Watershed - Manitowish River (UC16)
Manitowish River Watershed

Details

The Manitowish River Watershed lies in the northeastern-most tip of the Upper Chippewa River Basin. and is almost completely contained within the Northern Highland American Legion State Forest. The region is mostly forest and wetlands. The Manitowish River originates in wetland areas of central Vilas County, then runs through several lakes before it joins with the Bear River to form the Flambeau River. The communities in the watershed: Boulder Junction, Manitowish Waters, and Manitowish, are all located along the Manitowish River. though none are known to threaten water quality. The major lakes the river flows through are: Boulder, Island, Spider, Stone, and Rest Lakes. Boulder Lake is under a fish advisory for mercury contamination of walleye.

Date  1996

Ecological Landscapes for Manitowish River Watershed

Ecological Landscapes

The Manitowish River Watershed lies primarily in the Northern Highlands Ecological Landscape which is located in northern central Wisconsin. It is known for its pitted outwash plains and kettle lakes mixed with extensive forests and large peatlands. Its landforms are characterized mainly by pitted outwash but also contain some coarse-textured moraines. Soils are acidic and relatively unproductive due to low moisture-holding capacity and lack of organic matter. Historically, this was Wisconsin's greatest pinery. White and red pine forests largely dominated the vegetation, with some smaller pockets of jack pine. On the more mesic soils, hemlock-hardwood forests were common. Aspen-birch forests occurred in openings formed by disturbance events such as wind or fire. Current forest vegetation is primarily aspen, with some white, red and jack pine in both natural and plantation form. Northern hardwood forests, though reduced in extent, still occur on the more mesic soils. Lowland conifer occupies the many peatlands that are scattered throughout the Ecological Landscape.

Date  2010

Watershed Documents
Watershed Grants
Grant Details
Aquatic Invasives Control
Date
4/15/2015
Waters Involved
Alder Lake
Status
Complete

North Lakeland Discovery Center: Manitowish Waters Chain Ais Control & Prevention Project: North Lakeland Discovery Center is sponsoring an ACEI grant project which will focus on surveying, mapping and controlling CLP and PL in the Manitowish Chain, Vilas County.

Project activities include: 1) Conduct pre/post treatment surveys; 2) Herbicide, biological and hand removal management; 3) Conduct herbicide concentration monitoring; 4) Conduct wild rice surveys and develop maps; 5) Develop treatment reports.

Project deliverables include: 1) Aquatic plant survey data and maps; 2) Treatment reports.

Specific conditions for this project: Treatment reports need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of treatment reports, all maps, and all aquatic plant and GIS data.


Grant Details
Aquatic Invasives Control
Date
3/15/2023
Waters Involved
Fawn Lake
Status
Complete

North Lakeland Discovery Center: Manitowish Waters Chain Of Lakes Clp Control: Manitowish Waters Chain of Lakes CLP Control. Conduct curly-leaf pondweed Population Control on the Manitowish Waters Chain of Lakes using Hand-Harvesting and Herbicide Spot Treatments. Control Existing and Prevent Further Aquatic Invasive Species Establishment within the Manitowish Waters Chain of Lakes. Expand Awareness and Education of Lake Management and Stewardship Matters


Project final deliverables include:

(1) Summarized annual report.
(2) Monitor and collect baseline data to detect ecological change.
(3) Total CLP removed and future recommendations.


Specific project activities include:

(1) Locate populations of CLP and perform hand-harvesting and DASH for CLP.
(2) Assess current CLP population utilizing an Early Season AIS (ESAIS).
(3) Expand Awareness and Education of Lake Management and Stewardship Matters.
(4) Herbicide spot treatments.



Special Conditions: DNR is to receive copies of the final report along with, or prior to submission of grantee's final payment request. It is recommended that Grantee provide DNR Lake Coordinator with a draft of the final report for comment on report adequacy prior to making final payment to the consultant.

It is strongly recommended that an annual management strategy meeting be held each winter with DNR to discuss EWM management for the next year before aquatic plant management permit applications are submitted.




This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.



Grant Details
Aquatic Invasives Control
Date
10/1/2008
Waters Involved
Gresham Creek
Status
Complete

Gresham Lakes Association, Inc.: Gresham Lakes Ais Control And Prevention Project: Gresham Lakes Association, Inc. is sponsoring an AIS ACEI grant on Gresham Lakes in Vilas County. This four year project will focus on EWM management, and AIS education, prevention and monitoring. The goal is to reduce the treatable EWM to less than 8 acres and have a density rating below D=1. This will allow the Gresham Lakes Association to continue management of AIS with minimal state financial assistance.

Project activities include: 1) Annual chemical treatments of EWM; 2) Volunteer hand removal of isolated EWM plants; 3) Annual Pre and Post treatment monitoring and analysis; 4) Annual volunteer AIS monitoring; 5) Recruit volunteers and implement a CB/CW program; 6) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 7) Develop annual project report and a final report.

Project deliverables include: 1) Chemical and hand removal control of EWM; 2) Pre and post treatment survey data; 3) Completed entry of inspection 3200-120 and monitoring forms onto Dept website; 4) AIS educational, prevention and monitoring activities; 5) A minimum of 80 volunteer hours of monitoring and 400 hours of CB/CW; 6) Final report summarizing EWM management during project and future EWM management suggestions, CB/CW activities, AIS monitoring and AIS educational activities.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, all annual reports, pre and post treatment survey data, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Control
Date
3/15/2023
Waters Involved
Island Creek
Status
Complete

North Lakeland Discovery Center: Manitowish Waters Chain Of Lakes Clp Control: Manitowish Waters Chain of Lakes CLP Control. Conduct curly-leaf pondweed Population Control on the Manitowish Waters Chain of Lakes using Hand-Harvesting and Herbicide Spot Treatments. Control Existing and Prevent Further Aquatic Invasive Species Establishment within the Manitowish Waters Chain of Lakes. Expand Awareness and Education of Lake Management and Stewardship Matters


Project final deliverables include:

(1) Summarized annual report.
(2) Monitor and collect baseline data to detect ecological change.
(3) Total CLP removed and future recommendations.


Specific project activities include:

(1) Locate populations of CLP and perform hand-harvesting and DASH for CLP.
(2) Assess current CLP population utilizing an Early Season AIS (ESAIS).
(3) Expand Awareness and Education of Lake Management and Stewardship Matters.
(4) Herbicide spot treatments.



Special Conditions: DNR is to receive copies of the final report along with, or prior to submission of grantee's final payment request. It is recommended that Grantee provide DNR Lake Coordinator with a draft of the final report for comment on report adequacy prior to making final payment to the consultant.

It is strongly recommended that an annual management strategy meeting be held each winter with DNR to discuss EWM management for the next year before aquatic plant management permit applications are submitted.




This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.



Grant Details
Aquatic Invasives Control
Date
3/15/2023
Waters Involved
Island Lake
Status
Complete

North Lakeland Discovery Center: Manitowish Waters Chain Of Lakes Clp Control: Manitowish Waters Chain of Lakes CLP Control. Conduct curly-leaf pondweed Population Control on the Manitowish Waters Chain of Lakes using Hand-Harvesting and Herbicide Spot Treatments. Control Existing and Prevent Further Aquatic Invasive Species Establishment within the Manitowish Waters Chain of Lakes. Expand Awareness and Education of Lake Management and Stewardship Matters


Project final deliverables include:

(1) Summarized annual report.
(2) Monitor and collect baseline data to detect ecological change.
(3) Total CLP removed and future recommendations.


Specific project activities include:

(1) Locate populations of CLP and perform hand-harvesting and DASH for CLP.
(2) Assess current CLP population utilizing an Early Season AIS (ESAIS).
(3) Expand Awareness and Education of Lake Management and Stewardship Matters.
(4) Herbicide spot treatments.



Special Conditions: DNR is to receive copies of the final report along with, or prior to submission of grantee's final payment request. It is recommended that Grantee provide DNR Lake Coordinator with a draft of the final report for comment on report adequacy prior to making final payment to the consultant.

It is strongly recommended that an annual management strategy meeting be held each winter with DNR to discuss EWM management for the next year before aquatic plant management permit applications are submitted.




This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.



Grant Details
Aquatic Invasives Control
Date
4/15/2015
Waters Involved
Little Star Lake
Status
Complete

North Lakeland Discovery Center: Manitowish Waters Chain Ais Control & Prevention Project: North Lakeland Discovery Center is sponsoring an ACEI grant project which will focus on surveying, mapping and controlling CLP and PL in the Manitowish Chain, Vilas County.

Project activities include: 1) Conduct pre/post treatment surveys; 2) Herbicide, biological and hand removal management; 3) Conduct herbicide concentration monitoring; 4) Conduct wild rice surveys and develop maps; 5) Develop treatment reports.

Project deliverables include: 1) Aquatic plant survey data and maps; 2) Treatment reports.

Specific conditions for this project: Treatment reports need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of treatment reports, all maps, and all aquatic plant and GIS data.


Grant Details
Aquatic Invasives Control
Date
10/1/2008
Waters Involved
Lower Gresham Lake
Status
Complete

Gresham Lakes Association, Inc.: Gresham Lakes Ais Control And Prevention Project: Gresham Lakes Association, Inc. is sponsoring an AIS ACEI grant on Gresham Lakes in Vilas County. This four year project will focus on EWM management, and AIS education, prevention and monitoring. The goal is to reduce the treatable EWM to less than 8 acres and have a density rating below D=1. This will allow the Gresham Lakes Association to continue management of AIS with minimal state financial assistance.

Project activities include: 1) Annual chemical treatments of EWM; 2) Volunteer hand removal of isolated EWM plants; 3) Annual Pre and Post treatment monitoring and analysis; 4) Annual volunteer AIS monitoring; 5) Recruit volunteers and implement a CB/CW program; 6) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 7) Develop annual project report and a final report.

Project deliverables include: 1) Chemical and hand removal control of EWM; 2) Pre and post treatment survey data; 3) Completed entry of inspection 3200-120 and monitoring forms onto Dept website; 4) AIS educational, prevention and monitoring activities; 5) A minimum of 80 volunteer hours of monitoring and 400 hours of CB/CW; 6) Final report summarizing EWM management during project and future EWM management suggestions, CB/CW activities, AIS monitoring and AIS educational activities.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, all annual reports, pre and post treatment survey data, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Control
Date
4/15/2015
Waters Involved
Manitowish Lake
Status
Complete

North Lakeland Discovery Center: Manitowish Waters Chain Ais Control & Prevention Project: North Lakeland Discovery Center is sponsoring an ACEI grant project which will focus on surveying, mapping and controlling CLP and PL in the Manitowish Chain, Vilas County.

Project activities include: 1) Conduct pre/post treatment surveys; 2) Herbicide, biological and hand removal management; 3) Conduct herbicide concentration monitoring; 4) Conduct wild rice surveys and develop maps; 5) Develop treatment reports.

Project deliverables include: 1) Aquatic plant survey data and maps; 2) Treatment reports.

Specific conditions for this project: Treatment reports need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of treatment reports, all maps, and all aquatic plant and GIS data.


Grant Details
Aquatic Invasives Control
Date
4/15/2015
Waters Involved
Manitowish River
Status
Complete

North Lakeland Discovery Center: Manitowish Waters Chain Ais Control & Prevention Project: North Lakeland Discovery Center is sponsoring an ACEI grant project which will focus on surveying, mapping and controlling CLP and PL in the Manitowish Chain, Vilas County.

Project activities include: 1) Conduct pre/post treatment surveys; 2) Herbicide, biological and hand removal management; 3) Conduct herbicide concentration monitoring; 4) Conduct wild rice surveys and develop maps; 5) Develop treatment reports.

Project deliverables include: 1) Aquatic plant survey data and maps; 2) Treatment reports.

Specific conditions for this project: Treatment reports need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of treatment reports, all maps, and all aquatic plant and GIS data.


Grant Details
Aquatic Invasives Control
Date
3/15/2023
Waters Involved
Manitowish River
Status
Complete

North Lakeland Discovery Center: Manitowish Waters Chain Of Lakes Clp Control: Manitowish Waters Chain of Lakes CLP Control. Conduct curly-leaf pondweed Population Control on the Manitowish Waters Chain of Lakes using Hand-Harvesting and Herbicide Spot Treatments. Control Existing and Prevent Further Aquatic Invasive Species Establishment within the Manitowish Waters Chain of Lakes. Expand Awareness and Education of Lake Management and Stewardship Matters


Project final deliverables include:

(1) Summarized annual report.
(2) Monitor and collect baseline data to detect ecological change.
(3) Total CLP removed and future recommendations.


Specific project activities include:

(1) Locate populations of CLP and perform hand-harvesting and DASH for CLP.
(2) Assess current CLP population utilizing an Early Season AIS (ESAIS).
(3) Expand Awareness and Education of Lake Management and Stewardship Matters.
(4) Herbicide spot treatments.



Special Conditions: DNR is to receive copies of the final report along with, or prior to submission of grantee's final payment request. It is recommended that Grantee provide DNR Lake Coordinator with a draft of the final report for comment on report adequacy prior to making final payment to the consultant.

It is strongly recommended that an annual management strategy meeting be held each winter with DNR to discuss EWM management for the next year before aquatic plant management permit applications are submitted.




This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.



Grant Details
Aquatic Invasives Control
Date
10/1/2008
Waters Involved
Middle Gresham Lake
Status
Complete

Gresham Lakes Association, Inc.: Gresham Lakes Ais Control And Prevention Project: Gresham Lakes Association, Inc. is sponsoring an AIS ACEI grant on Gresham Lakes in Vilas County. This four year project will focus on EWM management, and AIS education, prevention and monitoring. The goal is to reduce the treatable EWM to less than 8 acres and have a density rating below D=1. This will allow the Gresham Lakes Association to continue management of AIS with minimal state financial assistance.

Project activities include: 1) Annual chemical treatments of EWM; 2) Volunteer hand removal of isolated EWM plants; 3) Annual Pre and Post treatment monitoring and analysis; 4) Annual volunteer AIS monitoring; 5) Recruit volunteers and implement a CB/CW program; 6) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 7) Develop annual project report and a final report.

Project deliverables include: 1) Chemical and hand removal control of EWM; 2) Pre and post treatment survey data; 3) Completed entry of inspection 3200-120 and monitoring forms onto Dept website; 4) AIS educational, prevention and monitoring activities; 5) A minimum of 80 volunteer hours of monitoring and 400 hours of CB/CW; 6) Final report summarizing EWM management during project and future EWM management suggestions, CB/CW activities, AIS monitoring and AIS educational activities.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, all annual reports, pre and post treatment survey data, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Control
Date
3/15/2023
Waters Involved
Papoose Creek
Status
Complete

North Lakeland Discovery Center: Manitowish Waters Chain Of Lakes Clp Control: Manitowish Waters Chain of Lakes CLP Control. Conduct curly-leaf pondweed Population Control on the Manitowish Waters Chain of Lakes using Hand-Harvesting and Herbicide Spot Treatments. Control Existing and Prevent Further Aquatic Invasive Species Establishment within the Manitowish Waters Chain of Lakes. Expand Awareness and Education of Lake Management and Stewardship Matters


Project final deliverables include:

(1) Summarized annual report.
(2) Monitor and collect baseline data to detect ecological change.
(3) Total CLP removed and future recommendations.


Specific project activities include:

(1) Locate populations of CLP and perform hand-harvesting and DASH for CLP.
(2) Assess current CLP population utilizing an Early Season AIS (ESAIS).
(3) Expand Awareness and Education of Lake Management and Stewardship Matters.
(4) Herbicide spot treatments.



Special Conditions: DNR is to receive copies of the final report along with, or prior to submission of grantee's final payment request. It is recommended that Grantee provide DNR Lake Coordinator with a draft of the final report for comment on report adequacy prior to making final payment to the consultant.

It is strongly recommended that an annual management strategy meeting be held each winter with DNR to discuss EWM management for the next year before aquatic plant management permit applications are submitted.




This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.



Grant Details
Aquatic Invasives Control
Date
3/15/2023
Waters Involved
Rest Lake
Status
Complete

North Lakeland Discovery Center: Manitowish Waters Chain Of Lakes Clp Control: Manitowish Waters Chain of Lakes CLP Control. Conduct curly-leaf pondweed Population Control on the Manitowish Waters Chain of Lakes using Hand-Harvesting and Herbicide Spot Treatments. Control Existing and Prevent Further Aquatic Invasive Species Establishment within the Manitowish Waters Chain of Lakes. Expand Awareness and Education of Lake Management and Stewardship Matters


Project final deliverables include:

(1) Summarized annual report.
(2) Monitor and collect baseline data to detect ecological change.
(3) Total CLP removed and future recommendations.


Specific project activities include:

(1) Locate populations of CLP and perform hand-harvesting and DASH for CLP.
(2) Assess current CLP population utilizing an Early Season AIS (ESAIS).
(3) Expand Awareness and Education of Lake Management and Stewardship Matters.
(4) Herbicide spot treatments.



Special Conditions: DNR is to receive copies of the final report along with, or prior to submission of grantee's final payment request. It is recommended that Grantee provide DNR Lake Coordinator with a draft of the final report for comment on report adequacy prior to making final payment to the consultant.

It is strongly recommended that an annual management strategy meeting be held each winter with DNR to discuss EWM management for the next year before aquatic plant management permit applications are submitted.




This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.



Grant Details
Aquatic Invasives Control
Date
3/15/2023
Waters Involved
Rice Creek
Status
Complete

North Lakeland Discovery Center: Manitowish Waters Chain Of Lakes Clp Control: Manitowish Waters Chain of Lakes CLP Control. Conduct curly-leaf pondweed Population Control on the Manitowish Waters Chain of Lakes using Hand-Harvesting and Herbicide Spot Treatments. Control Existing and Prevent Further Aquatic Invasive Species Establishment within the Manitowish Waters Chain of Lakes. Expand Awareness and Education of Lake Management and Stewardship Matters


Project final deliverables include:

(1) Summarized annual report.
(2) Monitor and collect baseline data to detect ecological change.
(3) Total CLP removed and future recommendations.


Specific project activities include:

(1) Locate populations of CLP and perform hand-harvesting and DASH for CLP.
(2) Assess current CLP population utilizing an Early Season AIS (ESAIS).
(3) Expand Awareness and Education of Lake Management and Stewardship Matters.
(4) Herbicide spot treatments.



Special Conditions: DNR is to receive copies of the final report along with, or prior to submission of grantee's final payment request. It is recommended that Grantee provide DNR Lake Coordinator with a draft of the final report for comment on report adequacy prior to making final payment to the consultant.

It is strongly recommended that an annual management strategy meeting be held each winter with DNR to discuss EWM management for the next year before aquatic plant management permit applications are submitted.




This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.



Grant Details
Aquatic Invasives Control
Date
4/15/2015
Waters Involved
Spider Lake
Status
Complete

North Lakeland Discovery Center: Manitowish Waters Chain Ais Control & Prevention Project: North Lakeland Discovery Center is sponsoring an ACEI grant project which will focus on surveying, mapping and controlling CLP and PL in the Manitowish Chain, Vilas County.

Project activities include: 1) Conduct pre/post treatment surveys; 2) Herbicide, biological and hand removal management; 3) Conduct herbicide concentration monitoring; 4) Conduct wild rice surveys and develop maps; 5) Develop treatment reports.

Project deliverables include: 1) Aquatic plant survey data and maps; 2) Treatment reports.

Specific conditions for this project: Treatment reports need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of treatment reports, all maps, and all aquatic plant and GIS data.


Grant Details
Aquatic Invasives Control
Date
3/15/2023
Waters Involved
Spider Lake
Status
Complete

North Lakeland Discovery Center: Manitowish Waters Chain Of Lakes Clp Control: Manitowish Waters Chain of Lakes CLP Control. Conduct curly-leaf pondweed Population Control on the Manitowish Waters Chain of Lakes using Hand-Harvesting and Herbicide Spot Treatments. Control Existing and Prevent Further Aquatic Invasive Species Establishment within the Manitowish Waters Chain of Lakes. Expand Awareness and Education of Lake Management and Stewardship Matters


Project final deliverables include:

(1) Summarized annual report.
(2) Monitor and collect baseline data to detect ecological change.
(3) Total CLP removed and future recommendations.


Specific project activities include:

(1) Locate populations of CLP and perform hand-harvesting and DASH for CLP.
(2) Assess current CLP population utilizing an Early Season AIS (ESAIS).
(3) Expand Awareness and Education of Lake Management and Stewardship Matters.
(4) Herbicide spot treatments.



Special Conditions: DNR is to receive copies of the final report along with, or prior to submission of grantee's final payment request. It is recommended that Grantee provide DNR Lake Coordinator with a draft of the final report for comment on report adequacy prior to making final payment to the consultant.

It is strongly recommended that an annual management strategy meeting be held each winter with DNR to discuss EWM management for the next year before aquatic plant management permit applications are submitted.




This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.



Grant Details
Aquatic Invasives Control
Date
3/15/2023
Waters Involved
Stone Lake
Status
Complete

North Lakeland Discovery Center: Manitowish Waters Chain Of Lakes Clp Control: Manitowish Waters Chain of Lakes CLP Control. Conduct curly-leaf pondweed Population Control on the Manitowish Waters Chain of Lakes using Hand-Harvesting and Herbicide Spot Treatments. Control Existing and Prevent Further Aquatic Invasive Species Establishment within the Manitowish Waters Chain of Lakes. Expand Awareness and Education of Lake Management and Stewardship Matters


Project final deliverables include:

(1) Summarized annual report.
(2) Monitor and collect baseline data to detect ecological change.
(3) Total CLP removed and future recommendations.


Specific project activities include:

(1) Locate populations of CLP and perform hand-harvesting and DASH for CLP.
(2) Assess current CLP population utilizing an Early Season AIS (ESAIS).
(3) Expand Awareness and Education of Lake Management and Stewardship Matters.
(4) Herbicide spot treatments.



Special Conditions: DNR is to receive copies of the final report along with, or prior to submission of grantee's final payment request. It is recommended that Grantee provide DNR Lake Coordinator with a draft of the final report for comment on report adequacy prior to making final payment to the consultant.

It is strongly recommended that an annual management strategy meeting be held each winter with DNR to discuss EWM management for the next year before aquatic plant management permit applications are submitted.




This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.



Grant Details
Aquatic Invasives Control
Date
4/15/2015
Waters Involved
Trout River
Status
Complete

North Lakeland Discovery Center: Manitowish Waters Chain Ais Control & Prevention Project: North Lakeland Discovery Center is sponsoring an ACEI grant project which will focus on surveying, mapping and controlling CLP and PL in the Manitowish Chain, Vilas County.

Project activities include: 1) Conduct pre/post treatment surveys; 2) Herbicide, biological and hand removal management; 3) Conduct herbicide concentration monitoring; 4) Conduct wild rice surveys and develop maps; 5) Develop treatment reports.

Project deliverables include: 1) Aquatic plant survey data and maps; 2) Treatment reports.

Specific conditions for this project: Treatment reports need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of treatment reports, all maps, and all aquatic plant and GIS data.


Grant Details
Aquatic Invasives Control
Date
3/15/2023
Waters Involved
Trout River
Status
Complete

North Lakeland Discovery Center: Manitowish Waters Chain Of Lakes Clp Control: Manitowish Waters Chain of Lakes CLP Control. Conduct curly-leaf pondweed Population Control on the Manitowish Waters Chain of Lakes using Hand-Harvesting and Herbicide Spot Treatments. Control Existing and Prevent Further Aquatic Invasive Species Establishment within the Manitowish Waters Chain of Lakes. Expand Awareness and Education of Lake Management and Stewardship Matters


Project final deliverables include:

(1) Summarized annual report.
(2) Monitor and collect baseline data to detect ecological change.
(3) Total CLP removed and future recommendations.


Specific project activities include:

(1) Locate populations of CLP and perform hand-harvesting and DASH for CLP.
(2) Assess current CLP population utilizing an Early Season AIS (ESAIS).
(3) Expand Awareness and Education of Lake Management and Stewardship Matters.
(4) Herbicide spot treatments.



Special Conditions: DNR is to receive copies of the final report along with, or prior to submission of grantee's final payment request. It is recommended that Grantee provide DNR Lake Coordinator with a draft of the final report for comment on report adequacy prior to making final payment to the consultant.

It is strongly recommended that an annual management strategy meeting be held each winter with DNR to discuss EWM management for the next year before aquatic plant management permit applications are submitted.




This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.



Grant Details
Aquatic Invasives Control
Date
3/15/2023
Waters Involved
Unnamed
Status
Complete

North Lakeland Discovery Center: Manitowish Waters Chain Of Lakes Clp Control: Manitowish Waters Chain of Lakes CLP Control. Conduct curly-leaf pondweed Population Control on the Manitowish Waters Chain of Lakes using Hand-Harvesting and Herbicide Spot Treatments. Control Existing and Prevent Further Aquatic Invasive Species Establishment within the Manitowish Waters Chain of Lakes. Expand Awareness and Education of Lake Management and Stewardship Matters


Project final deliverables include:

(1) Summarized annual report.
(2) Monitor and collect baseline data to detect ecological change.
(3) Total CLP removed and future recommendations.


Specific project activities include:

(1) Locate populations of CLP and perform hand-harvesting and DASH for CLP.
(2) Assess current CLP population utilizing an Early Season AIS (ESAIS).
(3) Expand Awareness and Education of Lake Management and Stewardship Matters.
(4) Herbicide spot treatments.



Special Conditions: DNR is to receive copies of the final report along with, or prior to submission of grantee's final payment request. It is recommended that Grantee provide DNR Lake Coordinator with a draft of the final report for comment on report adequacy prior to making final payment to the consultant.

It is strongly recommended that an annual management strategy meeting be held each winter with DNR to discuss EWM management for the next year before aquatic plant management permit applications are submitted.




This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.



Grant Details
Aquatic Invasives Control
Date
10/1/2008
Waters Involved
Upper Gresham Lake
Status
Complete

Gresham Lakes Association, Inc.: Gresham Lakes Ais Control And Prevention Project: Gresham Lakes Association, Inc. is sponsoring an AIS ACEI grant on Gresham Lakes in Vilas County. This four year project will focus on EWM management, and AIS education, prevention and monitoring. The goal is to reduce the treatable EWM to less than 8 acres and have a density rating below D=1. This will allow the Gresham Lakes Association to continue management of AIS with minimal state financial assistance.

Project activities include: 1) Annual chemical treatments of EWM; 2) Volunteer hand removal of isolated EWM plants; 3) Annual Pre and Post treatment monitoring and analysis; 4) Annual volunteer AIS monitoring; 5) Recruit volunteers and implement a CB/CW program; 6) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 7) Develop annual project report and a final report.

Project deliverables include: 1) Chemical and hand removal control of EWM; 2) Pre and post treatment survey data; 3) Completed entry of inspection 3200-120 and monitoring forms onto Dept website; 4) AIS educational, prevention and monitoring activities; 5) A minimum of 80 volunteer hours of monitoring and 400 hours of CB/CW; 6) Final report summarizing EWM management during project and future EWM management suggestions, CB/CW activities, AIS monitoring and AIS educational activities.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, all annual reports, pre and post treatment survey data, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Control
Date
3/15/2022
Waters Involved
Upper Gresham Lake
Status
Complete

Gresham Lakes Association, Inc.: 2021-2022 Ewm Management & Monitoring Project: Gresham Lakes Association, Inc. is sponsoring a small scale population control grant for Eurasian water milfoil control in 2022 on Upper Gresham Lake. the Grant will focus on chemical control utilizing ProcellaCOR and pre/post treatment monitoring.

Specific project activities include: 1) pretreatment surveys and dosing strategy, 2) pre/post treatment sub PI sampling, 3) herbicide concentration monitoring and shipping of samples to EPL lab, 4) general project communications, 5) late season EWM mapping survey

Project final deliverables include: 1) pre and post treatment surveys including EWM mapping surveys and sub PI surveys, 2) annual AIS Monitoring and Control Strategy Assessment Report, 3) raw data from surveys and mapping


Specific conditions: 1) department shall be provided copies of raw data and GIS information for the approved surveys being conducted, 2) any reports would need department review prior to approval and reimbursement

The specific objectives, activities, metrics, and deliverables for the listed activities are explicated in the application and supporting materials. This scope summarized proposed work but does not replace or supersede the information presented in those documents.


Grant Details
Aquatic Invasives Early Detection and Response
Date
7/1/2012
Waters Involved
Island Creek
Status
Complete

North Lakeland Discovery Center: Manitowish Chain Of Lakes Edr Project - Phase 2: North Lakeland Discovery Center is sponsoring an Early Detection & Response project focusing on surveying, mapping and controlling CLP in Stone Lake, Island Lake, Spider Lake, and Rice Creek, Vilas County.

Project activities include: 1) Conduct pre/post treatment and peak-biomass surveys; 2) Control CLP by chemical treatments and volunteer hand removal; 3) Conduct volunteer herbicide concentration monitoring; 4) Conduct wild rice surveys and develop maps; 5) Develop letter reports.

Project deliverables include: 1) Aquatic plant survey data and maps; 2) Annual letter report describing the findings of the pre/post treatment and peak-biomass surveys and guidance for continued control actions.

Specific conditions for this project: Annual letter report needs Department review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of letter reports, all maps, and all aquatic plant and GIS data.


Grant Details
Aquatic Invasives Early Detection and Response
Date
7/1/2011
Waters Involved
Island Lake
Status
Complete

North Lakeland Discovery Center: Manitowish Chain Of Lakes Edr Project - Phase 1: North Lakeland Discovery Center is sponsoring an AIRR project which will focus on surveying and mapping CLP and managing up to 27 acres of CLP in Island Lake, Spider Lake, and Rice Creek, Vilas County.

Project activities include: 1) Conduct pre/post treatment and peak-biomass surveys; 2) Control CLP by chemical treatments; 3) Develop letter reports.

Project deliverables include: 1) Aquatic plant survey data and maps; 2) Annual letter report describing the findings of the pre/post treatment and peak-biomass surveys and guidance for continued control actions.

Specific conditions for this project: Annual letter report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of letter reports, all maps, and all aquatic plant and GIS data.


Grant Details
Aquatic Invasives Early Detection and Response
Date
7/1/2012
Waters Involved
Island Lake
Status
Complete

North Lakeland Discovery Center: Manitowish Chain Of Lakes Edr Project - Phase 2: North Lakeland Discovery Center is sponsoring an Early Detection & Response project focusing on surveying, mapping and controlling CLP in Stone Lake, Island Lake, Spider Lake, and Rice Creek, Vilas County.

Project activities include: 1) Conduct pre/post treatment and peak-biomass surveys; 2) Control CLP by chemical treatments and volunteer hand removal; 3) Conduct volunteer herbicide concentration monitoring; 4) Conduct wild rice surveys and develop maps; 5) Develop letter reports.

Project deliverables include: 1) Aquatic plant survey data and maps; 2) Annual letter report describing the findings of the pre/post treatment and peak-biomass surveys and guidance for continued control actions.

Specific conditions for this project: Annual letter report needs Department review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of letter reports, all maps, and all aquatic plant and GIS data.


Grant Details
Aquatic Invasives Early Detection and Response
Date
4/1/2024
Waters Involved
Manitowish Lake
Status
Complete

North Lakeland Discovery Center: Manitowish Waters Chain Of Lakes - Ewm Control: North Lakeland Discovery Center is sponsoring a project for Manitowish Waters Chain of Lakes \2013 EWM Control

Project final deliverables include: 1) Annual report summarizing work both monitoring and control 2) Final report summarizing all monitoring, and control efforts.

Specific project activities include: 1) Completion of 2 \2013 AIS surveys in 2024 2) Professional hand-harvesting on known EWM populations. 3) DASH work on known EWM

Special Conditions: 1) All data shall be entered into SWIMS database 2) Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by regional AIS biologist.



This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.



Grant Details
Aquatic Invasives Early Detection and Response
Date
7/1/2012
Waters Involved
Manitowish River
Status
Complete

North Lakeland Discovery Center: Manitowish Chain Of Lakes Edr Project - Phase 2: North Lakeland Discovery Center is sponsoring an Early Detection & Response project focusing on surveying, mapping and controlling CLP in Stone Lake, Island Lake, Spider Lake, and Rice Creek, Vilas County.

Project activities include: 1) Conduct pre/post treatment and peak-biomass surveys; 2) Control CLP by chemical treatments and volunteer hand removal; 3) Conduct volunteer herbicide concentration monitoring; 4) Conduct wild rice surveys and develop maps; 5) Develop letter reports.

Project deliverables include: 1) Aquatic plant survey data and maps; 2) Annual letter report describing the findings of the pre/post treatment and peak-biomass surveys and guidance for continued control actions.

Specific conditions for this project: Annual letter report needs Department review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of letter reports, all maps, and all aquatic plant and GIS data.


Grant Details
Aquatic Invasives Early Detection and Response
Date
4/1/2024
Waters Involved
Manitowish River
Status
Complete

North Lakeland Discovery Center: Manitowish Waters Chain Of Lakes - Vance Lake Clp Control: North Lakeland Discovery Center is sponsoring a project on Manitowish Waters Chain of Lakes \2013 Vance Lake CLP Control.

Project final deliverables include: 1) Final report summarizing all project activities 2) Annual report summarizing work performed, total CLP removed, and future recommendations 3) Maps, and raw data related to CLP mapping with ESAIS and LSAIS.


Specific project activities include: 1) Monitor and locate CLP populations 2) Conduct management activities on identified CLP populations (Hand-harvesting and DASH) 3) Conduct ESAIS and LSAIS surveys to monitor management activities, and population dynamics.


Special Conditions: 1) All data shall be entered into SWIMS database 2) Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a formal specified by regional AIS Biologist.


This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.



Grant Details
Aquatic Invasives Early Detection and Response
Date
7/1/2011
Waters Involved
Rice Creek
Status
Complete

North Lakeland Discovery Center: Manitowish Chain Of Lakes Edr Project - Phase 1: North Lakeland Discovery Center is sponsoring an AIRR project which will focus on surveying and mapping CLP and managing up to 27 acres of CLP in Island Lake, Spider Lake, and Rice Creek, Vilas County.

Project activities include: 1) Conduct pre/post treatment and peak-biomass surveys; 2) Control CLP by chemical treatments; 3) Develop letter reports.

Project deliverables include: 1) Aquatic plant survey data and maps; 2) Annual letter report describing the findings of the pre/post treatment and peak-biomass surveys and guidance for continued control actions.

Specific conditions for this project: Annual letter report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of letter reports, all maps, and all aquatic plant and GIS data.


Grant Details
Aquatic Invasives Early Detection and Response
Date
7/1/2011
Waters Involved
Spider Lake
Status
Complete

North Lakeland Discovery Center: Manitowish Chain Of Lakes Edr Project - Phase 1: North Lakeland Discovery Center is sponsoring an AIRR project which will focus on surveying and mapping CLP and managing up to 27 acres of CLP in Island Lake, Spider Lake, and Rice Creek, Vilas County.

Project activities include: 1) Conduct pre/post treatment and peak-biomass surveys; 2) Control CLP by chemical treatments; 3) Develop letter reports.

Project deliverables include: 1) Aquatic plant survey data and maps; 2) Annual letter report describing the findings of the pre/post treatment and peak-biomass surveys and guidance for continued control actions.

Specific conditions for this project: Annual letter report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of letter reports, all maps, and all aquatic plant and GIS data.


Grant Details
Aquatic Invasives Early Detection and Response
Date
7/1/2012
Waters Involved
Spider Lake
Status
Complete

North Lakeland Discovery Center: Manitowish Chain Of Lakes Edr Project - Phase 2: North Lakeland Discovery Center is sponsoring an Early Detection & Response project focusing on surveying, mapping and controlling CLP in Stone Lake, Island Lake, Spider Lake, and Rice Creek, Vilas County.

Project activities include: 1) Conduct pre/post treatment and peak-biomass surveys; 2) Control CLP by chemical treatments and volunteer hand removal; 3) Conduct volunteer herbicide concentration monitoring; 4) Conduct wild rice surveys and develop maps; 5) Develop letter reports.

Project deliverables include: 1) Aquatic plant survey data and maps; 2) Annual letter report describing the findings of the pre/post treatment and peak-biomass surveys and guidance for continued control actions.

Specific conditions for this project: Annual letter report needs Department review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of letter reports, all maps, and all aquatic plant and GIS data.


Grant Details
Aquatic Invasives Early Detection and Response
Date
7/1/2012
Waters Involved
Stone Lake
Status
Complete

North Lakeland Discovery Center: Manitowish Chain Of Lakes Edr Project - Phase 2: North Lakeland Discovery Center is sponsoring an Early Detection & Response project focusing on surveying, mapping and controlling CLP in Stone Lake, Island Lake, Spider Lake, and Rice Creek, Vilas County.

Project activities include: 1) Conduct pre/post treatment and peak-biomass surveys; 2) Control CLP by chemical treatments and volunteer hand removal; 3) Conduct volunteer herbicide concentration monitoring; 4) Conduct wild rice surveys and develop maps; 5) Develop letter reports.

Project deliverables include: 1) Aquatic plant survey data and maps; 2) Annual letter report describing the findings of the pre/post treatment and peak-biomass surveys and guidance for continued control actions.

Specific conditions for this project: Annual letter report needs Department review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of letter reports, all maps, and all aquatic plant and GIS data.


Grant Details
Aquatic Invasives Early Detection and Response
Date
7/1/2012
Waters Involved
Trout River
Status
Complete

North Lakeland Discovery Center: Manitowish Chain Of Lakes Edr Project - Phase 2: North Lakeland Discovery Center is sponsoring an Early Detection & Response project focusing on surveying, mapping and controlling CLP in Stone Lake, Island Lake, Spider Lake, and Rice Creek, Vilas County.

Project activities include: 1) Conduct pre/post treatment and peak-biomass surveys; 2) Control CLP by chemical treatments and volunteer hand removal; 3) Conduct volunteer herbicide concentration monitoring; 4) Conduct wild rice surveys and develop maps; 5) Develop letter reports.

Project deliverables include: 1) Aquatic plant survey data and maps; 2) Annual letter report describing the findings of the pre/post treatment and peak-biomass surveys and guidance for continued control actions.

Specific conditions for this project: Annual letter report needs Department review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of letter reports, all maps, and all aquatic plant and GIS data.


Grant Details
Aquatic Invasives Early Detection and Response
Date
4/1/2024
Waters Involved
Trout River
Status
Complete

North Lakeland Discovery Center: Manitowish Waters Chain Of Lakes - Ewm Control: North Lakeland Discovery Center is sponsoring a project for Manitowish Waters Chain of Lakes \2013 EWM Control

Project final deliverables include: 1) Annual report summarizing work both monitoring and control 2) Final report summarizing all monitoring, and control efforts.

Specific project activities include: 1) Completion of 2 \2013 AIS surveys in 2024 2) Professional hand-harvesting on known EWM populations. 3) DASH work on known EWM

Special Conditions: 1) All data shall be entered into SWIMS database 2) Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by regional AIS biologist.



This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.



Grant Details
Aquatic Invasives Early Detection and Response
Date
4/1/2024
Waters Involved
Vance Lake
Status
Complete

North Lakeland Discovery Center: Manitowish Waters Chain Of Lakes - Vance Lake Clp Control: North Lakeland Discovery Center is sponsoring a project on Manitowish Waters Chain of Lakes \2013 Vance Lake CLP Control.

Project final deliverables include: 1) Final report summarizing all project activities 2) Annual report summarizing work performed, total CLP removed, and future recommendations 3) Maps, and raw data related to CLP mapping with ESAIS and LSAIS.


Specific project activities include: 1) Monitor and locate CLP populations 2) Conduct management activities on identified CLP populations (Hand-harvesting and DASH) 3) Conduct ESAIS and LSAIS surveys to monitor management activities, and population dynamics.


Special Conditions: 1) All data shall be entered into SWIMS database 2) Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a formal specified by regional AIS Biologist.


This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.



Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Aimer Creek
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Aimer Creek
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Alder Lake
Status
Complete

Town Of Manitowish Waters: Manitowish Waters Ais Education, Prevention & Planning Project: The Town of Manitowish Waters is sponsoring an Aquatic Invasive Species Education Prevention & Planning project which will focus on providing AIS education, preventing AIS introductions into town lakes and AIS monitoring.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 9 high use landings within township from May-October 2006
2) Hire an AIS Coordinator (duties listed in position description in proposal)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Create AIS power point presentation
6) Conduct AIS monitoring
7) Develop AIS information packet and shopping bag inserts
8) Participate in Fourth of July and Cranberry Colorama town events
9) Install AIS signage/kiosks where needed
10) Provide speakers for town gatherings and events

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- AIS power point presentation
- Position description for AIS Coordinator
- AIS information packet, shopping bag inserts and signage (including photo)
- Final report (summarizing CB/CW, AIS monitoring and town events attended with list of speakers)

Specific conditions for this project:
- A minimum of 2080 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables as described above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Alder Lake
Status
Complete

Town Of Manitowish Waters: Ais Education, Prevention & Planning Project: The Town of Manitowish Waters is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education and prevention, monitoring for AIS and preparing an AIS action plan.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire an AIS coordinator (duties listed in position description attached to proposal)
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Conduct 2 shoreline sweeps
5) Conduct "Guided AIS Monitoring"
6) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
7) Develop a local "Plan of Action" for AIS containment and management
8) Build portable CB/CW kiosks
9) Assemble 10 AIS monitoring equipment packages

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) An AIS containment and management plan
3) Portable CB/CW kiosks
4) AIS monitoring equipment packages
5) Final report summarizing CB/CW activities, AIS monitoring, and the AIS plan of action

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and photographs of portable kiosks.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Alder Lake
Status
Complete

Town Of Manitowish Waters: Ais Education, Prevention And Planning Project: The Town of Manitowish Waters is sponsoring an AIS EPP grant to be completed by December 31, 2008. The project will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire an AIS coordinator (duties listed in position description attached to proposal); 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Conduct 2 shoreline sweeps; 5) Conduct "Guided AIS Monitoring"; 6) Entry of inspection forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 7) Disseminate AIS information at boat landings, public areas, resorts, businesses, tournaments, and newsletter; 8) Sponsor an AIS float at 4th of July parade and an AIS booth at various public events.

Project deliverables include: 1) Completed entry of inspection 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 2) Photographs of float and AIS booth; 3) Final report summarizing CB/CW activities and AIS monitoring and education activities.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and photographs of float and AIS booth.


Grant Details
Aquatic Invasives Education
Date
4/1/2014
Waters Involved
Alder Lake
Status
Complete

North Lakeland Discovery Center: Manitowish Chain Of Lakes Management Planning Project, Ph Iiib: North Lakeland Discovery Center is sponsoring an AEPP grant to study Alder Lake, Wild Rice Lake and Trout River in Vilas County. The project will focus on developing a Lake Management Plan (LMP) for Wild Rice and Alder Lakes and conducting AIS education and monitoring.

Project activities include: 1) Stakeholder survey; 2) Water quality assessment; 3) Data analysis; 4) Hire AIS Coordinator and Water Education Intern; 5) AIS educational activities; 6) Develop LMP.

Project deliverables include: 1) Stakeholder survey; 2) Water quality data; 3) Hired staff; 4) AIS educational products and events; 5) LMP.

Specific conditions for this project: 1) Draft of stakeholder survey needs to be submitted to Lakes Management Coordinator for review and approval before sending to public; 2) Draft of LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, news release(s), newsletter article, any AIS educational products, stakeholder survey, and all data and maps from the project.


Grant Details
Aquatic Invasives Education
Date
3/15/2024
Waters Involved
Alder Lake
Status
Complete

North Lakeland Discovery Center: Manitowish Waters Chain Of Lakes Aquatic Plant Studies - Phase Iii - Adler: The North Lakeland Discovery Center is sponsoring an aquatic plant studies project on Alder Lake.

Activities: 1) Aquatic plant PI survey and community mapping 2) Lake/AIS educational activities 3) Early season AIS/CLP meander surveys 4) PL and SWF monitoring 5) PL biocontrol 6) SWIMS monitoring data entry 7) Develop final reports.

Deliverables: 1) Aquatic plant data 2) Educational events/products 3) PL efforts 4) Final reports.

Conditions:
1) Final reports need Dept review and approval

This scope summarizes details provided in the application and does not negate tasks and/or deliverables described therein. Data, reports, surveys, and supporting information, including photos, maps and GIS data, must be submitted to the DNR Biologist in electronic format and in any other format they specify


Grant Details
Aquatic Invasives Education
Date
3/15/2024
Waters Involved
Alder Lake
Status
Complete

North Lakeland Discovery Center: Manitowish Waters Chain Of Lakes Aquatic Plant Studies - Phase Iii - Wild Rice: The North Lakeland Discovery Center is sponsoring an aquatic plant studies project on Wild Rice Lake.

Activities: 1) Aquatic plant PI survey and community mapping 2) Lake/AIS educational activities 3) Early season AIS/CLP meander surveys 4) PL and SWF monitoring 5) PL biocontrol 6) SWIMS monitoring data entry 7) Develop final reports.

Deliverables: 1) Aquatic plant data 2) Educational events/products 3) PL efforts 4) Final reports.

Conditions:
1) Final reports need Dept review and approval

This scope summarizes details provided in the application and does not negate tasks and/or deliverables described therein. Data, reports, surveys, and supporting information, including photos, maps and GIS data, must be submitted to the DNR Biologist in electronic format and in any other format they specify


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Allequash Creek
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Allequash Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Allequash Springs
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Amber Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Amber Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Amber Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Amber Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Amber Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Amber Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Amber Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Amber Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Amber Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Amber Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Ambleside Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Ambleside Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Amik Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Amik Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Amik Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Amik Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Amik Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Annabelle Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Annabelle Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
2/15/2019
Waters Involved
Annabelle Lake
Status
Complete

Town Of Presque Isle: Wilderness Waters: Annabelle, Anne, Red Bass, & Vanvliet Lks: The Town of Presque Isle is sponsoring an AEPP grant to study Annabelle, Anne, Red Bass, and VanVliet Lakes, in Vilas County, with a study completion date of June 30, 2021. The project will focus on developing Lake Management Plans (LMP\2019s).

Activities:
1) Gather and assess existing lake info
2) PI aquatic plant survey, community and substrate mapping and analysis
3) Shoreland assessment
4) Water quality assessment
5) Professional and volunteer AIS monitoring
6) Educational program \2013 meetings and \201Cfloating\201D workshop
7) Watercraft inspections
8) Develop LMP\2019s

Project deliverables include:
1) PI, AIS water quality, and shoreland habitat data
2) Aquatic plant community and substrate maps
3) Aquatic plant vouchers
4) Education materials
5) Entered inspection data
6) Lake Management Plans

Specific project conditions:
- LMP\2019s need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP\2019s, PI, AIS, and shoreland habitat data, a set of aquatic plant vouchers, all maps from project, and all GIS data.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Anne Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Anne Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Anne Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
2/15/2019
Waters Involved
Anne Lake
Status
Complete

Town Of Presque Isle: Wilderness Waters: Annabelle, Anne, Red Bass, & Vanvliet Lks: The Town of Presque Isle is sponsoring an AEPP grant to study Annabelle, Anne, Red Bass, and VanVliet Lakes, in Vilas County, with a study completion date of June 30, 2021. The project will focus on developing Lake Management Plans (LMP\2019s).

Activities:
1) Gather and assess existing lake info
2) PI aquatic plant survey, community and substrate mapping and analysis
3) Shoreland assessment
4) Water quality assessment
5) Professional and volunteer AIS monitoring
6) Educational program \2013 meetings and \201Cfloating\201D workshop
7) Watercraft inspections
8) Develop LMP\2019s

Project deliverables include:
1) PI, AIS water quality, and shoreland habitat data
2) Aquatic plant community and substrate maps
3) Aquatic plant vouchers
4) Education materials
5) Entered inspection data
6) Lake Management Plans

Specific project conditions:
- LMP\2019s need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP\2019s, PI, AIS, and shoreland habitat data, a set of aquatic plant vouchers, all maps from project, and all GIS data.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Apeekwa Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Apeekwa Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Apeekwa Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Apeekwa Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Apeekwa Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Armour Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Armour Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
2/15/2019
Waters Involved
Armour Lake
Status
Complete

Town Of Presque Isle: Wilderness Waters: Armour, Big, And Horsehead Lakes: The Town of Presque Isle is sponsoring an AEPP grant to study Armour, Big, and Horsehead Lakes, in Vilas County, with a study completion date of June 30, 2021. The project will focus on developing Lake Management Plans (LMP\2019s).

Activities:
1) Gather and assess existing lake info
2) PI aquatic plant survey, community and substrate mapping and analysis
3) Shoreland assessment
4) Water quality assessment
5) Professional and volunteer AIS monitoring
6) Educational program \2013 meetings and \201Cfloating\201D workshop
7) Watercraft inspections
8) Develop LMP\2019s

Project deliverables include:
1) PI, AIS water quality, and shoreland habitat data
2) Aquatic plant community and substrate maps
3) Aquatic plant vouchers
4) Education materials
5) Entered inspection data
6) Lake Management Plans

Specific project conditions:
- LMP\2019s need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP\2019s, PI, AIS, and shoreland habitat data, a set of aquatic plant vouchers, all maps from project, and all GIS data.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Aurora Creek
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
3/15/2024
Waters Involved
Aurora Creek
Status
Complete

Vilas County: Prev - Vilas County 2024 Prohibited & Priority Species Prevention & Monitoring Project: The Vilas County Land & Water Conservation Department is sponsoring a project to target recreational boater pathway to prevent and monitoring for prohibited & local priority aquatic and wetland invasive species.

Activities: 1) Offer hot water pressure boat decontamination to boaters at Big Muskellunge, Plum, Star, and Trout Lakes 2) Spiny Waterflea sampling on 12+ lakes 3) Increase resident and visitor awareness of spiny water fleas 4) Development of flyers on decontamination program 5) Monitor for non-native Phragmites 6) Partner with Wisconsin Headwaters Invasive Species Partnership to post billboard 7) Perform CBCW inspections

Deliverables: 1) Report developed on decontamination unit impacts 2) Lab results reported to DNR 3) Log number of attendees, number of videos accessed, number of comments on social media posts. 4) Number of flyers disseminated 5) Number of new phragmites sites detected 6) Photo of billboard displayed 7) Data entered into SWIMS

Conditions:
1) Enter data collected into SWIMS database under the grant project number.
2) All monitoring shall follow WDNR protocols.
3) All outreach and education materials shall use DNR messaging; DNR AIS biologist review and approval is required before dissemination.
4) Notify DNR AIS Biologist of any new detection of an AIS species.
5) Lab analysis will be completed by Wisconsin State Lab of Hygiene

This scope summarizes details provided in the application and does not negate tasks and/or deliverables described therein. Data, reports, surveys, and supporting information, including photos, maps and GIS data, must be submitted to the DNR Biologist in electronic format and in any other format they specify.

Also see B. Special Conditions below.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Aurora Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
3/15/2024
Waters Involved
Aurora Lake
Status
Complete

Vilas County: Prev - Vilas County 2024 Prohibited & Priority Species Prevention & Monitoring Project: The Vilas County Land & Water Conservation Department is sponsoring a project to target recreational boater pathway to prevent and monitoring for prohibited & local priority aquatic and wetland invasive species.

Activities: 1) Offer hot water pressure boat decontamination to boaters at Big Muskellunge, Plum, Star, and Trout Lakes 2) Spiny Waterflea sampling on 12+ lakes 3) Increase resident and visitor awareness of spiny water fleas 4) Development of flyers on decontamination program 5) Monitor for non-native Phragmites 6) Partner with Wisconsin Headwaters Invasive Species Partnership to post billboard 7) Perform CBCW inspections

Deliverables: 1) Report developed on decontamination unit impacts 2) Lab results reported to DNR 3) Log number of attendees, number of videos accessed, number of comments on social media posts. 4) Number of flyers disseminated 5) Number of new phragmites sites detected 6) Photo of billboard displayed 7) Data entered into SWIMS

Conditions:
1) Enter data collected into SWIMS database under the grant project number.
2) All monitoring shall follow WDNR protocols.
3) All outreach and education materials shall use DNR messaging; DNR AIS biologist review and approval is required before dissemination.
4) Notify DNR AIS Biologist of any new detection of an AIS species.
5) Lab analysis will be completed by Wisconsin State Lab of Hygiene

This scope summarizes details provided in the application and does not negate tasks and/or deliverables described therein. Data, reports, surveys, and supporting information, including photos, maps and GIS data, must be submitted to the DNR Biologist in electronic format and in any other format they specify.

Also see B. Special Conditions below.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Averill Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Averill Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
2/15/2019
Waters Involved
Averill Lake
Status
Complete

Town Of Presque Isle: Wilderness Waters: Averill, Presque Isle, & Wildcat Lakes: The Town of Presque Isle is sponsoring an AEPP grant to study Averill, Presque Isle, and Wildcat Lakes, in Vilas County, with a study completion date of June 30, 2021. The project will focus on developing Lake Management Plans (LMP\2019s).

Activities:
1) Gather and assess existing lake info
2) PI aquatic plant survey, community and substrate mapping and analysis
3) Shoreland assessment
4) Water quality assessment
5) Professional and volunteer AIS monitoring
6) Educational program \2013 meetings and \201Cfloating\201D workshop
7) Watercraft inspections
8) Develop LMP\2019s

Project deliverables include:
1) PI, AIS water quality, and shoreland habitat data
2) Aquatic plant community and substrate maps
3) Aquatic plant vouchers
4) Education materials
5) Entered inspection data
6) Lake Management Plans

Specific project conditions:
- LMP\2019s need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP\2019s, PI, AIS, and shoreland habitat data, a set of aquatic plant vouchers, all maps from project, and all GIS data.


Grant Details
Aquatic Invasives Education
Date
3/15/2024
Waters Involved
Baker Lake
Status
Complete

Vilas County: Prev - Vilas County 2024 Prohibited & Priority Species Prevention & Monitoring Project: The Vilas County Land & Water Conservation Department is sponsoring a project to target recreational boater pathway to prevent and monitoring for prohibited & local priority aquatic and wetland invasive species.

Activities: 1) Offer hot water pressure boat decontamination to boaters at Big Muskellunge, Plum, Star, and Trout Lakes 2) Spiny Waterflea sampling on 12+ lakes 3) Increase resident and visitor awareness of spiny water fleas 4) Development of flyers on decontamination program 5) Monitor for non-native Phragmites 6) Partner with Wisconsin Headwaters Invasive Species Partnership to post billboard 7) Perform CBCW inspections

Deliverables: 1) Report developed on decontamination unit impacts 2) Lab results reported to DNR 3) Log number of attendees, number of videos accessed, number of comments on social media posts. 4) Number of flyers disseminated 5) Number of new phragmites sites detected 6) Photo of billboard displayed 7) Data entered into SWIMS

Conditions:
1) Enter data collected into SWIMS database under the grant project number.
2) All monitoring shall follow WDNR protocols.
3) All outreach and education materials shall use DNR messaging; DNR AIS biologist review and approval is required before dissemination.
4) Notify DNR AIS Biologist of any new detection of an AIS species.
5) Lab analysis will be completed by Wisconsin State Lab of Hygiene

This scope summarizes details provided in the application and does not negate tasks and/or deliverables described therein. Data, reports, surveys, and supporting information, including photos, maps and GIS data, must be submitted to the DNR Biologist in electronic format and in any other format they specify.

Also see B. Special Conditions below.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Ballard Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
2/15/2018
Waters Involved
Ballard Lake
Status
Complete

Town Of Plum Lake: I-Lids Camera Monitoring #4 - Ballard Lake: The Town of Plum Lake is sponsoring an AIS Education, Prevention & Planning project to place an ILids camera at the Northern Highland American Legion (NHAL) State Forest public boat landing on Ballard Lake (Camp 2 Road), in Vilas County.

Project activities include: 1) Purchase and install ILids camera; 2) Develop final report.

Project deliverables include: 1) ILids camera; 2) Final report.

Specific conditions for this project: 1) WDNR Lakes Coordinator is to be notified that a land use agreement between the Town and the NHAL State Forest has been signed before purchasing and installation of ILids camera; 2) 200 hours of watercraft inspection time is required during the tenure of this project.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report.


Grant Details
Aquatic Invasives Education
Date
3/15/2024
Waters Involved
Ballard Lake
Status
Complete

Vilas County: Prev - Vilas County 2024 Prohibited & Priority Species Prevention & Monitoring Project: The Vilas County Land & Water Conservation Department is sponsoring a project to target recreational boater pathway to prevent and monitoring for prohibited & local priority aquatic and wetland invasive species.

Activities: 1) Offer hot water pressure boat decontamination to boaters at Big Muskellunge, Plum, Star, and Trout Lakes 2) Spiny Waterflea sampling on 12+ lakes 3) Increase resident and visitor awareness of spiny water fleas 4) Development of flyers on decontamination program 5) Monitor for non-native Phragmites 6) Partner with Wisconsin Headwaters Invasive Species Partnership to post billboard 7) Perform CBCW inspections

Deliverables: 1) Report developed on decontamination unit impacts 2) Lab results reported to DNR 3) Log number of attendees, number of videos accessed, number of comments on social media posts. 4) Number of flyers disseminated 5) Number of new phragmites sites detected 6) Photo of billboard displayed 7) Data entered into SWIMS

Conditions:
1) Enter data collected into SWIMS database under the grant project number.
2) All monitoring shall follow WDNR protocols.
3) All outreach and education materials shall use DNR messaging; DNR AIS biologist review and approval is required before dissemination.
4) Notify DNR AIS Biologist of any new detection of an AIS species.
5) Lab analysis will be completed by Wisconsin State Lab of Hygiene

This scope summarizes details provided in the application and does not negate tasks and/or deliverables described therein. Data, reports, surveys, and supporting information, including photos, maps and GIS data, must be submitted to the DNR Biologist in electronic format and in any other format they specify.

Also see B. Special Conditions below.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Bambi Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Bambi Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Basin Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Basin Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Battine Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Battine Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Bear Creek
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Bear Creek
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Bear Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Bear Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Bear River
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Bear River
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Bear River
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Bear River
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Bear River
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Bear Springs
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Beatrice Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Beaver Creek
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Beaver Creek
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Beaver Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Beaver Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Belle Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Belle Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Bena Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Benson Lake
Status
Complete

Town Of Manitowish Waters: Manitowish Waters Ais Education, Prevention & Planning Project: The Town of Manitowish Waters is sponsoring an Aquatic Invasive Species Education Prevention & Planning project which will focus on providing AIS education, preventing AIS introductions into town lakes and AIS monitoring.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 9 high use landings within township from May-October 2006
2) Hire an AIS Coordinator (duties listed in position description in proposal)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Create AIS power point presentation
6) Conduct AIS monitoring
7) Develop AIS information packet and shopping bag inserts
8) Participate in Fourth of July and Cranberry Colorama town events
9) Install AIS signage/kiosks where needed
10) Provide speakers for town gatherings and events

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- AIS power point presentation
- Position description for AIS Coordinator
- AIS information packet, shopping bag inserts and signage (including photo)
- Final report (summarizing CB/CW, AIS monitoring and town events attended with list of speakers)

Specific conditions for this project:
- A minimum of 2080 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables as described above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Benson Lake
Status
Complete

Town Of Manitowish Waters: Ais Education, Prevention & Planning Project: The Town of Manitowish Waters is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education and prevention, monitoring for AIS and preparing an AIS action plan.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire an AIS coordinator (duties listed in position description attached to proposal)
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Conduct 2 shoreline sweeps
5) Conduct "Guided AIS Monitoring"
6) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
7) Develop a local "Plan of Action" for AIS containment and management
8) Build portable CB/CW kiosks
9) Assemble 10 AIS monitoring equipment packages

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) An AIS containment and management plan
3) Portable CB/CW kiosks
4) AIS monitoring equipment packages
5) Final report summarizing CB/CW activities, AIS monitoring, and the AIS plan of action

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and photographs of portable kiosks.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Benson Lake
Status
Complete

Town Of Manitowish Waters: Ais Education, Prevention And Planning Project: The Town of Manitowish Waters is sponsoring an AIS EPP grant to be completed by December 31, 2008. The project will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire an AIS coordinator (duties listed in position description attached to proposal); 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Conduct 2 shoreline sweeps; 5) Conduct "Guided AIS Monitoring"; 6) Entry of inspection forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 7) Disseminate AIS information at boat landings, public areas, resorts, businesses, tournaments, and newsletter; 8) Sponsor an AIS float at 4th of July parade and an AIS booth at various public events.

Project deliverables include: 1) Completed entry of inspection 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 2) Photographs of float and AIS booth; 3) Final report summarizing CB/CW activities and AIS monitoring and education activities.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and photographs of float and AIS booth.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Big Crooked Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Big Crooked Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Big Crooked Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Big Crooked Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Big Crooked Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Big Hurst Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Big Hurst Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Big Kitten Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Big Kitten Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Big Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Big Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
2/15/2019
Waters Involved
Big Lake
Status
Complete

Town Of Presque Isle: Wilderness Waters: Armour, Big, And Horsehead Lakes: The Town of Presque Isle is sponsoring an AEPP grant to study Armour, Big, and Horsehead Lakes, in Vilas County, with a study completion date of June 30, 2021. The project will focus on developing Lake Management Plans (LMP\2019s).

Activities:
1) Gather and assess existing lake info
2) PI aquatic plant survey, community and substrate mapping and analysis
3) Shoreland assessment
4) Water quality assessment
5) Professional and volunteer AIS monitoring
6) Educational program \2013 meetings and \201Cfloating\201D workshop
7) Watercraft inspections
8) Develop LMP\2019s

Project deliverables include:
1) PI, AIS water quality, and shoreland habitat data
2) Aquatic plant community and substrate maps
3) Aquatic plant vouchers
4) Education materials
5) Entered inspection data
6) Lake Management Plans

Specific project conditions:
- LMP\2019s need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP\2019s, PI, AIS, and shoreland habitat data, a set of aquatic plant vouchers, all maps from project, and all GIS data.


Grant Details
Aquatic Invasives Education
Date
3/15/2024
Waters Involved
Big Lake
Status
Complete

Vilas County: Prev - Vilas County 2024 Prohibited & Priority Species Prevention & Monitoring Project: The Vilas County Land & Water Conservation Department is sponsoring a project to target recreational boater pathway to prevent and monitoring for prohibited & local priority aquatic and wetland invasive species.

Activities: 1) Offer hot water pressure boat decontamination to boaters at Big Muskellunge, Plum, Star, and Trout Lakes 2) Spiny Waterflea sampling on 12+ lakes 3) Increase resident and visitor awareness of spiny water fleas 4) Development of flyers on decontamination program 5) Monitor for non-native Phragmites 6) Partner with Wisconsin Headwaters Invasive Species Partnership to post billboard 7) Perform CBCW inspections

Deliverables: 1) Report developed on decontamination unit impacts 2) Lab results reported to DNR 3) Log number of attendees, number of videos accessed, number of comments on social media posts. 4) Number of flyers disseminated 5) Number of new phragmites sites detected 6) Photo of billboard displayed 7) Data entered into SWIMS

Conditions:
1) Enter data collected into SWIMS database under the grant project number.
2) All monitoring shall follow WDNR protocols.
3) All outreach and education materials shall use DNR messaging; DNR AIS biologist review and approval is required before dissemination.
4) Notify DNR AIS Biologist of any new detection of an AIS species.
5) Lab analysis will be completed by Wisconsin State Lab of Hygiene

This scope summarizes details provided in the application and does not negate tasks and/or deliverables described therein. Data, reports, surveys, and supporting information, including photos, maps and GIS data, must be submitted to the DNR Biologist in electronic format and in any other format they specify.

Also see B. Special Conditions below.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Big Muskellunge Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
3/15/2024
Waters Involved
Big Muskellunge Lake
Status
Complete

Vilas County: Prev - Vilas County 2024 Prohibited & Priority Species Prevention & Monitoring Project: The Vilas County Land & Water Conservation Department is sponsoring a project to target recreational boater pathway to prevent and monitoring for prohibited & local priority aquatic and wetland invasive species.

Activities: 1) Offer hot water pressure boat decontamination to boaters at Big Muskellunge, Plum, Star, and Trout Lakes 2) Spiny Waterflea sampling on 12+ lakes 3) Increase resident and visitor awareness of spiny water fleas 4) Development of flyers on decontamination program 5) Monitor for non-native Phragmites 6) Partner with Wisconsin Headwaters Invasive Species Partnership to post billboard 7) Perform CBCW inspections

Deliverables: 1) Report developed on decontamination unit impacts 2) Lab results reported to DNR 3) Log number of attendees, number of videos accessed, number of comments on social media posts. 4) Number of flyers disseminated 5) Number of new phragmites sites detected 6) Photo of billboard displayed 7) Data entered into SWIMS

Conditions:
1) Enter data collected into SWIMS database under the grant project number.
2) All monitoring shall follow WDNR protocols.
3) All outreach and education materials shall use DNR messaging; DNR AIS biologist review and approval is required before dissemination.
4) Notify DNR AIS Biologist of any new detection of an AIS species.
5) Lab analysis will be completed by Wisconsin State Lab of Hygiene

This scope summarizes details provided in the application and does not negate tasks and/or deliverables described therein. Data, reports, surveys, and supporting information, including photos, maps and GIS data, must be submitted to the DNR Biologist in electronic format and in any other format they specify.

Also see B. Special Conditions below.


Grant Details
Aquatic Invasives Education
Date
3/15/2024
Waters Involved
Big Saint Germain Lake
Status
Complete

Vilas County: Prev - Vilas County 2024 Prohibited & Priority Species Prevention & Monitoring Project: The Vilas County Land & Water Conservation Department is sponsoring a project to target recreational boater pathway to prevent and monitoring for prohibited & local priority aquatic and wetland invasive species.

Activities: 1) Offer hot water pressure boat decontamination to boaters at Big Muskellunge, Plum, Star, and Trout Lakes 2) Spiny Waterflea sampling on 12+ lakes 3) Increase resident and visitor awareness of spiny water fleas 4) Development of flyers on decontamination program 5) Monitor for non-native Phragmites 6) Partner with Wisconsin Headwaters Invasive Species Partnership to post billboard 7) Perform CBCW inspections

Deliverables: 1) Report developed on decontamination unit impacts 2) Lab results reported to DNR 3) Log number of attendees, number of videos accessed, number of comments on social media posts. 4) Number of flyers disseminated 5) Number of new phragmites sites detected 6) Photo of billboard displayed 7) Data entered into SWIMS

Conditions:
1) Enter data collected into SWIMS database under the grant project number.
2) All monitoring shall follow WDNR protocols.
3) All outreach and education materials shall use DNR messaging; DNR AIS biologist review and approval is required before dissemination.
4) Notify DNR AIS Biologist of any new detection of an AIS species.
5) Lab analysis will be completed by Wisconsin State Lab of Hygiene

This scope summarizes details provided in the application and does not negate tasks and/or deliverables described therein. Data, reports, surveys, and supporting information, including photos, maps and GIS data, must be submitted to the DNR Biologist in electronic format and in any other format they specify.

Also see B. Special Conditions below.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Bills Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Bills Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Bills Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Bills Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Bills Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Birch Creek
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Birch Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
3/15/2024
Waters Involved
Black Oak Lake
Status
Complete

Vilas County: Prev - Vilas County 2024 Prohibited & Priority Species Prevention & Monitoring Project: The Vilas County Land & Water Conservation Department is sponsoring a project to target recreational boater pathway to prevent and monitoring for prohibited & local priority aquatic and wetland invasive species.

Activities: 1) Offer hot water pressure boat decontamination to boaters at Big Muskellunge, Plum, Star, and Trout Lakes 2) Spiny Waterflea sampling on 12+ lakes 3) Increase resident and visitor awareness of spiny water fleas 4) Development of flyers on decontamination program 5) Monitor for non-native Phragmites 6) Partner with Wisconsin Headwaters Invasive Species Partnership to post billboard 7) Perform CBCW inspections

Deliverables: 1) Report developed on decontamination unit impacts 2) Lab results reported to DNR 3) Log number of attendees, number of videos accessed, number of comments on social media posts. 4) Number of flyers disseminated 5) Number of new phragmites sites detected 6) Photo of billboard displayed 7) Data entered into SWIMS

Conditions:
1) Enter data collected into SWIMS database under the grant project number.
2) All monitoring shall follow WDNR protocols.
3) All outreach and education materials shall use DNR messaging; DNR AIS biologist review and approval is required before dissemination.
4) Notify DNR AIS Biologist of any new detection of an AIS species.
5) Lab analysis will be completed by Wisconsin State Lab of Hygiene

This scope summarizes details provided in the application and does not negate tasks and/or deliverables described therein. Data, reports, surveys, and supporting information, including photos, maps and GIS data, must be submitted to the DNR Biologist in electronic format and in any other format they specify.

Also see B. Special Conditions below.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Blue Gill Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Blue Gill Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Blueberry Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Bobidosh Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Bobidosh Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Bobidosh Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Bobidosh Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Bobidosh Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Bobs Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Bolin Lake
Status
Complete

Town Of Manitowish Waters: Manitowish Waters Ais Education, Prevention & Planning Project: The Town of Manitowish Waters is sponsoring an Aquatic Invasive Species Education Prevention & Planning project which will focus on providing AIS education, preventing AIS introductions into town lakes and AIS monitoring.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 9 high use landings within township from May-October 2006
2) Hire an AIS Coordinator (duties listed in position description in proposal)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Create AIS power point presentation
6) Conduct AIS monitoring
7) Develop AIS information packet and shopping bag inserts
8) Participate in Fourth of July and Cranberry Colorama town events
9) Install AIS signage/kiosks where needed
10) Provide speakers for town gatherings and events

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- AIS power point presentation
- Position description for AIS Coordinator
- AIS information packet, shopping bag inserts and signage (including photo)
- Final report (summarizing CB/CW, AIS monitoring and town events attended with list of speakers)

Specific conditions for this project:
- A minimum of 2080 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables as described above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Bolin Lake
Status
Complete

Town Of Manitowish Waters: Ais Education, Prevention & Planning Project: The Town of Manitowish Waters is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education and prevention, monitoring for AIS and preparing an AIS action plan.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire an AIS coordinator (duties listed in position description attached to proposal)
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Conduct 2 shoreline sweeps
5) Conduct "Guided AIS Monitoring"
6) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
7) Develop a local "Plan of Action" for AIS containment and management
8) Build portable CB/CW kiosks
9) Assemble 10 AIS monitoring equipment packages

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) An AIS containment and management plan
3) Portable CB/CW kiosks
4) AIS monitoring equipment packages
5) Final report summarizing CB/CW activities, AIS monitoring, and the AIS plan of action

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and photographs of portable kiosks.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Bolin Lake
Status
Complete

Town Of Manitowish Waters: Ais Education, Prevention And Planning Project: The Town of Manitowish Waters is sponsoring an AIS EPP grant to be completed by December 31, 2008. The project will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire an AIS coordinator (duties listed in position description attached to proposal); 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Conduct 2 shoreline sweeps; 5) Conduct "Guided AIS Monitoring"; 6) Entry of inspection forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 7) Disseminate AIS information at boat landings, public areas, resorts, businesses, tournaments, and newsletter; 8) Sponsor an AIS float at 4th of July parade and an AIS booth at various public events.

Project deliverables include: 1) Completed entry of inspection 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 2) Photographs of float and AIS booth; 3) Final report summarizing CB/CW activities and AIS monitoring and education activities.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and photographs of float and AIS booth.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Bolton Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Bolton Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Bolton Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Bolton Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Bolton Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Bolton Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Bolton Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Bolton Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Bolton Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Bolton Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Boot Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Boot Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Borden Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Borden Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Broken Bow Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Broken Bow Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Broken Bow Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Broken Bow Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Broken Bow Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Brown Beaver Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Brown Beaver Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Buck Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Buck Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Buckskin Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Buckskin Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Buckskin Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Buckskin Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Buckskin Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Bug Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Bug Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Camp Five Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Camp Ten Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Camp Twelve Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Canteen Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Canteen Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Carlin Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Carlin Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Cathaline Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Cathaline Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Cedar Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Cedar Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Cedar Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Cedar Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Cedar Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Chewelah Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Chewelah Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Chewelah Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Chewelah Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Chewelah Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Chub Lake
Status
Complete

Town Of Manitowish Waters: Manitowish Waters Ais Education, Prevention & Planning Project: The Town of Manitowish Waters is sponsoring an Aquatic Invasive Species Education Prevention & Planning project which will focus on providing AIS education, preventing AIS introductions into town lakes and AIS monitoring.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 9 high use landings within township from May-October 2006
2) Hire an AIS Coordinator (duties listed in position description in proposal)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Create AIS power point presentation
6) Conduct AIS monitoring
7) Develop AIS information packet and shopping bag inserts
8) Participate in Fourth of July and Cranberry Colorama town events
9) Install AIS signage/kiosks where needed
10) Provide speakers for town gatherings and events

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- AIS power point presentation
- Position description for AIS Coordinator
- AIS information packet, shopping bag inserts and signage (including photo)
- Final report (summarizing CB/CW, AIS monitoring and town events attended with list of speakers)

Specific conditions for this project:
- A minimum of 2080 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables as described above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Chub Lake
Status
Complete

Town Of Manitowish Waters: Ais Education, Prevention & Planning Project: The Town of Manitowish Waters is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education and prevention, monitoring for AIS and preparing an AIS action plan.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire an AIS coordinator (duties listed in position description attached to proposal)
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Conduct 2 shoreline sweeps
5) Conduct "Guided AIS Monitoring"
6) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
7) Develop a local "Plan of Action" for AIS containment and management
8) Build portable CB/CW kiosks
9) Assemble 10 AIS monitoring equipment packages

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) An AIS containment and management plan
3) Portable CB/CW kiosks
4) AIS monitoring equipment packages
5) Final report summarizing CB/CW activities, AIS monitoring, and the AIS plan of action

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and photographs of portable kiosks.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Chub Lake
Status
Complete

Town Of Manitowish Waters: Ais Education, Prevention And Planning Project: The Town of Manitowish Waters is sponsoring an AIS EPP grant to be completed by December 31, 2008. The project will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire an AIS coordinator (duties listed in position description attached to proposal); 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Conduct 2 shoreline sweeps; 5) Conduct "Guided AIS Monitoring"; 6) Entry of inspection forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 7) Disseminate AIS information at boat landings, public areas, resorts, businesses, tournaments, and newsletter; 8) Sponsor an AIS float at 4th of July parade and an AIS booth at various public events.

Project deliverables include: 1) Completed entry of inspection 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 2) Photographs of float and AIS booth; 3) Final report summarizing CB/CW activities and AIS monitoring and education activities.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and photographs of float and AIS booth.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Circle Lily Creek
Status
Complete

Town Of Manitowish Waters: Ais Education, Prevention & Planning Project: The Town of Manitowish Waters is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education and prevention, monitoring for AIS and preparing an AIS action plan.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire an AIS coordinator (duties listed in position description attached to proposal)
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Conduct 2 shoreline sweeps
5) Conduct "Guided AIS Monitoring"
6) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
7) Develop a local "Plan of Action" for AIS containment and management
8) Build portable CB/CW kiosks
9) Assemble 10 AIS monitoring equipment packages

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) An AIS containment and management plan
3) Portable CB/CW kiosks
4) AIS monitoring equipment packages
5) Final report summarizing CB/CW activities, AIS monitoring, and the AIS plan of action

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and photographs of portable kiosks.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Circle Lily Creek
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Circle Lily Creek
Status
Complete

Town Of Manitowish Waters: Ais Education, Prevention And Planning Project: The Town of Manitowish Waters is sponsoring an AIS EPP grant to be completed by December 31, 2008. The project will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire an AIS coordinator (duties listed in position description attached to proposal); 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Conduct 2 shoreline sweeps; 5) Conduct "Guided AIS Monitoring"; 6) Entry of inspection forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 7) Disseminate AIS information at boat landings, public areas, resorts, businesses, tournaments, and newsletter; 8) Sponsor an AIS float at 4th of July parade and an AIS booth at various public events.

Project deliverables include: 1) Completed entry of inspection 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 2) Photographs of float and AIS booth; 3) Final report summarizing CB/CW activities and AIS monitoring and education activities.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and photographs of float and AIS booth.


Grant Details
Aquatic Invasives Education
Date
2/15/2018
Waters Involved
Circle Lily Creek
Status
Complete

North Lakeland Discovery Center: Town Of Winchester Lake Mgmt Planning - Phase 4: North Lakeland Discovery Center is sponsoring an Aquatic Invasive Species (AIS) Education, Prevention, & Planning grant to study multiple lakes in the Town of Winchester, Vilas County. The project will focus on developing a Lake Management Plan (LMP) for Circle Lily and Pardee Lakes, conducting early-season AIS monitoring on Adelaide, Helen and Harris Lakes and conducting AIS education and monitoring.

Project activities include: 1) Stakeholder participation \2013 stakeholder survey, planning meetings (up to 2), kick-off meeting, wrap-up meeting, news release(s), and newsletter article; 2) Water quality sampling and analysis; 3) Watershed assessment and P load modeling; 4) Fisheries assessment; 5) Shoreline and coarse woody habitat assessment; 6) Early-season AIS monitoring and professional Dreissena monitoring; 7) Aquatic plant surveys (PI survey, acoustic, community mapping, substrate mapping); 8) Volunteer AIS and lake level monitoring and watercraft inspections; 9) Data analysis; 10) Develop LMP; 11) Hire AIS Coordinator and Water Education Intern; 12) AIS educational activities.

Project deliverables include: 1) Stakeholder survey, news release(s), and newsletter article; 2) Water chemistry data; 3) Watershed maps and modeling data; 4) PI, shoreland, and coarse woody habitat data; 5) Aquatic plant community and substrate maps; 6) LMP; 7) Hired staff; 8) AIS educational products and events.

Specific conditions for this project: 1) Draft of stakeholder survey needs to be submitted to Lakes Management Coordinator for review and approval before sending to public; 2) Draft of LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, news release(s), newsletter article, any AIS educational products, stakeholder survey, and all data and maps from the project.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Circle Lily Lake
Status
Complete

Town Of Manitowish Waters: Manitowish Waters Ais Education, Prevention & Planning Project: The Town of Manitowish Waters is sponsoring an Aquatic Invasive Species Education Prevention & Planning project which will focus on providing AIS education, preventing AIS introductions into town lakes and AIS monitoring.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 9 high use landings within township from May-October 2006
2) Hire an AIS Coordinator (duties listed in position description in proposal)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Create AIS power point presentation
6) Conduct AIS monitoring
7) Develop AIS information packet and shopping bag inserts
8) Participate in Fourth of July and Cranberry Colorama town events
9) Install AIS signage/kiosks where needed
10) Provide speakers for town gatherings and events

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- AIS power point presentation
- Position description for AIS Coordinator
- AIS information packet, shopping bag inserts and signage (including photo)
- Final report (summarizing CB/CW, AIS monitoring and town events attended with list of speakers)

Specific conditions for this project:
- A minimum of 2080 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables as described above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Circle Lily Lake
Status
Complete

Town Of Manitowish Waters: Ais Education, Prevention & Planning Project: The Town of Manitowish Waters is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education and prevention, monitoring for AIS and preparing an AIS action plan.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire an AIS coordinator (duties listed in position description attached to proposal)
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Conduct 2 shoreline sweeps
5) Conduct "Guided AIS Monitoring"
6) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
7) Develop a local "Plan of Action" for AIS containment and management
8) Build portable CB/CW kiosks
9) Assemble 10 AIS monitoring equipment packages

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) An AIS containment and management plan
3) Portable CB/CW kiosks
4) AIS monitoring equipment packages
5) Final report summarizing CB/CW activities, AIS monitoring, and the AIS plan of action

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and photographs of portable kiosks.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Circle Lily Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Circle Lily Lake
Status
Complete

Town Of Manitowish Waters: Ais Education, Prevention And Planning Project: The Town of Manitowish Waters is sponsoring an AIS EPP grant to be completed by December 31, 2008. The project will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire an AIS coordinator (duties listed in position description attached to proposal); 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Conduct 2 shoreline sweeps; 5) Conduct "Guided AIS Monitoring"; 6) Entry of inspection forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 7) Disseminate AIS information at boat landings, public areas, resorts, businesses, tournaments, and newsletter; 8) Sponsor an AIS float at 4th of July parade and an AIS booth at various public events.

Project deliverables include: 1) Completed entry of inspection 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 2) Photographs of float and AIS booth; 3) Final report summarizing CB/CW activities and AIS monitoring and education activities.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and photographs of float and AIS booth.


Grant Details
Aquatic Invasives Education
Date
2/15/2018
Waters Involved
Circle Lily Lake
Status
Complete

North Lakeland Discovery Center: Town Of Winchester Lake Mgmt Planning - Phase 4: North Lakeland Discovery Center is sponsoring an Aquatic Invasive Species (AIS) Education, Prevention, & Planning grant to study multiple lakes in the Town of Winchester, Vilas County. The project will focus on developing a Lake Management Plan (LMP) for Circle Lily and Pardee Lakes, conducting early-season AIS monitoring on Adelaide, Helen and Harris Lakes and conducting AIS education and monitoring.

Project activities include: 1) Stakeholder participation \2013 stakeholder survey, planning meetings (up to 2), kick-off meeting, wrap-up meeting, news release(s), and newsletter article; 2) Water quality sampling and analysis; 3) Watershed assessment and P load modeling; 4) Fisheries assessment; 5) Shoreline and coarse woody habitat assessment; 6) Early-season AIS monitoring and professional Dreissena monitoring; 7) Aquatic plant surveys (PI survey, acoustic, community mapping, substrate mapping); 8) Volunteer AIS and lake level monitoring and watercraft inspections; 9) Data analysis; 10) Develop LMP; 11) Hire AIS Coordinator and Water Education Intern; 12) AIS educational activities.

Project deliverables include: 1) Stakeholder survey, news release(s), and newsletter article; 2) Water chemistry data; 3) Watershed maps and modeling data; 4) PI, shoreland, and coarse woody habitat data; 5) Aquatic plant community and substrate maps; 6) LMP; 7) Hired staff; 8) AIS educational products and events.

Specific conditions for this project: 1) Draft of stakeholder survey needs to be submitted to Lakes Management Coordinator for review and approval before sending to public; 2) Draft of LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, news release(s), newsletter article, any AIS educational products, stakeholder survey, and all data and maps from the project.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Clear Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Clear Lake
Status
Complete

Town Of Manitowish Waters: Manitowish Waters Ais Education, Prevention & Planning Project: The Town of Manitowish Waters is sponsoring an Aquatic Invasive Species Education Prevention & Planning project which will focus on providing AIS education, preventing AIS introductions into town lakes and AIS monitoring.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 9 high use landings within township from May-October 2006
2) Hire an AIS Coordinator (duties listed in position description in proposal)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Create AIS power point presentation
6) Conduct AIS monitoring
7) Develop AIS information packet and shopping bag inserts
8) Participate in Fourth of July and Cranberry Colorama town events
9) Install AIS signage/kiosks where needed
10) Provide speakers for town gatherings and events

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- AIS power point presentation
- Position description for AIS Coordinator
- AIS information packet, shopping bag inserts and signage (including photo)
- Final report (summarizing CB/CW, AIS monitoring and town events attended with list of speakers)

Specific conditions for this project:
- A minimum of 2080 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables as described above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Clear Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Clear Lake
Status
Complete

Town Of Manitowish Waters: Ais Education, Prevention & Planning Project: The Town of Manitowish Waters is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education and prevention, monitoring for AIS and preparing an AIS action plan.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire an AIS coordinator (duties listed in position description attached to proposal)
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Conduct 2 shoreline sweeps
5) Conduct "Guided AIS Monitoring"
6) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
7) Develop a local "Plan of Action" for AIS containment and management
8) Build portable CB/CW kiosks
9) Assemble 10 AIS monitoring equipment packages

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) An AIS containment and management plan
3) Portable CB/CW kiosks
4) AIS monitoring equipment packages
5) Final report summarizing CB/CW activities, AIS monitoring, and the AIS plan of action

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and photographs of portable kiosks.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Clear Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Clear Lake
Status
Complete

Town Of Manitowish Waters: Ais Education, Prevention And Planning Project: The Town of Manitowish Waters is sponsoring an AIS EPP grant to be completed by December 31, 2008. The project will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire an AIS coordinator (duties listed in position description attached to proposal); 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Conduct 2 shoreline sweeps; 5) Conduct "Guided AIS Monitoring"; 6) Entry of inspection forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 7) Disseminate AIS information at boat landings, public areas, resorts, businesses, tournaments, and newsletter; 8) Sponsor an AIS float at 4th of July parade and an AIS booth at various public events.

Project deliverables include: 1) Completed entry of inspection 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 2) Photographs of float and AIS booth; 3) Final report summarizing CB/CW activities and AIS monitoring and education activities.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and photographs of float and AIS booth.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Clear Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Clear Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
10/1/2012
Waters Involved
Clear Lake
Status
Complete

North Lakeland Discovery Center: Manitowish Chain Of Lakes Management Planning Project, Phase 2a: North Lakeland Discovery Center is sponsoring a study of Clear Lake and Fawn Lake, in Vilas County focusing on developing a Lake Management Plan (LMP) for Clear Lake and Fawn Lake, conducting AIS education and monitoring, and performing early-season AIS monitoring on Stone Lake and Manitowish Lake.

Project activities include: 1) Stakeholder participation \2013 stakeholder survey, planning meetings (up to 2), kick-off meeting, wrap-up meeting, news release(s), and newsletter article; 2) Water quality sampling and analysis; 3) Watershed assessment and P load modeling; 4) Fisheries assessment and shoreline assessment; 5) Professional Dreissena monitoring; 6) Aquatic plant surveys (PI survey, CLP assessment, community mapping, substrate mapping); 7) Data analysis; 8) Hire AIS Coordinator and Water Education Intern; 9) Volunteer watercraft inspections and AIS monitoring; 10) CLP hand-pulling and PL bio-control program; 11) AIS educational activities; 12) Develop LMP.

Project deliverables include: 1) Stakeholder survey, news release(s), and newsletter article; 2) Water chemistry data, watershed maps, and modeling data; 3) PI and shoreland data; 4) Aquatic plant community and substrate maps and aquatic plant vouchers; 5) Entered inspection and AIS monitoring data into SWIMS; 6) Hired staff; 7) AIS educational products and events; 8) LMP.

Specific conditions for this project: 1) Draft of stakeholder survey needs to be submitted to Lakes Management Coordinator for review and approval before sending to public; 2) Draft of LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, news release(s), newsletter article, any AIS educational products, stakeholder survey, data from PI, shoreland assessment, watershed assessment and water quality sampling, all maps from project, all GIS data, and aquatic plant vouchers.


Grant Details
Aquatic Invasives Education
Date
4/1/2013
Waters Involved
Clear Lake
Status
Complete

North Lakeland Discovery Center: Manitowish Chain Of Lakes Management Planning Project Phase Iib: North Lakeland Discovery Center is sponsoring an AEPP grant to study Clear Lake, Fawn Lake, Manitowish Lake, and Stone Lake, in Vilas County. The project will focus on developing a Lake Management Plan (LMP) for Clear, Fawn, Manitowish, and Stone Lakes and conducting AIS education and monitoring.

Project activities include: 1) Stakeholder participation \2013 stakeholder survey, planning meetings (up to 2), kick-off meeting, wrap-up meeting, news release(s), and newsletter article; 2) Data analysis; 3) Hire AIS Coordinator and Water Education Intern; 4) Volunteer watercraft inspections and AIS monitoring; 5) AIS educational activities; 6) Develop LMP.

Project deliverables include: 1) Stakeholder survey, news release(s), and newsletter article; 2) Entered inspection and AIS monitoring data into SWIMS; 3) Hired staff; 4) AIS educational products and events; 5) LMP.

Specific conditions for this project: 1) Draft of stakeholder survey needs to be submitted to Lakes Management Coordinator for review and approval before sending to public; 2) Draft of LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, news release(s), newsletter article, any AIS educational products, stakeholder survey, and all data and maps from the project.


Grant Details
Aquatic Invasives Education
Date
3/15/2023
Waters Involved
Clear Lake
Status
Complete

North Lakeland Discovery Center: Manitowish Waters Chain Of Lakes Aquatic Plant Studies - Phase Ib - Rice Creek: Manitowish Waters Chain of Lakes Aquatic Plant Studies - Phase Ib - Rice Creek. Expand Awareness and Education of Lake Management and Stewardship Matters. Continue control and monitoring efforts on other aquatic invasive species that pose a threat to the Manitowish Waters Chain of Lakes. Control Existing and Prevent Further Aquatic Invasive Species Establishment within the Manitowish Waters Chain of Lakes.



Project final deliverables include:
(1) NLDC will provide a written report that includes all educational activities, including dates, times, and number of participants. We will provide copies of social media postings, press releases, and links to potential TV interviews. All CBCW data will be entered into SWIMS.
(2) Community Mapping Survey.
(3) Data Analysis and Report Creation.




Specific project activities include:
(1) Assess current aquatic plant community, a point-intercept (PI) survey.
(2) An aquatic plant community mapping survey.
(3) NLDC educational initiatives.



Special Conditions: DNR is to receive copies of the final report along with, or prior to submission of grantee's final payment request. It is recommended that Grantee provide DNR Lake Coordinator with a draft of the final report for comment on report adequacy prior to making final payment to the consultant.

It is strongly recommended that an annual management strategy meeting be held each winter with DNR to discuss EWM management for the next year before aquatic plant management permit applications are submitted.




This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.




Grant Details
Aquatic Invasives Education
Date
3/15/2023
Waters Involved
Clear Lake
Status
Complete

North Lakeland Discovery Center: Manitowish Waters Chain Of Lakes Aquatic Plant Studies - Phase Ii-Clear: Manitowish Waters Chain of Lakes Aquatic Plant Studies - Phase II-Clear. Management Goal 3: Expand Awareness and Education of Lake Management and Stewardship Matters. Control Existing and Prevent Further Aquatic Invasive Species Establishment within the Manitowish Waters Chain of Lakes. Continue control and monitoring efforts on other aquatic invasive species that pose a threat to the Manitowish Waters Chain of Lakes. Continue to Understand, Protect and Enhance the Ecology of the Manitowish Waters Chain of Lakes Through Stakeholder Stewardship and Science-based Studies.

Project final deliverables include:
(1) A written report that includes all educational activities, including dates, times, and number of participants. We will provide copies of social media postings, press releases, and links to potential TV interviews. All CBCW data will be entered into SWIMS.
(2) PL biocontrol and monitoring data will be entered into SWIMS.

Specific project activities include:
(1) Assess current aquatic plant community.
(2) Data collection and data entry into SWIMS.
(3) NLDC participates in the PL beetle biocontrol program.

Special Conditions: DNR is to receive copies of the final report along with, or prior to submission of grantee's final payment request. It is recommended that Grantee provide DNR Lake Coordinator with a draft of the final report for comment on report adequacy prior to making final payment to the consultant.

It is strongly recommended that an annual management strategy meeting be held each winter with DNR to discuss EWM management for the next year before aquatic plant management permit applications are submitted.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.



Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Constance Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Crab Creek
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Crab Creek
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
2/15/2019
Waters Involved
Crab Creek
Status
Complete

Town Of Presque Isle: Wilderness Waters: Armour, Big, And Horsehead Lakes: The Town of Presque Isle is sponsoring an AEPP grant to study Armour, Big, and Horsehead Lakes, in Vilas County, with a study completion date of June 30, 2021. The project will focus on developing Lake Management Plans (LMP\2019s).

Activities:
1) Gather and assess existing lake info
2) PI aquatic plant survey, community and substrate mapping and analysis
3) Shoreland assessment
4) Water quality assessment
5) Professional and volunteer AIS monitoring
6) Educational program \2013 meetings and \201Cfloating\201D workshop
7) Watercraft inspections
8) Develop LMP\2019s

Project deliverables include:
1) PI, AIS water quality, and shoreland habitat data
2) Aquatic plant community and substrate maps
3) Aquatic plant vouchers
4) Education materials
5) Entered inspection data
6) Lake Management Plans

Specific project conditions:
- LMP\2019s need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP\2019s, PI, AIS, and shoreland habitat data, a set of aquatic plant vouchers, all maps from project, and all GIS data.


Grant Details
Aquatic Invasives Education
Date
3/15/2024
Waters Involved
Crab Creek
Status
Complete

Vilas County: Prev - Vilas County 2024 Prohibited & Priority Species Prevention & Monitoring Project: The Vilas County Land & Water Conservation Department is sponsoring a project to target recreational boater pathway to prevent and monitoring for prohibited & local priority aquatic and wetland invasive species.

Activities: 1) Offer hot water pressure boat decontamination to boaters at Big Muskellunge, Plum, Star, and Trout Lakes 2) Spiny Waterflea sampling on 12+ lakes 3) Increase resident and visitor awareness of spiny water fleas 4) Development of flyers on decontamination program 5) Monitor for non-native Phragmites 6) Partner with Wisconsin Headwaters Invasive Species Partnership to post billboard 7) Perform CBCW inspections

Deliverables: 1) Report developed on decontamination unit impacts 2) Lab results reported to DNR 3) Log number of attendees, number of videos accessed, number of comments on social media posts. 4) Number of flyers disseminated 5) Number of new phragmites sites detected 6) Photo of billboard displayed 7) Data entered into SWIMS

Conditions:
1) Enter data collected into SWIMS database under the grant project number.
2) All monitoring shall follow WDNR protocols.
3) All outreach and education materials shall use DNR messaging; DNR AIS biologist review and approval is required before dissemination.
4) Notify DNR AIS Biologist of any new detection of an AIS species.
5) Lab analysis will be completed by Wisconsin State Lab of Hygiene

This scope summarizes details provided in the application and does not negate tasks and/or deliverables described therein. Data, reports, surveys, and supporting information, including photos, maps and GIS data, must be submitted to the DNR Biologist in electronic format and in any other format they specify.

Also see B. Special Conditions below.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Crab Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Crab Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
3/15/2024
Waters Involved
Crab Lake
Status
Complete

Vilas County: Prev - Vilas County 2024 Prohibited & Priority Species Prevention & Monitoring Project: The Vilas County Land & Water Conservation Department is sponsoring a project to target recreational boater pathway to prevent and monitoring for prohibited & local priority aquatic and wetland invasive species.

Activities: 1) Offer hot water pressure boat decontamination to boaters at Big Muskellunge, Plum, Star, and Trout Lakes 2) Spiny Waterflea sampling on 12+ lakes 3) Increase resident and visitor awareness of spiny water fleas 4) Development of flyers on decontamination program 5) Monitor for non-native Phragmites 6) Partner with Wisconsin Headwaters Invasive Species Partnership to post billboard 7) Perform CBCW inspections

Deliverables: 1) Report developed on decontamination unit impacts 2) Lab results reported to DNR 3) Log number of attendees, number of videos accessed, number of comments on social media posts. 4) Number of flyers disseminated 5) Number of new phragmites sites detected 6) Photo of billboard displayed 7) Data entered into SWIMS

Conditions:
1) Enter data collected into SWIMS database under the grant project number.
2) All monitoring shall follow WDNR protocols.
3) All outreach and education materials shall use DNR messaging; DNR AIS biologist review and approval is required before dissemination.
4) Notify DNR AIS Biologist of any new detection of an AIS species.
5) Lab analysis will be completed by Wisconsin State Lab of Hygiene

This scope summarizes details provided in the application and does not negate tasks and/or deliverables described therein. Data, reports, surveys, and supporting information, including photos, maps and GIS data, must be submitted to the DNR Biologist in electronic format and in any other format they specify.

Also see B. Special Conditions below.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Crawford Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Crawford Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Crawling Stone Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Crawling Stone Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Crawling Stone Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Crawling Stone Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Crawling Stone Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Crystal Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Cyrus Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Cyrus Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Dads Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
David Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
David Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
David Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
David Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
David Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Dead Pike Lake
Status
Complete

Town Of Manitowish Waters: Manitowish Waters Ais Education, Prevention & Planning Project: The Town of Manitowish Waters is sponsoring an Aquatic Invasive Species Education Prevention & Planning project which will focus on providing AIS education, preventing AIS introductions into town lakes and AIS monitoring.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 9 high use landings within township from May-October 2006
2) Hire an AIS Coordinator (duties listed in position description in proposal)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Create AIS power point presentation
6) Conduct AIS monitoring
7) Develop AIS information packet and shopping bag inserts
8) Participate in Fourth of July and Cranberry Colorama town events
9) Install AIS signage/kiosks where needed
10) Provide speakers for town gatherings and events

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- AIS power point presentation
- Position description for AIS Coordinator
- AIS information packet, shopping bag inserts and signage (including photo)
- Final report (summarizing CB/CW, AIS monitoring and town events attended with list of speakers)

Specific conditions for this project:
- A minimum of 2080 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables as described above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Dead Pike Lake
Status
Complete

Town Of Manitowish Waters: Ais Education, Prevention & Planning Project: The Town of Manitowish Waters is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education and prevention, monitoring for AIS and preparing an AIS action plan.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire an AIS coordinator (duties listed in position description attached to proposal)
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Conduct 2 shoreline sweeps
5) Conduct "Guided AIS Monitoring"
6) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
7) Develop a local "Plan of Action" for AIS containment and management
8) Build portable CB/CW kiosks
9) Assemble 10 AIS monitoring equipment packages

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) An AIS containment and management plan
3) Portable CB/CW kiosks
4) AIS monitoring equipment packages
5) Final report summarizing CB/CW activities, AIS monitoring, and the AIS plan of action

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and photographs of portable kiosks.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Dead Pike Lake
Status
Complete

Town Of Manitowish Waters: Ais Education, Prevention And Planning Project: The Town of Manitowish Waters is sponsoring an AIS EPP grant to be completed by December 31, 2008. The project will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire an AIS coordinator (duties listed in position description attached to proposal); 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Conduct 2 shoreline sweeps; 5) Conduct "Guided AIS Monitoring"; 6) Entry of inspection forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 7) Disseminate AIS information at boat landings, public areas, resorts, businesses, tournaments, and newsletter; 8) Sponsor an AIS float at 4th of July parade and an AIS booth at various public events.

Project deliverables include: 1) Completed entry of inspection 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 2) Photographs of float and AIS booth; 3) Final report summarizing CB/CW activities and AIS monitoring and education activities.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and photographs of float and AIS booth.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Decker Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Deer Creek
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Deer Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Deerfoot Lake
Status
Complete

Town Of Manitowish Waters: Manitowish Waters Ais Education, Prevention & Planning Project: The Town of Manitowish Waters is sponsoring an Aquatic Invasive Species Education Prevention & Planning project which will focus on providing AIS education, preventing AIS introductions into town lakes and AIS monitoring.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 9 high use landings within township from May-October 2006
2) Hire an AIS Coordinator (duties listed in position description in proposal)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Create AIS power point presentation
6) Conduct AIS monitoring
7) Develop AIS information packet and shopping bag inserts
8) Participate in Fourth of July and Cranberry Colorama town events
9) Install AIS signage/kiosks where needed
10) Provide speakers for town gatherings and events

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- AIS power point presentation
- Position description for AIS Coordinator
- AIS information packet, shopping bag inserts and signage (including photo)
- Final report (summarizing CB/CW, AIS monitoring and town events attended with list of speakers)

Specific conditions for this project:
- A minimum of 2080 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables as described above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Deerfoot Lake
Status
Complete

Town Of Manitowish Waters: Ais Education, Prevention & Planning Project: The Town of Manitowish Waters is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education and prevention, monitoring for AIS and preparing an AIS action plan.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire an AIS coordinator (duties listed in position description attached to proposal)
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Conduct 2 shoreline sweeps
5) Conduct "Guided AIS Monitoring"
6) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
7) Develop a local "Plan of Action" for AIS containment and management
8) Build portable CB/CW kiosks
9) Assemble 10 AIS monitoring equipment packages

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) An AIS containment and management plan
3) Portable CB/CW kiosks
4) AIS monitoring equipment packages
5) Final report summarizing CB/CW activities, AIS monitoring, and the AIS plan of action

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and photographs of portable kiosks.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Deerfoot Lake
Status
Complete

Town Of Manitowish Waters: Ais Education, Prevention And Planning Project: The Town of Manitowish Waters is sponsoring an AIS EPP grant to be completed by December 31, 2008. The project will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire an AIS coordinator (duties listed in position description attached to proposal); 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Conduct 2 shoreline sweeps; 5) Conduct "Guided AIS Monitoring"; 6) Entry of inspection forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 7) Disseminate AIS information at boat landings, public areas, resorts, businesses, tournaments, and newsletter; 8) Sponsor an AIS float at 4th of July parade and an AIS booth at various public events.

Project deliverables include: 1) Completed entry of inspection 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 2) Photographs of float and AIS booth; 3) Final report summarizing CB/CW activities and AIS monitoring and education activities.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and photographs of float and AIS booth.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Doe Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Doe Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Dog Lake
Status
Complete

Town Of Manitowish Waters: Manitowish Waters Ais Education, Prevention & Planning Project: The Town of Manitowish Waters is sponsoring an Aquatic Invasive Species Education Prevention & Planning project which will focus on providing AIS education, preventing AIS introductions into town lakes and AIS monitoring.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 9 high use landings within township from May-October 2006
2) Hire an AIS Coordinator (duties listed in position description in proposal)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Create AIS power point presentation
6) Conduct AIS monitoring
7) Develop AIS information packet and shopping bag inserts
8) Participate in Fourth of July and Cranberry Colorama town events
9) Install AIS signage/kiosks where needed
10) Provide speakers for town gatherings and events

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- AIS power point presentation
- Position description for AIS Coordinator
- AIS information packet, shopping bag inserts and signage (including photo)
- Final report (summarizing CB/CW, AIS monitoring and town events attended with list of speakers)

Specific conditions for this project:
- A minimum of 2080 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables as described above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Dog Lake
Status
Complete

Town Of Manitowish Waters: Ais Education, Prevention & Planning Project: The Town of Manitowish Waters is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education and prevention, monitoring for AIS and preparing an AIS action plan.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire an AIS coordinator (duties listed in position description attached to proposal)
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Conduct 2 shoreline sweeps
5) Conduct "Guided AIS Monitoring"
6) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
7) Develop a local "Plan of Action" for AIS containment and management
8) Build portable CB/CW kiosks
9) Assemble 10 AIS monitoring equipment packages

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) An AIS containment and management plan
3) Portable CB/CW kiosks
4) AIS monitoring equipment packages
5) Final report summarizing CB/CW activities, AIS monitoring, and the AIS plan of action

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and photographs of portable kiosks.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Dog Lake
Status
Complete

Town Of Manitowish Waters: Ais Education, Prevention And Planning Project: The Town of Manitowish Waters is sponsoring an AIS EPP grant to be completed by December 31, 2008. The project will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire an AIS coordinator (duties listed in position description attached to proposal); 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Conduct 2 shoreline sweeps; 5) Conduct "Guided AIS Monitoring"; 6) Entry of inspection forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 7) Disseminate AIS information at boat landings, public areas, resorts, businesses, tournaments, and newsletter; 8) Sponsor an AIS float at 4th of July parade and an AIS booth at various public events.

Project deliverables include: 1) Completed entry of inspection 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 2) Photographs of float and AIS booth; 3) Final report summarizing CB/CW activities and AIS monitoring and education activities.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and photographs of float and AIS booth.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Dorothy Dunn Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Drager Springs
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Drott Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Dumbell Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Dunn Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Dunn Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Eagle Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Eagle Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Eagle Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Eagle Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Eagle Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
3/15/2024
Waters Involved
Eagle River
Status
Complete

Vilas County: Prev - Vilas County 2024 Prohibited & Priority Species Prevention & Monitoring Project: The Vilas County Land & Water Conservation Department is sponsoring a project to target recreational boater pathway to prevent and monitoring for prohibited & local priority aquatic and wetland invasive species.

Activities: 1) Offer hot water pressure boat decontamination to boaters at Big Muskellunge, Plum, Star, and Trout Lakes 2) Spiny Waterflea sampling on 12+ lakes 3) Increase resident and visitor awareness of spiny water fleas 4) Development of flyers on decontamination program 5) Monitor for non-native Phragmites 6) Partner with Wisconsin Headwaters Invasive Species Partnership to post billboard 7) Perform CBCW inspections

Deliverables: 1) Report developed on decontamination unit impacts 2) Lab results reported to DNR 3) Log number of attendees, number of videos accessed, number of comments on social media posts. 4) Number of flyers disseminated 5) Number of new phragmites sites detected 6) Photo of billboard displayed 7) Data entered into SWIMS

Conditions:
1) Enter data collected into SWIMS database under the grant project number.
2) All monitoring shall follow WDNR protocols.
3) All outreach and education materials shall use DNR messaging; DNR AIS biologist review and approval is required before dissemination.
4) Notify DNR AIS Biologist of any new detection of an AIS species.
5) Lab analysis will be completed by Wisconsin State Lab of Hygiene

This scope summarizes details provided in the application and does not negate tasks and/or deliverables described therein. Data, reports, surveys, and supporting information, including photos, maps and GIS data, must be submitted to the DNR Biologist in electronic format and in any other format they specify.

Also see B. Special Conditions below.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
East Branch Presque Isle River
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
East Branch Presque Isle River
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Edith Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Edith Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Eloise Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Elsie Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Elsie Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Elsie Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Elsie Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Elsie Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Emily Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Emily Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Emily Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Emily Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Emily Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Emily Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Emily Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Emily Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Emily Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Emily Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Escanaba Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Etna Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Favil Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Favil Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Favil Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Favil Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Favil Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Fawn Lake
Status
Complete

Town Of Manitowish Waters: Manitowish Waters Ais Education, Prevention & Planning Project: The Town of Manitowish Waters is sponsoring an Aquatic Invasive Species Education Prevention & Planning project which will focus on providing AIS education, preventing AIS introductions into town lakes and AIS monitoring.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 9 high use landings within township from May-October 2006
2) Hire an AIS Coordinator (duties listed in position description in proposal)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Create AIS power point presentation
6) Conduct AIS monitoring
7) Develop AIS information packet and shopping bag inserts
8) Participate in Fourth of July and Cranberry Colorama town events
9) Install AIS signage/kiosks where needed
10) Provide speakers for town gatherings and events

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- AIS power point presentation
- Position description for AIS Coordinator
- AIS information packet, shopping bag inserts and signage (including photo)
- Final report (summarizing CB/CW, AIS monitoring and town events attended with list of speakers)

Specific conditions for this project:
- A minimum of 2080 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables as described above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Fawn Lake
Status
Complete

Town Of Manitowish Waters: Ais Education, Prevention & Planning Project: The Town of Manitowish Waters is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education and prevention, monitoring for AIS and preparing an AIS action plan.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire an AIS coordinator (duties listed in position description attached to proposal)
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Conduct 2 shoreline sweeps
5) Conduct "Guided AIS Monitoring"
6) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
7) Develop a local "Plan of Action" for AIS containment and management
8) Build portable CB/CW kiosks
9) Assemble 10 AIS monitoring equipment packages

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) An AIS containment and management plan
3) Portable CB/CW kiosks
4) AIS monitoring equipment packages
5) Final report summarizing CB/CW activities, AIS monitoring, and the AIS plan of action

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and photographs of portable kiosks.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Fawn Lake
Status
Complete

Town Of Manitowish Waters: Ais Education, Prevention And Planning Project: The Town of Manitowish Waters is sponsoring an AIS EPP grant to be completed by December 31, 2008. The project will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire an AIS coordinator (duties listed in position description attached to proposal); 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Conduct 2 shoreline sweeps; 5) Conduct "Guided AIS Monitoring"; 6) Entry of inspection forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 7) Disseminate AIS information at boat landings, public areas, resorts, businesses, tournaments, and newsletter; 8) Sponsor an AIS float at 4th of July parade and an AIS booth at various public events.

Project deliverables include: 1) Completed entry of inspection 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 2) Photographs of float and AIS booth; 3) Final report summarizing CB/CW activities and AIS monitoring and education activities.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and photographs of float and AIS booth.


Grant Details
Aquatic Invasives Education
Date
10/1/2012
Waters Involved
Fawn Lake
Status
Complete

North Lakeland Discovery Center: Manitowish Chain Of Lakes Management Planning Project, Phase 2a: North Lakeland Discovery Center is sponsoring a study of Clear Lake and Fawn Lake, in Vilas County focusing on developing a Lake Management Plan (LMP) for Clear Lake and Fawn Lake, conducting AIS education and monitoring, and performing early-season AIS monitoring on Stone Lake and Manitowish Lake.

Project activities include: 1) Stakeholder participation \2013 stakeholder survey, planning meetings (up to 2), kick-off meeting, wrap-up meeting, news release(s), and newsletter article; 2) Water quality sampling and analysis; 3) Watershed assessment and P load modeling; 4) Fisheries assessment and shoreline assessment; 5) Professional Dreissena monitoring; 6) Aquatic plant surveys (PI survey, CLP assessment, community mapping, substrate mapping); 7) Data analysis; 8) Hire AIS Coordinator and Water Education Intern; 9) Volunteer watercraft inspections and AIS monitoring; 10) CLP hand-pulling and PL bio-control program; 11) AIS educational activities; 12) Develop LMP.

Project deliverables include: 1) Stakeholder survey, news release(s), and newsletter article; 2) Water chemistry data, watershed maps, and modeling data; 3) PI and shoreland data; 4) Aquatic plant community and substrate maps and aquatic plant vouchers; 5) Entered inspection and AIS monitoring data into SWIMS; 6) Hired staff; 7) AIS educational products and events; 8) LMP.

Specific conditions for this project: 1) Draft of stakeholder survey needs to be submitted to Lakes Management Coordinator for review and approval before sending to public; 2) Draft of LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, news release(s), newsletter article, any AIS educational products, stakeholder survey, data from PI, shoreland assessment, watershed assessment and water quality sampling, all maps from project, all GIS data, and aquatic plant vouchers.


Grant Details
Aquatic Invasives Education
Date
4/1/2013
Waters Involved
Fawn Lake
Status
Complete

North Lakeland Discovery Center: Manitowish Chain Of Lakes Management Planning Project Phase Iib: North Lakeland Discovery Center is sponsoring an AEPP grant to study Clear Lake, Fawn Lake, Manitowish Lake, and Stone Lake, in Vilas County. The project will focus on developing a Lake Management Plan (LMP) for Clear, Fawn, Manitowish, and Stone Lakes and conducting AIS education and monitoring.

Project activities include: 1) Stakeholder participation \2013 stakeholder survey, planning meetings (up to 2), kick-off meeting, wrap-up meeting, news release(s), and newsletter article; 2) Data analysis; 3) Hire AIS Coordinator and Water Education Intern; 4) Volunteer watercraft inspections and AIS monitoring; 5) AIS educational activities; 6) Develop LMP.

Project deliverables include: 1) Stakeholder survey, news release(s), and newsletter article; 2) Entered inspection and AIS monitoring data into SWIMS; 3) Hired staff; 4) AIS educational products and events; 5) LMP.

Specific conditions for this project: 1) Draft of stakeholder survey needs to be submitted to Lakes Management Coordinator for review and approval before sending to public; 2) Draft of LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, news release(s), newsletter article, any AIS educational products, stakeholder survey, and all data and maps from the project.


Grant Details
Aquatic Invasives Education
Date
3/15/2023
Waters Involved
Fawn Lake
Status
Complete

North Lakeland Discovery Center: Manitowish Waters Chain Of Lakes Aquatic Plant Studies - Phase Ib - Rice Creek: Manitowish Waters Chain of Lakes Aquatic Plant Studies - Phase Ib - Rice Creek. Expand Awareness and Education of Lake Management and Stewardship Matters. Continue control and monitoring efforts on other aquatic invasive species that pose a threat to the Manitowish Waters Chain of Lakes. Control Existing and Prevent Further Aquatic Invasive Species Establishment within the Manitowish Waters Chain of Lakes.



Project final deliverables include:
(1) NLDC will provide a written report that includes all educational activities, including dates, times, and number of participants. We will provide copies of social media postings, press releases, and links to potential TV interviews. All CBCW data will be entered into SWIMS.
(2) Community Mapping Survey.
(3) Data Analysis and Report Creation.




Specific project activities include:
(1) Assess current aquatic plant community, a point-intercept (PI) survey.
(2) An aquatic plant community mapping survey.
(3) NLDC educational initiatives.



Special Conditions: DNR is to receive copies of the final report along with, or prior to submission of grantee's final payment request. It is recommended that Grantee provide DNR Lake Coordinator with a draft of the final report for comment on report adequacy prior to making final payment to the consultant.

It is strongly recommended that an annual management strategy meeting be held each winter with DNR to discuss EWM management for the next year before aquatic plant management permit applications are submitted.




This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.




Grant Details
Aquatic Invasives Education
Date
3/15/2023
Waters Involved
Fawn Lake
Status
Complete

North Lakeland Discovery Center: Manitowish Waters Chain Of Lakes Aquatic Plant Studies - Phase Ii - Fawn: Manitowish Waters Chain of Lakes Aquatic Plant Studies - Phase II \2013 Fawn. Expand Awareness and Education of Lake Management and Stewardship Matters. Control Existing and Prevent Further Aquatic Invasive Species Establishment within the Manitowish Waters Chain of Lakes.

Project final deliverables include:
(1) All CBCW data will be entered into SWIMS.
(2) A written annual report that includes all educational activities, including dates, times, and number of participants. We will provide copies of social media postings, press releases, and links to potential TV interviews.
(3) PL biocontrol and monitoring data will be entered into SWIMS.


Specific project activities include:
(1) Monitor and manage for purple loosestrife (PL) and spiny water flea on the entire Chain.
(2) Two types of surveys would be performed: a point-intercept (PI) survey and an aquatic plant community mapping survey. The PI survey is a plot-based inventory characterizing relative frequency of all plants, native and exotic.
(3) Collect current aquatic plant community data on the Manitowish Waters Chain of Lakes ecosystem.

Special Conditions: DNR is to receive copies of the final report along with, or prior to submission of grantee's final payment request. It is recommended that Grantee provide DNR Lake Coordinator with a draft of the final report for comment on report adequacy prior to making final payment to the consultant.

It is strongly recommended that an annual management strategy meeting be held each winter with DNR to discuss EWM management for the next year before aquatic plant management permit applications are submitted.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.



Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Fence Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Fence Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Fence Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Fence Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Fence Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
3/15/2024
Waters Involved
Fence Lake
Status
Complete

Vilas County: Prev - Vilas County 2024 Prohibited & Priority Species Prevention & Monitoring Project: The Vilas County Land & Water Conservation Department is sponsoring a project to target recreational boater pathway to prevent and monitoring for prohibited & local priority aquatic and wetland invasive species.

Activities: 1) Offer hot water pressure boat decontamination to boaters at Big Muskellunge, Plum, Star, and Trout Lakes 2) Spiny Waterflea sampling on 12+ lakes 3) Increase resident and visitor awareness of spiny water fleas 4) Development of flyers on decontamination program 5) Monitor for non-native Phragmites 6) Partner with Wisconsin Headwaters Invasive Species Partnership to post billboard 7) Perform CBCW inspections

Deliverables: 1) Report developed on decontamination unit impacts 2) Lab results reported to DNR 3) Log number of attendees, number of videos accessed, number of comments on social media posts. 4) Number of flyers disseminated 5) Number of new phragmites sites detected 6) Photo of billboard displayed 7) Data entered into SWIMS

Conditions:
1) Enter data collected into SWIMS database under the grant project number.
2) All monitoring shall follow WDNR protocols.
3) All outreach and education materials shall use DNR messaging; DNR AIS biologist review and approval is required before dissemination.
4) Notify DNR AIS Biologist of any new detection of an AIS species.
5) Lab analysis will be completed by Wisconsin State Lab of Hygiene

This scope summarizes details provided in the application and does not negate tasks and/or deliverables described therein. Data, reports, surveys, and supporting information, including photos, maps and GIS data, must be submitted to the DNR Biologist in electronic format and in any other format they specify.

Also see B. Special Conditions below.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Findler Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Flambeau Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Flambeau Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Flambeau Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Flambeau Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Flambeau Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Flora Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Flora Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
3/15/2024
Waters Involved
Found Lake
Status
Complete

Vilas County: Prev - Vilas County 2024 Prohibited & Priority Species Prevention & Monitoring Project: The Vilas County Land & Water Conservation Department is sponsoring a project to target recreational boater pathway to prevent and monitoring for prohibited & local priority aquatic and wetland invasive species.

Activities: 1) Offer hot water pressure boat decontamination to boaters at Big Muskellunge, Plum, Star, and Trout Lakes 2) Spiny Waterflea sampling on 12+ lakes 3) Increase resident and visitor awareness of spiny water fleas 4) Development of flyers on decontamination program 5) Monitor for non-native Phragmites 6) Partner with Wisconsin Headwaters Invasive Species Partnership to post billboard 7) Perform CBCW inspections

Deliverables: 1) Report developed on decontamination unit impacts 2) Lab results reported to DNR 3) Log number of attendees, number of videos accessed, number of comments on social media posts. 4) Number of flyers disseminated 5) Number of new phragmites sites detected 6) Photo of billboard displayed 7) Data entered into SWIMS

Conditions:
1) Enter data collected into SWIMS database under the grant project number.
2) All monitoring shall follow WDNR protocols.
3) All outreach and education materials shall use DNR messaging; DNR AIS biologist review and approval is required before dissemination.
4) Notify DNR AIS Biologist of any new detection of an AIS species.
5) Lab analysis will be completed by Wisconsin State Lab of Hygiene

This scope summarizes details provided in the application and does not negate tasks and/or deliverables described therein. Data, reports, surveys, and supporting information, including photos, maps and GIS data, must be submitted to the DNR Biologist in electronic format and in any other format they specify.

Also see B. Special Conditions below.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Fox Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Frank Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Gem Lake
Status
Complete

Town Of Manitowish Waters: Manitowish Waters Ais Education, Prevention & Planning Project: The Town of Manitowish Waters is sponsoring an Aquatic Invasive Species Education Prevention & Planning project which will focus on providing AIS education, preventing AIS introductions into town lakes and AIS monitoring.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 9 high use landings within township from May-October 2006
2) Hire an AIS Coordinator (duties listed in position description in proposal)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Create AIS power point presentation
6) Conduct AIS monitoring
7) Develop AIS information packet and shopping bag inserts
8) Participate in Fourth of July and Cranberry Colorama town events
9) Install AIS signage/kiosks where needed
10) Provide speakers for town gatherings and events

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- AIS power point presentation
- Position description for AIS Coordinator
- AIS information packet, shopping bag inserts and signage (including photo)
- Final report (summarizing CB/CW, AIS monitoring and town events attended with list of speakers)

Specific conditions for this project:
- A minimum of 2080 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables as described above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Gem Lake
Status
Complete

Town Of Manitowish Waters: Ais Education, Prevention & Planning Project: The Town of Manitowish Waters is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education and prevention, monitoring for AIS and preparing an AIS action plan.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire an AIS coordinator (duties listed in position description attached to proposal)
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Conduct 2 shoreline sweeps
5) Conduct "Guided AIS Monitoring"
6) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
7) Develop a local "Plan of Action" for AIS containment and management
8) Build portable CB/CW kiosks
9) Assemble 10 AIS monitoring equipment packages

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) An AIS containment and management plan
3) Portable CB/CW kiosks
4) AIS monitoring equipment packages
5) Final report summarizing CB/CW activities, AIS monitoring, and the AIS plan of action

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and photographs of portable kiosks.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Gem Lake
Status
Complete

Town Of Manitowish Waters: Ais Education, Prevention And Planning Project: The Town of Manitowish Waters is sponsoring an AIS EPP grant to be completed by December 31, 2008. The project will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire an AIS coordinator (duties listed in position description attached to proposal); 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Conduct 2 shoreline sweeps; 5) Conduct "Guided AIS Monitoring"; 6) Entry of inspection forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 7) Disseminate AIS information at boat landings, public areas, resorts, businesses, tournaments, and newsletter; 8) Sponsor an AIS float at 4th of July parade and an AIS booth at various public events.

Project deliverables include: 1) Completed entry of inspection 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 2) Photographs of float and AIS booth; 3) Final report summarizing CB/CW activities and AIS monitoring and education activities.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and photographs of float and AIS booth.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Gene Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Gene Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Gene Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Gene Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Gene Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Geneveive Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
George Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Grant Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Great Corn Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Great Corn Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Great Corn Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Great Corn Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Great Corn Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Gresham Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Gresham Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Gresham Creek
Status
Complete

Town Of Boulder Junction: Gresham Lakes 2008 Eurasian Watermilfoil Treatment Monitoring: Town of Boulder Junction is sponsoring an AIS EPP grant on Upper, Lower, and Middle Gresham Lakes in Vilas County to be completed by June 30, 2009. The project will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Annual Pre and Post treatment monitoring and analysis; 2) Volunteer AIS monitoring; 3) Stakeholder participation: AIS identification training; 4) pretreatment informational meeting, and post treatment monitoring results meeting; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 6) Develop annual project report and a final report.

Project deliverables include: 1) Pre and post treatment survey data; 2) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 3) AIS educational, prevention and monitoring activities; 4) Final report summarizing CB/CW activities, AIS monitoring, pre and post treatment monitoring, meetings, GPS locations, and guidance for continued control actions.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, all annual reports, pre and post treatment survey data, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Gresham Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Gresham Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Gresham Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Gretchen Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Grey Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Grey Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Grey Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Grey Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Grey Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Gunlock Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Gunlock Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Gunlock Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Gunlock Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Gunlock Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Harris Creek
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
2/15/2015
Waters Involved
Harris Creek
Status
Complete

North Lakeland Discovery Center: Town Of Winchester Lake Management Planning Project Ph1, Hiawatha & Harris Lks: North Lakeland Discovery Center is sponsoring an AEPP grant to study Harris Lake and Hiawatha Lakes in Vilas County. The project will focus on developing a Lake Management Plan (LMP) for Harris and Hiawatha Lakes and conducting AIS education and monitoring.

Project activities include: 1) Stakeholder participation \2013 stakeholder survey, planning meetings (up to 2), kick-off meeting, wrap-up meeting, news release(s), and newsletter article; 2) Water quality sampling and analysis; 3) Watershed assessment and P load modeling; 4) Fisheries assessment; 5) Shoreline and coarse woody habitat assessment; 6) Early-season AIS monitoring and professional Dreissena monitoring; 7) Aquatic plant surveys (PI survey, acoustic, community mapping, substrate mapping); 8) Volunteer AIS and lake level monitoring and watercraft inspections; 9) Data analysis; 10) Develop LMP; 11) Hire AIS Coordinator and Water Education Intern; 12) AIS educational activities.

Project deliverables include: 1) Stakeholder survey, news release(s), and newsletter article; 2) Water chemistry data; 3) Watershed maps and modeling data; 4) PI, shoreland, and coarse woody habitat data; 5) Aquatic plant community and substrate maps; 6) LMP; 7) Hired staff; 8) AIS educational products and events.

Specific conditions for this project: 1) Draft of stakeholder survey needs to be submitted to Lakes Management Coordinator for review and approval before sending to public; 2) Draft of LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, news release(s), newsletter article, any AIS educational products, stakeholder survey, and all data and maps from the project.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Harris Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
2/15/2015
Waters Involved
Harris Lake
Status
Complete

North Lakeland Discovery Center: Town Of Winchester Lake Management Planning Project Ph1, Hiawatha & Harris Lks: North Lakeland Discovery Center is sponsoring an AEPP grant to study Harris Lake and Hiawatha Lakes in Vilas County. The project will focus on developing a Lake Management Plan (LMP) for Harris and Hiawatha Lakes and conducting AIS education and monitoring.

Project activities include: 1) Stakeholder participation \2013 stakeholder survey, planning meetings (up to 2), kick-off meeting, wrap-up meeting, news release(s), and newsletter article; 2) Water quality sampling and analysis; 3) Watershed assessment and P load modeling; 4) Fisheries assessment; 5) Shoreline and coarse woody habitat assessment; 6) Early-season AIS monitoring and professional Dreissena monitoring; 7) Aquatic plant surveys (PI survey, acoustic, community mapping, substrate mapping); 8) Volunteer AIS and lake level monitoring and watercraft inspections; 9) Data analysis; 10) Develop LMP; 11) Hire AIS Coordinator and Water Education Intern; 12) AIS educational activities.

Project deliverables include: 1) Stakeholder survey, news release(s), and newsletter article; 2) Water chemistry data; 3) Watershed maps and modeling data; 4) PI, shoreland, and coarse woody habitat data; 5) Aquatic plant community and substrate maps; 6) LMP; 7) Hired staff; 8) AIS educational products and events.

Specific conditions for this project: 1) Draft of stakeholder survey needs to be submitted to Lakes Management Coordinator for review and approval before sending to public; 2) Draft of LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, news release(s), newsletter article, any AIS educational products, stakeholder survey, and all data and maps from the project.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Harris Lake Creek
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Harvey Creek
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Harvey Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Haskell Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Haskell Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Haskell Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Haskell Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Haskell Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Headflyer Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Headflyer Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Headflyer Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Headflyer Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Headflyer Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Heart Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Heart Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Hells Kitchen Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Hells Kitchen Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Helmet Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Helmet Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Hennig Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Hiawatha Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
2/15/2015
Waters Involved
Hiawatha Lake
Status
Complete

North Lakeland Discovery Center: Town Of Winchester Lake Management Planning Project Ph1, Hiawatha & Harris Lks: North Lakeland Discovery Center is sponsoring an AEPP grant to study Harris Lake and Hiawatha Lakes in Vilas County. The project will focus on developing a Lake Management Plan (LMP) for Harris and Hiawatha Lakes and conducting AIS education and monitoring.

Project activities include: 1) Stakeholder participation \2013 stakeholder survey, planning meetings (up to 2), kick-off meeting, wrap-up meeting, news release(s), and newsletter article; 2) Water quality sampling and analysis; 3) Watershed assessment and P load modeling; 4) Fisheries assessment; 5) Shoreline and coarse woody habitat assessment; 6) Early-season AIS monitoring and professional Dreissena monitoring; 7) Aquatic plant surveys (PI survey, acoustic, community mapping, substrate mapping); 8) Volunteer AIS and lake level monitoring and watercraft inspections; 9) Data analysis; 10) Develop LMP; 11) Hire AIS Coordinator and Water Education Intern; 12) AIS educational activities.

Project deliverables include: 1) Stakeholder survey, news release(s), and newsletter article; 2) Water chemistry data; 3) Watershed maps and modeling data; 4) PI, shoreland, and coarse woody habitat data; 5) Aquatic plant community and substrate maps; 6) LMP; 7) Hired staff; 8) AIS educational products and events.

Specific conditions for this project: 1) Draft of stakeholder survey needs to be submitted to Lakes Management Coordinator for review and approval before sending to public; 2) Draft of LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, news release(s), newsletter article, any AIS educational products, stakeholder survey, and all data and maps from the project.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
High Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
High Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
3/15/2024
Waters Involved
High Lake
Status
Complete

Vilas County: Prev - Vilas County 2024 Prohibited & Priority Species Prevention & Monitoring Project: The Vilas County Land & Water Conservation Department is sponsoring a project to target recreational boater pathway to prevent and monitoring for prohibited & local priority aquatic and wetland invasive species.

Activities: 1) Offer hot water pressure boat decontamination to boaters at Big Muskellunge, Plum, Star, and Trout Lakes 2) Spiny Waterflea sampling on 12+ lakes 3) Increase resident and visitor awareness of spiny water fleas 4) Development of flyers on decontamination program 5) Monitor for non-native Phragmites 6) Partner with Wisconsin Headwaters Invasive Species Partnership to post billboard 7) Perform CBCW inspections

Deliverables: 1) Report developed on decontamination unit impacts 2) Lab results reported to DNR 3) Log number of attendees, number of videos accessed, number of comments on social media posts. 4) Number of flyers disseminated 5) Number of new phragmites sites detected 6) Photo of billboard displayed 7) Data entered into SWIMS

Conditions:
1) Enter data collected into SWIMS database under the grant project number.
2) All monitoring shall follow WDNR protocols.
3) All outreach and education materials shall use DNR messaging; DNR AIS biologist review and approval is required before dissemination.
4) Notify DNR AIS Biologist of any new detection of an AIS species.
5) Lab analysis will be completed by Wisconsin State Lab of Hygiene

This scope summarizes details provided in the application and does not negate tasks and/or deliverables described therein. Data, reports, surveys, and supporting information, including photos, maps and GIS data, must be submitted to the DNR Biologist in electronic format and in any other format they specify.

Also see B. Special Conditions below.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Hobo Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Homestead Lake
Status
Complete

Town Of Manitowish Waters: Manitowish Waters Ais Education, Prevention & Planning Project: The Town of Manitowish Waters is sponsoring an Aquatic Invasive Species Education Prevention & Planning project which will focus on providing AIS education, preventing AIS introductions into town lakes and AIS monitoring.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 9 high use landings within township from May-October 2006
2) Hire an AIS Coordinator (duties listed in position description in proposal)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Create AIS power point presentation
6) Conduct AIS monitoring
7) Develop AIS information packet and shopping bag inserts
8) Participate in Fourth of July and Cranberry Colorama town events
9) Install AIS signage/kiosks where needed
10) Provide speakers for town gatherings and events

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- AIS power point presentation
- Position description for AIS Coordinator
- AIS information packet, shopping bag inserts and signage (including photo)
- Final report (summarizing CB/CW, AIS monitoring and town events attended with list of speakers)

Specific conditions for this project:
- A minimum of 2080 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables as described above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Homestead Lake
Status
Complete

Town Of Manitowish Waters: Ais Education, Prevention & Planning Project: The Town of Manitowish Waters is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education and prevention, monitoring for AIS and preparing an AIS action plan.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire an AIS coordinator (duties listed in position description attached to proposal)
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Conduct 2 shoreline sweeps
5) Conduct "Guided AIS Monitoring"
6) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
7) Develop a local "Plan of Action" for AIS containment and management
8) Build portable CB/CW kiosks
9) Assemble 10 AIS monitoring equipment packages

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) An AIS containment and management plan
3) Portable CB/CW kiosks
4) AIS monitoring equipment packages
5) Final report summarizing CB/CW activities, AIS monitoring, and the AIS plan of action

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and photographs of portable kiosks.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Homestead Lake
Status
Complete

Town Of Manitowish Waters: Ais Education, Prevention And Planning Project: The Town of Manitowish Waters is sponsoring an AIS EPP grant to be completed by December 31, 2008. The project will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire an AIS coordinator (duties listed in position description attached to proposal); 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Conduct 2 shoreline sweeps; 5) Conduct "Guided AIS Monitoring"; 6) Entry of inspection forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 7) Disseminate AIS information at boat landings, public areas, resorts, businesses, tournaments, and newsletter; 8) Sponsor an AIS float at 4th of July parade and an AIS booth at various public events.

Project deliverables include: 1) Completed entry of inspection 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 2) Photographs of float and AIS booth; 3) Final report summarizing CB/CW activities and AIS monitoring and education activities.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and photographs of float and AIS booth.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Horsehead Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Horsehead Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
2/15/2019
Waters Involved
Horsehead Lake
Status
Complete

Town Of Presque Isle: Wilderness Waters: Armour, Big, And Horsehead Lakes: The Town of Presque Isle is sponsoring an AEPP grant to study Armour, Big, and Horsehead Lakes, in Vilas County, with a study completion date of June 30, 2021. The project will focus on developing Lake Management Plans (LMP\2019s).

Activities:
1) Gather and assess existing lake info
2) PI aquatic plant survey, community and substrate mapping and analysis
3) Shoreland assessment
4) Water quality assessment
5) Professional and volunteer AIS monitoring
6) Educational program \2013 meetings and \201Cfloating\201D workshop
7) Watercraft inspections
8) Develop LMP\2019s

Project deliverables include:
1) PI, AIS water quality, and shoreland habitat data
2) Aquatic plant community and substrate maps
3) Aquatic plant vouchers
4) Education materials
5) Entered inspection data
6) Lake Management Plans

Specific project conditions:
- LMP\2019s need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP\2019s, PI, AIS, and shoreland habitat data, a set of aquatic plant vouchers, all maps from project, and all GIS data.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Horseshoe Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Ike Walton Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Ike Walton Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Ike Walton Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Ike Walton Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Ike Walton Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Indian Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Irving Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
3/15/2021
Waters Involved
Irving Lake
Status
Complete

Town Of Plum Lake: Prev - Boat Landing Monitoring Devices - Irving, Razorback & Laura: The Town of Plum Lake is sponsoring a project to install ILIDS cameras at the boat landings (public pier) on Laura Lake, Irving Lake, and Razorback Lake in Vilas County with the following goals: Prevent the introduction of aquatic invasive species into the lake, educate boaters on best practices.

Project final deliverables include:
1. Purchase and installation of ILIDS cameras.
2. Written reports of activities gathered by ILIDS cameras.
3. Results shared on Town website.
4. Press releases with local media.

Specific conditions for this project:
1. 200 hours of watercraft inspection time is required at each landing during the tenure of this project (being funded with
2. grant number CBCW100521).
3. Grantee must enter into a recorded land use agreement with the property owner.
4. The useful life of an ILIDS unit is 6 years.


Grant Details
Aquatic Invasives Education
Date
3/15/2022
Waters Involved
Island Creek
Status
Complete

North Lakeland Discovery Center: Manitowish Waters Chain Of Lakes Aquatic Plant Studies - Phase I - Island: The North Lakeland Discovery Center is sponsoring an aquatic plant studies project on Island Lake.

Project final deliverables include:
Aquatic plant data, educational and outreach events/products, PL biocontrol, data entry into SWIMS, final reports.

Specific project activities include:
1) Aquatic plant PI survey and community mapping
2) Lake/AIS educational and outreach activities
3) Early season AIS/CLP meander surveys
4) PL and SWF monitoring
5) PL biocontrol
6) SWIMS monitoring data entry
7) Develop final reports

Special Conditions:
Final reports need Department review and approval.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.





Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Island Lake
Status
Complete

Town Of Manitowish Waters: Manitowish Waters Ais Education, Prevention & Planning Project: The Town of Manitowish Waters is sponsoring an Aquatic Invasive Species Education Prevention & Planning project which will focus on providing AIS education, preventing AIS introductions into town lakes and AIS monitoring.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 9 high use landings within township from May-October 2006
2) Hire an AIS Coordinator (duties listed in position description in proposal)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Create AIS power point presentation
6) Conduct AIS monitoring
7) Develop AIS information packet and shopping bag inserts
8) Participate in Fourth of July and Cranberry Colorama town events
9) Install AIS signage/kiosks where needed
10) Provide speakers for town gatherings and events

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- AIS power point presentation
- Position description for AIS Coordinator
- AIS information packet, shopping bag inserts and signage (including photo)
- Final report (summarizing CB/CW, AIS monitoring and town events attended with list of speakers)

Specific conditions for this project:
- A minimum of 2080 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables as described above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Island Lake
Status
Complete

Town Of Manitowish Waters: Ais Education, Prevention & Planning Project: The Town of Manitowish Waters is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education and prevention, monitoring for AIS and preparing an AIS action plan.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire an AIS coordinator (duties listed in position description attached to proposal)
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Conduct 2 shoreline sweeps
5) Conduct "Guided AIS Monitoring"
6) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
7) Develop a local "Plan of Action" for AIS containment and management
8) Build portable CB/CW kiosks
9) Assemble 10 AIS monitoring equipment packages

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) An AIS containment and management plan
3) Portable CB/CW kiosks
4) AIS monitoring equipment packages
5) Final report summarizing CB/CW activities, AIS monitoring, and the AIS plan of action

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and photographs of portable kiosks.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Island Lake
Status
Complete

Town Of Manitowish Waters: Ais Education, Prevention And Planning Project: The Town of Manitowish Waters is sponsoring an AIS EPP grant to be completed by December 31, 2008. The project will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire an AIS coordinator (duties listed in position description attached to proposal); 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Conduct 2 shoreline sweeps; 5) Conduct "Guided AIS Monitoring"; 6) Entry of inspection forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 7) Disseminate AIS information at boat landings, public areas, resorts, businesses, tournaments, and newsletter; 8) Sponsor an AIS float at 4th of July parade and an AIS booth at various public events.

Project deliverables include: 1) Completed entry of inspection 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 2) Photographs of float and AIS booth; 3) Final report summarizing CB/CW activities and AIS monitoring and education activities.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and photographs of float and AIS booth.


Grant Details
Aquatic Invasives Education
Date
4/1/2012
Waters Involved
Island Lake
Status
Complete

North Lakeland Discovery Center: Manitowish Chain Of Lakes Management Planning Project, Phase 1b: North Lakeland Discovery Center is sponsoring an AEPP projectt to study Island Lake, Spider Lake and Rice Creek, in Vilas County. The project will focus on developing a Lake Management Plan (LMP) for Island Lake and Spider Lake and conducting AIS education and monitoring.

Project activities include: 1) Stakeholder participation \2013 stakeholder survey, planning meetings (up to 2), kick-off meeting, wrap-up meeting, news release(s), and newsletter article; 2) Water quality sampling and analysis; 3) Watershed assessment and P load modeling; 4) Fisheries assessment; 5) Shoreline assessment; 6) Professional Dreissena monitoring; 7) Aquatic plant surveys (PI survey, CLP assessment, community mapping, substrate mapping); 8) Data analysis; 9) Hire AIS Coordinator and CB/CW Intern; 10) Volunteer watercraft inspections and AIS monitoring; 11) AIS educational activities; 12) Develop LMP.

Project deliverables include: 1) Stakeholder survey, news release(s), and newsletter article; 2) Water chemistry data; 3) Watershed maps and modeling data; 4) PI and shoreland data; 5) Aquatic plant community and substrate maps; 6) Aquatic plant vouchers; 7) Entered inspection and AIS monitoring data into SWIMS; 8) Hired staff; 9) AIS educational products and events; 10) LMP.

Specific project conditions: 1) Draft of stakeholder survey needs to be submitted to Lakes Management Coordinator for review and approval before sending to public; 2) Draft of LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, news release(s), newsletter article, any AIS educational products, stakeholder survey, data from PI, shoreland assessment, watershed assessment and water quality sampling, all maps from project, all GIS data, and aquatic plant vouchers.


Grant Details
Aquatic Invasives Education
Date
3/15/2022
Waters Involved
Island Lake
Status
Complete

North Lakeland Discovery Center: Manitowish Waters Chain Of Lakes Aquatic Plant Studies - Phase I - Island: The North Lakeland Discovery Center is sponsoring an aquatic plant studies project on Island Lake.

Project final deliverables include:
Aquatic plant data, educational and outreach events/products, PL biocontrol, data entry into SWIMS, final reports.

Specific project activities include:
1) Aquatic plant PI survey and community mapping
2) Lake/AIS educational and outreach activities
3) Early season AIS/CLP meander surveys
4) PL and SWF monitoring
5) PL biocontrol
6) SWIMS monitoring data entry
7) Develop final reports

Special Conditions:
Final reports need Department review and approval.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.





Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Jamie Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Jamie Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Jean Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Jenny Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Jenny Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Jerms Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Jerms Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Jerms Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Jerms Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Jerms Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Jingwak Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Jingwak Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
John Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
John Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Junction Creek
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Junction Creek
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
2/15/2019
Waters Involved
Junction Creek
Status
Complete

Town Of Presque Isle: Wilderness Waters: Annabelle, Anne, Red Bass, & Vanvliet Lks: The Town of Presque Isle is sponsoring an AEPP grant to study Annabelle, Anne, Red Bass, and VanVliet Lakes, in Vilas County, with a study completion date of June 30, 2021. The project will focus on developing Lake Management Plans (LMP\2019s).

Activities:
1) Gather and assess existing lake info
2) PI aquatic plant survey, community and substrate mapping and analysis
3) Shoreland assessment
4) Water quality assessment
5) Professional and volunteer AIS monitoring
6) Educational program \2013 meetings and \201Cfloating\201D workshop
7) Watercraft inspections
8) Develop LMP\2019s

Project deliverables include:
1) PI, AIS water quality, and shoreland habitat data
2) Aquatic plant community and substrate maps
3) Aquatic plant vouchers
4) Education materials
5) Entered inspection data
6) Lake Management Plans

Specific project conditions:
- LMP\2019s need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP\2019s, PI, AIS, and shoreland habitat data, a set of aquatic plant vouchers, all maps from project, and all GIS data.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Katinka Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Katinka Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Keego Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Keego Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Knife Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Knife Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Lake Adelaide
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
2/15/2018
Waters Involved
Lake Adelaide
Status
Complete

North Lakeland Discovery Center: Town Of Winchester Lake Mgmt Planning - Phase 4: North Lakeland Discovery Center is sponsoring an Aquatic Invasive Species (AIS) Education, Prevention, & Planning grant to study multiple lakes in the Town of Winchester, Vilas County. The project will focus on developing a Lake Management Plan (LMP) for Circle Lily and Pardee Lakes, conducting early-season AIS monitoring on Adelaide, Helen and Harris Lakes and conducting AIS education and monitoring.

Project activities include: 1) Stakeholder participation \2013 stakeholder survey, planning meetings (up to 2), kick-off meeting, wrap-up meeting, news release(s), and newsletter article; 2) Water quality sampling and analysis; 3) Watershed assessment and P load modeling; 4) Fisheries assessment; 5) Shoreline and coarse woody habitat assessment; 6) Early-season AIS monitoring and professional Dreissena monitoring; 7) Aquatic plant surveys (PI survey, acoustic, community mapping, substrate mapping); 8) Volunteer AIS and lake level monitoring and watercraft inspections; 9) Data analysis; 10) Develop LMP; 11) Hire AIS Coordinator and Water Education Intern; 12) AIS educational activities.

Project deliverables include: 1) Stakeholder survey, news release(s), and newsletter article; 2) Water chemistry data; 3) Watershed maps and modeling data; 4) PI, shoreland, and coarse woody habitat data; 5) Aquatic plant community and substrate maps; 6) LMP; 7) Hired staff; 8) AIS educational products and events.

Specific conditions for this project: 1) Draft of stakeholder survey needs to be submitted to Lakes Management Coordinator for review and approval before sending to public; 2) Draft of LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, news release(s), newsletter article, any AIS educational products, stakeholder survey, and all data and maps from the project.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Lake Alva
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Lake Franchian
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Lake Helen
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
2/15/2018
Waters Involved
Lake Helen
Status
Complete

North Lakeland Discovery Center: Town Of Winchester Lake Mgmt Planning - Phase 4: North Lakeland Discovery Center is sponsoring an Aquatic Invasive Species (AIS) Education, Prevention, & Planning grant to study multiple lakes in the Town of Winchester, Vilas County. The project will focus on developing a Lake Management Plan (LMP) for Circle Lily and Pardee Lakes, conducting early-season AIS monitoring on Adelaide, Helen and Harris Lakes and conducting AIS education and monitoring.

Project activities include: 1) Stakeholder participation \2013 stakeholder survey, planning meetings (up to 2), kick-off meeting, wrap-up meeting, news release(s), and newsletter article; 2) Water quality sampling and analysis; 3) Watershed assessment and P load modeling; 4) Fisheries assessment; 5) Shoreline and coarse woody habitat assessment; 6) Early-season AIS monitoring and professional Dreissena monitoring; 7) Aquatic plant surveys (PI survey, acoustic, community mapping, substrate mapping); 8) Volunteer AIS and lake level monitoring and watercraft inspections; 9) Data analysis; 10) Develop LMP; 11) Hire AIS Coordinator and Water Education Intern; 12) AIS educational activities.

Project deliverables include: 1) Stakeholder survey, news release(s), and newsletter article; 2) Water chemistry data; 3) Watershed maps and modeling data; 4) PI, shoreland, and coarse woody habitat data; 5) Aquatic plant community and substrate maps; 6) LMP; 7) Hired staff; 8) AIS educational products and events.

Specific conditions for this project: 1) Draft of stakeholder survey needs to be submitted to Lakes Management Coordinator for review and approval before sending to public; 2) Draft of LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, news release(s), newsletter article, any AIS educational products, stakeholder survey, and all data and maps from the project.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Lake Laura
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
3/15/2021
Waters Involved
Lake Laura
Status
Complete

Town Of Plum Lake: Prev - Boat Landing Monitoring Devices - Irving, Razorback & Laura: The Town of Plum Lake is sponsoring a project to install ILIDS cameras at the boat landings (public pier) on Laura Lake, Irving Lake, and Razorback Lake in Vilas County with the following goals: Prevent the introduction of aquatic invasive species into the lake, educate boaters on best practices.

Project final deliverables include:
1. Purchase and installation of ILIDS cameras.
2. Written reports of activities gathered by ILIDS cameras.
3. Results shared on Town website.
4. Press releases with local media.

Specific conditions for this project:
1. 200 hours of watercraft inspection time is required at each landing during the tenure of this project (being funded with
2. grant number CBCW100521).
3. Grantee must enter into a recorded land use agreement with the property owner.
4. The useful life of an ILIDS unit is 6 years.


Grant Details
Aquatic Invasives Education
Date
3/15/2024
Waters Involved
Lake Laura
Status
Complete

Vilas County: Prev - Vilas County 2024 Prohibited & Priority Species Prevention & Monitoring Project: The Vilas County Land & Water Conservation Department is sponsoring a project to target recreational boater pathway to prevent and monitoring for prohibited & local priority aquatic and wetland invasive species.

Activities: 1) Offer hot water pressure boat decontamination to boaters at Big Muskellunge, Plum, Star, and Trout Lakes 2) Spiny Waterflea sampling on 12+ lakes 3) Increase resident and visitor awareness of spiny water fleas 4) Development of flyers on decontamination program 5) Monitor for non-native Phragmites 6) Partner with Wisconsin Headwaters Invasive Species Partnership to post billboard 7) Perform CBCW inspections

Deliverables: 1) Report developed on decontamination unit impacts 2) Lab results reported to DNR 3) Log number of attendees, number of videos accessed, number of comments on social media posts. 4) Number of flyers disseminated 5) Number of new phragmites sites detected 6) Photo of billboard displayed 7) Data entered into SWIMS

Conditions:
1) Enter data collected into SWIMS database under the grant project number.
2) All monitoring shall follow WDNR protocols.
3) All outreach and education materials shall use DNR messaging; DNR AIS biologist review and approval is required before dissemination.
4) Notify DNR AIS Biologist of any new detection of an AIS species.
5) Lab analysis will be completed by Wisconsin State Lab of Hygiene

This scope summarizes details provided in the application and does not negate tasks and/or deliverables described therein. Data, reports, surveys, and supporting information, including photos, maps and GIS data, must be submitted to the DNR Biologist in electronic format and in any other format they specify.

Also see B. Special Conditions below.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Lake Rose
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Lake Salsich
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Lake Yolanda
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Langley Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Lewis Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Little Bass Lake
Status
Complete

Town Of Manitowish Waters: Ais Education, Prevention & Planning Project: The Town of Manitowish Waters is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education and prevention, monitoring for AIS and preparing an AIS action plan.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire an AIS coordinator (duties listed in position description attached to proposal)
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Conduct 2 shoreline sweeps
5) Conduct "Guided AIS Monitoring"
6) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
7) Develop a local "Plan of Action" for AIS containment and management
8) Build portable CB/CW kiosks
9) Assemble 10 AIS monitoring equipment packages

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) An AIS containment and management plan
3) Portable CB/CW kiosks
4) AIS monitoring equipment packages
5) Final report summarizing CB/CW activities, AIS monitoring, and the AIS plan of action

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and photographs of portable kiosks.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Little Bass Lake
Status
Complete

Town Of Manitowish Waters: Ais Education, Prevention And Planning Project: The Town of Manitowish Waters is sponsoring an AIS EPP grant to be completed by December 31, 2008. The project will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire an AIS coordinator (duties listed in position description attached to proposal); 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Conduct 2 shoreline sweeps; 5) Conduct "Guided AIS Monitoring"; 6) Entry of inspection forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 7) Disseminate AIS information at boat landings, public areas, resorts, businesses, tournaments, and newsletter; 8) Sponsor an AIS float at 4th of July parade and an AIS booth at various public events.

Project deliverables include: 1) Completed entry of inspection 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 2) Photographs of float and AIS booth; 3) Final report summarizing CB/CW activities and AIS monitoring and education activities.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and photographs of float and AIS booth.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Little Birch Creek
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Little Corn Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Little Corn Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Little Corn Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Little Corn Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Little Corn Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Little Crab Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Little Crab Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Little Crawling Stone Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Little Crawling Stone Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Little Crawling Stone Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Little Crawling Stone Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Little Crawling Stone Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Little Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Little Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Little Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Little Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Little Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Little Horsehead Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Little Horsehead Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Little Hurst Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Little Hurst Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Little Papoose Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
10/1/2013
Waters Involved
Little Papoose Lake
Status
Proposed

Co/Pa/Pi Voluntary Lake Association: Connors Lake & Lake Of The Pines Ais Prevention: CO/PA/PI Voluntary Lake Association is sponsoring a 4-yr project to conduct AIS monitoring and update the APM plan for the three lakes.

Project deliverables include GIS data & maps of areas monitored, aquatic plant survey & bed mapping results, examples of AIS education & outreach, AIS monitoring & watercraft inspection data in SWIMS, and an updated APM plan.

Specific project activities include: 1) Pre-post treatment aquatic plant monitoring; 2) Point Intercept plant survey on Lake of the Pines & Papoose Lake; 3) Watercraft inspections, including Landing Blitz participation; 4) AIS education & monitoring; 5) Aquatic Plant Management Plan (APM) update.

Special Conditions: 1) WDNR\2019s Aquatic Plant Management in Wisconsin guidance shall be followed for point-intercept survey monitoring and aquatic plant management plan development. The NOR Native Plant Protection Strategy shall be integrated into the APM plan; 2) Sponsor shall contact DNR immediately if a new AIS is found; 3) AIS monitoring and watercraft inspection personnel shall be trained and follow DNR approved protocols; 4) Education materials shall be consistent with the Department\2019s statewide education strategy for preventing and controlling AIS.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lakes Biologist.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Little Pine Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Little Pine Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Little Pine Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Little Pine Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Little Pine Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Little Presque Isle Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Little Presque Isle Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
3/15/2024
Waters Involved
Little Presque Isle Lake
Status
Complete

Vilas County: Prev - Vilas County 2024 Prohibited & Priority Species Prevention & Monitoring Project: The Vilas County Land & Water Conservation Department is sponsoring a project to target recreational boater pathway to prevent and monitoring for prohibited & local priority aquatic and wetland invasive species.

Activities: 1) Offer hot water pressure boat decontamination to boaters at Big Muskellunge, Plum, Star, and Trout Lakes 2) Spiny Waterflea sampling on 12+ lakes 3) Increase resident and visitor awareness of spiny water fleas 4) Development of flyers on decontamination program 5) Monitor for non-native Phragmites 6) Partner with Wisconsin Headwaters Invasive Species Partnership to post billboard 7) Perform CBCW inspections

Deliverables: 1) Report developed on decontamination unit impacts 2) Lab results reported to DNR 3) Log number of attendees, number of videos accessed, number of comments on social media posts. 4) Number of flyers disseminated 5) Number of new phragmites sites detected 6) Photo of billboard displayed 7) Data entered into SWIMS

Conditions:
1) Enter data collected into SWIMS database under the grant project number.
2) All monitoring shall follow WDNR protocols.
3) All outreach and education materials shall use DNR messaging; DNR AIS biologist review and approval is required before dissemination.
4) Notify DNR AIS Biologist of any new detection of an AIS species.
5) Lab analysis will be completed by Wisconsin State Lab of Hygiene

This scope summarizes details provided in the application and does not negate tasks and/or deliverables described therein. Data, reports, surveys, and supporting information, including photos, maps and GIS data, must be submitted to the DNR Biologist in electronic format and in any other format they specify.

Also see B. Special Conditions below.


Grant Details
Aquatic Invasives Education
Date
3/15/2024
Waters Involved
Little Saint Germain Lake
Status
Complete

Vilas County: Prev - Vilas County 2024 Prohibited & Priority Species Prevention & Monitoring Project: The Vilas County Land & Water Conservation Department is sponsoring a project to target recreational boater pathway to prevent and monitoring for prohibited & local priority aquatic and wetland invasive species.

Activities: 1) Offer hot water pressure boat decontamination to boaters at Big Muskellunge, Plum, Star, and Trout Lakes 2) Spiny Waterflea sampling on 12+ lakes 3) Increase resident and visitor awareness of spiny water fleas 4) Development of flyers on decontamination program 5) Monitor for non-native Phragmites 6) Partner with Wisconsin Headwaters Invasive Species Partnership to post billboard 7) Perform CBCW inspections

Deliverables: 1) Report developed on decontamination unit impacts 2) Lab results reported to DNR 3) Log number of attendees, number of videos accessed, number of comments on social media posts. 4) Number of flyers disseminated 5) Number of new phragmites sites detected 6) Photo of billboard displayed 7) Data entered into SWIMS

Conditions:
1) Enter data collected into SWIMS database under the grant project number.
2) All monitoring shall follow WDNR protocols.
3) All outreach and education materials shall use DNR messaging; DNR AIS biologist review and approval is required before dissemination.
4) Notify DNR AIS Biologist of any new detection of an AIS species.
5) Lab analysis will be completed by Wisconsin State Lab of Hygiene

This scope summarizes details provided in the application and does not negate tasks and/or deliverables described therein. Data, reports, surveys, and supporting information, including photos, maps and GIS data, must be submitted to the DNR Biologist in electronic format and in any other format they specify.

Also see B. Special Conditions below.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Little Sand Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Little Sand Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Little Sand Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Little Sand Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Little Sand Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
3/15/2024
Waters Involved
Little St Germain Creek
Status
Complete

Vilas County: Prev - Vilas County 2024 Prohibited & Priority Species Prevention & Monitoring Project: The Vilas County Land & Water Conservation Department is sponsoring a project to target recreational boater pathway to prevent and monitoring for prohibited & local priority aquatic and wetland invasive species.

Activities: 1) Offer hot water pressure boat decontamination to boaters at Big Muskellunge, Plum, Star, and Trout Lakes 2) Spiny Waterflea sampling on 12+ lakes 3) Increase resident and visitor awareness of spiny water fleas 4) Development of flyers on decontamination program 5) Monitor for non-native Phragmites 6) Partner with Wisconsin Headwaters Invasive Species Partnership to post billboard 7) Perform CBCW inspections

Deliverables: 1) Report developed on decontamination unit impacts 2) Lab results reported to DNR 3) Log number of attendees, number of videos accessed, number of comments on social media posts. 4) Number of flyers disseminated 5) Number of new phragmites sites detected 6) Photo of billboard displayed 7) Data entered into SWIMS

Conditions:
1) Enter data collected into SWIMS database under the grant project number.
2) All monitoring shall follow WDNR protocols.
3) All outreach and education materials shall use DNR messaging; DNR AIS biologist review and approval is required before dissemination.
4) Notify DNR AIS Biologist of any new detection of an AIS species.
5) Lab analysis will be completed by Wisconsin State Lab of Hygiene

This scope summarizes details provided in the application and does not negate tasks and/or deliverables described therein. Data, reports, surveys, and supporting information, including photos, maps and GIS data, must be submitted to the DNR Biologist in electronic format and in any other format they specify.

Also see B. Special Conditions below.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Little Star Lake
Status
Complete

Town Of Manitowish Waters: Manitowish Waters Ais Education, Prevention & Planning Project: The Town of Manitowish Waters is sponsoring an Aquatic Invasive Species Education Prevention & Planning project which will focus on providing AIS education, preventing AIS introductions into town lakes and AIS monitoring.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 9 high use landings within township from May-October 2006
2) Hire an AIS Coordinator (duties listed in position description in proposal)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Create AIS power point presentation
6) Conduct AIS monitoring
7) Develop AIS information packet and shopping bag inserts
8) Participate in Fourth of July and Cranberry Colorama town events
9) Install AIS signage/kiosks where needed
10) Provide speakers for town gatherings and events

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- AIS power point presentation
- Position description for AIS Coordinator
- AIS information packet, shopping bag inserts and signage (including photo)
- Final report (summarizing CB/CW, AIS monitoring and town events attended with list of speakers)

Specific conditions for this project:
- A minimum of 2080 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables as described above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Little Star Lake
Status
Complete

Town Of Manitowish Waters: Ais Education, Prevention & Planning Project: The Town of Manitowish Waters is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education and prevention, monitoring for AIS and preparing an AIS action plan.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire an AIS coordinator (duties listed in position description attached to proposal)
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Conduct 2 shoreline sweeps
5) Conduct "Guided AIS Monitoring"
6) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
7) Develop a local "Plan of Action" for AIS containment and management
8) Build portable CB/CW kiosks
9) Assemble 10 AIS monitoring equipment packages

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) An AIS containment and management plan
3) Portable CB/CW kiosks
4) AIS monitoring equipment packages
5) Final report summarizing CB/CW activities, AIS monitoring, and the AIS plan of action

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and photographs of portable kiosks.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Little Star Lake
Status
Complete

Town Of Manitowish Waters: Ais Education, Prevention And Planning Project: The Town of Manitowish Waters is sponsoring an AIS EPP grant to be completed by December 31, 2008. The project will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire an AIS coordinator (duties listed in position description attached to proposal); 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Conduct 2 shoreline sweeps; 5) Conduct "Guided AIS Monitoring"; 6) Entry of inspection forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 7) Disseminate AIS information at boat landings, public areas, resorts, businesses, tournaments, and newsletter; 8) Sponsor an AIS float at 4th of July parade and an AIS booth at various public events.

Project deliverables include: 1) Completed entry of inspection 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 2) Photographs of float and AIS booth; 3) Final report summarizing CB/CW activities and AIS monitoring and education activities.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and photographs of float and AIS booth.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Little Star Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
3/15/2024
Waters Involved
Little Star Lake
Status
Complete

Vilas County: Prev - Vilas County 2024 Prohibited & Priority Species Prevention & Monitoring Project: The Vilas County Land & Water Conservation Department is sponsoring a project to target recreational boater pathway to prevent and monitoring for prohibited & local priority aquatic and wetland invasive species.

Activities: 1) Offer hot water pressure boat decontamination to boaters at Big Muskellunge, Plum, Star, and Trout Lakes 2) Spiny Waterflea sampling on 12+ lakes 3) Increase resident and visitor awareness of spiny water fleas 4) Development of flyers on decontamination program 5) Monitor for non-native Phragmites 6) Partner with Wisconsin Headwaters Invasive Species Partnership to post billboard 7) Perform CBCW inspections

Deliverables: 1) Report developed on decontamination unit impacts 2) Lab results reported to DNR 3) Log number of attendees, number of videos accessed, number of comments on social media posts. 4) Number of flyers disseminated 5) Number of new phragmites sites detected 6) Photo of billboard displayed 7) Data entered into SWIMS

Conditions:
1) Enter data collected into SWIMS database under the grant project number.
2) All monitoring shall follow WDNR protocols.
3) All outreach and education materials shall use DNR messaging; DNR AIS biologist review and approval is required before dissemination.
4) Notify DNR AIS Biologist of any new detection of an AIS species.
5) Lab analysis will be completed by Wisconsin State Lab of Hygiene

This scope summarizes details provided in the application and does not negate tasks and/or deliverables described therein. Data, reports, surveys, and supporting information, including photos, maps and GIS data, must be submitted to the DNR Biologist in electronic format and in any other format they specify.

Also see B. Special Conditions below.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Little Sugarbush Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Little Sugarbush Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Little Sugarbush Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Little Sugarbush Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Little Sugarbush Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
3/15/2024
Waters Involved
Little Tamarack Creek
Status
Complete

Vilas County: Prev - Vilas County 2024 Prohibited & Priority Species Prevention & Monitoring Project: The Vilas County Land & Water Conservation Department is sponsoring a project to target recreational boater pathway to prevent and monitoring for prohibited & local priority aquatic and wetland invasive species.

Activities: 1) Offer hot water pressure boat decontamination to boaters at Big Muskellunge, Plum, Star, and Trout Lakes 2) Spiny Waterflea sampling on 12+ lakes 3) Increase resident and visitor awareness of spiny water fleas 4) Development of flyers on decontamination program 5) Monitor for non-native Phragmites 6) Partner with Wisconsin Headwaters Invasive Species Partnership to post billboard 7) Perform CBCW inspections

Deliverables: 1) Report developed on decontamination unit impacts 2) Lab results reported to DNR 3) Log number of attendees, number of videos accessed, number of comments on social media posts. 4) Number of flyers disseminated 5) Number of new phragmites sites detected 6) Photo of billboard displayed 7) Data entered into SWIMS

Conditions:
1) Enter data collected into SWIMS database under the grant project number.
2) All monitoring shall follow WDNR protocols.
3) All outreach and education materials shall use DNR messaging; DNR AIS biologist review and approval is required before dissemination.
4) Notify DNR AIS Biologist of any new detection of an AIS species.
5) Lab analysis will be completed by Wisconsin State Lab of Hygiene

This scope summarizes details provided in the application and does not negate tasks and/or deliverables described therein. Data, reports, surveys, and supporting information, including photos, maps and GIS data, must be submitted to the DNR Biologist in electronic format and in any other format they specify.

Also see B. Special Conditions below.


Grant Details
Aquatic Invasives Education
Date
3/15/2024
Waters Involved
Little Tamarack Flowage
Status
Complete

Vilas County: Prev - Vilas County 2024 Prohibited & Priority Species Prevention & Monitoring Project: The Vilas County Land & Water Conservation Department is sponsoring a project to target recreational boater pathway to prevent and monitoring for prohibited & local priority aquatic and wetland invasive species.

Activities: 1) Offer hot water pressure boat decontamination to boaters at Big Muskellunge, Plum, Star, and Trout Lakes 2) Spiny Waterflea sampling on 12+ lakes 3) Increase resident and visitor awareness of spiny water fleas 4) Development of flyers on decontamination program 5) Monitor for non-native Phragmites 6) Partner with Wisconsin Headwaters Invasive Species Partnership to post billboard 7) Perform CBCW inspections

Deliverables: 1) Report developed on decontamination unit impacts 2) Lab results reported to DNR 3) Log number of attendees, number of videos accessed, number of comments on social media posts. 4) Number of flyers disseminated 5) Number of new phragmites sites detected 6) Photo of billboard displayed 7) Data entered into SWIMS

Conditions:
1) Enter data collected into SWIMS database under the grant project number.
2) All monitoring shall follow WDNR protocols.
3) All outreach and education materials shall use DNR messaging; DNR AIS biologist review and approval is required before dissemination.
4) Notify DNR AIS Biologist of any new detection of an AIS species.
5) Lab analysis will be completed by Wisconsin State Lab of Hygiene

This scope summarizes details provided in the application and does not negate tasks and/or deliverables described therein. Data, reports, surveys, and supporting information, including photos, maps and GIS data, must be submitted to the DNR Biologist in electronic format and in any other format they specify.

Also see B. Special Conditions below.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Little Ten Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Little Ten Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Little Ten Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Little Ten Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Little Ten Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Little Trout Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Little Trout Lake
Status
Complete

Town Of Manitowish Waters: Manitowish Waters Ais Education, Prevention & Planning Project: The Town of Manitowish Waters is sponsoring an Aquatic Invasive Species Education Prevention & Planning project which will focus on providing AIS education, preventing AIS introductions into town lakes and AIS monitoring.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 9 high use landings within township from May-October 2006
2) Hire an AIS Coordinator (duties listed in position description in proposal)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Create AIS power point presentation
6) Conduct AIS monitoring
7) Develop AIS information packet and shopping bag inserts
8) Participate in Fourth of July and Cranberry Colorama town events
9) Install AIS signage/kiosks where needed
10) Provide speakers for town gatherings and events

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- AIS power point presentation
- Position description for AIS Coordinator
- AIS information packet, shopping bag inserts and signage (including photo)
- Final report (summarizing CB/CW, AIS monitoring and town events attended with list of speakers)

Specific conditions for this project:
- A minimum of 2080 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables as described above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Little Trout Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Little Trout Lake
Status
Complete

Town Of Manitowish Waters: Ais Education, Prevention & Planning Project: The Town of Manitowish Waters is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education and prevention, monitoring for AIS and preparing an AIS action plan.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire an AIS coordinator (duties listed in position description attached to proposal)
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Conduct 2 shoreline sweeps
5) Conduct "Guided AIS Monitoring"
6) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
7) Develop a local "Plan of Action" for AIS containment and management
8) Build portable CB/CW kiosks
9) Assemble 10 AIS monitoring equipment packages

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) An AIS containment and management plan
3) Portable CB/CW kiosks
4) AIS monitoring equipment packages
5) Final report summarizing CB/CW activities, AIS monitoring, and the AIS plan of action

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and photographs of portable kiosks.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Little Trout Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Little Trout Lake
Status
Complete

Town Of Manitowish Waters: Ais Education, Prevention And Planning Project: The Town of Manitowish Waters is sponsoring an AIS EPP grant to be completed by December 31, 2008. The project will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire an AIS coordinator (duties listed in position description attached to proposal); 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Conduct 2 shoreline sweeps; 5) Conduct "Guided AIS Monitoring"; 6) Entry of inspection forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 7) Disseminate AIS information at boat landings, public areas, resorts, businesses, tournaments, and newsletter; 8) Sponsor an AIS float at 4th of July parade and an AIS booth at various public events.

Project deliverables include: 1) Completed entry of inspection 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 2) Photographs of float and AIS booth; 3) Final report summarizing CB/CW activities and AIS monitoring and education activities.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and photographs of float and AIS booth.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Little Trout Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Little Trout Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Lone Pine Creek
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Lone Pine Creek
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Lone Pine Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Lone Pine Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Lone Tree Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
3/15/2024
Waters Involved
Lone Tree Lake
Status
Complete

Vilas County: Prev - Vilas County 2024 Prohibited & Priority Species Prevention & Monitoring Project: The Vilas County Land & Water Conservation Department is sponsoring a project to target recreational boater pathway to prevent and monitoring for prohibited & local priority aquatic and wetland invasive species.

Activities: 1) Offer hot water pressure boat decontamination to boaters at Big Muskellunge, Plum, Star, and Trout Lakes 2) Spiny Waterflea sampling on 12+ lakes 3) Increase resident and visitor awareness of spiny water fleas 4) Development of flyers on decontamination program 5) Monitor for non-native Phragmites 6) Partner with Wisconsin Headwaters Invasive Species Partnership to post billboard 7) Perform CBCW inspections

Deliverables: 1) Report developed on decontamination unit impacts 2) Lab results reported to DNR 3) Log number of attendees, number of videos accessed, number of comments on social media posts. 4) Number of flyers disseminated 5) Number of new phragmites sites detected 6) Photo of billboard displayed 7) Data entered into SWIMS

Conditions:
1) Enter data collected into SWIMS database under the grant project number.
2) All monitoring shall follow WDNR protocols.
3) All outreach and education materials shall use DNR messaging; DNR AIS biologist review and approval is required before dissemination.
4) Notify DNR AIS Biologist of any new detection of an AIS species.
5) Lab analysis will be completed by Wisconsin State Lab of Hygiene

This scope summarizes details provided in the application and does not negate tasks and/or deliverables described therein. Data, reports, surveys, and supporting information, including photos, maps and GIS data, must be submitted to the DNR Biologist in electronic format and in any other format they specify.

Also see B. Special Conditions below.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Long Interlaken Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Long Interlaken Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Long Interlaken Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Long Interlaken Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Long Interlaken Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Lost Creek
Status
Complete

Town Of Manitowish Waters: Ais Education, Prevention & Planning Project: The Town of Manitowish Waters is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education and prevention, monitoring for AIS and preparing an AIS action plan.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire an AIS coordinator (duties listed in position description attached to proposal)
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Conduct 2 shoreline sweeps
5) Conduct "Guided AIS Monitoring"
6) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
7) Develop a local "Plan of Action" for AIS containment and management
8) Build portable CB/CW kiosks
9) Assemble 10 AIS monitoring equipment packages

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) An AIS containment and management plan
3) Portable CB/CW kiosks
4) AIS monitoring equipment packages
5) Final report summarizing CB/CW activities, AIS monitoring, and the AIS plan of action

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and photographs of portable kiosks.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Lost Creek
Status
Complete

Town Of Manitowish Waters: Ais Education, Prevention And Planning Project: The Town of Manitowish Waters is sponsoring an AIS EPP grant to be completed by December 31, 2008. The project will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire an AIS coordinator (duties listed in position description attached to proposal); 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Conduct 2 shoreline sweeps; 5) Conduct "Guided AIS Monitoring"; 6) Entry of inspection forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 7) Disseminate AIS information at boat landings, public areas, resorts, businesses, tournaments, and newsletter; 8) Sponsor an AIS float at 4th of July parade and an AIS booth at various public events.

Project deliverables include: 1) Completed entry of inspection 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 2) Photographs of float and AIS booth; 3) Final report summarizing CB/CW activities and AIS monitoring and education activities.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and photographs of float and AIS booth.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Lost Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Lost Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Lost Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Lost Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Lost Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Lower Aimer Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Lower Aimer Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Lower Gresham Lake
Status
Complete

Town Of Boulder Junction: Gresham Lakes 2008 Eurasian Watermilfoil Treatment Monitoring: Town of Boulder Junction is sponsoring an AIS EPP grant on Upper, Lower, and Middle Gresham Lakes in Vilas County to be completed by June 30, 2009. The project will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Annual Pre and Post treatment monitoring and analysis; 2) Volunteer AIS monitoring; 3) Stakeholder participation: AIS identification training; 4) pretreatment informational meeting, and post treatment monitoring results meeting; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 6) Develop annual project report and a final report.

Project deliverables include: 1) Pre and post treatment survey data; 2) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 3) AIS educational, prevention and monitoring activities; 4) Final report summarizing CB/CW activities, AIS monitoring, pre and post treatment monitoring, meetings, GPS locations, and guidance for continued control actions.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, all annual reports, pre and post treatment survey data, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Lower Sugarbush Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Lower Sugarbush Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Lower Sugarbush Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Lower Sugarbush Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Lower Sugarbush Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Lucy Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Lucy Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Lucy Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Lucy Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Lucy Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Lynx Creek
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Lynx Creek
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Lynx Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Lynx Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Mabel Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Mabel Lake
Status
Complete

Town Of Presque Isle: Presque Isle Town Lakes Committee Apm Plans: The Town of Presque Isle is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on creating APM Plans for Annabelle, Armour, Cathaline, Horsehead, Lynx, Mabel, Papoose, and Van Vliet Lakes and AIS education and prevention.

Project activities include: 1) Point-intercept surveys; 2) Recruit volunteers and implement a CB/CW program; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Water quality sampling; 6) Stakeholder participation: Initial/final meetings, public survey; 7) Develop project report.

Project deliverables include: 1) Point-intercept survey data; 2) Completed entry of inspection Forms 3200-120 onto Dept website; 3) AIS educational and prevention activities; 4) Final report summarizing CB/CW activities, AIS educational activities, and APM Plan.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, all annual reports, survey data, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Mabel Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Manitowish Lake
Status
Complete

Town Of Manitowish Waters: Manitowish Waters Ais Education, Prevention & Planning Project: The Town of Manitowish Waters is sponsoring an Aquatic Invasive Species Education Prevention & Planning project which will focus on providing AIS education, preventing AIS introductions into town lakes and AIS monitoring.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 9 high use landings within township from May-October 2006
2) Hire an AIS Coordinator (duties listed in position description in proposal)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Create AIS power point presentation
6) Conduct AIS monitoring
7) Develop AIS information packet and shopping bag inserts
8) Participate in Fourth of July and Cranberry Colorama town events
9) Install AIS signage/kiosks where needed
10) Provide speakers for town gatherings and events

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- AIS power point presentation
- Position description for AIS Coordinator
- AIS information packet, shopping bag inserts and signage (including photo)
- Final report (summarizing CB/CW, AIS monitoring and town events attended with list of speakers)

Specific conditions for this project:
- A minimum of 2080 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables as described above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Manitowish Lake
Status
Complete

Town Of Manitowish Waters: Ais Education, Prevention & Planning Project: The Town of Manitowish Waters is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education and prevention, monitoring for AIS and preparing an AIS action plan.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire an AIS coordinator (duties listed in position description attached to proposal)
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Conduct 2 shoreline sweeps
5) Conduct "Guided AIS Monitoring"
6) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
7) Develop a local "Plan of Action" for AIS containment and management
8) Build portable CB/CW kiosks
9) Assemble 10 AIS monitoring equipment packages

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) An AIS containment and management plan
3) Portable CB/CW kiosks
4) AIS monitoring equipment packages
5) Final report summarizing CB/CW activities, AIS monitoring, and the AIS plan of action

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and photographs of portable kiosks.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Manitowish Lake
Status
Complete

Town Of Manitowish Waters: Ais Education, Prevention And Planning Project: The Town of Manitowish Waters is sponsoring an AIS EPP grant to be completed by December 31, 2008. The project will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire an AIS coordinator (duties listed in position description attached to proposal); 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Conduct 2 shoreline sweeps; 5) Conduct "Guided AIS Monitoring"; 6) Entry of inspection forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 7) Disseminate AIS information at boat landings, public areas, resorts, businesses, tournaments, and newsletter; 8) Sponsor an AIS float at 4th of July parade and an AIS booth at various public events.

Project deliverables include: 1) Completed entry of inspection 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 2) Photographs of float and AIS booth; 3) Final report summarizing CB/CW activities and AIS monitoring and education activities.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and photographs of float and AIS booth.


Grant Details
Aquatic Invasives Education
Date
4/1/2013
Waters Involved
Manitowish Lake
Status
Complete

North Lakeland Discovery Center: Manitowish Chain Of Lakes Management Planning Project Phase Iib: North Lakeland Discovery Center is sponsoring an AEPP grant to study Clear Lake, Fawn Lake, Manitowish Lake, and Stone Lake, in Vilas County. The project will focus on developing a Lake Management Plan (LMP) for Clear, Fawn, Manitowish, and Stone Lakes and conducting AIS education and monitoring.

Project activities include: 1) Stakeholder participation \2013 stakeholder survey, planning meetings (up to 2), kick-off meeting, wrap-up meeting, news release(s), and newsletter article; 2) Data analysis; 3) Hire AIS Coordinator and Water Education Intern; 4) Volunteer watercraft inspections and AIS monitoring; 5) AIS educational activities; 6) Develop LMP.

Project deliverables include: 1) Stakeholder survey, news release(s), and newsletter article; 2) Entered inspection and AIS monitoring data into SWIMS; 3) Hired staff; 4) AIS educational products and events; 5) LMP.

Specific conditions for this project: 1) Draft of stakeholder survey needs to be submitted to Lakes Management Coordinator for review and approval before sending to public; 2) Draft of LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, news release(s), newsletter article, any AIS educational products, stakeholder survey, and all data and maps from the project.


Grant Details
Aquatic Invasives Education
Date
2/15/2017
Waters Involved
Manitowish Lake
Status
Complete

North Lakeland Discovery Center: Manitowish Chain Of Lake Management Plan - Phase V: North Lakeland Discovery Center is sponsoring an AEPP grant to study Benson, Sturgeon, Vance, and Stone Lakes in Vilas County. The project will focus on developing a Lake Management Plan (LMP) for phase V lakes and conducting AIS education and monitoring.

Project activities include: 1) Stakeholder participation \2013 stakeholder survey, planning meetings (up to 2), kick-off meeting, wrap-up meeting, news release(s), and newsletter article; 2) Water quality sampling and analysis; 3) Watershed assessment and P load modeling; 4) Fisheries assessment and professional Dreissena monitoring; 5) Shoreline and coarse woody habitat assessment; 6) Early-season AIS monitoring and professional Dreissena monitoring; 7) Aquatic plant surveys (PI survey, community mapping, substrate mapping, wild rice mapping); 8) Volunteer AIS monitoring and watercraft inspections; 9) Data analysis; 10) Develop LMP; 11) Hire AIS Coordinator and Water Education Intern; 12) AIS educational activities.

Project deliverables include: 1) Stakeholder survey, news release(s), and newsletter article; 2) Water chemistry data; 3) Watershed maps and modeling data; 4) PI, shoreland, wild rice, and coarse woody habitat data; 5) Aquatic plant community and substrate maps; 6) Entered watercraft inspection data \2013 200 hours; 7) LMP; 8) Hired staff; 9) AIS educational products and events.

Specific conditions for this project: 1) Draft of stakeholder survey needs to be submitted to Lakes Management Coordinator for review and approval before sending to the public; 2) Draft of LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, news release(s), newsletter article, any AIS educational products, stakeholder survey, and all data and maps from the project.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Manitowish River
Status
Complete

Town Of Manitowish Waters: Ais Education, Prevention & Planning Project: The Town of Manitowish Waters is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education and prevention, monitoring for AIS and preparing an AIS action plan.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire an AIS coordinator (duties listed in position description attached to proposal)
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Conduct 2 shoreline sweeps
5) Conduct "Guided AIS Monitoring"
6) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
7) Develop a local "Plan of Action" for AIS containment and management
8) Build portable CB/CW kiosks
9) Assemble 10 AIS monitoring equipment packages

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) An AIS containment and management plan
3) Portable CB/CW kiosks
4) AIS monitoring equipment packages
5) Final report summarizing CB/CW activities, AIS monitoring, and the AIS plan of action

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and photographs of portable kiosks.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Manitowish River
Status
Complete

Town Of Manitowish Waters: Ais Education, Prevention And Planning Project: The Town of Manitowish Waters is sponsoring an AIS EPP grant to be completed by December 31, 2008. The project will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire an AIS coordinator (duties listed in position description attached to proposal); 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Conduct 2 shoreline sweeps; 5) Conduct "Guided AIS Monitoring"; 6) Entry of inspection forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 7) Disseminate AIS information at boat landings, public areas, resorts, businesses, tournaments, and newsletter; 8) Sponsor an AIS float at 4th of July parade and an AIS booth at various public events.

Project deliverables include: 1) Completed entry of inspection 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 2) Photographs of float and AIS booth; 3) Final report summarizing CB/CW activities and AIS monitoring and education activities.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and photographs of float and AIS booth.


Grant Details
Aquatic Invasives Education
Date
4/1/2013
Waters Involved
Manitowish River
Status
Complete

North Lakeland Discovery Center: Manitowish Chain Of Lakes Management Planning Project Phase Iib: North Lakeland Discovery Center is sponsoring an AEPP grant to study Clear Lake, Fawn Lake, Manitowish Lake, and Stone Lake, in Vilas County. The project will focus on developing a Lake Management Plan (LMP) for Clear, Fawn, Manitowish, and Stone Lakes and conducting AIS education and monitoring.

Project activities include: 1) Stakeholder participation \2013 stakeholder survey, planning meetings (up to 2), kick-off meeting, wrap-up meeting, news release(s), and newsletter article; 2) Data analysis; 3) Hire AIS Coordinator and Water Education Intern; 4) Volunteer watercraft inspections and AIS monitoring; 5) AIS educational activities; 6) Develop LMP.

Project deliverables include: 1) Stakeholder survey, news release(s), and newsletter article; 2) Entered inspection and AIS monitoring data into SWIMS; 3) Hired staff; 4) AIS educational products and events; 5) LMP.

Specific conditions for this project: 1) Draft of stakeholder survey needs to be submitted to Lakes Management Coordinator for review and approval before sending to public; 2) Draft of LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, news release(s), newsletter article, any AIS educational products, stakeholder survey, and all data and maps from the project.


Grant Details
Aquatic Invasives Education
Date
3/15/2022
Waters Involved
Manitowish River
Status
Complete

North Lakeland Discovery Center: Manitowish Waters Chain Of Lakes Aquatic Plant Studies - Phase I - Island: The North Lakeland Discovery Center is sponsoring an aquatic plant studies project on Island Lake.

Project final deliverables include:
Aquatic plant data, educational and outreach events/products, PL biocontrol, data entry into SWIMS, final reports.

Specific project activities include:
1) Aquatic plant PI survey and community mapping
2) Lake/AIS educational and outreach activities
3) Early season AIS/CLP meander surveys
4) PL and SWF monitoring
5) PL biocontrol
6) SWIMS monitoring data entry
7) Develop final reports

Special Conditions:
Final reports need Department review and approval.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.





Grant Details
Aquatic Invasives Education
Date
3/15/2022
Waters Involved
Manitowish River
Status
Complete

North Lakeland Discovery Center: Manitowish Waters Chain Of Lakes Aquatic Plant Studies - Phase I - Rest Lake: The North Lakeland Discovery Center is sponsoring an aquatic plant studies project on Rest Lake.

Project final deliverables include:
Aquatic plant data, educational and outreach events/products, PL biocontrol, data entry into SWIMS, final reports.

Specific project activities include:
1) Aquatic plant PI survey and community mapping
2) Lake/AIS educational and outreach activities
3) Early season AIS/CLP meander surveys
4) PL and SWF monitoring
5) PL biocontrol
6) SWIMS monitoring data entry
7) Develop final reports

Special Conditions:
Final reports need Department review and approval.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.



Grant Details
Aquatic Invasives Education
Date
3/15/2022
Waters Involved
Manitowish River
Status
Complete

North Lakeland Discovery Center: Manitowish Waters Chain Of Lakes Aquatic Plant Studies - Phase I - Spider: The North Lakeland Discovery Center is sponsoring an aquatic plant studies project on Spider Lake.

Project final deliverables include:
Aquatic plant data, educational and outreach events/products, PL biocontrol, data entry into SWIMS, final reports.

Specific project activities include:
1) Aquatic plant PI survey and community mapping
2) Lake/AIS educational and outreach activities
3) Early season AIS/CLP meander surveys
4) PL and SWF monitoring
5) PL biocontrol
6) SWIMS monitoring data entry
7) Develop final reports

Special Conditions:
Final reports need Department review and approval.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.



Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Marion Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Marlands Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Marlands Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Marlands Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Marlands Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Marlands Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Mary Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
McCabe Lake
Status
Complete

Town Of Manitowish Waters: Manitowish Waters Ais Education, Prevention & Planning Project: The Town of Manitowish Waters is sponsoring an Aquatic Invasive Species Education Prevention & Planning project which will focus on providing AIS education, preventing AIS introductions into town lakes and AIS monitoring.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 9 high use landings within township from May-October 2006
2) Hire an AIS Coordinator (duties listed in position description in proposal)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Create AIS power point presentation
6) Conduct AIS monitoring
7) Develop AIS information packet and shopping bag inserts
8) Participate in Fourth of July and Cranberry Colorama town events
9) Install AIS signage/kiosks where needed
10) Provide speakers for town gatherings and events

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- AIS power point presentation
- Position description for AIS Coordinator
- AIS information packet, shopping bag inserts and signage (including photo)
- Final report (summarizing CB/CW, AIS monitoring and town events attended with list of speakers)

Specific conditions for this project:
- A minimum of 2080 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables as described above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
McCabe Lake
Status
Complete

Town Of Manitowish Waters: Ais Education, Prevention & Planning Project: The Town of Manitowish Waters is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education and prevention, monitoring for AIS and preparing an AIS action plan.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire an AIS coordinator (duties listed in position description attached to proposal)
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Conduct 2 shoreline sweeps
5) Conduct "Guided AIS Monitoring"
6) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
7) Develop a local "Plan of Action" for AIS containment and management
8) Build portable CB/CW kiosks
9) Assemble 10 AIS monitoring equipment packages

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) An AIS containment and management plan
3) Portable CB/CW kiosks
4) AIS monitoring equipment packages
5) Final report summarizing CB/CW activities, AIS monitoring, and the AIS plan of action

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and photographs of portable kiosks.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
McCabe Lake
Status
Complete

Town Of Manitowish Waters: Ais Education, Prevention And Planning Project: The Town of Manitowish Waters is sponsoring an AIS EPP grant to be completed by December 31, 2008. The project will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire an AIS coordinator (duties listed in position description attached to proposal); 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Conduct 2 shoreline sweeps; 5) Conduct "Guided AIS Monitoring"; 6) Entry of inspection forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 7) Disseminate AIS information at boat landings, public areas, resorts, businesses, tournaments, and newsletter; 8) Sponsor an AIS float at 4th of July parade and an AIS booth at various public events.

Project deliverables include: 1) Completed entry of inspection 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 2) Photographs of float and AIS booth; 3) Final report summarizing CB/CW activities and AIS monitoring and education activities.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and photographs of float and AIS booth.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
McCullough Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
McCullough Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
McGinnis Creek
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
McKinney Lake
Status
Complete

Town Of Manitowish Waters: Manitowish Waters Ais Education, Prevention & Planning Project: The Town of Manitowish Waters is sponsoring an Aquatic Invasive Species Education Prevention & Planning project which will focus on providing AIS education, preventing AIS introductions into town lakes and AIS monitoring.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 9 high use landings within township from May-October 2006
2) Hire an AIS Coordinator (duties listed in position description in proposal)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Create AIS power point presentation
6) Conduct AIS monitoring
7) Develop AIS information packet and shopping bag inserts
8) Participate in Fourth of July and Cranberry Colorama town events
9) Install AIS signage/kiosks where needed
10) Provide speakers for town gatherings and events

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- AIS power point presentation
- Position description for AIS Coordinator
- AIS information packet, shopping bag inserts and signage (including photo)
- Final report (summarizing CB/CW, AIS monitoring and town events attended with list of speakers)

Specific conditions for this project:
- A minimum of 2080 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables as described above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
McKinney Lake
Status
Complete

Town Of Manitowish Waters: Ais Education, Prevention & Planning Project: The Town of Manitowish Waters is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education and prevention, monitoring for AIS and preparing an AIS action plan.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire an AIS coordinator (duties listed in position description attached to proposal)
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Conduct 2 shoreline sweeps
5) Conduct "Guided AIS Monitoring"
6) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
7) Develop a local "Plan of Action" for AIS containment and management
8) Build portable CB/CW kiosks
9) Assemble 10 AIS monitoring equipment packages

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) An AIS containment and management plan
3) Portable CB/CW kiosks
4) AIS monitoring equipment packages
5) Final report summarizing CB/CW activities, AIS monitoring, and the AIS plan of action

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and photographs of portable kiosks.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
McKinney Lake
Status
Complete

Town Of Manitowish Waters: Ais Education, Prevention And Planning Project: The Town of Manitowish Waters is sponsoring an AIS EPP grant to be completed by December 31, 2008. The project will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire an AIS coordinator (duties listed in position description attached to proposal); 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Conduct 2 shoreline sweeps; 5) Conduct "Guided AIS Monitoring"; 6) Entry of inspection forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 7) Disseminate AIS information at boat landings, public areas, resorts, businesses, tournaments, and newsletter; 8) Sponsor an AIS float at 4th of July parade and an AIS booth at various public events.

Project deliverables include: 1) Completed entry of inspection 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 2) Photographs of float and AIS booth; 3) Final report summarizing CB/CW activities and AIS monitoring and education activities.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and photographs of float and AIS booth.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Mermaid Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Mermaid Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Middle Ellerson Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Middle Ellerson Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Middle Ellerson Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Middle Ellerson Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Middle Ellerson Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Middle Gresham Lake
Status
Complete

Town Of Boulder Junction: Gresham Lakes 2008 Eurasian Watermilfoil Treatment Monitoring: Town of Boulder Junction is sponsoring an AIS EPP grant on Upper, Lower, and Middle Gresham Lakes in Vilas County to be completed by June 30, 2009. The project will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Annual Pre and Post treatment monitoring and analysis; 2) Volunteer AIS monitoring; 3) Stakeholder participation: AIS identification training; 4) pretreatment informational meeting, and post treatment monitoring results meeting; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 6) Develop annual project report and a final report.

Project deliverables include: 1) Pre and post treatment survey data; 2) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 3) AIS educational, prevention and monitoring activities; 4) Final report summarizing CB/CW activities, AIS monitoring, pre and post treatment monitoring, meetings, GPS locations, and guidance for continued control actions.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, all annual reports, pre and post treatment survey data, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Middle Sugarbush Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Middle Sugarbush Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Middle Sugarbush Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Middle Sugarbush Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Middle Sugarbush Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Minette Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Minette Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Minette Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Minette Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Minette Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Minonk Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Minonk Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Mishonagon Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Mishonagon Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Mishonagon Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Mishonagon Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Mishonagon Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Mitten Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Mitten Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Mitten Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Mitten Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Mitten Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Monahan Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Moraine Creek
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Moraine Creek
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Moraine Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Moraine Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Morton Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Morton Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Moss Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Moss Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Moss Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Moss Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Moss Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Moving Cloud Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Moving Cloud Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Moving Cloud Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Moving Cloud Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Moving Cloud Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Mud Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Mud Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Mud Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Mud Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Mud Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Mud Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Mud Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Murphy Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Murphy Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Muskesin Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Muskesin Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Muskesin Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Muskesin Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Muskesin Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Mystery Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Nebish Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Nell Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Nineweb Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Nixon Creek
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Nixon Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
No Mans Creek
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
No Mans Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
North Crab Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
North Crab Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
North Turtle Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Noseeum Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Oriole Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Oxbow Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Oxbow Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Pallette Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Papoose Creek
Status
Complete

Town Of Manitowish Waters: Ais Education, Prevention & Planning Project: The Town of Manitowish Waters is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education and prevention, monitoring for AIS and preparing an AIS action plan.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire an AIS coordinator (duties listed in position description attached to proposal)
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Conduct 2 shoreline sweeps
5) Conduct "Guided AIS Monitoring"
6) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
7) Develop a local "Plan of Action" for AIS containment and management
8) Build portable CB/CW kiosks
9) Assemble 10 AIS monitoring equipment packages

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) An AIS containment and management plan
3) Portable CB/CW kiosks
4) AIS monitoring equipment packages
5) Final report summarizing CB/CW activities, AIS monitoring, and the AIS plan of action

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and photographs of portable kiosks.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Papoose Creek
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Papoose Creek
Status
Complete

Town Of Manitowish Waters: Ais Education, Prevention And Planning Project: The Town of Manitowish Waters is sponsoring an AIS EPP grant to be completed by December 31, 2008. The project will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire an AIS coordinator (duties listed in position description attached to proposal); 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Conduct 2 shoreline sweeps; 5) Conduct "Guided AIS Monitoring"; 6) Entry of inspection forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 7) Disseminate AIS information at boat landings, public areas, resorts, businesses, tournaments, and newsletter; 8) Sponsor an AIS float at 4th of July parade and an AIS booth at various public events.

Project deliverables include: 1) Completed entry of inspection 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 2) Photographs of float and AIS booth; 3) Final report summarizing CB/CW activities and AIS monitoring and education activities.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and photographs of float and AIS booth.


Grant Details
Aquatic Invasives Education
Date
10/1/2013
Waters Involved
Papoose Creek
Status
Proposed

Co/Pa/Pi Voluntary Lake Association: Connors Lake & Lake Of The Pines Ais Prevention: CO/PA/PI Voluntary Lake Association is sponsoring a 4-yr project to conduct AIS monitoring and update the APM plan for the three lakes.

Project deliverables include GIS data & maps of areas monitored, aquatic plant survey & bed mapping results, examples of AIS education & outreach, AIS monitoring & watercraft inspection data in SWIMS, and an updated APM plan.

Specific project activities include: 1) Pre-post treatment aquatic plant monitoring; 2) Point Intercept plant survey on Lake of the Pines & Papoose Lake; 3) Watercraft inspections, including Landing Blitz participation; 4) AIS education & monitoring; 5) Aquatic Plant Management Plan (APM) update.

Special Conditions: 1) WDNR\2019s Aquatic Plant Management in Wisconsin guidance shall be followed for point-intercept survey monitoring and aquatic plant management plan development. The NOR Native Plant Protection Strategy shall be integrated into the APM plan; 2) Sponsor shall contact DNR immediately if a new AIS is found; 3) AIS monitoring and watercraft inspection personnel shall be trained and follow DNR approved protocols; 4) Education materials shall be consistent with the Department\2019s statewide education strategy for preventing and controlling AIS.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lakes Biologist.


Grant Details
Aquatic Invasives Education
Date
3/15/2022
Waters Involved
Papoose Creek
Status
Complete

North Lakeland Discovery Center: Manitowish Waters Chain Of Lakes Aquatic Plant Studies - Phase I - Rest Lake: The North Lakeland Discovery Center is sponsoring an aquatic plant studies project on Rest Lake.

Project final deliverables include:
Aquatic plant data, educational and outreach events/products, PL biocontrol, data entry into SWIMS, final reports.

Specific project activities include:
1) Aquatic plant PI survey and community mapping
2) Lake/AIS educational and outreach activities
3) Early season AIS/CLP meander surveys
4) PL and SWF monitoring
5) PL biocontrol
6) SWIMS monitoring data entry
7) Develop final reports

Special Conditions:
Final reports need Department review and approval.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.



Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Papoose Lake
Status
Complete

Co/Pa/Pi Voluntary Lake Association: Ais Education, Prevention, & Planning Project: The CoPaPi Assoc. will sponsor an AIS prevention project including public education and monitoring of launches by boat inspections, an aquatic plant survey, and development of an AP Management Plan. The project includes public contact at landings, newsletters, written material distribution, and activities to educate the public about AIS and prevention of spread. An aquatic plant management plan will be developed including whole lake aquatic plant surveys on Connors, Papoose, and Lake of the Pines using the Point Intercept Survey method. Aquatic macrophyte samples will be sent to a herbarium for identification.

Deliverables include a comprehensive report including: 1) Documentation of donated time & services related to grant administration. 2) Agendas of training sessions & workshops. 3) Watercraft inspection report with time & number of people reached; Clean Boats, Clean Water survey data will be entered on the CB/CW database. 4) Aquatic plant survey report including graphs & maps. 5) Minutes of meetings indicating changes to local ordinances were reviewed. 6) Examples of articles or newsletters. 7) Aquatic Plant Management Plan. 8) AIS materials generated or paid for by this grant.

Special conditions for this project: The project sponsor shall immediately contact proper DNR authorities in the event of a new aquatic invasive species infestation.

This scope is intended to summarize the scope provided in the grant application and does not supersede the application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide DNR Lake Coordinator with a draft final report. The DNR shall receive paper and electronic copies of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Papoose Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Papoose Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Papoose Lake
Status
Complete

Town Of Presque Isle: Presque Isle Town Lakes Committee Apm Plans: The Town of Presque Isle is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on creating APM Plans for Annabelle, Armour, Cathaline, Horsehead, Lynx, Mabel, Papoose, and Van Vliet Lakes and AIS education and prevention.

Project activities include: 1) Point-intercept surveys; 2) Recruit volunteers and implement a CB/CW program; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Water quality sampling; 6) Stakeholder participation: Initial/final meetings, public survey; 7) Develop project report.

Project deliverables include: 1) Point-intercept survey data; 2) Completed entry of inspection Forms 3200-120 onto Dept website; 3) AIS educational and prevention activities; 4) Final report summarizing CB/CW activities, AIS educational activities, and APM Plan.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, all annual reports, survey data, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Papoose Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Pardee Creek
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Pardee Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
2/15/2018
Waters Involved
Pardee Lake
Status
Complete

North Lakeland Discovery Center: Town Of Winchester Lake Mgmt Planning - Phase 4: North Lakeland Discovery Center is sponsoring an Aquatic Invasive Species (AIS) Education, Prevention, & Planning grant to study multiple lakes in the Town of Winchester, Vilas County. The project will focus on developing a Lake Management Plan (LMP) for Circle Lily and Pardee Lakes, conducting early-season AIS monitoring on Adelaide, Helen and Harris Lakes and conducting AIS education and monitoring.

Project activities include: 1) Stakeholder participation \2013 stakeholder survey, planning meetings (up to 2), kick-off meeting, wrap-up meeting, news release(s), and newsletter article; 2) Water quality sampling and analysis; 3) Watershed assessment and P load modeling; 4) Fisheries assessment; 5) Shoreline and coarse woody habitat assessment; 6) Early-season AIS monitoring and professional Dreissena monitoring; 7) Aquatic plant surveys (PI survey, acoustic, community mapping, substrate mapping); 8) Volunteer AIS and lake level monitoring and watercraft inspections; 9) Data analysis; 10) Develop LMP; 11) Hire AIS Coordinator and Water Education Intern; 12) AIS educational activities.

Project deliverables include: 1) Stakeholder survey, news release(s), and newsletter article; 2) Water chemistry data; 3) Watershed maps and modeling data; 4) PI, shoreland, and coarse woody habitat data; 5) Aquatic plant community and substrate maps; 6) LMP; 7) Hired staff; 8) AIS educational products and events.

Specific conditions for this project: 1) Draft of stakeholder survey needs to be submitted to Lakes Management Coordinator for review and approval before sending to public; 2) Draft of LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, news release(s), newsletter article, any AIS educational products, stakeholder survey, and all data and maps from the project.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Partridge Creek
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Partridge Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Patterson Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Patterson Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Patterson Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Patterson Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Patterson Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Pier Lake
Status
Complete

Town Of Manitowish Waters: Manitowish Waters Ais Education, Prevention & Planning Project: The Town of Manitowish Waters is sponsoring an Aquatic Invasive Species Education Prevention & Planning project which will focus on providing AIS education, preventing AIS introductions into town lakes and AIS monitoring.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 9 high use landings within township from May-October 2006
2) Hire an AIS Coordinator (duties listed in position description in proposal)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Create AIS power point presentation
6) Conduct AIS monitoring
7) Develop AIS information packet and shopping bag inserts
8) Participate in Fourth of July and Cranberry Colorama town events
9) Install AIS signage/kiosks where needed
10) Provide speakers for town gatherings and events

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- AIS power point presentation
- Position description for AIS Coordinator
- AIS information packet, shopping bag inserts and signage (including photo)
- Final report (summarizing CB/CW, AIS monitoring and town events attended with list of speakers)

Specific conditions for this project:
- A minimum of 2080 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables as described above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Pier Lake
Status
Complete

Town Of Manitowish Waters: Ais Education, Prevention & Planning Project: The Town of Manitowish Waters is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education and prevention, monitoring for AIS and preparing an AIS action plan.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire an AIS coordinator (duties listed in position description attached to proposal)
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Conduct 2 shoreline sweeps
5) Conduct "Guided AIS Monitoring"
6) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
7) Develop a local "Plan of Action" for AIS containment and management
8) Build portable CB/CW kiosks
9) Assemble 10 AIS monitoring equipment packages

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) An AIS containment and management plan
3) Portable CB/CW kiosks
4) AIS monitoring equipment packages
5) Final report summarizing CB/CW activities, AIS monitoring, and the AIS plan of action

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and photographs of portable kiosks.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Pier Lake
Status
Complete

Town Of Manitowish Waters: Ais Education, Prevention And Planning Project: The Town of Manitowish Waters is sponsoring an AIS EPP grant to be completed by December 31, 2008. The project will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire an AIS coordinator (duties listed in position description attached to proposal); 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Conduct 2 shoreline sweeps; 5) Conduct "Guided AIS Monitoring"; 6) Entry of inspection forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 7) Disseminate AIS information at boat landings, public areas, resorts, businesses, tournaments, and newsletter; 8) Sponsor an AIS float at 4th of July parade and an AIS booth at various public events.

Project deliverables include: 1) Completed entry of inspection 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 2) Photographs of float and AIS booth; 3) Final report summarizing CB/CW activities and AIS monitoring and education activities.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and photographs of float and AIS booth.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Pine Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Pine Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Pine Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Pine Creek
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Pine Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Pine Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Pine Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Placid Twin Lake, North
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Placid Twin Lake, North
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Placid Twin Lake, North
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Placid Twin Lake, North
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Placid Twin Lake, North
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Placid Twin Lakes
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Placid Twin Lakes
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Placid Twin Lakes
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Placid Twin Lakes
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Placid Twin Lakes
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Plum Creek
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
3/15/2024
Waters Involved
Plum Creek
Status
Complete

Vilas County: Prev - Vilas County 2024 Prohibited & Priority Species Prevention & Monitoring Project: The Vilas County Land & Water Conservation Department is sponsoring a project to target recreational boater pathway to prevent and monitoring for prohibited & local priority aquatic and wetland invasive species.

Activities: 1) Offer hot water pressure boat decontamination to boaters at Big Muskellunge, Plum, Star, and Trout Lakes 2) Spiny Waterflea sampling on 12+ lakes 3) Increase resident and visitor awareness of spiny water fleas 4) Development of flyers on decontamination program 5) Monitor for non-native Phragmites 6) Partner with Wisconsin Headwaters Invasive Species Partnership to post billboard 7) Perform CBCW inspections

Deliverables: 1) Report developed on decontamination unit impacts 2) Lab results reported to DNR 3) Log number of attendees, number of videos accessed, number of comments on social media posts. 4) Number of flyers disseminated 5) Number of new phragmites sites detected 6) Photo of billboard displayed 7) Data entered into SWIMS

Conditions:
1) Enter data collected into SWIMS database under the grant project number.
2) All monitoring shall follow WDNR protocols.
3) All outreach and education materials shall use DNR messaging; DNR AIS biologist review and approval is required before dissemination.
4) Notify DNR AIS Biologist of any new detection of an AIS species.
5) Lab analysis will be completed by Wisconsin State Lab of Hygiene

This scope summarizes details provided in the application and does not negate tasks and/or deliverables described therein. Data, reports, surveys, and supporting information, including photos, maps and GIS data, must be submitted to the DNR Biologist in electronic format and in any other format they specify.

Also see B. Special Conditions below.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Plum Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
3/15/2024
Waters Involved
Plum Lake
Status
Complete

Vilas County: Prev - Vilas County 2024 Prohibited & Priority Species Prevention & Monitoring Project: The Vilas County Land & Water Conservation Department is sponsoring a project to target recreational boater pathway to prevent and monitoring for prohibited & local priority aquatic and wetland invasive species.

Activities: 1) Offer hot water pressure boat decontamination to boaters at Big Muskellunge, Plum, Star, and Trout Lakes 2) Spiny Waterflea sampling on 12+ lakes 3) Increase resident and visitor awareness of spiny water fleas 4) Development of flyers on decontamination program 5) Monitor for non-native Phragmites 6) Partner with Wisconsin Headwaters Invasive Species Partnership to post billboard 7) Perform CBCW inspections

Deliverables: 1) Report developed on decontamination unit impacts 2) Lab results reported to DNR 3) Log number of attendees, number of videos accessed, number of comments on social media posts. 4) Number of flyers disseminated 5) Number of new phragmites sites detected 6) Photo of billboard displayed 7) Data entered into SWIMS

Conditions:
1) Enter data collected into SWIMS database under the grant project number.
2) All monitoring shall follow WDNR protocols.
3) All outreach and education materials shall use DNR messaging; DNR AIS biologist review and approval is required before dissemination.
4) Notify DNR AIS Biologist of any new detection of an AIS species.
5) Lab analysis will be completed by Wisconsin State Lab of Hygiene

This scope summarizes details provided in the application and does not negate tasks and/or deliverables described therein. Data, reports, surveys, and supporting information, including photos, maps and GIS data, must be submitted to the DNR Biologist in electronic format and in any other format they specify.

Also see B. Special Conditions below.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Plummer Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Plummer Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Plummer Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Plummer Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Plummer Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Pokegama Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Pokegama Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Pokegama Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Pokegama Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Pokegama Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Pond Creek
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Pond Creek
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Poupart Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Poupart Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Poupart Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Poupart Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Poupart Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Presque Isle Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Presque Isle Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
2/15/2019
Waters Involved
Presque Isle Lake
Status
Complete

Town Of Presque Isle: Wilderness Waters: Averill, Presque Isle, & Wildcat Lakes: The Town of Presque Isle is sponsoring an AEPP grant to study Averill, Presque Isle, and Wildcat Lakes, in Vilas County, with a study completion date of June 30, 2021. The project will focus on developing Lake Management Plans (LMP\2019s).

Activities:
1) Gather and assess existing lake info
2) PI aquatic plant survey, community and substrate mapping and analysis
3) Shoreland assessment
4) Water quality assessment
5) Professional and volunteer AIS monitoring
6) Educational program \2013 meetings and \201Cfloating\201D workshop
7) Watercraft inspections
8) Develop LMP\2019s

Project deliverables include:
1) PI, AIS water quality, and shoreland habitat data
2) Aquatic plant community and substrate maps
3) Aquatic plant vouchers
4) Education materials
5) Entered inspection data
6) Lake Management Plans

Specific project conditions:
- LMP\2019s need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP\2019s, PI, AIS, and shoreland habitat data, a set of aquatic plant vouchers, all maps from project, and all GIS data.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Presque Springs
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Presque Springs
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Rainbow Creek
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Rainbow Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Rainbow Spring
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Raven Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Raven Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Raven Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Raven Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Raven Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Razorback Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
3/15/2021
Waters Involved
Razorback Lake
Status
Complete

Town Of Plum Lake: Prev - Boat Landing Monitoring Devices - Irving, Razorback & Laura: The Town of Plum Lake is sponsoring a project to install ILIDS cameras at the boat landings (public pier) on Laura Lake, Irving Lake, and Razorback Lake in Vilas County with the following goals: Prevent the introduction of aquatic invasive species into the lake, educate boaters on best practices.

Project final deliverables include:
1. Purchase and installation of ILIDS cameras.
2. Written reports of activities gathered by ILIDS cameras.
3. Results shared on Town website.
4. Press releases with local media.

Specific conditions for this project:
1. 200 hours of watercraft inspection time is required at each landing during the tenure of this project (being funded with
2. grant number CBCW100521).
3. Grantee must enter into a recorded land use agreement with the property owner.
4. The useful life of an ILIDS unit is 6 years.


Grant Details
Aquatic Invasives Education
Date
3/15/2024
Waters Involved
Razorback Lake
Status
Complete

Vilas County: Prev - Vilas County 2024 Prohibited & Priority Species Prevention & Monitoring Project: The Vilas County Land & Water Conservation Department is sponsoring a project to target recreational boater pathway to prevent and monitoring for prohibited & local priority aquatic and wetland invasive species.

Activities: 1) Offer hot water pressure boat decontamination to boaters at Big Muskellunge, Plum, Star, and Trout Lakes 2) Spiny Waterflea sampling on 12+ lakes 3) Increase resident and visitor awareness of spiny water fleas 4) Development of flyers on decontamination program 5) Monitor for non-native Phragmites 6) Partner with Wisconsin Headwaters Invasive Species Partnership to post billboard 7) Perform CBCW inspections

Deliverables: 1) Report developed on decontamination unit impacts 2) Lab results reported to DNR 3) Log number of attendees, number of videos accessed, number of comments on social media posts. 4) Number of flyers disseminated 5) Number of new phragmites sites detected 6) Photo of billboard displayed 7) Data entered into SWIMS

Conditions:
1) Enter data collected into SWIMS database under the grant project number.
2) All monitoring shall follow WDNR protocols.
3) All outreach and education materials shall use DNR messaging; DNR AIS biologist review and approval is required before dissemination.
4) Notify DNR AIS Biologist of any new detection of an AIS species.
5) Lab analysis will be completed by Wisconsin State Lab of Hygiene

This scope summarizes details provided in the application and does not negate tasks and/or deliverables described therein. Data, reports, surveys, and supporting information, including photos, maps and GIS data, must be submitted to the DNR Biologist in electronic format and in any other format they specify.

Also see B. Special Conditions below.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Red Bass Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Red Bass Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
2/15/2019
Waters Involved
Red Bass Lake
Status
Complete

Town Of Presque Isle: Wilderness Waters: Annabelle, Anne, Red Bass, & Vanvliet Lks: The Town of Presque Isle is sponsoring an AEPP grant to study Annabelle, Anne, Red Bass, and VanVliet Lakes, in Vilas County, with a study completion date of June 30, 2021. The project will focus on developing Lake Management Plans (LMP\2019s).

Activities:
1) Gather and assess existing lake info
2) PI aquatic plant survey, community and substrate mapping and analysis
3) Shoreland assessment
4) Water quality assessment
5) Professional and volunteer AIS monitoring
6) Educational program \2013 meetings and \201Cfloating\201D workshop
7) Watercraft inspections
8) Develop LMP\2019s

Project deliverables include:
1) PI, AIS water quality, and shoreland habitat data
2) Aquatic plant community and substrate maps
3) Aquatic plant vouchers
4) Education materials
5) Entered inspection data
6) Lake Management Plans

Specific project conditions:
- LMP\2019s need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP\2019s, PI, AIS, and shoreland habitat data, a set of aquatic plant vouchers, all maps from project, and all GIS data.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Red Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Red Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Refuge Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Refuge Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Refuge Creek
Status
Complete

Town Of Manitowish Waters: Ais Education, Prevention & Planning Project: The Town of Manitowish Waters is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education and prevention, monitoring for AIS and preparing an AIS action plan.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire an AIS coordinator (duties listed in position description attached to proposal)
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Conduct 2 shoreline sweeps
5) Conduct "Guided AIS Monitoring"
6) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
7) Develop a local "Plan of Action" for AIS containment and management
8) Build portable CB/CW kiosks
9) Assemble 10 AIS monitoring equipment packages

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) An AIS containment and management plan
3) Portable CB/CW kiosks
4) AIS monitoring equipment packages
5) Final report summarizing CB/CW activities, AIS monitoring, and the AIS plan of action

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and photographs of portable kiosks.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Refuge Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Refuge Creek
Status
Complete

Town Of Manitowish Waters: Ais Education, Prevention And Planning Project: The Town of Manitowish Waters is sponsoring an AIS EPP grant to be completed by December 31, 2008. The project will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire an AIS coordinator (duties listed in position description attached to proposal); 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Conduct 2 shoreline sweeps; 5) Conduct "Guided AIS Monitoring"; 6) Entry of inspection forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 7) Disseminate AIS information at boat landings, public areas, resorts, businesses, tournaments, and newsletter; 8) Sponsor an AIS float at 4th of July parade and an AIS booth at various public events.

Project deliverables include: 1) Completed entry of inspection 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 2) Photographs of float and AIS booth; 3) Final report summarizing CB/CW activities and AIS monitoring and education activities.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and photographs of float and AIS booth.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Refuge Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Refuge Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Rest Lake
Status
Complete

Town Of Manitowish Waters: Manitowish Waters Ais Education, Prevention & Planning Project: The Town of Manitowish Waters is sponsoring an Aquatic Invasive Species Education Prevention & Planning project which will focus on providing AIS education, preventing AIS introductions into town lakes and AIS monitoring.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 9 high use landings within township from May-October 2006
2) Hire an AIS Coordinator (duties listed in position description in proposal)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Create AIS power point presentation
6) Conduct AIS monitoring
7) Develop AIS information packet and shopping bag inserts
8) Participate in Fourth of July and Cranberry Colorama town events
9) Install AIS signage/kiosks where needed
10) Provide speakers for town gatherings and events

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- AIS power point presentation
- Position description for AIS Coordinator
- AIS information packet, shopping bag inserts and signage (including photo)
- Final report (summarizing CB/CW, AIS monitoring and town events attended with list of speakers)

Specific conditions for this project:
- A minimum of 2080 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables as described above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Rest Lake
Status
Complete

Town Of Manitowish Waters: Ais Education, Prevention & Planning Project: The Town of Manitowish Waters is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education and prevention, monitoring for AIS and preparing an AIS action plan.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire an AIS coordinator (duties listed in position description attached to proposal)
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Conduct 2 shoreline sweeps
5) Conduct "Guided AIS Monitoring"
6) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
7) Develop a local "Plan of Action" for AIS containment and management
8) Build portable CB/CW kiosks
9) Assemble 10 AIS monitoring equipment packages

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) An AIS containment and management plan
3) Portable CB/CW kiosks
4) AIS monitoring equipment packages
5) Final report summarizing CB/CW activities, AIS monitoring, and the AIS plan of action

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and photographs of portable kiosks.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Rest Lake
Status
Complete

Town Of Manitowish Waters: Ais Education, Prevention And Planning Project: The Town of Manitowish Waters is sponsoring an AIS EPP grant to be completed by December 31, 2008. The project will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire an AIS coordinator (duties listed in position description attached to proposal); 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Conduct 2 shoreline sweeps; 5) Conduct "Guided AIS Monitoring"; 6) Entry of inspection forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 7) Disseminate AIS information at boat landings, public areas, resorts, businesses, tournaments, and newsletter; 8) Sponsor an AIS float at 4th of July parade and an AIS booth at various public events.

Project deliverables include: 1) Completed entry of inspection 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 2) Photographs of float and AIS booth; 3) Final report summarizing CB/CW activities and AIS monitoring and education activities.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and photographs of float and AIS booth.


Grant Details
Aquatic Invasives Education
Date
3/15/2022
Waters Involved
Rest Lake
Status
Complete

North Lakeland Discovery Center: Manitowish Waters Chain Of Lakes Aquatic Plant Studies - Phase I - Rest Lake: The North Lakeland Discovery Center is sponsoring an aquatic plant studies project on Rest Lake.

Project final deliverables include:
Aquatic plant data, educational and outreach events/products, PL biocontrol, data entry into SWIMS, final reports.

Specific project activities include:
1) Aquatic plant PI survey and community mapping
2) Lake/AIS educational and outreach activities
3) Early season AIS/CLP meander surveys
4) PL and SWF monitoring
5) PL biocontrol
6) SWIMS monitoring data entry
7) Develop final reports

Special Conditions:
Final reports need Department review and approval.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.



Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Rice Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Rice Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Rice Creek
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Rice Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Rice Creek
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Rice Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Rice Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2012
Waters Involved
Rice Creek
Status
Complete

North Lakeland Discovery Center: Manitowish Chain Of Lakes Management Planning Project, Phase 1b: North Lakeland Discovery Center is sponsoring an AEPP projectt to study Island Lake, Spider Lake and Rice Creek, in Vilas County. The project will focus on developing a Lake Management Plan (LMP) for Island Lake and Spider Lake and conducting AIS education and monitoring.

Project activities include: 1) Stakeholder participation \2013 stakeholder survey, planning meetings (up to 2), kick-off meeting, wrap-up meeting, news release(s), and newsletter article; 2) Water quality sampling and analysis; 3) Watershed assessment and P load modeling; 4) Fisheries assessment; 5) Shoreline assessment; 6) Professional Dreissena monitoring; 7) Aquatic plant surveys (PI survey, CLP assessment, community mapping, substrate mapping); 8) Data analysis; 9) Hire AIS Coordinator and CB/CW Intern; 10) Volunteer watercraft inspections and AIS monitoring; 11) AIS educational activities; 12) Develop LMP.

Project deliverables include: 1) Stakeholder survey, news release(s), and newsletter article; 2) Water chemistry data; 3) Watershed maps and modeling data; 4) PI and shoreland data; 5) Aquatic plant community and substrate maps; 6) Aquatic plant vouchers; 7) Entered inspection and AIS monitoring data into SWIMS; 8) Hired staff; 9) AIS educational products and events; 10) LMP.

Specific project conditions: 1) Draft of stakeholder survey needs to be submitted to Lakes Management Coordinator for review and approval before sending to public; 2) Draft of LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, news release(s), newsletter article, any AIS educational products, stakeholder survey, data from PI, shoreland assessment, watershed assessment and water quality sampling, all maps from project, all GIS data, and aquatic plant vouchers.


Grant Details
Aquatic Invasives Education
Date
2/15/2019
Waters Involved
Rice Creek
Status
Complete

Town Of Presque Isle: Wilderness Waters: Armour, Big, And Horsehead Lakes: The Town of Presque Isle is sponsoring an AEPP grant to study Armour, Big, and Horsehead Lakes, in Vilas County, with a study completion date of June 30, 2021. The project will focus on developing Lake Management Plans (LMP\2019s).

Activities:
1) Gather and assess existing lake info
2) PI aquatic plant survey, community and substrate mapping and analysis
3) Shoreland assessment
4) Water quality assessment
5) Professional and volunteer AIS monitoring
6) Educational program \2013 meetings and \201Cfloating\201D workshop
7) Watercraft inspections
8) Develop LMP\2019s

Project deliverables include:
1) PI, AIS water quality, and shoreland habitat data
2) Aquatic plant community and substrate maps
3) Aquatic plant vouchers
4) Education materials
5) Entered inspection data
6) Lake Management Plans

Specific project conditions:
- LMP\2019s need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP\2019s, PI, AIS, and shoreland habitat data, a set of aquatic plant vouchers, all maps from project, and all GIS data.


Grant Details
Aquatic Invasives Education
Date
3/15/2023
Waters Involved
Rice Creek
Status
Complete

North Lakeland Discovery Center: Manitowish Waters Chain Of Lakes Aquatic Plant Studies - Phase Ib - Rice Creek: Manitowish Waters Chain of Lakes Aquatic Plant Studies - Phase Ib - Rice Creek. Expand Awareness and Education of Lake Management and Stewardship Matters. Continue control and monitoring efforts on other aquatic invasive species that pose a threat to the Manitowish Waters Chain of Lakes. Control Existing and Prevent Further Aquatic Invasive Species Establishment within the Manitowish Waters Chain of Lakes.



Project final deliverables include:
(1) NLDC will provide a written report that includes all educational activities, including dates, times, and number of participants. We will provide copies of social media postings, press releases, and links to potential TV interviews. All CBCW data will be entered into SWIMS.
(2) Community Mapping Survey.
(3) Data Analysis and Report Creation.




Specific project activities include:
(1) Assess current aquatic plant community, a point-intercept (PI) survey.
(2) An aquatic plant community mapping survey.
(3) NLDC educational initiatives.



Special Conditions: DNR is to receive copies of the final report along with, or prior to submission of grantee's final payment request. It is recommended that Grantee provide DNR Lake Coordinator with a draft of the final report for comment on report adequacy prior to making final payment to the consultant.

It is strongly recommended that an annual management strategy meeting be held each winter with DNR to discuss EWM management for the next year before aquatic plant management permit applications are submitted.




This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.




Grant Details
Aquatic Invasives Education
Date
3/15/2024
Waters Involved
Rice Creek
Status
Complete

Vilas County: Prev - Vilas County 2024 Prohibited & Priority Species Prevention & Monitoring Project: The Vilas County Land & Water Conservation Department is sponsoring a project to target recreational boater pathway to prevent and monitoring for prohibited & local priority aquatic and wetland invasive species.

Activities: 1) Offer hot water pressure boat decontamination to boaters at Big Muskellunge, Plum, Star, and Trout Lakes 2) Spiny Waterflea sampling on 12+ lakes 3) Increase resident and visitor awareness of spiny water fleas 4) Development of flyers on decontamination program 5) Monitor for non-native Phragmites 6) Partner with Wisconsin Headwaters Invasive Species Partnership to post billboard 7) Perform CBCW inspections

Deliverables: 1) Report developed on decontamination unit impacts 2) Lab results reported to DNR 3) Log number of attendees, number of videos accessed, number of comments on social media posts. 4) Number of flyers disseminated 5) Number of new phragmites sites detected 6) Photo of billboard displayed 7) Data entered into SWIMS

Conditions:
1) Enter data collected into SWIMS database under the grant project number.
2) All monitoring shall follow WDNR protocols.
3) All outreach and education materials shall use DNR messaging; DNR AIS biologist review and approval is required before dissemination.
4) Notify DNR AIS Biologist of any new detection of an AIS species.
5) Lab analysis will be completed by Wisconsin State Lab of Hygiene

This scope summarizes details provided in the application and does not negate tasks and/or deliverables described therein. Data, reports, surveys, and supporting information, including photos, maps and GIS data, must be submitted to the DNR Biologist in electronic format and in any other format they specify.

Also see B. Special Conditions below.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Rice Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Rice Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Rock Creek
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Rock Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Rosalind Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Rosalind Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Ross Allen Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Ross Allen Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Ross Allen Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Ross Allen Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Ross Allen Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Round Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Round Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Rudolph Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Rudolph Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Russet Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Russet Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Sanborn Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Sanborn Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Sanford Creek
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Sanford Creek
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Sanford Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Sanford Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Sherman Lake
Status
Complete

Town Of Manitowish Waters: Manitowish Waters Ais Education, Prevention & Planning Project: The Town of Manitowish Waters is sponsoring an Aquatic Invasive Species Education Prevention & Planning project which will focus on providing AIS education, preventing AIS introductions into town lakes and AIS monitoring.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 9 high use landings within township from May-October 2006
2) Hire an AIS Coordinator (duties listed in position description in proposal)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Create AIS power point presentation
6) Conduct AIS monitoring
7) Develop AIS information packet and shopping bag inserts
8) Participate in Fourth of July and Cranberry Colorama town events
9) Install AIS signage/kiosks where needed
10) Provide speakers for town gatherings and events

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- AIS power point presentation
- Position description for AIS Coordinator
- AIS information packet, shopping bag inserts and signage (including photo)
- Final report (summarizing CB/CW, AIS monitoring and town events attended with list of speakers)

Specific conditions for this project:
- A minimum of 2080 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables as described above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Sherman Lake
Status
Complete

Town Of Manitowish Waters: Ais Education, Prevention & Planning Project: The Town of Manitowish Waters is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education and prevention, monitoring for AIS and preparing an AIS action plan.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire an AIS coordinator (duties listed in position description attached to proposal)
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Conduct 2 shoreline sweeps
5) Conduct "Guided AIS Monitoring"
6) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
7) Develop a local "Plan of Action" for AIS containment and management
8) Build portable CB/CW kiosks
9) Assemble 10 AIS monitoring equipment packages

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) An AIS containment and management plan
3) Portable CB/CW kiosks
4) AIS monitoring equipment packages
5) Final report summarizing CB/CW activities, AIS monitoring, and the AIS plan of action

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and photographs of portable kiosks.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Sherman Lake
Status
Complete

Town Of Manitowish Waters: Ais Education, Prevention And Planning Project: The Town of Manitowish Waters is sponsoring an AIS EPP grant to be completed by December 31, 2008. The project will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire an AIS coordinator (duties listed in position description attached to proposal); 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Conduct 2 shoreline sweeps; 5) Conduct "Guided AIS Monitoring"; 6) Entry of inspection forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 7) Disseminate AIS information at boat landings, public areas, resorts, businesses, tournaments, and newsletter; 8) Sponsor an AIS float at 4th of July parade and an AIS booth at various public events.

Project deliverables include: 1) Completed entry of inspection 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 2) Photographs of float and AIS booth; 3) Final report summarizing CB/CW activities and AIS monitoring and education activities.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and photographs of float and AIS booth.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Shishebogama Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Shishebogama Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Shishebogama Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Shishebogama Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Shishebogama Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Signal Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Signal Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Signal Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Signal Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Signal Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Siphon Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Snort Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Snort Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Snort Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Snort Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Snort Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Snyder Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
South Branch Presque Isle River
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
South Branch Presque Isle River
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
2/15/2019
Waters Involved
South Branch Presque Isle River
Status
Complete

Town Of Presque Isle: Wilderness Waters: Averill, Presque Isle, & Wildcat Lakes: The Town of Presque Isle is sponsoring an AEPP grant to study Averill, Presque Isle, and Wildcat Lakes, in Vilas County, with a study completion date of June 30, 2021. The project will focus on developing Lake Management Plans (LMP\2019s).

Activities:
1) Gather and assess existing lake info
2) PI aquatic plant survey, community and substrate mapping and analysis
3) Shoreland assessment
4) Water quality assessment
5) Professional and volunteer AIS monitoring
6) Educational program \2013 meetings and \201Cfloating\201D workshop
7) Watercraft inspections
8) Develop LMP\2019s

Project deliverables include:
1) PI, AIS water quality, and shoreland habitat data
2) Aquatic plant community and substrate maps
3) Aquatic plant vouchers
4) Education materials
5) Entered inspection data
6) Lake Management Plans

Specific project conditions:
- LMP\2019s need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP\2019s, PI, AIS, and shoreland habitat data, a set of aquatic plant vouchers, all maps from project, and all GIS data.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
South Turtle Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Spider Lake
Status
Complete

Town Of Manitowish Waters: Manitowish Waters Ais Education, Prevention & Planning Project: The Town of Manitowish Waters is sponsoring an Aquatic Invasive Species Education Prevention & Planning project which will focus on providing AIS education, preventing AIS introductions into town lakes and AIS monitoring.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 9 high use landings within township from May-October 2006
2) Hire an AIS Coordinator (duties listed in position description in proposal)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Create AIS power point presentation
6) Conduct AIS monitoring
7) Develop AIS information packet and shopping bag inserts
8) Participate in Fourth of July and Cranberry Colorama town events
9) Install AIS signage/kiosks where needed
10) Provide speakers for town gatherings and events

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- AIS power point presentation
- Position description for AIS Coordinator
- AIS information packet, shopping bag inserts and signage (including photo)
- Final report (summarizing CB/CW, AIS monitoring and town events attended with list of speakers)

Specific conditions for this project:
- A minimum of 2080 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables as described above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Spider Lake
Status
Complete

Town Of Manitowish Waters: Ais Education, Prevention & Planning Project: The Town of Manitowish Waters is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education and prevention, monitoring for AIS and preparing an AIS action plan.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire an AIS coordinator (duties listed in position description attached to proposal)
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Conduct 2 shoreline sweeps
5) Conduct "Guided AIS Monitoring"
6) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
7) Develop a local "Plan of Action" for AIS containment and management
8) Build portable CB/CW kiosks
9) Assemble 10 AIS monitoring equipment packages

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) An AIS containment and management plan
3) Portable CB/CW kiosks
4) AIS monitoring equipment packages
5) Final report summarizing CB/CW activities, AIS monitoring, and the AIS plan of action

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and photographs of portable kiosks.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Spider Lake
Status
Complete

Town Of Manitowish Waters: Ais Education, Prevention And Planning Project: The Town of Manitowish Waters is sponsoring an AIS EPP grant to be completed by December 31, 2008. The project will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire an AIS coordinator (duties listed in position description attached to proposal); 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Conduct 2 shoreline sweeps; 5) Conduct "Guided AIS Monitoring"; 6) Entry of inspection forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 7) Disseminate AIS information at boat landings, public areas, resorts, businesses, tournaments, and newsletter; 8) Sponsor an AIS float at 4th of July parade and an AIS booth at various public events.

Project deliverables include: 1) Completed entry of inspection 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 2) Photographs of float and AIS booth; 3) Final report summarizing CB/CW activities and AIS monitoring and education activities.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and photographs of float and AIS booth.


Grant Details
Aquatic Invasives Education
Date
4/1/2012
Waters Involved
Spider Lake
Status
Complete

North Lakeland Discovery Center: Manitowish Chain Of Lakes Management Planning Project, Phase 1b: North Lakeland Discovery Center is sponsoring an AEPP projectt to study Island Lake, Spider Lake and Rice Creek, in Vilas County. The project will focus on developing a Lake Management Plan (LMP) for Island Lake and Spider Lake and conducting AIS education and monitoring.

Project activities include: 1) Stakeholder participation \2013 stakeholder survey, planning meetings (up to 2), kick-off meeting, wrap-up meeting, news release(s), and newsletter article; 2) Water quality sampling and analysis; 3) Watershed assessment and P load modeling; 4) Fisheries assessment; 5) Shoreline assessment; 6) Professional Dreissena monitoring; 7) Aquatic plant surveys (PI survey, CLP assessment, community mapping, substrate mapping); 8) Data analysis; 9) Hire AIS Coordinator and CB/CW Intern; 10) Volunteer watercraft inspections and AIS monitoring; 11) AIS educational activities; 12) Develop LMP.

Project deliverables include: 1) Stakeholder survey, news release(s), and newsletter article; 2) Water chemistry data; 3) Watershed maps and modeling data; 4) PI and shoreland data; 5) Aquatic plant community and substrate maps; 6) Aquatic plant vouchers; 7) Entered inspection and AIS monitoring data into SWIMS; 8) Hired staff; 9) AIS educational products and events; 10) LMP.

Specific project conditions: 1) Draft of stakeholder survey needs to be submitted to Lakes Management Coordinator for review and approval before sending to public; 2) Draft of LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, news release(s), newsletter article, any AIS educational products, stakeholder survey, data from PI, shoreland assessment, watershed assessment and water quality sampling, all maps from project, all GIS data, and aquatic plant vouchers.


Grant Details
Aquatic Invasives Education
Date
3/15/2022
Waters Involved
Spider Lake
Status
Complete

North Lakeland Discovery Center: Manitowish Waters Chain Of Lakes Aquatic Plant Studies - Phase I - Spider: The North Lakeland Discovery Center is sponsoring an aquatic plant studies project on Spider Lake.

Project final deliverables include:
Aquatic plant data, educational and outreach events/products, PL biocontrol, data entry into SWIMS, final reports.

Specific project activities include:
1) Aquatic plant PI survey and community mapping
2) Lake/AIS educational and outreach activities
3) Early season AIS/CLP meander surveys
4) PL and SWF monitoring
5) PL biocontrol
6) SWIMS monitoring data entry
7) Develop final reports

Special Conditions:
Final reports need Department review and approval.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.



Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Spread Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Spread Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Spring Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Spring Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Spring Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Spring Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Spring Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Spruce Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Squirrel Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Squirrel Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Squirrel Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Squirrel Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Squirrel Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Star Creek
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
3/15/2024
Waters Involved
Star Creek
Status
Complete

Vilas County: Prev - Vilas County 2024 Prohibited & Priority Species Prevention & Monitoring Project: The Vilas County Land & Water Conservation Department is sponsoring a project to target recreational boater pathway to prevent and monitoring for prohibited & local priority aquatic and wetland invasive species.

Activities: 1) Offer hot water pressure boat decontamination to boaters at Big Muskellunge, Plum, Star, and Trout Lakes 2) Spiny Waterflea sampling on 12+ lakes 3) Increase resident and visitor awareness of spiny water fleas 4) Development of flyers on decontamination program 5) Monitor for non-native Phragmites 6) Partner with Wisconsin Headwaters Invasive Species Partnership to post billboard 7) Perform CBCW inspections

Deliverables: 1) Report developed on decontamination unit impacts 2) Lab results reported to DNR 3) Log number of attendees, number of videos accessed, number of comments on social media posts. 4) Number of flyers disseminated 5) Number of new phragmites sites detected 6) Photo of billboard displayed 7) Data entered into SWIMS

Conditions:
1) Enter data collected into SWIMS database under the grant project number.
2) All monitoring shall follow WDNR protocols.
3) All outreach and education materials shall use DNR messaging; DNR AIS biologist review and approval is required before dissemination.
4) Notify DNR AIS Biologist of any new detection of an AIS species.
5) Lab analysis will be completed by Wisconsin State Lab of Hygiene

This scope summarizes details provided in the application and does not negate tasks and/or deliverables described therein. Data, reports, surveys, and supporting information, including photos, maps and GIS data, must be submitted to the DNR Biologist in electronic format and in any other format they specify.

Also see B. Special Conditions below.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Star Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
3/15/2024
Waters Involved
Star Lake
Status
Complete

Vilas County: Prev - Vilas County 2024 Prohibited & Priority Species Prevention & Monitoring Project: The Vilas County Land & Water Conservation Department is sponsoring a project to target recreational boater pathway to prevent and monitoring for prohibited & local priority aquatic and wetland invasive species.

Activities: 1) Offer hot water pressure boat decontamination to boaters at Big Muskellunge, Plum, Star, and Trout Lakes 2) Spiny Waterflea sampling on 12+ lakes 3) Increase resident and visitor awareness of spiny water fleas 4) Development of flyers on decontamination program 5) Monitor for non-native Phragmites 6) Partner with Wisconsin Headwaters Invasive Species Partnership to post billboard 7) Perform CBCW inspections

Deliverables: 1) Report developed on decontamination unit impacts 2) Lab results reported to DNR 3) Log number of attendees, number of videos accessed, number of comments on social media posts. 4) Number of flyers disseminated 5) Number of new phragmites sites detected 6) Photo of billboard displayed 7) Data entered into SWIMS

Conditions:
1) Enter data collected into SWIMS database under the grant project number.
2) All monitoring shall follow WDNR protocols.
3) All outreach and education materials shall use DNR messaging; DNR AIS biologist review and approval is required before dissemination.
4) Notify DNR AIS Biologist of any new detection of an AIS species.
5) Lab analysis will be completed by Wisconsin State Lab of Hygiene

This scope summarizes details provided in the application and does not negate tasks and/or deliverables described therein. Data, reports, surveys, and supporting information, including photos, maps and GIS data, must be submitted to the DNR Biologist in electronic format and in any other format they specify.

Also see B. Special Conditions below.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Starrett Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Statehouse Lake
Status
Complete

Town Of Manitowish Waters: Manitowish Waters Ais Education, Prevention & Planning Project: The Town of Manitowish Waters is sponsoring an Aquatic Invasive Species Education Prevention & Planning project which will focus on providing AIS education, preventing AIS introductions into town lakes and AIS monitoring.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 9 high use landings within township from May-October 2006
2) Hire an AIS Coordinator (duties listed in position description in proposal)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Create AIS power point presentation
6) Conduct AIS monitoring
7) Develop AIS information packet and shopping bag inserts
8) Participate in Fourth of July and Cranberry Colorama town events
9) Install AIS signage/kiosks where needed
10) Provide speakers for town gatherings and events

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- AIS power point presentation
- Position description for AIS Coordinator
- AIS information packet, shopping bag inserts and signage (including photo)
- Final report (summarizing CB/CW, AIS monitoring and town events attended with list of speakers)

Specific conditions for this project:
- A minimum of 2080 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables as described above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Statehouse Lake
Status
Complete

Town Of Manitowish Waters: Ais Education, Prevention & Planning Project: The Town of Manitowish Waters is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education and prevention, monitoring for AIS and preparing an AIS action plan.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire an AIS coordinator (duties listed in position description attached to proposal)
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Conduct 2 shoreline sweeps
5) Conduct "Guided AIS Monitoring"
6) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
7) Develop a local "Plan of Action" for AIS containment and management
8) Build portable CB/CW kiosks
9) Assemble 10 AIS monitoring equipment packages

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) An AIS containment and management plan
3) Portable CB/CW kiosks
4) AIS monitoring equipment packages
5) Final report summarizing CB/CW activities, AIS monitoring, and the AIS plan of action

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and photographs of portable kiosks.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Statehouse Lake
Status
Complete

Town Of Manitowish Waters: Ais Education, Prevention And Planning Project: The Town of Manitowish Waters is sponsoring an AIS EPP grant to be completed by December 31, 2008. The project will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire an AIS coordinator (duties listed in position description attached to proposal); 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Conduct 2 shoreline sweeps; 5) Conduct "Guided AIS Monitoring"; 6) Entry of inspection forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 7) Disseminate AIS information at boat landings, public areas, resorts, businesses, tournaments, and newsletter; 8) Sponsor an AIS float at 4th of July parade and an AIS booth at various public events.

Project deliverables include: 1) Completed entry of inspection 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 2) Photographs of float and AIS booth; 3) Final report summarizing CB/CW activities and AIS monitoring and education activities.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and photographs of float and AIS booth.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Stateline Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Stateline Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Statenaker Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Statenaker Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Statenaker Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Statenaker Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Statenaker Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Stearns Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Stearns Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Stearns Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Stearns Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Stearns Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Stella Creek
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Stepping Stone Lake Number 1
Status
Complete

Town Of Manitowish Waters: Manitowish Waters Ais Education, Prevention & Planning Project: The Town of Manitowish Waters is sponsoring an Aquatic Invasive Species Education Prevention & Planning project which will focus on providing AIS education, preventing AIS introductions into town lakes and AIS monitoring.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 9 high use landings within township from May-October 2006
2) Hire an AIS Coordinator (duties listed in position description in proposal)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Create AIS power point presentation
6) Conduct AIS monitoring
7) Develop AIS information packet and shopping bag inserts
8) Participate in Fourth of July and Cranberry Colorama town events
9) Install AIS signage/kiosks where needed
10) Provide speakers for town gatherings and events

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- AIS power point presentation
- Position description for AIS Coordinator
- AIS information packet, shopping bag inserts and signage (including photo)
- Final report (summarizing CB/CW, AIS monitoring and town events attended with list of speakers)

Specific conditions for this project:
- A minimum of 2080 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables as described above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Stepping Stone Lake Number 1
Status
Complete

Town Of Manitowish Waters: Ais Education, Prevention & Planning Project: The Town of Manitowish Waters is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education and prevention, monitoring for AIS and preparing an AIS action plan.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire an AIS coordinator (duties listed in position description attached to proposal)
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Conduct 2 shoreline sweeps
5) Conduct "Guided AIS Monitoring"
6) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
7) Develop a local "Plan of Action" for AIS containment and management
8) Build portable CB/CW kiosks
9) Assemble 10 AIS monitoring equipment packages

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) An AIS containment and management plan
3) Portable CB/CW kiosks
4) AIS monitoring equipment packages
5) Final report summarizing CB/CW activities, AIS monitoring, and the AIS plan of action

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and photographs of portable kiosks.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Stepping Stone Lake Number 1
Status
Complete

Town Of Manitowish Waters: Ais Education, Prevention And Planning Project: The Town of Manitowish Waters is sponsoring an AIS EPP grant to be completed by December 31, 2008. The project will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire an AIS coordinator (duties listed in position description attached to proposal); 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Conduct 2 shoreline sweeps; 5) Conduct "Guided AIS Monitoring"; 6) Entry of inspection forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 7) Disseminate AIS information at boat landings, public areas, resorts, businesses, tournaments, and newsletter; 8) Sponsor an AIS float at 4th of July parade and an AIS booth at various public events.

Project deliverables include: 1) Completed entry of inspection 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 2) Photographs of float and AIS booth; 3) Final report summarizing CB/CW activities and AIS monitoring and education activities.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and photographs of float and AIS booth.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Stepping Stone Lake Number 2
Status
Complete

Town Of Manitowish Waters: Manitowish Waters Ais Education, Prevention & Planning Project: The Town of Manitowish Waters is sponsoring an Aquatic Invasive Species Education Prevention & Planning project which will focus on providing AIS education, preventing AIS introductions into town lakes and AIS monitoring.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 9 high use landings within township from May-October 2006
2) Hire an AIS Coordinator (duties listed in position description in proposal)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Create AIS power point presentation
6) Conduct AIS monitoring
7) Develop AIS information packet and shopping bag inserts
8) Participate in Fourth of July and Cranberry Colorama town events
9) Install AIS signage/kiosks where needed
10) Provide speakers for town gatherings and events

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- AIS power point presentation
- Position description for AIS Coordinator
- AIS information packet, shopping bag inserts and signage (including photo)
- Final report (summarizing CB/CW, AIS monitoring and town events attended with list of speakers)

Specific conditions for this project:
- A minimum of 2080 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables as described above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Stepping Stone Lake Number 2
Status
Complete

Town Of Manitowish Waters: Ais Education, Prevention & Planning Project: The Town of Manitowish Waters is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education and prevention, monitoring for AIS and preparing an AIS action plan.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire an AIS coordinator (duties listed in position description attached to proposal)
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Conduct 2 shoreline sweeps
5) Conduct "Guided AIS Monitoring"
6) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
7) Develop a local "Plan of Action" for AIS containment and management
8) Build portable CB/CW kiosks
9) Assemble 10 AIS monitoring equipment packages

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) An AIS containment and management plan
3) Portable CB/CW kiosks
4) AIS monitoring equipment packages
5) Final report summarizing CB/CW activities, AIS monitoring, and the AIS plan of action

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and photographs of portable kiosks.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Stepping Stone Lake Number 2
Status
Complete

Town Of Manitowish Waters: Ais Education, Prevention And Planning Project: The Town of Manitowish Waters is sponsoring an AIS EPP grant to be completed by December 31, 2008. The project will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire an AIS coordinator (duties listed in position description attached to proposal); 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Conduct 2 shoreline sweeps; 5) Conduct "Guided AIS Monitoring"; 6) Entry of inspection forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 7) Disseminate AIS information at boat landings, public areas, resorts, businesses, tournaments, and newsletter; 8) Sponsor an AIS float at 4th of July parade and an AIS booth at various public events.

Project deliverables include: 1) Completed entry of inspection 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 2) Photographs of float and AIS booth; 3) Final report summarizing CB/CW activities and AIS monitoring and education activities.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and photographs of float and AIS booth.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Stepping Stone Lake Number 3
Status
Complete

Town Of Manitowish Waters: Manitowish Waters Ais Education, Prevention & Planning Project: The Town of Manitowish Waters is sponsoring an Aquatic Invasive Species Education Prevention & Planning project which will focus on providing AIS education, preventing AIS introductions into town lakes and AIS monitoring.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 9 high use landings within township from May-October 2006
2) Hire an AIS Coordinator (duties listed in position description in proposal)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Create AIS power point presentation
6) Conduct AIS monitoring
7) Develop AIS information packet and shopping bag inserts
8) Participate in Fourth of July and Cranberry Colorama town events
9) Install AIS signage/kiosks where needed
10) Provide speakers for town gatherings and events

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- AIS power point presentation
- Position description for AIS Coordinator
- AIS information packet, shopping bag inserts and signage (including photo)
- Final report (summarizing CB/CW, AIS monitoring and town events attended with list of speakers)

Specific conditions for this project:
- A minimum of 2080 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables as described above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Stepping Stone Lake Number 3
Status
Complete

Town Of Manitowish Waters: Ais Education, Prevention & Planning Project: The Town of Manitowish Waters is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education and prevention, monitoring for AIS and preparing an AIS action plan.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire an AIS coordinator (duties listed in position description attached to proposal)
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Conduct 2 shoreline sweeps
5) Conduct "Guided AIS Monitoring"
6) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
7) Develop a local "Plan of Action" for AIS containment and management
8) Build portable CB/CW kiosks
9) Assemble 10 AIS monitoring equipment packages

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) An AIS containment and management plan
3) Portable CB/CW kiosks
4) AIS monitoring equipment packages
5) Final report summarizing CB/CW activities, AIS monitoring, and the AIS plan of action

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and photographs of portable kiosks.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Stepping Stone Lake Number 3
Status
Complete

Town Of Manitowish Waters: Ais Education, Prevention And Planning Project: The Town of Manitowish Waters is sponsoring an AIS EPP grant to be completed by December 31, 2008. The project will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire an AIS coordinator (duties listed in position description attached to proposal); 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Conduct 2 shoreline sweeps; 5) Conduct "Guided AIS Monitoring"; 6) Entry of inspection forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 7) Disseminate AIS information at boat landings, public areas, resorts, businesses, tournaments, and newsletter; 8) Sponsor an AIS float at 4th of July parade and an AIS booth at various public events.

Project deliverables include: 1) Completed entry of inspection 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 2) Photographs of float and AIS booth; 3) Final report summarizing CB/CW activities and AIS monitoring and education activities.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and photographs of float and AIS booth.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Stevenson Creek
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Stevenson Creek Flowage
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Stewart Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Stone Lake
Status
Complete

Town Of Manitowish Waters: Manitowish Waters Ais Education, Prevention & Planning Project: The Town of Manitowish Waters is sponsoring an Aquatic Invasive Species Education Prevention & Planning project which will focus on providing AIS education, preventing AIS introductions into town lakes and AIS monitoring.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 9 high use landings within township from May-October 2006
2) Hire an AIS Coordinator (duties listed in position description in proposal)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Create AIS power point presentation
6) Conduct AIS monitoring
7) Develop AIS information packet and shopping bag inserts
8) Participate in Fourth of July and Cranberry Colorama town events
9) Install AIS signage/kiosks where needed
10) Provide speakers for town gatherings and events

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- AIS power point presentation
- Position description for AIS Coordinator
- AIS information packet, shopping bag inserts and signage (including photo)
- Final report (summarizing CB/CW, AIS monitoring and town events attended with list of speakers)

Specific conditions for this project:
- A minimum of 2080 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables as described above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Stone Lake
Status
Complete

Town Of Manitowish Waters: Ais Education, Prevention & Planning Project: The Town of Manitowish Waters is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education and prevention, monitoring for AIS and preparing an AIS action plan.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire an AIS coordinator (duties listed in position description attached to proposal)
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Conduct 2 shoreline sweeps
5) Conduct "Guided AIS Monitoring"
6) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
7) Develop a local "Plan of Action" for AIS containment and management
8) Build portable CB/CW kiosks
9) Assemble 10 AIS monitoring equipment packages

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) An AIS containment and management plan
3) Portable CB/CW kiosks
4) AIS monitoring equipment packages
5) Final report summarizing CB/CW activities, AIS monitoring, and the AIS plan of action

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and photographs of portable kiosks.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Stone Lake
Status
Complete

Town Of Manitowish Waters: Ais Education, Prevention And Planning Project: The Town of Manitowish Waters is sponsoring an AIS EPP grant to be completed by December 31, 2008. The project will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire an AIS coordinator (duties listed in position description attached to proposal); 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Conduct 2 shoreline sweeps; 5) Conduct "Guided AIS Monitoring"; 6) Entry of inspection forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 7) Disseminate AIS information at boat landings, public areas, resorts, businesses, tournaments, and newsletter; 8) Sponsor an AIS float at 4th of July parade and an AIS booth at various public events.

Project deliverables include: 1) Completed entry of inspection 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 2) Photographs of float and AIS booth; 3) Final report summarizing CB/CW activities and AIS monitoring and education activities.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and photographs of float and AIS booth.


Grant Details
Aquatic Invasives Education
Date
4/1/2013
Waters Involved
Stone Lake
Status
Complete

North Lakeland Discovery Center: Manitowish Chain Of Lakes Management Planning Project Phase Iib: North Lakeland Discovery Center is sponsoring an AEPP grant to study Clear Lake, Fawn Lake, Manitowish Lake, and Stone Lake, in Vilas County. The project will focus on developing a Lake Management Plan (LMP) for Clear, Fawn, Manitowish, and Stone Lakes and conducting AIS education and monitoring.

Project activities include: 1) Stakeholder participation \2013 stakeholder survey, planning meetings (up to 2), kick-off meeting, wrap-up meeting, news release(s), and newsletter article; 2) Data analysis; 3) Hire AIS Coordinator and Water Education Intern; 4) Volunteer watercraft inspections and AIS monitoring; 5) AIS educational activities; 6) Develop LMP.

Project deliverables include: 1) Stakeholder survey, news release(s), and newsletter article; 2) Entered inspection and AIS monitoring data into SWIMS; 3) Hired staff; 4) AIS educational products and events; 5) LMP.

Specific conditions for this project: 1) Draft of stakeholder survey needs to be submitted to Lakes Management Coordinator for review and approval before sending to public; 2) Draft of LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, news release(s), newsletter article, any AIS educational products, stakeholder survey, and all data and maps from the project.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Sturgeon Lake
Status
Complete

Town Of Manitowish Waters: Manitowish Waters Ais Education, Prevention & Planning Project: The Town of Manitowish Waters is sponsoring an Aquatic Invasive Species Education Prevention & Planning project which will focus on providing AIS education, preventing AIS introductions into town lakes and AIS monitoring.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 9 high use landings within township from May-October 2006
2) Hire an AIS Coordinator (duties listed in position description in proposal)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Create AIS power point presentation
6) Conduct AIS monitoring
7) Develop AIS information packet and shopping bag inserts
8) Participate in Fourth of July and Cranberry Colorama town events
9) Install AIS signage/kiosks where needed
10) Provide speakers for town gatherings and events

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- AIS power point presentation
- Position description for AIS Coordinator
- AIS information packet, shopping bag inserts and signage (including photo)
- Final report (summarizing CB/CW, AIS monitoring and town events attended with list of speakers)

Specific conditions for this project:
- A minimum of 2080 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables as described above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Sturgeon Lake
Status
Complete

Town Of Manitowish Waters: Ais Education, Prevention & Planning Project: The Town of Manitowish Waters is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education and prevention, monitoring for AIS and preparing an AIS action plan.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire an AIS coordinator (duties listed in position description attached to proposal)
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Conduct 2 shoreline sweeps
5) Conduct "Guided AIS Monitoring"
6) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
7) Develop a local "Plan of Action" for AIS containment and management
8) Build portable CB/CW kiosks
9) Assemble 10 AIS monitoring equipment packages

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) An AIS containment and management plan
3) Portable CB/CW kiosks
4) AIS monitoring equipment packages
5) Final report summarizing CB/CW activities, AIS monitoring, and the AIS plan of action

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and photographs of portable kiosks.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Sturgeon Lake
Status
Complete

Town Of Manitowish Waters: Ais Education, Prevention And Planning Project: The Town of Manitowish Waters is sponsoring an AIS EPP grant to be completed by December 31, 2008. The project will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire an AIS coordinator (duties listed in position description attached to proposal); 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Conduct 2 shoreline sweeps; 5) Conduct "Guided AIS Monitoring"; 6) Entry of inspection forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 7) Disseminate AIS information at boat landings, public areas, resorts, businesses, tournaments, and newsletter; 8) Sponsor an AIS float at 4th of July parade and an AIS booth at various public events.

Project deliverables include: 1) Completed entry of inspection 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 2) Photographs of float and AIS booth; 3) Final report summarizing CB/CW activities and AIS monitoring and education activities.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and photographs of float and AIS booth.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Sugarbush Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Sugarbush Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Sugarbush Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Sugarbush Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Sugarbush Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Sunfish Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Sunfish Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Sunfish Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Sunfish Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Sunfish Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Sunfish Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Sunfish Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Sunfish Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Sunfish Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Sunfish Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Tamarack Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Tambier Creek
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Tank Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Tank Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Tank Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Tank Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Tank Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
3/15/2024
Waters Involved
Tenderfoot Lake
Status
Complete

Vilas County: Prev - Vilas County 2024 Prohibited & Priority Species Prevention & Monitoring Project: The Vilas County Land & Water Conservation Department is sponsoring a project to target recreational boater pathway to prevent and monitoring for prohibited & local priority aquatic and wetland invasive species.

Activities: 1) Offer hot water pressure boat decontamination to boaters at Big Muskellunge, Plum, Star, and Trout Lakes 2) Spiny Waterflea sampling on 12+ lakes 3) Increase resident and visitor awareness of spiny water fleas 4) Development of flyers on decontamination program 5) Monitor for non-native Phragmites 6) Partner with Wisconsin Headwaters Invasive Species Partnership to post billboard 7) Perform CBCW inspections

Deliverables: 1) Report developed on decontamination unit impacts 2) Lab results reported to DNR 3) Log number of attendees, number of videos accessed, number of comments on social media posts. 4) Number of flyers disseminated 5) Number of new phragmites sites detected 6) Photo of billboard displayed 7) Data entered into SWIMS

Conditions:
1) Enter data collected into SWIMS database under the grant project number.
2) All monitoring shall follow WDNR protocols.
3) All outreach and education materials shall use DNR messaging; DNR AIS biologist review and approval is required before dissemination.
4) Notify DNR AIS Biologist of any new detection of an AIS species.
5) Lab analysis will be completed by Wisconsin State Lab of Hygiene

This scope summarizes details provided in the application and does not negate tasks and/or deliverables described therein. Data, reports, surveys, and supporting information, including photos, maps and GIS data, must be submitted to the DNR Biologist in electronic format and in any other format they specify.

Also see B. Special Conditions below.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Tippecanoe Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Tippecanoe Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Tippecanoe Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Tippecanoe Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Tippecanoe Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Tomahawk River
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Tomahawk River
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Tomahawk River
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Tomahawk River
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Tomahawk River
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Toulish Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Toulish Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Toulish Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Toulish Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Toulish Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Toy Creek
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Toy Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Trostel Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
3/15/2024
Waters Involved
Trout Lake
Status
Complete

Vilas County: Prev - Vilas County 2024 Prohibited & Priority Species Prevention & Monitoring Project: The Vilas County Land & Water Conservation Department is sponsoring a project to target recreational boater pathway to prevent and monitoring for prohibited & local priority aquatic and wetland invasive species.

Activities: 1) Offer hot water pressure boat decontamination to boaters at Big Muskellunge, Plum, Star, and Trout Lakes 2) Spiny Waterflea sampling on 12+ lakes 3) Increase resident and visitor awareness of spiny water fleas 4) Development of flyers on decontamination program 5) Monitor for non-native Phragmites 6) Partner with Wisconsin Headwaters Invasive Species Partnership to post billboard 7) Perform CBCW inspections

Deliverables: 1) Report developed on decontamination unit impacts 2) Lab results reported to DNR 3) Log number of attendees, number of videos accessed, number of comments on social media posts. 4) Number of flyers disseminated 5) Number of new phragmites sites detected 6) Photo of billboard displayed 7) Data entered into SWIMS

Conditions:
1) Enter data collected into SWIMS database under the grant project number.
2) All monitoring shall follow WDNR protocols.
3) All outreach and education materials shall use DNR messaging; DNR AIS biologist review and approval is required before dissemination.
4) Notify DNR AIS Biologist of any new detection of an AIS species.
5) Lab analysis will be completed by Wisconsin State Lab of Hygiene

This scope summarizes details provided in the application and does not negate tasks and/or deliverables described therein. Data, reports, surveys, and supporting information, including photos, maps and GIS data, must be submitted to the DNR Biologist in electronic format and in any other format they specify.

Also see B. Special Conditions below.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Trout River
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Trout River
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Trout River
Status
Complete

Town Of Manitowish Waters: Ais Education, Prevention & Planning Project: The Town of Manitowish Waters is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education and prevention, monitoring for AIS and preparing an AIS action plan.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire an AIS coordinator (duties listed in position description attached to proposal)
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Conduct 2 shoreline sweeps
5) Conduct "Guided AIS Monitoring"
6) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
7) Develop a local "Plan of Action" for AIS containment and management
8) Build portable CB/CW kiosks
9) Assemble 10 AIS monitoring equipment packages

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) An AIS containment and management plan
3) Portable CB/CW kiosks
4) AIS monitoring equipment packages
5) Final report summarizing CB/CW activities, AIS monitoring, and the AIS plan of action

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and photographs of portable kiosks.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Trout River
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Trout River
Status
Complete

Town Of Manitowish Waters: Ais Education, Prevention And Planning Project: The Town of Manitowish Waters is sponsoring an AIS EPP grant to be completed by December 31, 2008. The project will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire an AIS coordinator (duties listed in position description attached to proposal); 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Conduct 2 shoreline sweeps; 5) Conduct "Guided AIS Monitoring"; 6) Entry of inspection forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 7) Disseminate AIS information at boat landings, public areas, resorts, businesses, tournaments, and newsletter; 8) Sponsor an AIS float at 4th of July parade and an AIS booth at various public events.

Project deliverables include: 1) Completed entry of inspection 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 2) Photographs of float and AIS booth; 3) Final report summarizing CB/CW activities and AIS monitoring and education activities.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and photographs of float and AIS booth.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Trout River
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Trout River
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2013
Waters Involved
Trout River
Status
Complete

North Lakeland Discovery Center: Manitowish Chain Of Lakes Management Planning Project Phase Iib: North Lakeland Discovery Center is sponsoring an AEPP grant to study Clear Lake, Fawn Lake, Manitowish Lake, and Stone Lake, in Vilas County. The project will focus on developing a Lake Management Plan (LMP) for Clear, Fawn, Manitowish, and Stone Lakes and conducting AIS education and monitoring.

Project activities include: 1) Stakeholder participation \2013 stakeholder survey, planning meetings (up to 2), kick-off meeting, wrap-up meeting, news release(s), and newsletter article; 2) Data analysis; 3) Hire AIS Coordinator and Water Education Intern; 4) Volunteer watercraft inspections and AIS monitoring; 5) AIS educational activities; 6) Develop LMP.

Project deliverables include: 1) Stakeholder survey, news release(s), and newsletter article; 2) Entered inspection and AIS monitoring data into SWIMS; 3) Hired staff; 4) AIS educational products and events; 5) LMP.

Specific conditions for this project: 1) Draft of stakeholder survey needs to be submitted to Lakes Management Coordinator for review and approval before sending to public; 2) Draft of LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, news release(s), newsletter article, any AIS educational products, stakeholder survey, and all data and maps from the project.


Grant Details
Aquatic Invasives Education
Date
4/1/2014
Waters Involved
Trout River
Status
Complete

North Lakeland Discovery Center: Manitowish Chain Of Lakes Management Planning Project, Ph Iiib: North Lakeland Discovery Center is sponsoring an AEPP grant to study Alder Lake, Wild Rice Lake and Trout River in Vilas County. The project will focus on developing a Lake Management Plan (LMP) for Wild Rice and Alder Lakes and conducting AIS education and monitoring.

Project activities include: 1) Stakeholder survey; 2) Water quality assessment; 3) Data analysis; 4) Hire AIS Coordinator and Water Education Intern; 5) AIS educational activities; 6) Develop LMP.

Project deliverables include: 1) Stakeholder survey; 2) Water quality data; 3) Hired staff; 4) AIS educational products and events; 5) LMP.

Specific conditions for this project: 1) Draft of stakeholder survey needs to be submitted to Lakes Management Coordinator for review and approval before sending to public; 2) Draft of LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, news release(s), newsletter article, any AIS educational products, stakeholder survey, and all data and maps from the project.


Grant Details
Aquatic Invasives Education
Date
2/15/2017
Waters Involved
Trout River
Status
Complete

North Lakeland Discovery Center: Manitowish Chain Of Lake Management Plan - Phase V: North Lakeland Discovery Center is sponsoring an AEPP grant to study Benson, Sturgeon, Vance, and Stone Lakes in Vilas County. The project will focus on developing a Lake Management Plan (LMP) for phase V lakes and conducting AIS education and monitoring.

Project activities include: 1) Stakeholder participation \2013 stakeholder survey, planning meetings (up to 2), kick-off meeting, wrap-up meeting, news release(s), and newsletter article; 2) Water quality sampling and analysis; 3) Watershed assessment and P load modeling; 4) Fisheries assessment and professional Dreissena monitoring; 5) Shoreline and coarse woody habitat assessment; 6) Early-season AIS monitoring and professional Dreissena monitoring; 7) Aquatic plant surveys (PI survey, community mapping, substrate mapping, wild rice mapping); 8) Volunteer AIS monitoring and watercraft inspections; 9) Data analysis; 10) Develop LMP; 11) Hire AIS Coordinator and Water Education Intern; 12) AIS educational activities.

Project deliverables include: 1) Stakeholder survey, news release(s), and newsletter article; 2) Water chemistry data; 3) Watershed maps and modeling data; 4) PI, shoreland, wild rice, and coarse woody habitat data; 5) Aquatic plant community and substrate maps; 6) Entered watercraft inspection data \2013 200 hours; 7) LMP; 8) Hired staff; 9) AIS educational products and events.

Specific conditions for this project: 1) Draft of stakeholder survey needs to be submitted to Lakes Management Coordinator for review and approval before sending to the public; 2) Draft of LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, news release(s), newsletter article, any AIS educational products, stakeholder survey, and all data and maps from the project.


Grant Details
Aquatic Invasives Education
Date
3/15/2022
Waters Involved
Trout River
Status
Complete

North Lakeland Discovery Center: Manitowish Waters Chain Of Lakes Aquatic Plant Studies - Phase I - Spider: The North Lakeland Discovery Center is sponsoring an aquatic plant studies project on Spider Lake.

Project final deliverables include:
Aquatic plant data, educational and outreach events/products, PL biocontrol, data entry into SWIMS, final reports.

Specific project activities include:
1) Aquatic plant PI survey and community mapping
2) Lake/AIS educational and outreach activities
3) Early season AIS/CLP meander surveys
4) PL and SWF monitoring
5) PL biocontrol
6) SWIMS monitoring data entry
7) Develop final reports

Special Conditions:
Final reports need Department review and approval.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.



Grant Details
Aquatic Invasives Education
Date
3/15/2024
Waters Involved
Trout River
Status
Complete

North Lakeland Discovery Center: Manitowish Waters Chain Of Lakes Aquatic Plant Studies - Phase Iii - Adler: The North Lakeland Discovery Center is sponsoring an aquatic plant studies project on Alder Lake.

Activities: 1) Aquatic plant PI survey and community mapping 2) Lake/AIS educational activities 3) Early season AIS/CLP meander surveys 4) PL and SWF monitoring 5) PL biocontrol 6) SWIMS monitoring data entry 7) Develop final reports.

Deliverables: 1) Aquatic plant data 2) Educational events/products 3) PL efforts 4) Final reports.

Conditions:
1) Final reports need Dept review and approval

This scope summarizes details provided in the application and does not negate tasks and/or deliverables described therein. Data, reports, surveys, and supporting information, including photos, maps and GIS data, must be submitted to the DNR Biologist in electronic format and in any other format they specify


Grant Details
Aquatic Invasives Education
Date
3/15/2024
Waters Involved
Trout River
Status
Complete

North Lakeland Discovery Center: Manitowish Waters Chain Of Lakes Aquatic Plant Studies - Phase Iii - Wild Rice: The North Lakeland Discovery Center is sponsoring an aquatic plant studies project on Wild Rice Lake.

Activities: 1) Aquatic plant PI survey and community mapping 2) Lake/AIS educational activities 3) Early season AIS/CLP meander surveys 4) PL and SWF monitoring 5) PL biocontrol 6) SWIMS monitoring data entry 7) Develop final reports.

Deliverables: 1) Aquatic plant data 2) Educational events/products 3) PL efforts 4) Final reports.

Conditions:
1) Final reports need Dept review and approval

This scope summarizes details provided in the application and does not negate tasks and/or deliverables described therein. Data, reports, surveys, and supporting information, including photos, maps and GIS data, must be submitted to the DNR Biologist in electronic format and in any other format they specify


Grant Details
Aquatic Invasives Education
Date
3/15/2024
Waters Involved
Trout River
Status
Complete

Vilas County: Prev - Vilas County 2024 Prohibited & Priority Species Prevention & Monitoring Project: The Vilas County Land & Water Conservation Department is sponsoring a project to target recreational boater pathway to prevent and monitoring for prohibited & local priority aquatic and wetland invasive species.

Activities: 1) Offer hot water pressure boat decontamination to boaters at Big Muskellunge, Plum, Star, and Trout Lakes 2) Spiny Waterflea sampling on 12+ lakes 3) Increase resident and visitor awareness of spiny water fleas 4) Development of flyers on decontamination program 5) Monitor for non-native Phragmites 6) Partner with Wisconsin Headwaters Invasive Species Partnership to post billboard 7) Perform CBCW inspections

Deliverables: 1) Report developed on decontamination unit impacts 2) Lab results reported to DNR 3) Log number of attendees, number of videos accessed, number of comments on social media posts. 4) Number of flyers disseminated 5) Number of new phragmites sites detected 6) Photo of billboard displayed 7) Data entered into SWIMS

Conditions:
1) Enter data collected into SWIMS database under the grant project number.
2) All monitoring shall follow WDNR protocols.
3) All outreach and education materials shall use DNR messaging; DNR AIS biologist review and approval is required before dissemination.
4) Notify DNR AIS Biologist of any new detection of an AIS species.
5) Lab analysis will be completed by Wisconsin State Lab of Hygiene

This scope summarizes details provided in the application and does not negate tasks and/or deliverables described therein. Data, reports, surveys, and supporting information, including photos, maps and GIS data, must be submitted to the DNR Biologist in electronic format and in any other format they specify.

Also see B. Special Conditions below.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Tucker Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Tucker Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Tucker Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Tucker Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Tucker Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Turner Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Turner Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Turner Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Turner Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Turner Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Turtle River
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Twin Island Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Twin Island Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
3/15/2024
Waters Involved
Twin Island Lake
Status
Complete

Vilas County: Prev - Vilas County 2024 Prohibited & Priority Species Prevention & Monitoring Project: The Vilas County Land & Water Conservation Department is sponsoring a project to target recreational boater pathway to prevent and monitoring for prohibited & local priority aquatic and wetland invasive species.

Activities: 1) Offer hot water pressure boat decontamination to boaters at Big Muskellunge, Plum, Star, and Trout Lakes 2) Spiny Waterflea sampling on 12+ lakes 3) Increase resident and visitor awareness of spiny water fleas 4) Development of flyers on decontamination program 5) Monitor for non-native Phragmites 6) Partner with Wisconsin Headwaters Invasive Species Partnership to post billboard 7) Perform CBCW inspections

Deliverables: 1) Report developed on decontamination unit impacts 2) Lab results reported to DNR 3) Log number of attendees, number of videos accessed, number of comments on social media posts. 4) Number of flyers disseminated 5) Number of new phragmites sites detected 6) Photo of billboard displayed 7) Data entered into SWIMS

Conditions:
1) Enter data collected into SWIMS database under the grant project number.
2) All monitoring shall follow WDNR protocols.
3) All outreach and education materials shall use DNR messaging; DNR AIS biologist review and approval is required before dissemination.
4) Notify DNR AIS Biologist of any new detection of an AIS species.
5) Lab analysis will be completed by Wisconsin State Lab of Hygiene

This scope summarizes details provided in the application and does not negate tasks and/or deliverables described therein. Data, reports, surveys, and supporting information, including photos, maps and GIS data, must be submitted to the DNR Biologist in electronic format and in any other format they specify.

Also see B. Special Conditions below.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Un Spring
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Un Spring
Status
Complete

Town Of Manitowish Waters: Manitowish Waters Ais Education, Prevention & Planning Project: The Town of Manitowish Waters is sponsoring an Aquatic Invasive Species Education Prevention & Planning project which will focus on providing AIS education, preventing AIS introductions into town lakes and AIS monitoring.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 9 high use landings within township from May-October 2006
2) Hire an AIS Coordinator (duties listed in position description in proposal)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Create AIS power point presentation
6) Conduct AIS monitoring
7) Develop AIS information packet and shopping bag inserts
8) Participate in Fourth of July and Cranberry Colorama town events
9) Install AIS signage/kiosks where needed
10) Provide speakers for town gatherings and events

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- AIS power point presentation
- Position description for AIS Coordinator
- AIS information packet, shopping bag inserts and signage (including photo)
- Final report (summarizing CB/CW, AIS monitoring and town events attended with list of speakers)

Specific conditions for this project:
- A minimum of 2080 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables as described above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Un Spring
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Un Spring
Status
Complete

Town Of Manitowish Waters: Ais Education, Prevention & Planning Project: The Town of Manitowish Waters is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education and prevention, monitoring for AIS and preparing an AIS action plan.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire an AIS coordinator (duties listed in position description attached to proposal)
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Conduct 2 shoreline sweeps
5) Conduct "Guided AIS Monitoring"
6) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
7) Develop a local "Plan of Action" for AIS containment and management
8) Build portable CB/CW kiosks
9) Assemble 10 AIS monitoring equipment packages

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) An AIS containment and management plan
3) Portable CB/CW kiosks
4) AIS monitoring equipment packages
5) Final report summarizing CB/CW activities, AIS monitoring, and the AIS plan of action

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and photographs of portable kiosks.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Un Spring
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Un Spring
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Un Spring
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Un Spring
Status
Complete

Town Of Manitowish Waters: Ais Education, Prevention And Planning Project: The Town of Manitowish Waters is sponsoring an AIS EPP grant to be completed by December 31, 2008. The project will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire an AIS coordinator (duties listed in position description attached to proposal); 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Conduct 2 shoreline sweeps; 5) Conduct "Guided AIS Monitoring"; 6) Entry of inspection forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 7) Disseminate AIS information at boat landings, public areas, resorts, businesses, tournaments, and newsletter; 8) Sponsor an AIS float at 4th of July parade and an AIS booth at various public events.

Project deliverables include: 1) Completed entry of inspection 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 2) Photographs of float and AIS booth; 3) Final report summarizing CB/CW activities and AIS monitoring and education activities.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and photographs of float and AIS booth.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Un Spring
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Un Spring
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Un Spring
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Un Spring
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Unnamed
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Unnamed
Status
Complete

Town Of Manitowish Waters: Manitowish Waters Ais Education, Prevention & Planning Project: The Town of Manitowish Waters is sponsoring an Aquatic Invasive Species Education Prevention & Planning project which will focus on providing AIS education, preventing AIS introductions into town lakes and AIS monitoring.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 9 high use landings within township from May-October 2006
2) Hire an AIS Coordinator (duties listed in position description in proposal)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Create AIS power point presentation
6) Conduct AIS monitoring
7) Develop AIS information packet and shopping bag inserts
8) Participate in Fourth of July and Cranberry Colorama town events
9) Install AIS signage/kiosks where needed
10) Provide speakers for town gatherings and events

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- AIS power point presentation
- Position description for AIS Coordinator
- AIS information packet, shopping bag inserts and signage (including photo)
- Final report (summarizing CB/CW, AIS monitoring and town events attended with list of speakers)

Specific conditions for this project:
- A minimum of 2080 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables as described above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Unnamed
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Unnamed
Status
Complete

Town Of Manitowish Waters: Ais Education, Prevention & Planning Project: The Town of Manitowish Waters is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education and prevention, monitoring for AIS and preparing an AIS action plan.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire an AIS coordinator (duties listed in position description attached to proposal)
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Conduct 2 shoreline sweeps
5) Conduct "Guided AIS Monitoring"
6) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
7) Develop a local "Plan of Action" for AIS containment and management
8) Build portable CB/CW kiosks
9) Assemble 10 AIS monitoring equipment packages

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) An AIS containment and management plan
3) Portable CB/CW kiosks
4) AIS monitoring equipment packages
5) Final report summarizing CB/CW activities, AIS monitoring, and the AIS plan of action

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and photographs of portable kiosks.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Unnamed
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Unnamed
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Unnamed
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Unnamed
Status
Complete

Town Of Manitowish Waters: Ais Education, Prevention And Planning Project: The Town of Manitowish Waters is sponsoring an AIS EPP grant to be completed by December 31, 2008. The project will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire an AIS coordinator (duties listed in position description attached to proposal); 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Conduct 2 shoreline sweeps; 5) Conduct "Guided AIS Monitoring"; 6) Entry of inspection forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 7) Disseminate AIS information at boat landings, public areas, resorts, businesses, tournaments, and newsletter; 8) Sponsor an AIS float at 4th of July parade and an AIS booth at various public events.

Project deliverables include: 1) Completed entry of inspection 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 2) Photographs of float and AIS booth; 3) Final report summarizing CB/CW activities and AIS monitoring and education activities.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and photographs of float and AIS booth.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Unnamed
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Unnamed
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Unnamed
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Unnamed
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
2/15/2015
Waters Involved
Unnamed
Status
Complete

North Lakeland Discovery Center: Town Of Winchester Lake Management Planning Project Ph1, Hiawatha & Harris Lks: North Lakeland Discovery Center is sponsoring an AEPP grant to study Harris Lake and Hiawatha Lakes in Vilas County. The project will focus on developing a Lake Management Plan (LMP) for Harris and Hiawatha Lakes and conducting AIS education and monitoring.

Project activities include: 1) Stakeholder participation \2013 stakeholder survey, planning meetings (up to 2), kick-off meeting, wrap-up meeting, news release(s), and newsletter article; 2) Water quality sampling and analysis; 3) Watershed assessment and P load modeling; 4) Fisheries assessment; 5) Shoreline and coarse woody habitat assessment; 6) Early-season AIS monitoring and professional Dreissena monitoring; 7) Aquatic plant surveys (PI survey, acoustic, community mapping, substrate mapping); 8) Volunteer AIS and lake level monitoring and watercraft inspections; 9) Data analysis; 10) Develop LMP; 11) Hire AIS Coordinator and Water Education Intern; 12) AIS educational activities.

Project deliverables include: 1) Stakeholder survey, news release(s), and newsletter article; 2) Water chemistry data; 3) Watershed maps and modeling data; 4) PI, shoreland, and coarse woody habitat data; 5) Aquatic plant community and substrate maps; 6) LMP; 7) Hired staff; 8) AIS educational products and events.

Specific conditions for this project: 1) Draft of stakeholder survey needs to be submitted to Lakes Management Coordinator for review and approval before sending to public; 2) Draft of LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, news release(s), newsletter article, any AIS educational products, stakeholder survey, and all data and maps from the project.


Grant Details
Aquatic Invasives Education
Date
2/15/2018
Waters Involved
Unnamed
Status
Complete

North Lakeland Discovery Center: Town Of Winchester Lake Mgmt Planning - Phase 4: North Lakeland Discovery Center is sponsoring an Aquatic Invasive Species (AIS) Education, Prevention, & Planning grant to study multiple lakes in the Town of Winchester, Vilas County. The project will focus on developing a Lake Management Plan (LMP) for Circle Lily and Pardee Lakes, conducting early-season AIS monitoring on Adelaide, Helen and Harris Lakes and conducting AIS education and monitoring.

Project activities include: 1) Stakeholder participation \2013 stakeholder survey, planning meetings (up to 2), kick-off meeting, wrap-up meeting, news release(s), and newsletter article; 2) Water quality sampling and analysis; 3) Watershed assessment and P load modeling; 4) Fisheries assessment; 5) Shoreline and coarse woody habitat assessment; 6) Early-season AIS monitoring and professional Dreissena monitoring; 7) Aquatic plant surveys (PI survey, acoustic, community mapping, substrate mapping); 8) Volunteer AIS and lake level monitoring and watercraft inspections; 9) Data analysis; 10) Develop LMP; 11) Hire AIS Coordinator and Water Education Intern; 12) AIS educational activities.

Project deliverables include: 1) Stakeholder survey, news release(s), and newsletter article; 2) Water chemistry data; 3) Watershed maps and modeling data; 4) PI, shoreland, and coarse woody habitat data; 5) Aquatic plant community and substrate maps; 6) LMP; 7) Hired staff; 8) AIS educational products and events.

Specific conditions for this project: 1) Draft of stakeholder survey needs to be submitted to Lakes Management Coordinator for review and approval before sending to public; 2) Draft of LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, news release(s), newsletter article, any AIS educational products, stakeholder survey, and all data and maps from the project.


Grant Details
Aquatic Invasives Education
Date
2/15/2018
Waters Involved
Unnamed
Status
Complete

Town Of Plum Lake: I-Lids Camera Monitoring #4 - Ballard Lake: The Town of Plum Lake is sponsoring an AIS Education, Prevention & Planning project to place an ILids camera at the Northern Highland American Legion (NHAL) State Forest public boat landing on Ballard Lake (Camp 2 Road), in Vilas County.

Project activities include: 1) Purchase and install ILids camera; 2) Develop final report.

Project deliverables include: 1) ILids camera; 2) Final report.

Specific conditions for this project: 1) WDNR Lakes Coordinator is to be notified that a land use agreement between the Town and the NHAL State Forest has been signed before purchasing and installation of ILids camera; 2) 200 hours of watercraft inspection time is required during the tenure of this project.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report.


Grant Details
Aquatic Invasives Education
Date
3/15/2023
Waters Involved
Unnamed
Status
Complete

North Lakeland Discovery Center: Manitowish Waters Chain Of Lakes Aquatic Plant Studies - Phase Ib - Rice Creek: Manitowish Waters Chain of Lakes Aquatic Plant Studies - Phase Ib - Rice Creek. Expand Awareness and Education of Lake Management and Stewardship Matters. Continue control and monitoring efforts on other aquatic invasive species that pose a threat to the Manitowish Waters Chain of Lakes. Control Existing and Prevent Further Aquatic Invasive Species Establishment within the Manitowish Waters Chain of Lakes.



Project final deliverables include:
(1) NLDC will provide a written report that includes all educational activities, including dates, times, and number of participants. We will provide copies of social media postings, press releases, and links to potential TV interviews. All CBCW data will be entered into SWIMS.
(2) Community Mapping Survey.
(3) Data Analysis and Report Creation.




Specific project activities include:
(1) Assess current aquatic plant community, a point-intercept (PI) survey.
(2) An aquatic plant community mapping survey.
(3) NLDC educational initiatives.



Special Conditions: DNR is to receive copies of the final report along with, or prior to submission of grantee's final payment request. It is recommended that Grantee provide DNR Lake Coordinator with a draft of the final report for comment on report adequacy prior to making final payment to the consultant.

It is strongly recommended that an annual management strategy meeting be held each winter with DNR to discuss EWM management for the next year before aquatic plant management permit applications are submitted.




This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.




Grant Details
Aquatic Invasives Education
Date
3/15/2024
Waters Involved
Unnamed
Status
Complete

Vilas County: Prev - Vilas County 2024 Prohibited & Priority Species Prevention & Monitoring Project: The Vilas County Land & Water Conservation Department is sponsoring a project to target recreational boater pathway to prevent and monitoring for prohibited & local priority aquatic and wetland invasive species.

Activities: 1) Offer hot water pressure boat decontamination to boaters at Big Muskellunge, Plum, Star, and Trout Lakes 2) Spiny Waterflea sampling on 12+ lakes 3) Increase resident and visitor awareness of spiny water fleas 4) Development of flyers on decontamination program 5) Monitor for non-native Phragmites 6) Partner with Wisconsin Headwaters Invasive Species Partnership to post billboard 7) Perform CBCW inspections

Deliverables: 1) Report developed on decontamination unit impacts 2) Lab results reported to DNR 3) Log number of attendees, number of videos accessed, number of comments on social media posts. 4) Number of flyers disseminated 5) Number of new phragmites sites detected 6) Photo of billboard displayed 7) Data entered into SWIMS

Conditions:
1) Enter data collected into SWIMS database under the grant project number.
2) All monitoring shall follow WDNR protocols.
3) All outreach and education materials shall use DNR messaging; DNR AIS biologist review and approval is required before dissemination.
4) Notify DNR AIS Biologist of any new detection of an AIS species.
5) Lab analysis will be completed by Wisconsin State Lab of Hygiene

This scope summarizes details provided in the application and does not negate tasks and/or deliverables described therein. Data, reports, surveys, and supporting information, including photos, maps and GIS data, must be submitted to the DNR Biologist in electronic format and in any other format they specify.

Also see B. Special Conditions below.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Upper Aimer Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Upper Aimer Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Upper Gresham Lake
Status
Complete

Town Of Boulder Junction: Gresham Lakes 2008 Eurasian Watermilfoil Treatment Monitoring: Town of Boulder Junction is sponsoring an AIS EPP grant on Upper, Lower, and Middle Gresham Lakes in Vilas County to be completed by June 30, 2009. The project will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Annual Pre and Post treatment monitoring and analysis; 2) Volunteer AIS monitoring; 3) Stakeholder participation: AIS identification training; 4) pretreatment informational meeting, and post treatment monitoring results meeting; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 6) Develop annual project report and a final report.

Project deliverables include: 1) Pre and post treatment survey data; 2) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 3) AIS educational, prevention and monitoring activities; 4) Final report summarizing CB/CW activities, AIS monitoring, pre and post treatment monitoring, meetings, GPS locations, and guidance for continued control actions.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, all annual reports, pre and post treatment survey data, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
3/15/2024
Waters Involved
Upper Gresham Lake
Status
Complete

Gresham Lakes Association, Inc.: Ugl 2024 Aquatic Plant Studies Project: The Gresham Lakes Association (GLA) is sponsoring a project to complete an update to their aquatic plant monitoring.

Activities: 1) Aquatic plant point intercept survey 2) Late season EWM mapping survey 3) Project reporting 4) Virtual meetings to discuss results

Deliverables: 1) Aquatic plant point intercept survey data 2) Late season EWM maps 3) Final project report 4) Summary of meetings

Conditions:
1) All monitoring shall follow DNR protocols.
2) Invite DNR Biologist to management plan development meetings.

This scope summarizes details provided in the application and does not negate tasks and/or deliverables described therein. Data, reports, surveys, and supporting information, including photos, maps and GIS data, must be submitted to the DNR Biologist in electronic format and in any other format they specify.

If a consultant provides a final report, it is recommended that the Grantee provide the DNR Biologist with a draft for comment on report adequacy prior to making a final payment to the consultant. Include electronic copy of the final report along with or prior to submission of grantee's final payment request.

Also see B. Special Conditions below.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Upper Sugarbush Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Upper Sugarbush Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Upper Sugarbush Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Upper Sugarbush Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Upper Sugarbush Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Van Vliet Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Van Vliet Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
2/15/2019
Waters Involved
Van Vliet Lake
Status
Complete

Town Of Presque Isle: Wilderness Waters: Annabelle, Anne, Red Bass, & Vanvliet Lks: The Town of Presque Isle is sponsoring an AEPP grant to study Annabelle, Anne, Red Bass, and VanVliet Lakes, in Vilas County, with a study completion date of June 30, 2021. The project will focus on developing Lake Management Plans (LMP\2019s).

Activities:
1) Gather and assess existing lake info
2) PI aquatic plant survey, community and substrate mapping and analysis
3) Shoreland assessment
4) Water quality assessment
5) Professional and volunteer AIS monitoring
6) Educational program \2013 meetings and \201Cfloating\201D workshop
7) Watercraft inspections
8) Develop LMP\2019s

Project deliverables include:
1) PI, AIS water quality, and shoreland habitat data
2) Aquatic plant community and substrate maps
3) Aquatic plant vouchers
4) Education materials
5) Entered inspection data
6) Lake Management Plans

Specific project conditions:
- LMP\2019s need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP\2019s, PI, AIS, and shoreland habitat data, a set of aquatic plant vouchers, all maps from project, and all GIS data.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Vance Lake
Status
Complete

Town Of Manitowish Waters: Manitowish Waters Ais Education, Prevention & Planning Project: The Town of Manitowish Waters is sponsoring an Aquatic Invasive Species Education Prevention & Planning project which will focus on providing AIS education, preventing AIS introductions into town lakes and AIS monitoring.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 9 high use landings within township from May-October 2006
2) Hire an AIS Coordinator (duties listed in position description in proposal)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Create AIS power point presentation
6) Conduct AIS monitoring
7) Develop AIS information packet and shopping bag inserts
8) Participate in Fourth of July and Cranberry Colorama town events
9) Install AIS signage/kiosks where needed
10) Provide speakers for town gatherings and events

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- AIS power point presentation
- Position description for AIS Coordinator
- AIS information packet, shopping bag inserts and signage (including photo)
- Final report (summarizing CB/CW, AIS monitoring and town events attended with list of speakers)

Specific conditions for this project:
- A minimum of 2080 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables as described above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Vance Lake
Status
Complete

Town Of Manitowish Waters: Ais Education, Prevention & Planning Project: The Town of Manitowish Waters is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education and prevention, monitoring for AIS and preparing an AIS action plan.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire an AIS coordinator (duties listed in position description attached to proposal)
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Conduct 2 shoreline sweeps
5) Conduct "Guided AIS Monitoring"
6) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
7) Develop a local "Plan of Action" for AIS containment and management
8) Build portable CB/CW kiosks
9) Assemble 10 AIS monitoring equipment packages

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) An AIS containment and management plan
3) Portable CB/CW kiosks
4) AIS monitoring equipment packages
5) Final report summarizing CB/CW activities, AIS monitoring, and the AIS plan of action

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and photographs of portable kiosks.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Vance Lake
Status
Complete

Town Of Manitowish Waters: Ais Education, Prevention And Planning Project: The Town of Manitowish Waters is sponsoring an AIS EPP grant to be completed by December 31, 2008. The project will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire an AIS coordinator (duties listed in position description attached to proposal); 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Conduct 2 shoreline sweeps; 5) Conduct "Guided AIS Monitoring"; 6) Entry of inspection forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 7) Disseminate AIS information at boat landings, public areas, resorts, businesses, tournaments, and newsletter; 8) Sponsor an AIS float at 4th of July parade and an AIS booth at various public events.

Project deliverables include: 1) Completed entry of inspection 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 2) Photographs of float and AIS booth; 3) Final report summarizing CB/CW activities and AIS monitoring and education activities.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and photographs of float and AIS booth.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Village Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Village Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Village Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Village Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Village Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Wabasso Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Wabasso Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Wabasso Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Wabasso Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Wabasso Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Warrior Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Warrior Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Warrior Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Warrior Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Warrior Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
West Ellerson Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
West Ellerson Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
West Ellerson Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
West Ellerson Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
West Ellerson Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
West Plum Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Wharton Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
White Birch Creek
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
White Birch Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
White Sand Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
White Sand Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
White Sand Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
White Sand Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
White Sand Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Whitefish Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Whitefish Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Whitefish Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Whitefish Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Whitefish Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Whitefish Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Whitefish Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Whitefish Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Whitefish Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Whitefish Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Wild Rice Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Wild Rice Lake
Status
Complete

Town Of Manitowish Waters: Manitowish Waters Ais Education, Prevention & Planning Project: The Town of Manitowish Waters is sponsoring an Aquatic Invasive Species Education Prevention & Planning project which will focus on providing AIS education, preventing AIS introductions into town lakes and AIS monitoring.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 9 high use landings within township from May-October 2006
2) Hire an AIS Coordinator (duties listed in position description in proposal)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Create AIS power point presentation
6) Conduct AIS monitoring
7) Develop AIS information packet and shopping bag inserts
8) Participate in Fourth of July and Cranberry Colorama town events
9) Install AIS signage/kiosks where needed
10) Provide speakers for town gatherings and events

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- AIS power point presentation
- Position description for AIS Coordinator
- AIS information packet, shopping bag inserts and signage (including photo)
- Final report (summarizing CB/CW, AIS monitoring and town events attended with list of speakers)

Specific conditions for this project:
- A minimum of 2080 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables as described above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Wild Rice Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Wild Rice Lake
Status
Complete

Town Of Manitowish Waters: Ais Education, Prevention & Planning Project: The Town of Manitowish Waters is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education and prevention, monitoring for AIS and preparing an AIS action plan.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire an AIS coordinator (duties listed in position description attached to proposal)
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Conduct 2 shoreline sweeps
5) Conduct "Guided AIS Monitoring"
6) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
7) Develop a local "Plan of Action" for AIS containment and management
8) Build portable CB/CW kiosks
9) Assemble 10 AIS monitoring equipment packages

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) An AIS containment and management plan
3) Portable CB/CW kiosks
4) AIS monitoring equipment packages
5) Final report summarizing CB/CW activities, AIS monitoring, and the AIS plan of action

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and photographs of portable kiosks.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Wild Rice Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Wild Rice Lake
Status
Complete

Town Of Manitowish Waters: Ais Education, Prevention And Planning Project: The Town of Manitowish Waters is sponsoring an AIS EPP grant to be completed by December 31, 2008. The project will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire an AIS coordinator (duties listed in position description attached to proposal); 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Conduct 2 shoreline sweeps; 5) Conduct "Guided AIS Monitoring"; 6) Entry of inspection forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 7) Disseminate AIS information at boat landings, public areas, resorts, businesses, tournaments, and newsletter; 8) Sponsor an AIS float at 4th of July parade and an AIS booth at various public events.

Project deliverables include: 1) Completed entry of inspection 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 2) Photographs of float and AIS booth; 3) Final report summarizing CB/CW activities and AIS monitoring and education activities.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and photographs of float and AIS booth.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Wild Rice Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Wild Rice Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2014
Waters Involved
Wild Rice Lake
Status
Complete

North Lakeland Discovery Center: Manitowish Chain Of Lakes Management Planning Project, Ph Iiib: North Lakeland Discovery Center is sponsoring an AEPP grant to study Alder Lake, Wild Rice Lake and Trout River in Vilas County. The project will focus on developing a Lake Management Plan (LMP) for Wild Rice and Alder Lakes and conducting AIS education and monitoring.

Project activities include: 1) Stakeholder survey; 2) Water quality assessment; 3) Data analysis; 4) Hire AIS Coordinator and Water Education Intern; 5) AIS educational activities; 6) Develop LMP.

Project deliverables include: 1) Stakeholder survey; 2) Water quality data; 3) Hired staff; 4) AIS educational products and events; 5) LMP.

Specific conditions for this project: 1) Draft of stakeholder survey needs to be submitted to Lakes Management Coordinator for review and approval before sending to public; 2) Draft of LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, news release(s), newsletter article, any AIS educational products, stakeholder survey, and all data and maps from the project.


Grant Details
Aquatic Invasives Education
Date
3/15/2024
Waters Involved
Wild Rice Lake
Status
Complete

North Lakeland Discovery Center: Manitowish Waters Chain Of Lakes Aquatic Plant Studies - Phase Iii - Adler: The North Lakeland Discovery Center is sponsoring an aquatic plant studies project on Alder Lake.

Activities: 1) Aquatic plant PI survey and community mapping 2) Lake/AIS educational activities 3) Early season AIS/CLP meander surveys 4) PL and SWF monitoring 5) PL biocontrol 6) SWIMS monitoring data entry 7) Develop final reports.

Deliverables: 1) Aquatic plant data 2) Educational events/products 3) PL efforts 4) Final reports.

Conditions:
1) Final reports need Dept review and approval

This scope summarizes details provided in the application and does not negate tasks and/or deliverables described therein. Data, reports, surveys, and supporting information, including photos, maps and GIS data, must be submitted to the DNR Biologist in electronic format and in any other format they specify


Grant Details
Aquatic Invasives Education
Date
3/15/2024
Waters Involved
Wild Rice Lake
Status
Complete

North Lakeland Discovery Center: Manitowish Waters Chain Of Lakes Aquatic Plant Studies - Phase Iii - Wild Rice: The North Lakeland Discovery Center is sponsoring an aquatic plant studies project on Wild Rice Lake.

Activities: 1) Aquatic plant PI survey and community mapping 2) Lake/AIS educational activities 3) Early season AIS/CLP meander surveys 4) PL and SWF monitoring 5) PL biocontrol 6) SWIMS monitoring data entry 7) Develop final reports.

Deliverables: 1) Aquatic plant data 2) Educational events/products 3) PL efforts 4) Final reports.

Conditions:
1) Final reports need Dept review and approval

This scope summarizes details provided in the application and does not negate tasks and/or deliverables described therein. Data, reports, surveys, and supporting information, including photos, maps and GIS data, must be submitted to the DNR Biologist in electronic format and in any other format they specify


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Wildcat Creek
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Wildcat Creek
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
2/15/2019
Waters Involved
Wildcat Creek
Status
Complete

Town Of Presque Isle: Wilderness Waters: Averill, Presque Isle, & Wildcat Lakes: The Town of Presque Isle is sponsoring an AEPP grant to study Averill, Presque Isle, and Wildcat Lakes, in Vilas County, with a study completion date of June 30, 2021. The project will focus on developing Lake Management Plans (LMP\2019s).

Activities:
1) Gather and assess existing lake info
2) PI aquatic plant survey, community and substrate mapping and analysis
3) Shoreland assessment
4) Water quality assessment
5) Professional and volunteer AIS monitoring
6) Educational program \2013 meetings and \201Cfloating\201D workshop
7) Watercraft inspections
8) Develop LMP\2019s

Project deliverables include:
1) PI, AIS water quality, and shoreland habitat data
2) Aquatic plant community and substrate maps
3) Aquatic plant vouchers
4) Education materials
5) Entered inspection data
6) Lake Management Plans

Specific project conditions:
- LMP\2019s need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP\2019s, PI, AIS, and shoreland habitat data, a set of aquatic plant vouchers, all maps from project, and all GIS data.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Wildcat Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Wildcat Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
2/15/2019
Waters Involved
Wildcat Lake
Status
Complete

Town Of Presque Isle: Wilderness Waters: Averill, Presque Isle, & Wildcat Lakes: The Town of Presque Isle is sponsoring an AEPP grant to study Averill, Presque Isle, and Wildcat Lakes, in Vilas County, with a study completion date of June 30, 2021. The project will focus on developing Lake Management Plans (LMP\2019s).

Activities:
1) Gather and assess existing lake info
2) PI aquatic plant survey, community and substrate mapping and analysis
3) Shoreland assessment
4) Water quality assessment
5) Professional and volunteer AIS monitoring
6) Educational program \2013 meetings and \201Cfloating\201D workshop
7) Watercraft inspections
8) Develop LMP\2019s

Project deliverables include:
1) PI, AIS water quality, and shoreland habitat data
2) Aquatic plant community and substrate maps
3) Aquatic plant vouchers
4) Education materials
5) Entered inspection data
6) Lake Management Plans

Specific project conditions:
- LMP\2019s need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP\2019s, PI, AIS, and shoreland habitat data, a set of aquatic plant vouchers, all maps from project, and all GIS data.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Wilson Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Winifred Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Winifred Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Wishow Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Wishow Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Wishow Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Wishow Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Wishow Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Wyandock Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Wyandock Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Wyandock Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Wyandock Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Wyandock Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Zee Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Zee Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Zee Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Zee Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Zee Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Research Grant
Date
4/1/2010
Waters Involved
Crystal Lake
Status
Complete

University Of Wisconsin-Madison: Whole Lake Mixing To Remove Invasive Rainbow Smelt From Wisconsin: UW-Madison Center for Limnology is sponsoring an ACEI Research and Demonstration grant to study Crystal Lake, in Vilas County. The project will focus on mixing Crystal Lake to remove smelt and restore the ecosystem that existed prior to smelt invasion. If successful, this project will be used as a model to apply to other smelt removal projects.

Project activities include: 1) Build Gradual Entrainment Lake Inverters (GELI\2019s) and mixing system; 2)Hire three undergraduates each summer; 3) Mix Crystal Lake for three summers (2011-2013); 4) Monitor physical and chemical limnology weekly and every ten minutes (with automated sensor networks); 5) Monitor fish community every 2 weeks, benthos every month, and zooplankton every week; 6) public education and outreach \2013 build an exhibit for Crystal Lake Nature Center, lead 2 interpretive Naturalist sessions, news releases, website updates, workshops, WAL Lakes Convention presentation, and K-12 educational events; 7) Annual summaries and a final report.

Project deliverables include: 1) Mixing system; 2) Hired students; 3) Limnological, fish, benthos, and zooplankton monitoring data; 4) Potential extirpation of rainbow smelt; 5) Public education and outreach \2013 informational materials, presentations, media outreach, web-based materials, K-12 education, and undergraduate education; 6) Annual summaries and final report.

Specific conditions for this project: Annual summaries and final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of annual summaries, final report, all education and outreach materials, and all data and maps from project.


Grant Details
Aquatic Invasives Research Grant
Date
4/1/2012
Waters Involved
Crystal Lake
Status
Complete

University Of Wisconsin-Madison: Whole Lake Mixing To Remove Invasive Rainbow Smelt In Crystal Lake, Phase 2: UW-Madison Center for Limnology is sponsoring an ACEI Research and Demonstration grant to study Crystal Lake, in Vilas County. The project will focus on mixing Crystal Lake to remove smelt and restore the ecosystem that existed prior to smelt invasion. If successful, this project will be used as a model to apply to other smelt removal projects.

Project activities include: 1) Build Gradual Entrainment Lake Inverters (GELI\2019s) and mixing system; 2) Hire three undergraduates each summer; 3) Mix Crystal Lake for three summers (2011-2013); 4) Monitor physical and chemical limnology weekly and every ten minutes (with automated sensor networks); 5) Monitor fish community every 2 weeks, benthos every month, and zooplankton every week; 6) Public education and outreach \2013 build an exhibit for Crystal Lake Nature Center, lead 2 interpretive Naturalist sessions, news releases, website updates, workshops, WAL Lakes Convention presentation, and K-12 educational events; 7) Annual summaries and a final report.

Project deliverables include: 1) Mixing system; 2) Hired students; 3) Limnological, fish, benthos, and zooplankton monitoring data; 4) Potential extirpation of rainbow smelt; 5) Public education and outreach \2013 informational materials, presentations, media outreach, web-based materials, K-12 education, and undergraduate education; 6) Annual summaries and final report.

Specific conditions for this project: Annual summaries and final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of annual summaries, final report, all education and outreach materials, and all data and maps from project.


Grant Details
Aquatic Invasives Research Grant
Date
4/1/2013
Waters Involved
Crystal Lake
Status
Complete

University Of Wisconsin-Madison: Whole Lake Mixing To Remove Invasive Rainbow Smelt In Crystal Lk: Final Phase: UW-Madison Center for Limnology is sponsoring the final ACEI Research and Demonstration grant to study Crystal Lake, in Vilas County. The project will focus on mixing Crystal Lake to remove smelt and restore the ecosystem that existed prior to smelt invasion. If successful, this project will be used as a model to apply to other smelt removal projects.

Project activities include: 1) Build Gradual Entrainment Lake Inverters (GELI\2019s) and mixing system; 2) Hire undergraduates each summer; 3) Mix Crystal Lake for three summers (2012-2015); 4) Monitor physical and chemical limnology weekly and every ten minutes (with automated sensor networks); 5) Monitor fish community every 2 weeks, benthos every month, and zooplankton every week; 6) Public education and outreach \2013 build an exhibit for Crystal Lake Nature Center, lead 2 interpretive Naturalist sessions, news releases, website updates, workshops, WI Lakes Convention presentation, and K-12 educational events; 7) Annual summaries and a final report.

Project deliverables include: 1) Mixing system; 2) Hired students; 3) Limnological, fish, benthos, and zooplankton monitoring data; 4) potential extirpation of rainbow smelt; 5) Public education and outreach \2013 informational materials, presentations, media outreach, web-based materials, K-12 education, and undergraduate education; 6) Annual summaries and final report.

Specific conditions for this project: Annual summaries and final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of annual summaries, final report, all education and outreach materials, and all data and maps from project.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2020
Waters Involved
Allequash Creek
Status
Complete

Boulder Junction: Town Of Boulder Junction 2020 Cbcw: Boulder Junction is sponsoring a Clean Boats Clean Waters project in 2020 at 1 single public boat landings and 4 public boat landing pairs on TROUT LAKE (NORTH TROUT, SOUTH TROUT), HIGH/BOULDER(HIGH LK LANDING, BOULDER LK LANDIN), LITTLE JOHN/MANN (LITTLE JOHN LANDING, MANN LK LANDING), ALLEQ LK/WHITE SND (ALLEQUSH LANDING, WHITE SAND LANDIN), UPPER GRESHAM (UPPER GRESHAM).


Grant Details
Clean Boats, Clean Waters
Date
2/15/2020
Waters Involved
Allequash Lake
Status
Complete

Boulder Junction: Town Of Boulder Junction 2020 Cbcw: Boulder Junction is sponsoring a Clean Boats Clean Waters project in 2020 at 1 single public boat landings and 4 public boat landing pairs on TROUT LAKE (NORTH TROUT, SOUTH TROUT), HIGH/BOULDER(HIGH LK LANDING, BOULDER LK LANDIN), LITTLE JOHN/MANN (LITTLE JOHN LANDING, MANN LK LANDING), ALLEQ LK/WHITE SND (ALLEQUSH LANDING, WHITE SAND LANDIN), UPPER GRESHAM (UPPER GRESHAM).


Grant Details
Clean Boats, Clean Waters
Date
4/1/2013
Waters Involved
Ballard Lake
Status
Complete

Town Of Plum Lake: Town Of Plum Lake Clean Boats Clean Waters 2013: TheTown of Plum Lake will sponsor a Clean Boats Clean Waters landing inspection program for 2013 on four public boat landings.


Grant Details
Clean Boats, Clean Waters
Date
4/1/2014
Waters Involved
Ballard Lake
Status
Complete

Town Of Plum Lake: Plum, Star, Ballard And Laura Lake Clean Boats Clean Waters Project 2014: Town of Plum Lake will sponsor a Clean Boats Clean Water landing inspection program at 4 public accesses in 2014.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2015
Waters Involved
Ballard Lake
Status
Complete

Town Of Plum Lake: Town Of Plum Lake 2015 Clean Boats Clean Waters Project: The Town of Plum Lake is sponsoring a 2015 Clean Boats Clean Water project including Ballard, Star, Plum, Razorback, Big Muskellunge Lakes and 5 public landings.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2017
Waters Involved
Ballard Lake
Status
Complete

Town Of Plum Lake: Town Of Plum Lake 2017 Cbcw: Town Of Plum Lake is sponsoring a Clean Boats Clean Waters project in 2017 at 5 single public boat landings and 1 public boat landing pairs on PLUM LAKE, STAR LAKE, BALLARD/IRVING, PLUM LAKE, RAZORBACK LAKE, LAURA/BIG MUSKELLU.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2021
Waters Involved
Ballard Lake
Status
Complete

Town Of Plum Lake: Town Of Plum Lake 2021 Cbcw: Plum Lake is sponsoring a Clean Boats Clean Waters project in 2021 at 6 single public boat landings and 0 public boat landing pairs on IRVING LAKE (CAMP 2 ROAD), LAKE LAURA(DEERFOOT LANDING), STAR LAKE (EAST BOAT LANDING), RAZORBACK LAKE (NORTH LANDING), PLUM LAKE (STATEHOUSE LANDING), PLUM LAKE.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2021
Waters Involved
Big Arbor Vitae Lake
Status
Complete

Big Arbor Vitae Lake Assoc: Big Arbor Vitae Lake Assoc 2021 Cbcw: Big Arbor Vitae Lake Assoc is sponsoring a Clean Boats Clean Waters project in 2021 at 0 single public boat landings and 1 public boat landing pairs on BIG ARBOR VITAE (MIELKE 10007671, N BAY 10018777).


Grant Details
Clean Boats, Clean Waters
Date
4/1/2013
Waters Involved
Big Lake
Status
Complete

Town Of Presque Isle: Big Lake Clean Boats Clean Waters 2013: The Town of Presque Isle is sponsoring a project to conduct a Clean Boats Clean Waters boat landing inspection program in 2013 on one public boat landing on Big Lake.


Grant Details
Clean Boats, Clean Waters
Date
4/1/2014
Waters Involved
Big Lake
Status
Complete

Town Of Presque Isle: Big Lake Clean Boats Clean Waters Project 2014: Town of Presque Isle will sponser a Clean Boats Clean Water landing inspection program at 1 public access in 2014.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2017
Waters Involved
Big Lake
Status
Complete

Big Lake Property Owners Association: Big Lake Property Owners Association 2017 Cbcw: Big Lake Property Owners Association is sponsoring a Clean Boats Clean Waters project in 2017 at 1 single public boat landings and 0 public boat landing pairs on BIG LAKE.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2018
Waters Involved
Big Lake
Status
Complete

Big Lake Property Owners Association: Big Lake Property Owners Association 2018 Cbcw: Big Lake Property Owners Association is sponsoring a Clean Boats Clean Waters project in 2018 at 1 single public boat landings and 0 public boat landing pairs on BIG LAKE.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2020
Waters Involved
Big Lake
Status
Complete

Big Lake Property Owners Association: Big Lake Property Owners Association 2020 Cbcw: Big Lake Property Owners Association is sponsoring a Clean Boats Clean Waters project in 2020 at 1 single public boat landings and 0 public boat landing pairs on BIG LAKE (HIGHWAY K).


Grant Details
Clean Boats, Clean Waters
Date
2/15/2015
Waters Involved
Big Muskellunge Lake
Status
Complete

Town Of Plum Lake: Town Of Plum Lake 2015 Clean Boats Clean Waters Project: The Town of Plum Lake is sponsoring a 2015 Clean Boats Clean Water project including Ballard, Star, Plum, Razorback, Big Muskellunge Lakes and 5 public landings.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2017
Waters Involved
Big Muskellunge Lake
Status
Complete

Town Of Plum Lake: Town Of Plum Lake 2017 Cbcw: Town Of Plum Lake is sponsoring a Clean Boats Clean Waters project in 2017 at 5 single public boat landings and 1 public boat landing pairs on PLUM LAKE, STAR LAKE, BALLARD/IRVING, PLUM LAKE, RAZORBACK LAKE, LAURA/BIG MUSKELLU.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2020
Waters Involved
Boulder Lake
Status
Complete

Boulder Junction: Town Of Boulder Junction 2020 Cbcw: Boulder Junction is sponsoring a Clean Boats Clean Waters project in 2020 at 1 single public boat landings and 4 public boat landing pairs on TROUT LAKE (NORTH TROUT, SOUTH TROUT), HIGH/BOULDER(HIGH LK LANDING, BOULDER LK LANDIN), LITTLE JOHN/MANN (LITTLE JOHN LANDING, MANN LK LANDING), ALLEQ LK/WHITE SND (ALLEQUSH LANDING, WHITE SAND LANDIN), UPPER GRESHAM (UPPER GRESHAM).


Grant Details
Clean Boats, Clean Waters
Date
2/15/2017
Waters Involved
Clear Lake
Status
Complete

North Lakeland Discovery Center: North Lakeland Discovery Center 2017 Cbcw: North Lakeland Discovery Center is sponsoring a Clean Boats Clean Waters project in 2017 at 0 single public boat landings and 1 public boat landing pairs on REST LAKE/CLEAR LK.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2020
Waters Involved
Clear Lake
Status
Complete

North Lakeland Discovery Center: North Lakeland Discovery Center 2020 Cbcw: North Lakeland Discovery Center is sponsoring a Clean Boats Clean Waters project in 2020 at 0 single public boat landings and 1 public boat landing pairs on MANITOWISH CHAIN (REST LAKE, CLEAR LAKE).


Grant Details
Clean Boats, Clean Waters
Date
2/15/2017
Waters Involved
High Lake
Status
Complete

High-Fishtrap-Rush Lks Assoc: High-Fishtrap-Rush Lks Assoc 2017 Cbcw: High-Fishtrap-Rush Lks Assoc is sponsoring a Clean Boats Clean Waters project in 2017 at 1 single public boat landings and 0 public boat landing pairs on HIGH LAKE.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2020
Waters Involved
High Lake
Status
Complete

Boulder Junction: Town Of Boulder Junction 2020 Cbcw: Boulder Junction is sponsoring a Clean Boats Clean Waters project in 2020 at 1 single public boat landings and 4 public boat landing pairs on TROUT LAKE (NORTH TROUT, SOUTH TROUT), HIGH/BOULDER(HIGH LK LANDING, BOULDER LK LANDIN), LITTLE JOHN/MANN (LITTLE JOHN LANDING, MANN LK LANDING), ALLEQ LK/WHITE SND (ALLEQUSH LANDING, WHITE SAND LANDIN), UPPER GRESHAM (UPPER GRESHAM).


Grant Details
Clean Boats, Clean Waters
Date
4/1/2013
Waters Involved
Irving Lake
Status
Proposed

Town Of Plum Lake: Town Of Plum Lake Clean Boats Clean Waters 2013: TheTown of Plum Lake will sponsor a Clean Boats Clean Waters landing inspection program for 2013 on four public boat landings.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2017
Waters Involved
Irving Lake
Status
Complete

Town Of Plum Lake: Town Of Plum Lake 2017 Cbcw: Town Of Plum Lake is sponsoring a Clean Boats Clean Waters project in 2017 at 5 single public boat landings and 1 public boat landing pairs on PLUM LAKE, STAR LAKE, BALLARD/IRVING, PLUM LAKE, RAZORBACK LAKE, LAURA/BIG MUSKELLU.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2020
Waters Involved
Irving Lake
Status
Complete

Town Of Plum Lake: Town Of Plum Lake 2020 Cbcw: Plum Lake is sponsoring a Clean Boats Clean Waters project in 2020 at 4 single public boat landings and 1 public boat landing pairs on IRVING LAKE (CANUP 2 RD, N/A), LAKE LAURA(DEERFOOT LANDING, N/A), STAR LAKE (EAST BOAT LANDING, N/A), RAZORBACK LK (NORTH LANDING, N/A), PLUM LAKE (STATEHOUSE PT., PUBLIC PIER).


Grant Details
Clean Boats, Clean Waters
Date
2/15/2021
Waters Involved
Irving Lake
Status
Complete

Town Of Plum Lake: Town Of Plum Lake 2021 Cbcw: Plum Lake is sponsoring a Clean Boats Clean Waters project in 2021 at 6 single public boat landings and 0 public boat landing pairs on IRVING LAKE (CAMP 2 ROAD), LAKE LAURA(DEERFOOT LANDING), STAR LAKE (EAST BOAT LANDING), RAZORBACK LAKE (NORTH LANDING), PLUM LAKE (STATEHOUSE LANDING), PLUM LAKE.


Grant Details
Clean Boats, Clean Waters
Date
4/1/2013
Waters Involved
Lake Laura
Status
Proposed

Town Of Plum Lake: Town Of Plum Lake Clean Boats Clean Waters 2013: TheTown of Plum Lake will sponsor a Clean Boats Clean Waters landing inspection program for 2013 on four public boat landings.


Grant Details
Clean Boats, Clean Waters
Date
4/1/2014
Waters Involved
Lake Laura
Status
Proposed

Town Of Plum Lake: Plum, Star, Ballard And Laura Lake Clean Boats Clean Waters Project 2014: Town of Plum Lake will sponsor a Clean Boats Clean Water landing inspection program at 4 public accesses in 2014.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2017
Waters Involved
Lake Laura
Status
Complete

Town Of Plum Lake: Town Of Plum Lake 2017 Cbcw: Town Of Plum Lake is sponsoring a Clean Boats Clean Waters project in 2017 at 5 single public boat landings and 1 public boat landing pairs on PLUM LAKE, STAR LAKE, BALLARD/IRVING, PLUM LAKE, RAZORBACK LAKE, LAURA/BIG MUSKELLU.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2020
Waters Involved
Lake Laura
Status
Complete

Town Of Plum Lake: Town Of Plum Lake 2020 Cbcw: Plum Lake is sponsoring a Clean Boats Clean Waters project in 2020 at 4 single public boat landings and 1 public boat landing pairs on IRVING LAKE (CANUP 2 RD, N/A), LAKE LAURA(DEERFOOT LANDING, N/A), STAR LAKE (EAST BOAT LANDING, N/A), RAZORBACK LK (NORTH LANDING, N/A), PLUM LAKE (STATEHOUSE PT., PUBLIC PIER).


Grant Details
Clean Boats, Clean Waters
Date
2/15/2021
Waters Involved
Lake Laura
Status
Complete

Big Arbor Vitae Lake Assoc: Big Arbor Vitae Lake Assoc 2021 Cbcw: Big Arbor Vitae Lake Assoc is sponsoring a Clean Boats Clean Waters project in 2021 at 0 single public boat landings and 1 public boat landing pairs on BIG ARBOR VITAE (MIELKE 10007671, N BAY 10018777).


Grant Details
Clean Boats, Clean Waters
Date
2/15/2021
Waters Involved
Lake Laura
Status
Complete

Town Of Plum Lake: Town Of Plum Lake 2021 Cbcw: Plum Lake is sponsoring a Clean Boats Clean Waters project in 2021 at 6 single public boat landings and 0 public boat landing pairs on IRVING LAKE (CAMP 2 ROAD), LAKE LAURA(DEERFOOT LANDING), STAR LAKE (EAST BOAT LANDING), RAZORBACK LAKE (NORTH LANDING), PLUM LAKE (STATEHOUSE LANDING), PLUM LAKE.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2021
Waters Involved
Link Creek
Status
Complete

Big Arbor Vitae Lake Assoc: Big Arbor Vitae Lake Assoc 2021 Cbcw: Big Arbor Vitae Lake Assoc is sponsoring a Clean Boats Clean Waters project in 2021 at 0 single public boat landings and 1 public boat landing pairs on BIG ARBOR VITAE (MIELKE 10007671, N BAY 10018777).


Grant Details
Clean Boats, Clean Waters
Date
2/15/2020
Waters Involved
Little John Lake
Status
Complete

Boulder Junction: Town Of Boulder Junction 2020 Cbcw: Boulder Junction is sponsoring a Clean Boats Clean Waters project in 2020 at 1 single public boat landings and 4 public boat landing pairs on TROUT LAKE (NORTH TROUT, SOUTH TROUT), HIGH/BOULDER(HIGH LK LANDING, BOULDER LK LANDIN), LITTLE JOHN/MANN (LITTLE JOHN LANDING, MANN LK LANDING), ALLEQ LK/WHITE SND (ALLEQUSH LANDING, WHITE SAND LANDIN), UPPER GRESHAM (UPPER GRESHAM).


Grant Details
Clean Boats, Clean Waters
Date
4/1/2013
Waters Involved
Little Star Lake
Status
Proposed

Town Of Plum Lake: Town Of Plum Lake Clean Boats Clean Waters 2013: TheTown of Plum Lake will sponsor a Clean Boats Clean Waters landing inspection program for 2013 on four public boat landings.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2021
Waters Involved
Little Star Lake
Status
Complete

Town Of Plum Lake: Town Of Plum Lake 2021 Cbcw: Plum Lake is sponsoring a Clean Boats Clean Waters project in 2021 at 6 single public boat landings and 0 public boat landing pairs on IRVING LAKE (CAMP 2 ROAD), LAKE LAURA(DEERFOOT LANDING), STAR LAKE (EAST BOAT LANDING), RAZORBACK LAKE (NORTH LANDING), PLUM LAKE (STATEHOUSE LANDING), PLUM LAKE.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2021
Waters Involved
Lost Creek
Status
Complete

Town Of Plum Lake: Town Of Plum Lake 2021 Cbcw: Plum Lake is sponsoring a Clean Boats Clean Waters project in 2021 at 6 single public boat landings and 0 public boat landing pairs on IRVING LAKE (CAMP 2 ROAD), LAKE LAURA(DEERFOOT LANDING), STAR LAKE (EAST BOAT LANDING), RAZORBACK LAKE (NORTH LANDING), PLUM LAKE (STATEHOUSE LANDING), PLUM LAKE.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2021
Waters Involved
Lost Lake
Status
Complete

Town Of Plum Lake: Town Of Plum Lake 2021 Cbcw: Plum Lake is sponsoring a Clean Boats Clean Waters project in 2021 at 6 single public boat landings and 0 public boat landing pairs on IRVING LAKE (CAMP 2 ROAD), LAKE LAURA(DEERFOOT LANDING), STAR LAKE (EAST BOAT LANDING), RAZORBACK LAKE (NORTH LANDING), PLUM LAKE (STATEHOUSE LANDING), PLUM LAKE.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2015
Waters Involved
Manitowish River
Status
Complete

North Lakeland Discovery Center: Rest Lake 2015 Clean Boats Clean Waters Project: The North Lakeland Discovery Center is sponsoring a 2015 Clean Boats Clean Waters project for the Manitowish Waters Chain of Lakes including one public landing on Rest Lake.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2016
Waters Involved
Manitowish River
Status
Complete

North Lakeland Discovery Center: Rest Lake North Lakeland Discovery Center 2016 Clean Boats Clean Waters: The North Lakeland Discovery Center, Inc. is sponsoring a Clean Boats Clean Waters project in 2016 at one public boat landing on Legend Lake.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2017
Waters Involved
Manitowish River
Status
Complete

North Lakeland Discovery Center: North Lakeland Discovery Center 2017 Cbcw: North Lakeland Discovery Center is sponsoring a Clean Boats Clean Waters project in 2017 at 0 single public boat landings and 1 public boat landing pairs on REST LAKE/CLEAR LK.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2019
Waters Involved
Manitowish River
Status
Complete

North Lakeland Discovery Center: North Lakeland Discovery Center 2019 Cbcw: North Lakeland Discovery Center is sponsoring a Clean Boats Clean Waters project in 2019 at 0 single public boat landings and 1 public boat landing pairs on MANITOWISH CHAIN (REST LAKE, CLEAR LAKE).


Grant Details
Clean Boats, Clean Waters
Date
2/15/2020
Waters Involved
Manitowish River
Status
Complete

Boulder Junction: Town Of Boulder Junction 2020 Cbcw: Boulder Junction is sponsoring a Clean Boats Clean Waters project in 2020 at 1 single public boat landings and 4 public boat landing pairs on TROUT LAKE (NORTH TROUT, SOUTH TROUT), HIGH/BOULDER(HIGH LK LANDING, BOULDER LK LANDIN), LITTLE JOHN/MANN (LITTLE JOHN LANDING, MANN LK LANDING), ALLEQ LK/WHITE SND (ALLEQUSH LANDING, WHITE SAND LANDIN), UPPER GRESHAM (UPPER GRESHAM).


Grant Details
Clean Boats, Clean Waters
Date
2/15/2020
Waters Involved
Manitowish River
Status
Complete

North Lakeland Discovery Center: North Lakeland Discovery Center 2020 Cbcw: North Lakeland Discovery Center is sponsoring a Clean Boats Clean Waters project in 2020 at 0 single public boat landings and 1 public boat landing pairs on MANITOWISH CHAIN (REST LAKE, CLEAR LAKE).


Grant Details
Clean Boats, Clean Waters
Date
2/15/2020
Waters Involved
Mann Lake
Status
Complete

Boulder Junction: Town Of Boulder Junction 2020 Cbcw: Boulder Junction is sponsoring a Clean Boats Clean Waters project in 2020 at 1 single public boat landings and 4 public boat landing pairs on TROUT LAKE (NORTH TROUT, SOUTH TROUT), HIGH/BOULDER(HIGH LK LANDING, BOULDER LK LANDIN), LITTLE JOHN/MANN (LITTLE JOHN LANDING, MANN LK LANDING), ALLEQ LK/WHITE SND (ALLEQUSH LANDING, WHITE SAND LANDIN), UPPER GRESHAM (UPPER GRESHAM).


Grant Details
Clean Boats, Clean Waters
Date
2/15/2015
Waters Involved
Papoose Creek
Status
Complete

North Lakeland Discovery Center: Rest Lake 2015 Clean Boats Clean Waters Project: The North Lakeland Discovery Center is sponsoring a 2015 Clean Boats Clean Waters project for the Manitowish Waters Chain of Lakes including one public landing on Rest Lake.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2016
Waters Involved
Papoose Creek
Status
Complete

North Lakeland Discovery Center: Rest Lake North Lakeland Discovery Center 2016 Clean Boats Clean Waters: The North Lakeland Discovery Center, Inc. is sponsoring a Clean Boats Clean Waters project in 2016 at one public boat landing on Legend Lake.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2017
Waters Involved
Papoose Creek
Status
Complete

North Lakeland Discovery Center: North Lakeland Discovery Center 2017 Cbcw: North Lakeland Discovery Center is sponsoring a Clean Boats Clean Waters project in 2017 at 0 single public boat landings and 1 public boat landing pairs on REST LAKE/CLEAR LK.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2019
Waters Involved
Papoose Creek
Status
Complete

North Lakeland Discovery Center: North Lakeland Discovery Center 2019 Cbcw: North Lakeland Discovery Center is sponsoring a Clean Boats Clean Waters project in 2019 at 0 single public boat landings and 1 public boat landing pairs on MANITOWISH CHAIN (REST LAKE, CLEAR LAKE).


Grant Details
Clean Boats, Clean Waters
Date
2/15/2020
Waters Involved
Papoose Creek
Status
Complete

North Lakeland Discovery Center: North Lakeland Discovery Center 2020 Cbcw: North Lakeland Discovery Center is sponsoring a Clean Boats Clean Waters project in 2020 at 0 single public boat landings and 1 public boat landing pairs on MANITOWISH CHAIN (REST LAKE, CLEAR LAKE).


Grant Details
Clean Boats, Clean Waters
Date
2/15/2015
Waters Involved
Plum Creek
Status
Complete

Town Of Plum Lake: Town Of Plum Lake 2015 Clean Boats Clean Waters Project: The Town of Plum Lake is sponsoring a 2015 Clean Boats Clean Water project including Ballard, Star, Plum, Razorback, Big Muskellunge Lakes and 5 public landings.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2017
Waters Involved
Plum Creek
Status
Complete

Town Of Plum Lake: Town Of Plum Lake 2017 Cbcw: Town Of Plum Lake is sponsoring a Clean Boats Clean Waters project in 2017 at 5 single public boat landings and 1 public boat landing pairs on PLUM LAKE, STAR LAKE, BALLARD/IRVING, PLUM LAKE, RAZORBACK LAKE, LAURA/BIG MUSKELLU.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2020
Waters Involved
Plum Creek
Status
Complete

Town Of Plum Lake: Town Of Plum Lake 2020 Cbcw: Plum Lake is sponsoring a Clean Boats Clean Waters project in 2020 at 4 single public boat landings and 1 public boat landing pairs on IRVING LAKE (CANUP 2 RD, N/A), LAKE LAURA(DEERFOOT LANDING, N/A), STAR LAKE (EAST BOAT LANDING, N/A), RAZORBACK LK (NORTH LANDING, N/A), PLUM LAKE (STATEHOUSE PT., PUBLIC PIER).


Grant Details
Clean Boats, Clean Waters
Date
2/15/2021
Waters Involved
Plum Creek
Status
Complete

Town Of Plum Lake: Town Of Plum Lake 2021 Cbcw: Plum Lake is sponsoring a Clean Boats Clean Waters project in 2021 at 6 single public boat landings and 0 public boat landing pairs on IRVING LAKE (CAMP 2 ROAD), LAKE LAURA(DEERFOOT LANDING), STAR LAKE (EAST BOAT LANDING), RAZORBACK LAKE (NORTH LANDING), PLUM LAKE (STATEHOUSE LANDING), PLUM LAKE.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2015
Waters Involved
Plum Lake
Status
Complete

Town Of Plum Lake: Town Of Plum Lake 2015 Clean Boats Clean Waters Project: The Town of Plum Lake is sponsoring a 2015 Clean Boats Clean Water project including Ballard, Star, Plum, Razorback, Big Muskellunge Lakes and 5 public landings.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2017
Waters Involved
Plum Lake
Status
Complete

Town Of Plum Lake: Town Of Plum Lake 2017 Cbcw: Town Of Plum Lake is sponsoring a Clean Boats Clean Waters project in 2017 at 5 single public boat landings and 1 public boat landing pairs on PLUM LAKE, STAR LAKE, BALLARD/IRVING, PLUM LAKE, RAZORBACK LAKE, LAURA/BIG MUSKELLU.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2020
Waters Involved
Plum Lake
Status
Complete

Town Of Plum Lake: Town Of Plum Lake 2020 Cbcw: Plum Lake is sponsoring a Clean Boats Clean Waters project in 2020 at 4 single public boat landings and 1 public boat landing pairs on IRVING LAKE (CANUP 2 RD, N/A), LAKE LAURA(DEERFOOT LANDING, N/A), STAR LAKE (EAST BOAT LANDING, N/A), RAZORBACK LK (NORTH LANDING, N/A), PLUM LAKE (STATEHOUSE PT., PUBLIC PIER).


Grant Details
Clean Boats, Clean Waters
Date
2/15/2021
Waters Involved
Plum Lake
Status
Complete

Town Of Plum Lake: Town Of Plum Lake 2021 Cbcw: Plum Lake is sponsoring a Clean Boats Clean Waters project in 2021 at 6 single public boat landings and 0 public boat landing pairs on IRVING LAKE (CAMP 2 ROAD), LAKE LAURA(DEERFOOT LANDING), STAR LAKE (EAST BOAT LANDING), RAZORBACK LAKE (NORTH LANDING), PLUM LAKE (STATEHOUSE LANDING), PLUM LAKE.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2017
Waters Involved
Presque Isle Lake
Status
Complete

Big Lake Property Owners Association: Big Lake Property Owners Association 2017 Cbcw: Big Lake Property Owners Association is sponsoring a Clean Boats Clean Waters project in 2017 at 1 single public boat landings and 0 public boat landing pairs on BIG LAKE.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2015
Waters Involved
Razorback Lake
Status
Complete

Town Of Plum Lake: Town Of Plum Lake 2015 Clean Boats Clean Waters Project: The Town of Plum Lake is sponsoring a 2015 Clean Boats Clean Water project including Ballard, Star, Plum, Razorback, Big Muskellunge Lakes and 5 public landings.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2017
Waters Involved
Razorback Lake
Status
Complete

Town Of Plum Lake: Town Of Plum Lake 2017 Cbcw: Town Of Plum Lake is sponsoring a Clean Boats Clean Waters project in 2017 at 5 single public boat landings and 1 public boat landing pairs on PLUM LAKE, STAR LAKE, BALLARD/IRVING, PLUM LAKE, RAZORBACK LAKE, LAURA/BIG MUSKELLU.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2020
Waters Involved
Razorback Lake
Status
Complete

Town Of Plum Lake: Town Of Plum Lake 2020 Cbcw: Plum Lake is sponsoring a Clean Boats Clean Waters project in 2020 at 4 single public boat landings and 1 public boat landing pairs on IRVING LAKE (CANUP 2 RD, N/A), LAKE LAURA(DEERFOOT LANDING, N/A), STAR LAKE (EAST BOAT LANDING, N/A), RAZORBACK LK (NORTH LANDING, N/A), PLUM LAKE (STATEHOUSE PT., PUBLIC PIER).


Grant Details
Clean Boats, Clean Waters
Date
2/15/2021
Waters Involved
Razorback Lake
Status
Complete

Town Of Plum Lake: Town Of Plum Lake 2021 Cbcw: Plum Lake is sponsoring a Clean Boats Clean Waters project in 2021 at 6 single public boat landings and 0 public boat landing pairs on IRVING LAKE (CAMP 2 ROAD), LAKE LAURA(DEERFOOT LANDING), STAR LAKE (EAST BOAT LANDING), RAZORBACK LAKE (NORTH LANDING), PLUM LAKE (STATEHOUSE LANDING), PLUM LAKE.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2015
Waters Involved
Rest Lake
Status
Complete

North Lakeland Discovery Center: Rest Lake 2015 Clean Boats Clean Waters Project: The North Lakeland Discovery Center is sponsoring a 2015 Clean Boats Clean Waters project for the Manitowish Waters Chain of Lakes including one public landing on Rest Lake.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2016
Waters Involved
Rest Lake
Status
Complete

North Lakeland Discovery Center: Rest Lake North Lakeland Discovery Center 2016 Clean Boats Clean Waters: The North Lakeland Discovery Center, Inc. is sponsoring a Clean Boats Clean Waters project in 2016 at one public boat landing on Legend Lake.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2017
Waters Involved
Rest Lake
Status
Complete

North Lakeland Discovery Center: North Lakeland Discovery Center 2017 Cbcw: North Lakeland Discovery Center is sponsoring a Clean Boats Clean Waters project in 2017 at 0 single public boat landings and 1 public boat landing pairs on REST LAKE/CLEAR LK.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2019
Waters Involved
Rest Lake
Status
Complete

North Lakeland Discovery Center: North Lakeland Discovery Center 2019 Cbcw: North Lakeland Discovery Center is sponsoring a Clean Boats Clean Waters project in 2019 at 0 single public boat landings and 1 public boat landing pairs on MANITOWISH CHAIN (REST LAKE, CLEAR LAKE).


Grant Details
Clean Boats, Clean Waters
Date
2/15/2020
Waters Involved
Rest Lake
Status
Complete

North Lakeland Discovery Center: North Lakeland Discovery Center 2020 Cbcw: North Lakeland Discovery Center is sponsoring a Clean Boats Clean Waters project in 2020 at 0 single public boat landings and 1 public boat landing pairs on MANITOWISH CHAIN (REST LAKE, CLEAR LAKE).


Grant Details
Clean Boats, Clean Waters
Date
4/1/2013
Waters Involved
Rice Creek
Status
Complete

Town Of Presque Isle: Big Lake Clean Boats Clean Waters 2013: The Town of Presque Isle is sponsoring a project to conduct a Clean Boats Clean Waters boat landing inspection program in 2013 on one public boat landing on Big Lake.


Grant Details
Clean Boats, Clean Waters
Date
4/1/2014
Waters Involved
Rice Creek
Status
Complete

Town Of Presque Isle: Big Lake Clean Boats Clean Waters Project 2014: Town of Presque Isle will sponser a Clean Boats Clean Water landing inspection program at 1 public access in 2014.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2017
Waters Involved
Rice Creek
Status
Complete

Big Lake Property Owners Association: Big Lake Property Owners Association 2017 Cbcw: Big Lake Property Owners Association is sponsoring a Clean Boats Clean Waters project in 2017 at 1 single public boat landings and 0 public boat landing pairs on BIG LAKE.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2018
Waters Involved
Rice Creek
Status
Complete

Big Lake Property Owners Association: Big Lake Property Owners Association 2018 Cbcw: Big Lake Property Owners Association is sponsoring a Clean Boats Clean Waters project in 2018 at 1 single public boat landings and 0 public boat landing pairs on BIG LAKE.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2020
Waters Involved
Rice Creek
Status
Complete

Big Lake Property Owners Association: Big Lake Property Owners Association 2020 Cbcw: Big Lake Property Owners Association is sponsoring a Clean Boats Clean Waters project in 2020 at 1 single public boat landings and 0 public boat landing pairs on BIG LAKE (HIGHWAY K).


Grant Details
Clean Boats, Clean Waters
Date
2/15/2017
Waters Involved
South Branch Presque Isle River
Status
Complete

Big Lake Property Owners Association: Big Lake Property Owners Association 2017 Cbcw: Big Lake Property Owners Association is sponsoring a Clean Boats Clean Waters project in 2017 at 1 single public boat landings and 0 public boat landing pairs on BIG LAKE.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2015
Waters Involved
Star Creek
Status
Complete

Town Of Plum Lake: Town Of Plum Lake 2015 Clean Boats Clean Waters Project: The Town of Plum Lake is sponsoring a 2015 Clean Boats Clean Water project including Ballard, Star, Plum, Razorback, Big Muskellunge Lakes and 5 public landings.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2017
Waters Involved
Star Creek
Status
Complete

Town Of Plum Lake: Town Of Plum Lake 2017 Cbcw: Town Of Plum Lake is sponsoring a Clean Boats Clean Waters project in 2017 at 5 single public boat landings and 1 public boat landing pairs on PLUM LAKE, STAR LAKE, BALLARD/IRVING, PLUM LAKE, RAZORBACK LAKE, LAURA/BIG MUSKELLU.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2020
Waters Involved
Star Creek
Status
Complete

Town Of Plum Lake: Town Of Plum Lake 2020 Cbcw: Plum Lake is sponsoring a Clean Boats Clean Waters project in 2020 at 4 single public boat landings and 1 public boat landing pairs on IRVING LAKE (CANUP 2 RD, N/A), LAKE LAURA(DEERFOOT LANDING, N/A), STAR LAKE (EAST BOAT LANDING, N/A), RAZORBACK LK (NORTH LANDING, N/A), PLUM LAKE (STATEHOUSE PT., PUBLIC PIER).


Grant Details
Clean Boats, Clean Waters
Date
2/15/2021
Waters Involved
Star Creek
Status
Complete

Town Of Plum Lake: Town Of Plum Lake 2021 Cbcw: Plum Lake is sponsoring a Clean Boats Clean Waters project in 2021 at 6 single public boat landings and 0 public boat landing pairs on IRVING LAKE (CAMP 2 ROAD), LAKE LAURA(DEERFOOT LANDING), STAR LAKE (EAST BOAT LANDING), RAZORBACK LAKE (NORTH LANDING), PLUM LAKE (STATEHOUSE LANDING), PLUM LAKE.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2015
Waters Involved
Star Lake
Status
Complete

Town Of Plum Lake: Town Of Plum Lake 2015 Clean Boats Clean Waters Project: The Town of Plum Lake is sponsoring a 2015 Clean Boats Clean Water project including Ballard, Star, Plum, Razorback, Big Muskellunge Lakes and 5 public landings.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2017
Waters Involved
Star Lake
Status
Complete

Town Of Plum Lake: Town Of Plum Lake 2017 Cbcw: Town Of Plum Lake is sponsoring a Clean Boats Clean Waters project in 2017 at 5 single public boat landings and 1 public boat landing pairs on PLUM LAKE, STAR LAKE, BALLARD/IRVING, PLUM LAKE, RAZORBACK LAKE, LAURA/BIG MUSKELLU.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2020
Waters Involved
Star Lake
Status
Complete

Town Of Plum Lake: Town Of Plum Lake 2020 Cbcw: Plum Lake is sponsoring a Clean Boats Clean Waters project in 2020 at 4 single public boat landings and 1 public boat landing pairs on IRVING LAKE (CANUP 2 RD, N/A), LAKE LAURA(DEERFOOT LANDING, N/A), STAR LAKE (EAST BOAT LANDING, N/A), RAZORBACK LK (NORTH LANDING, N/A), PLUM LAKE (STATEHOUSE PT., PUBLIC PIER).


Grant Details
Clean Boats, Clean Waters
Date
2/15/2021
Waters Involved
Star Lake
Status
Complete

Town Of Plum Lake: Town Of Plum Lake 2021 Cbcw: Plum Lake is sponsoring a Clean Boats Clean Waters project in 2021 at 6 single public boat landings and 0 public boat landing pairs on IRVING LAKE (CAMP 2 ROAD), LAKE LAURA(DEERFOOT LANDING), STAR LAKE (EAST BOAT LANDING), RAZORBACK LAKE (NORTH LANDING), PLUM LAKE (STATEHOUSE LANDING), PLUM LAKE.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2015
Waters Involved
Trout Lake
Status
Complete

Uw Systems: Trout Lake 2015 Clean Boats Clean Waters Project: The University of Wisconsin is sponsoring a 2015 Clean Boats Clean Waters project including one public landing on Trout Lake.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2016
Waters Involved
Trout Lake
Status
Complete

Uw Systems: The Board Of Regents Of The Uw System- Trout Lake 2016 Clean Boats Clean Waters: The Board of Regents of the University of Wisconsin is sponsoring a Clean Boats Clean Waters project in 2016 at one public boat landing on Trout Lake.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2017
Waters Involved
Trout Lake
Status
Complete

Friends Of Mann Lake: Friends Of Mann Lake 2017 Cbcw: Friends Of Mann Lake is sponsoring a Clean Boats Clean Waters project in 2017 at 0 single public boat landings and 1 public boat landing pairs on TROUT LAKE.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2020
Waters Involved
Trout Lake
Status
Complete

Boulder Junction: Town Of Boulder Junction 2020 Cbcw: Boulder Junction is sponsoring a Clean Boats Clean Waters project in 2020 at 1 single public boat landings and 4 public boat landing pairs on TROUT LAKE (NORTH TROUT, SOUTH TROUT), HIGH/BOULDER(HIGH LK LANDING, BOULDER LK LANDIN), LITTLE JOHN/MANN (LITTLE JOHN LANDING, MANN LK LANDING), ALLEQ LK/WHITE SND (ALLEQUSH LANDING, WHITE SAND LANDIN), UPPER GRESHAM (UPPER GRESHAM).


Grant Details
Clean Boats, Clean Waters
Date
2/15/2015
Waters Involved
Trout River
Status
Complete

Uw Systems: Trout Lake 2015 Clean Boats Clean Waters Project: The University of Wisconsin is sponsoring a 2015 Clean Boats Clean Waters project including one public landing on Trout Lake.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2016
Waters Involved
Trout River
Status
Complete

Uw Systems: The Board Of Regents Of The Uw System- Trout Lake 2016 Clean Boats Clean Waters: The Board of Regents of the University of Wisconsin is sponsoring a Clean Boats Clean Waters project in 2016 at one public boat landing on Trout Lake.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2017
Waters Involved
Trout River
Status
Complete

Friends Of Mann Lake: Friends Of Mann Lake 2017 Cbcw: Friends Of Mann Lake is sponsoring a Clean Boats Clean Waters project in 2017 at 0 single public boat landings and 1 public boat landing pairs on TROUT LAKE.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2020
Waters Involved
Trout River
Status
Complete

Boulder Junction: Town Of Boulder Junction 2020 Cbcw: Boulder Junction is sponsoring a Clean Boats Clean Waters project in 2020 at 1 single public boat landings and 4 public boat landing pairs on TROUT LAKE (NORTH TROUT, SOUTH TROUT), HIGH/BOULDER(HIGH LK LANDING, BOULDER LK LANDIN), LITTLE JOHN/MANN (LITTLE JOHN LANDING, MANN LK LANDING), ALLEQ LK/WHITE SND (ALLEQUSH LANDING, WHITE SAND LANDIN), UPPER GRESHAM (UPPER GRESHAM).


Grant Details
Clean Boats, Clean Waters
Date
2/15/2021
Waters Involved
Twin Lakes (South)
Status
Complete

Big Arbor Vitae Lake Assoc: Big Arbor Vitae Lake Assoc 2021 Cbcw: Big Arbor Vitae Lake Assoc is sponsoring a Clean Boats Clean Waters project in 2021 at 0 single public boat landings and 1 public boat landing pairs on BIG ARBOR VITAE (MIELKE 10007671, N BAY 10018777).


Grant Details
Clean Boats, Clean Waters
Date
2/15/2021
Waters Involved
Twin River
Status
Complete

Big Arbor Vitae Lake Assoc: Big Arbor Vitae Lake Assoc 2021 Cbcw: Big Arbor Vitae Lake Assoc is sponsoring a Clean Boats Clean Waters project in 2021 at 0 single public boat landings and 1 public boat landing pairs on BIG ARBOR VITAE (MIELKE 10007671, N BAY 10018777).


Grant Details
Clean Boats, Clean Waters
Date
4/1/2013
Waters Involved
Unnamed
Status
Complete

Town Of Plum Lake: Town Of Plum Lake Clean Boats Clean Waters 2013: TheTown of Plum Lake will sponsor a Clean Boats Clean Waters landing inspection program for 2013 on four public boat landings.


Grant Details
Clean Boats, Clean Waters
Date
4/1/2014
Waters Involved
Unnamed
Status
Complete

Town Of Plum Lake: Plum, Star, Ballard And Laura Lake Clean Boats Clean Waters Project 2014: Town of Plum Lake will sponsor a Clean Boats Clean Water landing inspection program at 4 public accesses in 2014.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2015
Waters Involved
Unnamed
Status
Complete

Town Of Plum Lake: Town Of Plum Lake 2015 Clean Boats Clean Waters Project: The Town of Plum Lake is sponsoring a 2015 Clean Boats Clean Water project including Ballard, Star, Plum, Razorback, Big Muskellunge Lakes and 5 public landings.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2017
Waters Involved
Unnamed
Status
Complete

Town Of Plum Lake: Town Of Plum Lake 2017 Cbcw: Town Of Plum Lake is sponsoring a Clean Boats Clean Waters project in 2017 at 5 single public boat landings and 1 public boat landing pairs on PLUM LAKE, STAR LAKE, BALLARD/IRVING, PLUM LAKE, RAZORBACK LAKE, LAURA/BIG MUSKELLU.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2021
Waters Involved
Unnamed
Status
Complete

Town Of Plum Lake: Town Of Plum Lake 2021 Cbcw: Plum Lake is sponsoring a Clean Boats Clean Waters project in 2021 at 6 single public boat landings and 0 public boat landing pairs on IRVING LAKE (CAMP 2 ROAD), LAKE LAURA(DEERFOOT LANDING), STAR LAKE (EAST BOAT LANDING), RAZORBACK LAKE (NORTH LANDING), PLUM LAKE (STATEHOUSE LANDING), PLUM LAKE.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2020
Waters Involved
Upper Gresham Lake
Status
Complete

Boulder Junction: Town Of Boulder Junction 2020 Cbcw: Boulder Junction is sponsoring a Clean Boats Clean Waters project in 2020 at 1 single public boat landings and 4 public boat landing pairs on TROUT LAKE (NORTH TROUT, SOUTH TROUT), HIGH/BOULDER(HIGH LK LANDING, BOULDER LK LANDIN), LITTLE JOHN/MANN (LITTLE JOHN LANDING, MANN LK LANDING), ALLEQ LK/WHITE SND (ALLEQUSH LANDING, WHITE SAND LANDIN), UPPER GRESHAM (UPPER GRESHAM).


Grant Details
Clean Boats, Clean Waters
Date
2/15/2017
Waters Involved
Van Vliet Lake
Status
Complete

Big Lake Property Owners Association: Big Lake Property Owners Association 2017 Cbcw: Big Lake Property Owners Association is sponsoring a Clean Boats Clean Waters project in 2017 at 1 single public boat landings and 0 public boat landing pairs on BIG LAKE.


Grant Details
Clean Boats, Clean Waters
Date
4/1/2013
Waters Involved
White Birch Creek
Status
Proposed

Town Of Plum Lake: Town Of Plum Lake Clean Boats Clean Waters 2013: TheTown of Plum Lake will sponsor a Clean Boats Clean Waters landing inspection program for 2013 on four public boat landings.


Grant Details
Clean Boats, Clean Waters
Date
4/1/2013
Waters Involved
White Birch Lake
Status
Proposed

Town Of Plum Lake: Town Of Plum Lake Clean Boats Clean Waters 2013: TheTown of Plum Lake will sponsor a Clean Boats Clean Waters landing inspection program for 2013 on four public boat landings.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2016
Waters Involved
White Sand Creek
Status
Complete

White Sand Lake Assoc: White Sand Lake Association 2016 Clean Boats Clean Waters: The White Sand Lake Association, Inc. is sponsoring a Clean Boats Clean Waters project in 2016 at one public boat landing on White Sand, Little Sand and Headflyer Lake.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2020
Waters Involved
White Sand Creek
Status
Complete

Boulder Junction: Town Of Boulder Junction 2020 Cbcw: Boulder Junction is sponsoring a Clean Boats Clean Waters project in 2020 at 1 single public boat landings and 4 public boat landing pairs on TROUT LAKE (NORTH TROUT, SOUTH TROUT), HIGH/BOULDER(HIGH LK LANDING, BOULDER LK LANDIN), LITTLE JOHN/MANN (LITTLE JOHN LANDING, MANN LK LANDING), ALLEQ LK/WHITE SND (ALLEQUSH LANDING, WHITE SAND LANDIN), UPPER GRESHAM (UPPER GRESHAM).


Grant Details
Clean Boats, Clean Waters
Date
2/15/2016
Waters Involved
White Sand Lake
Status
Complete

White Sand Lake Assoc: White Sand Lake Association 2016 Clean Boats Clean Waters: The White Sand Lake Association, Inc. is sponsoring a Clean Boats Clean Waters project in 2016 at one public boat landing on White Sand, Little Sand and Headflyer Lake.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2020
Waters Involved
White Sand Lake
Status
Complete

Boulder Junction: Town Of Boulder Junction 2020 Cbcw: Boulder Junction is sponsoring a Clean Boats Clean Waters project in 2020 at 1 single public boat landings and 4 public boat landing pairs on TROUT LAKE (NORTH TROUT, SOUTH TROUT), HIGH/BOULDER(HIGH LK LANDING, BOULDER LK LANDIN), LITTLE JOHN/MANN (LITTLE JOHN LANDING, MANN LK LANDING), ALLEQ LK/WHITE SND (ALLEQUSH LANDING, WHITE SAND LANDIN), UPPER GRESHAM (UPPER GRESHAM).


Grant Details
Date
3/15/2022
Waters Involved
Trout Lake
Status
Complete

University Of Florida: A Microsporidian Pathogen As A Control For Invasive Crayfish: The Grantee is to investigate the mechanism by which the microsporidian pathogen (Nosema sp.) is transmitted, how it impacts rusty crayfish populations, & whether it can effectively facilitate restoration of lake communities. Project activities include: 1) Measure impacts of Nosema sp. by monitoring crayfish densities & microsporidian prevalence in Trout Lake; 2) assess crayfish abundance at the whole-lake scale using traps; 3) conduct statistical analyses on relationship between crayfish density & microsporidian prevalence; 4) conduct laboratory experiments on transmission of Nosema sp. among adult crayfish across a range of water temperatures; 5) test potential for crayfish to transmit pathogen to offspring; 6) conduct statistical analyses on impact of temperature on transmission success & microsporidian development time; 7) assess whether macrophyte biomass & diversity is related to crayfish density & microsporidian prevalence in Trout Lake; 8) conduct controlled mesocosm experiments to test effects of microsporidian infection on rusty crayfish impacts; 9) conduct statistical analyses on how crayfish density & microsporidian prevalence relate to macrophyte biomass & richness; 10) measure effects of Nosema sp. on crayfish growth & survival in mesocosm experiments; 11) examine relationship between Nosema sp. infection & rusty crayfish fecundity; 12) conduct statistical analyses on how infection with Nosema sp. affects crayfish growth, survival, egg number & egg mass; 13) examine incidence of microsporidian outbreaks by monitoring 10 additional lakes. Project deliverables include: 1) Data on crayfish density, size, sex, species & microsporidian prevalence in Trout Lake; 2) results from statistical analyses; 3) data from laboratory & mesocosm experiments; 4) data on macrophyte biomass & composition; 5) data on microsporidian prevalence in WI lakes.


Grant Details
Date
3/15/2022
Waters Involved
Trout River
Status
Complete

University Of Florida: A Microsporidian Pathogen As A Control For Invasive Crayfish: The Grantee is to investigate the mechanism by which the microsporidian pathogen (Nosema sp.) is transmitted, how it impacts rusty crayfish populations, & whether it can effectively facilitate restoration of lake communities. Project activities include: 1) Measure impacts of Nosema sp. by monitoring crayfish densities & microsporidian prevalence in Trout Lake; 2) assess crayfish abundance at the whole-lake scale using traps; 3) conduct statistical analyses on relationship between crayfish density & microsporidian prevalence; 4) conduct laboratory experiments on transmission of Nosema sp. among adult crayfish across a range of water temperatures; 5) test potential for crayfish to transmit pathogen to offspring; 6) conduct statistical analyses on impact of temperature on transmission success & microsporidian development time; 7) assess whether macrophyte biomass & diversity is related to crayfish density & microsporidian prevalence in Trout Lake; 8) conduct controlled mesocosm experiments to test effects of microsporidian infection on rusty crayfish impacts; 9) conduct statistical analyses on how crayfish density & microsporidian prevalence relate to macrophyte biomass & richness; 10) measure effects of Nosema sp. on crayfish growth & survival in mesocosm experiments; 11) examine relationship between Nosema sp. infection & rusty crayfish fecundity; 12) conduct statistical analyses on how infection with Nosema sp. affects crayfish growth, survival, egg number & egg mass; 13) examine incidence of microsporidian outbreaks by monitoring 10 additional lakes. Project deliverables include: 1) Data on crayfish density, size, sex, species & microsporidian prevalence in Trout Lake; 2) results from statistical analyses; 3) data from laboratory & mesocosm experiments; 4) data on macrophyte biomass & composition; 5) data on microsporidian prevalence in WI lakes.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Alder Lake
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
4/15/2020
Waters Involved
Ballard Lake
Status
Complete

Vilas County: Hlk-Vilas Co Hlk Projects: Partnering with property owners, the applicant is sponsoring a grant to implement best practices from Wisconsin\2019s 2019 Healthy Lakes & Rivers Action Plan. Best practices, including fish sticks, 350 sq. ft. native plantings, diversions, rock infiltration, and/or rain gardens, will be designed and installed according to program fact sheets, technical guidance and the grant application.

All funded best practices require contracts that must remain in place for 10 years and include the minimum operation and maintenance requirements described in the special condistions at the end of this agreement. If the landowner is the grant sponsor this Lake Protection Grant Agreement serves as the contract. If the best practice(s) will be implemented on land other than the sponsor\2019s, a contract between the sponsor and landowner describing the 10-year contract period, minimum operation and maintenance details, and data to be collected is required. The Department may perform site inspections and/or monitoring to ensure project success.

Deliverables include: a project summary including data requirements, pre/post photographs, and confirmation of completed design work and landowner contracts. A Healthy Lakes & Rivers Example Report is available to assist you.

Special conditions: Project management and technical assistance costs cannot exceed 10% of the state share of the grant award; this does not include implementation labor. Water regulation and/or county zoning permits must be issued before construction. Projects required for regulatory compliance purposes, including shoreland mitigation projects, are not eligible for reimbursement. The Healthy Lakes & Rivers logo should be used for promotion and publicity and DNR recognized as a funding source.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Benson Lake
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
2/15/2017
Waters Involved
Big Arbor Vitae Lake
Status
Complete

Vilas County: Lco-Vilas County Monitoring & Healthy Lakes Program: Vilas County Land and Water Conservation Dept is sponsoring a lake protection grant to monitor lakes and begin healthy lakes projects in Vilas County.

Project activities include: 1) Perform 6 Directed Lakes surveys (PI, water quality, AIS, and shoreland); 2) Initiate 3 healthy lakes programs; 3) Assist regional DNR in accomplishing work plan objectives; 4) Support and attend activities of the WI Lakes Partnership; 5) Provide technical assistance; 6) Hire LTE Lakes Monitoring Technician and fund part of the FTE Lakes Specialist; 7) Develop annual and final report.

Project deliverables include: 1) Directed Lakes data and maps; 2) Healthy Lakes projects; 3) FTE and LTE Lakes Specialists; 4) Annual and final report.

Specific conditions for this project: Draft of annual and final report need Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of annual report, final report, directed lakes data, all maps from project, and all GIS data.


Grant Details
Lake Protection Grant
Date
3/15/2021
Waters Involved
Big Lake
Status
Complete

Uw System Board Of Regegents: Lmi - Wild Rice: Development Of A Population Risk Assessment Tool: Project Scope and Description of Deliverables

The University of Madison is sponsoring a surface water management grant to implement a Habitat Equivalency Analysis (HEA) to assess wild rice health and management strategies using a culturally responsible, whole ecosystem approach.

Project final deliverables include: All data collected, HEA\2019s and reports.

Specific project activities include: 1) During the first two years of the study, sample the physical, chemical, and biological characteristics of rice stands in six lake systems in Vilas and Oneida Counties; 2) In years two and three, test how long wild rice seeds can remain dormant, the viability of long-stored seeds and if germination varies across water and sediment depths within rice bed habitats; 3) Expand network of partners to collaborate on developing and vetting wild rice health assessment tools; 4) Produce cultural and ecosystem characterizations for each of the six chosen research lakes; 5) Develop reports for each lake that also provides guidance for restoration and/or monitoring

Special Conditions: 1) Draft HEA\2019s and reports need Dept review and approval.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.

If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive an electronic .pdf copies of the reports along with, or prior to submission of grantee's final payment request.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Bolin Lake
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
4/15/2020
Waters Involved
Boulder Lake
Status
Complete

Vilas County: Hlk-Vilas Co Hlk Projects: Partnering with property owners, the applicant is sponsoring a grant to implement best practices from Wisconsin\2019s 2019 Healthy Lakes & Rivers Action Plan. Best practices, including fish sticks, 350 sq. ft. native plantings, diversions, rock infiltration, and/or rain gardens, will be designed and installed according to program fact sheets, technical guidance and the grant application.

All funded best practices require contracts that must remain in place for 10 years and include the minimum operation and maintenance requirements described in the special condistions at the end of this agreement. If the landowner is the grant sponsor this Lake Protection Grant Agreement serves as the contract. If the best practice(s) will be implemented on land other than the sponsor\2019s, a contract between the sponsor and landowner describing the 10-year contract period, minimum operation and maintenance details, and data to be collected is required. The Department may perform site inspections and/or monitoring to ensure project success.

Deliverables include: a project summary including data requirements, pre/post photographs, and confirmation of completed design work and landowner contracts. A Healthy Lakes & Rivers Example Report is available to assist you.

Special conditions: Project management and technical assistance costs cannot exceed 10% of the state share of the grant award; this does not include implementation labor. Water regulation and/or county zoning permits must be issued before construction. Projects required for regulatory compliance purposes, including shoreland mitigation projects, are not eligible for reimbursement. The Healthy Lakes & Rivers logo should be used for promotion and publicity and DNR recognized as a funding source.


Grant Details
Lake Protection Grant
Date
4/15/2020
Waters Involved
Buckatabon Creek
Status
Complete

Vilas County: Hlk-Vilas Co Hlk Projects: Partnering with property owners, the applicant is sponsoring a grant to implement best practices from Wisconsin\2019s 2019 Healthy Lakes & Rivers Action Plan. Best practices, including fish sticks, 350 sq. ft. native plantings, diversions, rock infiltration, and/or rain gardens, will be designed and installed according to program fact sheets, technical guidance and the grant application.

All funded best practices require contracts that must remain in place for 10 years and include the minimum operation and maintenance requirements described in the special condistions at the end of this agreement. If the landowner is the grant sponsor this Lake Protection Grant Agreement serves as the contract. If the best practice(s) will be implemented on land other than the sponsor\2019s, a contract between the sponsor and landowner describing the 10-year contract period, minimum operation and maintenance details, and data to be collected is required. The Department may perform site inspections and/or monitoring to ensure project success.

Deliverables include: a project summary including data requirements, pre/post photographs, and confirmation of completed design work and landowner contracts. A Healthy Lakes & Rivers Example Report is available to assist you.

Special conditions: Project management and technical assistance costs cannot exceed 10% of the state share of the grant award; this does not include implementation labor. Water regulation and/or county zoning permits must be issued before construction. Projects required for regulatory compliance purposes, including shoreland mitigation projects, are not eligible for reimbursement. The Healthy Lakes & Rivers logo should be used for promotion and publicity and DNR recognized as a funding source.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Chub Lake
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Circle Lily Lake
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Clear Lake
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Dead Pike Lake
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Deerfoot Lake
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Dog Lake
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
3/15/2021
Waters Involved
Eagle River
Status
Complete

Uw System Board Of Regegents: Lmi - Wild Rice: Development Of A Population Risk Assessment Tool: Project Scope and Description of Deliverables

The University of Madison is sponsoring a surface water management grant to implement a Habitat Equivalency Analysis (HEA) to assess wild rice health and management strategies using a culturally responsible, whole ecosystem approach.

Project final deliverables include: All data collected, HEA\2019s and reports.

Specific project activities include: 1) During the first two years of the study, sample the physical, chemical, and biological characteristics of rice stands in six lake systems in Vilas and Oneida Counties; 2) In years two and three, test how long wild rice seeds can remain dormant, the viability of long-stored seeds and if germination varies across water and sediment depths within rice bed habitats; 3) Expand network of partners to collaborate on developing and vetting wild rice health assessment tools; 4) Produce cultural and ecosystem characterizations for each of the six chosen research lakes; 5) Develop reports for each lake that also provides guidance for restoration and/or monitoring

Special Conditions: 1) Draft HEA\2019s and reports need Dept review and approval.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.

If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive an electronic .pdf copies of the reports along with, or prior to submission of grantee's final payment request.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Fawn Lake
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
4/15/2019
Waters Involved
Fishtrap Lake
Status
Complete

High-Fishtrap-Rush Lks Assoc: Lmi-Clmp Implementation- Plant Sampling & Ais Inventory: Project scope: High/Fishtrap/Rush Lakes Association is sponsoring a LPT grant to study High, Fishtrap and Rush Lakes, in Vilas County, with a study completion date of December 31, 2019. The project will focus on completing aquatic plant point-intercept (PI) and AIS early detection surveys.

Project activities:
1) PI and AIS early detection surveys
2) Data analysis
3) Develop project report

Project deliverables include:
1) PI and AIS data
2) Aquatic plant vouchers
3) Project report

Specific project conditions:
- Draft of project report needs Wisconsin DNR review and approval


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Gem Lake
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Homestead Lake
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
3/15/2021
Waters Involved
Island Creek
Status
Complete

Uw System Board Of Regegents: Lmi - Wild Rice: Development Of A Population Risk Assessment Tool: Project Scope and Description of Deliverables

The University of Madison is sponsoring a surface water management grant to implement a Habitat Equivalency Analysis (HEA) to assess wild rice health and management strategies using a culturally responsible, whole ecosystem approach.

Project final deliverables include: All data collected, HEA\2019s and reports.

Specific project activities include: 1) During the first two years of the study, sample the physical, chemical, and biological characteristics of rice stands in six lake systems in Vilas and Oneida Counties; 2) In years two and three, test how long wild rice seeds can remain dormant, the viability of long-stored seeds and if germination varies across water and sediment depths within rice bed habitats; 3) Expand network of partners to collaborate on developing and vetting wild rice health assessment tools; 4) Produce cultural and ecosystem characterizations for each of the six chosen research lakes; 5) Develop reports for each lake that also provides guidance for restoration and/or monitoring

Special Conditions: 1) Draft HEA\2019s and reports need Dept review and approval.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.

If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive an electronic .pdf copies of the reports along with, or prior to submission of grantee's final payment request.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Island Lake
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
3/15/2021
Waters Involved
Island Lake
Status
Complete

Uw System Board Of Regegents: Lmi - Wild Rice: Development Of A Population Risk Assessment Tool: Project Scope and Description of Deliverables

The University of Madison is sponsoring a surface water management grant to implement a Habitat Equivalency Analysis (HEA) to assess wild rice health and management strategies using a culturally responsible, whole ecosystem approach.

Project final deliverables include: All data collected, HEA\2019s and reports.

Specific project activities include: 1) During the first two years of the study, sample the physical, chemical, and biological characteristics of rice stands in six lake systems in Vilas and Oneida Counties; 2) In years two and three, test how long wild rice seeds can remain dormant, the viability of long-stored seeds and if germination varies across water and sediment depths within rice bed habitats; 3) Expand network of partners to collaborate on developing and vetting wild rice health assessment tools; 4) Produce cultural and ecosystem characterizations for each of the six chosen research lakes; 5) Develop reports for each lake that also provides guidance for restoration and/or monitoring

Special Conditions: 1) Draft HEA\2019s and reports need Dept review and approval.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.

If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive an electronic .pdf copies of the reports along with, or prior to submission of grantee's final payment request.


Grant Details
Lake Protection Grant
Date
4/15/2015
Waters Involved
Kentuck Lake
Status
Complete

Kentuck Lake P&R District: Lmi-Df-Kentuck Lake Plan Implementation: Water Quality & Ais: Kentuck Lake P&R District is sponsoring a lake protection grant to further assess water quality and manage AIS in Kentuck Lake, in Vilas County.

Project activities include: 1) In-lake water quality assessment; 2) Groundwater assessment; 3) Sediment core collection; 4) EWM and CLP monitoring and mapping; 5) Stakeholder participation planning meeting; 6) Purchase LDO probe; 7) Develop annual report and final report.

Project deliverables include: 1) In-lake, groundwater and sediment core data; 2) EWM and CLP data and mapping; 3) LDO probe; 4) Annual summary and final report.

Specific conditions for this project: Annual summary and final report need Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of annual summary, final report, all maps, data and GIS from project.


Grant Details
Lake Protection Grant
Date
3/15/2023
Waters Involved
Lake Laura
Status
Complete

Vilas County: Hlr - 2023 Vilas County Healthy Lakes Projects: Partnering with property owners, Vilas County is sponsoring a grant to implement best practices from Wisconsin\2019s 2019 Healthy Lakes & Rivers Action Plan. Best practices, including fish sticks, 350 sq. ft. native plantings, diversions, rock infiltration, and/or rain gardens, will be designed and installed according to program fact sheets, technical guidance and the grant application.
All funded best practices require contracts that must remain in place for 10 years and include the minimum operation and maintenance requirements described in the special conditions at the end of this agreement. If the landowner is the grant sponsor this Lake Protection Grant Agreement serves as the contract. If the best practice(s) will be implemented on land other than the sponsor\2019s, a contract between the sponsor and landowner describing the 10-year contract period, minimum operation and maintenance details, and data to be collected is required. The Department may perform site inspections and/or monitoring to ensure project success.
Deliverables include: a project summary including data requirements, pre/post photographs, and confirmation of completed design work and landowner contracts. A Healthy Lakes & Rivers Example Report is available to assist you.
Special conditions: Project management and technical assistance cash costs cannot exceed 10% of the state share of the grant award; this does not include implementation labor. Water regulation and/or county zoning permits must be issued before construction. Projects required for regulatory compliance purposes, including shoreland mitigation projects, are not eligible for reimbursement. The Healthy Lakes & Rivers logo should be used for promotion and publicity and DNR recognized as a funding source.
The grantee may request a one-time cost amendment and a one-time time extension. The grantee must notify the department if they wish to add or subtract practices to the scope of this grant agreement


Grant Details
Lake Protection Grant
Date
9/1/1997
Waters Involved
Lake of the Falls
Status
Complete

Lake Of The Falls Association: Lmi-Walleye Spawning Habitat Project: Lake of the Falls Association proposes to establish a Walleye Spawning Habitat Project on Lake of the Falls. The project activities will include six approved spawning beds made of approved materials. Other activities that are included besides the actual construction of the rock spawning beds are site preparation and clean-up as called for in the application.


Grant Details
Lake Protection Grant
Date
2/15/2017
Waters Involved
Link Creek
Status
Complete

Vilas County: Lco-Vilas County Monitoring & Healthy Lakes Program: Vilas County Land and Water Conservation Dept is sponsoring a lake protection grant to monitor lakes and begin healthy lakes projects in Vilas County.

Project activities include: 1) Perform 6 Directed Lakes surveys (PI, water quality, AIS, and shoreland); 2) Initiate 3 healthy lakes programs; 3) Assist regional DNR in accomplishing work plan objectives; 4) Support and attend activities of the WI Lakes Partnership; 5) Provide technical assistance; 6) Hire LTE Lakes Monitoring Technician and fund part of the FTE Lakes Specialist; 7) Develop annual and final report.

Project deliverables include: 1) Directed Lakes data and maps; 2) Healthy Lakes projects; 3) FTE and LTE Lakes Specialists; 4) Annual and final report.

Specific conditions for this project: Draft of annual and final report need Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of annual report, final report, directed lakes data, all maps from project, and all GIS data.


Grant Details
Lake Protection Grant
Date
2/15/2017
Waters Involved
Little Arbor Vitae Lake
Status
Complete

Vilas County: Lco-Vilas County Monitoring & Healthy Lakes Program: Vilas County Land and Water Conservation Dept is sponsoring a lake protection grant to monitor lakes and begin healthy lakes projects in Vilas County.

Project activities include: 1) Perform 6 Directed Lakes surveys (PI, water quality, AIS, and shoreland); 2) Initiate 3 healthy lakes programs; 3) Assist regional DNR in accomplishing work plan objectives; 4) Support and attend activities of the WI Lakes Partnership; 5) Provide technical assistance; 6) Hire LTE Lakes Monitoring Technician and fund part of the FTE Lakes Specialist; 7) Develop annual and final report.

Project deliverables include: 1) Directed Lakes data and maps; 2) Healthy Lakes projects; 3) FTE and LTE Lakes Specialists; 4) Annual and final report.

Specific conditions for this project: Draft of annual and final report need Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of annual report, final report, directed lakes data, all maps from project, and all GIS data.


Grant Details
Lake Protection Grant
Date
3/15/2023
Waters Involved
Little Arbor Vitae Lake
Status
Complete

Vilas County: Hlr - 2023 Vilas County Healthy Lakes Projects: Partnering with property owners, Vilas County is sponsoring a grant to implement best practices from Wisconsin\2019s 2019 Healthy Lakes & Rivers Action Plan. Best practices, including fish sticks, 350 sq. ft. native plantings, diversions, rock infiltration, and/or rain gardens, will be designed and installed according to program fact sheets, technical guidance and the grant application.
All funded best practices require contracts that must remain in place for 10 years and include the minimum operation and maintenance requirements described in the special conditions at the end of this agreement. If the landowner is the grant sponsor this Lake Protection Grant Agreement serves as the contract. If the best practice(s) will be implemented on land other than the sponsor\2019s, a contract between the sponsor and landowner describing the 10-year contract period, minimum operation and maintenance details, and data to be collected is required. The Department may perform site inspections and/or monitoring to ensure project success.
Deliverables include: a project summary including data requirements, pre/post photographs, and confirmation of completed design work and landowner contracts. A Healthy Lakes & Rivers Example Report is available to assist you.
Special conditions: Project management and technical assistance cash costs cannot exceed 10% of the state share of the grant award; this does not include implementation labor. Water regulation and/or county zoning permits must be issued before construction. Projects required for regulatory compliance purposes, including shoreland mitigation projects, are not eligible for reimbursement. The Healthy Lakes & Rivers logo should be used for promotion and publicity and DNR recognized as a funding source.
The grantee may request a one-time cost amendment and a one-time time extension. The grantee must notify the department if they wish to add or subtract practices to the scope of this grant agreement


Grant Details
Lake Protection Grant
Date
2/15/2017
Waters Involved
Little John Lake
Status
Complete

Vilas County: Lco-Vilas County Monitoring & Healthy Lakes Program: Vilas County Land and Water Conservation Dept is sponsoring a lake protection grant to monitor lakes and begin healthy lakes projects in Vilas County.

Project activities include: 1) Perform 6 Directed Lakes surveys (PI, water quality, AIS, and shoreland); 2) Initiate 3 healthy lakes programs; 3) Assist regional DNR in accomplishing work plan objectives; 4) Support and attend activities of the WI Lakes Partnership; 5) Provide technical assistance; 6) Hire LTE Lakes Monitoring Technician and fund part of the FTE Lakes Specialist; 7) Develop annual and final report.

Project deliverables include: 1) Directed Lakes data and maps; 2) Healthy Lakes projects; 3) FTE and LTE Lakes Specialists; 4) Annual and final report.

Specific conditions for this project: Draft of annual and final report need Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of annual report, final report, directed lakes data, all maps from project, and all GIS data.


Grant Details
Lake Protection Grant
Date
9/1/2000
Waters Involved
Little Saint Germain Lake
Status
Complete

Little St Germain Lake P & R District: Res- L. St. Germain Lake Aeration & Phosphorus Removal Engineering: The Little St. Germain Lake Protection and Rehabilitation District is sponsoring a project involving the installation of two lake aerators for improvement of the winter lake dissolved oxygen levels, development of a preliminary engineering work scope for reduction of phosphorus loading to Little St. Germain Lake, and monitoring of inlake water chemistry, Muskellunge Creek monitoring, and groungwater monitoring to be conducted by the USGS.

Project deliverables for this grant project will be:
USGS report including data from the continued trend monitoring, phosphorus loading data from Muskellunge Creek, sources of phosphorus to Muskellunge Creek, groundwater phosphorus contribution, pre and post aeration system installation oxygen monitoring, an updated lake water and phosphorus budget, and an evaluation of the effectiveness of the aeration system.

A final report from Foth &Van Dyke will include a feasibility study for reduction of the phosphorus loading to Little St. Germain, preliminary engineering of chemical phosphorus removal and cost projections.

Specific conditions for this project include:
* The installation of all stream gauging stations and lake aeration equipment must receive the approval and/or permit from the Department of Natural Resources water regulation section.

The Department of Natural Resources will be provided with electronic and paper copies of the final report of this project.


Grant Details
Lake Protection Grant
Date
10/1/2009
Waters Involved
Little Saint Germain Lake
Status
Complete

Little St Germain Lake P & R District: Res-Restoring Shoreline Habitat On Lt. Saint Germain Lake: Little St. Germain Lake P&R District is sponsoring a project focused on restoring 500 meters of shoreline on Lt. St. Germain Lake. Partners include the USGS, VCLA, Vilas Co. LWCD, UW Ext., WDATCP, MI Tech Univ., & WDNR.

Activities include: 1) native vegetation restoration of 500 meters of shoreline & > 4000 sq. meters of lakeshore buffer; 2) terrestrial & aquatic invasives survey & treatment/removal on restored area; 3) evaluate ecological benefits of buffer restoration for wildlife & fish pops.; 4) assess feasibility of using project to conduct experiments to quantify benifits of buffer re-establishment to reduce nutrient runoff; 5) conduct experiments to develop BMP's for shoreland restoration in the Upper Wisc. River Watershed & Northern Highlands Ecological Landscape; 6) removal, replacement of retaining walls, impervious surfaces within buffer; installation of BMPs for runoff control; 7) repair shoreland erosion w/ biologically degradable materials; 8) tree drops & aquatic macrophyte bed establishment; 9) demo. & education activities including lake ecology workshops, meetings, pamphlets & newsletters; 10) implement pollinator response surveys; 11) final report summarizing project activities including restortaion before & after photos.

Deliverables: 1) 500 meters of restoration & >4000 sq. meters of buffer area; 2) invasives control; 3) installation of BMP's & erosion control measures; 4) habitat improvements (tree drops & macrophyte bed); 5) completed workshops, pamphlets & newsletters; 6) final report (w/ BMP's & nutrient run-off component).

Specific conditions: Shoreling habitat restorations require perpetual deed restrictions; final report needs Dept. review & approval.

Lake Mgt. Coor will be provided with electronic (pdf or word) & hard copy of final report & copeis of pamphlets & newsletters.


Grant Details
Lake Protection Grant
Date
10/1/2009
Waters Involved
Little St Germain Creek
Status
Complete

Little St Germain Lake P & R District: Res-Restoring Shoreline Habitat On Lt. Saint Germain Lake: Little St. Germain Lake P&R District is sponsoring a project focused on restoring 500 meters of shoreline on Lt. St. Germain Lake. Partners include the USGS, VCLA, Vilas Co. LWCD, UW Ext., WDATCP, MI Tech Univ., & WDNR.

Activities include: 1) native vegetation restoration of 500 meters of shoreline & > 4000 sq. meters of lakeshore buffer; 2) terrestrial & aquatic invasives survey & treatment/removal on restored area; 3) evaluate ecological benefits of buffer restoration for wildlife & fish pops.; 4) assess feasibility of using project to conduct experiments to quantify benifits of buffer re-establishment to reduce nutrient runoff; 5) conduct experiments to develop BMP's for shoreland restoration in the Upper Wisc. River Watershed & Northern Highlands Ecological Landscape; 6) removal, replacement of retaining walls, impervious surfaces within buffer; installation of BMPs for runoff control; 7) repair shoreland erosion w/ biologically degradable materials; 8) tree drops & aquatic macrophyte bed establishment; 9) demo. & education activities including lake ecology workshops, meetings, pamphlets & newsletters; 10) implement pollinator response surveys; 11) final report summarizing project activities including restortaion before & after photos.

Deliverables: 1) 500 meters of restoration & >4000 sq. meters of buffer area; 2) invasives control; 3) installation of BMP's & erosion control measures; 4) habitat improvements (tree drops & macrophyte bed); 5) completed workshops, pamphlets & newsletters; 6) final report (w/ BMP's & nutrient run-off component).

Specific conditions: Shoreling habitat restorations require perpetual deed restrictions; final report needs Dept. review & approval.

Lake Mgt. Coor will be provided with electronic (pdf or word) & hard copy of final report & copeis of pamphlets & newsletters.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Little Star Lake
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Little Trout Lake
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Lower Post Lake
Status
Complete

Post Lakes P & R District: Natural Shoreland & Habitat Project: This project will implement one of the recommendations of the Post Lakes Management Plan. The project will include development of a long-term project to support and encourage shoreland buffers and restoration of shoreland properties. The project also includes the restoration of 6 lots as education demonstration sites.

Deliverables include:
1. Development of a Natural Shorelands and Habitat Committee including DNR and County representatives to guide the development of a pilot project.
2. Development of a long-term project guide including training of volunteers to complete site assessments and an education plan.
3. Site analysis and design for 6 parcels including restoration of these sites.

The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.


Grant Details
Lake Protection Grant
Date
2/15/2017
Waters Involved
Mamie Lake
Status
Complete

Vilas County: Lco-Vilas County Monitoring & Healthy Lakes Program: Vilas County Land and Water Conservation Dept is sponsoring a lake protection grant to monitor lakes and begin healthy lakes projects in Vilas County.

Project activities include: 1) Perform 6 Directed Lakes surveys (PI, water quality, AIS, and shoreland); 2) Initiate 3 healthy lakes programs; 3) Assist regional DNR in accomplishing work plan objectives; 4) Support and attend activities of the WI Lakes Partnership; 5) Provide technical assistance; 6) Hire LTE Lakes Monitoring Technician and fund part of the FTE Lakes Specialist; 7) Develop annual and final report.

Project deliverables include: 1) Directed Lakes data and maps; 2) Healthy Lakes projects; 3) FTE and LTE Lakes Specialists; 4) Annual and final report.

Specific conditions for this project: Draft of annual and final report need Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of annual report, final report, directed lakes data, all maps from project, and all GIS data.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Manitowish Lake
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
4/15/2019
Waters Involved
Manitowish River
Status
Complete

High-Fishtrap-Rush Lks Assoc: Lmi-Clmp Implementation- Plant Sampling & Ais Inventory: Project scope: High/Fishtrap/Rush Lakes Association is sponsoring a LPT grant to study High, Fishtrap and Rush Lakes, in Vilas County, with a study completion date of December 31, 2019. The project will focus on completing aquatic plant point-intercept (PI) and AIS early detection surveys.

Project activities:
1) PI and AIS early detection surveys
2) Data analysis
3) Develop project report

Project deliverables include:
1) PI and AIS data
2) Aquatic plant vouchers
3) Project report

Specific project conditions:
- Draft of project report needs Wisconsin DNR review and approval


Grant Details
Lake Protection Grant
Date
4/15/2020
Waters Involved
Manitowish River
Status
Complete

Vilas County: Hlk-Vilas Co Hlk Projects: Partnering with property owners, the applicant is sponsoring a grant to implement best practices from Wisconsin\2019s 2019 Healthy Lakes & Rivers Action Plan. Best practices, including fish sticks, 350 sq. ft. native plantings, diversions, rock infiltration, and/or rain gardens, will be designed and installed according to program fact sheets, technical guidance and the grant application.

All funded best practices require contracts that must remain in place for 10 years and include the minimum operation and maintenance requirements described in the special condistions at the end of this agreement. If the landowner is the grant sponsor this Lake Protection Grant Agreement serves as the contract. If the best practice(s) will be implemented on land other than the sponsor\2019s, a contract between the sponsor and landowner describing the 10-year contract period, minimum operation and maintenance details, and data to be collected is required. The Department may perform site inspections and/or monitoring to ensure project success.

Deliverables include: a project summary including data requirements, pre/post photographs, and confirmation of completed design work and landowner contracts. A Healthy Lakes & Rivers Example Report is available to assist you.

Special conditions: Project management and technical assistance costs cannot exceed 10% of the state share of the grant award; this does not include implementation labor. Water regulation and/or county zoning permits must be issued before construction. Projects required for regulatory compliance purposes, including shoreland mitigation projects, are not eligible for reimbursement. The Healthy Lakes & Rivers logo should be used for promotion and publicity and DNR recognized as a funding source.


Grant Details
Lake Protection Grant
Date
3/15/2021
Waters Involved
Manitowish River
Status
Complete

Uw System Board Of Regegents: Lmi - Wild Rice: Development Of A Population Risk Assessment Tool: Project Scope and Description of Deliverables

The University of Madison is sponsoring a surface water management grant to implement a Habitat Equivalency Analysis (HEA) to assess wild rice health and management strategies using a culturally responsible, whole ecosystem approach.

Project final deliverables include: All data collected, HEA\2019s and reports.

Specific project activities include: 1) During the first two years of the study, sample the physical, chemical, and biological characteristics of rice stands in six lake systems in Vilas and Oneida Counties; 2) In years two and three, test how long wild rice seeds can remain dormant, the viability of long-stored seeds and if germination varies across water and sediment depths within rice bed habitats; 3) Expand network of partners to collaborate on developing and vetting wild rice health assessment tools; 4) Produce cultural and ecosystem characterizations for each of the six chosen research lakes; 5) Develop reports for each lake that also provides guidance for restoration and/or monitoring

Special Conditions: 1) Draft HEA\2019s and reports need Dept review and approval.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.

If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive an electronic .pdf copies of the reports along with, or prior to submission of grantee's final payment request.


Grant Details
Lake Protection Grant
Date
3/15/2023
Waters Involved
Manitowish River
Status
Complete

North Lakeland Discovery Center: Hlr - Nldc Revitalizing Lakes\005c00a0: Partnering with property owners, North Lakeland Discovery Center is sponsoring a grant to implement best practices from Wisconsin\2019s 2019 Healthy Lakes & Rivers Action Plan. Best practices, including fish sticks, 350 sq. ft. native plantings, diversions, rock infiltration, and/or rain gardens, will be designed and installed according to program fact sheets, technical guidance and the grant application.
All funded best practices require contracts that must remain in place for 10 years and include the minimum operation and maintenance requirements described in the special conditions at the end of this agreement. If the landowner is the grant sponsor this Lake Protection Grant Agreement serves as the contract. If the best practice(s) will be implemented on land other than the sponsor\2019s, a contract between the sponsor and landowner describing the 10-year contract period, minimum operation and maintenance details, and data to be collected is required. The Department may perform site inspections and/or monitoring to ensure project success.
Deliverables include: a project summary including data requirements, pre/post photographs, and confirmation of completed design work and landowner contracts. A Healthy Lakes & Rivers Example Report is available to assist you.
Special conditions: Project management and technical assistance cash costs cannot exceed 10% of the state share of the grant award; this does not include implementation labor. Water regulation and/or county zoning permits must be issued before construction. Projects required for regulatory compliance purposes, including shoreland mitigation projects, are not eligible for reimbursement. The Healthy Lakes & Rivers logo should be used for promotion and publicity and DNR recognized as a funding source.
The grantee may request a one-time cost amendment and a one-time time extension. The grantee must notify the department if they wish to add or subtract practices to the scope of this grant agreement


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
McCabe Lake
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
McKinney Lake
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
2/15/2017
Waters Involved
Minocqua Thoroughfare
Status
Complete

Vilas County: Lco-Vilas County Monitoring & Healthy Lakes Program: Vilas County Land and Water Conservation Dept is sponsoring a lake protection grant to monitor lakes and begin healthy lakes projects in Vilas County.

Project activities include: 1) Perform 6 Directed Lakes surveys (PI, water quality, AIS, and shoreland); 2) Initiate 3 healthy lakes programs; 3) Assist regional DNR in accomplishing work plan objectives; 4) Support and attend activities of the WI Lakes Partnership; 5) Provide technical assistance; 6) Hire LTE Lakes Monitoring Technician and fund part of the FTE Lakes Specialist; 7) Develop annual and final report.

Project deliverables include: 1) Directed Lakes data and maps; 2) Healthy Lakes projects; 3) FTE and LTE Lakes Specialists; 4) Annual and final report.

Specific conditions for this project: Draft of annual and final report need Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of annual report, final report, directed lakes data, all maps from project, and all GIS data.


Grant Details
Lake Protection Grant
Date
3/15/2023
Waters Involved
Minocqua Thoroughfare
Status
Complete

Vilas County: Hlr - 2023 Vilas County Healthy Lakes Projects: Partnering with property owners, Vilas County is sponsoring a grant to implement best practices from Wisconsin\2019s 2019 Healthy Lakes & Rivers Action Plan. Best practices, including fish sticks, 350 sq. ft. native plantings, diversions, rock infiltration, and/or rain gardens, will be designed and installed according to program fact sheets, technical guidance and the grant application.
All funded best practices require contracts that must remain in place for 10 years and include the minimum operation and maintenance requirements described in the special conditions at the end of this agreement. If the landowner is the grant sponsor this Lake Protection Grant Agreement serves as the contract. If the best practice(s) will be implemented on land other than the sponsor\2019s, a contract between the sponsor and landowner describing the 10-year contract period, minimum operation and maintenance details, and data to be collected is required. The Department may perform site inspections and/or monitoring to ensure project success.
Deliverables include: a project summary including data requirements, pre/post photographs, and confirmation of completed design work and landowner contracts. A Healthy Lakes & Rivers Example Report is available to assist you.
Special conditions: Project management and technical assistance cash costs cannot exceed 10% of the state share of the grant award; this does not include implementation labor. Water regulation and/or county zoning permits must be issued before construction. Projects required for regulatory compliance purposes, including shoreland mitigation projects, are not eligible for reimbursement. The Healthy Lakes & Rivers logo should be used for promotion and publicity and DNR recognized as a funding source.
The grantee may request a one-time cost amendment and a one-time time extension. The grantee must notify the department if they wish to add or subtract practices to the scope of this grant agreement


Grant Details
Lake Protection Grant
Date
9/1/2008
Waters Involved
Moon Lake
Status
Complete

Alma-Moon Lake P & R District: Res-Restoring Shoreline Habitat On Moon Lake: Alma/Moon Lake P&R District is sponsoring a project focusing on restoring 1500 feet of shoreline on Moon Lake as part of a WDNR Science Services Lakeshore Restoration Research Project. Partners include UCC Moon Beach Camp, Michigan Technical University and WDNR.

Project activities include: 1) Native vegetation restoration of 1500 feet of shoreline & >4000 square meters of lakeshore buffer area; 2) Survey of restoration area for terrestrial & aquatic invasives - all encountered will be treated &/or removed; 3) Install & maintain an 8' fence & 3' hardware cloth for 3-4 years for site protection from deer & snowshoe hares; 4) Install rain gardens along areas of significant run-off; 5) Install enviro-lock biodegradable bags along areas of significant erosion; 6) 4-6 trees will be dropped & establishment of an aquatic macrophyte bed in the restoration area; 7) Shoreline restoration demonstration & education activities including lake ecology workshops, creating pamphlets, hand-outs & video DVD's, signage, brochures, & an updated Moon Beach website detailing project progress; 8) Final report summarizing project activities, including before and after photographs of restored areas.

Project deliverables include: 1)1500 feet of restored shoreline and >4000 square meters of lakeshore buffer area; 2) Treatment &/or removal of invasive species; 3) Installed rain gardens and erosion control measures; 4) Habitat improvements (tree drops and macrophyte bed); 5) Completed workshops, pamphlets, hand-outs, video DVD's, signage, brochures, and website updates; 6) Final report.

Specific Conditionst: Shoreland habitat restorations require perpetual deed restrictions; Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, and copies of pamphlets, brochures, hand-outs, and DVD's and any established protocols for tree drops and aquatic macrophyte bed establishment.


Grant Details
Lake Protection Grant
Date
3/15/2023
Waters Involved
Papoose Creek
Status
Complete

North Lakeland Discovery Center: Hlr - Nldc Revitalizing Lakes\005c00a0: Partnering with property owners, North Lakeland Discovery Center is sponsoring a grant to implement best practices from Wisconsin\2019s 2019 Healthy Lakes & Rivers Action Plan. Best practices, including fish sticks, 350 sq. ft. native plantings, diversions, rock infiltration, and/or rain gardens, will be designed and installed according to program fact sheets, technical guidance and the grant application.
All funded best practices require contracts that must remain in place for 10 years and include the minimum operation and maintenance requirements described in the special conditions at the end of this agreement. If the landowner is the grant sponsor this Lake Protection Grant Agreement serves as the contract. If the best practice(s) will be implemented on land other than the sponsor\2019s, a contract between the sponsor and landowner describing the 10-year contract period, minimum operation and maintenance details, and data to be collected is required. The Department may perform site inspections and/or monitoring to ensure project success.
Deliverables include: a project summary including data requirements, pre/post photographs, and confirmation of completed design work and landowner contracts. A Healthy Lakes & Rivers Example Report is available to assist you.
Special conditions: Project management and technical assistance cash costs cannot exceed 10% of the state share of the grant award; this does not include implementation labor. Water regulation and/or county zoning permits must be issued before construction. Projects required for regulatory compliance purposes, including shoreland mitigation projects, are not eligible for reimbursement. The Healthy Lakes & Rivers logo should be used for promotion and publicity and DNR recognized as a funding source.
The grantee may request a one-time cost amendment and a one-time time extension. The grantee must notify the department if they wish to add or subtract practices to the scope of this grant agreement


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Pier Lake
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
3/15/2023
Waters Involved
Pioneer Creek
Status
Complete

Vilas County: Hlr - 2023 Vilas County Healthy Lakes Projects: Partnering with property owners, Vilas County is sponsoring a grant to implement best practices from Wisconsin\2019s 2019 Healthy Lakes & Rivers Action Plan. Best practices, including fish sticks, 350 sq. ft. native plantings, diversions, rock infiltration, and/or rain gardens, will be designed and installed according to program fact sheets, technical guidance and the grant application.
All funded best practices require contracts that must remain in place for 10 years and include the minimum operation and maintenance requirements described in the special conditions at the end of this agreement. If the landowner is the grant sponsor this Lake Protection Grant Agreement serves as the contract. If the best practice(s) will be implemented on land other than the sponsor\2019s, a contract between the sponsor and landowner describing the 10-year contract period, minimum operation and maintenance details, and data to be collected is required. The Department may perform site inspections and/or monitoring to ensure project success.
Deliverables include: a project summary including data requirements, pre/post photographs, and confirmation of completed design work and landowner contracts. A Healthy Lakes & Rivers Example Report is available to assist you.
Special conditions: Project management and technical assistance cash costs cannot exceed 10% of the state share of the grant award; this does not include implementation labor. Water regulation and/or county zoning permits must be issued before construction. Projects required for regulatory compliance purposes, including shoreland mitigation projects, are not eligible for reimbursement. The Healthy Lakes & Rivers logo should be used for promotion and publicity and DNR recognized as a funding source.
The grantee may request a one-time cost amendment and a one-time time extension. The grantee must notify the department if they wish to add or subtract practices to the scope of this grant agreement


Grant Details
Lake Protection Grant
Date
3/15/2023
Waters Involved
Pioneer Lake
Status
Complete

Vilas County: Hlr - 2023 Vilas County Healthy Lakes Projects: Partnering with property owners, Vilas County is sponsoring a grant to implement best practices from Wisconsin\2019s 2019 Healthy Lakes & Rivers Action Plan. Best practices, including fish sticks, 350 sq. ft. native plantings, diversions, rock infiltration, and/or rain gardens, will be designed and installed according to program fact sheets, technical guidance and the grant application.
All funded best practices require contracts that must remain in place for 10 years and include the minimum operation and maintenance requirements described in the special conditions at the end of this agreement. If the landowner is the grant sponsor this Lake Protection Grant Agreement serves as the contract. If the best practice(s) will be implemented on land other than the sponsor\2019s, a contract between the sponsor and landowner describing the 10-year contract period, minimum operation and maintenance details, and data to be collected is required. The Department may perform site inspections and/or monitoring to ensure project success.
Deliverables include: a project summary including data requirements, pre/post photographs, and confirmation of completed design work and landowner contracts. A Healthy Lakes & Rivers Example Report is available to assist you.
Special conditions: Project management and technical assistance cash costs cannot exceed 10% of the state share of the grant award; this does not include implementation labor. Water regulation and/or county zoning permits must be issued before construction. Projects required for regulatory compliance purposes, including shoreland mitigation projects, are not eligible for reimbursement. The Healthy Lakes & Rivers logo should be used for promotion and publicity and DNR recognized as a funding source.
The grantee may request a one-time cost amendment and a one-time time extension. The grantee must notify the department if they wish to add or subtract practices to the scope of this grant agreement


Grant Details
Lake Protection Grant
Date
4/15/2020
Waters Involved
Plum Creek
Status
Complete

Vilas County: Hlk-Vilas Co Hlk Projects: Partnering with property owners, the applicant is sponsoring a grant to implement best practices from Wisconsin\2019s 2019 Healthy Lakes & Rivers Action Plan. Best practices, including fish sticks, 350 sq. ft. native plantings, diversions, rock infiltration, and/or rain gardens, will be designed and installed according to program fact sheets, technical guidance and the grant application.

All funded best practices require contracts that must remain in place for 10 years and include the minimum operation and maintenance requirements described in the special condistions at the end of this agreement. If the landowner is the grant sponsor this Lake Protection Grant Agreement serves as the contract. If the best practice(s) will be implemented on land other than the sponsor\2019s, a contract between the sponsor and landowner describing the 10-year contract period, minimum operation and maintenance details, and data to be collected is required. The Department may perform site inspections and/or monitoring to ensure project success.

Deliverables include: a project summary including data requirements, pre/post photographs, and confirmation of completed design work and landowner contracts. A Healthy Lakes & Rivers Example Report is available to assist you.

Special conditions: Project management and technical assistance costs cannot exceed 10% of the state share of the grant award; this does not include implementation labor. Water regulation and/or county zoning permits must be issued before construction. Projects required for regulatory compliance purposes, including shoreland mitigation projects, are not eligible for reimbursement. The Healthy Lakes & Rivers logo should be used for promotion and publicity and DNR recognized as a funding source.


Grant Details
Lake Protection Grant
Date
4/15/2020
Waters Involved
Plum Lake
Status
Complete

Vilas County: Hlk-Vilas Co Hlk Projects: Partnering with property owners, the applicant is sponsoring a grant to implement best practices from Wisconsin\2019s 2019 Healthy Lakes & Rivers Action Plan. Best practices, including fish sticks, 350 sq. ft. native plantings, diversions, rock infiltration, and/or rain gardens, will be designed and installed according to program fact sheets, technical guidance and the grant application.

All funded best practices require contracts that must remain in place for 10 years and include the minimum operation and maintenance requirements described in the special condistions at the end of this agreement. If the landowner is the grant sponsor this Lake Protection Grant Agreement serves as the contract. If the best practice(s) will be implemented on land other than the sponsor\2019s, a contract between the sponsor and landowner describing the 10-year contract period, minimum operation and maintenance details, and data to be collected is required. The Department may perform site inspections and/or monitoring to ensure project success.

Deliverables include: a project summary including data requirements, pre/post photographs, and confirmation of completed design work and landowner contracts. A Healthy Lakes & Rivers Example Report is available to assist you.

Special conditions: Project management and technical assistance costs cannot exceed 10% of the state share of the grant award; this does not include implementation labor. Water regulation and/or county zoning permits must be issued before construction. Projects required for regulatory compliance purposes, including shoreland mitigation projects, are not eligible for reimbursement. The Healthy Lakes & Rivers logo should be used for promotion and publicity and DNR recognized as a funding source.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Rest Lake
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
3/15/2023
Waters Involved
Rest Lake
Status
Complete

North Lakeland Discovery Center: Hlr - Nldc Revitalizing Lakes\005c00a0: Partnering with property owners, North Lakeland Discovery Center is sponsoring a grant to implement best practices from Wisconsin\2019s 2019 Healthy Lakes & Rivers Action Plan. Best practices, including fish sticks, 350 sq. ft. native plantings, diversions, rock infiltration, and/or rain gardens, will be designed and installed according to program fact sheets, technical guidance and the grant application.
All funded best practices require contracts that must remain in place for 10 years and include the minimum operation and maintenance requirements described in the special conditions at the end of this agreement. If the landowner is the grant sponsor this Lake Protection Grant Agreement serves as the contract. If the best practice(s) will be implemented on land other than the sponsor\2019s, a contract between the sponsor and landowner describing the 10-year contract period, minimum operation and maintenance details, and data to be collected is required. The Department may perform site inspections and/or monitoring to ensure project success.
Deliverables include: a project summary including data requirements, pre/post photographs, and confirmation of completed design work and landowner contracts. A Healthy Lakes & Rivers Example Report is available to assist you.
Special conditions: Project management and technical assistance cash costs cannot exceed 10% of the state share of the grant award; this does not include implementation labor. Water regulation and/or county zoning permits must be issued before construction. Projects required for regulatory compliance purposes, including shoreland mitigation projects, are not eligible for reimbursement. The Healthy Lakes & Rivers logo should be used for promotion and publicity and DNR recognized as a funding source.
The grantee may request a one-time cost amendment and a one-time time extension. The grantee must notify the department if they wish to add or subtract practices to the scope of this grant agreement


Grant Details
Lake Protection Grant
Date
3/15/2021
Waters Involved
Rice Creek
Status
Complete

Uw System Board Of Regegents: Lmi - Wild Rice: Development Of A Population Risk Assessment Tool: Project Scope and Description of Deliverables

The University of Madison is sponsoring a surface water management grant to implement a Habitat Equivalency Analysis (HEA) to assess wild rice health and management strategies using a culturally responsible, whole ecosystem approach.

Project final deliverables include: All data collected, HEA\2019s and reports.

Specific project activities include: 1) During the first two years of the study, sample the physical, chemical, and biological characteristics of rice stands in six lake systems in Vilas and Oneida Counties; 2) In years two and three, test how long wild rice seeds can remain dormant, the viability of long-stored seeds and if germination varies across water and sediment depths within rice bed habitats; 3) Expand network of partners to collaborate on developing and vetting wild rice health assessment tools; 4) Produce cultural and ecosystem characterizations for each of the six chosen research lakes; 5) Develop reports for each lake that also provides guidance for restoration and/or monitoring

Special Conditions: 1) Draft HEA\2019s and reports need Dept review and approval.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.

If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive an electronic .pdf copies of the reports along with, or prior to submission of grantee's final payment request.


Grant Details
Lake Protection Grant
Date
3/15/2023
Waters Involved
Rock Creek
Status
Complete

North Lakeland Discovery Center: Hlr - Nldc Revitalizing Lakes\005c00a0: Partnering with property owners, North Lakeland Discovery Center is sponsoring a grant to implement best practices from Wisconsin\2019s 2019 Healthy Lakes & Rivers Action Plan. Best practices, including fish sticks, 350 sq. ft. native plantings, diversions, rock infiltration, and/or rain gardens, will be designed and installed according to program fact sheets, technical guidance and the grant application.
All funded best practices require contracts that must remain in place for 10 years and include the minimum operation and maintenance requirements described in the special conditions at the end of this agreement. If the landowner is the grant sponsor this Lake Protection Grant Agreement serves as the contract. If the best practice(s) will be implemented on land other than the sponsor\2019s, a contract between the sponsor and landowner describing the 10-year contract period, minimum operation and maintenance details, and data to be collected is required. The Department may perform site inspections and/or monitoring to ensure project success.
Deliverables include: a project summary including data requirements, pre/post photographs, and confirmation of completed design work and landowner contracts. A Healthy Lakes & Rivers Example Report is available to assist you.
Special conditions: Project management and technical assistance cash costs cannot exceed 10% of the state share of the grant award; this does not include implementation labor. Water regulation and/or county zoning permits must be issued before construction. Projects required for regulatory compliance purposes, including shoreland mitigation projects, are not eligible for reimbursement. The Healthy Lakes & Rivers logo should be used for promotion and publicity and DNR recognized as a funding source.
The grantee may request a one-time cost amendment and a one-time time extension. The grantee must notify the department if they wish to add or subtract practices to the scope of this grant agreement


Grant Details
Lake Protection Grant
Date
3/15/2023
Waters Involved
Rock Lake
Status
Complete

North Lakeland Discovery Center: Hlr - Nldc Revitalizing Lakes\005c00a0: Partnering with property owners, North Lakeland Discovery Center is sponsoring a grant to implement best practices from Wisconsin\2019s 2019 Healthy Lakes & Rivers Action Plan. Best practices, including fish sticks, 350 sq. ft. native plantings, diversions, rock infiltration, and/or rain gardens, will be designed and installed according to program fact sheets, technical guidance and the grant application.
All funded best practices require contracts that must remain in place for 10 years and include the minimum operation and maintenance requirements described in the special conditions at the end of this agreement. If the landowner is the grant sponsor this Lake Protection Grant Agreement serves as the contract. If the best practice(s) will be implemented on land other than the sponsor\2019s, a contract between the sponsor and landowner describing the 10-year contract period, minimum operation and maintenance details, and data to be collected is required. The Department may perform site inspections and/or monitoring to ensure project success.
Deliverables include: a project summary including data requirements, pre/post photographs, and confirmation of completed design work and landowner contracts. A Healthy Lakes & Rivers Example Report is available to assist you.
Special conditions: Project management and technical assistance cash costs cannot exceed 10% of the state share of the grant award; this does not include implementation labor. Water regulation and/or county zoning permits must be issued before construction. Projects required for regulatory compliance purposes, including shoreland mitigation projects, are not eligible for reimbursement. The Healthy Lakes & Rivers logo should be used for promotion and publicity and DNR recognized as a funding source.
The grantee may request a one-time cost amendment and a one-time time extension. The grantee must notify the department if they wish to add or subtract practices to the scope of this grant agreement


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Sherman Lake
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Spider Lake
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Statehouse Lake
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
3/15/2023
Waters Involved
Statehouse Lake
Status
Complete

North Lakeland Discovery Center: Hlr - Nldc Revitalizing Lakes\005c00a0: Partnering with property owners, North Lakeland Discovery Center is sponsoring a grant to implement best practices from Wisconsin\2019s 2019 Healthy Lakes & Rivers Action Plan. Best practices, including fish sticks, 350 sq. ft. native plantings, diversions, rock infiltration, and/or rain gardens, will be designed and installed according to program fact sheets, technical guidance and the grant application.
All funded best practices require contracts that must remain in place for 10 years and include the minimum operation and maintenance requirements described in the special conditions at the end of this agreement. If the landowner is the grant sponsor this Lake Protection Grant Agreement serves as the contract. If the best practice(s) will be implemented on land other than the sponsor\2019s, a contract between the sponsor and landowner describing the 10-year contract period, minimum operation and maintenance details, and data to be collected is required. The Department may perform site inspections and/or monitoring to ensure project success.
Deliverables include: a project summary including data requirements, pre/post photographs, and confirmation of completed design work and landowner contracts. A Healthy Lakes & Rivers Example Report is available to assist you.
Special conditions: Project management and technical assistance cash costs cannot exceed 10% of the state share of the grant award; this does not include implementation labor. Water regulation and/or county zoning permits must be issued before construction. Projects required for regulatory compliance purposes, including shoreland mitigation projects, are not eligible for reimbursement. The Healthy Lakes & Rivers logo should be used for promotion and publicity and DNR recognized as a funding source.
The grantee may request a one-time cost amendment and a one-time time extension. The grantee must notify the department if they wish to add or subtract practices to the scope of this grant agreement


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Stepping Stone Lake Number 1
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Stepping Stone Lake Number 2
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Stepping Stone Lake Number 3
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Stone Lake
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Sturgeon Lake
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
8/1/2002
Waters Involved
Tambling Lake
Status
Complete

Tambling Lake Association, Inc.: Res-Tambling Lake Aeration System: The Tambling Lake Association, Inc. will sponsor a project for the installation of one aeration system. The DNR will be provided with a written summary of the work completed under this grant and photographs.


Grant Details
Lake Protection Grant
Date
2/14/1996
Waters Involved
Torch Lake
Status
Complete

Vilas County: Acq-Torch Lake Land Acquisition - Crist Property: Vilas County will acquire 60 acres of land with frontage on Torch Lake and the Wisconsin River for lake protection and public outdoor recreation purposes. Eligible costs are outlined on the attached Cost Estimate Worksheet. PER SPONSOR: PROJECT FELL THROUGH; GRANT AWARD WITHDRAWN.


Grant Details
Lake Protection Grant
Date
3/15/2021
Waters Involved
Trout River
Status
Complete

Uw System Board Of Regegents: Lmi - Wild Rice: Development Of A Population Risk Assessment Tool: Project Scope and Description of Deliverables

The University of Madison is sponsoring a surface water management grant to implement a Habitat Equivalency Analysis (HEA) to assess wild rice health and management strategies using a culturally responsible, whole ecosystem approach.

Project final deliverables include: All data collected, HEA\2019s and reports.

Specific project activities include: 1) During the first two years of the study, sample the physical, chemical, and biological characteristics of rice stands in six lake systems in Vilas and Oneida Counties; 2) In years two and three, test how long wild rice seeds can remain dormant, the viability of long-stored seeds and if germination varies across water and sediment depths within rice bed habitats; 3) Expand network of partners to collaborate on developing and vetting wild rice health assessment tools; 4) Produce cultural and ecosystem characterizations for each of the six chosen research lakes; 5) Develop reports for each lake that also provides guidance for restoration and/or monitoring

Special Conditions: 1) Draft HEA\2019s and reports need Dept review and approval.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.

If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive an electronic .pdf copies of the reports along with, or prior to submission of grantee's final payment request.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Un Spring
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Unnamed
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
4/15/2015
Waters Involved
Unnamed
Status
Complete

Kentuck Lake P&R District: Lmi-Df-Kentuck Lake Plan Implementation: Water Quality & Ais: Kentuck Lake P&R District is sponsoring a lake protection grant to further assess water quality and manage AIS in Kentuck Lake, in Vilas County.

Project activities include: 1) In-lake water quality assessment; 2) Groundwater assessment; 3) Sediment core collection; 4) EWM and CLP monitoring and mapping; 5) Stakeholder participation planning meeting; 6) Purchase LDO probe; 7) Develop annual report and final report.

Project deliverables include: 1) In-lake, groundwater and sediment core data; 2) EWM and CLP data and mapping; 3) LDO probe; 4) Annual summary and final report.

Specific conditions for this project: Annual summary and final report need Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of annual summary, final report, all maps, data and GIS from project.


Grant Details
Lake Protection Grant
Date
4/15/2019
Waters Involved
Unnamed
Status
Complete

High-Fishtrap-Rush Lks Assoc: Lmi-Clmp Implementation- Plant Sampling & Ais Inventory: Project scope: High/Fishtrap/Rush Lakes Association is sponsoring a LPT grant to study High, Fishtrap and Rush Lakes, in Vilas County, with a study completion date of December 31, 2019. The project will focus on completing aquatic plant point-intercept (PI) and AIS early detection surveys.

Project activities:
1) PI and AIS early detection surveys
2) Data analysis
3) Develop project report

Project deliverables include:
1) PI and AIS data
2) Aquatic plant vouchers
3) Project report

Specific project conditions:
- Draft of project report needs Wisconsin DNR review and approval


Grant Details
Lake Protection Grant
Date
4/15/2020
Waters Involved
Unnamed
Status
Complete

Vilas County: Hlk-Vilas Co Hlk Projects: Partnering with property owners, the applicant is sponsoring a grant to implement best practices from Wisconsin\2019s 2019 Healthy Lakes & Rivers Action Plan. Best practices, including fish sticks, 350 sq. ft. native plantings, diversions, rock infiltration, and/or rain gardens, will be designed and installed according to program fact sheets, technical guidance and the grant application.

All funded best practices require contracts that must remain in place for 10 years and include the minimum operation and maintenance requirements described in the special condistions at the end of this agreement. If the landowner is the grant sponsor this Lake Protection Grant Agreement serves as the contract. If the best practice(s) will be implemented on land other than the sponsor\2019s, a contract between the sponsor and landowner describing the 10-year contract period, minimum operation and maintenance details, and data to be collected is required. The Department may perform site inspections and/or monitoring to ensure project success.

Deliverables include: a project summary including data requirements, pre/post photographs, and confirmation of completed design work and landowner contracts. A Healthy Lakes & Rivers Example Report is available to assist you.

Special conditions: Project management and technical assistance costs cannot exceed 10% of the state share of the grant award; this does not include implementation labor. Water regulation and/or county zoning permits must be issued before construction. Projects required for regulatory compliance purposes, including shoreland mitigation projects, are not eligible for reimbursement. The Healthy Lakes & Rivers logo should be used for promotion and publicity and DNR recognized as a funding source.


Grant Details
Lake Protection Grant
Date
4/15/2020
Waters Involved
Upper Buckatabon Lake
Status
Complete

Vilas County: Hlk-Vilas Co Hlk Projects: Partnering with property owners, the applicant is sponsoring a grant to implement best practices from Wisconsin\2019s 2019 Healthy Lakes & Rivers Action Plan. Best practices, including fish sticks, 350 sq. ft. native plantings, diversions, rock infiltration, and/or rain gardens, will be designed and installed according to program fact sheets, technical guidance and the grant application.

All funded best practices require contracts that must remain in place for 10 years and include the minimum operation and maintenance requirements described in the special condistions at the end of this agreement. If the landowner is the grant sponsor this Lake Protection Grant Agreement serves as the contract. If the best practice(s) will be implemented on land other than the sponsor\2019s, a contract between the sponsor and landowner describing the 10-year contract period, minimum operation and maintenance details, and data to be collected is required. The Department may perform site inspections and/or monitoring to ensure project success.

Deliverables include: a project summary including data requirements, pre/post photographs, and confirmation of completed design work and landowner contracts. A Healthy Lakes & Rivers Example Report is available to assist you.

Special conditions: Project management and technical assistance costs cannot exceed 10% of the state share of the grant award; this does not include implementation labor. Water regulation and/or county zoning permits must be issued before construction. Projects required for regulatory compliance purposes, including shoreland mitigation projects, are not eligible for reimbursement. The Healthy Lakes & Rivers logo should be used for promotion and publicity and DNR recognized as a funding source.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Vance Lake
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
2/15/2017
Waters Involved
Wabasso Lake
Status
Complete

Vilas County: Lco-Vilas County Monitoring & Healthy Lakes Program: Vilas County Land and Water Conservation Dept is sponsoring a lake protection grant to monitor lakes and begin healthy lakes projects in Vilas County.

Project activities include: 1) Perform 6 Directed Lakes surveys (PI, water quality, AIS, and shoreland); 2) Initiate 3 healthy lakes programs; 3) Assist regional DNR in accomplishing work plan objectives; 4) Support and attend activities of the WI Lakes Partnership; 5) Provide technical assistance; 6) Hire LTE Lakes Monitoring Technician and fund part of the FTE Lakes Specialist; 7) Develop annual and final report.

Project deliverables include: 1) Directed Lakes data and maps; 2) Healthy Lakes projects; 3) FTE and LTE Lakes Specialists; 4) Annual and final report.

Specific conditions for this project: Draft of annual and final report need Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of annual report, final report, directed lakes data, all maps from project, and all GIS data.


Grant Details
Lake Protection Grant
Date
3/15/2021
Waters Involved
Watersmeet Lake
Status
Complete

Uw System Board Of Regegents: Lmi - Wild Rice: Development Of A Population Risk Assessment Tool: Project Scope and Description of Deliverables

The University of Madison is sponsoring a surface water management grant to implement a Habitat Equivalency Analysis (HEA) to assess wild rice health and management strategies using a culturally responsible, whole ecosystem approach.

Project final deliverables include: All data collected, HEA\2019s and reports.

Specific project activities include: 1) During the first two years of the study, sample the physical, chemical, and biological characteristics of rice stands in six lake systems in Vilas and Oneida Counties; 2) In years two and three, test how long wild rice seeds can remain dormant, the viability of long-stored seeds and if germination varies across water and sediment depths within rice bed habitats; 3) Expand network of partners to collaborate on developing and vetting wild rice health assessment tools; 4) Produce cultural and ecosystem characterizations for each of the six chosen research lakes; 5) Develop reports for each lake that also provides guidance for restoration and/or monitoring

Special Conditions: 1) Draft HEA\2019s and reports need Dept review and approval.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.

If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive an electronic .pdf copies of the reports along with, or prior to submission of grantee's final payment request.


Grant Details
Lake Protection Grant
Date
2/15/2017
Waters Involved
Whitney Lake
Status
Complete

Vilas County: Lco-Vilas County Monitoring & Healthy Lakes Program: Vilas County Land and Water Conservation Dept is sponsoring a lake protection grant to monitor lakes and begin healthy lakes projects in Vilas County.

Project activities include: 1) Perform 6 Directed Lakes surveys (PI, water quality, AIS, and shoreland); 2) Initiate 3 healthy lakes programs; 3) Assist regional DNR in accomplishing work plan objectives; 4) Support and attend activities of the WI Lakes Partnership; 5) Provide technical assistance; 6) Hire LTE Lakes Monitoring Technician and fund part of the FTE Lakes Specialist; 7) Develop annual and final report.

Project deliverables include: 1) Directed Lakes data and maps; 2) Healthy Lakes projects; 3) FTE and LTE Lakes Specialists; 4) Annual and final report.

Specific conditions for this project: Draft of annual and final report need Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of annual report, final report, directed lakes data, all maps from project, and all GIS data.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Wild Rice Lake
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
3/15/2021
Waters Involved
Wild Rice Lake
Status
Complete

Uw System Board Of Regegents: Lmi - Wild Rice: Development Of A Population Risk Assessment Tool: Project Scope and Description of Deliverables

The University of Madison is sponsoring a surface water management grant to implement a Habitat Equivalency Analysis (HEA) to assess wild rice health and management strategies using a culturally responsible, whole ecosystem approach.

Project final deliverables include: All data collected, HEA\2019s and reports.

Specific project activities include: 1) During the first two years of the study, sample the physical, chemical, and biological characteristics of rice stands in six lake systems in Vilas and Oneida Counties; 2) In years two and three, test how long wild rice seeds can remain dormant, the viability of long-stored seeds and if germination varies across water and sediment depths within rice bed habitats; 3) Expand network of partners to collaborate on developing and vetting wild rice health assessment tools; 4) Produce cultural and ecosystem characterizations for each of the six chosen research lakes; 5) Develop reports for each lake that also provides guidance for restoration and/or monitoring

Special Conditions: 1) Draft HEA\2019s and reports need Dept review and approval.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.

If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive an electronic .pdf copies of the reports along with, or prior to submission of grantee's final payment request.


Grant Details
Lake Protection Grant
Date
3/15/2021
Waters Involved
Wisconsin River
Status
Complete

Uw System Board Of Regegents: Lmi - Wild Rice: Development Of A Population Risk Assessment Tool: Project Scope and Description of Deliverables

The University of Madison is sponsoring a surface water management grant to implement a Habitat Equivalency Analysis (HEA) to assess wild rice health and management strategies using a culturally responsible, whole ecosystem approach.

Project final deliverables include: All data collected, HEA\2019s and reports.

Specific project activities include: 1) During the first two years of the study, sample the physical, chemical, and biological characteristics of rice stands in six lake systems in Vilas and Oneida Counties; 2) In years two and three, test how long wild rice seeds can remain dormant, the viability of long-stored seeds and if germination varies across water and sediment depths within rice bed habitats; 3) Expand network of partners to collaborate on developing and vetting wild rice health assessment tools; 4) Produce cultural and ecosystem characterizations for each of the six chosen research lakes; 5) Develop reports for each lake that also provides guidance for restoration and/or monitoring

Special Conditions: 1) Draft HEA\2019s and reports need Dept review and approval.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.

If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive an electronic .pdf copies of the reports along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
3/15/2024
Waters Involved
Amik Lake
Status
Complete

Vilas County: Clg - Vilas County Strategic Lake Protection Implementation Program: The Vilas County Land and Water Dept is sponsoring a project to accomplish workplan activities from the Land and Water plan that focus on improving and protecting water quality in the highest quality waters of Vilas County.

Activities: 1) Conduct AIS, shoreland, coarse wood, PI and water quality sampling 2) Conduct shoreland habitat protection campaign 3) Conduct contractor training workshop 4) Design and install shoreline BMP\2019s 5) Recruit and train WAV volunteers 6) Finalize road and stream crossing project

Deliverables: 1) Monitoring data and entry into SWIMS 2) Completed trainings/workshops 3) Final report.

Conditions:
1) Final report needs Dept review and approval

This scope summarizes details provided in the application and does not negate tasks and/or deliverables described therein. Data, reports, surveys, and supporting information, including photos, maps and GIS data, must be submitted to the DNR Biologist in electronic format and in any other format they specify.


Grant Details
Large Scale Lake Planning
Date
10/1/2006
Waters Involved
Big Kitten Lake
Status
Complete

Town Of Presque Isle: Wildcat & Averill Lake Limnological Baseline Studies & Apm Plans: The Town of Presque Isle is sponsoring a large scale lake planning grant to study Wildcat and Averill Lakes in Vilas County with a study completion date of June 30, 2008. The project will focus on developing an Aquatic Plant Management (APM) Plan for each lake.

Project activities include:
1) Data review and project kick-off meeting, one site visit to discuss goals, and project final meeting
2) Develop public questionnaire and prepare educational article
3) Point-intercept (PI) survey of aquatic plants with 2 sets of pressed plants from each lake
4) Aquatic plant community mapping and analysis
5) Water quality sampling - secchi, P, Chla, DO, and Temp during aquatic plant sampling
6) Watershed and land use analysis
7) Develop APM Plan

Project deliverables include:
1) Public questionnaire and educational article
2) PI data and aquatic plant community and watershed maps
3) 2 sets of pressed aquatic plants from each lake (one set for lake group and second for Dept)
4) Water quality sampling results
5) APM Plan

Specific conditions for this project:
- Draft of public questionnaire should be submitted to Lakes Management Coordinator for review before sending to public
- APM Plan needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of APM Plan, educational article, public questionnaire, data from watershed and land use analysis, data from PI survey, data from water quality sampling, all maps from project, and a set of pressed aquatic plants from each lake.


Grant Details
Large Scale Lake Planning
Date
10/1/2006
Waters Involved
Big Lake
Status
Complete

Town Of Presque Isle: Big Lake Limnological Baseline Study & Apm Plan: The Town of Presque Isle is sponsoring a large scale lake planning grant to study Big Lake in Vilas County with a study completion date of June 30, 2008. The Big Lake Property Owners Association is a project partner. The project will focus on developing an Aquatic Plant Management (APM) Plan.

Project activities include:
1) Data review and project kick-off meeting, one site visit to discuss goals, and project final meeting
2) Develop public questionnaire and prepare educational article
3) Point-intercept (PI) survey of aquatic plants with 2 sets of pressed plants
4) Aquatic plant community mapping and analysis
5) Water quality sampling - secchi through citizen lake monitor and P, Chla, DO, and Temp during aquatic plant sampling
6) Watershed and land use analysis
7) Develop APM Plan

Project deliverables include:
1) Public questionnaire and educational article
2) PI data and aquatic plant community and watershed maps
3) 2 sets of pressed aquatic plants (one set for lake group and second for Dept)
4) Water quality sampling results
5) APM Plan

Specific conditions for this project:
- Draft of public questionnaire should be submitted to Lakes Management Coordinator for review before sending to public
- APM Plan needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of APM Plan, educational article, public questionnaire, data from watershed and land use analysis, data from PI survey, data from water quality sampling, all maps from project, and a set of pressed aquatic plants.


Grant Details
Large Scale Lake Planning
Date
10/1/2012
Waters Involved
Big Lake
Status
Complete

Town Of Presque Isle: Aquatic Plant Survey & Analysis Of Plant Community Change Armour/Big/Horsehead Lakes: Town of Presque Isle Lakes Committee is sponsoring a large scale lake planning grant to study Armour, Big and Horsehead Lake, in Vilas County. The Big Lake Property Owners Association and Friends of Armour Lake are project partners. The project will focus on updating Lake Management Plans (LMP) for Armour, Big and Horsehead Lake.

Project activities include: 1) Gather and assess existing Armour, Big and Horsehead Lake information; 2) PI aquatic plant survey, community and substrate mapping and analysis; 3) CLMN water quality sampling; 4) Educational program \2013 meetings, newsletter articles, and press releases; 5) Watercraft inspections and AIS monitoring.

Project deliverables include: 1) LMP; 2) PI and water quality data; 3) Aquatic plant community and substrate maps; 4) Entered inspection data into SWIMS; 5) Aquatic plant vouchers; 6) Education materials.

Specific conditions for this project: LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, PI and water quality data, a set of aquatic plant vouchers, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
3/15/2024
Waters Involved
Big Lake
Status
Complete

Vilas County: Clg - Vilas County Strategic Lake Protection Implementation Program: The Vilas County Land and Water Dept is sponsoring a project to accomplish workplan activities from the Land and Water plan that focus on improving and protecting water quality in the highest quality waters of Vilas County.

Activities: 1) Conduct AIS, shoreland, coarse wood, PI and water quality sampling 2) Conduct shoreland habitat protection campaign 3) Conduct contractor training workshop 4) Design and install shoreline BMP\2019s 5) Recruit and train WAV volunteers 6) Finalize road and stream crossing project

Deliverables: 1) Monitoring data and entry into SWIMS 2) Completed trainings/workshops 3) Final report.

Conditions:
1) Final report needs Dept review and approval

This scope summarizes details provided in the application and does not negate tasks and/or deliverables described therein. Data, reports, surveys, and supporting information, including photos, maps and GIS data, must be submitted to the DNR Biologist in electronic format and in any other format they specify.


Grant Details
Large Scale Lake Planning
Date
2/15/2019
Waters Involved
Big Muskellunge Lake
Status
Complete

Town Of Plum Lake: Town Of Plum Lake Mgmt Plan Phiii - Big Muskellunge Lake: The Town of Plum Lake is sponsoring a LPL grant to study Big Muskellunge Lake, in Vilas County, with a study completion date of June 30, 2021. The project will focus on developing a Lake Management Plan (LMP).

Activities:
1) Stakeholder participation \2013 planning meetings (up to 2) and wrap-up meeting
2) Water quality sampling and analysis
3) Watershed assessment and P load modeling
4) Fisheries, Shoreland, and Coarse Woody Habitat assessment
5) Professional Dreissena monitoring
6) Aquatic plant surveys (PI survey, community mapping, and early-season AIS)
7) Early and late-season AIS surveys on Little Star Lake
8) Data analysis and develop LMP

Project deliverables include:
1) Water chemistry data
2) Watershed maps and modeling data
3) PI, shoreland and woody habitat data
4) Aquatic plant community and AIS maps
5) Aquatic plant vouchers
6) LMP

Specific project conditions:
- Draft of LMP needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, data from PI survey, shoreland assessment, woody habitat assessment, watershed assessment and water quality sampling, all maps from project, all GIS data, and aquatic plant vouchers.


Grant Details
Large Scale Lake Planning
Date
4/1/2007
Waters Involved
Diamond Creek
Status
Complete

Town Of Boulder Junction: Gresham Lakes Management Plan - Phase 4 Lower Gresham Lake: The Town of Boulder Junction is sponsoring large scale lake planning grants to study the Gresham Chain of Lakes in Vilas County with a study completion date of December 31, 2008. The project will focus on developing a Lake Management Plan (LMP) for the Gresham Chain of Lakes. Completion of a LMP will allow for potential Aquatic Invasive Species (AIS) cost sharing grants and permits for Eurasian water-milfoil (EWM) control.

Project activities include:
1) Stakeholder participation - kick-off meeting, survey, planning meetings (up to 2), wrap-up meeting, news release, newsletter article, and progress report
2) Water quality sampling (Secchi, P, Chla, N, Conductivity, pH, Alkalinity, Total Suspended solids, Calcium, DO, and temp)
3) Curly-leaf pondweed survey on entire Chain
4) Point-intercept aquatic plant survey on Lower Gresham Lake with 2 sets of pressed aquatic plants
5) Spring EWM assessment on Upper Gresham Lake
6) Aquatic plant community mapping
7) Fisheries assessment
8) Watershed assessment
9) Zebra mussel monitoring
10) Develop LMP

Project deliverables include:
1) Stakeholder survey, news release, newsletter article, and progress report
2) Aquatic plant community and watershed maps
3) Point-intercept aquatic plant data and 2 sets of pressed aquatic plants from Lower Gresham Lake
4) LMP

Specific conditions for this project:
- Draft of stakeholder survey should be submitted to Lakes Management Coordinator for review before sending to public
- LMP needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP, news release, newsletter article, progress report, stakeholder survey, data from watershed assessment and point-intercept aquatic plant survey, set of pressed aquatic plants, and all maps from project.


Grant Details
Large Scale Lake Planning
Date
4/1/2007
Waters Involved
Diamond Creek
Status
Complete

Town Of Boulder Junction: Gresham Lakes Management Planning Project - Phase I Stakeholder Participation: The Town of Boulder Junction is sponsoring large scale lake planning grants to study the Gresham Chain of Lakes in Vilas County with a study completion date of December 31, 2008. The project will focus on developing a Lake Management Plan (LMP) for the Gresham Chain of Lakes. Completion of a LMP will allow for potential Aquatic Invasive Species (AIS) cost sharing grants and permits for Eurasian water-milfoil (EWM) control.

Project activities include:
1) Stakeholder participation - kick-off meeting, survey, planning meetings (up to 2), wrap-up meeting, news release, newsletter article, and progress report
2) Water quality sampling (Secchi, P, Chla, N, Conductivity, pH, Alkalinity, Total Suspended solids, Calcium, DO, and temp)
3) Curly-leaf pondweed survey on entire Chain
4) Point-intercept aquatic plant survey on Lower Gresham Lake with 2 sets of pressed aquatic plants
5) Spring EWM assessment on Upper Gresham Lake
6) Aquatic plant community mapping
7) Fisheries assessment
8) Watershed assessment
9) Zebra mussel monitoring
10) Develop LMP

Project deliverables include:
1) Stakeholder survey, news release, newsletter article, and progress report
2) Aquatic plant community and watershed maps
3) Point-intercept aquatic plant data and 2 sets of pressed aquatic plants from Lower Gresham Lake
4) LMP

Specific conditions for this project:
- Draft of stakeholder survey should be submitted to Lakes Management Coordinator for review before sending to public
- LMP needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP, news release, newsletter article, progress report, stakeholder survey, data from watershed assessment and point-intercept aquatic plant survey, set of pressed aquatic plants, and all maps from project.


Grant Details
Large Scale Lake Planning
Date
10/1/2012
Waters Involved
Fishtrap Lake
Status
Complete

High-Fishtrap-Rush Lks Assoc: High-Fishtrap-Rush Lakes Stewardship Program, Phase 1: High-Fishtrap-Rush Lakes Association is sponsoring phased large scale lake planning grants to study High-Fishtrap-Rush Lakes, in Vilas County. The project will focus on developing a Lake Management Plan (LMP) for High-Fishtrap-Rush Lakes. Phase 2 will be submitted for funding during the Feb 1, 2013 grant cycle.

Phase 1 project activities include: 1) Gather and assess existing High-Fishtrap-Rush Lakes information; 2) Volunteer frog and toad monitoring and angler\2019s journal program; 3) PI aquatic plant survey, community and substrate mapping and analysis; 4) Watershed assessment and water quality sampling; 5) Lake stage, discharge and retention time assessment; 6) Rare species assessment; 7) Educational program \2013 stakeholder survey, meetings, newsletter articles, and press releases; 8) Watercraft inspections.

Project deliverables include: 1) PI, stakeholder survey, water quality, rare species, frog and toad, angler\2019s journal, lake stage, discharge, retention, and watershed data; 2) Aquatic plant community and substrate maps; 3) Entered inspection data into SWIMS; 4) Aquatic plant vouchers; 5) Education materials.

Specific conditions for this project: 1) Draft of stakeholder survey needs to be submitted to Lakes Management Coordinator for review and approval before sending to public; 2) Project summaries and reports need Dept. review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of reports, PI, stakeholder survey, water quality, watershed, rare species, frog and toad, stage, discharge, retention, and angler data, a set of aquatic plant vouchers, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
4/1/2014
Waters Involved
Fishtrap Lake
Status
Complete

High-Fishtrap-Rush Lks Assoc: High-Fishtrap-Rush Lakes Stewardship Program, Phase 2: High-Fishtrap-Rush Lakes Association is sponsoring phased large scale lake planning grants to study High-Fishtrap-Rush Lakes, in Vilas County. The project will focus on developing a Lake Management Plan (LMP) for High-Fishtrap-Rush Lakes.

Phase 2 project activities include: 1) Volunteer frog and toad monitoring and angler\2019s journal program; 2) Watershed assessment and water quality sampling; 3) Lake stage, discharge and retention time assessment; 4) Rare species assessment; 5) Shoreland assessment; 6) Watercraft inspections; 7) Develop LMP.

Project deliverables include: 1) Water quality, rare species, frog and toad, angler\2019s journal, lake stage, discharge, retention, and watershed data; 2) Entered inspection data into SWIMS; 3) Education materials; 4) LMP.

Specific conditions for this project: LMP needs Dept. review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, water quality, watershed, rare species, frog and toad, stage, discharge, retention, and angler data, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
4/1/2007
Waters Involved
Gresham Creek
Status
Complete

Town Of Boulder Junction: Gresham Lakes Management Plan - Phase 3 Middle Gresham Lake: The Town of Boulder Junction is sponsoring large scale lake planning grants to study the Gresham Chain of Lakes in Vilas County with a study completion date of December 31, 2008. The project will focus on developing a Lake Management Plan (LMP) for the Gresham Chain of Lakes. Completion of a LMP will allow for potential Aquatic Invasive Species (AIS) cost sharing grants and permits for Eurasian water-milfoil (EWM) control.

Project activities include:
1) Stakeholder participation - kick-off meeting, survey, planning meetings (up to 2), wrap-up meeting, news release, newsletter article, and progress report
2) Water quality sampling (Secchi, P, Chla, N, Conductivity, pH, Alkalinity, Total Suspended solids, Calcium, DO, and temp)
3) Curly-leaf pondweed survey on entire Chain
4) Point-intercept aquatic plant survey on Lower Gresham Lake with 2 sets of pressed aquatic plants
5) Spring EWM assessment on Upper Gresham Lake
6) Aquatic plant community mapping
7) Fisheries assessment
8) Watershed assessment
9) Zebra mussel monitoring
10) Develop LMP

Project deliverables include:
1) Stakeholder survey, news release, newsletter article, and progress report
2) Aquatic plant community and watershed maps
3) Point-intercept aquatic plant data and 2 sets of pressed aquatic plants from Lower Gresham Lake
4) LMP

Specific conditions for this project:
- Draft of stakeholder survey should be submitted to Lakes Management Coordinator for review before sending to public
- LMP needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP, news release, newsletter article, progress report, stakeholder survey, data from watershed assessment and point-intercept aquatic plant survey, set of pressed aquatic plants, and all maps from project.


Grant Details
Large Scale Lake Planning
Date
4/1/2007
Waters Involved
Gresham Creek
Status
Complete

Town Of Boulder Junction: Gresham Lakes Management Plan - Phase 4 Lower Gresham Lake: The Town of Boulder Junction is sponsoring large scale lake planning grants to study the Gresham Chain of Lakes in Vilas County with a study completion date of December 31, 2008. The project will focus on developing a Lake Management Plan (LMP) for the Gresham Chain of Lakes. Completion of a LMP will allow for potential Aquatic Invasive Species (AIS) cost sharing grants and permits for Eurasian water-milfoil (EWM) control.

Project activities include:
1) Stakeholder participation - kick-off meeting, survey, planning meetings (up to 2), wrap-up meeting, news release, newsletter article, and progress report
2) Water quality sampling (Secchi, P, Chla, N, Conductivity, pH, Alkalinity, Total Suspended solids, Calcium, DO, and temp)
3) Curly-leaf pondweed survey on entire Chain
4) Point-intercept aquatic plant survey on Lower Gresham Lake with 2 sets of pressed aquatic plants
5) Spring EWM assessment on Upper Gresham Lake
6) Aquatic plant community mapping
7) Fisheries assessment
8) Watershed assessment
9) Zebra mussel monitoring
10) Develop LMP

Project deliverables include:
1) Stakeholder survey, news release, newsletter article, and progress report
2) Aquatic plant community and watershed maps
3) Point-intercept aquatic plant data and 2 sets of pressed aquatic plants from Lower Gresham Lake
4) LMP

Specific conditions for this project:
- Draft of stakeholder survey should be submitted to Lakes Management Coordinator for review before sending to public
- LMP needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP, news release, newsletter article, progress report, stakeholder survey, data from watershed assessment and point-intercept aquatic plant survey, set of pressed aquatic plants, and all maps from project.


Grant Details
Large Scale Lake Planning
Date
4/1/2007
Waters Involved
Gresham Creek
Status
Complete

Town Of Boulder Junction: Gresham Lakes Management Planning - Phase 2 Upper Gresham Lake: The Town of Boulder Junction is sponsoring large scale lake planning grants to study the Gresham Chain of Lakes in Vilas County with a study completion date of December 31, 2008. The project will focus on developing a Lake Management Plan (LMP) for the Gresham Chain of Lakes. Completion of a LMP will allow for potential Aquatic Invasive Species (AIS) cost sharing grants and permits for Eurasian water-milfoil (EWM) control.

Project activities include:
1) Stakeholder participation - kick-off meeting, survey, planning meetings (up to 2), wrap-up meeting, news release, newsletter article, and progress report
2) Water quality sampling (Secchi, P, Chla, N, Conductivity, pH, Alkalinity, Total Suspended solids, Calcium, DO, and temp)
3) Curly-leaf pondweed survey on entire Chain
4) Point-intercept aquatic plant survey on Lower Gresham Lake with 2 sets of pressed aquatic plants
5) Spring EWM assessment on Upper Gresham Lake
6) Aquatic plant community mapping
7) Fisheries assessment
8) Watershed assessment
9) Zebra mussel monitoring
10) Develop LMP

Project deliverables include:
1) Stakeholder survey, news release, newsletter article, and progress report
2) Aquatic plant community and watershed maps
3) Point-intercept aquatic plant data and 2 sets of pressed aquatic plants from Lower Gresham Lake
4) LMP

Specific conditions for this project:
- Draft of stakeholder survey should be submitted to Lakes Management Coordinator for review before sending to public
- LMP needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP, news release, newsletter article, progress report, stakeholder survey, data from watershed assessment and point-intercept aquatic plant survey, set of pressed aquatic plants, and all maps from project.


Grant Details
Large Scale Lake Planning
Date
4/1/2007
Waters Involved
Gresham Creek
Status
Complete

Town Of Boulder Junction: Gresham Lakes Management Planning Project - Phase I Stakeholder Participation: The Town of Boulder Junction is sponsoring large scale lake planning grants to study the Gresham Chain of Lakes in Vilas County with a study completion date of December 31, 2008. The project will focus on developing a Lake Management Plan (LMP) for the Gresham Chain of Lakes. Completion of a LMP will allow for potential Aquatic Invasive Species (AIS) cost sharing grants and permits for Eurasian water-milfoil (EWM) control.

Project activities include:
1) Stakeholder participation - kick-off meeting, survey, planning meetings (up to 2), wrap-up meeting, news release, newsletter article, and progress report
2) Water quality sampling (Secchi, P, Chla, N, Conductivity, pH, Alkalinity, Total Suspended solids, Calcium, DO, and temp)
3) Curly-leaf pondweed survey on entire Chain
4) Point-intercept aquatic plant survey on Lower Gresham Lake with 2 sets of pressed aquatic plants
5) Spring EWM assessment on Upper Gresham Lake
6) Aquatic plant community mapping
7) Fisheries assessment
8) Watershed assessment
9) Zebra mussel monitoring
10) Develop LMP

Project deliverables include:
1) Stakeholder survey, news release, newsletter article, and progress report
2) Aquatic plant community and watershed maps
3) Point-intercept aquatic plant data and 2 sets of pressed aquatic plants from Lower Gresham Lake
4) LMP

Specific conditions for this project:
- Draft of stakeholder survey should be submitted to Lakes Management Coordinator for review before sending to public
- LMP needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP, news release, newsletter article, progress report, stakeholder survey, data from watershed assessment and point-intercept aquatic plant survey, set of pressed aquatic plants, and all maps from project.


Grant Details
Large Scale Lake Planning
Date
10/1/2012
Waters Involved
High Lake
Status
Complete

High-Fishtrap-Rush Lks Assoc: High-Fishtrap-Rush Lakes Stewardship Program, Phase 1: High-Fishtrap-Rush Lakes Association is sponsoring phased large scale lake planning grants to study High-Fishtrap-Rush Lakes, in Vilas County. The project will focus on developing a Lake Management Plan (LMP) for High-Fishtrap-Rush Lakes. Phase 2 will be submitted for funding during the Feb 1, 2013 grant cycle.

Phase 1 project activities include: 1) Gather and assess existing High-Fishtrap-Rush Lakes information; 2) Volunteer frog and toad monitoring and angler\2019s journal program; 3) PI aquatic plant survey, community and substrate mapping and analysis; 4) Watershed assessment and water quality sampling; 5) Lake stage, discharge and retention time assessment; 6) Rare species assessment; 7) Educational program \2013 stakeholder survey, meetings, newsletter articles, and press releases; 8) Watercraft inspections.

Project deliverables include: 1) PI, stakeholder survey, water quality, rare species, frog and toad, angler\2019s journal, lake stage, discharge, retention, and watershed data; 2) Aquatic plant community and substrate maps; 3) Entered inspection data into SWIMS; 4) Aquatic plant vouchers; 5) Education materials.

Specific conditions for this project: 1) Draft of stakeholder survey needs to be submitted to Lakes Management Coordinator for review and approval before sending to public; 2) Project summaries and reports need Dept. review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of reports, PI, stakeholder survey, water quality, watershed, rare species, frog and toad, stage, discharge, retention, and angler data, a set of aquatic plant vouchers, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
4/1/2014
Waters Involved
High Lake
Status
Complete

High-Fishtrap-Rush Lks Assoc: High-Fishtrap-Rush Lakes Stewardship Program, Phase 2: High-Fishtrap-Rush Lakes Association is sponsoring phased large scale lake planning grants to study High-Fishtrap-Rush Lakes, in Vilas County. The project will focus on developing a Lake Management Plan (LMP) for High-Fishtrap-Rush Lakes.

Phase 2 project activities include: 1) Volunteer frog and toad monitoring and angler\2019s journal program; 2) Watershed assessment and water quality sampling; 3) Lake stage, discharge and retention time assessment; 4) Rare species assessment; 5) Shoreland assessment; 6) Watercraft inspections; 7) Develop LMP.

Project deliverables include: 1) Water quality, rare species, frog and toad, angler\2019s journal, lake stage, discharge, retention, and watershed data; 2) Entered inspection data into SWIMS; 3) Education materials; 4) LMP.

Specific conditions for this project: LMP needs Dept. review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, water quality, watershed, rare species, frog and toad, stage, discharge, retention, and angler data, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Irving Lake
Status
Complete

Ballard-Irving-White Birch Lakes Assn, Inc.: Irving Lake Mgt. Plan: A comprehensive management plan will be developed for the Ballard-Irving-White Birch chain of lakes. This project will include the gathering of information needed from Irving Lake. Information will be collected in the following areas: lake history, water quality sampling, aquatic vegetation map updates, fisheries study, shoreline vegetation and sensitive area mapping, watershed mapping and inventory including nutrient and water budgets, lake usage study.

Information from the above elements will be combined with results from the Ballard and White Birch study to form a final report consisting of a comprehensive management plan for the chain addressing rehabilitation, improvement, and protection of the three lakes.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), fact sheets, public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
2/15/2018
Waters Involved
Irving Lake
Status
Complete

Town Of Plum Lake: Town Of Plum Lake Mgmt Plan Ph Ii - Irving, Laura, & Lt Star: The Town of Plum Lake is sponsoring a LPL grant to study Irving, Laura and Little Star Lakes, in Vilas County, with a study completion date of June 30, 2020. The project will focus on developing Lake Management Plans (LMP\2019s).

Project activities include: 1) Stakeholder participation \2013 stakeholder survey, planning meetings (up to 2), kick-off meeting, and wrap-up meeting; 2) Water quality sampling and analysis; 3) Paleocore collection and analysis; 4) Watershed assessment and P load modeling; 5) Fisheries, Shoreline, and Coarse Woody Habitat assessment; 6) Professional Dreissena monitoring; 7) Aquatic plant surveys (PI survey, community mapping, and early-season AIS); 8) Early and late-season AIS surveys on Little Star Lake; 9) Data analysis; 10) Develop LMP\2019s.

Project deliverables include: 1) Stakeholder survey; 2) Water chemistry and paleocore data; 3) Watershed maps and modeling data; 4) PI, shoreland and woody habitat data; 5) Aquatic plant community and AIS maps; 6) Aquatic plant vouchers; 7) LMP\2019s.

Specific conditions for this project: 1) Draft of stakeholder survey needs Dept review and approval; 2) Draft of LMP\2019s needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP\2019s, stakeholder survey, data from PI survey, paleocore sampling, shoreland assessment, woody habitat assessment, watershed assessment and water quality sampling, all maps from project, all GIS data, and aquatic plant vouchers.


Grant Details
Large Scale Lake Planning
Date
3/15/2024
Waters Involved
Little Portage Lake
Status
Complete

Vilas County: Clg - Vilas County Strategic Lake Protection Implementation Program: The Vilas County Land and Water Dept is sponsoring a project to accomplish workplan activities from the Land and Water plan that focus on improving and protecting water quality in the highest quality waters of Vilas County.

Activities: 1) Conduct AIS, shoreland, coarse wood, PI and water quality sampling 2) Conduct shoreland habitat protection campaign 3) Conduct contractor training workshop 4) Design and install shoreline BMP\2019s 5) Recruit and train WAV volunteers 6) Finalize road and stream crossing project

Deliverables: 1) Monitoring data and entry into SWIMS 2) Completed trainings/workshops 3) Final report.

Conditions:
1) Final report needs Dept review and approval

This scope summarizes details provided in the application and does not negate tasks and/or deliverables described therein. Data, reports, surveys, and supporting information, including photos, maps and GIS data, must be submitted to the DNR Biologist in electronic format and in any other format they specify.


Grant Details
Large Scale Lake Planning
Date
4/1/2007
Waters Involved
Lower Gresham Lake
Status
Complete

Town Of Boulder Junction: Gresham Lakes Management Plan - Phase 4 Lower Gresham Lake: The Town of Boulder Junction is sponsoring large scale lake planning grants to study the Gresham Chain of Lakes in Vilas County with a study completion date of December 31, 2008. The project will focus on developing a Lake Management Plan (LMP) for the Gresham Chain of Lakes. Completion of a LMP will allow for potential Aquatic Invasive Species (AIS) cost sharing grants and permits for Eurasian water-milfoil (EWM) control.

Project activities include:
1) Stakeholder participation - kick-off meeting, survey, planning meetings (up to 2), wrap-up meeting, news release, newsletter article, and progress report
2) Water quality sampling (Secchi, P, Chla, N, Conductivity, pH, Alkalinity, Total Suspended solids, Calcium, DO, and temp)
3) Curly-leaf pondweed survey on entire Chain
4) Point-intercept aquatic plant survey on Lower Gresham Lake with 2 sets of pressed aquatic plants
5) Spring EWM assessment on Upper Gresham Lake
6) Aquatic plant community mapping
7) Fisheries assessment
8) Watershed assessment
9) Zebra mussel monitoring
10) Develop LMP

Project deliverables include:
1) Stakeholder survey, news release, newsletter article, and progress report
2) Aquatic plant community and watershed maps
3) Point-intercept aquatic plant data and 2 sets of pressed aquatic plants from Lower Gresham Lake
4) LMP

Specific conditions for this project:
- Draft of stakeholder survey should be submitted to Lakes Management Coordinator for review before sending to public
- LMP needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP, news release, newsletter article, progress report, stakeholder survey, data from watershed assessment and point-intercept aquatic plant survey, set of pressed aquatic plants, and all maps from project.


Grant Details
Large Scale Lake Planning
Date
4/1/2007
Waters Involved
Lower Gresham Lake
Status
Complete

Town Of Boulder Junction: Gresham Lakes Management Planning Project - Phase I Stakeholder Participation: The Town of Boulder Junction is sponsoring large scale lake planning grants to study the Gresham Chain of Lakes in Vilas County with a study completion date of December 31, 2008. The project will focus on developing a Lake Management Plan (LMP) for the Gresham Chain of Lakes. Completion of a LMP will allow for potential Aquatic Invasive Species (AIS) cost sharing grants and permits for Eurasian water-milfoil (EWM) control.

Project activities include:
1) Stakeholder participation - kick-off meeting, survey, planning meetings (up to 2), wrap-up meeting, news release, newsletter article, and progress report
2) Water quality sampling (Secchi, P, Chla, N, Conductivity, pH, Alkalinity, Total Suspended solids, Calcium, DO, and temp)
3) Curly-leaf pondweed survey on entire Chain
4) Point-intercept aquatic plant survey on Lower Gresham Lake with 2 sets of pressed aquatic plants
5) Spring EWM assessment on Upper Gresham Lake
6) Aquatic plant community mapping
7) Fisheries assessment
8) Watershed assessment
9) Zebra mussel monitoring
10) Develop LMP

Project deliverables include:
1) Stakeholder survey, news release, newsletter article, and progress report
2) Aquatic plant community and watershed maps
3) Point-intercept aquatic plant data and 2 sets of pressed aquatic plants from Lower Gresham Lake
4) LMP

Specific conditions for this project:
- Draft of stakeholder survey should be submitted to Lakes Management Coordinator for review before sending to public
- LMP needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP, news release, newsletter article, progress report, stakeholder survey, data from watershed assessment and point-intercept aquatic plant survey, set of pressed aquatic plants, and all maps from project.


Grant Details
Large Scale Lake Planning
Date
2/15/2017
Waters Involved
Mabel Lake
Status
Complete

Town Of Presque Isle: Wilderness Waters: Mabel Lake: The Town of Presque Isle is sponsoring a large scale lake planning grant to study Mabel Lake, in Vilas County. The project will focus on developing a Lake Management Plan (LMP) for Mabel Lake.

Project activities include: 1) Gather and assess existing lake info; 2) PI aquatic plant survey, community and substrate mapping and analysis; 3) Shoreland assessment; 4) Professional and volunteer AIS monitoring; 5) Educational program \2013 meetings and \201Cfloating\201D workshop; 6) Watercraft inspections; 7) Develop LMP.

Project deliverables include: 1) PI, AIS and shoreland habitat data; 2) Aquatic plant community and substrate maps; 3) Aquatic plant vouchers; 4) Education materials; 5) Entered inspection data; 6) LMP.

Specific conditions for this project: LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, PI, AIS, and shoreland habitat data, a set of aquatic plant vouchers, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
4/1/2014
Waters Involved
Manitowish River
Status
Complete

High-Fishtrap-Rush Lks Assoc: High-Fishtrap-Rush Lakes Stewardship Program, Phase 2: High-Fishtrap-Rush Lakes Association is sponsoring phased large scale lake planning grants to study High-Fishtrap-Rush Lakes, in Vilas County. The project will focus on developing a Lake Management Plan (LMP) for High-Fishtrap-Rush Lakes.

Phase 2 project activities include: 1) Volunteer frog and toad monitoring and angler\2019s journal program; 2) Watershed assessment and water quality sampling; 3) Lake stage, discharge and retention time assessment; 4) Rare species assessment; 5) Shoreland assessment; 6) Watercraft inspections; 7) Develop LMP.

Project deliverables include: 1) Water quality, rare species, frog and toad, angler\2019s journal, lake stage, discharge, retention, and watershed data; 2) Entered inspection data into SWIMS; 3) Education materials; 4) LMP.

Specific conditions for this project: LMP needs Dept. review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, water quality, watershed, rare species, frog and toad, stage, discharge, retention, and angler data, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
4/1/2014
Waters Involved
Mann Lake
Status
Complete

Friends Of Mann Lake: Mann Lake Management Planning Project: Friends of Mann Lake Association is sponsoring a Lake Planning grant to study Mann Lake, in Vilas County. The project will focus on developing a Lake Management Plan (LMP) for Mann Lake.

Project activities include: 1) Stakeholder participation \2013 stakeholder survey, planning meetings (up to 2), kick-off meeting, wrap-up meeting, news release(s), and newsletter article; 2) Water quality sampling and analysis; 3) Watershed assessment and P load modeling; 4) Fisheries assessment; 5) Shoreline and coarse woody habitat assessment; 6) Early-season AIS monitoring and professional Dreissena monitoring; 7) Aquatic plant surveys (PI survey, community mapping, substrate mapping); 8) Volunteer AIS monitoring; 9) Data analysis; 10) Develop LMP.

Project deliverables include: 1) Stakeholder survey, news release(s), and newsletter article; 2) Water chemistry data; 3) Watershed maps and modeling data; 4) PI, shoreland, and coarse woody habitat data; 5) Aquatic plant community and substrate maps; 6) LMP.

Specific conditions for this project: 1) Draft of stakeholder survey needs to be submitted to Lakes Management Coordinator for review and approval before sending to public; 2) Draft of LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, news release(s), newsletter article, stakeholder survey, data from PI, shoreland assessment, coarse woody habitat assessment, watershed assessment and water quality sampling, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
4/1/2014
Waters Involved
Mann Lake
Status
Proposed

Friends Of Mann Lake: Mann Lake Management Planning Project: Friends of Mann Lake Association is sponsoring a Lake Planning grant to study Mann Lake, in Vilas County. The project will focus on developing a Lake Management Plan (LMP) for Mann Lake.

Project activities include: 1) Stakeholder participation \2013 stakeholder survey, planning meetings (up to 2), kick-off meeting, wrap-up meeting, news release(s), and newsletter article; 2) Water quality sampling and analysis; 3) Watershed assessment and P load modeling; 4) Fisheries assessment; 5) Shoreline and coarse woody habitat assessment; 6) Early-season AIS monitoring and professional Dreissena monitoring; 7) Aquatic plant surveys (PI survey, community mapping, substrate mapping); 8) Volunteer AIS monitoring; 9) Data analysis; 10) Develop LMP.

Project deliverables include: 1) Stakeholder survey, news release(s), and newsletter article; 2) Water chemistry data; 3) Watershed maps and modeling data; 4) PI, shoreland, and coarse woody habitat data; 5) Aquatic plant community and substrate maps; 6) LMP.

Specific conditions for this project: 1) Draft of stakeholder survey needs to be submitted to Lakes Management Coordinator for review and approval before sending to public; 2) Draft of LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, news release(s), newsletter article, stakeholder survey, data from PI, shoreland assessment, coarse woody habitat assessment, watershed assessment and water quality sampling, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
4/1/2007
Waters Involved
Middle Gresham Lake
Status
Complete

Town Of Boulder Junction: Gresham Lakes Management Plan - Phase 3 Middle Gresham Lake: The Town of Boulder Junction is sponsoring large scale lake planning grants to study the Gresham Chain of Lakes in Vilas County with a study completion date of December 31, 2008. The project will focus on developing a Lake Management Plan (LMP) for the Gresham Chain of Lakes. Completion of a LMP will allow for potential Aquatic Invasive Species (AIS) cost sharing grants and permits for Eurasian water-milfoil (EWM) control.

Project activities include:
1) Stakeholder participation - kick-off meeting, survey, planning meetings (up to 2), wrap-up meeting, news release, newsletter article, and progress report
2) Water quality sampling (Secchi, P, Chla, N, Conductivity, pH, Alkalinity, Total Suspended solids, Calcium, DO, and temp)
3) Curly-leaf pondweed survey on entire Chain
4) Point-intercept aquatic plant survey on Lower Gresham Lake with 2 sets of pressed aquatic plants
5) Spring EWM assessment on Upper Gresham Lake
6) Aquatic plant community mapping
7) Fisheries assessment
8) Watershed assessment
9) Zebra mussel monitoring
10) Develop LMP

Project deliverables include:
1) Stakeholder survey, news release, newsletter article, and progress report
2) Aquatic plant community and watershed maps
3) Point-intercept aquatic plant data and 2 sets of pressed aquatic plants from Lower Gresham Lake
4) LMP

Specific conditions for this project:
- Draft of stakeholder survey should be submitted to Lakes Management Coordinator for review before sending to public
- LMP needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP, news release, newsletter article, progress report, stakeholder survey, data from watershed assessment and point-intercept aquatic plant survey, set of pressed aquatic plants, and all maps from project.


Grant Details
Large Scale Lake Planning
Date
4/1/2007
Waters Involved
Middle Gresham Lake
Status
Complete

Town Of Boulder Junction: Gresham Lakes Management Planning Project - Phase I Stakeholder Participation: The Town of Boulder Junction is sponsoring large scale lake planning grants to study the Gresham Chain of Lakes in Vilas County with a study completion date of December 31, 2008. The project will focus on developing a Lake Management Plan (LMP) for the Gresham Chain of Lakes. Completion of a LMP will allow for potential Aquatic Invasive Species (AIS) cost sharing grants and permits for Eurasian water-milfoil (EWM) control.

Project activities include:
1) Stakeholder participation - kick-off meeting, survey, planning meetings (up to 2), wrap-up meeting, news release, newsletter article, and progress report
2) Water quality sampling (Secchi, P, Chla, N, Conductivity, pH, Alkalinity, Total Suspended solids, Calcium, DO, and temp)
3) Curly-leaf pondweed survey on entire Chain
4) Point-intercept aquatic plant survey on Lower Gresham Lake with 2 sets of pressed aquatic plants
5) Spring EWM assessment on Upper Gresham Lake
6) Aquatic plant community mapping
7) Fisheries assessment
8) Watershed assessment
9) Zebra mussel monitoring
10) Develop LMP

Project deliverables include:
1) Stakeholder survey, news release, newsletter article, and progress report
2) Aquatic plant community and watershed maps
3) Point-intercept aquatic plant data and 2 sets of pressed aquatic plants from Lower Gresham Lake
4) LMP

Specific conditions for this project:
- Draft of stakeholder survey should be submitted to Lakes Management Coordinator for review before sending to public
- LMP needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP, news release, newsletter article, progress report, stakeholder survey, data from watershed assessment and point-intercept aquatic plant survey, set of pressed aquatic plants, and all maps from project.


Grant Details
Large Scale Lake Planning
Date
3/15/2024
Waters Involved
Moccasin Lake
Status
Complete

Vilas County: Clg - Vilas County Strategic Lake Protection Implementation Program: The Vilas County Land and Water Dept is sponsoring a project to accomplish workplan activities from the Land and Water plan that focus on improving and protecting water quality in the highest quality waters of Vilas County.

Activities: 1) Conduct AIS, shoreland, coarse wood, PI and water quality sampling 2) Conduct shoreland habitat protection campaign 3) Conduct contractor training workshop 4) Design and install shoreline BMP\2019s 5) Recruit and train WAV volunteers 6) Finalize road and stream crossing project

Deliverables: 1) Monitoring data and entry into SWIMS 2) Completed trainings/workshops 3) Final report.

Conditions:
1) Final report needs Dept review and approval

This scope summarizes details provided in the application and does not negate tasks and/or deliverables described therein. Data, reports, surveys, and supporting information, including photos, maps and GIS data, must be submitted to the DNR Biologist in electronic format and in any other format they specify.


Grant Details
Large Scale Lake Planning
Date
2/15/2017
Waters Involved
Papoose Creek
Status
Complete

Town Of Presque Isle: Wilderness Waters: Papoose Lake: The Town of Presque Isle is sponsoring a large scale lake planning grant to study Papoose Lake, in Vilas County. The project will focus on developing a Lake Management Plan (LMP) for Papoose Lake.

Project activities include: 1) Gather and assess existing lake info; 2) PI aquatic plant survey, community and substrate mapping and analysis; 3) Shoreland assessment; 4) Professional and volunteer AIS monitoring; 5) Educational program \2013 meetings and \201Cfloating\201D workshop; 6) Watercraft inspections; 7) Develop LMP.

Project deliverables include: 1) PI, AIS and shoreland habitat data; 2) Aquatic plant community and substrate maps; 3) Aquatic plant vouchers; 4) Education materials; 5) Entered inspection data; 6) LMP.

Specific conditions for this project: LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, PI, AIS, and shoreland habitat data, a set of aquatic plant vouchers, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
2/15/2017
Waters Involved
Papoose Lake
Status
Complete

Town Of Presque Isle: Wilderness Waters: Papoose Lake: The Town of Presque Isle is sponsoring a large scale lake planning grant to study Papoose Lake, in Vilas County. The project will focus on developing a Lake Management Plan (LMP) for Papoose Lake.

Project activities include: 1) Gather and assess existing lake info; 2) PI aquatic plant survey, community and substrate mapping and analysis; 3) Shoreland assessment; 4) Professional and volunteer AIS monitoring; 5) Educational program \2013 meetings and \201Cfloating\201D workshop; 6) Watercraft inspections; 7) Develop LMP.

Project deliverables include: 1) PI, AIS and shoreland habitat data; 2) Aquatic plant community and substrate maps; 3) Aquatic plant vouchers; 4) Education materials; 5) Entered inspection data; 6) LMP.

Specific conditions for this project: LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, PI, AIS, and shoreland habitat data, a set of aquatic plant vouchers, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
3/15/2024
Waters Involved
Papoose Lake
Status
Complete

Vilas County: Clg - Vilas County Strategic Lake Protection Implementation Program: The Vilas County Land and Water Dept is sponsoring a project to accomplish workplan activities from the Land and Water plan that focus on improving and protecting water quality in the highest quality waters of Vilas County.

Activities: 1) Conduct AIS, shoreland, coarse wood, PI and water quality sampling 2) Conduct shoreland habitat protection campaign 3) Conduct contractor training workshop 4) Design and install shoreline BMP\2019s 5) Recruit and train WAV volunteers 6) Finalize road and stream crossing project

Deliverables: 1) Monitoring data and entry into SWIMS 2) Completed trainings/workshops 3) Final report.

Conditions:
1) Final report needs Dept review and approval

This scope summarizes details provided in the application and does not negate tasks and/or deliverables described therein. Data, reports, surveys, and supporting information, including photos, maps and GIS data, must be submitted to the DNR Biologist in electronic format and in any other format they specify.


Grant Details
Large Scale Lake Planning
Date
3/15/2024
Waters Involved
Pickerel Creek
Status
Complete

Vilas County: Clg - Vilas County Strategic Lake Protection Implementation Program: The Vilas County Land and Water Dept is sponsoring a project to accomplish workplan activities from the Land and Water plan that focus on improving and protecting water quality in the highest quality waters of Vilas County.

Activities: 1) Conduct AIS, shoreland, coarse wood, PI and water quality sampling 2) Conduct shoreland habitat protection campaign 3) Conduct contractor training workshop 4) Design and install shoreline BMP\2019s 5) Recruit and train WAV volunteers 6) Finalize road and stream crossing project

Deliverables: 1) Monitoring data and entry into SWIMS 2) Completed trainings/workshops 3) Final report.

Conditions:
1) Final report needs Dept review and approval

This scope summarizes details provided in the application and does not negate tasks and/or deliverables described therein. Data, reports, surveys, and supporting information, including photos, maps and GIS data, must be submitted to the DNR Biologist in electronic format and in any other format they specify.


Grant Details
Large Scale Lake Planning
Date
3/15/2024
Waters Involved
Pickerel Lake
Status
Complete

Vilas County: Clg - Vilas County Strategic Lake Protection Implementation Program: The Vilas County Land and Water Dept is sponsoring a project to accomplish workplan activities from the Land and Water plan that focus on improving and protecting water quality in the highest quality waters of Vilas County.

Activities: 1) Conduct AIS, shoreland, coarse wood, PI and water quality sampling 2) Conduct shoreland habitat protection campaign 3) Conduct contractor training workshop 4) Design and install shoreline BMP\2019s 5) Recruit and train WAV volunteers 6) Finalize road and stream crossing project

Deliverables: 1) Monitoring data and entry into SWIMS 2) Completed trainings/workshops 3) Final report.

Conditions:
1) Final report needs Dept review and approval

This scope summarizes details provided in the application and does not negate tasks and/or deliverables described therein. Data, reports, surveys, and supporting information, including photos, maps and GIS data, must be submitted to the DNR Biologist in electronic format and in any other format they specify.


Grant Details
Large Scale Lake Planning
Date
10/1/2006
Waters Involved
Pond Creek
Status
Complete

Town Of Presque Isle: Wildcat & Averill Lake Limnological Baseline Studies & Apm Plans: The Town of Presque Isle is sponsoring a large scale lake planning grant to study Wildcat and Averill Lakes in Vilas County with a study completion date of June 30, 2008. The project will focus on developing an Aquatic Plant Management (APM) Plan for each lake.

Project activities include:
1) Data review and project kick-off meeting, one site visit to discuss goals, and project final meeting
2) Develop public questionnaire and prepare educational article
3) Point-intercept (PI) survey of aquatic plants with 2 sets of pressed plants from each lake
4) Aquatic plant community mapping and analysis
5) Water quality sampling - secchi, P, Chla, DO, and Temp during aquatic plant sampling
6) Watershed and land use analysis
7) Develop APM Plan

Project deliverables include:
1) Public questionnaire and educational article
2) PI data and aquatic plant community and watershed maps
3) 2 sets of pressed aquatic plants from each lake (one set for lake group and second for Dept)
4) Water quality sampling results
5) APM Plan

Specific conditions for this project:
- Draft of public questionnaire should be submitted to Lakes Management Coordinator for review before sending to public
- APM Plan needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of APM Plan, educational article, public questionnaire, data from watershed and land use analysis, data from PI survey, data from water quality sampling, all maps from project, and a set of pressed aquatic plants from each lake.


Grant Details
Large Scale Lake Planning
Date
2/15/2017
Waters Involved
Pond Creek
Status
Complete

Town Of Presque Isle: Wilderness Waters: Mabel Lake: The Town of Presque Isle is sponsoring a large scale lake planning grant to study Mabel Lake, in Vilas County. The project will focus on developing a Lake Management Plan (LMP) for Mabel Lake.

Project activities include: 1) Gather and assess existing lake info; 2) PI aquatic plant survey, community and substrate mapping and analysis; 3) Shoreland assessment; 4) Professional and volunteer AIS monitoring; 5) Educational program \2013 meetings and \201Cfloating\201D workshop; 6) Watercraft inspections; 7) Develop LMP.

Project deliverables include: 1) PI, AIS and shoreland habitat data; 2) Aquatic plant community and substrate maps; 3) Aquatic plant vouchers; 4) Education materials; 5) Entered inspection data; 6) LMP.

Specific conditions for this project: LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, PI, AIS, and shoreland habitat data, a set of aquatic plant vouchers, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
3/15/2024
Waters Involved
Portage Creek
Status
Complete

Vilas County: Clg - Vilas County Strategic Lake Protection Implementation Program: The Vilas County Land and Water Dept is sponsoring a project to accomplish workplan activities from the Land and Water plan that focus on improving and protecting water quality in the highest quality waters of Vilas County.

Activities: 1) Conduct AIS, shoreland, coarse wood, PI and water quality sampling 2) Conduct shoreland habitat protection campaign 3) Conduct contractor training workshop 4) Design and install shoreline BMP\2019s 5) Recruit and train WAV volunteers 6) Finalize road and stream crossing project

Deliverables: 1) Monitoring data and entry into SWIMS 2) Completed trainings/workshops 3) Final report.

Conditions:
1) Final report needs Dept review and approval

This scope summarizes details provided in the application and does not negate tasks and/or deliverables described therein. Data, reports, surveys, and supporting information, including photos, maps and GIS data, must be submitted to the DNR Biologist in electronic format and in any other format they specify.


Grant Details
Large Scale Lake Planning
Date
10/1/2011
Waters Involved
Rest Lake
Status
Complete

Manitowish Waters Lake Association: Rest Lake Management Planning Project: Manitowish Waters Lakes Association, Inc is sponsoring a large scale lake planning grant to study Rest Lake in Vilas County. The project will focus on developing a Lake Management Plan (LMP) for Rest Lake.

Project activities include: 1) Stakeholder participation \2013 stakeholder survey, planning meetings (up to 2), kick-off meeting, wrap-up meeting, news release(s), and newsletter article; 2) Water quality sampling and analysis; 3) Watershed assessment and P load modeling; 4) Fisheries assessment; 5) Shoreline assessment; 6) Professional Dreissena monitoring; 7) Curly-leaf pondweed survey, PI survey, and aquatic plant community mapping; 8) Data analysis and develop LMP; 9) Volunteer AIS monitoring and watercraft inspections; 10) Purple loosestrife biocontrol.

Project deliverables include: 1) Stakeholder survey, news release(s), and newsletter article; 2) Entered AIS monitoring and inspection data onto SWIMS; 3) Water chemistry data; 4) Watershed maps and modeling data; 5) Point Intercept and shoreland data; 6) Aquatic plant community and substrate maps; 7) Aquatic plant vouchers; 8) LMP.

Specific conditions for this project: 1) Draft of stakeholder survey needs to be submitted to Lakes Management Coordinator for review and approval before sending to public; 2) Draft of LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, news release(s), newsletter article, stakeholder survey, data from PI, shoreland assessment, watershed assessment and water quality sampling, all maps from project, all GIS data, and aquatic plant vouchers.


Grant Details
Large Scale Lake Planning
Date
10/1/2011
Waters Involved
Rest Lake
Status
In_Progress

Manitowish Waters Lake Association: Rest Lake Management Planning Project: Manitowish Waters Lakes Association, Inc is sponsoring a large scale lake planning grant to study Rest Lake in Vilas County. The project will focus on developing a Lake Management Plan (LMP) for Rest Lake.

Project activities include: 1) Stakeholder participation \2013 stakeholder survey, planning meetings (up to 2), kick-off meeting, wrap-up meeting, news release(s), and newsletter article; 2) Water quality sampling and analysis; 3) Watershed assessment and P load modeling; 4) Fisheries assessment; 5) Shoreline assessment; 6) Professional Dreissena monitoring; 7) Curly-leaf pondweed survey, PI survey, and aquatic plant community mapping; 8) Data analysis and develop LMP; 9) Volunteer AIS monitoring and watercraft inspections; 10) Purple loosestrife biocontrol.

Project deliverables include: 1) Stakeholder survey, news release(s), and newsletter article; 2) Entered AIS monitoring and inspection data onto SWIMS; 3) Water chemistry data; 4) Watershed maps and modeling data; 5) Point Intercept and shoreland data; 6) Aquatic plant community and substrate maps; 7) Aquatic plant vouchers; 8) LMP.

Specific conditions for this project: 1) Draft of stakeholder survey needs to be submitted to Lakes Management Coordinator for review and approval before sending to public; 2) Draft of LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, news release(s), newsletter article, stakeholder survey, data from PI, shoreland assessment, watershed assessment and water quality sampling, all maps from project, all GIS data, and aquatic plant vouchers.


Grant Details
Large Scale Lake Planning
Date
10/1/2011
Waters Involved
Rest Lake
Status
Proposed

Manitowish Waters Lake Association: Rest Lake Management Planning Project: Manitowish Waters Lakes Association, Inc is sponsoring a large scale lake planning grant to study Rest Lake in Vilas County. The project will focus on developing a Lake Management Plan (LMP) for Rest Lake.

Project activities include: 1) Stakeholder participation \2013 stakeholder survey, planning meetings (up to 2), kick-off meeting, wrap-up meeting, news release(s), and newsletter article; 2) Water quality sampling and analysis; 3) Watershed assessment and P load modeling; 4) Fisheries assessment; 5) Shoreline assessment; 6) Professional Dreissena monitoring; 7) Curly-leaf pondweed survey, PI survey, and aquatic plant community mapping; 8) Data analysis and develop LMP; 9) Volunteer AIS monitoring and watercraft inspections; 10) Purple loosestrife biocontrol.

Project deliverables include: 1) Stakeholder survey, news release(s), and newsletter article; 2) Entered AIS monitoring and inspection data onto SWIMS; 3) Water chemistry data; 4) Watershed maps and modeling data; 5) Point Intercept and shoreland data; 6) Aquatic plant community and substrate maps; 7) Aquatic plant vouchers; 8) LMP.

Specific conditions for this project: 1) Draft of stakeholder survey needs to be submitted to Lakes Management Coordinator for review and approval before sending to public; 2) Draft of LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, news release(s), newsletter article, stakeholder survey, data from PI, shoreland assessment, watershed assessment and water quality sampling, all maps from project, all GIS data, and aquatic plant vouchers.


Grant Details
Large Scale Lake Planning
Date
10/1/2006
Waters Involved
Rice Creek
Status
Complete

Town Of Presque Isle: Big Lake Limnological Baseline Study & Apm Plan: The Town of Presque Isle is sponsoring a large scale lake planning grant to study Big Lake in Vilas County with a study completion date of June 30, 2008. The Big Lake Property Owners Association is a project partner. The project will focus on developing an Aquatic Plant Management (APM) Plan.

Project activities include:
1) Data review and project kick-off meeting, one site visit to discuss goals, and project final meeting
2) Develop public questionnaire and prepare educational article
3) Point-intercept (PI) survey of aquatic plants with 2 sets of pressed plants
4) Aquatic plant community mapping and analysis
5) Water quality sampling - secchi through citizen lake monitor and P, Chla, DO, and Temp during aquatic plant sampling
6) Watershed and land use analysis
7) Develop APM Plan

Project deliverables include:
1) Public questionnaire and educational article
2) PI data and aquatic plant community and watershed maps
3) 2 sets of pressed aquatic plants (one set for lake group and second for Dept)
4) Water quality sampling results
5) APM Plan

Specific conditions for this project:
- Draft of public questionnaire should be submitted to Lakes Management Coordinator for review before sending to public
- APM Plan needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of APM Plan, educational article, public questionnaire, data from watershed and land use analysis, data from PI survey, data from water quality sampling, all maps from project, and a set of pressed aquatic plants.


Grant Details
Large Scale Lake Planning
Date
3/15/2024
Waters Involved
Rice Creek
Status
Complete

Vilas County: Clg - Vilas County Strategic Lake Protection Implementation Program: The Vilas County Land and Water Dept is sponsoring a project to accomplish workplan activities from the Land and Water plan that focus on improving and protecting water quality in the highest quality waters of Vilas County.

Activities: 1) Conduct AIS, shoreland, coarse wood, PI and water quality sampling 2) Conduct shoreland habitat protection campaign 3) Conduct contractor training workshop 4) Design and install shoreline BMP\2019s 5) Recruit and train WAV volunteers 6) Finalize road and stream crossing project

Deliverables: 1) Monitoring data and entry into SWIMS 2) Completed trainings/workshops 3) Final report.

Conditions:
1) Final report needs Dept review and approval

This scope summarizes details provided in the application and does not negate tasks and/or deliverables described therein. Data, reports, surveys, and supporting information, including photos, maps and GIS data, must be submitted to the DNR Biologist in electronic format and in any other format they specify.


Grant Details
Large Scale Lake Planning
Date
10/1/2012
Waters Involved
Rush Lake
Status
Complete

High-Fishtrap-Rush Lks Assoc: High-Fishtrap-Rush Lakes Stewardship Program, Phase 1: High-Fishtrap-Rush Lakes Association is sponsoring phased large scale lake planning grants to study High-Fishtrap-Rush Lakes, in Vilas County. The project will focus on developing a Lake Management Plan (LMP) for High-Fishtrap-Rush Lakes. Phase 2 will be submitted for funding during the Feb 1, 2013 grant cycle.

Phase 1 project activities include: 1) Gather and assess existing High-Fishtrap-Rush Lakes information; 2) Volunteer frog and toad monitoring and angler\2019s journal program; 3) PI aquatic plant survey, community and substrate mapping and analysis; 4) Watershed assessment and water quality sampling; 5) Lake stage, discharge and retention time assessment; 6) Rare species assessment; 7) Educational program \2013 stakeholder survey, meetings, newsletter articles, and press releases; 8) Watercraft inspections.

Project deliverables include: 1) PI, stakeholder survey, water quality, rare species, frog and toad, angler\2019s journal, lake stage, discharge, retention, and watershed data; 2) Aquatic plant community and substrate maps; 3) Entered inspection data into SWIMS; 4) Aquatic plant vouchers; 5) Education materials.

Specific conditions for this project: 1) Draft of stakeholder survey needs to be submitted to Lakes Management Coordinator for review and approval before sending to public; 2) Project summaries and reports need Dept. review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of reports, PI, stakeholder survey, water quality, watershed, rare species, frog and toad, stage, discharge, retention, and angler data, a set of aquatic plant vouchers, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
4/1/2014
Waters Involved
Rush Lake
Status
Complete

High-Fishtrap-Rush Lks Assoc: High-Fishtrap-Rush Lakes Stewardship Program, Phase 2: High-Fishtrap-Rush Lakes Association is sponsoring phased large scale lake planning grants to study High-Fishtrap-Rush Lakes, in Vilas County. The project will focus on developing a Lake Management Plan (LMP) for High-Fishtrap-Rush Lakes.

Phase 2 project activities include: 1) Volunteer frog and toad monitoring and angler\2019s journal program; 2) Watershed assessment and water quality sampling; 3) Lake stage, discharge and retention time assessment; 4) Rare species assessment; 5) Shoreland assessment; 6) Watercraft inspections; 7) Develop LMP.

Project deliverables include: 1) Water quality, rare species, frog and toad, angler\2019s journal, lake stage, discharge, retention, and watershed data; 2) Entered inspection data into SWIMS; 3) Education materials; 4) LMP.

Specific conditions for this project: LMP needs Dept. review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, water quality, watershed, rare species, frog and toad, stage, discharge, retention, and angler data, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
3/15/2024
Waters Involved
Spectacle Lake
Status
Complete

Vilas County: Clg - Vilas County Strategic Lake Protection Implementation Program: The Vilas County Land and Water Dept is sponsoring a project to accomplish workplan activities from the Land and Water plan that focus on improving and protecting water quality in the highest quality waters of Vilas County.

Activities: 1) Conduct AIS, shoreland, coarse wood, PI and water quality sampling 2) Conduct shoreland habitat protection campaign 3) Conduct contractor training workshop 4) Design and install shoreline BMP\2019s 5) Recruit and train WAV volunteers 6) Finalize road and stream crossing project

Deliverables: 1) Monitoring data and entry into SWIMS 2) Completed trainings/workshops 3) Final report.

Conditions:
1) Final report needs Dept review and approval

This scope summarizes details provided in the application and does not negate tasks and/or deliverables described therein. Data, reports, surveys, and supporting information, including photos, maps and GIS data, must be submitted to the DNR Biologist in electronic format and in any other format they specify.


Grant Details
Large Scale Lake Planning
Date
4/1/2014
Waters Involved
Unnamed
Status
Complete

High-Fishtrap-Rush Lks Assoc: High-Fishtrap-Rush Lakes Stewardship Program, Phase 2: High-Fishtrap-Rush Lakes Association is sponsoring phased large scale lake planning grants to study High-Fishtrap-Rush Lakes, in Vilas County. The project will focus on developing a Lake Management Plan (LMP) for High-Fishtrap-Rush Lakes.

Phase 2 project activities include: 1) Volunteer frog and toad monitoring and angler\2019s journal program; 2) Watershed assessment and water quality sampling; 3) Lake stage, discharge and retention time assessment; 4) Rare species assessment; 5) Shoreland assessment; 6) Watercraft inspections; 7) Develop LMP.

Project deliverables include: 1) Water quality, rare species, frog and toad, angler\2019s journal, lake stage, discharge, retention, and watershed data; 2) Entered inspection data into SWIMS; 3) Education materials; 4) LMP.

Specific conditions for this project: LMP needs Dept. review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, water quality, watershed, rare species, frog and toad, stage, discharge, retention, and angler data, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
4/1/2007
Waters Involved
Upper Gresham Lake
Status
Complete

Town Of Boulder Junction: Gresham Lakes Management Planning - Phase 2 Upper Gresham Lake: The Town of Boulder Junction is sponsoring large scale lake planning grants to study the Gresham Chain of Lakes in Vilas County with a study completion date of December 31, 2008. The project will focus on developing a Lake Management Plan (LMP) for the Gresham Chain of Lakes. Completion of a LMP will allow for potential Aquatic Invasive Species (AIS) cost sharing grants and permits for Eurasian water-milfoil (EWM) control.

Project activities include:
1) Stakeholder participation - kick-off meeting, survey, planning meetings (up to 2), wrap-up meeting, news release, newsletter article, and progress report
2) Water quality sampling (Secchi, P, Chla, N, Conductivity, pH, Alkalinity, Total Suspended solids, Calcium, DO, and temp)
3) Curly-leaf pondweed survey on entire Chain
4) Point-intercept aquatic plant survey on Lower Gresham Lake with 2 sets of pressed aquatic plants
5) Spring EWM assessment on Upper Gresham Lake
6) Aquatic plant community mapping
7) Fisheries assessment
8) Watershed assessment
9) Zebra mussel monitoring
10) Develop LMP

Project deliverables include:
1) Stakeholder survey, news release, newsletter article, and progress report
2) Aquatic plant community and watershed maps
3) Point-intercept aquatic plant data and 2 sets of pressed aquatic plants from Lower Gresham Lake
4) LMP

Specific conditions for this project:
- Draft of stakeholder survey should be submitted to Lakes Management Coordinator for review before sending to public
- LMP needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP, news release, newsletter article, progress report, stakeholder survey, data from watershed assessment and point-intercept aquatic plant survey, set of pressed aquatic plants, and all maps from project.


Grant Details
Large Scale Lake Planning
Date
4/1/2007
Waters Involved
Upper Gresham Lake
Status
Complete

Town Of Boulder Junction: Gresham Lakes Management Planning Project - Phase I Stakeholder Participation: The Town of Boulder Junction is sponsoring large scale lake planning grants to study the Gresham Chain of Lakes in Vilas County with a study completion date of December 31, 2008. The project will focus on developing a Lake Management Plan (LMP) for the Gresham Chain of Lakes. Completion of a LMP will allow for potential Aquatic Invasive Species (AIS) cost sharing grants and permits for Eurasian water-milfoil (EWM) control.

Project activities include:
1) Stakeholder participation - kick-off meeting, survey, planning meetings (up to 2), wrap-up meeting, news release, newsletter article, and progress report
2) Water quality sampling (Secchi, P, Chla, N, Conductivity, pH, Alkalinity, Total Suspended solids, Calcium, DO, and temp)
3) Curly-leaf pondweed survey on entire Chain
4) Point-intercept aquatic plant survey on Lower Gresham Lake with 2 sets of pressed aquatic plants
5) Spring EWM assessment on Upper Gresham Lake
6) Aquatic plant community mapping
7) Fisheries assessment
8) Watershed assessment
9) Zebra mussel monitoring
10) Develop LMP

Project deliverables include:
1) Stakeholder survey, news release, newsletter article, and progress report
2) Aquatic plant community and watershed maps
3) Point-intercept aquatic plant data and 2 sets of pressed aquatic plants from Lower Gresham Lake
4) LMP

Specific conditions for this project:
- Draft of stakeholder survey should be submitted to Lakes Management Coordinator for review before sending to public
- LMP needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP, news release, newsletter article, progress report, stakeholder survey, data from watershed assessment and point-intercept aquatic plant survey, set of pressed aquatic plants, and all maps from project.


Grant Details
Large Scale Lake Planning
Date
2/15/2018
Waters Involved
White Birch Creek
Status
Complete

Town Of Plum Lake: Town Of Plum Lake Mgmt Plan Ph Ii - White Birch & Ballard Lakes: The Town of Plum Lake is sponsoring a Lake Planning grant to study White Birch and Ballard Lakes, in Vilas County. The project will focus on developing Lake Management Plans (LMP\2019s).

Project activities include: 1) Stakeholder participation \2013 stakeholder survey, planning meetings (up to 2), kick-off meeting, and wrap-up meeting; 2) Water quality sampling and analysis; 3) Watershed assessment and P load modeling; 4) Fisheries, Shoreline, and Coarse Woody Habitat assessment; 5) Professional Dreissena monitoring; 6) Aquatic plant surveys (PI survey, community mapping, and early-season AIS); 7) Data analysis; 8) Develop LMP\2019s.

Project deliverables include: 1) Stakeholder survey; 2) Water chemistry data; 3) Watershed maps and modeling data; 4) PI, shoreland and woody habitat data; 5) Aquatic plant community and AIS maps; 6) Aquatic plant vouchers; 7) LMP\2019s.

Specific conditions for this project: 1) Draft of stakeholder survey needs Dept review and approval; 2) Draft of LMP\2019s needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP\2019s, stakeholder survey, data from PI survey, shoreland assessment, woody habitat assessment, watershed assessment and water quality sampling, all maps from project, all GIS data, and aquatic plant vouchers.


Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
White Birch Lake
Status
Complete

Ballard-Irving-White Birch Lakes Assn, Inc.: Ballard-Irving-White Birch Mgt. Plan - Ballard/White Birch: A comprehensive management plan will be developed for the Ballard-Irving-White Birch chain of lakes. This project will include the gathering of information needed from Ballard and White Birch Lakes. Information will be collected in the following areas: lake history, water quality sampling, aquatic vegetation map updates, fisheries study, shoreline vegetation and sensitive area mapping, watershed mapping and inventory including nutrient and water budgets, lake usage survey.

Information from the above elements will be combined with results from the Irving Lake study to form a final report consisting of a comprehensive management plan for the chain addressing rehabilitation, improvement, and protection of the three lakes.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), fact sheets, public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
2/15/2018
Waters Involved
White Birch Lake
Status
Complete

Town Of Plum Lake: Town Of Plum Lake Mgmt Plan Ph Ii - White Birch & Ballard Lakes: The Town of Plum Lake is sponsoring a Lake Planning grant to study White Birch and Ballard Lakes, in Vilas County. The project will focus on developing Lake Management Plans (LMP\2019s).

Project activities include: 1) Stakeholder participation \2013 stakeholder survey, planning meetings (up to 2), kick-off meeting, and wrap-up meeting; 2) Water quality sampling and analysis; 3) Watershed assessment and P load modeling; 4) Fisheries, Shoreline, and Coarse Woody Habitat assessment; 5) Professional Dreissena monitoring; 6) Aquatic plant surveys (PI survey, community mapping, and early-season AIS); 7) Data analysis; 8) Develop LMP\2019s.

Project deliverables include: 1) Stakeholder survey; 2) Water chemistry data; 3) Watershed maps and modeling data; 4) PI, shoreland and woody habitat data; 5) Aquatic plant community and AIS maps; 6) Aquatic plant vouchers; 7) LMP\2019s.

Specific conditions for this project: 1) Draft of stakeholder survey needs Dept review and approval; 2) Draft of LMP\2019s needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP\2019s, stakeholder survey, data from PI survey, shoreland assessment, woody habitat assessment, watershed assessment and water quality sampling, all maps from project, all GIS data, and aquatic plant vouchers.


Grant Details
Large Scale Lake Planning
Date
10/1/2006
Waters Involved
Wildcat Creek
Status
Complete

Town Of Presque Isle: Wildcat & Averill Lake Limnological Baseline Studies & Apm Plans: The Town of Presque Isle is sponsoring a large scale lake planning grant to study Wildcat and Averill Lakes in Vilas County with a study completion date of June 30, 2008. The project will focus on developing an Aquatic Plant Management (APM) Plan for each lake.

Project activities include:
1) Data review and project kick-off meeting, one site visit to discuss goals, and project final meeting
2) Develop public questionnaire and prepare educational article
3) Point-intercept (PI) survey of aquatic plants with 2 sets of pressed plants from each lake
4) Aquatic plant community mapping and analysis
5) Water quality sampling - secchi, P, Chla, DO, and Temp during aquatic plant sampling
6) Watershed and land use analysis
7) Develop APM Plan

Project deliverables include:
1) Public questionnaire and educational article
2) PI data and aquatic plant community and watershed maps
3) 2 sets of pressed aquatic plants from each lake (one set for lake group and second for Dept)
4) Water quality sampling results
5) APM Plan

Specific conditions for this project:
- Draft of public questionnaire should be submitted to Lakes Management Coordinator for review before sending to public
- APM Plan needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of APM Plan, educational article, public questionnaire, data from watershed and land use analysis, data from PI survey, data from water quality sampling, all maps from project, and a set of pressed aquatic plants from each lake.


Grant Details
Large Scale Lake Planning
Date
3/15/2024
Waters Involved
Wildcat Creek
Status
Complete

Vilas County: Clg - Vilas County Strategic Lake Protection Implementation Program: The Vilas County Land and Water Dept is sponsoring a project to accomplish workplan activities from the Land and Water plan that focus on improving and protecting water quality in the highest quality waters of Vilas County.

Activities: 1) Conduct AIS, shoreland, coarse wood, PI and water quality sampling 2) Conduct shoreland habitat protection campaign 3) Conduct contractor training workshop 4) Design and install shoreline BMP\2019s 5) Recruit and train WAV volunteers 6) Finalize road and stream crossing project

Deliverables: 1) Monitoring data and entry into SWIMS 2) Completed trainings/workshops 3) Final report.

Conditions:
1) Final report needs Dept review and approval

This scope summarizes details provided in the application and does not negate tasks and/or deliverables described therein. Data, reports, surveys, and supporting information, including photos, maps and GIS data, must be submitted to the DNR Biologist in electronic format and in any other format they specify.


Grant Details
Large Scale Lake Planning
Date
10/1/2006
Waters Involved
Wildcat Lake
Status
Complete

Town Of Presque Isle: Wildcat & Averill Lake Limnological Baseline Studies & Apm Plans: The Town of Presque Isle is sponsoring a large scale lake planning grant to study Wildcat and Averill Lakes in Vilas County with a study completion date of June 30, 2008. The project will focus on developing an Aquatic Plant Management (APM) Plan for each lake.

Project activities include:
1) Data review and project kick-off meeting, one site visit to discuss goals, and project final meeting
2) Develop public questionnaire and prepare educational article
3) Point-intercept (PI) survey of aquatic plants with 2 sets of pressed plants from each lake
4) Aquatic plant community mapping and analysis
5) Water quality sampling - secchi, P, Chla, DO, and Temp during aquatic plant sampling
6) Watershed and land use analysis
7) Develop APM Plan

Project deliverables include:
1) Public questionnaire and educational article
2) PI data and aquatic plant community and watershed maps
3) 2 sets of pressed aquatic plants from each lake (one set for lake group and second for Dept)
4) Water quality sampling results
5) APM Plan

Specific conditions for this project:
- Draft of public questionnaire should be submitted to Lakes Management Coordinator for review before sending to public
- APM Plan needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of APM Plan, educational article, public questionnaire, data from watershed and land use analysis, data from PI survey, data from water quality sampling, all maps from project, and a set of pressed aquatic plants from each lake.


Grant Details
Large Scale Lake Planning
Date
10/1/2012
Waters Involved
Wildcat Lake
Status
Complete

Town Of Presque Isle: Aquatic Plant Survey & Analysis Of Plant Community Change Annabelle, Lt. Crab, N. Crab, Wildcat Lake: The Town of Presque Isle Lakes Committee is sponsoring a large scale lake planning grant to study Annabelle, Little Crab, North Crab, and Wildcat Lake, in Vilas County. The Annabelle Lake Property Owners Association is a project partner. The project will focus on updating Lake Management Plans (LMP) for Annabelle, Little Crab, North Crab, and Wildcat Lake.

Project activities include: 1) Gather and assess existing Annabelle, Little Crab, North Crab, and Wildcat Lake information; 2) PI aquatic plant survey, community and substrate mapping and analysis; 3) CLMN water quality sampling; 4) Educational program \2013 meetings, newsletter articles, and press releases; 5) Watercraft inspections and AIS monitoring.

Project deliverables include: 1) LMP; 2) PI and water quality data; 3) Aquatic plant community and substrate maps; 4) Entered inspection data into SWIMS; 5) Aquatic plant vouchers; 6) Education materials.

Specific conditions for this project: LMP needs Department review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, PI and water quality data, a set of aquatic plant vouchers, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
3/15/2024
Waters Involved
Wildcat Lake
Status
Complete

Vilas County: Clg - Vilas County Strategic Lake Protection Implementation Program: The Vilas County Land and Water Dept is sponsoring a project to accomplish workplan activities from the Land and Water plan that focus on improving and protecting water quality in the highest quality waters of Vilas County.

Activities: 1) Conduct AIS, shoreland, coarse wood, PI and water quality sampling 2) Conduct shoreland habitat protection campaign 3) Conduct contractor training workshop 4) Design and install shoreline BMP\2019s 5) Recruit and train WAV volunteers 6) Finalize road and stream crossing project

Deliverables: 1) Monitoring data and entry into SWIMS 2) Completed trainings/workshops 3) Final report.

Conditions:
1) Final report needs Dept review and approval

This scope summarizes details provided in the application and does not negate tasks and/or deliverables described therein. Data, reports, surveys, and supporting information, including photos, maps and GIS data, must be submitted to the DNR Biologist in electronic format and in any other format they specify.


Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Amber Creek
Status
Complete

Town Of Lac Du Flambeau: Lake Steward Program: The Town of Lac du Flambeau is sponsoring a small scale lake planning grant project to promote good lake stewardship within the Town of Lac du Flambeau. The project will focus on developing and hosting a Lake Steward Program.

Project activities include: 1) Develop and host Lake Steward Program; 2) Lake Steward education and involvement \2013 spring meeting, bulletins, newsletter, website, Lakes Fest, and volunteer reception; 3) Develop final report summarizing Lake Steward Program and project activities.

Project deliverables include: 1) Lake Steward Program; 2) Newsletters and bulletins; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, newsletters, bulletins, and other educational products from project.


Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Amber Lake
Status
Complete

Town Of Lac Du Flambeau: Lake Steward Program: The Town of Lac du Flambeau is sponsoring a small scale lake planning grant project to promote good lake stewardship within the Town of Lac du Flambeau. The project will focus on developing and hosting a Lake Steward Program.

Project activities include: 1) Develop and host Lake Steward Program; 2) Lake Steward education and involvement \2013 spring meeting, bulletins, newsletter, website, Lakes Fest, and volunteer reception; 3) Develop final report summarizing Lake Steward Program and project activities.

Project deliverables include: 1) Lake Steward Program; 2) Newsletters and bulletins; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, newsletters, bulletins, and other educational products from project.


Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Amik Lake
Status
Complete

Town Of Lac Du Flambeau: Lake Steward Program: The Town of Lac du Flambeau is sponsoring a small scale lake planning grant project to promote good lake stewardship within the Town of Lac du Flambeau. The project will focus on developing and hosting a Lake Steward Program.

Project activities include: 1) Develop and host Lake Steward Program; 2) Lake Steward education and involvement \2013 spring meeting, bulletins, newsletter, website, Lakes Fest, and volunteer reception; 3) Develop final report summarizing Lake Steward Program and project activities.

Project deliverables include: 1) Lake Steward Program; 2) Newsletters and bulletins; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, newsletters, bulletins, and other educational products from project.


Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Apeekwa Lake
Status
Complete

Town Of Lac Du Flambeau: Lake Steward Program: The Town of Lac du Flambeau is sponsoring a small scale lake planning grant project to promote good lake stewardship within the Town of Lac du Flambeau. The project will focus on developing and hosting a Lake Steward Program.

Project activities include: 1) Develop and host Lake Steward Program; 2) Lake Steward education and involvement \2013 spring meeting, bulletins, newsletter, website, Lakes Fest, and volunteer reception; 3) Develop final report summarizing Lake Steward Program and project activities.

Project deliverables include: 1) Lake Steward Program; 2) Newsletters and bulletins; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, newsletters, bulletins, and other educational products from project.


Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Bear River
Status
Complete

Town Of Lac Du Flambeau: Lake Steward Program: The Town of Lac du Flambeau is sponsoring a small scale lake planning grant project to promote good lake stewardship within the Town of Lac du Flambeau. The project will focus on developing and hosting a Lake Steward Program.

Project activities include: 1) Develop and host Lake Steward Program; 2) Lake Steward education and involvement \2013 spring meeting, bulletins, newsletter, website, Lakes Fest, and volunteer reception; 3) Develop final report summarizing Lake Steward Program and project activities.

Project deliverables include: 1) Lake Steward Program; 2) Newsletters and bulletins; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, newsletters, bulletins, and other educational products from project.


Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Big Crooked Lake
Status
Complete

Town Of Lac Du Flambeau: Lake Steward Program: The Town of Lac du Flambeau is sponsoring a small scale lake planning grant project to promote good lake stewardship within the Town of Lac du Flambeau. The project will focus on developing and hosting a Lake Steward Program.

Project activities include: 1) Develop and host Lake Steward Program; 2) Lake Steward education and involvement \2013 spring meeting, bulletins, newsletter, website, Lakes Fest, and volunteer reception; 3) Develop final report summarizing Lake Steward Program and project activities.

Project deliverables include: 1) Lake Steward Program; 2) Newsletters and bulletins; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, newsletters, bulletins, and other educational products from project.


Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Bills Lake
Status
Complete

Town Of Lac Du Flambeau: Lake Steward Program: The Town of Lac du Flambeau is sponsoring a small scale lake planning grant project to promote good lake stewardship within the Town of Lac du Flambeau. The project will focus on developing and hosting a Lake Steward Program.

Project activities include: 1) Develop and host Lake Steward Program; 2) Lake Steward education and involvement \2013 spring meeting, bulletins, newsletter, website, Lakes Fest, and volunteer reception; 3) Develop final report summarizing Lake Steward Program and project activities.

Project deliverables include: 1) Lake Steward Program; 2) Newsletters and bulletins; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, newsletters, bulletins, and other educational products from project.


Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Bobidosh Lake
Status
Complete

Town Of Lac Du Flambeau: Lake Steward Program: The Town of Lac du Flambeau is sponsoring a small scale lake planning grant project to promote good lake stewardship within the Town of Lac du Flambeau. The project will focus on developing and hosting a Lake Steward Program.

Project activities include: 1) Develop and host Lake Steward Program; 2) Lake Steward education and involvement \2013 spring meeting, bulletins, newsletter, website, Lakes Fest, and volunteer reception; 3) Develop final report summarizing Lake Steward Program and project activities.

Project deliverables include: 1) Lake Steward Program; 2) Newsletters and bulletins; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, newsletters, bulletins, and other educational products from project.


Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Bolton Creek
Status
Complete

Town Of Lac Du Flambeau: Lake Steward Program: The Town of Lac du Flambeau is sponsoring a small scale lake planning grant project to promote good lake stewardship within the Town of Lac du Flambeau. The project will focus on developing and hosting a Lake Steward Program.

Project activities include: 1) Develop and host Lake Steward Program; 2) Lake Steward education and involvement \2013 spring meeting, bulletins, newsletter, website, Lakes Fest, and volunteer reception; 3) Develop final report summarizing Lake Steward Program and project activities.

Project deliverables include: 1) Lake Steward Program; 2) Newsletters and bulletins; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, newsletters, bulletins, and other educational products from project.


Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Bolton Lake
Status
Complete

Town Of Lac Du Flambeau: Lake Steward Program: The Town of Lac du Flambeau is sponsoring a small scale lake planning grant project to promote good lake stewardship within the Town of Lac du Flambeau. The project will focus on developing and hosting a Lake Steward Program.

Project activities include: 1) Develop and host Lake Steward Program; 2) Lake Steward education and involvement \2013 spring meeting, bulletins, newsletter, website, Lakes Fest, and volunteer reception; 3) Develop final report summarizing Lake Steward Program and project activities.

Project deliverables include: 1) Lake Steward Program; 2) Newsletters and bulletins; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, newsletters, bulletins, and other educational products from project.


Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Broken Bow Lake
Status
Complete

Town Of Lac Du Flambeau: Lake Steward Program: The Town of Lac du Flambeau is sponsoring a small scale lake planning grant project to promote good lake stewardship within the Town of Lac du Flambeau. The project will focus on developing and hosting a Lake Steward Program.

Project activities include: 1) Develop and host Lake Steward Program; 2) Lake Steward education and involvement \2013 spring meeting, bulletins, newsletter, website, Lakes Fest, and volunteer reception; 3) Develop final report summarizing Lake Steward Program and project activities.

Project deliverables include: 1) Lake Steward Program; 2) Newsletters and bulletins; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, newsletters, bulletins, and other educational products from project.


Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Buckskin Lake
Status
Complete

Town Of Lac Du Flambeau: Lake Steward Program: The Town of Lac du Flambeau is sponsoring a small scale lake planning grant project to promote good lake stewardship within the Town of Lac du Flambeau. The project will focus on developing and hosting a Lake Steward Program.

Project activities include: 1) Develop and host Lake Steward Program; 2) Lake Steward education and involvement \2013 spring meeting, bulletins, newsletter, website, Lakes Fest, and volunteer reception; 3) Develop final report summarizing Lake Steward Program and project activities.

Project deliverables include: 1) Lake Steward Program; 2) Newsletters and bulletins; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, newsletters, bulletins, and other educational products from project.


Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Cedar Lake
Status
Complete

Town Of Lac Du Flambeau: Lake Steward Program: The Town of Lac du Flambeau is sponsoring a small scale lake planning grant project to promote good lake stewardship within the Town of Lac du Flambeau. The project will focus on developing and hosting a Lake Steward Program.

Project activities include: 1) Develop and host Lake Steward Program; 2) Lake Steward education and involvement \2013 spring meeting, bulletins, newsletter, website, Lakes Fest, and volunteer reception; 3) Develop final report summarizing Lake Steward Program and project activities.

Project deliverables include: 1) Lake Steward Program; 2) Newsletters and bulletins; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, newsletters, bulletins, and other educational products from project.


Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Chewelah Lake
Status
Complete

Town Of Lac Du Flambeau: Lake Steward Program: The Town of Lac du Flambeau is sponsoring a small scale lake planning grant project to promote good lake stewardship within the Town of Lac du Flambeau. The project will focus on developing and hosting a Lake Steward Program.

Project activities include: 1) Develop and host Lake Steward Program; 2) Lake Steward education and involvement \2013 spring meeting, bulletins, newsletter, website, Lakes Fest, and volunteer reception; 3) Develop final report summarizing Lake Steward Program and project activities.

Project deliverables include: 1) Lake Steward Program; 2) Newsletters and bulletins; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, newsletters, bulletins, and other educational products from project.


Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Clear Lake
Status
Complete

Town Of Lac Du Flambeau: Lake Steward Program: The Town of Lac du Flambeau is sponsoring a small scale lake planning grant project to promote good lake stewardship within the Town of Lac du Flambeau. The project will focus on developing and hosting a Lake Steward Program.

Project activities include: 1) Develop and host Lake Steward Program; 2) Lake Steward education and involvement \2013 spring meeting, bulletins, newsletter, website, Lakes Fest, and volunteer reception; 3) Develop final report summarizing Lake Steward Program and project activities.

Project deliverables include: 1) Lake Steward Program; 2) Newsletters and bulletins; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, newsletters, bulletins, and other educational products from project.


Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Crawling Stone Lake
Status
Complete

Town Of Lac Du Flambeau: Lake Steward Program: The Town of Lac du Flambeau is sponsoring a small scale lake planning grant project to promote good lake stewardship within the Town of Lac du Flambeau. The project will focus on developing and hosting a Lake Steward Program.

Project activities include: 1) Develop and host Lake Steward Program; 2) Lake Steward education and involvement \2013 spring meeting, bulletins, newsletter, website, Lakes Fest, and volunteer reception; 3) Develop final report summarizing Lake Steward Program and project activities.

Project deliverables include: 1) Lake Steward Program; 2) Newsletters and bulletins; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, newsletters, bulletins, and other educational products from project.


Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
David Lake
Status
Complete

Town Of Lac Du Flambeau: Lake Steward Program: The Town of Lac du Flambeau is sponsoring a small scale lake planning grant project to promote good lake stewardship within the Town of Lac du Flambeau. The project will focus on developing and hosting a Lake Steward Program.

Project activities include: 1) Develop and host Lake Steward Program; 2) Lake Steward education and involvement \2013 spring meeting, bulletins, newsletter, website, Lakes Fest, and volunteer reception; 3) Develop final report summarizing Lake Steward Program and project activities.

Project deliverables include: 1) Lake Steward Program; 2) Newsletters and bulletins; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, newsletters, bulletins, and other educational products from project.


Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Eagle Lake
Status
Complete

Town Of Lac Du Flambeau: Lake Steward Program: The Town of Lac du Flambeau is sponsoring a small scale lake planning grant project to promote good lake stewardship within the Town of Lac du Flambeau. The project will focus on developing and hosting a Lake Steward Program.

Project activities include: 1) Develop and host Lake Steward Program; 2) Lake Steward education and involvement \2013 spring meeting, bulletins, newsletter, website, Lakes Fest, and volunteer reception; 3) Develop final report summarizing Lake Steward Program and project activities.

Project deliverables include: 1) Lake Steward Program; 2) Newsletters and bulletins; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, newsletters, bulletins, and other educational products from project.


Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Elsie Lake
Status
Complete

Town Of Lac Du Flambeau: Lake Steward Program: The Town of Lac du Flambeau is sponsoring a small scale lake planning grant project to promote good lake stewardship within the Town of Lac du Flambeau. The project will focus on developing and hosting a Lake Steward Program.

Project activities include: 1) Develop and host Lake Steward Program; 2) Lake Steward education and involvement \2013 spring meeting, bulletins, newsletter, website, Lakes Fest, and volunteer reception; 3) Develop final report summarizing Lake Steward Program and project activities.

Project deliverables include: 1) Lake Steward Program; 2) Newsletters and bulletins; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, newsletters, bulletins, and other educational products from project.


Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Emily Creek
Status
Complete

Town Of Lac Du Flambeau: Lake Steward Program: The Town of Lac du Flambeau is sponsoring a small scale lake planning grant project to promote good lake stewardship within the Town of Lac du Flambeau. The project will focus on developing and hosting a Lake Steward Program.

Project activities include: 1) Develop and host Lake Steward Program; 2) Lake Steward education and involvement \2013 spring meeting, bulletins, newsletter, website, Lakes Fest, and volunteer reception; 3) Develop final report summarizing Lake Steward Program and project activities.

Project deliverables include: 1) Lake Steward Program; 2) Newsletters and bulletins; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, newsletters, bulletins, and other educational products from project.


Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Emily Lake
Status
Complete

Town Of Lac Du Flambeau: Lake Steward Program: The Town of Lac du Flambeau is sponsoring a small scale lake planning grant project to promote good lake stewardship within the Town of Lac du Flambeau. The project will focus on developing and hosting a Lake Steward Program.

Project activities include: 1) Develop and host Lake Steward Program; 2) Lake Steward education and involvement \2013 spring meeting, bulletins, newsletter, website, Lakes Fest, and volunteer reception; 3) Develop final report summarizing Lake Steward Program and project activities.

Project deliverables include: 1) Lake Steward Program; 2) Newsletters and bulletins; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, newsletters, bulletins, and other educational products from project.


Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Favil Lake
Status
Complete

Town Of Lac Du Flambeau: Lake Steward Program: The Town of Lac du Flambeau is sponsoring a small scale lake planning grant project to promote good lake stewardship within the Town of Lac du Flambeau. The project will focus on developing and hosting a Lake Steward Program.

Project activities include: 1) Develop and host Lake Steward Program; 2) Lake Steward education and involvement \2013 spring meeting, bulletins, newsletter, website, Lakes Fest, and volunteer reception; 3) Develop final report summarizing Lake Steward Program and project activities.

Project deliverables include: 1) Lake Steward Program; 2) Newsletters and bulletins; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, newsletters, bulletins, and other educational products from project.


Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Fence Lake
Status
Complete

Town Of Lac Du Flambeau: Lake Steward Program: The Town of Lac du Flambeau is sponsoring a small scale lake planning grant project to promote good lake stewardship within the Town of Lac du Flambeau. The project will focus on developing and hosting a Lake Steward Program.

Project activities include: 1) Develop and host Lake Steward Program; 2) Lake Steward education and involvement \2013 spring meeting, bulletins, newsletter, website, Lakes Fest, and volunteer reception; 3) Develop final report summarizing Lake Steward Program and project activities.

Project deliverables include: 1) Lake Steward Program; 2) Newsletters and bulletins; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, newsletters, bulletins, and other educational products from project.


Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Flambeau Lake
Status
Complete

Town Of Lac Du Flambeau: Lake Steward Program: The Town of Lac du Flambeau is sponsoring a small scale lake planning grant project to promote good lake stewardship within the Town of Lac du Flambeau. The project will focus on developing and hosting a Lake Steward Program.

Project activities include: 1) Develop and host Lake Steward Program; 2) Lake Steward education and involvement \2013 spring meeting, bulletins, newsletter, website, Lakes Fest, and volunteer reception; 3) Develop final report summarizing Lake Steward Program and project activities.

Project deliverables include: 1) Lake Steward Program; 2) Newsletters and bulletins; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, newsletters, bulletins, and other educational products from project.


Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Gene Lake
Status
Complete

Town Of Lac Du Flambeau: Lake Steward Program: The Town of Lac du Flambeau is sponsoring a small scale lake planning grant project to promote good lake stewardship within the Town of Lac du Flambeau. The project will focus on developing and hosting a Lake Steward Program.

Project activities include: 1) Develop and host Lake Steward Program; 2) Lake Steward education and involvement \2013 spring meeting, bulletins, newsletter, website, Lakes Fest, and volunteer reception; 3) Develop final report summarizing Lake Steward Program and project activities.

Project deliverables include: 1) Lake Steward Program; 2) Newsletters and bulletins; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, newsletters, bulletins, and other educational products from project.


Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Great Corn Lake
Status
Complete

Town Of Lac Du Flambeau: Lake Steward Program: The Town of Lac du Flambeau is sponsoring a small scale lake planning grant project to promote good lake stewardship within the Town of Lac du Flambeau. The project will focus on developing and hosting a Lake Steward Program.

Project activities include: 1) Develop and host Lake Steward Program; 2) Lake Steward education and involvement \2013 spring meeting, bulletins, newsletter, website, Lakes Fest, and volunteer reception; 3) Develop final report summarizing Lake Steward Program and project activities.

Project deliverables include: 1) Lake Steward Program; 2) Newsletters and bulletins; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, newsletters, bulletins, and other educational products from project.


Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Gresham Creek
Status
Complete

Town Of Lac Du Flambeau: Lake Steward Program: The Town of Lac du Flambeau is sponsoring a small scale lake planning grant project to promote good lake stewardship within the Town of Lac du Flambeau. The project will focus on developing and hosting a Lake Steward Program.

Project activities include: 1) Develop and host Lake Steward Program; 2) Lake Steward education and involvement \2013 spring meeting, bulletins, newsletter, website, Lakes Fest, and volunteer reception; 3) Develop final report summarizing Lake Steward Program and project activities.

Project deliverables include: 1) Lake Steward Program; 2) Newsletters and bulletins; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, newsletters, bulletins, and other educational products from project.


Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Grey Lake
Status
Complete

Town Of Lac Du Flambeau: Lake Steward Program: The Town of Lac du Flambeau is sponsoring a small scale lake planning grant project to promote good lake stewardship within the Town of Lac du Flambeau. The project will focus on developing and hosting a Lake Steward Program.

Project activities include: 1) Develop and host Lake Steward Program; 2) Lake Steward education and involvement \2013 spring meeting, bulletins, newsletter, website, Lakes Fest, and volunteer reception; 3) Develop final report summarizing Lake Steward Program and project activities.

Project deliverables include: 1) Lake Steward Program; 2) Newsletters and bulletins; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, newsletters, bulletins, and other educational products from project.


Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Gunlock Lake
Status
Complete

Town Of Lac Du Flambeau: Lake Steward Program: The Town of Lac du Flambeau is sponsoring a small scale lake planning grant project to promote good lake stewardship within the Town of Lac du Flambeau. The project will focus on developing and hosting a Lake Steward Program.

Project activities include: 1) Develop and host Lake Steward Program; 2) Lake Steward education and involvement \2013 spring meeting, bulletins, newsletter, website, Lakes Fest, and volunteer reception; 3) Develop final report summarizing Lake Steward Program and project activities.

Project deliverables include: 1) Lake Steward Program; 2) Newsletters and bulletins; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, newsletters, bulletins, and other educational products from project.


Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Haskell Lake
Status
Complete

Town Of Lac Du Flambeau: Lake Steward Program: The Town of Lac du Flambeau is sponsoring a small scale lake planning grant project to promote good lake stewardship within the Town of Lac du Flambeau. The project will focus on developing and hosting a Lake Steward Program.

Project activities include: 1) Develop and host Lake Steward Program; 2) Lake Steward education and involvement \2013 spring meeting, bulletins, newsletter, website, Lakes Fest, and volunteer reception; 3) Develop final report summarizing Lake Steward Program and project activities.

Project deliverables include: 1) Lake Steward Program; 2) Newsletters and bulletins; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, newsletters, bulletins, and other educational products from project.


Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Headflyer Lake
Status
Complete

Town Of Lac Du Flambeau: Lake Steward Program: The Town of Lac du Flambeau is sponsoring a small scale lake planning grant project to promote good lake stewardship within the Town of Lac du Flambeau. The project will focus on developing and hosting a Lake Steward Program.

Project activities include: 1) Develop and host Lake Steward Program; 2) Lake Steward education and involvement \2013 spring meeting, bulletins, newsletter, website, Lakes Fest, and volunteer reception; 3) Develop final report summarizing Lake Steward Program and project activities.

Project deliverables include: 1) Lake Steward Program; 2) Newsletters and bulletins; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, newsletters, bulletins, and other educational products from project.


Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Ike Walton Lake
Status
Complete

Town Of Lac Du Flambeau: Lake Steward Program: The Town of Lac du Flambeau is sponsoring a small scale lake planning grant project to promote good lake stewardship within the Town of Lac du Flambeau. The project will focus on developing and hosting a Lake Steward Program.

Project activities include: 1) Develop and host Lake Steward Program; 2) Lake Steward education and involvement \2013 spring meeting, bulletins, newsletter, website, Lakes Fest, and volunteer reception; 3) Develop final report summarizing Lake Steward Program and project activities.

Project deliverables include: 1) Lake Steward Program; 2) Newsletters and bulletins; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, newsletters, bulletins, and other educational products from project.


Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Jerms Lake
Status
Complete

Town Of Lac Du Flambeau: Lake Steward Program: The Town of Lac du Flambeau is sponsoring a small scale lake planning grant project to promote good lake stewardship within the Town of Lac du Flambeau. The project will focus on developing and hosting a Lake Steward Program.

Project activities include: 1) Develop and host Lake Steward Program; 2) Lake Steward education and involvement \2013 spring meeting, bulletins, newsletter, website, Lakes Fest, and volunteer reception; 3) Develop final report summarizing Lake Steward Program and project activities.

Project deliverables include: 1) Lake Steward Program; 2) Newsletters and bulletins; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, newsletters, bulletins, and other educational products from project.


Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Little Corn Lake
Status
Complete

Town Of Lac Du Flambeau: Lake Steward Program: The Town of Lac du Flambeau is sponsoring a small scale lake planning grant project to promote good lake stewardship within the Town of Lac du Flambeau. The project will focus on developing and hosting a Lake Steward Program.

Project activities include: 1) Develop and host Lake Steward Program; 2) Lake Steward education and involvement \2013 spring meeting, bulletins, newsletter, website, Lakes Fest, and volunteer reception; 3) Develop final report summarizing Lake Steward Program and project activities.

Project deliverables include: 1) Lake Steward Program; 2) Newsletters and bulletins; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, newsletters, bulletins, and other educational products from project.


Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Little Crawling Stone Lake
Status
Complete

Town Of Lac Du Flambeau: Lake Steward Program: The Town of Lac du Flambeau is sponsoring a small scale lake planning grant project to promote good lake stewardship within the Town of Lac du Flambeau. The project will focus on developing and hosting a Lake Steward Program.

Project activities include: 1) Develop and host Lake Steward Program; 2) Lake Steward education and involvement \2013 spring meeting, bulletins, newsletter, website, Lakes Fest, and volunteer reception; 3) Develop final report summarizing Lake Steward Program and project activities.

Project deliverables include: 1) Lake Steward Program; 2) Newsletters and bulletins; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, newsletters, bulletins, and other educational products from project.


Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Little Creek
Status
Complete

Town Of Lac Du Flambeau: Lake Steward Program: The Town of Lac du Flambeau is sponsoring a small scale lake planning grant project to promote good lake stewardship within the Town of Lac du Flambeau. The project will focus on developing and hosting a Lake Steward Program.

Project activities include: 1) Develop and host Lake Steward Program; 2) Lake Steward education and involvement \2013 spring meeting, bulletins, newsletter, website, Lakes Fest, and volunteer reception; 3) Develop final report summarizing Lake Steward Program and project activities.

Project deliverables include: 1) Lake Steward Program; 2) Newsletters and bulletins; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, newsletters, bulletins, and other educational products from project.


Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Little Pine Creek
Status
Complete

Town Of Lac Du Flambeau: Lake Steward Program: The Town of Lac du Flambeau is sponsoring a small scale lake planning grant project to promote good lake stewardship within the Town of Lac du Flambeau. The project will focus on developing and hosting a Lake Steward Program.

Project activities include: 1) Develop and host Lake Steward Program; 2) Lake Steward education and involvement \2013 spring meeting, bulletins, newsletter, website, Lakes Fest, and volunteer reception; 3) Develop final report summarizing Lake Steward Program and project activities.

Project deliverables include: 1) Lake Steward Program; 2) Newsletters and bulletins; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, newsletters, bulletins, and other educational products from project.


Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Little Sand Lake
Status
Complete

Town Of Lac Du Flambeau: Lake Steward Program: The Town of Lac du Flambeau is sponsoring a small scale lake planning grant project to promote good lake stewardship within the Town of Lac du Flambeau. The project will focus on developing and hosting a Lake Steward Program.

Project activities include: 1) Develop and host Lake Steward Program; 2) Lake Steward education and involvement \2013 spring meeting, bulletins, newsletter, website, Lakes Fest, and volunteer reception; 3) Develop final report summarizing Lake Steward Program and project activities.

Project deliverables include: 1) Lake Steward Program; 2) Newsletters and bulletins; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, newsletters, bulletins, and other educational products from project.


Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Little Sugarbush Lake
Status
Complete

Town Of Lac Du Flambeau: Lake Steward Program: The Town of Lac du Flambeau is sponsoring a small scale lake planning grant project to promote good lake stewardship within the Town of Lac du Flambeau. The project will focus on developing and hosting a Lake Steward Program.

Project activities include: 1) Develop and host Lake Steward Program; 2) Lake Steward education and involvement \2013 spring meeting, bulletins, newsletter, website, Lakes Fest, and volunteer reception; 3) Develop final report summarizing Lake Steward Program and project activities.

Project deliverables include: 1) Lake Steward Program; 2) Newsletters and bulletins; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, newsletters, bulletins, and other educational products from project.


Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Little Ten Lake
Status
Complete

Town Of Lac Du Flambeau: Lake Steward Program: The Town of Lac du Flambeau is sponsoring a small scale lake planning grant project to promote good lake stewardship within the Town of Lac du Flambeau. The project will focus on developing and hosting a Lake Steward Program.

Project activities include: 1) Develop and host Lake Steward Program; 2) Lake Steward education and involvement \2013 spring meeting, bulletins, newsletter, website, Lakes Fest, and volunteer reception; 3) Develop final report summarizing Lake Steward Program and project activities.

Project deliverables include: 1) Lake Steward Program; 2) Newsletters and bulletins; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, newsletters, bulletins, and other educational products from project.


Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Little Trout Lake
Status
Complete

Town Of Lac Du Flambeau: Lake Steward Program: The Town of Lac du Flambeau is sponsoring a small scale lake planning grant project to promote good lake stewardship within the Town of Lac du Flambeau. The project will focus on developing and hosting a Lake Steward Program.

Project activities include: 1) Develop and host Lake Steward Program; 2) Lake Steward education and involvement \2013 spring meeting, bulletins, newsletter, website, Lakes Fest, and volunteer reception; 3) Develop final report summarizing Lake Steward Program and project activities.

Project deliverables include: 1) Lake Steward Program; 2) Newsletters and bulletins; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, newsletters, bulletins, and other educational products from project.


Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Long Interlaken Lake
Status
Complete

Town Of Lac Du Flambeau: Lake Steward Program: The Town of Lac du Flambeau is sponsoring a small scale lake planning grant project to promote good lake stewardship within the Town of Lac du Flambeau. The project will focus on developing and hosting a Lake Steward Program.

Project activities include: 1) Develop and host Lake Steward Program; 2) Lake Steward education and involvement \2013 spring meeting, bulletins, newsletter, website, Lakes Fest, and volunteer reception; 3) Develop final report summarizing Lake Steward Program and project activities.

Project deliverables include: 1) Lake Steward Program; 2) Newsletters and bulletins; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, newsletters, bulletins, and other educational products from project.


Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Lost Lake
Status
Complete

Town Of Lac Du Flambeau: Lake Steward Program: The Town of Lac du Flambeau is sponsoring a small scale lake planning grant project to promote good lake stewardship within the Town of Lac du Flambeau. The project will focus on developing and hosting a Lake Steward Program.

Project activities include: 1) Develop and host Lake Steward Program; 2) Lake Steward education and involvement \2013 spring meeting, bulletins, newsletter, website, Lakes Fest, and volunteer reception; 3) Develop final report summarizing Lake Steward Program and project activities.

Project deliverables include: 1) Lake Steward Program; 2) Newsletters and bulletins; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, newsletters, bulletins, and other educational products from project.


Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Lower Sugarbush Lake
Status
Complete

Town Of Lac Du Flambeau: Lake Steward Program: The Town of Lac du Flambeau is sponsoring a small scale lake planning grant project to promote good lake stewardship within the Town of Lac du Flambeau. The project will focus on developing and hosting a Lake Steward Program.

Project activities include: 1) Develop and host Lake Steward Program; 2) Lake Steward education and involvement \2013 spring meeting, bulletins, newsletter, website, Lakes Fest, and volunteer reception; 3) Develop final report summarizing Lake Steward Program and project activities.

Project deliverables include: 1) Lake Steward Program; 2) Newsletters and bulletins; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, newsletters, bulletins, and other educational products from project.


Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Lucy Lake
Status
Complete

Town Of Lac Du Flambeau: Lake Steward Program: The Town of Lac du Flambeau is sponsoring a small scale lake planning grant project to promote good lake stewardship within the Town of Lac du Flambeau. The project will focus on developing and hosting a Lake Steward Program.

Project activities include: 1) Develop and host Lake Steward Program; 2) Lake Steward education and involvement \2013 spring meeting, bulletins, newsletter, website, Lakes Fest, and volunteer reception; 3) Develop final report summarizing Lake Steward Program and project activities.

Project deliverables include: 1) Lake Steward Program; 2) Newsletters and bulletins; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, newsletters, bulletins, and other educational products from project.


Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Marlands Lake
Status
Complete

Town Of Lac Du Flambeau: Lake Steward Program: The Town of Lac du Flambeau is sponsoring a small scale lake planning grant project to promote good lake stewardship within the Town of Lac du Flambeau. The project will focus on developing and hosting a Lake Steward Program.

Project activities include: 1) Develop and host Lake Steward Program; 2) Lake Steward education and involvement \2013 spring meeting, bulletins, newsletter, website, Lakes Fest, and volunteer reception; 3) Develop final report summarizing Lake Steward Program and project activities.

Project deliverables include: 1) Lake Steward Program; 2) Newsletters and bulletins; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, newsletters, bulletins, and other educational products from project.


Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Middle Ellerson Lake
Status
Complete

Town Of Lac Du Flambeau: Lake Steward Program: The Town of Lac du Flambeau is sponsoring a small scale lake planning grant project to promote good lake stewardship within the Town of Lac du Flambeau. The project will focus on developing and hosting a Lake Steward Program.

Project activities include: 1) Develop and host Lake Steward Program; 2) Lake Steward education and involvement \2013 spring meeting, bulletins, newsletter, website, Lakes Fest, and volunteer reception; 3) Develop final report summarizing Lake Steward Program and project activities.

Project deliverables include: 1) Lake Steward Program; 2) Newsletters and bulletins; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, newsletters, bulletins, and other educational products from project.


Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Middle Sugarbush Lake
Status
Complete

Town Of Lac Du Flambeau: Lake Steward Program: The Town of Lac du Flambeau is sponsoring a small scale lake planning grant project to promote good lake stewardship within the Town of Lac du Flambeau. The project will focus on developing and hosting a Lake Steward Program.

Project activities include: 1) Develop and host Lake Steward Program; 2) Lake Steward education and involvement \2013 spring meeting, bulletins, newsletter, website, Lakes Fest, and volunteer reception; 3) Develop final report summarizing Lake Steward Program and project activities.

Project deliverables include: 1) Lake Steward Program; 2) Newsletters and bulletins; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, newsletters, bulletins, and other educational products from project.


Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Minette Lake
Status
Complete

Town Of Lac Du Flambeau: Lake Steward Program: The Town of Lac du Flambeau is sponsoring a small scale lake planning grant project to promote good lake stewardship within the Town of Lac du Flambeau. The project will focus on developing and hosting a Lake Steward Program.

Project activities include: 1) Develop and host Lake Steward Program; 2) Lake Steward education and involvement \2013 spring meeting, bulletins, newsletter, website, Lakes Fest, and volunteer reception; 3) Develop final report summarizing Lake Steward Program and project activities.

Project deliverables include: 1) Lake Steward Program; 2) Newsletters and bulletins; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, newsletters, bulletins, and other educational products from project.


Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Mishonagon Creek
Status
Complete

Town Of Lac Du Flambeau: Lake Steward Program: The Town of Lac du Flambeau is sponsoring a small scale lake planning grant project to promote good lake stewardship within the Town of Lac du Flambeau. The project will focus on developing and hosting a Lake Steward Program.

Project activities include: 1) Develop and host Lake Steward Program; 2) Lake Steward education and involvement \2013 spring meeting, bulletins, newsletter, website, Lakes Fest, and volunteer reception; 3) Develop final report summarizing Lake Steward Program and project activities.

Project deliverables include: 1) Lake Steward Program; 2) Newsletters and bulletins; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, newsletters, bulletins, and other educational products from project.


Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Mitten Lake
Status
Complete

Town Of Lac Du Flambeau: Lake Steward Program: The Town of Lac du Flambeau is sponsoring a small scale lake planning grant project to promote good lake stewardship within the Town of Lac du Flambeau. The project will focus on developing and hosting a Lake Steward Program.

Project activities include: 1) Develop and host Lake Steward Program; 2) Lake Steward education and involvement \2013 spring meeting, bulletins, newsletter, website, Lakes Fest, and volunteer reception; 3) Develop final report summarizing Lake Steward Program and project activities.

Project deliverables include: 1) Lake Steward Program; 2) Newsletters and bulletins; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, newsletters, bulletins, and other educational products from project.


Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Moss Lake
Status
Complete

Town Of Lac Du Flambeau: Lake Steward Program: The Town of Lac du Flambeau is sponsoring a small scale lake planning grant project to promote good lake stewardship within the Town of Lac du Flambeau. The project will focus on developing and hosting a Lake Steward Program.

Project activities include: 1) Develop and host Lake Steward Program; 2) Lake Steward education and involvement \2013 spring meeting, bulletins, newsletter, website, Lakes Fest, and volunteer reception; 3) Develop final report summarizing Lake Steward Program and project activities.

Project deliverables include: 1) Lake Steward Program; 2) Newsletters and bulletins; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, newsletters, bulletins, and other educational products from project.


Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Moving Cloud Lake
Status
Complete

Town Of Lac Du Flambeau: Lake Steward Program: The Town of Lac du Flambeau is sponsoring a small scale lake planning grant project to promote good lake stewardship within the Town of Lac du Flambeau. The project will focus on developing and hosting a Lake Steward Program.

Project activities include: 1) Develop and host Lake Steward Program; 2) Lake Steward education and involvement \2013 spring meeting, bulletins, newsletter, website, Lakes Fest, and volunteer reception; 3) Develop final report summarizing Lake Steward Program and project activities.

Project deliverables include: 1) Lake Steward Program; 2) Newsletters and bulletins; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, newsletters, bulletins, and other educational products from project.


Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Mud Creek
Status
Complete

Town Of Lac Du Flambeau: Lake Steward Program: The Town of Lac du Flambeau is sponsoring a small scale lake planning grant project to promote good lake stewardship within the Town of Lac du Flambeau. The project will focus on developing and hosting a Lake Steward Program.

Project activities include: 1) Develop and host Lake Steward Program; 2) Lake Steward education and involvement \2013 spring meeting, bulletins, newsletter, website, Lakes Fest, and volunteer reception; 3) Develop final report summarizing Lake Steward Program and project activities.

Project deliverables include: 1) Lake Steward Program; 2) Newsletters and bulletins; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, newsletters, bulletins, and other educational products from project.


Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Muskesin Lake
Status
Complete

Town Of Lac Du Flambeau: Lake Steward Program: The Town of Lac du Flambeau is sponsoring a small scale lake planning grant project to promote good lake stewardship within the Town of Lac du Flambeau. The project will focus on developing and hosting a Lake Steward Program.

Project activities include: 1) Develop and host Lake Steward Program; 2) Lake Steward education and involvement \2013 spring meeting, bulletins, newsletter, website, Lakes Fest, and volunteer reception; 3) Develop final report summarizing Lake Steward Program and project activities.

Project deliverables include: 1) Lake Steward Program; 2) Newsletters and bulletins; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, newsletters, bulletins, and other educational products from project.


Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Patterson Lake
Status
Complete

Town Of Lac Du Flambeau: Lake Steward Program: The Town of Lac du Flambeau is sponsoring a small scale lake planning grant project to promote good lake stewardship within the Town of Lac du Flambeau. The project will focus on developing and hosting a Lake Steward Program.

Project activities include: 1) Develop and host Lake Steward Program; 2) Lake Steward education and involvement \2013 spring meeting, bulletins, newsletter, website, Lakes Fest, and volunteer reception; 3) Develop final report summarizing Lake Steward Program and project activities.

Project deliverables include: 1) Lake Steward Program; 2) Newsletters and bulletins; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, newsletters, bulletins, and other educational products from project.


Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Pine Creek
Status
Complete

Town Of Lac Du Flambeau: Lake Steward Program: The Town of Lac du Flambeau is sponsoring a small scale lake planning grant project to promote good lake stewardship within the Town of Lac du Flambeau. The project will focus on developing and hosting a Lake Steward Program.

Project activities include: 1) Develop and host Lake Steward Program; 2) Lake Steward education and involvement \2013 spring meeting, bulletins, newsletter, website, Lakes Fest, and volunteer reception; 3) Develop final report summarizing Lake Steward Program and project activities.

Project deliverables include: 1) Lake Steward Program; 2) Newsletters and bulletins; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, newsletters, bulletins, and other educational products from project.


Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Placid Twin Lake, North
Status
Complete

Town Of Lac Du Flambeau: Lake Steward Program: The Town of Lac du Flambeau is sponsoring a small scale lake planning grant project to promote good lake stewardship within the Town of Lac du Flambeau. The project will focus on developing and hosting a Lake Steward Program.

Project activities include: 1) Develop and host Lake Steward Program; 2) Lake Steward education and involvement \2013 spring meeting, bulletins, newsletter, website, Lakes Fest, and volunteer reception; 3) Develop final report summarizing Lake Steward Program and project activities.

Project deliverables include: 1) Lake Steward Program; 2) Newsletters and bulletins; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, newsletters, bulletins, and other educational products from project.


Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Placid Twin Lakes
Status
Complete

Town Of Lac Du Flambeau: Lake Steward Program: The Town of Lac du Flambeau is sponsoring a small scale lake planning grant project to promote good lake stewardship within the Town of Lac du Flambeau. The project will focus on developing and hosting a Lake Steward Program.

Project activities include: 1) Develop and host Lake Steward Program; 2) Lake Steward education and involvement \2013 spring meeting, bulletins, newsletter, website, Lakes Fest, and volunteer reception; 3) Develop final report summarizing Lake Steward Program and project activities.

Project deliverables include: 1) Lake Steward Program; 2) Newsletters and bulletins; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, newsletters, bulletins, and other educational products from project.


Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Plummer Lake
Status
Complete

Town Of Lac Du Flambeau: Lake Steward Program: The Town of Lac du Flambeau is sponsoring a small scale lake planning grant project to promote good lake stewardship within the Town of Lac du Flambeau. The project will focus on developing and hosting a Lake Steward Program.

Project activities include: 1) Develop and host Lake Steward Program; 2) Lake Steward education and involvement \2013 spring meeting, bulletins, newsletter, website, Lakes Fest, and volunteer reception; 3) Develop final report summarizing Lake Steward Program and project activities.

Project deliverables include: 1) Lake Steward Program; 2) Newsletters and bulletins; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, newsletters, bulletins, and other educational products from project.


Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Pokegama Lake
Status
Complete

Town Of Lac Du Flambeau: Lake Steward Program: The Town of Lac du Flambeau is sponsoring a small scale lake planning grant project to promote good lake stewardship within the Town of Lac du Flambeau. The project will focus on developing and hosting a Lake Steward Program.

Project activities include: 1) Develop and host Lake Steward Program; 2) Lake Steward education and involvement \2013 spring meeting, bulletins, newsletter, website, Lakes Fest, and volunteer reception; 3) Develop final report summarizing Lake Steward Program and project activities.

Project deliverables include: 1) Lake Steward Program; 2) Newsletters and bulletins; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, newsletters, bulletins, and other educational products from project.


Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Poupart Lake
Status
Complete

Town Of Lac Du Flambeau: Lake Steward Program: The Town of Lac du Flambeau is sponsoring a small scale lake planning grant project to promote good lake stewardship within the Town of Lac du Flambeau. The project will focus on developing and hosting a Lake Steward Program.

Project activities include: 1) Develop and host Lake Steward Program; 2) Lake Steward education and involvement \2013 spring meeting, bulletins, newsletter, website, Lakes Fest, and volunteer reception; 3) Develop final report summarizing Lake Steward Program and project activities.

Project deliverables include: 1) Lake Steward Program; 2) Newsletters and bulletins; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, newsletters, bulletins, and other educational products from project.


Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Raven Lake
Status
Complete

Town Of Lac Du Flambeau: Lake Steward Program: The Town of Lac du Flambeau is sponsoring a small scale lake planning grant project to promote good lake stewardship within the Town of Lac du Flambeau. The project will focus on developing and hosting a Lake Steward Program.

Project activities include: 1) Develop and host Lake Steward Program; 2) Lake Steward education and involvement \2013 spring meeting, bulletins, newsletter, website, Lakes Fest, and volunteer reception; 3) Develop final report summarizing Lake Steward Program and project activities.

Project deliverables include: 1) Lake Steward Program; 2) Newsletters and bulletins; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, newsletters, bulletins, and other educational products from project.


Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Refuge Creek
Status
Complete

Town Of Lac Du Flambeau: Lake Steward Program: The Town of Lac du Flambeau is sponsoring a small scale lake planning grant project to promote good lake stewardship within the Town of Lac du Flambeau. The project will focus on developing and hosting a Lake Steward Program.

Project activities include: 1) Develop and host Lake Steward Program; 2) Lake Steward education and involvement \2013 spring meeting, bulletins, newsletter, website, Lakes Fest, and volunteer reception; 3) Develop final report summarizing Lake Steward Program and project activities.

Project deliverables include: 1) Lake Steward Program; 2) Newsletters and bulletins; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, newsletters, bulletins, and other educational products from project.


Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Rice Creek
Status
Complete

Town Of Lac Du Flambeau: Lake Steward Program: The Town of Lac du Flambeau is sponsoring a small scale lake planning grant project to promote good lake stewardship within the Town of Lac du Flambeau. The project will focus on developing and hosting a Lake Steward Program.

Project activities include: 1) Develop and host Lake Steward Program; 2) Lake Steward education and involvement \2013 spring meeting, bulletins, newsletter, website, Lakes Fest, and volunteer reception; 3) Develop final report summarizing Lake Steward Program and project activities.

Project deliverables include: 1) Lake Steward Program; 2) Newsletters and bulletins; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, newsletters, bulletins, and other educational products from project.


Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Ross Allen Lake
Status
Complete

Town Of Lac Du Flambeau: Lake Steward Program: The Town of Lac du Flambeau is sponsoring a small scale lake planning grant project to promote good lake stewardship within the Town of Lac du Flambeau. The project will focus on developing and hosting a Lake Steward Program.

Project activities include: 1) Develop and host Lake Steward Program; 2) Lake Steward education and involvement \2013 spring meeting, bulletins, newsletter, website, Lakes Fest, and volunteer reception; 3) Develop final report summarizing Lake Steward Program and project activities.

Project deliverables include: 1) Lake Steward Program; 2) Newsletters and bulletins; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, newsletters, bulletins, and other educational products from project.


Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Shishebogama Lake
Status
Complete

Town Of Lac Du Flambeau: Lake Steward Program: The Town of Lac du Flambeau is sponsoring a small scale lake planning grant project to promote good lake stewardship within the Town of Lac du Flambeau. The project will focus on developing and hosting a Lake Steward Program.

Project activities include: 1) Develop and host Lake Steward Program; 2) Lake Steward education and involvement \2013 spring meeting, bulletins, newsletter, website, Lakes Fest, and volunteer reception; 3) Develop final report summarizing Lake Steward Program and project activities.

Project deliverables include: 1) Lake Steward Program; 2) Newsletters and bulletins; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, newsletters, bulletins, and other educational products from project.


Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Signal Lake
Status
Complete

Town Of Lac Du Flambeau: Lake Steward Program: The Town of Lac du Flambeau is sponsoring a small scale lake planning grant project to promote good lake stewardship within the Town of Lac du Flambeau. The project will focus on developing and hosting a Lake Steward Program.

Project activities include: 1) Develop and host Lake Steward Program; 2) Lake Steward education and involvement \2013 spring meeting, bulletins, newsletter, website, Lakes Fest, and volunteer reception; 3) Develop final report summarizing Lake Steward Program and project activities.

Project deliverables include: 1) Lake Steward Program; 2) Newsletters and bulletins; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, newsletters, bulletins, and other educational products from project.


Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Snort Lake
Status
Complete

Town Of Lac Du Flambeau: Lake Steward Program: The Town of Lac du Flambeau is sponsoring a small scale lake planning grant project to promote good lake stewardship within the Town of Lac du Flambeau. The project will focus on developing and hosting a Lake Steward Program.

Project activities include: 1) Develop and host Lake Steward Program; 2) Lake Steward education and involvement \2013 spring meeting, bulletins, newsletter, website, Lakes Fest, and volunteer reception; 3) Develop final report summarizing Lake Steward Program and project activities.

Project deliverables include: 1) Lake Steward Program; 2) Newsletters and bulletins; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, newsletters, bulletins, and other educational products from project.


Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Spring Creek
Status
Complete

Town Of Lac Du Flambeau: Lake Steward Program: The Town of Lac du Flambeau is sponsoring a small scale lake planning grant project to promote good lake stewardship within the Town of Lac du Flambeau. The project will focus on developing and hosting a Lake Steward Program.

Project activities include: 1) Develop and host Lake Steward Program; 2) Lake Steward education and involvement \2013 spring meeting, bulletins, newsletter, website, Lakes Fest, and volunteer reception; 3) Develop final report summarizing Lake Steward Program and project activities.

Project deliverables include: 1) Lake Steward Program; 2) Newsletters and bulletins; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, newsletters, bulletins, and other educational products from project.


Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Squirrel Lake
Status
Complete

Town Of Lac Du Flambeau: Lake Steward Program: The Town of Lac du Flambeau is sponsoring a small scale lake planning grant project to promote good lake stewardship within the Town of Lac du Flambeau. The project will focus on developing and hosting a Lake Steward Program.

Project activities include: 1) Develop and host Lake Steward Program; 2) Lake Steward education and involvement \2013 spring meeting, bulletins, newsletter, website, Lakes Fest, and volunteer reception; 3) Develop final report summarizing Lake Steward Program and project activities.

Project deliverables include: 1) Lake Steward Program; 2) Newsletters and bulletins; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, newsletters, bulletins, and other educational products from project.


Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Statenaker Lake
Status
Complete

Town Of Lac Du Flambeau: Lake Steward Program: The Town of Lac du Flambeau is sponsoring a small scale lake planning grant project to promote good lake stewardship within the Town of Lac du Flambeau. The project will focus on developing and hosting a Lake Steward Program.

Project activities include: 1) Develop and host Lake Steward Program; 2) Lake Steward education and involvement \2013 spring meeting, bulletins, newsletter, website, Lakes Fest, and volunteer reception; 3) Develop final report summarizing Lake Steward Program and project activities.

Project deliverables include: 1) Lake Steward Program; 2) Newsletters and bulletins; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, newsletters, bulletins, and other educational products from project.


Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Stearns Lake
Status
Complete

Town Of Lac Du Flambeau: Lake Steward Program: The Town of Lac du Flambeau is sponsoring a small scale lake planning grant project to promote good lake stewardship within the Town of Lac du Flambeau. The project will focus on developing and hosting a Lake Steward Program.

Project activities include: 1) Develop and host Lake Steward Program; 2) Lake Steward education and involvement \2013 spring meeting, bulletins, newsletter, website, Lakes Fest, and volunteer reception; 3) Develop final report summarizing Lake Steward Program and project activities.

Project deliverables include: 1) Lake Steward Program; 2) Newsletters and bulletins; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, newsletters, bulletins, and other educational products from project.


Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Sugarbush Creek
Status
Complete

Town Of Lac Du Flambeau: Lake Steward Program: The Town of Lac du Flambeau is sponsoring a small scale lake planning grant project to promote good lake stewardship within the Town of Lac du Flambeau. The project will focus on developing and hosting a Lake Steward Program.

Project activities include: 1) Develop and host Lake Steward Program; 2) Lake Steward education and involvement \2013 spring meeting, bulletins, newsletter, website, Lakes Fest, and volunteer reception; 3) Develop final report summarizing Lake Steward Program and project activities.

Project deliverables include: 1) Lake Steward Program; 2) Newsletters and bulletins; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, newsletters, bulletins, and other educational products from project.


Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Sunfish Creek
Status
Complete

Town Of Lac Du Flambeau: Lake Steward Program: The Town of Lac du Flambeau is sponsoring a small scale lake planning grant project to promote good lake stewardship within the Town of Lac du Flambeau. The project will focus on developing and hosting a Lake Steward Program.

Project activities include: 1) Develop and host Lake Steward Program; 2) Lake Steward education and involvement \2013 spring meeting, bulletins, newsletter, website, Lakes Fest, and volunteer reception; 3) Develop final report summarizing Lake Steward Program and project activities.

Project deliverables include: 1) Lake Steward Program; 2) Newsletters and bulletins; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, newsletters, bulletins, and other educational products from project.


Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Sunfish Lake
Status
Complete

Town Of Lac Du Flambeau: Lake Steward Program: The Town of Lac du Flambeau is sponsoring a small scale lake planning grant project to promote good lake stewardship within the Town of Lac du Flambeau. The project will focus on developing and hosting a Lake Steward Program.

Project activities include: 1) Develop and host Lake Steward Program; 2) Lake Steward education and involvement \2013 spring meeting, bulletins, newsletter, website, Lakes Fest, and volunteer reception; 3) Develop final report summarizing Lake Steward Program and project activities.

Project deliverables include: 1) Lake Steward Program; 2) Newsletters and bulletins; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, newsletters, bulletins, and other educational products from project.


Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Tank Lake
Status
Complete

Town Of Lac Du Flambeau: Lake Steward Program: The Town of Lac du Flambeau is sponsoring a small scale lake planning grant project to promote good lake stewardship within the Town of Lac du Flambeau. The project will focus on developing and hosting a Lake Steward Program.

Project activities include: 1) Develop and host Lake Steward Program; 2) Lake Steward education and involvement \2013 spring meeting, bulletins, newsletter, website, Lakes Fest, and volunteer reception; 3) Develop final report summarizing Lake Steward Program and project activities.

Project deliverables include: 1) Lake Steward Program; 2) Newsletters and bulletins; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, newsletters, bulletins, and other educational products from project.


Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Tippecanoe Lake
Status
Complete

Town Of Lac Du Flambeau: Lake Steward Program: The Town of Lac du Flambeau is sponsoring a small scale lake planning grant project to promote good lake stewardship within the Town of Lac du Flambeau. The project will focus on developing and hosting a Lake Steward Program.

Project activities include: 1) Develop and host Lake Steward Program; 2) Lake Steward education and involvement \2013 spring meeting, bulletins, newsletter, website, Lakes Fest, and volunteer reception; 3) Develop final report summarizing Lake Steward Program and project activities.

Project deliverables include: 1) Lake Steward Program; 2) Newsletters and bulletins; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, newsletters, bulletins, and other educational products from project.


Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Tomahawk River
Status
Complete

Town Of Lac Du Flambeau: Lake Steward Program: The Town of Lac du Flambeau is sponsoring a small scale lake planning grant project to promote good lake stewardship within the Town of Lac du Flambeau. The project will focus on developing and hosting a Lake Steward Program.

Project activities include: 1) Develop and host Lake Steward Program; 2) Lake Steward education and involvement \2013 spring meeting, bulletins, newsletter, website, Lakes Fest, and volunteer reception; 3) Develop final report summarizing Lake Steward Program and project activities.

Project deliverables include: 1) Lake Steward Program; 2) Newsletters and bulletins; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, newsletters, bulletins, and other educational products from project.


Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Toulish Lake
Status
Complete

Town Of Lac Du Flambeau: Lake Steward Program: The Town of Lac du Flambeau is sponsoring a small scale lake planning grant project to promote good lake stewardship within the Town of Lac du Flambeau. The project will focus on developing and hosting a Lake Steward Program.

Project activities include: 1) Develop and host Lake Steward Program; 2) Lake Steward education and involvement \2013 spring meeting, bulletins, newsletter, website, Lakes Fest, and volunteer reception; 3) Develop final report summarizing Lake Steward Program and project activities.

Project deliverables include: 1) Lake Steward Program; 2) Newsletters and bulletins; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, newsletters, bulletins, and other educational products from project.


Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Trout River
Status
Complete

Town Of Lac Du Flambeau: Lake Steward Program: The Town of Lac du Flambeau is sponsoring a small scale lake planning grant project to promote good lake stewardship within the Town of Lac du Flambeau. The project will focus on developing and hosting a Lake Steward Program.

Project activities include: 1) Develop and host Lake Steward Program; 2) Lake Steward education and involvement \2013 spring meeting, bulletins, newsletter, website, Lakes Fest, and volunteer reception; 3) Develop final report summarizing Lake Steward Program and project activities.

Project deliverables include: 1) Lake Steward Program; 2) Newsletters and bulletins; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, newsletters, bulletins, and other educational products from project.


Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Tucker Creek
Status
Complete

Town Of Lac Du Flambeau: Lake Steward Program: The Town of Lac du Flambeau is sponsoring a small scale lake planning grant project to promote good lake stewardship within the Town of Lac du Flambeau. The project will focus on developing and hosting a Lake Steward Program.

Project activities include: 1) Develop and host Lake Steward Program; 2) Lake Steward education and involvement \2013 spring meeting, bulletins, newsletter, website, Lakes Fest, and volunteer reception; 3) Develop final report summarizing Lake Steward Program and project activities.

Project deliverables include: 1) Lake Steward Program; 2) Newsletters and bulletins; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, newsletters, bulletins, and other educational products from project.


Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Turner Lake
Status
Complete

Town Of Lac Du Flambeau: Lake Steward Program: The Town of Lac du Flambeau is sponsoring a small scale lake planning grant project to promote good lake stewardship within the Town of Lac du Flambeau. The project will focus on developing and hosting a Lake Steward Program.

Project activities include: 1) Develop and host Lake Steward Program; 2) Lake Steward education and involvement \2013 spring meeting, bulletins, newsletter, website, Lakes Fest, and volunteer reception; 3) Develop final report summarizing Lake Steward Program and project activities.

Project deliverables include: 1) Lake Steward Program; 2) Newsletters and bulletins; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, newsletters, bulletins, and other educational products from project.


Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Un Spring
Status
Complete

Town Of Lac Du Flambeau: Lake Steward Program: The Town of Lac du Flambeau is sponsoring a small scale lake planning grant project to promote good lake stewardship within the Town of Lac du Flambeau. The project will focus on developing and hosting a Lake Steward Program.

Project activities include: 1) Develop and host Lake Steward Program; 2) Lake Steward education and involvement \2013 spring meeting, bulletins, newsletter, website, Lakes Fest, and volunteer reception; 3) Develop final report summarizing Lake Steward Program and project activities.

Project deliverables include: 1) Lake Steward Program; 2) Newsletters and bulletins; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, newsletters, bulletins, and other educational products from project.


Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Unnamed
Status
Complete

Town Of Lac Du Flambeau: Lake Steward Program: The Town of Lac du Flambeau is sponsoring a small scale lake planning grant project to promote good lake stewardship within the Town of Lac du Flambeau. The project will focus on developing and hosting a Lake Steward Program.

Project activities include: 1) Develop and host Lake Steward Program; 2) Lake Steward education and involvement \2013 spring meeting, bulletins, newsletter, website, Lakes Fest, and volunteer reception; 3) Develop final report summarizing Lake Steward Program and project activities.

Project deliverables include: 1) Lake Steward Program; 2) Newsletters and bulletins; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, newsletters, bulletins, and other educational products from project.


Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Upper Sugarbush Lake
Status
Complete

Town Of Lac Du Flambeau: Lake Steward Program: The Town of Lac du Flambeau is sponsoring a small scale lake planning grant project to promote good lake stewardship within the Town of Lac du Flambeau. The project will focus on developing and hosting a Lake Steward Program.

Project activities include: 1) Develop and host Lake Steward Program; 2) Lake Steward education and involvement \2013 spring meeting, bulletins, newsletter, website, Lakes Fest, and volunteer reception; 3) Develop final report summarizing Lake Steward Program and project activities.

Project deliverables include: 1) Lake Steward Program; 2) Newsletters and bulletins; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, newsletters, bulletins, and other educational products from project.


Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Village Creek
Status
Complete

Town Of Lac Du Flambeau: Lake Steward Program: The Town of Lac du Flambeau is sponsoring a small scale lake planning grant project to promote good lake stewardship within the Town of Lac du Flambeau. The project will focus on developing and hosting a Lake Steward Program.

Project activities include: 1) Develop and host Lake Steward Program; 2) Lake Steward education and involvement \2013 spring meeting, bulletins, newsletter, website, Lakes Fest, and volunteer reception; 3) Develop final report summarizing Lake Steward Program and project activities.

Project deliverables include: 1) Lake Steward Program; 2) Newsletters and bulletins; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, newsletters, bulletins, and other educational products from project.


Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Wabasso Lake
Status
Complete

Town Of Lac Du Flambeau: Lake Steward Program: The Town of Lac du Flambeau is sponsoring a small scale lake planning grant project to promote good lake stewardship within the Town of Lac du Flambeau. The project will focus on developing and hosting a Lake Steward Program.

Project activities include: 1) Develop and host Lake Steward Program; 2) Lake Steward education and involvement \2013 spring meeting, bulletins, newsletter, website, Lakes Fest, and volunteer reception; 3) Develop final report summarizing Lake Steward Program and project activities.

Project deliverables include: 1) Lake Steward Program; 2) Newsletters and bulletins; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, newsletters, bulletins, and other educational products from project.


Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Warrior Lake
Status
Complete

Town Of Lac Du Flambeau: Lake Steward Program: The Town of Lac du Flambeau is sponsoring a small scale lake planning grant project to promote good lake stewardship within the Town of Lac du Flambeau. The project will focus on developing and hosting a Lake Steward Program.

Project activities include: 1) Develop and host Lake Steward Program; 2) Lake Steward education and involvement \2013 spring meeting, bulletins, newsletter, website, Lakes Fest, and volunteer reception; 3) Develop final report summarizing Lake Steward Program and project activities.

Project deliverables include: 1) Lake Steward Program; 2) Newsletters and bulletins; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, newsletters, bulletins, and other educational products from project.


Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
West Ellerson Lake
Status
Complete

Town Of Lac Du Flambeau: Lake Steward Program: The Town of Lac du Flambeau is sponsoring a small scale lake planning grant project to promote good lake stewardship within the Town of Lac du Flambeau. The project will focus on developing and hosting a Lake Steward Program.

Project activities include: 1) Develop and host Lake Steward Program; 2) Lake Steward education and involvement \2013 spring meeting, bulletins, newsletter, website, Lakes Fest, and volunteer reception; 3) Develop final report summarizing Lake Steward Program and project activities.

Project deliverables include: 1) Lake Steward Program; 2) Newsletters and bulletins; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, newsletters, bulletins, and other educational products from project.


Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
White Sand Lake
Status
Complete

Town Of Lac Du Flambeau: Lake Steward Program: The Town of Lac du Flambeau is sponsoring a small scale lake planning grant project to promote good lake stewardship within the Town of Lac du Flambeau. The project will focus on developing and hosting a Lake Steward Program.

Project activities include: 1) Develop and host Lake Steward Program; 2) Lake Steward education and involvement \2013 spring meeting, bulletins, newsletter, website, Lakes Fest, and volunteer reception; 3) Develop final report summarizing Lake Steward Program and project activities.

Project deliverables include: 1) Lake Steward Program; 2) Newsletters and bulletins; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, newsletters, bulletins, and other educational products from project.


Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Whitefish Creek
Status
Complete

Town Of Lac Du Flambeau: Lake Steward Program: The Town of Lac du Flambeau is sponsoring a small scale lake planning grant project to promote good lake stewardship within the Town of Lac du Flambeau. The project will focus on developing and hosting a Lake Steward Program.

Project activities include: 1) Develop and host Lake Steward Program; 2) Lake Steward education and involvement \2013 spring meeting, bulletins, newsletter, website, Lakes Fest, and volunteer reception; 3) Develop final report summarizing Lake Steward Program and project activities.

Project deliverables include: 1) Lake Steward Program; 2) Newsletters and bulletins; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, newsletters, bulletins, and other educational products from project.


Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Whitefish Lake
Status
Complete

Town Of Lac Du Flambeau: Lake Steward Program: The Town of Lac du Flambeau is sponsoring a small scale lake planning grant project to promote good lake stewardship within the Town of Lac du Flambeau. The project will focus on developing and hosting a Lake Steward Program.

Project activities include: 1) Develop and host Lake Steward Program; 2) Lake Steward education and involvement \2013 spring meeting, bulletins, newsletter, website, Lakes Fest, and volunteer reception; 3) Develop final report summarizing Lake Steward Program and project activities.

Project deliverables include: 1) Lake Steward Program; 2) Newsletters and bulletins; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, newsletters, bulletins, and other educational products from project.


Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Wild Rice Lake
Status
Complete

Town Of Lac Du Flambeau: Lake Steward Program: The Town of Lac du Flambeau is sponsoring a small scale lake planning grant project to promote good lake stewardship within the Town of Lac du Flambeau. The project will focus on developing and hosting a Lake Steward Program.

Project activities include: 1) Develop and host Lake Steward Program; 2) Lake Steward education and involvement \2013 spring meeting, bulletins, newsletter, website, Lakes Fest, and volunteer reception; 3) Develop final report summarizing Lake Steward Program and project activities.

Project deliverables include: 1) Lake Steward Program; 2) Newsletters and bulletins; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, newsletters, bulletins, and other educational products from project.


Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Wishow Lake
Status
Complete

Town Of Lac Du Flambeau: Lake Steward Program: The Town of Lac du Flambeau is sponsoring a small scale lake planning grant project to promote good lake stewardship within the Town of Lac du Flambeau. The project will focus on developing and hosting a Lake Steward Program.

Project activities include: 1) Develop and host Lake Steward Program; 2) Lake Steward education and involvement \2013 spring meeting, bulletins, newsletter, website, Lakes Fest, and volunteer reception; 3) Develop final report summarizing Lake Steward Program and project activities.

Project deliverables include: 1) Lake Steward Program; 2) Newsletters and bulletins; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, newsletters, bulletins, and other educational products from project.


Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Wyandock Lake
Status
Complete

Town Of Lac Du Flambeau: Lake Steward Program: The Town of Lac du Flambeau is sponsoring a small scale lake planning grant project to promote good lake stewardship within the Town of Lac du Flambeau. The project will focus on developing and hosting a Lake Steward Program.

Project activities include: 1) Develop and host Lake Steward Program; 2) Lake Steward education and involvement \2013 spring meeting, bulletins, newsletter, website, Lakes Fest, and volunteer reception; 3) Develop final report summarizing Lake Steward Program and project activities.

Project deliverables include: 1) Lake Steward Program; 2) Newsletters and bulletins; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, newsletters, bulletins, and other educational products from project.


Grant Details
Small Scale Lake Planning
Date
4/1/2011
Waters Involved
Zee Lake
Status
Complete

Town Of Lac Du Flambeau: Lake Steward Program: The Town of Lac du Flambeau is sponsoring a small scale lake planning grant project to promote good lake stewardship within the Town of Lac du Flambeau. The project will focus on developing and hosting a Lake Steward Program.

Project activities include: 1) Develop and host Lake Steward Program; 2) Lake Steward education and involvement \2013 spring meeting, bulletins, newsletter, website, Lakes Fest, and volunteer reception; 3) Develop final report summarizing Lake Steward Program and project activities.

Project deliverables include: 1) Lake Steward Program; 2) Newsletters and bulletins; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, newsletters, bulletins, and other educational products from project.


Monitoring & Projects

Projects including grants, restoration work and studies shown below have occurred in this watershed. Click the links below to read through the text. While these are not an exhaustive list of activities, they provide insight into the management activities happening in this watershed.

Grants and Management Projects
Manitowish River Watershed
Watershed Recommendations
Data analysis, report production
 
Date
Status
4/1/2014
Proposed
Projects
 
Develop/Distribute Newsletter
 
Date
Status
4/1/2014
Proposed
Projects
 
Hold Workshops
 
Date
Status
5/22/2010
Proposed
Projects
 
Informational Meetings
 
Date
Status
4/1/2014
Proposed
Projects
 
Informational Meetings
 
Date
Status
10/1/2011
In Progress
Projects
 
Issue News/Media Release
 
Date
Status
4/1/2014
Proposed
Projects
 
Lake Management Plan Development
 
Date
Status
4/1/2014
Proposed
Projects
 
Lake Management Plan Development
 
Date
Status
10/1/2011
In Progress
Projects
 
Lakes Planning Grant
 
Date
Status
4/1/2014
Proposed
Projects
 
Monitor Fish Tissue
Confirm FCA: IW pre-2000 data
Date
Status
11/4/2011
Proposed
Projects
 
Monitor Fish Tissue
Confirm FCA: IW pre-2000 data
Date
Status
10/28/2011
Proposed
Projects
 
Monitor Fish Tissue
Confirm FCA: IW pre-2000 data
Date
Status
10/28/2011
Proposed
Projects
 
Monitor Fish Tissue
Confirm FCA: IW pre-2000 data
Date
Status
10/28/2011
Proposed
Projects
 
Shoreland Monitoring, Assessment, Inventory
Grant LPL-1551-14 - Shoreland Assessment
Date
Status
Shoreland Monitoring, Assessment or Inventory
4/1/2014
Proposed
Projects
 
Shoreland Monitoring, Assessment, Inventory
Grant LPL-1442-12 - Shoreland Assessment
Date
Status
Shoreland Monitoring, Assessment or Inventory
10/1/2011
Proposed
Projects
 
Water Quality Modeling
 
Date
Status
4/1/2014
Proposed
Projects
 
Watershed Mapping or Assessment
 
Date
Status
4/1/2014
Proposed
Projects
 
Manitowish River WatershedWatershed History Note

Camp Manito-wish is located along the shores of Boulder Lake in the Manitowish River Watershed. The camp was founded in the spring of 1919 when Walter "Daddy" H. Wones, H.E. Andrews and Judge E. B. Beldon searched for the perfect place to establish a summer camp for the State of Wisconsin YMCA. Wones believed that the wilderness of the north woods of Wisconsin would offer an in depth experience and challenge for campers. It would be a place for many kids from urban areas to experience a quiet night, observe wildlife, and paddle through beautiful lakes, rivers and streams. The men visited the Rabbit's Foot Resort, and determined that this was the place that they had envisioned. On June 1, 1919, the sign for Rabbit's Foot Resort was removed, and the first summer of Camp Manito-wish YMCA was underway. The program was a success and by 1925, a new and large dining hall was added. Nash Lodge was built through a contribution from C.W. Nash and is still considered the gathering place of the Manito-wish community. The first session of Camp opened on July 4, 1919 with 100 boys and 29 staff members. Until 1941, Camp Manito-wish was for boys only. The summer of 1941 brought the first girls sessions to Camp Manito-wish and today Manito-wish still runs separate boys and girls sessions for summer camp. Almost 100 years later, Camp Manito-wish operates twelve months a year and serves thousands of youth and families through its leadership programs and annual family camp session.

Date  2011