THREE LAKES WATERFRONT ASSOCIATION: Three Lakes Chain Mgt. Planning Project - Ph. 3 Virgin Lake

Purpose

Three Lakes Waterfront Association, Inc. is sponsoring a large scale lake planning grant to study Virgin Lake in Oneida County. The project will begin the process of EWM monitoring and removal, and developing a Lake Management Plan (LMP) for Virgin Lake. Phase 3 project activities include: 1) EWM survey and monitoring; 2) Hire CBCW coordinator; 3) Volunteer watercraft inspections; 4) Data entry of inspection forms into SWIMS; 5) Develop final report summarizing activities and giving future EWM monitoring and control guidance. Project deliverables include: 1) EWM monitoring data; 2) CBCW coordinator; 3) Entered inspection data into SWIMS; 4) Final report. Specific conditions for this project: Draft of final report needs Dept review and approval. WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, all maps and GIS data from project.

Related Reports

Run Project Summary Report
View Umbrella-Projects
View Related-Projects

Lakes Grant
Large Scale Lake Planning
LPL-1426-11
2011
Complete
 
Reports and Documents
Appendicies are a separate file
 
Activities & Recommendations
Grant Awarded
Three Lakes Waterfront Association, Inc. is sponsoring a large scale lake planning grant to study Virgin Lake in Oneida County. The project will begin the process of EWM monitoring and removal, and developing a Lake Management Plan (LMP) for Virgin Lake. Phase 3 project activities include: 1) EWM survey and monitoring; 2) Hire CBCW coordinator; 3) Volunteer watercraft inspections; 4) Data entry of inspection forms into SWIMS; 5) Develop final report summarizing activities and giving future EWM monitoring and control guidance. Project deliverables include: 1) EWM monitoring data; 2) CBCW coordinator; 3) Entered inspection data into SWIMS; 4) Final report. Specific conditions for this project: Draft of final report needs Dept review and approval. WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, all maps and GIS data from project.
Grant Awarded
Three Lakes Waterfront Association, Inc. is sponsoring a large scale lake planning grant to study Virgin Lake in Oneida County. The project will begin the process of EWM monitoring and removal, and developing a Lake Management Plan (LMP) for Virgin Lake. Phase 3 project activities include: 1) EWM survey and monitoring; 2) Hire CBCW coordinator; 3) Volunteer watercraft inspections; 4) Data entry of inspection forms into SWIMS; 5) Develop final report summarizing activities and giving future EWM monitoring and control guidance. Project deliverables include: 1) EWM monitoring data; 2) CBCW coordinator; 3) Entered inspection data into SWIMS; 4) Final report. Specific conditions for this project: Draft of final report needs Dept review and approval. WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, all maps and GIS data from project.
Grant Awarded
Three Lakes Waterfront Association, Inc. is sponsoring a large scale lake planning grant to study Virgin Lake in Oneida County. The project will begin the process of EWM monitoring and removal, and developing a Lake Management Plan (LMP) for Virgin Lake. Phase 3 project activities include: 1) EWM survey and monitoring; 2) Hire CBCW coordinator; 3) Volunteer watercraft inspections; 4) Data entry of inspection forms into SWIMS; 5) Develop final report summarizing activities and giving future EWM monitoring and control guidance. Project deliverables include: 1) EWM monitoring data; 2) CBCW coordinator; 3) Entered inspection data into SWIMS; 4) Final report. Specific conditions for this project: Draft of final report needs Dept review and approval. WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, all maps and GIS data from project.
Grant Awarded
Three Lakes Waterfront Association, Inc. is sponsoring a large scale lake planning grant to study Virgin Lake in Oneida County. The project will begin the process of EWM monitoring and removal, and developing a Lake Management Plan (LMP) for Virgin Lake. Phase 3 project activities include: 1) EWM survey and monitoring; 2) Hire CBCW coordinator; 3) Volunteer watercraft inspections; 4) Data entry of inspection forms into SWIMS; 5) Develop final report summarizing activities and giving future EWM monitoring and control guidance. Project deliverables include: 1) EWM monitoring data; 2) CBCW coordinator; 3) Entered inspection data into SWIMS; 4) Final report. Specific conditions for this project: Draft of final report needs Dept review and approval. WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, all maps and GIS data from project.
Grant Awarded
Three Lakes Waterfront Association, Inc. is sponsoring a large scale lake planning grant to study Virgin Lake in Oneida County. The project will begin the process of EWM monitoring and removal, and developing a Lake Management Plan (LMP) for Virgin Lake. Phase 3 project activities include: 1) EWM survey and monitoring; 2) Hire CBCW coordinator; 3) Volunteer watercraft inspections; 4) Data entry of inspection forms into SWIMS; 5) Develop final report summarizing activities and giving future EWM monitoring and control guidance. Project deliverables include: 1) EWM monitoring data; 2) CBCW coordinator; 3) Entered inspection data into SWIMS; 4) Final report. Specific conditions for this project: Draft of final report needs Dept review and approval. WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, all maps and GIS data from project.
Grant Awarded
Three Lakes Waterfront Association, Inc. is sponsoring a large scale lake planning grant to study Virgin Lake in Oneida County. The project will begin the process of EWM monitoring and removal, and developing a Lake Management Plan (LMP) for Virgin Lake. Phase 3 project activities include: 1) EWM survey and monitoring; 2) Hire CBCW coordinator; 3) Volunteer watercraft inspections; 4) Data entry of inspection forms into SWIMS; 5) Develop final report summarizing activities and giving future EWM monitoring and control guidance. Project deliverables include: 1) EWM monitoring data; 2) CBCW coordinator; 3) Entered inspection data into SWIMS; 4) Final report. Specific conditions for this project: Draft of final report needs Dept review and approval. WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, all maps and GIS data from project.
Grant Awarded
Three Lakes Waterfront Association, Inc. is sponsoring a large scale lake planning grant to study Virgin Lake in Oneida County. The project will begin the process of EWM monitoring and removal, and developing a Lake Management Plan (LMP) for Virgin Lake. Phase 3 project activities include: 1) EWM survey and monitoring; 2) Hire CBCW coordinator; 3) Volunteer watercraft inspections; 4) Data entry of inspection forms into SWIMS; 5) Develop final report summarizing activities and giving future EWM monitoring and control guidance. Project deliverables include: 1) EWM monitoring data; 2) CBCW coordinator; 3) Entered inspection data into SWIMS; 4) Final report. Specific conditions for this project: Draft of final report needs Dept review and approval. WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, all maps and GIS data from project.
Grant Awarded
Three Lakes Waterfront Association, Inc. is sponsoring a large scale lake planning grant to study Virgin Lake in Oneida County. The project will begin the process of EWM monitoring and removal, and developing a Lake Management Plan (LMP) for Virgin Lake. Phase 3 project activities include: 1) EWM survey and monitoring; 2) Hire CBCW coordinator; 3) Volunteer watercraft inspections; 4) Data entry of inspection forms into SWIMS; 5) Develop final report summarizing activities and giving future EWM monitoring and control guidance. Project deliverables include: 1) EWM monitoring data; 2) CBCW coordinator; 3) Entered inspection data into SWIMS; 4) Final report. Specific conditions for this project: Draft of final report needs Dept review and approval. WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, all maps and GIS data from project.
Grant Awarded
Three Lakes Waterfront Association, Inc. is sponsoring a large scale lake planning grant to study Virgin Lake in Oneida County. The project will begin the process of EWM monitoring and removal, and developing a Lake Management Plan (LMP) for Virgin Lake. Phase 3 project activities include: 1) EWM survey and monitoring; 2) Hire CBCW coordinator; 3) Volunteer watercraft inspections; 4) Data entry of inspection forms into SWIMS; 5) Develop final report summarizing activities and giving future EWM monitoring and control guidance. Project deliverables include: 1) EWM monitoring data; 2) CBCW coordinator; 3) Entered inspection data into SWIMS; 4) Final report. Specific conditions for this project: Draft of final report needs Dept review and approval. WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, all maps and GIS data from project.
Grant Awarded
Three Lakes Waterfront Association, Inc. is sponsoring a large scale lake planning grant to study Virgin Lake in Oneida County. The project will begin the process of EWM monitoring and removal, and developing a Lake Management Plan (LMP) for Virgin Lake. Phase 3 project activities include: 1) EWM survey and monitoring; 2) Hire CBCW coordinator; 3) Volunteer watercraft inspections; 4) Data entry of inspection forms into SWIMS; 5) Develop final report summarizing activities and giving future EWM monitoring and control guidance. Project deliverables include: 1) EWM monitoring data; 2) CBCW coordinator; 3) Entered inspection data into SWIMS; 4) Final report. Specific conditions for this project: Draft of final report needs Dept review and approval. WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, all maps and GIS data from project.
Grant Awarded
Three Lakes Waterfront Association, Inc. is sponsoring a large scale lake planning grant to study Virgin Lake in Oneida County. The project will begin the process of EWM monitoring and removal, and developing a Lake Management Plan (LMP) for Virgin Lake. Phase 3 project activities include: 1) EWM survey and monitoring; 2) Hire CBCW coordinator; 3) Volunteer watercraft inspections; 4) Data entry of inspection forms into SWIMS; 5) Develop final report summarizing activities and giving future EWM monitoring and control guidance. Project deliverables include: 1) EWM monitoring data; 2) CBCW coordinator; 3) Entered inspection data into SWIMS; 4) Final report. Specific conditions for this project: Draft of final report needs Dept review and approval. WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, all maps and GIS data from project.
Grant Awarded
Three Lakes Waterfront Association, Inc. is sponsoring a large scale lake planning grant to study Virgin Lake in Oneida County. The project will begin the process of EWM monitoring and removal, and developing a Lake Management Plan (LMP) for Virgin Lake. Phase 3 project activities include: 1) EWM survey and monitoring; 2) Hire CBCW coordinator; 3) Volunteer watercraft inspections; 4) Data entry of inspection forms into SWIMS; 5) Develop final report summarizing activities and giving future EWM monitoring and control guidance. Project deliverables include: 1) EWM monitoring data; 2) CBCW coordinator; 3) Entered inspection data into SWIMS; 4) Final report. Specific conditions for this project: Draft of final report needs Dept review and approval. WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, all maps and GIS data from project.
Grant Awarded
Three Lakes Waterfront Association, Inc. is sponsoring a large scale lake planning grant to study Virgin Lake in Oneida County. The project will begin the process of EWM monitoring and removal, and developing a Lake Management Plan (LMP) for Virgin Lake. Phase 3 project activities include: 1) EWM survey and monitoring; 2) Hire CBCW coordinator; 3) Volunteer watercraft inspections; 4) Data entry of inspection forms into SWIMS; 5) Develop final report summarizing activities and giving future EWM monitoring and control guidance. Project deliverables include: 1) EWM monitoring data; 2) CBCW coordinator; 3) Entered inspection data into SWIMS; 4) Final report. Specific conditions for this project: Draft of final report needs Dept review and approval. WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, all maps and GIS data from project.
Grant Awarded
Three Lakes Waterfront Association, Inc. is sponsoring a large scale lake planning grant to study Virgin Lake in Oneida County. The project will begin the process of EWM monitoring and removal, and developing a Lake Management Plan (LMP) for Virgin Lake. Phase 3 project activities include: 1) EWM survey and monitoring; 2) Hire CBCW coordinator; 3) Volunteer watercraft inspections; 4) Data entry of inspection forms into SWIMS; 5) Develop final report summarizing activities and giving future EWM monitoring and control guidance. Project deliverables include: 1) EWM monitoring data; 2) CBCW coordinator; 3) Entered inspection data into SWIMS; 4) Final report. Specific conditions for this project: Draft of final report needs Dept review and approval. WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, all maps and GIS data from project.
Grant Awarded
Three Lakes Waterfront Association, Inc. is sponsoring a large scale lake planning grant to study Virgin Lake in Oneida County. The project will begin the process of EWM monitoring and removal, and developing a Lake Management Plan (LMP) for Virgin Lake. Phase 3 project activities include: 1) EWM survey and monitoring; 2) Hire CBCW coordinator; 3) Volunteer watercraft inspections; 4) Data entry of inspection forms into SWIMS; 5) Develop final report summarizing activities and giving future EWM monitoring and control guidance. Project deliverables include: 1) EWM monitoring data; 2) CBCW coordinator; 3) Entered inspection data into SWIMS; 4) Final report. Specific conditions for this project: Draft of final report needs Dept review and approval. WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, all maps and GIS data from project.
Grant Awarded
Three Lakes Waterfront Association, Inc. is sponsoring a large scale lake planning grant to study Virgin Lake in Oneida County. The project will begin the process of EWM monitoring and removal, and developing a Lake Management Plan (LMP) for Virgin Lake. Phase 3 project activities include: 1) EWM survey and monitoring; 2) Hire CBCW coordinator; 3) Volunteer watercraft inspections; 4) Data entry of inspection forms into SWIMS; 5) Develop final report summarizing activities and giving future EWM monitoring and control guidance. Project deliverables include: 1) EWM monitoring data; 2) CBCW coordinator; 3) Entered inspection data into SWIMS; 4) Final report. Specific conditions for this project: Draft of final report needs Dept review and approval. WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, all maps and GIS data from project.
Grant Awarded
Three Lakes Waterfront Association, Inc. is sponsoring a large scale lake planning grant to study Virgin Lake in Oneida County. The project will begin the process of EWM monitoring and removal, and developing a Lake Management Plan (LMP) for Virgin Lake. Phase 3 project activities include: 1) EWM survey and monitoring; 2) Hire CBCW coordinator; 3) Volunteer watercraft inspections; 4) Data entry of inspection forms into SWIMS; 5) Develop final report summarizing activities and giving future EWM monitoring and control guidance. Project deliverables include: 1) EWM monitoring data; 2) CBCW coordinator; 3) Entered inspection data into SWIMS; 4) Final report. Specific conditions for this project: Draft of final report needs Dept review and approval. WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, all maps and GIS data from project.
Grant Awarded
Three Lakes Waterfront Association, Inc. is sponsoring a large scale lake planning grant to study Virgin Lake in Oneida County. The project will begin the process of EWM monitoring and removal, and developing a Lake Management Plan (LMP) for Virgin Lake. Phase 3 project activities include: 1) EWM survey and monitoring; 2) Hire CBCW coordinator; 3) Volunteer watercraft inspections; 4) Data entry of inspection forms into SWIMS; 5) Develop final report summarizing activities and giving future EWM monitoring and control guidance. Project deliverables include: 1) EWM monitoring data; 2) CBCW coordinator; 3) Entered inspection data into SWIMS; 4) Final report. Specific conditions for this project: Draft of final report needs Dept review and approval. WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, all maps and GIS data from project.
Grant Awarded
Three Lakes Waterfront Association, Inc. is sponsoring a large scale lake planning grant to study Virgin Lake in Oneida County. The project will begin the process of EWM monitoring and removal, and developing a Lake Management Plan (LMP) for Virgin Lake. Phase 3 project activities include: 1) EWM survey and monitoring; 2) Hire CBCW coordinator; 3) Volunteer watercraft inspections; 4) Data entry of inspection forms into SWIMS; 5) Develop final report summarizing activities and giving future EWM monitoring and control guidance. Project deliverables include: 1) EWM monitoring data; 2) CBCW coordinator; 3) Entered inspection data into SWIMS; 4) Final report. Specific conditions for this project: Draft of final report needs Dept review and approval. WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, all maps and GIS data from project.
Grant Awarded
Three Lakes Waterfront Association, Inc. is sponsoring a large scale lake planning grant to study Virgin Lake in Oneida County. The project will begin the process of EWM monitoring and removal, and developing a Lake Management Plan (LMP) for Virgin Lake. Phase 3 project activities include: 1) EWM survey and monitoring; 2) Hire CBCW coordinator; 3) Volunteer watercraft inspections; 4) Data entry of inspection forms into SWIMS; 5) Develop final report summarizing activities and giving future EWM monitoring and control guidance. Project deliverables include: 1) EWM monitoring data; 2) CBCW coordinator; 3) Entered inspection data into SWIMS; 4) Final report. Specific conditions for this project: Draft of final report needs Dept review and approval. WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, all maps and GIS data from project.
Grant Awarded
Three Lakes Waterfront Association, Inc. is sponsoring a large scale lake planning grant to study Virgin Lake in Oneida County. The project will begin the process of EWM monitoring and removal, and developing a Lake Management Plan (LMP) for Virgin Lake. Phase 3 project activities include: 1) EWM survey and monitoring; 2) Hire CBCW coordinator; 3) Volunteer watercraft inspections; 4) Data entry of inspection forms into SWIMS; 5) Develop final report summarizing activities and giving future EWM monitoring and control guidance. Project deliverables include: 1) EWM monitoring data; 2) CBCW coordinator; 3) Entered inspection data into SWIMS; 4) Final report. Specific conditions for this project: Draft of final report needs Dept review and approval. WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, all maps and GIS data from project.
Lake Management Plan Development
 
Watershed
 
Waters