River Grant
River Protection Grant
RM06116
2016
Complete
Hunting River Project Before and After
PHOTO
PHOTO
The Hunting River at Fitzgerald Dam Road has been identified as a high priority fish passage barrier for many years. It is a pleasure to report that after many years of cooperative efforts between the Town of Elcho, Langlade County Land Conservation Department (LCD), Department of Agriculture Trade & Consumer Protection (DATCP), Department of Natural Resources (DNR), and Trout Unlimited (TU), aquatic connectivity of the Hunting River System has been restored. This resulted in significant environmental benefits to the Hunting River and delivered a long-lived, low maintenance, flood resilient road crossing for the Town of Elcho.
Grant Awarded
The Town of Elcho is sponsoring a project to restore aquatic connectivity to the Hunting River. Project final deliverables include: Post construction monitoring would occur to document changes in water levels and flows after the new road crossing is installed. Success would be documented in part by comparing the water velocities, flow characteristics, and riverbed composition at the new road crossing to make sure they match the conditions in the natural river channel at a natural reference reach beyond the influence of the road. A stream and water elevation profile would also be tied to the local benchmarks to document the elimination of the impounding condition as well as culvert perch to allow for reestablishment of natural channel morphology and sediment transport. Instream water monitoring device data would also be evaluated to document any changes in upstream water temperatures. Specific project activities include: To design a road stream crossing that will meet the deliverables above and to replace the current culverts with an adequately sized and set road crossing during the 2016 field season.
Restore Hydrology, Morphology
The Town of Elcho is sponsoring a project to restore aquatic connectivity to the Hunting River. Project final deliverables include: Post construction monitoring would occur to document changes in water levels and flows after the new road crossing is installed. Success would be documented in part by comparing the water velocities, flow characteristics, and riverbed composition at the new road crossing to make sure they match the conditions in the natural river channel at a natural reference reach beyond the influence of the road. A stream and water elevation profile would also be tied to the local benchmarks to document the elimination of the impounding condition as well as culvert perch to allow for reestablishment of natural channel morphology and sediment transport. Instream water monitoring device data would also be evaluated to document any changes in upstream water temperatures. Specific project activities include: To design a road stream crossing that will meet the deliverables above and to replace the current culverts with an adequately sized and set road crossing during the 2016 field season.
Habitat Restoration - Instream
The Town of Elcho is sponsoring a project to restore aquatic connectivity to the Hunting River. Project final deliverables include: Post construction monitoring would occur to document changes in water levels and flows after the new road crossing is installed. Success would be documented in part by comparing the water velocities, flow characteristics, and riverbed composition at the new road crossing to make sure they match the conditions in the natural river channel at a natural reference reach beyond the influence of the road. A stream and water elevation profile would also be tied to the local benchmarks to document the elimination of the impounding condition as well as culvert perch to allow for reestablishment of natural channel morphology and sediment transport. Instream water monitoring device data would also be evaluated to document any changes in upstream water temperatures. Specific project activities include: To design a road stream crossing that will meet the deliverables above and to replace the current culverts with an adequately sized and set road crossing during the 2016 field season.
Restore Hydrology, Morphology
The Town of Elcho is sponsoring a project to restore aquatic connectivity to the Hunting River. Project final deliverables include: Post construction monitoring would occur to document changes in water levels and flows after the new road crossing is installed. Success would be documented in part by comparing the water velocities, flow characteristics, and riverbed composition at the new road crossing to make sure they match the conditions in the natural river channel at a natural reference reach beyond the influence of the road. A stream and water elevation profile would also be tied to the local benchmarks to document the elimination of the impounding condition as well as culvert perch to allow for reestablishment of natural channel morphology and sediment transport. Instream water monitoring device data would also be evaluated to document any changes in upstream water temperatures. Specific project activities include: To design a road stream crossing that will meet the deliverables above and to replace the current culverts with an adequately sized and set road crossing during the 2016 field season.