03-55-000408
DOUGS TIRE (FORMER)
|
Activity Type / Status | Jurisdiction |
---|---|
LUST / CLOSED | DNR RR |
Location Name | County | DNR Region |
---|---|---|
FLAMBEAU AUTO EXPO (FORMER) | RUSK | NORTHERN |
Address | Municipality |
---|---|
811 LAKE AVE | LADYSMITH |
PLSS Description | Latitude (WGS84) | Longitude (WGS84) | Google Maps | RR Sites Map |
---|---|---|---|---|
SW 1/4 of the SW 1/4 of Sec 34, T35N, R06W | 45.4653835 | -91.1108092 |
![]() |
![]() |
Additional Activity Details | Acres |
---|---|
WI DOT PROJECT # 1580-31-00 | .5 |
Facility ID | PECFA No. | EPA ID | Start Date | End Date |
---|---|---|---|---|
855039790 | 54848-1215-11 | 1991-05-13 | 2023-01-26 |
Above Ground Petrol Tank |
Drycleaner |
PECFA Funds Eligible |
PFAS |
ROW Impact |
Sediments |
Superfund NPL Site |
Underground Petrol Tank |
WI DOT Site |
---|---|---|---|---|---|---|---|---|
![]() |
![]() |
![]() |
Name | File |
---|---|
SITE FILE DOCUMENTATION FOR ACTIVITY 2009 THROUGH 2020 | ![]() |
SITE FILE DOCUMENTATION FOR ACTIVITY 1991 THROUGH 2008 | ![]() |
Date | Code | Name | File | Comment | |
---|---|---|---|---|---|
2023-01-26 | 11 | Activity Closed | |||
2023-01-26 | 56 | Continuing Obligation(s) Applied |
![]() |
||
2023-01-26 | 232 | Continuing Obligation - Residual Soil Contamination | |||
2023-01-26 | 236 | Continuing Obligation - Residual GW Contamination | |||
2023-01-26 | 66 | Continuing Obligations (COs) Apply at Off-site Property(ies) | |||
2023-01-26 | 46 | Impacted Right-of-Way (ROW) Notification | |||
2023-01-26 | 224 | Continuing Obligation - Structural Impediment to Cleanup | |||
2023-01-19 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 7/1/2022 - 12/31/2022 | |
2022-11-23 | 99 | Miscellaneous |
![]() |
USPS TRACKING INFO FROM WEBSITE | |
2022-11-22 | 190 | Remaining Actions Needed Requirements Met or Docs Received |
![]() |
MW ABANDONMENT FORMS REC'D | |
2022-11-22 | 99 | Miscellaneous |
![]() |
USPS RETURN RECEIPT - PEDERSON AVE (RE-NOTIFICATION) | |
2022-11-08 | 99 | Miscellaneous |
![]() |
APO NOTIFICATION RESENT FOR 818 PEDERSON AVE | |
2022-11-08 | 99 | Miscellaneous |
![]() |
USPS RECEIPT FOR NOTIFICATION MAILING - PEDERSON AVE | |
2022-11-08 | 99 | Miscellaneous |
![]() |
USPS RECEIPT FOR PEDERSON AVE RE-NOTIFICATION | |
2022-11-05 | 99 | Miscellaneous |
![]() |
APO MAIL RETURNED- UNABLE TO FORWARD - 818 PEDERSON AVE | |
2022-11-03 | 99 | Miscellaneous |
![]() |
APO SIGNED RETURNED USPS RECEIPT REC'D - 209 W 9TH ST N | |
2022-10-28 | 99 | Miscellaneous |
![]() |
DNR NOTIFICATION LETTER SENT TO NEW OWNERS OF 209 WEST 9TH STREET | |
2022-10-28 | 99 | Miscellaneous |
![]() |
DNR NOTIFICATION LETTER SENT TO NEW OWNERS OF 818 PEDERSON AVE | |
2022-10-26 | 99 | Miscellaneous |
![]() |
FILE MEMO ENTRY | |
2022-10-21 | 99 | Miscellaneous |
![]() |
SVE PIPING ABANDONMENT PICTURES | |
2022-10-21 | 99 | Miscellaneous |
![]() |
MW ABANDONMENT FORMS - AUTO STOP SITE 03-55-282548 & DOUGS TIRE 03-55-000408 | |
2022-07-18 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 1/1/2022 - 6/30/2022 | |
2022-07-15 | 84 | Remaining Actions Needed |
![]() |
ABANDON MW, DISPOSE WASTE, DOCUMENTATION | |
2022-05-06 | 99 | Miscellaneous |
![]() |
PAUSE BY PRG FOR INTERNAL DISCUSSION WITH THE COMPLEX PROJECTS AND TECHNICAL RESOURCES SECTION | |
2022-04-18 | 179 | Case Closure Review Request Received (non-fee) |
![]() |
CLOSURE RESUBMITAL ADDENDUM REC'D | |
2022-02-03 | 99 | Miscellaneous |
![]() |
PHONE CALL W/RP - RE: CLOSURE REVISIONS. RP WILL CONTACT CONSULTANT. DNR FOLLOW UP IN 30 DAYS | |
2021-07-15 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 1/1/2021 - 6/30/2021 | |
2021-05-13 | 99 | Miscellaneous |
![]() |
LETTER SENT TO ROW CTY OF LADYSMITH - RE: CLOSURE NOT RECOMMENDED | |
2021-05-12 | 80 | Closure Not Recommended |
![]() |
ADDT'L REQUIREMENTS FOR CASE CLOSURE, NEED TO CONDUCT ADDT'L GW MONITORING | |
2021-04-15 | 118 | PFAS Sampling Not Required At This Time |
![]() |
PFAS SAMPLING NOT REQUIRED AT THIS TIME | |
2021-04-06 | 130 | DNR Regulatory Reminder Sent |
![]() |
VAPOR INTRUSION AND TCE REMINDER LETTER | |
2021-03-24 | 199 | Info. Received or Request Ended (Fee-Based or Closure) | ADDT'L INFO REC'D | ||
2021-03-24 | 114 | PFAS Scoping Statement Received |
![]() |
PFAS SCOPING STATEMENT IN CLOSURE FROM 03/24/2021 | |
2021-01-15 | 99 | Miscellaneous |
![]() |
STATUS UPDATE REQUEST LETTER FOR CLOSURE REVISION SENT | |
2021-01-13 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 7/1/2020 - 12/31/2020 | |
2020-09-08 | 29 | Phase II Environmental Site Assessment (ESA) Rpt Received |
![]() |
PHASE 2.5 WI DOT PROJECT # 1580-31-00 | |
2020-08-17 | 130 | DNR Regulatory Reminder Sent |
![]() |
EMERGING CONTAMINANTS REMINDER LETTER | |
2020-07-23 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 1/1/2020 - 6/30/2020 | |
2020-07-10 | 99 | Miscellaneous |
![]() |
PAVINGS INFORMATION, MW ABAND PICS AND QUESTIONS ON ABANDONING OTHER WELLS | |
2020-07-10 | 99 | Miscellaneous |
![]() |
DNR RESPONSE TO QUESTIONS ON MW ABANDONMENT | |
2020-07-03 | 198 | Request for Additional Information (Fee-Based or Closure) | REQ INFO | ||
2020-07-02 | 779 | Case Closure Review Fee Received | PECFA LIEN | ||
2020-07-02 | 700 | Database Fee – GW above NR 140 ES or CO per WI Stat 292.12 | PECFA LIEN | ||
2020-07-02 | 710 | Database Fee - Soil above NR 720 RCLs | PECFA LIEN | ||
2020-07-02 | 79 | Case Closure Review Request Received |
![]() |
AUTO-ENTERED | |
2020-07-01 | 167 | Lien Draft Sent |
![]() |
LIEN DRAFT SENT - 60 DAY NOTICE 8/30/2020 | |
2020-06-29 | 165 | Voluntary Lien Acceptance Document Received |
![]() |
LIEN ACCEPTANCE REC'D | |
2020-06-23 | 182 | Case Closure Review Request Received - Fee Required |
![]() |
CLOSURE SUBMITTAL REC'D - FEE REQ. WAITING FOR 1ST LIEN LETTER FROM RP | |
2020-06-18 | 164 | Voluntary Lien Acceptance Document Sent |
![]() |
VOLUNTARY LIEN OFFER LTR SENT | |
2020-06-16 | 504 | PECFA Cost Request Received |
![]() |
PECFA COST REQ REC'D - CLOSURE PKG PREP W/ ENG REVIEW, MW AND VI PIN ABAND | |
2020-06-16 | 505 | PECFA Cost Request Approved |
![]() |
PECFA COSTS APPR $9,247.69 -CLOSURE PKG PREP W/ENG REVIEW & VI PIN ABAND. COSTS>CAP REM | |
2020-06-12 | 43 | Site Activity Status Update Received |
![]() |
STATUS REPORT REC'D | |
2020-06-08 | 504 | PECFA Cost Request Received |
![]() |
PECFA COST REQUEST TO ABAND EXTRACTION WELLS 2,3,6,8 & 9 | |
2020-06-08 | 505 | PECFA Cost Request Approved |
![]() |
PECFA COSTS APPR $3,419.11 - ABND EXTRACT WELL 2,3,6,8 & 9, EXT 2 ABAND WITH COMMODITY + CONSULTANT | |
2020-03-23 | 505 | PECFA Cost Request Approved |
![]() |
PECFA COSTS APPR $8,621.44 - INSTALL VAPOR AND LIF PROBES | |
2020-03-22 | 504 | PECFA Cost Request Received |
![]() |
PECFA COST REQ - TO INSTALL VAPOR & LIF PROBES | |
2020-02-27 | 43 | Site Activity Status Update Received |
![]() |
STATUS RPT REC'D | |
2020-01-23 | 130 | DNR Regulatory Reminder Sent |
![]() |
PECFA REMINDER LETTER | |
2020-01-02 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 7/1/2019 - 12/31/2019 | |
2019-10-09 | 505 | PECFA Cost Request Approved |
![]() |
PECFA COSTS APPR $1,743.75 - REVISION PUMPING ON SATURDAY. PREV APPR 8/13/19 | |
2019-10-01 | 504 | PECFA Cost Request Received |
![]() |
PECFA COSTS REQ - REVISION FOR PUMPING SATURDAY. PREV APPR 8/13/19 | |
2019-08-13 | 505 | PECFA Cost Request Approved |
![]() |
PECFA COSTS APPR $13,976.26 - MW/PZ INSTALL, EXTRACTION WELLS, ABAND MW'S, PUMPING EXTRACTION WELLS | |
2019-08-11 | 504 | PECFA Cost Request Received |
![]() |
PECFA COSTS REQ MW/PZ INSTALL, EXTRACTION WELLS, ABAND MW'S, PUMPING OF EXTRACTION WELLS | |
2019-08-05 | 99 | Miscellaneous |
![]() |
LTR TO RP RE: MW ABANDON 03-55-000592 | |
2019-08-05 | 99 | Miscellaneous |
![]() |
CONSULTANT RESPONSE TO ABANDONING 03-55-000592 MW'S | |
2019-07-25 | 130 | DNR Regulatory Reminder Sent |
![]() |
PECFA REMINDER LETTER | |
2019-07-19 | 43 | Site Activity Status Update Received |
![]() |
STATUS RPT REC'D - RESULTS OF GW SAMPLING, SUB-SLAB AIR SAMPLING, SVE OPERATION | |
2019-07-09 | 505 | PECFA Cost Request Approved |
![]() |
PECFA COSTS APPRV $828.29 - REPLACE SVE DRIVE/ELECTRICIAN TO REMOVE & REINSTALL | |
2019-07-08 | 504 | PECFA Cost Request Received |
![]() |
PECFA COSTS REQ TO REPLACE SVE DRIVE/ELECTRICIAN TO REMOVE & REINSTALL | |
2019-07-02 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 1/1/2019 - 6/30/2019 | |
2019-06-25 | 504 | PECFA Cost Request Received |
![]() |
PECFA COSTS REQ FOR CONTINGENCY VISIT - SVE SYSTEM | |
2019-06-25 | 505 | PECFA Cost Request Approved |
![]() |
PECFA COSTS APPR - CONTINGENCY VISIT SVE SYSTEM | |
2019-04-29 | 504 | PECFA Cost Request Received |
![]() |
PECFA COSTS REQ 4 RNDS GW, VI INVESTIGATION, O&M SVE 8 MONTHS | |
2019-04-29 | 505 | PECFA Cost Request Approved |
![]() |
PECFA COSTS APPR $16,351.81 - 4 RNDS GW, VI INVESTIGATION, O&M SVE 8 MONTHS | |
2019-02-07 | 92 | Operation & Maintenance (O & M) Report Received (non-Fee) |
![]() |
O&M RPT REC'D -2018 | |
2019-01-23 | 130 | DNR Regulatory Reminder Sent |
![]() |
PECFA REMINDER LETTER | |
2019-01-12 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 7/1/2018 - 12/31/2018 | |
2018-07-16 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 1/1/2018 - 6/30/2018 | |
2018-07-16 | 130 | DNR Regulatory Reminder Sent |
![]() |
PECFA REMINDER LETTER | |
2018-06-19 | 505 | PECFA Cost Request Approved |
![]() |
APPR COSTS $571.27 - 1 RND GW SAMPLING MW 100, THEN ABANDON IF OK DUE TO DAIRY QUEEN EXPANSION | |
2018-06-18 | 504 | PECFA Cost Request Received |
![]() |
REQ 1 RND GW SAMPLING MW-100, THEN ABANDON IF OK DUE TO DAIRY QUEEN EXPANSION | |
2018-05-18 | 505 | PECFA Cost Request Approved |
![]() |
COSTS APPR $8,983.52 SVE O&M 7 MONTHS W/ AUTO STOP 03-55-282548 | |
2018-05-17 | 505 | PECFA Cost Request Approved | COSTS APPR $658.91 GW MONITORING 1,2,4,5,103 & PZ-100 1 RND | ||
2018-05-14 | 504 | PECFA Cost Request Received |
![]() |
REQ FOR O&M - SVE FOR 7 MONTHS, GW MONITORING SELECT MW'S | |
2018-05-14 | 504 | PECFA Cost Request Received |
![]() |
REQ FOR O&M - SVE FOR 7 MONTHS | |
2018-03-28 | 43 | Site Activity Status Update Received |
![]() |
SOIL VAPOR EXTRACTION SEMI ANNUAL PROGRESS RPT REC'D | |
2018-02-23 | 505 | PECFA Cost Request Approved |
![]() |
APPR COSTS ($368.17) | |
2018-02-21 | 504 | PECFA Cost Request Received |
![]() |
COSTS TO THAW SVE PIPING | |
2018-01-16 | 130 | DNR Regulatory Reminder Sent |
![]() |
PECFA REMINDER LETTER | |
2018-01-12 | 505 | PECFA Cost Request Approved |
![]() |
$10,838.28, SVE 3/8 COSTS APPR | |
2018-01-11 | 504 | PECFA Cost Request Received |
![]() |
REQUEST COSTS FOR SVE OCT 17 TO MAY 18 | |
2018-01-04 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 7/1/2017 - 12/31/2017 | |
2017-11-20 | 92 | Operation & Maintenance (O & M) Report Received (non-Fee) |
![]() |
O&M RPT REC'D | |
2017-08-22 | 99 | Miscellaneous |
![]() |
REC'D REQUEST FOR CONTINGENCY ONSITE ALARM - OK'D | |
2017-07-18 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 1/1/2017 - 6/30/2017 | |
2017-01-12 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 7/1/2016 - 12/31/2016 | |
2016-10-25 | 505 | PECFA Cost Request Approved |
![]() |
APPROVED U&C + VAR ($13,010.17) FOR O&M OF SVE + PUMPING WASTE + RW'S | |
2016-10-14 | 504 | PECFA Cost Request Received | REC'D U&C FOR O&M OF SVE + PUMPING OF WASTE WATER + RW'S | ||
2016-09-12 | 151 | Remedial Action Documentation Report Received (non-fee) |
![]() |
VI EXTRACTION SYSTEM PROGRESS RPT | |
2016-07-10 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 1/1/2016 - 6/30/2016 | |
2016-02-11 | 505 | PECFA Cost Request Approved | APPROVED VAR COSTS ($287.33) FOR T&M HOOK UP OF OXIDISER TO NATURAL GAS LINE | ||
2016-02-01 | 504 | PECFA Cost Request Received | SUBMITTED VAR REQUEST FOR T&M TO HOOK UP OXIDISER TO NATURAL GAS LINE | ||
2016-01-06 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 7/1/2015 - 12/31/2015 | |
2015-11-20 | 505 | PECFA Cost Request Approved | APPROVED MOD TO CAP ($4,641) + VARIANCE ($965.25) FOR NATURAL GAS HOOK UP | ||
2015-11-17 | 504 | PECFA Cost Request Received | REC'D MODIFICATION REQUEST FOR COST CAP + VAR FOR NATURAL GAS HOOK UP | ||
2015-10-15 | 99 | Miscellaneous |
![]() |
DNR LNAPL PRESENTATION | |
2015-09-16 | 504 | PECFA Cost Request Received | REC'D COST REQUEST FOR ADDT'L OVERNIGHT PER DIEM - SVE INSTALLATION | ||
2015-09-16 | 505 | PECFA Cost Request Approved | APPROVED U&C COSTS ($420.64) PER DIEM OVERNIGHTS FOR SVE SYSTEM INSTALLATION | ||
2015-08-24 | 130 | DNR Regulatory Reminder Sent |
![]() |
PECFA SUNSET LETTER | |
2015-08-04 | 99 | Miscellaneous | ELECTRIC 8/6/15. SVE SYSTEM INSTALL SCHEDULE SEPT. ONLINE BY EARLY OCT | ||
2015-07-06 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 1/1/2015 - 6/30/2015 | |
2015-06-29 | 99 | Miscellaneous | SVE PIPING INSTALLED, TRAILER TO BE CONNECTED IN AUGUST | ||
2015-02-27 | 147 | Remedial Action Design Report Received (non-fee) |
![]() |
NON FEE REVISED REMEDIAL ACTION PLAN REC'D | |
2015-02-27 | 149 | Remedial Action Design Report Approved | APPROVED RAP $84,222.23 FOR VAR + U&C FOR RAP 1 YEAR | ||
2015-01-06 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 7/1/2014 - 12/31/2014 | |
2014-12-26 | 99 | Miscellaneous | SENT EMAIL TO CONSULTANT RE: STATUS OF RAP | ||
2014-07-31 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 1/1/2014 - 6/30/2014 | |
2014-07-09 | 39 | Remedial Action Options Report (RAOR) Received (non-fee) | |||
2014-06-02 | 99 | Miscellaneous | PILOT TEST AND SYSTEM DESIGN COMPLETED / COST ESTIMATE BY JULY | ||
2014-05-30 | 99 | Miscellaneous | EMAILED CONSULTANT FOR UPDATES | ||
2014-02-21 | 99 | Miscellaneous | PILOT TEST SCHEDULED FOR SPRING 2014 | ||
2014-01-15 | 99 | Miscellaneous | REC'D REMEDIAL DESIGN CHANGE ORDER | ||
2013-10-15 | 99 | Miscellaneous |
![]() |
DNR LNAPL ASSESSMENT PRESENTATION | |
2013-10-15 | 99 | Miscellaneous |
![]() |
LNAPL PRESENTATION - DNR | |
2013-09-15 | 43 | Site Activity Status Update Received |
![]() |
EXCAVATION FIELD RPT REC'D | |
2013-07-26 | 99 | Miscellaneous | EXCAVATION DELAYED UNTIL 9/9 | ||
2013-06-14 | 99 | Miscellaneous |
![]() |
LNAPL WORKSHEETS - DSPS | |
2013-06-03 | 35 | Site Investigation Workplan (SIWP) Received (non-fee) | EXCAVATION WORK PLAN SENT | ||
2013-06-03 | 30 | Site Investigation Workplan (SIWP) Notice to Proceed (NTP) | OK'D WP | ||
2013-05-18 | 99 | Miscellaneous | CONSULTANT TO REBID EXCAVATION PLAN. WORK PLAN TO FOLLOW | ||
2013-03-11 | 99 | Miscellaneous |
![]() |
LNAPL BAIL DOWNS, FIELD RESULTS, MODEL RESULTS, MW-3, API LNAPL TRANSMISSIVITY, RECOVERIES, GW LEVEL | |
2013-03-04 | 99 | Miscellaneous | MEETING W/ PARTIES INVOLVED ON 3/28 | ||
2013-02-13 | 43 | Site Activity Status Update Received |
![]() |
STATUS RPT - LNAPL ASSESSMENT ADDENDUM | |
2012-12-07 | 99 | Miscellaneous | REC'D COST APPROVAL FROM DSPS | ||
2012-12-07 | 99 | Miscellaneous | REVIEWED LNAPL RPT | ||
2012-11-19 | 43 | Site Activity Status Update Received |
![]() |
REC'D LNAPL ASSESSMENT RPT | |
2012-10-19 | 99 | Miscellaneous | LIF WORK COMPLETED. RPT TO COME | ||
2012-08-31 | 99 | Miscellaneous | CONSULTANT CHANGE | ||
2012-08-23 | 99 | Miscellaneous | LIF SURVEY TO BE DONE WK OF 9/10 | ||
2012-06-06 | 99 | Miscellaneous | REVIEWED UPDATE RPT | ||
2012-06-01 | 43 | Site Activity Status Update Received | |||
2011-11-17 | 99 | Miscellaneous | REVIEWED REVISED PROPOSAL | ||
2011-11-14 | 99 | Miscellaneous | REC'D REVISED PROPOSAL/COST ESTIMATE | ||
2011-10-20 | 99 | Miscellaneous | COST SUBMITTALS APPROVED BY DSPS | ||
2011-09-07 | 130 | DNR Regulatory Reminder Sent |
![]() |
Vapor Intrusion (VI) Assessment Notification Ltr Sent | |
2011-05-24 | 99 | Miscellaneous | REC'D STATUS UPDATE FROM CONSULTANT | ||
2011-05-23 | 99 | Miscellaneous | PM EMAILED CONSULTANT FOR AN UPDATE | ||
2011-03-11 | 99 | Miscellaneous | REQUEST FROM CONSULTANT TO CONDUCT LNAPL ASSESSMENT WITH LIF SURVEY | ||
2010-06-01 | 43 | Site Activity Status Update Received | ACTIVE GW PUMPING SYSTEM STILL COLLECTING FREE PRODUCT | ||
2008-08-07 | 92 | Operation & Maintenance (O & M) Report Received (non-Fee) | 7500 GAL OF FREE PRODUCT REMOVED TO DATE | ||
2007-09-26 | 92 | Operation & Maintenance (O & M) Report Received (non-Fee) | ACTIVE FREE PRODUCT REMOVAL SYSTEM CONTINUING TO OPERATE | ||
2006-07-24 | 92 | Operation & Maintenance (O & M) Report Received (non-Fee) | ACTIVE FREE PROD REMOVAL SYS CONTINUING | ||
2005-12-28 | 99 | Miscellaneous | APPROVED CHANGE IN BID SOW FOR SYS REPAIR | ||
2005-01-06 | 92 | Operation & Maintenance (O & M) Report Received (non-Fee) | 1655 GALLONS OF FREE PRODUCT REMOVED IN 04 AND CONTINUING | ||
2004-03-11 | 92 | Operation & Maintenance (O & M) Report Received (non-Fee) | 10/15/02-02/23/2004 | ||
2004-02-18 | 99 | Miscellaneous | OK TO REDUCE MONITORING FOR 2004 | ||
2002-10-15 | 40 | Remedial Action Options Report (RAOR) Approved | LETTER SENT APPROVING REVISED RAP | ||
2002-09-23 | 97 | Technical Assistance Request Received (fee) | $500 ENVIROGEN INC CHECK # 047413 | ||
2002-09-23 | 98 | Technical Assistance Provided | $500 ENVIROGEN INC CHECK # 047413 | ||
2002-09-19 | 149 | Remedial Action Design Report Approved | FREE PRODUCT REMOVAL SYSTEM CHANGE FROM BID | ||
2002-08-23 | 147 | Remedial Action Design Report Received (non-fee) | |||
2000-05-30 | 99 | Miscellaneous | PECFA BID DUE 6/26/00 | ||
2000-05-02 | 92 | Operation & Maintenance (O & M) Report Received (non-Fee) | |||
2000-05-01 | 92 | Operation & Maintenance (O & M) Report Received (non-Fee) | FREE PROD RECOVERY SYSTEM | ||
2000-05-01 | 99 | Miscellaneous | CROSS REF W/FILES 0355000210 & 0355000592 | ||
2000-04-26 | 99 | Miscellaneous | STATUS REPORT REVIEWED | ||
2000-02-22 | 43 | Site Activity Status Update Received | GW MONITORING & FREE PRODUCT RECOVERY | ||
1999-12-06 | 99 | Miscellaneous | INTERIM FREE PROD RECOVERY ON-GOING; 3550 GALS IN THE LAST 2-3 MONTHS | ||
1999-10-15 | 43 | Site Activity Status Update Received | GW MONITORING AND FREE PRODUCT REMOVAL UPDATE | ||
1999-09-15 | 99 | Miscellaneous | COPY OF INTERIM ACTION COST ESTIMATE SENT TO COMMERCE | ||
1999-08-04 | 99 | Miscellaneous | FREE PRODUCT REMOVAL CONTINUING | ||
1999-06-25 | 43 | Site Activity Status Update Received | |||
1999-03-18 | 99 | Miscellaneous | FREE PROD RECOVERY CONTINUING | ||
1999-02-04 | 43 | Site Activity Status Update Received | |||
1998-10-15 | 43 | Site Activity Status Update Received | |||
1998-10-15 | 99 | Miscellaneous | STATUS UPDATE REVIEWED BY SCHULTZ | ||
1998-09-30 | 99 | Miscellaneous | INTERIM ACTION COST ESTIMATE SUB. TO DCOM ON FREE PROD REMOVAL | ||
1998-07-14 | 37 | Site Investigation Report (SIR) Received (non-fee) | HIGH PRIORITY | ||
1998-06-17 | 43 | Site Activity Status Update Received | FREE PROD RECOVERY | ||
1998-06-17 | 77 | Free Product Removal Start | |||
1998-02-10 | 43 | Site Activity Status Update Received | QUARTERLY FREE PRODUCT UPDATE | ||
1998-02-10 | 99 | Miscellaneous | COST EST. FOR FREE PROD. RECOVERY SENT TO DCOM | ||
1997-10-13 | 77 | Free Product Removal Start | |||
1994-01-12 | 43 | Site Activity Status Update Received | QRTLY/MTHLY STATUS RPT | ||
1992-05-18 | 33 | Tank System Site Assessment (TSSA) Report Received | ADDENDUM | ||
1992-02-29 | 33 | Tank System Site Assessment (TSSA) Report Received | |||
1991-08-21 | 2 | Responsible Party (RP) letter sent | R.P. LETTER SEND | ||
1991-05-13 | 1 | Notification of Hazardous Substance Discharge |
Type | Related Activity |
---|---|
Property Affected -> | 13-55-591370 209 W 9TH ST N |
Property Affected -> | 13-55-591371 807 LAKE AVE W |
Property Affected -> | 13-55-591376 818 PEDERSON AVE W |
Substance | Type | Amt Released | Units |
---|---|---|---|
Petroleum - Unknown Type | Petroleum |
PECFA Site Name: | Doug's Tire Center |
Max. Reimbursement: | $1,000,000 | Total Amount Paid: | $1,000,000.00 |
Occ No | Claim No | Audit Date | Paid Date | Amt Submitted | Amt Ineligible | Amt Paid |
A | 1 | 1992-11-25 | 1993-11-26 | $49,533.27 | $5,325.59 | $41,997.30 |
A | 2 | 2000-06-09 | 2000-10-06 | $225,808.84 | $24,490.14 | $198,529.08 |
A | 2 | 2000-06-09 | 2001-01-25 | $.00 | $.00 | $12,934.49 |
A | 3 | 2003-08-07 | 2004-01-15 | $189,353.77 | $13,544.40 | $175,809.37 |
A | 3 | 2003-08-07 | 2004-04-27 | $.00 | $.00 | $7,100.23 |
A | 4 | 2004-09-23 | 2004-11-26 | $68,908.39 | $.41 | $68,907.98 |
A | 5 | 2007-09-21 | 2007-11-28 | $109,297.70 | $17.01 | $109,280.69 |
A | 6 | 2009-06-26 | 2009-07-29 | $51,430.84 | $.00 | $53,442.86 |
A | 7 | 2011-03-08 | 2011-04-13 | $54,934.45 | $.00 | $54,934.45 |
A | 8 | 2011-10-14 | 2011-11-16 | $4,969.46 | $.00 | $5,043.32 |
A | 9 | 2011-12-15 | 2012-01-25 | $4,376.35 | $.00 | $4,376.35 |
A | 10 | 2012-02-14 | 2012-05-16 | $1,838.23 | $.00 | $1,838.23 |
A | 11 | 2012-07-31 | 2012-09-12 | $2,132.83 | $.00 | $2,132.83 |
A | 12 | 2012-09-24 | 2012-11-07 | $17,285.38 | $.00 | $17,285.38 |
A | 13 | 2013-02-25 | 2013-03-27 | $5,414.02 | $.00 | $5,414.02 |
A | 14 | 2013-09-26 | 2013-11-15 | $75,740.88 | $.00 | $75,740.88 |
A | 15 | 2014-07-10 | 2014-08-04 | $4,335.90 | $.00 | $4,335.90 |
A | 16 | 2015-06-29 | 2015-07-27 | $34,660.05 | $.00 | $34,660.05 |
A | 17 | 2015-10-26 | 2016-01-19 | $3,915.97 | $.00 | $3,915.97 |
A | 18 | 2015-12-09 | 2016-02-24 | $14,517.71 | $.00 | $14,517.71 |
A | 19 | 2016-02-09 | 2016-06-23 | $6,481.38 | $.00 | $6,481.38 |
A | 20 | 2016-03-28 | 2016-07-01 | $10,118.64 | $.00 | $10,118.64 |
A | 21 | 2016-06-06 | 2016-08-01 | $1,956.56 | $.00 | $1,956.56 |
A | 22 | 2016-07-11 | 2016-08-25 | $3,244.32 | $.00 | $3,244.32 |
A | 23 | 2016-10-25 | 2016-11-23 | $3,765.07 | $.00 | $3,765.07 |
A | 24 | 2017-01-06 | 2017-02-14 | $3,053.81 | $.00 | $3,053.81 |
A | 25 | 2017-03-21 | 2017-05-02 | $3,343.40 | $.00 | $3,343.40 |
A | 26 | 2017-06-19 | 2017-07-13 | $3,463.08 | $.00 | $3,463.08 |
A | 27 | 2017-09-19 | 2017-10-06 | $3,043.00 | $.00 | $3,043.00 |
A | 28 | 2017-11-27 | 2017-12-15 | $1,824.63 | $.00 | $1,824.63 |
A | 29 | 2018-01-29 | 2018-02-09 | $3,864.15 | $.00 | $3,864.15 |
A | 30 | 2018-04-23 | 2018-05-03 | $5,187.99 | $.00 | $5,187.99 |
A | 31 | 2018-06-20 | 2018-07-06 | $3,354.79 | $.00 | $3,354.79 |
A | 32 | 2018-08-28 | 2018-09-04 | $3,874.90 | $.00 | $3,874.90 |
A | 33 | 2018-11-26 | 2018-12-17 | $2,206.99 | $.00 | $2,206.99 |
A | 34 | 2019-01-22 | 2019-02-12 | $2,065.62 | $.00 | $2,065.62 |
A | 35 | 2019-03-05 | 2019-03-21 | $2,081.43 | $.00 | $2,081.43 |
A | 36 | 2019-06-26 | 2019-07-10 | $3,526.32 | $.00 | $3,526.32 |
A | 37 | 2019-08-21 | 2019-08-30 | $5,147.00 | $.00 | $5,147.00 |
A | 38 | 2019-10-07 | 2019-10-22 | $4,605.66 | $.00 | $4,605.66 |
A | 39 | 2019-12-02 | 2019-12-09 | $7,033.35 | $.00 | $7,033.35 |
A | 40 | 2019-12-18 | 2020-01-13 | $2,157.34 | $.00 | $2,157.34 |
A | 41 | 2020-02-03 | 2020-02-13 | $3,587.60 | $.00 | $3,587.60 |
A | 42 | 2020-03-13 | 2020-05-14 | $1,870.48 | $.00 | $1,870.48 |
A | 43 | 2020-05-17 | 2020-08-06 | $9,213.09 | $.00 | $9,213.09 |
A | 44 | 2020-06-24 | 2020-08-28 | $3,125.32 | $.00 | $3,125.32 |
A | 45 | 2020-06-28 | 2020-10-09 | $5,532.75 | $925.76 | $4,606.99 |
VICKI RICHARDSON W8392 PARKVIEW ROAD, LADYSMITH, WI 54848 |
Northern Region Contact: Kathleen Shafel kathleen.shafel@wisconsin.gov |