THREE LAKES WATERFRONT ASSOCIATION: Three Lakes Chain Mgt. Planning Project - Ph. 1 Big Stone Lake

Purpose

Three Lakes Waterfront Association, Inc. is sponsoring phased large scale lake planning grants projects to study Big Stone Lake, in Oneida County. The project will focus on developing a Lake Management Plan (LMP) for Big Stone Lake. Phase 1 project activities include: 1) Stakeholder participation \2013 kick-off meeting, stakeholder survey, planning meetings (up to 2), wrap-up meeting, news release(s), and newsletter article; 2) Water quality sampling; 3) Shoreline assessment; 4) Watershed assessment and P load modeling; 5) Fisheries assessment; 6) Professional Dreissena monitoring; 7) Develop LMP. Project deliverables include: 1) Stakeholder survey, news release(s), and newsletter article; 2) Shoreland and water chemistry data; 3) Watershed maps and modeling data; 4) LMP. Specific conditions for this project: 1) Draft of stakeholder survey needs to be submitted to Lakes Management Coordinator for review and approval before sending to public; 2) Draft of LMP needs Dept review and approval. WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of management plan, news release(s), newsletter article, stakeholder survey, data from watershed and shoreland assessment, and water quality sampling, all maps and GIS data from project.

Related Reports

Run Project Summary Report
View Umbrella-Projects
View Related-Projects

Lakes Grant
Large Scale Lake Planning
LPL-1416-11
2011
Complete
 
Reports and Documents
Appendicies are a separate file
 
Activities & Recommendations
Grant Awarded
Three Lakes Waterfront Association, Inc. is sponsoring phased large scale lake planning grants projects to study Big Stone Lake, in Oneida County. The project will focus on developing a Lake Management Plan (LMP) for Big Stone Lake. Phase 1 project activities include: 1) Stakeholder participation \2013 kick-off meeting, stakeholder survey, planning meetings (up to 2), wrap-up meeting, news release(s), and newsletter article; 2) Water quality sampling; 3) Shoreline assessment; 4) Watershed assessment and P load modeling; 5) Fisheries assessment; 6) Professional Dreissena monitoring; 7) Develop LMP. Project deliverables include: 1) Stakeholder survey, news release(s), and newsletter article; 2) Shoreland and water chemistry data; 3) Watershed maps and modeling data; 4) LMP. Specific conditions for this project: 1) Draft of stakeholder survey needs to be submitted to Lakes Management Coordinator for review and approval before sending to public; 2) Draft of LMP needs Dept review and approval.
Grant Awarded
Three Lakes Waterfront Association, Inc. is sponsoring phased large scale lake planning grants projects to study Big Stone Lake, in Oneida County. The project will focus on developing a Lake Management Plan (LMP) for Big Stone Lake. Phase 1 project activities include: 1) Stakeholder participation \2013 kick-off meeting, stakeholder survey, planning meetings (up to 2), wrap-up meeting, news release(s), and newsletter article; 2) Water quality sampling; 3) Shoreline assessment; 4) Watershed assessment and P load modeling; 5) Fisheries assessment; 6) Professional Dreissena monitoring; 7) Develop LMP. Project deliverables include: 1) Stakeholder survey, news release(s), and newsletter article; 2) Shoreland and water chemistry data; 3) Watershed maps and modeling data; 4) LMP. Specific conditions for this project: 1) Draft of stakeholder survey needs to be submitted to Lakes Management Coordinator for review and approval before sending to public; 2) Draft of LMP needs Dept review and approval.
Grant Awarded
Three Lakes Waterfront Association, Inc. is sponsoring phased large scale lake planning grants projects to study Big Stone Lake, in Oneida County. The project will focus on developing a Lake Management Plan (LMP) for Big Stone Lake. Phase 1 project activities include: 1) Stakeholder participation \2013 kick-off meeting, stakeholder survey, planning meetings (up to 2), wrap-up meeting, news release(s), and newsletter article; 2) Water quality sampling; 3) Shoreline assessment; 4) Watershed assessment and P load modeling; 5) Fisheries assessment; 6) Professional Dreissena monitoring; 7) Develop LMP. Project deliverables include: 1) Stakeholder survey, news release(s), and newsletter article; 2) Shoreland and water chemistry data; 3) Watershed maps and modeling data; 4) LMP. Specific conditions for this project: 1) Draft of stakeholder survey needs to be submitted to Lakes Management Coordinator for review and approval before sending to public; 2) Draft of LMP needs Dept review and approval.
Grant Awarded
Three Lakes Waterfront Association, Inc. is sponsoring phased large scale lake planning grants projects to study Big Stone Lake, in Oneida County. The project will focus on developing a Lake Management Plan (LMP) for Big Stone Lake. Phase 1 project activities include: 1) Stakeholder participation \2013 kick-off meeting, stakeholder survey, planning meetings (up to 2), wrap-up meeting, news release(s), and newsletter article; 2) Water quality sampling; 3) Shoreline assessment; 4) Watershed assessment and P load modeling; 5) Fisheries assessment; 6) Professional Dreissena monitoring; 7) Develop LMP. Project deliverables include: 1) Stakeholder survey, news release(s), and newsletter article; 2) Shoreland and water chemistry data; 3) Watershed maps and modeling data; 4) LMP. Specific conditions for this project: 1) Draft of stakeholder survey needs to be submitted to Lakes Management Coordinator for review and approval before sending to public; 2) Draft of LMP needs Dept review and approval.
Grant Awarded
Three Lakes Waterfront Association, Inc. is sponsoring phased large scale lake planning grants projects to study Big Stone Lake, in Oneida County. The project will focus on developing a Lake Management Plan (LMP) for Big Stone Lake. Phase 1 project activities include: 1) Stakeholder participation \2013 kick-off meeting, stakeholder survey, planning meetings (up to 2), wrap-up meeting, news release(s), and newsletter article; 2) Water quality sampling; 3) Shoreline assessment; 4) Watershed assessment and P load modeling; 5) Fisheries assessment; 6) Professional Dreissena monitoring; 7) Develop LMP. Project deliverables include: 1) Stakeholder survey, news release(s), and newsletter article; 2) Shoreland and water chemistry data; 3) Watershed maps and modeling data; 4) LMP. Specific conditions for this project: 1) Draft of stakeholder survey needs to be submitted to Lakes Management Coordinator for review and approval before sending to public; 2) Draft of LMP needs Dept review and approval.
Grant Awarded
Three Lakes Waterfront Association, Inc. is sponsoring phased large scale lake planning grants projects to study Big Stone Lake, in Oneida County. The project will focus on developing a Lake Management Plan (LMP) for Big Stone Lake. Phase 1 project activities include: 1) Stakeholder participation \2013 kick-off meeting, stakeholder survey, planning meetings (up to 2), wrap-up meeting, news release(s), and newsletter article; 2) Water quality sampling; 3) Shoreline assessment; 4) Watershed assessment and P load modeling; 5) Fisheries assessment; 6) Professional Dreissena monitoring; 7) Develop LMP. Project deliverables include: 1) Stakeholder survey, news release(s), and newsletter article; 2) Shoreland and water chemistry data; 3) Watershed maps and modeling data; 4) LMP. Specific conditions for this project: 1) Draft of stakeholder survey needs to be submitted to Lakes Management Coordinator for review and approval before sending to public; 2) Draft of LMP needs Dept review and approval.
Grant Awarded
Three Lakes Waterfront Association, Inc. is sponsoring phased large scale lake planning grants projects to study Big Stone Lake, in Oneida County. The project will focus on developing a Lake Management Plan (LMP) for Big Stone Lake. Phase 1 project activities include: 1) Stakeholder participation \2013 kick-off meeting, stakeholder survey, planning meetings (up to 2), wrap-up meeting, news release(s), and newsletter article; 2) Water quality sampling; 3) Shoreline assessment; 4) Watershed assessment and P load modeling; 5) Fisheries assessment; 6) Professional Dreissena monitoring; 7) Develop LMP. Project deliverables include: 1) Stakeholder survey, news release(s), and newsletter article; 2) Shoreland and water chemistry data; 3) Watershed maps and modeling data; 4) LMP. Specific conditions for this project: 1) Draft of stakeholder survey needs to be submitted to Lakes Management Coordinator for review and approval before sending to public; 2) Draft of LMP needs Dept review and approval.
Grant Awarded
Three Lakes Waterfront Association, Inc. is sponsoring phased large scale lake planning grants projects to study Big Stone Lake, in Oneida County. The project will focus on developing a Lake Management Plan (LMP) for Big Stone Lake. Phase 1 project activities include: 1) Stakeholder participation \2013 kick-off meeting, stakeholder survey, planning meetings (up to 2), wrap-up meeting, news release(s), and newsletter article; 2) Water quality sampling; 3) Shoreline assessment; 4) Watershed assessment and P load modeling; 5) Fisheries assessment; 6) Professional Dreissena monitoring; 7) Develop LMP. Project deliverables include: 1) Stakeholder survey, news release(s), and newsletter article; 2) Shoreland and water chemistry data; 3) Watershed maps and modeling data; 4) LMP. Specific conditions for this project: 1) Draft of stakeholder survey needs to be submitted to Lakes Management Coordinator for review and approval before sending to public; 2) Draft of LMP needs Dept review and approval.
Grant Awarded
Three Lakes Waterfront Association, Inc. is sponsoring phased large scale lake planning grants projects to study Big Stone Lake, in Oneida County. The project will focus on developing a Lake Management Plan (LMP) for Big Stone Lake. Phase 1 project activities include: 1) Stakeholder participation \2013 kick-off meeting, stakeholder survey, planning meetings (up to 2), wrap-up meeting, news release(s), and newsletter article; 2) Water quality sampling; 3) Shoreline assessment; 4) Watershed assessment and P load modeling; 5) Fisheries assessment; 6) Professional Dreissena monitoring; 7) Develop LMP. Project deliverables include: 1) Stakeholder survey, news release(s), and newsletter article; 2) Shoreland and water chemistry data; 3) Watershed maps and modeling data; 4) LMP. Specific conditions for this project: 1) Draft of stakeholder survey needs to be submitted to Lakes Management Coordinator for review and approval before sending to public; 2) Draft of LMP needs Dept review and approval.
Grant Awarded
Three Lakes Waterfront Association, Inc. is sponsoring phased large scale lake planning grants projects to study Big Stone Lake, in Oneida County. The project will focus on developing a Lake Management Plan (LMP) for Big Stone Lake. Phase 1 project activities include: 1) Stakeholder participation \2013 kick-off meeting, stakeholder survey, planning meetings (up to 2), wrap-up meeting, news release(s), and newsletter article; 2) Water quality sampling; 3) Shoreline assessment; 4) Watershed assessment and P load modeling; 5) Fisheries assessment; 6) Professional Dreissena monitoring; 7) Develop LMP. Project deliverables include: 1) Stakeholder survey, news release(s), and newsletter article; 2) Shoreland and water chemistry data; 3) Watershed maps and modeling data; 4) LMP. Specific conditions for this project: 1) Draft of stakeholder survey needs to be submitted to Lakes Management Coordinator for review and approval before sending to public; 2) Draft of LMP needs Dept review and approval.
Grant Awarded
Three Lakes Waterfront Association, Inc. is sponsoring phased large scale lake planning grants projects to study Big Stone Lake, in Oneida County. The project will focus on developing a Lake Management Plan (LMP) for Big Stone Lake. Phase 1 project activities include: 1) Stakeholder participation \2013 kick-off meeting, stakeholder survey, planning meetings (up to 2), wrap-up meeting, news release(s), and newsletter article; 2) Water quality sampling; 3) Shoreline assessment; 4) Watershed assessment and P load modeling; 5) Fisheries assessment; 6) Professional Dreissena monitoring; 7) Develop LMP. Project deliverables include: 1) Stakeholder survey, news release(s), and newsletter article; 2) Shoreland and water chemistry data; 3) Watershed maps and modeling data; 4) LMP. Specific conditions for this project: 1) Draft of stakeholder survey needs to be submitted to Lakes Management Coordinator for review and approval before sending to public; 2) Draft of LMP needs Dept review and approval.
Grant Awarded
Three Lakes Waterfront Association, Inc. is sponsoring phased large scale lake planning grants projects to study Big Stone Lake, in Oneida County. The project will focus on developing a Lake Management Plan (LMP) for Big Stone Lake. Phase 1 project activities include: 1) Stakeholder participation \2013 kick-off meeting, stakeholder survey, planning meetings (up to 2), wrap-up meeting, news release(s), and newsletter article; 2) Water quality sampling; 3) Shoreline assessment; 4) Watershed assessment and P load modeling; 5) Fisheries assessment; 6) Professional Dreissena monitoring; 7) Develop LMP. Project deliverables include: 1) Stakeholder survey, news release(s), and newsletter article; 2) Shoreland and water chemistry data; 3) Watershed maps and modeling data; 4) LMP. Specific conditions for this project: 1) Draft of stakeholder survey needs to be submitted to Lakes Management Coordinator for review and approval before sending to public; 2) Draft of LMP needs Dept review and approval.
Grant Awarded
Three Lakes Waterfront Association, Inc. is sponsoring phased large scale lake planning grants projects to study Big Stone Lake, in Oneida County. The project will focus on developing a Lake Management Plan (LMP) for Big Stone Lake. Phase 1 project activities include: 1) Stakeholder participation \2013 kick-off meeting, stakeholder survey, planning meetings (up to 2), wrap-up meeting, news release(s), and newsletter article; 2) Water quality sampling; 3) Shoreline assessment; 4) Watershed assessment and P load modeling; 5) Fisheries assessment; 6) Professional Dreissena monitoring; 7) Develop LMP. Project deliverables include: 1) Stakeholder survey, news release(s), and newsletter article; 2) Shoreland and water chemistry data; 3) Watershed maps and modeling data; 4) LMP. Specific conditions for this project: 1) Draft of stakeholder survey needs to be submitted to Lakes Management Coordinator for review and approval before sending to public; 2) Draft of LMP needs Dept review and approval.
Grant Awarded
Three Lakes Waterfront Association, Inc. is sponsoring phased large scale lake planning grants projects to study Big Stone Lake, in Oneida County. The project will focus on developing a Lake Management Plan (LMP) for Big Stone Lake. Phase 1 project activities include: 1) Stakeholder participation \2013 kick-off meeting, stakeholder survey, planning meetings (up to 2), wrap-up meeting, news release(s), and newsletter article; 2) Water quality sampling; 3) Shoreline assessment; 4) Watershed assessment and P load modeling; 5) Fisheries assessment; 6) Professional Dreissena monitoring; 7) Develop LMP. Project deliverables include: 1) Stakeholder survey, news release(s), and newsletter article; 2) Shoreland and water chemistry data; 3) Watershed maps and modeling data; 4) LMP. Specific conditions for this project: 1) Draft of stakeholder survey needs to be submitted to Lakes Management Coordinator for review and approval before sending to public; 2) Draft of LMP needs Dept review and approval.
Grant Awarded
Three Lakes Waterfront Association, Inc. is sponsoring phased large scale lake planning grants projects to study Big Stone Lake, in Oneida County. The project will focus on developing a Lake Management Plan (LMP) for Big Stone Lake. Phase 1 project activities include: 1) Stakeholder participation \2013 kick-off meeting, stakeholder survey, planning meetings (up to 2), wrap-up meeting, news release(s), and newsletter article; 2) Water quality sampling; 3) Shoreline assessment; 4) Watershed assessment and P load modeling; 5) Fisheries assessment; 6) Professional Dreissena monitoring; 7) Develop LMP. Project deliverables include: 1) Stakeholder survey, news release(s), and newsletter article; 2) Shoreland and water chemistry data; 3) Watershed maps and modeling data; 4) LMP. Specific conditions for this project: 1) Draft of stakeholder survey needs to be submitted to Lakes Management Coordinator for review and approval before sending to public; 2) Draft of LMP needs Dept review and approval.
Grant Awarded
Three Lakes Waterfront Association, Inc. is sponsoring phased large scale lake planning grants projects to study Big Stone Lake, in Oneida County. The project will focus on developing a Lake Management Plan (LMP) for Big Stone Lake. Phase 1 project activities include: 1) Stakeholder participation \2013 kick-off meeting, stakeholder survey, planning meetings (up to 2), wrap-up meeting, news release(s), and newsletter article; 2) Water quality sampling; 3) Shoreline assessment; 4) Watershed assessment and P load modeling; 5) Fisheries assessment; 6) Professional Dreissena monitoring; 7) Develop LMP. Project deliverables include: 1) Stakeholder survey, news release(s), and newsletter article; 2) Shoreland and water chemistry data; 3) Watershed maps and modeling data; 4) LMP. Specific conditions for this project: 1) Draft of stakeholder survey needs to be submitted to Lakes Management Coordinator for review and approval before sending to public; 2) Draft of LMP needs Dept review and approval.
Grant Awarded
Three Lakes Waterfront Association, Inc. is sponsoring phased large scale lake planning grants projects to study Big Stone Lake, in Oneida County. The project will focus on developing a Lake Management Plan (LMP) for Big Stone Lake. Phase 1 project activities include: 1) Stakeholder participation \2013 kick-off meeting, stakeholder survey, planning meetings (up to 2), wrap-up meeting, news release(s), and newsletter article; 2) Water quality sampling; 3) Shoreline assessment; 4) Watershed assessment and P load modeling; 5) Fisheries assessment; 6) Professional Dreissena monitoring; 7) Develop LMP. Project deliverables include: 1) Stakeholder survey, news release(s), and newsletter article; 2) Shoreland and water chemistry data; 3) Watershed maps and modeling data; 4) LMP. Specific conditions for this project: 1) Draft of stakeholder survey needs to be submitted to Lakes Management Coordinator for review and approval before sending to public; 2) Draft of LMP needs Dept review and approval.
Grant Awarded
Three Lakes Waterfront Association, Inc. is sponsoring phased large scale lake planning grants projects to study Big Stone Lake, in Oneida County. The project will focus on developing a Lake Management Plan (LMP) for Big Stone Lake. Phase 1 project activities include: 1) Stakeholder participation \2013 kick-off meeting, stakeholder survey, planning meetings (up to 2), wrap-up meeting, news release(s), and newsletter article; 2) Water quality sampling; 3) Shoreline assessment; 4) Watershed assessment and P load modeling; 5) Fisheries assessment; 6) Professional Dreissena monitoring; 7) Develop LMP. Project deliverables include: 1) Stakeholder survey, news release(s), and newsletter article; 2) Shoreland and water chemistry data; 3) Watershed maps and modeling data; 4) LMP. Specific conditions for this project: 1) Draft of stakeholder survey needs to be submitted to Lakes Management Coordinator for review and approval before sending to public; 2) Draft of LMP needs Dept review and approval.
Grant Awarded
Three Lakes Waterfront Association, Inc. is sponsoring phased large scale lake planning grants projects to study Big Stone Lake, in Oneida County. The project will focus on developing a Lake Management Plan (LMP) for Big Stone Lake. Phase 1 project activities include: 1) Stakeholder participation \2013 kick-off meeting, stakeholder survey, planning meetings (up to 2), wrap-up meeting, news release(s), and newsletter article; 2) Water quality sampling; 3) Shoreline assessment; 4) Watershed assessment and P load modeling; 5) Fisheries assessment; 6) Professional Dreissena monitoring; 7) Develop LMP. Project deliverables include: 1) Stakeholder survey, news release(s), and newsletter article; 2) Shoreland and water chemistry data; 3) Watershed maps and modeling data; 4) LMP. Specific conditions for this project: 1) Draft of stakeholder survey needs to be submitted to Lakes Management Coordinator for review and approval before sending to public; 2) Draft of LMP needs Dept review and approval.
Grant Awarded
Three Lakes Waterfront Association, Inc. is sponsoring phased large scale lake planning grants projects to study Big Stone Lake, in Oneida County. The project will focus on developing a Lake Management Plan (LMP) for Big Stone Lake. Phase 1 project activities include: 1) Stakeholder participation \2013 kick-off meeting, stakeholder survey, planning meetings (up to 2), wrap-up meeting, news release(s), and newsletter article; 2) Water quality sampling; 3) Shoreline assessment; 4) Watershed assessment and P load modeling; 5) Fisheries assessment; 6) Professional Dreissena monitoring; 7) Develop LMP. Project deliverables include: 1) Stakeholder survey, news release(s), and newsletter article; 2) Shoreland and water chemistry data; 3) Watershed maps and modeling data; 4) LMP. Specific conditions for this project: 1) Draft of stakeholder survey needs to be submitted to Lakes Management Coordinator for review and approval before sending to public; 2) Draft of LMP needs Dept review and approval.
Grant Awarded
Three Lakes Waterfront Association, Inc. is sponsoring phased large scale lake planning grants projects to study Big Stone Lake, in Oneida County. The project will focus on developing a Lake Management Plan (LMP) for Big Stone Lake. Phase 1 project activities include: 1) Stakeholder participation \2013 kick-off meeting, stakeholder survey, planning meetings (up to 2), wrap-up meeting, news release(s), and newsletter article; 2) Water quality sampling; 3) Shoreline assessment; 4) Watershed assessment and P load modeling; 5) Fisheries assessment; 6) Professional Dreissena monitoring; 7) Develop LMP. Project deliverables include: 1) Stakeholder survey, news release(s), and newsletter article; 2) Shoreland and water chemistry data; 3) Watershed maps and modeling data; 4) LMP. Specific conditions for this project: 1) Draft of stakeholder survey needs to be submitted to Lakes Management Coordinator for review and approval before sending to public; 2) Draft of LMP needs Dept review and approval.
Issue News/Media Release
Lake Management Plan Development
Shoreland Monitoring, Assessment, Inventory
Shoreland Monitoring, Assessment or Inventory
 
Watershed
 
Waters