLAN FOR SOIL REMEDIATION
2016-01-27 99 Miscellaneous REQUESTED REVISION OF WK. PLAN FOR INVESTIGATION OF TRIBUTARY TO PIKE CREEK
2016-01-18 99 Miscellaneous REC'D EPA TECH. REVIEW COMMENTS ON PROPOSED PILOT TEST FOR KEP SITE
2016-01-08 99 Miscellaneous DNR APPROVES WK. PLAN FOR AUTHORIZATION OF EXPENDITURE - GW RECOVERY SYSTEMS O&M
2015-12-18 99 Miscellaneous REC'D SITE WIDE STORM AND SANITARY SEWER EVALUATION AND SUMMARY REPORT
2015-12-18 99 Miscellaneous REC'D TRANSFORMER PAD PCB SAMPLING RESULTS
2015-12-18 99 Miscellaneous REC'D PCB NOTICE OF RELEASE & REQUEST FOR A TSCA-COORDINATED APPROVAL UNDER 40CFR 761.77(A)(1)
2015-12-17 99 Miscellaneous REC'D WK. PLAN FOR AUTHORIZATION OF EXPENDITURE - GW RECOVERY SYSTEMS O&M
2015-12-11 99 Miscellaneous DNR APPROVES REVISED PLAN FOR PZ IN JOCKEY AREA
2015-12-03 99 Miscellaneous REC'D REVISED PLAN FOR PZ IN JOCKEY AREA
2015-11-25 99 Miscellaneous DNR APPROVES 11/24/15 WORK PLAN - KEP SOIL REMEDIATION
2015-11-25 99 Miscellaneous DNR APPROVES PART OF WORK PLAN TO ADDRESS VPLE INVEST. ADDITIONS, REQUESTS REVISION ON 2 ITEMS.
2015-11-24 99 Miscellaneous WORK PLAN - KEP SOIL REMEDIATION
2015-11-17 99 Miscellaneous WORK PLAN - FUNDING AUTHORIZATION REQUEST FOR FEASIBILITY STUDY - GW PILOT TESTING
2015-11-02 99 Miscellaneous REC'D DOCUMENTATION OF BERM SOIL FROM CS7 QUALITY AT KEP USED AS EXCAVATION BACKFILL (CS2)
2015-10-21 99 Miscellaneous REC'D GW PILOT TEST WORK PLAN
2015-10-06 99 Miscellaneous REC'D WORK PLAN TO ADDRESS VPLE INVESTIGATION ADDITIONS
2015-09-25 43 Site Activity Status Update Received REC'D JAN-JUNE 2015 SEMI-ANNUAL O&M REPORT
2015-09-25 99 Miscellaneous REC'D LABORATORY SCALE TREATABILITY STUDY RESULTS FOR GW REMEDIATION
2015-08-03 99 Miscellaneous REC'D ADD. SAMPLING RESULTS OF SOUTHPORT PARK SOILS
2015-07-27 99 Miscellaneous APPROVED WK. PLAN FOR CS2 SOIL REMEDIATION
2015-07-27 99 Miscellaneous APPROVED WK. PLAN FOR GW MONITORING - REVISION OF MARCH 12, 2015 WK. PLAN
2015-07-22 99 Miscellaneous REC'D WK. PLAN FOR CS2 SOIL REMEDIATION
2015-07-22 99 Miscellaneous REC'D WK. PLAN FOR GW MONITORING - REVISION OF MARCH 12, 2015 WK. PLAN
2015-07-17 99 Miscellaneous REQUESTED ADDITIONAL SAMPLING OF SOUTHPORT PARK SOILS
2015-07-07 99 Miscellaneous REC'D REQUEST TO USE SOUTHPORT PARK SOILS AS FILL FOR CS 2 REMEDIAL EXCAVATIONS
2015-06-18 40 Remedial Action Options Report (RAOR) Approved
2015-06-18 99 Miscellaneous Download PDF file REC'D DESIGN REPORT FOR ONLY SOIL REMEDIATION
2015-06-15 43 Site Activity Status Update Received REC'D MARCH 2015 GW SAMPLING SUMMARY
2015-05-12 140 Site Investigation Report (SIR) Not Approved MET WITH CITY TO DISCUSS ADDITIONAL WORK REQUIRED TO COMPLETE SI, AND POTENTIAL ENTRY INTO VPLE
2015-04-23 99 Miscellaneous APPROVED WK. PLAN FOR GW RECOVERY SYSTEMS O&M
2015-04-23 99 Miscellaneous APPROVED REQUEST TO TEMPORARILY SUSPEND THE OPERATION OF 2 GW RECOVERY SYSTEMS
2015-04-22 99 Miscellaneous APPROVED WK. PLAN FOR PRE-DESIGN STUDIES FOR GW TREATMENT, FOR PREP. OF REMED. DSGN. RPT. & BID DOCS
2015-04-13 99 Miscellaneous REC'D WK. PLAN FOR GW RECOVERY SYSTEMS O&M
2015-04-13 99 Miscellaneous REC'D WK. PLAN FOR PRE-DESIGN STUDIES FOR GW TREATMENT, FOR PREP. OF REMEDIAL DESIGN RPT. & BID DOCS
2015-04-13 99 Miscellaneous REC'D RPT. DOCUMENTING SOIL REMOVAL UNDER FMR. BUILDING 53
2015-04-10 43 Site Activity Status Update Received REC'D JULY-DEC. 2014 SEMI-ANNUAL O&M REPORT
2015-04-10 99 Miscellaneous REC'D GW RECOVERY SYSTEM PERMIT MODIFICATION REQUEST
2015-04-09 39 Remedial Action Options Report (RAOR) Received (non-fee) Download PDF file
2015-03-17 99 Miscellaneous APPROVED ONLY THE MARCH 2015 GW MONITORING NOT THE ENTIRE YEAR.
2015-03-17 43 Site Activity Status Update Received REC'D DECEMBER 2014 GW SAMPLING SUMMARY
2015-03-12 99 Miscellaneous REC'D WK. PLAN FOR 2015 GW MONITORING, ANALYSES & REPORTING
2015-02-24 37 Site Investigation Report (SIR) Received (non-fee)
2015-01-15 99 Miscellaneous REC'D WK. PLAN FOR MW NETWORK REVIEW & 2015 GW MONITORING PLAN PREPARATION
2014-11-26 43 Site Activity Status Update Received REC'D SEMI ANNUAL OPERATION AND MONITORING REPORT
2014-10-06 99 Miscellaneous APPROVED WK. PLANS FOR UPSTREAM STORM & SANITARY SEWER SAMPLING & FOR TRANSF. PAD CONCRETE SAMPLING
2014-09-22 99 Miscellaneous REC'D WK. PLANS FOR UPSTREAM STORM & SANITARY SEWER SAMPLING & FOR TRANSFORMER PAD CONCRETE SAMPLING
2014-09-12 99 Miscellaneous APPROVED WK. PLAN FOR 2 QTRS OF GW SAMPLING & FOR HYDRAULIC CONDUCTIVITY TESTING
2014-09-08 99 Miscellaneous APPROVED WK. PLAN FOR PRELIMINARY REMEDIAL ACTION OF PB-IMPACTED SOIL IN BUILDING 53 AREA
2014-09-08 99 Miscellaneous REC'D WK. PLAN FOR HYDRAULIC CONDUCTIVITY TESTING
2014-08-28 99 Miscellaneous REC'D WK. PLAN FOR 2 QTRS OF GW SAMPLING
2014-07-23 99 Miscellaneous REC'D WK. PLAN FOR EXCAVATION, PRE-TREATMENT & DISPOSAL OF PB-IMPACTED SOIL IN BUILDING 53 AREA
2014-07-22 99 Miscellaneous APPROVED WK. PLAN FOR PREP. OF PRELIM. RAOR
2014-07-18 99 Miscellaneous REC'D WK. PLAN FOR PREP. OF PRELIM. RAOR
2014-06-24 99 Miscellaneous REC'D POST-EXCAVATION SOIL SAMPLING PLAN FOR PETROLEUM-IMPACTED SOILS (LNAPL EXCAVATIONS)
2014-06-24 99 Miscellaneous APPROVED POST-EXCAVATION SOIL SAMPLING PLAN
2014-01-22 43 Site Activity Status Update Received REC'D PROGRESS RPT 4TH QTR 2013
2014-01-13 43 Site Activity Status Update Received REC'D PROGRESS RPT 3RD QTR 2013
2013-10-18 43 Site Activity Status Update Received REC'D PROGRESS RPT 2ND QTR 2013
2013-06-19 43 Site Activity Status Update Received REC'D REM PERFORMANCE & MONITOR. PROGRESS REPT FIRST QTR 2013
2013-06-19 30 Site Investigation Workplan (SIWP) Notice to Proceed (NTP) APPROVED REVISED SI WORK PLAN
2013-05-29 35 Site Investigation Workplan (SIWP) Received (non-fee) REC'D REVISED SI WORK PLAN
2013-02-11 43 Site Activity Status Update Received REC'D PROGRESS RPT 4TH QTR 2012
2013-01-23 43 Site Activity Status Update Received REC'D PROGRESS RPT 3RD QTR 2012
2012-08-02 43 Site Activity Status Update Received SEE 02-30-108645 02-30-287532
2012-06-22 43 Site Activity Status Update Received REC'D COMPLETION RPT-INTERIM ACTIONS, ETC
2012-03-01 43 Site Activity Status Update Received
2011-11-17 43 Site Activity Status Update Received PROGRESS REPT 3RD QTR 2011
2011-09-22 43 Site Activity Status Update Received ADDTNL GW DOC REC'D, ALSO APPLY TO BRRTS# 02-30-108645, 02-30-287532, 02-30-000625, 03-30-261138
2011-09-07 130 DNR Regulatory Reminder Sent Vapor Intrusion (VI) Assessment Notification Ltr Sent
2011-08-17 43 Site Activity Status Update Received GW SMPLG RPT REC'D FOR BRRTS# 03-30-000625, 02-30-000983, 03-30-167597, 03-30-000106, 02-30-000108
2011-06-02 43 Site Activity Status Update Received SEE BRRT'S #02-03-00147 - 02-03-108645 - 02-30-0287532 -03-30-000625 -03-30-261138
2011-05-18 43 Site Activity Status Update Received
2011-03-16 43 Site Activity Status Update Received SUPPLEMENTAL SAMP RPT SEE BRRTS # 02-30-00147, 02-30-108645, 02-30-287532, 03-30-000625,03-30-261138
2011-03-04 28 Phase I Environmental Site Assessment (ESA) Rpt Received Download PDF file MARCH 2011 PHASE I ESA
2011-02-04 43 Site Activity Status Update Received SEE 02-30-001147, 108645, 287532, 03-30-000625, 261138, 04-30-048728
2010-12-17 99 Miscellaneous DOJ SENT LETTERS TO LIQ. TRUST & CHRYSLER GP. LLC NOTIFYING THEM OF THEIR RESPONSIBILITIES
2010-11-04 43 Site Activity Status Update Received SEE 02-30-001147, 108645, 287532, 03-30-000625, 261138, 04-30-048728
2010-07-26 43 Site Activity Status Update Received REM. PERF./MON.PROG.REPT. SEE 02-30-001147, 108645, 287532, 03-30-000625, 261138
2010-07-16 99 Miscellaneous REC'D NOTIFICATION OF HIRING ENV. CONSULTANT
2010-06-16 2 Responsible Party (RP) letter sent DV. SENT RP LETTER TO LIQUIDATION TRUST
2010-06-03 151 Remedial Action (RA) Documentation Report Received (non-fee) REC'D AS-BUILT DRAWINGS FOR SOUTHERN & CENTRAL REMEDIATION SYSTEMS.
2010-05-07 99 Miscellaneous DV. REQUEST FOR REMED. SYSTEM AS BUILT REPORTS & CHANGE IN GW P&T REPORTING FROM ANN. TO 1/4LY
2010-05-07 99 Miscellaneous DV. SENT COPY OF 5/5/10 SITE VISIT PHOTOS TO JONES DAY
2010-03-11 43 Site Activity Status Update Received DV. 3.15.10 REC'D ANNUAL REM. PERFORMANCE MONITORING REPORT
2008-03-24 43 Site Activity Status Update Received REC'D ANNUAL REM. PERFORMANCE MONITORING REPT
2008-03-19 43 Site Activity Status Update Received REC'D UPDATE REPT
2007-03-30 43 Site Activity Status Update Received REC'D ANNUAL REM PERF. MONITORING REPT 10/1 - 09/30/06
2006-06-30 43 Site Activity Status Update Received
2001-09-14 43 Site Activity Status Update Received SEE GENERAL FILE FOR GW REPORT FOR SITE
1999-03-30 92 Operation & Maintenance (O&M) Report Received (non-fee) mw
1998-10-29 151 Remedial Action (RA) Documentation Report Received (non-fee) N AREA GW RECOV/TREAT SYS & IMMED ACTION RPT;60TH ST SEWER EXCAV
1998-09-17 35 Site Investigation Workplan (SIWP) Received (non-fee) Download PDF file
1998-09-08 99 Miscellaneous Download PDF file REMEDIAL WORK PLAN
1998-03-11 92 Operation & Maintenance (O&M) Report Received (non-fee)
1997-09-03 43 Site Activity Status Update Received
1996-10-15 99 Miscellaneous Download PDF file AIR EMISSIONS CALCULATIONS FOR SOIL AND GW REMEDIATION
1996-06-27 99 Miscellaneous Download PDF file EXISTING PROFILE EXTENSION REQ #4
1996-06-14 43 Site Activity Status Update Received Download PDF file GW MONITORING RPT MARCH 1996 QUARTERLY SAMPLING
1996-06-07 99 Miscellaneous Download PDF file PRELIMINARY REMEDIAL INVESTIGATION WORKPLAN
1996-05-16 99 Miscellaneous Download PDF file AIR EMISSIONS CALCULATIONS FOR SOIL AND GW REMEDIATION
1996-03-19 99 Miscellaneous Download PDF file ADDL DATA FOR EXISTING PROFILE EXTENSION REQ #3
1996-02-02 99 Miscellaneous Download PDF file EXISTING PROFILE EXTENSION REQ #3
1996-01-22 43 Site Activity Status Update Received Download PDF file GW MONITORING RPT DECEMBER 1995 QUARTERLY SAMPLING RPT
1996-01-15 99 Miscellaneous Download PDF file AIR EMISSIONS CALCULATIONS FOR SOIL AND GW REMEDIATION SYSTEMS
1995-12-19 43 Site Activity Status Update Received Download PDF file GW MONITORING RPT SEPT 19995 QUARTERLY SAMPLING
1995-10-16 99 Miscellaneous Download PDF file AIR EMISSIONS CALCULATIONS FOR SOIL AND GW REMEDIATION
1995-10-01 99 Miscellaneous Download PDF file INTERIM REMEDIAL ACTION EVALUATION RPT
1995-06-06 99 Miscellaneous Download PDF file SOLID WASTE STORAGE EXEMPTION
1995-05-04 43 Site Activity Status Update Received Download PDF file MARCH 1995 QUARTERLY
1995-03-27 99 Miscellaneous Download PDF file SOIL VAPOR EXTRACTION PROPOSAL
1995-02-24 99 Miscellaneous Download PDF file PHONE CALL ENCOUNTERED FREE PRODUCT DURING CONSTRUCTION
1995-01-26 99 Miscellaneous Download PDF file AIR EMISSIONS CALCULATIONS FROM GW TREATMENT SYSTEMS
1995-01-24 43 Site Activity Status Update Received Download PDF file DECEMBER 1994 QUARTERLY
1994-12-20 43 Site Activity Status Update Received Download PDF file GW MONITORING UPDATE
1994-11-17 99 Miscellaneous Download PDF file VARIANCE SOIL DISPOSAL REQ
1994-10-31 43 Site Activity Status Update Received Download PDF file SEPT 1994 QUARTERLY
1994-08-16 43 Site Activity Status Update Received Download PDF file JUNE QUARTERLY 1994
1994-07-14 99 Miscellaneous Download PDF file MEETING
1994-07-05 99 Miscellaneous Download PDF file VARIANCE SOIL DISPOSAL APPR
1994-06-23 99 Miscellaneous Download PDF file REQ FOR VARIANCE SOIL DISPOSAL
1994-06-20 147 Remedial Action (RA) Design Report Received (non-fee) Download PDF file SOIL REMEDIAL ACTION WP
1994-06-01 43 Site Activity Status Update Received Download PDF file MARCH QUARTERLY
1994-06-01 99 Miscellaneous Download PDF file SITE VISIT
1994-02-28 99 Miscellaneous Download PDF file INVESTIGATION AND REMEDIATION REVIEW
1994-02-17 99 Miscellaneous Download PDF file SUMMARY OF 2/15 MEETING
1994-01-25 99 Miscellaneous Download PDF file GW RESULTS
1994-01-20 43 Site Activity Status Update Received Download PDF file DECEMBER 1993 QUARTERLY
1994-01-06 99 Miscellaneous Download PDF file BOREHOLE/GEOPROBE INVESTIGATION
1994-01-01 99 Miscellaneous Download PDF file SUBSURFACE INVESTIGATION AND REMEDIATION PLAN
1993-12-01 99 Miscellaneous Download PDF file GW ANALYTICAL RESULTS
1993-11-19 99 Miscellaneous Download PDF file UST CLOSURE
1993-11-12 43 Site Activity Status Update Received Download PDF file SEPT 1993 QUARTERLY RPT
1993-11-01 33 Tank System Site Assessment (TSSA) Report Received Download PDF file TSSA
1993-08-13 43 Site Activity Status Update Received Download PDF file JUNE 1993 QUARTERLY
1993-07-29 99 Miscellaneous Download PDF file SOILS TREATMENT PLAN
1993-07-26 99 Miscellaneous Download PDF file GW TREATMENT PLAN
1993-07-19 998 Activity Transferred from Spill Activity 04-30-048728
1993-07-07 99 Miscellaneous Download PDF file ADDL INFO RECD
1993-06-10 43 Site Activity Status Update Received Download PDF file MARCH 1993 QUARTERLY
1993-04-02 43 Site Activity Status Update Received Download PDF file DEC 1992 QUARTERLY
1992-11-05 43 Site Activity Status Update Received Download PDF file JULY 1992 GWM RPT
1992-11-01 147 Remedial Action (RA) Design Report Received (non-fee) Download PDF file RADR NORTH AREA
1989-08-17 1 Notification of Hazardous Substance Discharge
Substances
Substance Type Amt Released Units
Petroleum - Unknown Type Petroleum
Trichloroethylene Industrial Chem
Responsible Party
CHRYSLER GROUP LLC 800 CHRYSLER DRIVE, AUBURN HILLS, MI 48326
DNR Project Manager
PAUL GRITTNER  paul.grittner@wisconsin.gov
33969 | 02-30-000327