ENVIRONMENTAL CLEANUP & BROWNFIELDS REDEVELOPMENT
BRRTS on
the Web
ACTIVITY DETAILS
03-05-588286
THE SOLBERG CO - PVOC
|
Activity Type / Status |
Jurisdiction |
LUST
/
OPEN
|
DNR RR |
Address |
Municipality |
1520 BROOKFIELD AVE |
HOWARD |
PLSS Description |
Latitude (WGS84) |
Longitude (WGS84) |
Google Maps |
RR Sites Map |
NW 1/4 of the SE 1/4 of Sec 03, T24N, R20E
|
44.5837662 |
-88.0563056 |
|
|
Additional Activity Details |
Acres |
Electronic Only - No Hard File |
UNKNOWN
|
Facility ID |
PECFA No. |
EPA ID |
Start Date |
End Date |
405227020
|
|
|
2021-08-27
|
|
Characteristics
Above Ground Petrol Tank
|
Drycleaner |
EPA NPL Site
|
EPA Superfund
|
PECFA Funds Eligible
|
PFAS |
ROW Impact |
Sediments |
Underground Petrol Tank
|
WI DOT Site
|
|
|
|
|
|
|
|
|
|
|
Actions
Records related to the site are
documents that were available at the time the scanned paper or
electronic file was uploaded. Records withheld by the
department due to confidentiality, attorney-client privilege,
and other sensitive records, as well as lab data, may not be
included. Additional records associated with the site may or
may not be accessible through an open records request through
DNR or another state agency (see Jurisdiction above).
|
|
Date |
Code |
Name |
File |
Comment |
|
2024-01-03
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 7/1/2023 - 12/31/2023
|
|
2023-08-23
|
43
|
Site Activity Status Update Received
|
|
JULY 2023 GROUNDWATER SAMPLING RESULTS & STATUS UPDATE REPORT
|
|
2023-07-07
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 01/01/2023 - 06/30/2023
|
|
2023-05-17
|
43
|
Site Activity Status Update Received
|
|
CAROW LAND SURVEYING & ENVIRONMENTAL HIRED AS CONSULTANT; WILL PERFORM GW MONITORING IN JULY
|
|
2023-01-12
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 7/1/2022 - 12/31/2022
|
|
2022-09-26
|
43
|
Site Activity Status Update Received
|
|
JULY 2022 PVOC GROUNDWATER SAMPLING RESULTS; PLAN TO SAMPLE TWO MORE ROUNDS FOR GW MONITORING
|
|
2022-07-25
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 1/1/2022 - 6/30/2022
|
|
2022-05-12
|
43
|
Site Activity Status Update Received
|
|
SAMPLING MW-1, MW-3, AND TANK SUMP FOR PVOCS ON 5/13/22
|
|
2022-01-25
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 7/1/2021 - 12/31/2021
|
|
2021-09-08
|
2
|
Responsible Party (RP) letter sent
|
|
|
|
2021-08-27
|
1
|
Notification of Hazardous Substance Discharge
|
|
HOSE DISCONNECTED WHILE PUMPING UNDERGROUND STORAGE TANK
|
|
2021-08-27
|
998
|
Activity Transferred from Spill Activity
|
|
BRRTS #04-05-588208 (SEE THE BRRTS # FOR THE SITE FILE)
|
Relationships to Other Activities
Click Activity Below to View
Details
Substances
Substance |
Type |
Amt Released |
Units |
Ammonia |
Industrial Chem |
|
|
Responsible Party
DNR Project Manager
588286
|
03-05-588286