Aquatic Invasives Grant
Aquatic Invasives Education
AEPP55018
2018
Complete
Several Facebook posts; Lake Level Monitoring article in Lake Tides
2015-2018 water quality data.
This project was designed to systematically conduct studies on 12 lakes within the township over the course of four years, with two to four lakes being studied each year (Table 1 and Map 1). Developing management plans for subsets of lakes within the town each year allows for financial savings to be realized in overall project costs while creating a manageable process that allows for sufficient attention to be applied to each lakes needs. This is opposed to completing all plans simultaneously, which would facilitate great cost savings, but only produce generic plans for each lake and the town as a whole. Financial assistance was obtained through the Wisconsin Department of Natural Resources (WDNR) Lake Management Grant Program for each phase of the project. [File split into two documents due to file size.]
This project was designed to systematically conduct studies on 12 lakes within the township over the course of four years, with two to four lakes being studied each year (Table 1 and Map 1). Developing management plans for subsets of lakes within the town each year allows for financial savings to be realized in overall project costs while creating a manageable process that allows for sufficient attention to be applied to each lakes needs. This is opposed to completing all plans simultaneously, which would facilitate great cost savings, but only produce generic plans for each lake and the town as a whole. Financial assistance was obtained through the Wisconsin Department of Natural Resources (WDNR) Lake Management Grant Program for each phase of the project. [File split into two documents due to file size.]
NLDC reporting for Wisconsin Department of Natural Resources, AEPP-550-18 Town of Winchester Lake Management Planning Project Phase 4: Circle Lily, Pardee, Helen, and Adelaide Lakes; Activities from September 1, 2020 through December 31, 2020
June 2016- May 2019 WiLMS results
2015-2018 Town of Winchester Lakes Stakeholder Survey.
PI plant survey data 2015-2017
Public Participation materials. July 2015- May 2017. [Document was split into two files due to size.]
Public Participation materials. July 2015- May 2017. [Document was split into two files due to size.]
Grant Awarded
Grant AEPP55018 awarded