2020-10-27
|
130
|
DNR Regulatory Reminder Sent
|
|
DERF FUNDING STATUS LTR
|
|
2020-07-07
|
99
|
Miscellaneous
|
|
CORRESPONDENCE FOR FINAL DERF CLAIM PAYMENT MADE ON 3/27/2020
|
|
2019-07-10
|
218
|
DERF - Cost Reimbursement Application Approved
|
|
|
|
2019-02-25
|
-
|
Dry Cleaner Response Fund
|
|
|
|
2019-02-21
|
288
|
DERF - Cost Reimbursement Paid
|
|
|
|
2017-10-10
|
217
|
DERF - Cost Reimbursement Application Received
|
|
RA #4 FINAL
|
|
2017-09-14
|
56
|
Continuing Obligation(s) Applied
|
|
|
|
2017-09-14
|
11
|
Activity Closed
|
|
|
|
2017-09-14
|
236
|
Continuing Obligation - Residual GW Contamination
|
|
|
|
2017-09-14
|
232
|
Continuing Obligation - Residual Soil Contamination
|
|
|
|
2017-09-14
|
222
|
Continuing Obligation - Maintain Cap Over Contaminated Area
|
|
|
|
2017-09-14
|
226
|
Continuing Obligation - Vapor Intrusion Response
|
|
|
|
2017-09-14
|
46
|
Impacted Right-of-Way (ROW) Notification
|
|
AUTO-POPULATED 2018-03-20
|
|
2017-09-14
|
66
|
Continuing Obligations (COs) Apply at Off-site Property(ies)
|
|
auto-populated on 08/01/2019 per activity relationship to off-site(s)
|
|
2017-08-31
|
43
|
Site Activity Status Update Received
|
|
REVISED CLOSURE DOC & MW, SVE WELL & VAPOR PORT ABANDONMENT FORMS
|
|
2017-07-24
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 1/1/2017 - 6/30/2017
|
|
2017-07-17
|
179
|
Case Closure Review Request Received (non-fee)
|
|
RESUBMITTAL
|
|
2017-05-19
|
43
|
Site Activity Status Update Received
|
|
MAY 2017 SOIL GAS & GW MONITORING
|
|
2017-05-16
|
99
|
Miscellaneous
|
|
CLOSURE RESUBMITTAL CORRESPONDENCE
|
|
2017-04-03
|
43
|
Site Activity Status Update Received
|
|
VAPOR MONITORING UPDATE
|
|
2017-03-28
|
99
|
Miscellaneous
|
|
VAPOR MONITORING INFORMATION FOR SHUTTING OFF VAPOR MITIGATION SYSTEMS
|
|
2017-03-17
|
43
|
Site Activity Status Update Received
|
|
SOIL SAMPLING AND VAPOR & GW MONITORING RESULTS
|
|
2017-01-23
|
217
|
DERF - Cost Reimbursement Application Received
|
|
PARTIAL RA #3
|
|
2017-01-19
|
99
|
Miscellaneous
|
|
REMEDIAL CHANGE ORDER #2 - REVISED APPROVAL LETTER ISSUED
|
|
2017-01-18
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 7/1/2016 - 12/31/2016
|
|
2017-01-17
|
112
|
DERF - Change Order Received
|
|
WORK PLAN RESPONSE TO NOV 2016 SOIL GAS & GW MONITORING RESULTS
|
|
2016-12-21
|
99
|
Miscellaneous
|
|
COMMENTS ON STATUS RPT FOR GW AND VAPOR MONITORING
|
|
2016-12-19
|
43
|
Site Activity Status Update Received
|
|
NOV 2016 SOIL GAS & GW MONITORING RESULTS
|
|
2016-10-19
|
99
|
Miscellaneous
|
|
REMEDIAL CHANGE ORDER #2 APPROVAL LETTER ISSUED
|
|
2016-10-14
|
112
|
DERF - Change Order Received
|
|
WORK PLAN RESPONSE TO CLOSURE DENIAL
|
|
2016-08-15
|
99
|
Miscellaneous
|
|
CLOSURE DENIAL NOTIFICATION LETTERS ISSUEDTO IMPACTED OFF-SITE PROPERTIES
|
|
2016-08-11
|
80
|
Closure Not Recommended
|
|
ADDT'L SOIL, GW & VAPOR REQUIREMENTS
|
|
2016-07-21
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 1/1/2016 - 6/30/2016
|
|
2016-07-05
|
79
|
Case Closure Review Request Received
|
|
AUTO-ENTERED
|
|
2016-06-27
|
700
|
Database Fee Paid for Groundwater Continuing Obligation(s)
|
|
|
|
2016-06-27
|
710
|
Database Fee Paid for Soil Continuing Obligation(s)
|
|
|
|
2016-06-27
|
779
|
Case Closure Review Fee Received
|
|
|
|
2016-03-21
|
43
|
Site Activity Status Update Received
|
|
POST REMEDIATION SOIL GAS & GROUNDWATER MONITORING
|
|
2016-02-02
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 7/1/2015 - 12/31/2015
|
|
2015-10-06
|
43
|
Site Activity Status Update Received
|
|
STATUS RPT REC'D: AUGUST 2015 GW, VAPOR, AND SOIL GAS RESULTS
|
|
2015-09-03
|
99
|
Miscellaneous
|
|
REMEDIAL CHANGE ORDER-REVISED #1 APPROVAL LTR ISSUED
|
|
2015-09-01
|
112
|
DERF - Change Order Received
|
|
REMEDIAL CHANGE ORDER-REVISED #1
|
|
2015-07-29
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 1/1/2015 - 6/30/2015
|
|
2015-07-06
|
43
|
Site Activity Status Update Received
|
|
SOIL GAS AND GW MONITORING RESULTS
|
|
2015-05-29
|
218
|
DERF - Cost Reimbursement Application Approved
|
|
|
|
2015-03-19
|
43
|
Site Activity Status Update Received
|
|
SOIL GAS & GW SAMPLING
|
|
2015-02-25
|
217
|
DERF - Cost Reimbursement Application Received
|
|
PARTIAL RA #2
|
|
2015-02-10
|
99
|
Miscellaneous
|
|
DNR RESPONSE TO OCTOBER 2014 O&M REPORT & JANUARY 2015 STATUS UPDATE REPORT
|
|
2015-02-04
|
99
|
Miscellaneous
|
|
NEW DNR PROJECT MANAGER ASSIGNED
|
|
2015-01-27
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 7/1/2014 - 12/31/2014
|
|
2015-01-05
|
43
|
Site Activity Status Update Received
|
|
STATUS UPDATE REGARDING GW & REMEDIATION SYSTEM SAMPLING
|
|
2014-10-20
|
92
|
Operation & Maintenance (O&M) Report Received (non-fee)
|
|
ANNUAL O&M REPORT
|
|
2014-09-29
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 1/1/2014 - 6/30/2014
|
|
2014-05-20
|
218
|
DERF - Cost Reimbursement Application Approved
|
|
RA 1 APPROVED. CHECK BEING PROCESSED.
|
|
2014-03-12
|
43
|
Site Activity Status Update Received
|
|
FEB 2014 SAMPLING RESULTS FIRST STATUS UPDATE SINCE RA EXCAVATION AND SVE INSTALLATION
|
|
2014-01-30
|
130
|
DNR Regulatory Reminder Sent
|
|
DERF FUNDING STATUS LTR
|
|
2014-01-30
|
99
|
Miscellaneous
|
|
STATUS OF DERF, EXPECT FUTURE DELAYS
|
|
2014-01-24
|
99
|
Miscellaneous
|
|
MTG W/PROPERTY OWNER ABOUT RA, NEXT STEPS & POSSIBLE CONTINUING OBLIGATIONS
|
|
2014-01-17
|
151
|
Remedial Action (RA) Documentation Report Received (non-fee)
|
|
CONSTRUCTION DOCUMENTATION REPORT FOR SOIL AND GROUNDWATER REMEDIATION
|
|
2013-10-18
|
149
|
Remedial Action (RA) Design Report Approved
|
|
WORK PLAN APPROVAL
|
|
2013-10-14
|
147
|
Remedial Action (RA) Design Report Received (non-fee)
|
|
WORK PLAN FOR SOIL AND GROUNDWATER REMEDIATION
|
|
2013-08-15
|
99
|
Miscellaneous
|
|
DEPT CONCURRENCE W/OWNER RECOMMENDATION
|
|
2013-08-12
|
43
|
Site Activity Status Update Received
|
|
OWNER RECOMMENDATION FOR CONSULTANT & RA APPROVAL
|
|
2013-07-19
|
218
|
DERF - Cost Reimbursement Application Approved
|
|
PAYMENT ISSUED $65,651.50 SI FINAL
|
|
2013-07-19
|
99
|
Miscellaneous
|
|
RA SEALED BIDS DUE
|
|
2013-04-08
|
43
|
Site Activity Status Update Received
|
|
TELCON WITH CONSULTANT, SSDS INSTALLED @ PARKVIEW 03/27/2013
|
|
2013-03-02
|
99
|
Miscellaneous
|
|
CO#8 APPROVAL
|
|
2013-02-25
|
112
|
DERF - Change Order Received
|
|
SSDS INSTALLATION CO #3 RECEIVED
|
|
2013-02-11
|
38
|
Site Investigation Report (SIR) Approved
|
|
DEPARTMENT SI APPROVAL LETTER
|
|
2013-01-25
|
37
|
Site Investigation Report (SIR) Received (non-fee)
|
|
SUPPLEMENTAL VI, AND OFF-SITE GROUNDWATER INVESTIGATION FINAL REPORT
|
|
2012-11-29
|
43
|
Site Activity Status Update Received
|
|
VENT WELLS, PILOT STUDY STARTED, MWS INSTALLED
|
|
2012-10-31
|
43
|
Site Activity Status Update Received
|
|
DNR COMMENTS ON VAPOR RESULTS, REQUEST MET WITH PROPERTY OWNER
|
|
2012-10-25
|
43
|
Site Activity Status Update Received
|
|
OCTOBER APT BLDG SUBFLOOR SAMPLE RESULTS RECEIVED
|
|
2012-09-28
|
99
|
Miscellaneous
|
|
CHANGE ORDER #7 APPROVAL
|
|
2012-09-25
|
112
|
DERF - Change Order Received
|
|
WORKPLAN ADDENDUM CO#7, OFF-SITE SUBFLOOR VI SAMPLING AND MW INSTALLATION
|
|
2012-09-11
|
99
|
Miscellaneous
|
|
NEED ADDITIONAL CO AND WORKPLAN FOR APPT BLDG AND GROUNDWATER
|
|
2012-08-24
|
43
|
Site Activity Status Update Received
|
|
ADDITIONAL GROUNDWATER AND DEEP AND SHALLOW SOIL VAPOR RECEIVED
|
|
2012-07-13
|
99
|
Miscellaneous
|
|
CHANGE ORDER #6 APPROVAL
|
|
2012-07-03
|
112
|
DERF - Change Order Received
|
|
WORKPLAN ADDENDUM AND CO #6
|
|
2012-06-25
|
35
|
Site Investigation Workplan (SIWP) Received (non-fee)
|
|
WORKPLAN ADDENDUM AND CHANGE ORDER#6 SUPPL VI, ADDITIONALL OFF-SITE GW, SVE PILOT TEST
|
|
2012-06-01
|
99
|
Miscellaneous
|
|
RESPONSE TO FINAL REPORT W/ADDT'L WORK NEEDED
|
|
2012-05-08
|
37
|
Site Investigation Report (SIR) Received (non-fee)
|
|
FINAL REPORT SUPPLEMENTAL VAPOR INTRUSION, OFF-SITE GW INVSTGTION & VAPOR MITIGATION SYS DOC REPORT
|
|
2012-04-10
|
218
|
DERF - Cost Reimbursement Application Approved
|
|
DERF DC-460 APPROVED, CHECK BEING PROCESSED
|
|
2012-03-19
|
99
|
Miscellaneous
|
|
CONTINUED VAPOR AND GROUNDWATER SAMPLING COMPLETED (3/19 AND 3/20/2012)
|
|
2012-03-01
|
30
|
Site Investigation Workplan (SIWP) Notice to Proceed (NTP)
|
|
CHANGE ORDER #5 (SUP VI AND OFF-SITE GW) APPROVED
|
|
2012-02-28
|
112
|
DERF - Change Order Received
|
|
WP FOR SUPPLEMENTAL VAPOR INTRUSION AND OFF-SITE GW SAMPLES
|
|
2012-02-03
|
216
|
DERF - Contained-in Rulings Review Request Received
|
|
TELCON WITH CONSULTANT ABOUT SOIL VAPOR TESTING RESULTS
|
|
2012-02-02
|
43
|
Site Activity Status Update Received
|
|
TELCON WITH CONSULTANT ABOUT ADDITIONAL VAPOR SAMPLING
|
|
2012-01-25
|
216
|
DERF - Contained-in Rulings Review Request Received
|
|
PW-P5 SOIL VAPOR TESTING RESULTS RECEIVED
|
|
2012-01-12
|
217
|
DERF - Cost Reimbursement Application Received
|
|
FOR PARTIAL SI REIMBURSEMENT
|
|
2012-01-09
|
98
|
Technical Assistance Provided
|
|
APPROVAL LETTER SENT
|
|
2012-01-06
|
216
|
DERF - Contained-in Rulings Review Request Received
|
|
WASTE DETERMINATION - FOR PCE CONTAMINATED SOILS
|
|
2012-01-06
|
97
|
Technical Assistance Request Received (fee)
|
|
$500 CK 1508 FROM ZENITH PROPERTIES - WATE DETERMINATION
|
|
2011-12-19
|
36
|
Site Investigation Workplan (SIWP) Approved
|
|
VAPOR MITIGATION SYSTEM INSTALLATION
|
|
2011-12-13
|
36
|
Site Investigation Workplan (SIWP) Approved
|
|
REVISED VAPOR MITIGATION RESPONSE WORK PLAN (CHANGE ORDER #4) APPROVED
|
|
2011-12-12
|
213
|
DERF - Interim Action Workplan Received
|
|
REVISED VAPOR MITIGATION RESPONSE WORK PLAN RECEIVED
|
|
2011-12-12
|
112
|
DERF - Change Order Received
|
|
CHANGE ORDER #4 RECEIVED - REVISED VAPOR MITIGATION RESPONSE WORKPLAN
|
|
2011-12-06
|
99
|
Miscellaneous
|
|
TELCON W/CONSULTANT RE VI MITIGATION WP, DO COMMUNICATION TESTING INSTEAD OF INDOOR AIR
|
|
2011-11-28
|
213
|
DERF - Interim Action Workplan Received
|
|
WORKPLAN FOR VAPOR MITIGATION INTERIM RESPONSE
|
|
2011-10-18
|
36
|
Site Investigation Workplan (SIWP) Approved
|
|
CHANGE ORDER #3 APPROVED
|
|
2011-10-10
|
112
|
DERF - Change Order Received
|
|
WORKPLAN (CO #3) FOR VI AND OFF-SITE MWS RECD
|
|
2011-09-26
|
37
|
Site Investigation Report (SIR) Received (non-fee)
|
|
TELCON WITH CONSULTANT ABOUT SIR AND ADDITIONAL WORK NEEDED
|
|
2011-09-12
|
37
|
Site Investigation Report (SIR) Received (non-fee)
|
|
FINAL SUPPLEMENTAL SITE INVESTIGATION REPORT RECEIVED
|
|
2011-09-08
|
130
|
DNR Regulatory Reminder Sent
|
|
Vapor Intrusion (VI) Assessment Notification Ltr Sent
|
|
2011-06-30
|
99
|
Miscellaneous
|
|
CHANGE ORDER #2 APPROVED
|
|
2011-06-28
|
112
|
DERF - Change Order Received
|
|
OFF-SITE GW INVESTIGATION AND CHANGE ORDER #2 RECEIVED
|
|
2011-05-20
|
99
|
Miscellaneous
|
|
PRELIMINARY DATA DROM APRIL 2011 SI REC'D
|
|
2011-04-14
|
43
|
Site Activity Status Update Received
|
|
SAMPLING SCHEDULED FOR APRIL 25-27
|
|
2011-03-28
|
36
|
Site Investigation Workplan (SIWP) Approved
|
|
SUPPLEMENTAL SI WP AND CHANGE ORDER #1 APPROVED
|
|
2011-03-24
|
112
|
DERF - Change Order Received
|
|
SUPPLEMENTAL SI WP AND CHANGE ORDER #1 RECEIVED
|
|
2011-03-14
|
43
|
Site Activity Status Update Received
|
|
PROPOSED SAMPLING LOCATIONS RECEIVED
|
|
2011-02-21
|
99
|
Miscellaneous
|
|
TELCON WITH CONSULTANT ABOUT VI AND ADDITIONAL WORK
|
|
2011-02-10
|
140
|
Site Investigation Report (SIR) Not Approved
|
|
ADDITIONAL SI WORK NEEDED
|
|
2011-01-12
|
37
|
Site Investigation Report (SIR) Received (non-fee)
|
|
|
|
2010-09-21
|
99
|
Miscellaneous
|
|
SI WORK SITE VISIT
|
|
2010-09-09
|
36
|
Site Investigation Workplan (SIWP) Approved
|
|
SIWP APPROVED
|
|
2010-09-07
|
35
|
Site Investigation Workplan (SIWP) Received (non-fee)
|
|
REVISED SI WORKPLAN RECEIVED
|
|
2010-08-23
|
99
|
Miscellaneous
|
|
TELCON TO DISCUSS SIWP
|
|
2010-08-02
|
99
|
Miscellaneous
|
|
STATUS UPDATE REQUESTED AND EXAMPLE RFP LETTER
|
|
2010-08-02
|
35
|
Site Investigation Workplan (SIWP) Received (non-fee)
|
|
SIWP RECEIVED FROM NEWFIELDS
|
|
2010-06-14
|
218
|
DERF - Cost Reimbursement Application Approved
|
|
AUDIT OF 1ST CLAIM (DC-362) COMPLETE, NO REIMBURSEMENT CHECK TO BE SENT, CLAIM LESS THAN DEDUCTIBLE.
|
|
2010-03-23
|
43
|
Site Activity Status Update Received
|
|
RECEIVED SIGNED AGENT AGREEMENT (ZENITH AND UNITED)
|
|
2010-03-23
|
217
|
DERF - Cost Reimbursement Application Received
|
|
1ST (AND ONLY) CLAIM FROM UNITED TO MEET DEDUCTIBLE
|
|
2010-02-10
|
140
|
Site Investigation Report (SIR) Not Approved
|
|
ACKNOWLEDGEMENT OF SI REPORT RECEIVED, ADDITIONAL SI WORK NEEDED
|
|
2010-01-26
|
43
|
Site Activity Status Update Received
|
|
WILL BE SUBMITTING DERF CLAIM FOR PREVIOUS RP'S WORK EFFORT
|
|
2010-01-19
|
43
|
Site Activity Status Update Received
|
|
UNITED LAUNDRIES AND ZENITH LLC SETTLEMENT AGREEMENT IN PROGRESS
|
|
2009-11-30
|
43
|
Site Activity Status Update Received
|
|
RESPONSIBLE PARTY STILL WORKING ON GETTING AGENT AGREEMENT
|
|
2009-10-19
|
99
|
Miscellaneous
|
|
DERF ELIGIBILITY INFO SENT
|
|
2009-10-06
|
99
|
Miscellaneous
|
|
ATTORNEY TELCON ABOUT DERF ELIGIBILITY
|
|
2009-08-20
|
2
|
Responsible Party (RP) letter sent
|
|
RESPONSIBLE PARTY LETTR TO PROPERTY OWNER
|
|
2009-04-09
|
99
|
Miscellaneous
|
|
INQUIRY ABOUT INVESTIGATIVE WASTE DRUMS
|
|
2009-01-26
|
99
|
Miscellaneous
|
|
STATUS UPDATE REQUESTED - AGAIN
|
|
2008-10-30
|
43
|
Site Activity Status Update Received
|
|
WILL HAVE LETTER REGARDING FINANCIAL SITUATION BY NOVEMBER 6
|
|
2008-10-15
|
43
|
Site Activity Status Update Received
|
|
TELCON WITH ATTORNEY REGARDING LACK OF ACTION AT SITE
|
|
2008-09-12
|
99
|
Miscellaneous
|
|
STATUS UPDATE REQUESTED
|
|
2008-07-31
|
99
|
Miscellaneous
|
|
STATUS UPDATE REQUESTED
|
|
2008-03-10
|
99
|
Miscellaneous
|
|
CONSULTANT HAS BEEN SELECTED FOR SI WORK
|
|
2008-01-15
|
99
|
Miscellaneous
|
|
TELCON WITH ATTORNEY REGARDING PROPOSALS
|
|
2007-12-03
|
43
|
Site Activity Status Update Received
|
|
ONE SI BID RECEIVED
|
|
2007-11-30
|
43
|
Site Activity Status Update Received
|
|
THREE SI BIDS RECEIVED
|
|
2007-11-02
|
43
|
Site Activity Status Update Received
|
|
RFPS FOR SI WORK MAILED OUT BY RP
|
|
2007-10-17
|
99
|
Miscellaneous
|
|
REQUEST FOR PROPOSAL NOTICED TO PROCEED
|
|
2007-10-15
|
43
|
Site Activity Status Update Received
|
|
DRAFT REQUEST FOR PROPOSAL RECEIVED
|
|
2007-09-17
|
30
|
Site Investigation Workplan (SIWP) Notice to Proceed (NTP)
|
|
|
|
2007-08-17
|
111
|
DERF - Site Investigation Scoping Report Received
|
|
SCOPING INESTIGATION STATUS REPORT RECEIVED
|
|
2007-01-26
|
99
|
Miscellaneous
|
|
SCOPING PROPOSAL APPROVED
|
|
2007-01-22
|
43
|
Site Activity Status Update Received
|
|
REVISED SCOPING PROPOSAL RECEIVED
|
|
2007-01-04
|
99
|
Miscellaneous
|
|
TELECON WITH CONSULTANT ABOUT SCOPING PLANS
|
|
2006-12-19
|
43
|
Site Activity Status Update Received
|
|
DISCUSS WITH ATTORNEY SCOPING VERSUS SITE INVESTIGATION
|
|
2006-11-07
|
110
|
DERF - Potential Claim Form Approved
|
|
THIS APPROVAL IS BASED ON A SCHEDULE OF PAYMENT IS IN PLACE FOR THE OLD FEES THAT ARE STILL DUE DOR.
|
|
2006-10-24
|
99
|
Miscellaneous
|
|
RP WILL REAPPLY TO DRY CLEANER FUND ELIGIBILITY (AGREEMENT REACHED WITH DOR)
|
|
2006-10-23
|
99
|
Miscellaneous
|
|
STATUS UPDATE REQUESTED
|
|
2006-07-06
|
43
|
Site Activity Status Update Received
|
|
WILL APPLY FOR DERF WEEK OF JULY 10TH
|
|
2006-05-22
|
99
|
Miscellaneous
|
|
PROPOSAL FOR SCOPING ACTIVITIES
|
|
2006-05-15
|
99
|
Miscellaneous
|
|
EXTENSION GRANTED FOR WP SUBMITTAL
|
|
2006-05-01
|
43
|
Site Activity Status Update Received
|
|
CONSULTANT HIRED, WILL SEEK DERF PROGRAM ASSISTANCE
|
|
2006-03-21
|
99
|
Miscellaneous
|
|
OFF-SITE LETTER ISSUED TO PARKVIEW HAVEN APARTMENTS BRRTS 07-36-545011
|
|
2006-03-17
|
2
|
Responsible Party (RP) letter sent
|
|
SITE ASSESSMENT REPORT
|
|
2006-03-16
|
99
|
Miscellaneous
|
|
TELCON W/RP
|
|
2006-03-16
|
43
|
Site Activity Status Update Received
|
|
UPDATE ON (IN)ABILITY TO PROCEED WITH SI
|
|
2006-02-03
|
43
|
Site Activity Status Update Received
|
|
GROUNDWATER & SOIL RESULTS (VERBAL) FROM OFF-SITE PHASE II
|
|
2005-11-15
|
2
|
Responsible Party (RP) letter sent
|
|
PRP LETTER TO UNITED CLEANERS
|
|
2005-11-08
|
1
|
Notification of Hazardous Substance Discharge
|
|
SITE ASSESSMENT 10/18/2005
|