Great Lakes Restoration Initiative
Nearshore Health and NPS
GLRI_00E00602-0
2010
Active
Stormwater Planning, Implementation
The Village is proposing to repave an 18 wide strip of pavement (the drive aisle) with a pervious strip that will reduce the volume of runoff leaving the parking lot. The Village would also make improvements to divert a greater portion of the runoff from the parking lot to the existing biofilter.