WIDNR on FaceBook  WIDNR on Twitter  WIDNR on YouTube  WIDNR on Instagram  WIDNR on LinkedIn  WIDNR Podcast  WIDNR on Pinterest

ENVIRONMENTAL CLEANUP & BROWNFIELDS REDEVELOPMENT
BRRTS on the Web

Click the Location Name or FID below to view the Location Details page. If additional Activities are present at this location, they may be accessed from Location Details.

ACTIVITY DETAILS

 
02-41-579429 SUNRISE SHOPPING CENTER - HF & FMR OPERATION
Activity Type / Status Jurisdiction
ERP  CLOSED DNR RR
Location Name County DNR Region
SUNRISE SHOPPING CENTER MILWAUKEE SOUTHEAST
Address Municipality
2410 - 2424 10TH AVE SOUTH MILWAUKEE
PLSS Description Latitude (WGS84) Longitude (WGS84) Google Maps RR Sites Map
NE 1/4 of the SW 1/4 of Sec 11, T05N, R22E 42.9068373 -87.861956 Click to view on Google Maps using Lat/Long Click to View RR Sites Map
Additional Activity Details Acres
3.5
Facility ID PECFA No. EPA ID Start Date End Date
241828620 2017-05-16 2023-12-20
Characteristics
Above Ground
Petrol Tank

Drycleaner
EPA
NPL Site
EPA
Superfund
PECFA Funds
Eligible

PFAS

ROW Impact

Sediments
Underground
Petrol Tank
WI DOT
Site
  PFAS flag
Actions and Documents
Date Code Name File Comment
2023-12-20 11 Activity Closed
2023-12-20 56 Continuing Obligation(s) Applied Download PDF file
2023-12-20 222 Continuing Obligation - Maintain Cap Over Contaminated Area
2023-12-20 226 Continuing Obligation - Vapor Intrusion Response
2023-12-20 232 Continuing Obligation - Residual Soil Contamination
2023-12-20 236 Continuing Obligation - Residual GW Contamination
2023-12-11 199 Additional Information Received (Fee-Based or Closure)
2023-10-16 198 Request for Additional Information (Fee-Based or Closure) PAUSED FOR CLOSURE REVISIONS
2023-10-05 805 Historic Waste Site
2023-08-30 79 Case Closure Review Request Received Indicates multiple files are linked to this action AUTO-ENTERED
2023-08-15 779 Case Closure Review Fee Received REC'D CK #12535 $1050
2023-08-15 700 Database Fee Paid for Groundwater Continuing Obligation(s) REC'D CK #12535 $350
2023-08-15 710 Database Fee Paid for Soil Continuing Obligation(s) REC'D CK #12535 $300
2023-07-21 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 01/01/2023 - 06/30/2023
2023-01-23 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2022 - 12/31/2022
2022-07-22 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2022 - 6/30/2022
2022-06-09 43 Site Activity Status Update Received Download PDF file MAY 2022 MONTHLY DISCHARGE MONITORING REPORT
2022-06-08 43 Site Activity Status Update Received Download PDF file QUARTERLY GROUNDWATER SAMPLING REPORT (APRIL 2022 RESULTS)
2022-05-10 43 Site Activity Status Update Received Download PDF file APRIL 2022 MONTHLY DISCHARGE MONITORING REPORT
2022-04-07 99 Miscellaneous DNR RESPONDED TO EMERGING CONTAMINANT EVALUATION REPORT ADDENDUM
2022-04-06 43 Site Activity Status Update Received Download PDF file MARCH 2022 MONTHLY DISCHARGE MONITORING REPORT
2022-03-29 43 Site Activity Status Update Received Download PDF file EMERGING CONTAMINANT EVALUATION REPORT ADDENDUM
2022-03-08 43 Site Activity Status Update Received Download PDF file FEBRUARY 2022 MONTHLY DISCHARGE MONITORING REPORT
2022-03-01 43 Site Activity Status Update Received Download PDF file QUARTERLY GW SAMPLING, JAN-FEB 2022
2022-02-08 43 Site Activity Status Update Received Download PDF file JANUARY 2022 MONTHLY DISCHARGE MONITORING REPORT
2022-01-20 43 Site Activity Status Update Received Download PDF file DECEMBER 2021 MONTHLY DISCHARGE MONITORING REPORT
2022-01-18 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2021 - 12/31/2021
2022-01-13 43 Site Activity Status Update Received Download PDF file REC'D DISCHARGE MONITORING RPT FOR OCTOBER 2021
2022-01-13 43 Site Activity Status Update Received Download PDF file REC'D DISCHARGE MONITORING RPT FOR NOVEMBER 2021
2022-01-13 43 Site Activity Status Update Received Download PDF file REC'D DISCHARGE MONITORING RPT FOR DECEMBER 2021
2021-12-14 43 Site Activity Status Update Received Download PDF file NOVEMBER 2021 MONTHLY DISCHARGE MONITORING REPORT
2021-11-08 43 Site Activity Status Update Received Download PDF file OCTOBER 2021 MONTHLY DISCHARGE MONITORING REPORT
2021-10-18 43 Site Activity Status Update Received Download PDF file EMERGING CONTAMINANT EVALUATION REPORT AMENDMENT
2021-10-14 43 Site Activity Status Update Received Download PDF file SEPTEMBER 2021 MONTHLY DISCHARGE MONITORING REPORT
2021-09-14 43 Site Activity Status Update Received Download PDF file AUGUST 2021 MONTHLY DISCHARGE MONITORING REPORT
2021-08-10 43 Site Activity Status Update Received Download PDF file JULY 2021 MONTHLY DISCHARGE MONITORING REPORT
2021-07-20 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2021 - 6/30/2021
2021-07-19 114 PFAS Scoping Statement Received Download PDF file SEE ALSO AC 35 1/25/2021
2021-07-06 43 Site Activity Status Update Received Download PDF file JUNE 2021 MONTHLY DISCHARGE MONITORING REPORT
2021-06-30 43 Site Activity Status Update Received Download PDF file QUARTERLY GROUNDWATER SAMPLING REPORT (MAY 2021)
2021-06-15 43 Site Activity Status Update Received Download PDF file MAY 2021 MONTHLY DISCHARGE MONITORING REPORT
2021-05-19 116 PFAS Sampling Required Download PDF file
2021-05-04 43 Site Activity Status Update Received Download PDF file APRIL 2021 MONTHLY DISCHARGE MONITORING REPORT
2021-04-16 120 PFAS Sampling Completed - Actionable Levels Detected SEE AC 43 DOCUMENT
2021-04-16 43 Site Activity Status Update Received Download PDF file EMERGING CONTAMINANT EVALUATION REPORT
2021-04-09 43 Site Activity Status Update Received Download PDF file MARCH 2021 MONTHLY DISCHARGE MONITORING REPORT
2021-04-06 130 DNR Regulatory Reminder Sent Download PDF file VAPOR INTRUSION AND TCE REMINDER LETTER
2021-04-05 151 Remedial Action (RA) Documentation Report Received (non-fee) Download PDF file REMEDIAL CONSTRUCTION REPORT ADDENDUM
2021-03-10 43 Site Activity Status Update Received Download PDF file FEBRUARY 2021 MONTHLY DISCHARGE MONITORING REPORT
2021-03-03 43 Site Activity Status Update Received Download PDF file QUARTERLY GROUNDWATER SAMPLING REPORT (JANUARY 2021)
2021-02-10 43 Site Activity Status Update Received Download PDF file JANUARY 2021 MONTHLY DISCHARGE MONITORING REPORT
2021-01-29 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2020 - 12/31/2020
2021-01-29 30 Site Investigation Workplan (SIWP) Notice to Proceed (NTP) NOTICE TO PROCEED - EMERGING CONTAMINANTS WORK PLAN
2021-01-25 35 Site Investigation Workplan (SIWP) Received (non-fee) Download PDF file EMERGING CONTAMINANT EVALUATION WORK PLAN
2021-01-15 43 Site Activity Status Update Received Download PDF file DECEMBER 2020 DISCHARGE MONITORING REPORT
2020-12-09 43 Site Activity Status Update Received Download PDF file NOVEMBER 2020 MONTHLY DISCHARGE MONITORING REPORT
2020-11-23 154 Remedial Action (RA) Documentation Report Not Approved Download PDF file ADDITIONAL ACTIONS REQUIRED
2020-11-20 43 Site Activity Status Update Received Download PDF file QUARTERLY GROUNDWATER SAMPLING REPORT (OCTOBER 2020)
2020-11-19 43 Site Activity Status Update Received Download PDF file OCTOBER 2020 MONTHLY DISCHARGE MONITORING REPORT
2020-10-15 43 Site Activity Status Update Received Download PDF file SEPTEMBER 2020 MONTHLY DISCHARGE MONITORING REPORT
2020-09-28 152 Remedial Action Documentation Report Received (fee) Download PDF file FEE PAID UNDER BRRTS #02-41-576336
2020-09-16 43 Site Activity Status Update Received Download PDF file AUGUST 2020 MONTHLY DISCHARGE MONITORING REPORT
2020-08-17 130 DNR Regulatory Reminder Sent Download PDF file EMERGING CONTAMINANTS REMINDER LETTER
2020-08-17 43 Site Activity Status Update Received Download PDF file JULY 2020 MONTHLY DISCHARGE MONITORING REPORT
2020-07-31 43 Site Activity Status Update Received Download PDF file QUARTERLY GROUNDWATER SAMPLING REPORT (JULY 2020)
2020-07-21 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2020 - 6/30/2020
2020-07-21 43 Site Activity Status Update Received Download PDF file JUNE 2020 MONTHLY DISCHARGE MONITORING REPORT
2020-06-15 43 Site Activity Status Update Received Download PDF file QUARTERLY GROUNDWATER SAMPLING REPORT (MAY 2020)
2020-06-08 43 Site Activity Status Update Received Download PDF file MAY 2020 MONTHLY DISCHARGE MONITORING REPORT
2020-05-11 43 Site Activity Status Update Received Download PDF file APRIL 2020 MONTHLY DISCHARGE MONITORING REPORT
2020-04-13 43 Site Activity Status Update Received Download PDF file MARCH 2020 MONTHLY DISCHARGE MONITORING REPORT
2020-03-11 43 Site Activity Status Update Received Download PDF file FEBRUARY 2020 MONTHLY DISCHARGE MONITORING REPORT
2020-03-04 43 Site Activity Status Update Received Download PDF file QUARTERLY GROUNDWATER SAMPLING REPORT (JANUARY 2020)
2020-02-10 43 Site Activity Status Update Received Download PDF file JANUARY 2020 MONTHLY DISCHARGE MONITORING REPORT
2020-01-21 99 Miscellaneous DISCUSSION RE: REMEDIAL ACTIONS/NEXT STEPS & PAH INVESTIGATION
2020-01-20 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2019 - 12/31/2019
2020-01-09 43 Site Activity Status Update Received Download PDF file DECEMBER 2019 MONTHLY DISCHARGE MONITORING REPORT
2019-12-04 43 Site Activity Status Update Received Download PDF file NOVEMBER 2019 MONTHLY DISCHARGE MONITORING REPORT
2019-11-21 43 Site Activity Status Update Received Download PDF file 4TH QUARTERLY GROUNDWATER SAMPLING REPORT (OCTOBER 2019)
2019-11-18 99 Miscellaneous DISCUSSION REGARDING REMEDIAL ACTIONS - CONSULTANT PROPOSING DIRECT SOIL MIXING
2019-11-12 43 Site Activity Status Update Received Download PDF file OCTOBER 2019 MONTHLY DISCHARGE MONITORING REPORT
2019-10-04 43 Site Activity Status Update Received Download PDF file SEPTEMBER 2019 MONTHLY DISCHARGE MONITORING REPORT
2019-09-12 43 Site Activity Status Update Received Download PDF file AUGUST 2019 MONTHLY DISCHARGE MONITORING REPORT
2019-08-22 43 Site Activity Status Update Received Download PDF file 3RD QUARTERLY GROUNDWATER SAMPLING REPORT (JULY 2019)
2019-08-06 43 Site Activity Status Update Received Download PDF file JULY 2019 MONTHLY DISCHARGE MONITORING REPORT
2019-07-19 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2019 - 6/30/2019
2019-07-08 43 Site Activity Status Update Received Download PDF file JUNE 2019 MONTHLY DISCHARGE MONITORING REPORT
2019-06-13 43 Site Activity Status Update Received Download PDF file MAY 2019 MONTHLY DISCHARGE MONITORING REPORT
2019-05-17 43 Site Activity Status Update Received Download PDF file 2ND QUARTERLY GROUNDWATER SAMPLING REPORT
2019-05-01 43 Site Activity Status Update Received Download PDF file MARCH 2019 MONTHLY DISCHARGE MONITORING REPORT
2019-05-01 43 Site Activity Status Update Received Download PDF file APRIL 2019 MONTHLY DISCHARGE MONITORING REPORT
2019-04-10 99 Miscellaneous Download PDF file WPDES AMENDMENT
2019-03-13 43 Site Activity Status Update Received Download PDF file JANUARY 2019 MONTHLY DISCHARGE MONITORING REPORT
2019-03-13 43 Site Activity Status Update Received Download PDF file FEBRUARY 2019 MONTHLY DISCHARGE MONITORING REPORT
2019-02-14 43 Site Activity Status Update Received Download PDF file 1ST QUARTERLY GROUNDWATER SAMPLING REPORT
2019-01-29 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2018 - 12/31/2018
2019-01-09 43 Site Activity Status Update Received Download PDF file DECEMBER 2018 MONTHLY DISCHARGE MONITORING REPORT
2018-12-24 43 Site Activity Status Update Received Download PDF file NOVEMBER 2018 MONTHLY DISCHARGE MONITORING REPORT
2018-12-19 149 Remedial Action (RA) Design Report Approved Download PDF file
2018-11-12 43 Site Activity Status Update Received Download PDF file OCTOBER 2018 MONTHLY DISCHARGE MONITORING REPORT
2018-10-31 147 Remedial Action (RA) Design Report Received (non-fee) Download PDF file FEE PAID UNDER BRRTS# 02-41-576336
2018-10-29 43 Site Activity Status Update Received Download PDF file QUARTERLY GROUNDWATER SAMPLING REPORT
2018-10-11 43 Site Activity Status Update Received Download PDF file SEPTEMBER 2018 DISCHARGE MONITORING REPORT
2018-09-26 43 Site Activity Status Update Received Download PDF file AUGUST 2018 DISCHARGE MONITORING REPORT
2018-09-26 43 Site Activity Status Update Received Download PDF file NR 140 EXEMPTION POST-INJECTION REPORT
2018-09-14 98 Technical Assistance Provided TA MEETING
2018-08-28 97 Technical Assistance Request Received (fee) Download PDF file FEE PAID UNDER 02-41-576336
2018-08-21 43 Site Activity Status Update Received Download PDF file 3RD QUARTERLY 2018 GW MONITORING REPORT
2018-08-13 43 Site Activity Status Update Received Download PDF file JULY 2018 DISCHARGE MONITORING REPORT
2018-07-18 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2018 - 6/30/2018
2018-07-09 99 Miscellaneous Download PDF file AMENDED INJECTION APPROVAL
2018-06-27 64 Inject/Infiltrate Request Approved Download PDF file SEE ALSO AMENDED INJECTION APPROVAL 07/09/2018
2018-06-06 99 Miscellaneous Download PDF file WPDES PERMIT
2018-05-29 63 Inject/Infiltrate Request Received (fee) Download PDF file FEE PAID UNDER BRRTS #02-41-576336
2018-05-14 43 Site Activity Status Update Received Download PDF file 2ND QUARTERLY 2018 REPORT
2018-04-24 38 Site Investigation Report (SIR) Approved Download PDF file
2018-04-17 99 Miscellaneous PHONE CALL WITH CONSULTANT TO DISCUSS REVIEW OF RAOR AND FUTURE RAP, AND DISCUSSED AMENDED SIR
2018-04-10 39 Remedial Action Options Report (RAOR) Received (non-fee) Download PDF file RAOR REC'D
2018-03-12 37 Site Investigation Report (SIR) Received (non-fee) Download PDF file SITE INVESTIGATION REPORT AMENDMENT ADDENDUM
2018-01-23 30 Site Investigation Workplan (SIWP) Notice to Proceed (NTP) PROVIDED FURTHER COMMENTS AND NOTICE TO PROCEED
2018-01-03 35 Site Investigation Workplan (SIWP) Received (non-fee) Download PDF file REC'D SIWP
2017-12-05 99 Miscellaneous Download PDF file SI COMMENTS PROVIDED IN LETTER, UNDER FEE FOR 02-41-576336
2017-11-17 99 Miscellaneous Download PDF file REC'D ADD'L INFO
2017-11-09 99 Miscellaneous TELECONFERENCE: REQUESTED ADDITIONAL INFORMATION (TEXT AND FIGURE REVISIONS)
2017-10-09 37 Site Investigation Report (SIR) Received (non-fee) Download PDF file FEE PAID UNDER BRRTS # 0241576336
2017-07-31 43 Site Activity Status Update Received Download PDF file SI STATUS RPT REC'D
2017-05-23 99 Miscellaneous DELINEATION OF PAHS TO OCCUR, SEE WORKPLAN UNDER 02-41-576336
2017-05-18 2 Responsible Party (RP) letter sent Download PDF file
2017-05-16 1 Notification of Hazardous Substance Discharge Download PDF file
Substances
Substance Type Amt Released Units
Naphthalene Naphthalene
Per- and Polyfluoroalkyl Substances (PFAS ADDED FROM AC120) Industrial Chem
Polynuclear Aromatic Hydrocarbons Petroleum
Vapor Intrusion Continuing Obligation(s)
(E) Future Redevelopment of Property – Vapor Control Technology Required for Construction: DNR requires notification prior to new building construction or building modifications. Potential for vapor intrusion exists due to residual contamination. Vapor control technologies are required to be installed or modified, and verified protective unless a vapor evaluation is accepted by DNR.
Responsible Party
CAROL INVESTMENT CORPORATION 1410 S CLINTON ST, CHICAGO, IL 60607
For More Information on this Activity
Southeast Region Contact: Jenny Meyer  jennifer.meyer1@wisconsin.gov
579429 | 02-41-579429
BOTW Release 4.13 | 06/03/2024 | Release Notes  Help  Disclaimers  Glossary of Terms  Supplemental Pages