Click the Location Name or FID below to view the Location Details
page. If additional Activities are present at this location, they may
be accessed from Location Details.
ACTIVITY DETAILS
*** CONTINUING
OBLIGATIONS APPLY ***
Continuing obligations apply to
one or more properties due to remaining contamination. For
information specific to the continuing obligations, review the
documentation below. Before constructing or reconstructing a
water supply well, you need to contact DNR for approval of
well construction specifications.
LICENSED LANDFILL OR
HISTORIC WASTE SITE
Waste Sites are sites that
are located on the same property as a landfill licensed under
Wis. Admin. Code NR500 or on a known historic waste site never
issued a license by the DNR. Prior to constructing or
reconstructing a water supply well, you need to contact DNR for
approval of well construction specifications. You may also need
approval to build or excavate. Please see the documentation below
or contact the DNR Project Manager or DNR File Contact listed at
the bottom of this page.
02-41-579429
SUNRISE SHOPPING CENTER - HF & FMR OPERATION
Records related to the site are
documents that were available at the time the scanned paper or
electronic file was uploaded. Records withheld by the
department due to confidentiality, attorney-client privilege,
and other sensitive records, as well as lab data, may not be
included. Additional records associated with the site may or
may not be accessible through an open records request through
DNR or another state agency (see Jurisdiction above).
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
Period: 1/1/2019 - 6/30/2019
2019-07-08
43
Site Activity Status Update Received
JUNE 2019 MONTHLY DISCHARGE MONITORING REPORT
2019-06-13
43
Site Activity Status Update Received
MAY 2019 MONTHLY DISCHARGE MONITORING REPORT
2019-05-17
43
Site Activity Status Update Received
2ND QUARTERLY GROUNDWATER SAMPLING REPORT
2019-05-01
43
Site Activity Status Update Received
MARCH 2019 MONTHLY DISCHARGE MONITORING REPORT
2019-05-01
43
Site Activity Status Update Received
APRIL 2019 MONTHLY DISCHARGE MONITORING REPORT
2019-04-10
99
Miscellaneous
WPDES AMENDMENT
2019-03-13
43
Site Activity Status Update Received
JANUARY 2019 MONTHLY DISCHARGE MONITORING REPORT
2019-03-13
43
Site Activity Status Update Received
FEBRUARY 2019 MONTHLY DISCHARGE MONITORING REPORT
2019-02-14
43
Site Activity Status Update Received
1ST QUARTERLY GROUNDWATER SAMPLING REPORT
2019-01-29
195
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
Period: 7/1/2018 - 12/31/2018
2019-01-09
43
Site Activity Status Update Received
DECEMBER 2018 MONTHLY DISCHARGE MONITORING REPORT
2018-12-24
43
Site Activity Status Update Received
NOVEMBER 2018 MONTHLY DISCHARGE MONITORING REPORT
2018-12-19
149
Remedial Action (RA) Design Report Approved
2018-11-12
43
Site Activity Status Update Received
OCTOBER 2018 MONTHLY DISCHARGE MONITORING REPORT
2018-10-31
147
Remedial Action (RA) Design Report Received (non-fee)
FEE PAID UNDER BRRTS# 02-41-576336
2018-10-29
43
Site Activity Status Update Received
QUARTERLY GROUNDWATER SAMPLING REPORT
2018-10-11
43
Site Activity Status Update Received
SEPTEMBER 2018 DISCHARGE MONITORING REPORT
2018-09-26
43
Site Activity Status Update Received
AUGUST 2018 DISCHARGE MONITORING REPORT
2018-09-26
43
Site Activity Status Update Received
NR 140 EXEMPTION POST-INJECTION REPORT
2018-09-14
98
Technical Assistance Provided
TA MEETING
2018-08-28
97
Technical Assistance Request Received (fee)
FEE PAID UNDER 02-41-576336
2018-08-21
43
Site Activity Status Update Received
3RD QUARTERLY 2018 GW MONITORING REPORT
2018-08-13
43
Site Activity Status Update Received
JULY 2018 DISCHARGE MONITORING REPORT
2018-07-18
195
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
Period: 1/1/2018 - 6/30/2018
2018-07-09
99
Miscellaneous
AMENDED INJECTION APPROVAL
2018-06-27
64
Inject/Infiltrate Request Approved
SEE ALSO AMENDED INJECTION APPROVAL 07/09/2018
2018-06-06
99
Miscellaneous
WPDES PERMIT
2018-05-29
63
Inject/Infiltrate Request Received (fee)
FEE PAID UNDER BRRTS #02-41-576336
2018-05-14
43
Site Activity Status Update Received
2ND QUARTERLY 2018 REPORT
2018-04-24
38
Site Investigation Report (SIR) Approved
2018-04-17
99
Miscellaneous
PHONE CALL WITH CONSULTANT TO DISCUSS REVIEW OF RAOR AND FUTURE RAP, AND DISCUSSED AMENDED SIR
2018-04-10
39
Remedial Action Options Report (RAOR) Received (non-fee)
RAOR REC'D
2018-03-12
37
Site Investigation Report (SIR) Received (non-fee)
SITE INVESTIGATION REPORT AMENDMENT ADDENDUM
2018-01-23
30
Site Investigation Workplan (SIWP) Notice to Proceed (NTP)
PROVIDED FURTHER COMMENTS AND NOTICE TO PROCEED
2018-01-03
35
Site Investigation Workplan (SIWP) Received (non-fee)
REC'D SIWP
2017-12-05
99
Miscellaneous
SI COMMENTS PROVIDED IN LETTER, UNDER FEE FOR 02-41-576336
2017-11-17
99
Miscellaneous
REC'D ADD'L INFO
2017-11-09
99
Miscellaneous
TELECONFERENCE: REQUESTED ADDITIONAL INFORMATION (TEXT AND FIGURE REVISIONS)
2017-10-09
37
Site Investigation Report (SIR) Received (non-fee)
FEE PAID UNDER BRRTS # 0241576336
2017-07-31
43
Site Activity Status Update Received
SI STATUS RPT REC'D
2017-05-23
99
Miscellaneous
DELINEATION OF PAHS TO OCCUR, SEE WORKPLAN UNDER 02-41-576336
2017-05-18
2
Responsible Party (RP) letter sent
2017-05-16
1
Notification of Hazardous Substance Discharge
Substances
Substance
Type
Amt Released
Units
Naphthalene
Naphthalene
Per- and Polyfluoroalkyl Substances (PFAS ADDED FROM AC120)
Industrial Chem
Polynuclear Aromatic Hydrocarbons
Petroleum
Vapor Intrusion Continuing Obligation(s)
(E) Future Redevelopment of Property – Vapor Control Technology Required for Construction: DNR requires notification prior to new building construction or building modifications. Potential for vapor intrusion exists due to residual contamination. Vapor control technologies are required to be installed or modified, and verified protective unless a vapor evaluation is accepted by DNR.
Responsible Party
CAROL INVESTMENT CORPORATION 1410 S CLINTON ST, CHICAGO, IL 60607
BRRTS data comes from various sources, both internal and external to DNR. There may be omissions and errors in the data and delays in updating new information.