2024-07-09
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 1/1/2024 - 6/30/2024
|
|
2024-06-13
|
43
|
Site Activity Status Update Received
|
|
MONTHLY SOIL VAPOR INTRUSION STUDY UPDATE
|
|
2024-05-21
|
43
|
Site Activity Status Update Received
|
|
SI SAMPLE RESULTS NOTIFICATION
|
|
2024-05-16
|
43
|
Site Activity Status Update Received
|
|
GROUNDWATER - SURFACE WATER DATA TRANSMITTAL
|
|
2024-05-16
|
43
|
Site Activity Status Update Received
|
|
MONTHLY SOIL VAPOR INTRUSION STUDY UPDATE
|
|
2024-04-24
|
154
|
Remedial Action (RA) Documentation Report Not Approved
|
|
|
|
2024-04-19
|
99
|
Miscellaneous
|
|
GLC FOR 1420 AND 1421 WHITE ROCK – SEE ALSO 07-68-586161 AND 07-68-586162
|
|
2024-04-02
|
43
|
Site Activity Status Update Received
|
|
MONTHLY SOIL VAPOR INTRUSION STUDY UPDATE
|
|
2024-03-25
|
43
|
Site Activity Status Update Received
|
|
STATUS UPDATE
|
|
2024-02-28
|
43
|
Site Activity Status Update Received
|
|
MONTHLY UPDATE
|
|
2024-02-08
|
43
|
Site Activity Status Update Received
|
|
MONTHLY SOIL VAPOR INTRUSION STUDY UPDATE
|
|
2024-01-17
|
43
|
Site Activity Status Update Received
|
|
OFF-SITE RESIDENTIAL DATA - PHOENIX DRIVE
|
|
2024-01-17
|
43
|
Site Activity Status Update Received
|
|
OFF-SITE RESIDENTIAL DATA - LOMBARDI AVE
|
|
2024-01-17
|
366
|
VAL and/or VRSL Exceeded at Off-Site Property or ROW
|
|
|
|
2024-01-04
|
43
|
Site Activity Status Update Received
|
|
SI SAMPLE RESULTS NOTIFICATION
|
|
2024-01-02
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 7/1/2023 - 12/31/2023
|
|
2024-01-02
|
43
|
Site Activity Status Update Received
|
|
MONTHLY SOIL VAPOR INTRUSION STUDY UPDATE
|
|
2023-12-19
|
152
|
Remedial Action Documentation Report Received (fee)
|
|
RECVD CK #21511 $350.00
|
|
2023-12-14
|
43
|
Site Activity Status Update Received
|
|
GROUNDWATER - SURFACE WATER DATA TRANSMITTAL SEPTEMBER 2023
|
|
2023-12-08
|
64
|
Inject/Infiltrate Request Approved
|
|
|
|
2023-12-05
|
43
|
Site Activity Status Update Received
|
|
MONTHLY SOIL VAPOR INTRUSION STUDY UPDATE
|
|
2023-12-04
|
99
|
Miscellaneous
|
|
NOV 2023 VAPOR DATA FROM PHOENIX HEIGHTS NEIGHBORHOOD SEWERS & 1165 WHITE ROCK AVE
|
|
2023-11-28
|
36
|
Site Investigation Workplan (SIWP) Approved
|
|
|
|
2023-11-28
|
43
|
Site Activity Status Update Received
|
|
SI SAMPLE RESULTS NOTIF
|
|
2023-11-09
|
43
|
Site Activity Status Update Received
|
|
SI SAMPLE RESULTS NOTIF
|
|
2023-11-07
|
43
|
Site Activity Status Update Received
|
|
MONTHLY SOIL VAPOR INTRUSION STUDY UPDATE
|
|
2023-10-24
|
135
|
Site Investigation Workplan (SIWP) Received (fee)
|
|
RECVD CK #21337 $700
|
|
2023-10-16
|
99
|
Miscellaneous
|
|
NAVISTAR REQ OFF-SITE EXEMPTION CLARIFICATION - SEE 07-68-586162
|
|
2023-10-10
|
43
|
Site Activity Status Update Received
|
|
SCS HEALTH AND SAFETY PLAN FOR VAPOR INTRUSION ZONE CONTRACT WORK
|
|
2023-10-05
|
43
|
Site Activity Status Update Received
|
|
MONTHLY SOIL VAPOR INTRUSION STUDY UPDATE
|
|
2023-10-02
|
43
|
Site Activity Status Update Received
|
|
CLASS 3 LEGAL NOTICE OF INTENT TO INCUR EXPENSES FOR FIDELITY UNION BANK - PUB SEPT 8, 15 & 22, 2023
|
|
2023-09-19
|
63
|
Inject/Infiltrate Request Received (fee)
|
|
REC'D CK $21257 $700
|
|
2023-09-11
|
43
|
Site Activity Status Update Received
|
|
AMBIENT AIR AND SUB-SLAB SAMPLING DATA TRANSMITTAL – 909 REGENT ST
|
|
2023-08-31
|
43
|
Site Activity Status Update Received
|
|
MONTHLY SOIL VAPOR INTRUSION STUDY UPDATE - AUGUST 2023
|
|
2023-08-11
|
43
|
Site Activity Status Update Received
|
|
GROUNDWATER - SURFACE WATER DATA TRANSMITTAL
|
|
2023-08-01
|
43
|
Site Activity Status Update Received
|
|
MONTHLY SOIL VAPOR INTRUSION STUDY UPDATE - JULY 2023
|
|
2023-07-17
|
128
|
Interim Action Report Approved
|
|
|
|
2023-07-10
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 01/01/2023 - 06/30/2023
|
|
2023-07-06
|
43
|
Site Activity Status Update Received
|
|
REC'D MONTHLY SOIL VAPOR INTRUSION STUDY UPDATE - JUNE 2023
|
|
2023-06-22
|
99
|
Miscellaneous
|
|
DNR INTRODUCTORY LETTER & PROPERTY ACCESS REQUESTS W/ FACT SHEETS FOR 1165 WHITE ROCK AVE
|
|
2023-06-06
|
43
|
Site Activity Status Update Received
|
|
REC'D MONTHLY SOIL VAPOR INTRUSION STUDY UPDATE - MAY 2023
|
|
2023-05-31
|
99
|
Miscellaneous
|
|
DNR NOTICE OF INTENT TO INCUR EXPENSES UNDER VAPOR INTRUSION ZONE CONTRACT
|
|
2023-05-30
|
43
|
Site Activity Status Update Received
|
|
SI SAMPLE RESULTS NOTIFICATION - MAY 2023
|
|
2023-05-04
|
43
|
Site Activity Status Update Received
|
|
MONTHLY SOIL VAPOR INTRUSION STUDY UPDATE - MAY 2023
|
|
2023-04-04
|
43
|
Site Activity Status Update Received
|
|
MONTHLY SOIL VAPOR INTRUSION STUDY UPDATE - APRIL
|
|
2023-03-30
|
43
|
Site Activity Status Update Received
|
|
SI SAMPLE RESULTS NOTIFICATION - MARCH 2023
|
|
2023-03-03
|
43
|
Site Activity Status Update Received
|
|
MONTHLY SOIL VAPOR INTRUSION STUDY UPDATE - FEBRUARY 2023
|
|
2023-02-07
|
43
|
Site Activity Status Update Received
|
|
MONTHLY SOIL VAPOR INTRUSION STUDY UPDATE - FEBRUARY 2023
|
|
2023-01-05
|
43
|
Site Activity Status Update Received
|
|
MONTHLY SOIL VAPOR INTRUSION STUDY UPDATE - DECEMBER 2022
|
|
2023-01-03
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 7/1/2022 - 12/31/2022
|
|
2022-12-06
|
43
|
Site Activity Status Update Received
|
|
MONTHLY SOIL VAPOR INTRUSION STUDY UPDATE - DECEMBER
|
|
2022-11-29
|
43
|
Site Activity Status Update Received
|
|
GW SURFACE WATER DATA TRANSMITTAL
|
|
2022-11-18
|
43
|
Site Activity Status Update Received
|
|
GROUNDWATER-SURFACE WATER DATA TRANSMITTAL
|
|
2022-11-03
|
43
|
Site Activity Status Update Received
|
|
SOIL VAPOR INTRUSION UPDATE - OCTOBER 2022
|
|
2022-10-11
|
43
|
Site Activity Status Update Received
|
|
SOIL VAPOR INTRUSION UPDATE - OCTOBER 2022
|
|
2022-10-01
|
99
|
Miscellaneous
|
|
INJECTION SUMMARY
|
|
2022-09-29
|
43
|
Site Activity Status Update Received
|
|
AMBIENT AIR AND SUB SLAB SAMPLING DATA - 1212 LOMBARDI WAY & 904 REGENT ST
|
|
2022-09-13
|
43
|
Site Activity Status Update Received
|
|
MONTHLY SOIL VAPOR INTRUSION STUDY UPDATE - SEPT 2022
|
|
2022-08-18
|
43
|
Site Activity Status Update Received
|
|
SI SAMPLE RESULTS NOTIFI
|
|
2022-08-04
|
43
|
Site Activity Status Update Received
|
|
SI SAMPLE RESULTS NOTIF
|
|
2022-08-04
|
43
|
Site Activity Status Update Received
|
|
MONTHLY SOIL VAPOR INTRUSION STUDY UPDATE
|
|
2022-08-02
|
43
|
Site Activity Status Update Received
|
|
SI SAMPLE RESULTS NOTIF
|
|
2022-07-12
|
43
|
Site Activity Status Update Received
|
|
MONTHLY SOIL VAPOR INTRUSION STUDY UPDATE
|
|
2022-07-12
|
43
|
Site Activity Status Update Received
|
|
AMBIENT AIR AND SUB-SLAB SAMPLING DATA TRANSMITTAL - 1200 ADAMS ST
|
|
2022-07-01
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 1/1/2022 - 6/30/2022
|
|
2022-06-07
|
43
|
Site Activity Status Update Received
|
|
MONTHLY SOIL VAPOR INTRUSION STUDY UPDATE
|
|
2022-05-23
|
43
|
Site Activity Status Update Received
|
|
GROUNDWATER-SURFACE WATER DATA SUMMARY MARCH 2022
|
|
2022-05-10
|
43
|
Site Activity Status Update Received
|
|
SI SAMPLE RESULTS NOTIF
|
|
2022-05-05
|
43
|
Site Activity Status Update Received
|
|
SI SAMPLE RESULTS NOTIF
|
|
2022-05-05
|
43
|
Site Activity Status Update Received
|
|
MONTHLY SOIL VAPOR INTRUSION STUDY UPDATE
|
|
2022-05-03
|
43
|
Site Activity Status Update Received
|
|
SI SAMPLE RESULTS NOTIF
|
|
2022-04-20
|
151
|
Remedial Action (RA) Documentation Report Received (non-fee)
|
|
REC'D REVISED RADR
|
|
2022-04-12
|
43
|
Site Activity Status Update Received
|
|
REC'D SI SAMPLE RESULTS NOTIF
|
|
2022-04-12
|
43
|
Site Activity Status Update Received
|
|
REC'D SOIL VAPOR INTRUSION STUDY UPDATE
|
|
2022-04-06
|
99
|
Miscellaneous
|
|
INJECTION APPROVAL EXTENSION
|
|
2022-03-15
|
43
|
Site Activity Status Update Received
|
|
SITE INVESTIGATION SAMPLE RESULTS NOTIFICATION
|
|
2022-03-07
|
43
|
Site Activity Status Update Received
|
|
MONTHLY SOIL VAPOR INTRUSION STUDY UPDATE
|
|
2022-03-02
|
127
|
Interim Action Report Received (fee)
|
|
REC'D CK #19977 $350
|
|
2022-03-01
|
43
|
Site Activity Status Update Received
|
|
SITE INVESTIGATION SAMPLE RESULTS NOTIFICATION
|
|
2022-02-08
|
43
|
Site Activity Status Update Received
|
|
MONTHLY SOIL VAPOR INTRUSION STUDY UPDATE
|
|
2022-01-06
|
43
|
Site Activity Status Update Received
|
|
MONTHLY SOIL VAPOR INTRUSION STUDY UPDATE
|
|
2022-01-04
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 7/1/2021 - 12/31/2021
|
|
2022-01-04
|
43
|
Site Activity Status Update Received
|
|
SI SAMPLE RESULTS NOTIFICATION
|
|
2021-12-07
|
43
|
Site Activity Status Update Received
|
|
MONTHLY SOIL VAPOR INTRUSION STUDY UPDATE - DECEMBER 2021
|
|
2021-11-17
|
43
|
Site Activity Status Update Received
|
|
GROUNDWATER-SURFACE WATER MONITORING DATA SUMMARY
|
|
2021-11-04
|
43
|
Site Activity Status Update Received
|
|
MONTHLY SOIL VAPOR INTRUSION STUDY UPDATE - NOVEMBER 2021
|
|
2021-10-25
|
43
|
Site Activity Status Update Received
|
|
SI SAMPLE RESULTS NOTIFICATION
|
|
2021-10-05
|
43
|
Site Activity Status Update Received
|
|
MONTHLY SOIL VAPOR INTRUSION STUDY UPDATE
|
|
2021-09-20
|
98
|
Technical Assistance Provided
|
|
CONTAINED OUT APPROVAL
|
|
2021-09-14
|
97
|
Technical Assistance Request Received (fee)
|
|
REC'D CK #19618 $700.00, HAZARDOUS WASTE DETERMINATION
|
|
2021-09-02
|
43
|
Site Activity Status Update Received
|
|
MONTHLY SOIL VAPOR INTRUSION STUDY UPDATE
|
|
2021-08-31
|
43
|
Site Activity Status Update Received
|
|
SI SAMPLE RESULTS NOTIFICATION
|
|
2021-08-25
|
43
|
Site Activity Status Update Received
|
|
GW - SURFACE WATER DATA TRANSMITTAL
|
|
2021-08-17
|
43
|
Site Activity Status Update Received
|
|
SI SAMPLE RESULTS NOTIFICATION
|
|
2021-08-09
|
43
|
Site Activity Status Update Received
|
|
REC'D SOIL VAPOR INTRUSION STUDY UPDATE
|
|
2021-08-09
|
43
|
Site Activity Status Update Received
|
|
SI SAMPLE RESULTS NOTIFICATION - 1225 LOMBARDI WAY
|
|
2021-08-09
|
43
|
Site Activity Status Update Received
|
|
SI SAMPLE RESULTS NOTIFICATION - 1212 PHOENIX DR
|
|
2021-08-05
|
40
|
Remedial Action Options Report (RAOR) Approved
|
|
|
|
2021-08-04
|
199
|
Additional Information Received (Fee-Based or Closure)
|
|
|
|
2021-08-04
|
99
|
Miscellaneous
|
|
RESPONSES TO DNR QUESTIONS REGARDING PROPOSED GW REMEDIATION
|
|
2021-07-09
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 1/1/2021 - 6/30/2021
|
|
2021-07-06
|
99
|
Miscellaneous
|
|
RESPONSE TO DNR EMAIL CORRESPONDENCE
|
|
2021-07-06
|
43
|
Site Activity Status Update Received
|
|
MONTHLY SOIL VAPOR INTRUSION STUDY UPDATE
|
|
2021-06-14
|
43
|
Site Activity Status Update Received
|
|
MONTHLY SOIL VAPOR INTRUSION STUDY UPDATE - JUNE 2021
|
|
2021-06-14
|
43
|
Site Activity Status Update Received
|
|
SI SAMPLE RESULTS NOTIFICATION AND RESAMPLING OF WELL MW-39 GW DATA
|
|
2021-05-13
|
43
|
Site Activity Status Update Received
|
|
MARCH 2021 GROUNDWATER - SURFACE WATER DATA TRANSMITTAL
|
|
2021-05-10
|
43
|
Site Activity Status Update Received
|
|
MONTHLY SOIL VAPOR INTRUSION STUDY UPDATE
|
|
2021-05-10
|
43
|
Site Activity Status Update Received
|
|
SI SAMPLE RESULTS NOTIFICATION - AIR AND VAPOR SAMPLING FOR 1231 THE STRAND
|
|
2021-05-06
|
99
|
Miscellaneous
|
|
GW RAOR MEMORANDUM ADDENDUM
|
|
2021-05-03
|
43
|
Site Activity Status Update Received
|
|
SI SAMPLE RESULTS NOTIFICATION - AMBIENT AIR SAMPLING DATA FOR 1242 THE STRAND
|
|
2021-05-03
|
43
|
Site Activity Status Update Received
|
|
SI SAMPLE RESULTS NOTIFICATION - AMBIENT AIR AND SUB-SLAB DATA FOR 1138 PHOENIX DR
|
|
2021-04-19
|
43
|
Site Activity Status Update Received
|
|
SI SAMPLE RESULTS NOTIFICATION
|
|
2021-04-07
|
43
|
Site Activity Status Update Received
|
|
MONTHLY SOIL VAPOR INTRUSION STUDY UPDATE
|
|
2021-04-06
|
130
|
DNR Regulatory Reminder Sent
|
|
VAPOR INTRUSION AND TCE REMINDER LETTER
|
|
2021-04-05
|
43
|
Site Activity Status Update Received
|
|
SI SAMPLE RESULTS NOTIFICATION
|
|
2021-04-01
|
40
|
Remedial Action Options Report (RAOR) Approved
|
|
APPROVAL FOR SOUTH PARKING LOT RAOR
|
|
2021-04-01
|
198
|
Request for Additional Information (Fee-Based or Closure)
|
|
ADDITIONAL INFO REQ FOR GW REMEDIAL ACTION OPTIONS
|
|
2021-03-29
|
43
|
Site Activity Status Update Received
|
|
SI SAMPLE RESULTS
|
|
2021-03-22
|
143
|
Remedial Action Options Report (RAOR) Received (fee)
|
|
REC'D CK#19158 $1050.00, SOUTH PARKING LOT RAOR
|
|
2021-03-22
|
143
|
Remedial Action Options Report (RAOR) Received (fee)
|
|
REC'D CK #19159 $1050.00, GW REMEDIAL ACTION OPTIONS
|
|
2021-03-16
|
43
|
Site Activity Status Update Received
|
|
FEBRUARY 2021 SI SAMPLE RESULTS NOTIFICATION: 1144 LOMBARDI WAY
|
|
2021-03-16
|
43
|
Site Activity Status Update Received
|
|
FEBRUARY 2021 SI SAMPLE RESULTS NOTIFICATION: 1204 LOMBARDI WAY
|
|
2021-03-15
|
43
|
Site Activity Status Update Received
|
|
SI SAMPLE RESULTS - 1225 LOMBARDI WAY
|
|
2021-03-08
|
43
|
Site Activity Status Update Received
|
|
MONTHLY SOIL VAPOR INTRUSION STUDY UPDATE
|
|
2021-03-02
|
43
|
Site Activity Status Update Received
|
|
FEBRUARY 2021 SI SAMPLE RESULTS NOTIFICATION: 1230 THE STRAND
|
|
2021-02-15
|
35
|
Site Investigation Workplan (SIWP) Received (non-fee)
|
|
ADD'L WORK PLAN
|
|
2021-02-08
|
43
|
Site Activity Status Update Received
|
|
GW SURFACE WATER DATA TRANSMITTAL
|
|
2021-02-08
|
43
|
Site Activity Status Update Received
|
|
MONTHLY SOIL VAPOR INTRUSION STUDY UPDATE
|
|
2021-02-08
|
43
|
Site Activity Status Update Received
|
|
SI SAMPLE RESULTS NOTIFICATION
|
|
2021-02-01
|
43
|
Site Activity Status Update Received
|
|
SITE INVESTIGATION SAMPLE RESULTS NOTIFICATION
|
|
2021-01-25
|
43
|
Site Activity Status Update Received
|
|
SI SAMPLE RESULTS NOTIFICATION
|
|
2021-01-20
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 7/1/2020 - 12/31/2020
|
|
2021-01-19
|
43
|
Site Activity Status Update Received
|
|
REC'D AMBIENT AIR AND SUB-SLAB SAMPLING DATA TRANSMITTAL
|
|
2021-01-07
|
43
|
Site Activity Status Update Received
|
|
REC'D MONTHLY SOIL VAPOR INTRUSION STUDY UPDATE
|
|
2021-01-05
|
43
|
Site Activity Status Update Received
|
|
DECEMBER 2020 OFFSITE SAMPLING RESULTS: 1200 ADAMS ST & 1124 THE STRAND
|
|
2020-12-15
|
43
|
Site Activity Status Update Received
|
|
OFFSITE SAMPLING RESULTS FOR 1219 THE STRAND AND 1230 LOMBARDI WAY
|
|
2020-12-03
|
43
|
Site Activity Status Update Received
|
|
MONTHLY SOIL VAPOR INTRUSION STUDY UPDATE
|
|
2020-12-01
|
43
|
Site Activity Status Update Received
|
|
SI SAMPLE RESULTS NOTIFICATION
|
|
2020-11-16
|
43
|
Site Activity Status Update Received
|
|
SI SAMPLE RESULTS NOTIFICATION
|
|
2020-11-09
|
99
|
Miscellaneous
|
|
NED WITTE EMAIL
|
|
2020-11-03
|
43
|
Site Activity Status Update Received
|
|
OFFSITE SAMPLING RESULTS FOR 2126 RUBEN DR, 2127 RUBEN DR, 2127 LAURA CT, AND 2124 RUBEN DR
|
|
2020-11-03
|
43
|
Site Activity Status Update Received
|
|
MONTHLY SOIL VAPOR INTRUSION STUDY UPDATE
|
|
2020-11-02
|
43
|
Site Activity Status Update Received
|
|
SI SAMPLE NOTIFICATION
|
|
2020-10-28
|
43
|
Site Activity Status Update Received
|
|
OFFSITE SAMPLING RESULTS FOR 2127 RUBEN DR, 2127 LAURA CT, & 2126 RUBEN DR
|
|
2020-10-27
|
43
|
Site Activity Status Update Received
|
|
SSDS COMMISSIONING TRANSMITTAL
|
|
2020-10-19
|
43
|
Site Activity Status Update Received
|
|
GW SURFACE WATER DATA TRANSMITTAL
|
|
2020-10-06
|
43
|
Site Activity Status Update Received
|
|
MONTHLY SOIL VAPOR INTRUSION STUDY UPDATE
|
|
2020-10-05
|
99
|
Miscellaneous
|
|
INTERIM ACTION APPROVAL, SEE AC 40 FOR DOCUMENT
|
|
2020-10-05
|
40
|
Remedial Action Options Report (RAOR) Approved
|
|
|
|
2020-09-29
|
43
|
Site Activity Status Update Received
|
|
OFFSITE SAMPLING RESULTS FOR 1223 RAYMOND ST AND 1344 WHITE ROCK AVE
|
|
2020-09-21
|
43
|
Site Activity Status Update Received
|
|
SI SAMPLE RESULTS NOTIFICATION
|
|
2020-09-21
|
99
|
Miscellaneous
|
|
OFF SITE LETTER 1420 WHITE ROCK
|
|
2020-09-21
|
99
|
Miscellaneous
|
|
OFF-SITE LETTER 1421 WHITE ROCK
|
|
2020-09-14
|
43
|
Site Activity Status Update Received
|
|
MONTHLY SOIL VAPOR INTRUSION STUDY UPDATE
|
|
2020-09-01
|
43
|
Site Activity Status Update Received
|
|
OFFSITE SAMPLING RESULTS FOR 1222 LOMBARDI WAY
|
|
2020-08-17
|
130
|
DNR Regulatory Reminder Sent
|
|
EMERGING CONTAMINANTS REMINDER LETTER
|
|
2020-08-17
|
43
|
Site Activity Status Update Received
|
|
SOIL VAPOR INTRUSION STATUS UPDATE
|
|
2020-08-10
|
43
|
Site Activity Status Update Received
|
|
SI SAMPLE RESULTS NOTIFICATION
|
|
2020-08-04
|
43
|
Site Activity Status Update Received
|
|
JULY 2020 OFFSITE SAMPLING RESULTS FOR 1208 LOMBARDI WAY
|
|
2020-07-27
|
43
|
Site Activity Status Update Received
|
|
GW SURFACE WATER DATA TRANSMITTAL
|
|
2020-07-27
|
43
|
Site Activity Status Update Received
|
|
SI SAMPLE RESULTS
|
|
2020-07-22
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 1/1/2020 - 6/30/2020
|
|
2020-07-16
|
43
|
Site Activity Status Update Received
|
|
REC'D SI SAMPLE RESULTS NOTIFICATION
|
|
2020-07-02
|
43
|
Site Activity Status Update Received
|
|
MONTHLY SOIL VAPOR INTRUSION STUDY UPDATE
|
|
2020-07-02
|
43
|
Site Activity Status Update Received
|
|
SI SAMPLE RESULTS NOTIFICATION
|
|
2020-06-25
|
43
|
Site Activity Status Update Received
|
|
SI SAMPLE RESULTS NOTIFICATION
|
|
2020-06-18
|
43
|
Site Activity Status Update Received
|
|
SI SAMPLE RESULTS NOTIFICATION
|
|
2020-06-09
|
137
|
Site Investigation Report (SIR) Received (fee)
|
|
REC'D CK#18500, $1050
|
|
2020-06-09
|
143
|
Remedial Action Options Report (RAOR) Received (fee)
|
|
RAOR/INTERIM RAP; REC'D CK# 18507, $1050
|
|
2020-06-09
|
122
|
Interim Action Plan Received (non-fee)
|
|
RAOR/INTERIM RAP, SEE AC 143 FOR DOC
|
|
2020-06-09
|
43
|
Site Activity Status Update Received
|
|
MONTHLY SOIL VAPOR INTRUSION STUDY UPDATE
|
|
2020-06-09
|
43
|
Site Activity Status Update Received
|
|
OFFSITE SAMPLING RESULTS FOR 1148 LOMBARDI WAY;1220, 1215, 1228, & 1223 RAMOND ST; 1231 THE STRAND
|
|
2020-05-26
|
99
|
Miscellaneous
|
|
COMPLIANCE ASSISTANCE RESPONSE
|
|
2020-05-14
|
99
|
Miscellaneous
|
|
COMPLIANCE ASSISTANCE REQUEST ACKNOWLEDGE
|
|
2020-05-14
|
99
|
Miscellaneous
|
|
COMPLIANCE ASSISTANCE CORRESPONDENCE
|
|
2020-05-05
|
43
|
Site Activity Status Update Received
|
|
MONTHLY SOIL VAPOR INTRUSION STUDY UPDATE
|
|
2020-05-05
|
99
|
Miscellaneous
|
|
WDNR EMAIL RESPONSE LETTER, RE: HEALE MANUFACTURING DATA TRANSMITTAL UPDATE
|
|
2020-05-05
|
99
|
Miscellaneous
|
|
COMPLIANCE ASSISTANCE REQUEST
|
|
2020-04-30
|
99
|
Miscellaneous
|
|
APPROVAL FOR VAPOR SAMPLING AT HEALE MFG.
|
|
2020-03-31
|
43
|
Site Activity Status Update Received
|
|
MONTHLY SOIL VAPOR INTRUSION STUDY UPDATE
|
|
2020-03-27
|
64
|
Inject/Infiltrate Request Approved
|
|
|
|
2020-03-17
|
43
|
Site Activity Status Update Received
|
|
OFFSITE SAMPLING RESULTS FOR 1208 THE STRAND & 1222 THE STRAND
|
|
2020-03-10
|
43
|
Site Activity Status Update Received
|
|
OFFSITE SAMPLING RESULTS FOR 1204 PHOENIX DR & 1200 PHOENIX DR
|
|
2020-03-09
|
43
|
Site Activity Status Update Received
|
|
OFFSITE SAMPLING RESULTS FOR 1138 PHOENIX DR.
|
|
2020-03-05
|
43
|
Site Activity Status Update Received
|
|
MONTHLY SOIL VAPOR INTRUSION STUDY UPDATE
|
|
2020-03-03
|
99
|
Miscellaneous
|
|
RESPONSE TO 2/20/20 EMAIL
|
|
2020-02-27
|
43
|
Site Activity Status Update Received
|
|
OFFSITE SAMPLING RESULTS FOR 1200 LOMBARDI WAY, 1205 PHOENIX DR, AND 1208 PHOENIX DR
|
|
2020-02-20
|
43
|
Site Activity Status Update Received
|
|
OFFSITE SAMPLING RESULTS FOR 1215 PHOENIX DR & 1221 LOMBARDI WAY
|
|
2020-02-11
|
43
|
Site Activity Status Update Received
|
|
OFFSITE SAMPLING RESULTS FOR 1223 PHOENIX DR & 1144 LOMBARDI WAY
|
|
2020-02-10
|
43
|
Site Activity Status Update Received
|
|
MONTHLY SOIL VAPOR INTRUSION STUDY UPDATE
|
|
2020-02-06
|
43
|
Site Activity Status Update Received
|
|
OFFSITE SAMPLING RESULTS FOR 1151 LOMBARDI WAY, 1204 LOMBARDI WAY, & 1208 LOMBARDI WAY
|
|
2020-02-04
|
63
|
Inject/Infiltrate Request Received (fee)
|
|
REC'D CK#18224, $700
|
|
2020-02-04
|
99
|
Miscellaneous
|
|
WPDES DISCHARGE MANAGEMENT PLAN
|
|
2020-01-29
|
43
|
Site Activity Status Update Received
|
|
OFFSITE SAMPLING RESULTS FOR 1148 LOMBARDI WAY & 1207 LOMBARDI WAY
|
|
2020-01-22
|
43
|
Site Activity Status Update Received
|
|
OFFSITE SAMPLING RESULTS FOR 1224 RAYMOND ST & 1212 PHOENIX DR
|
|
2020-01-17
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 7/1/2019 - 12/31/2019
|
|
2020-01-15
|
43
|
Site Activity Status Update Received
|
|
DECEMBER 2019 GW SAMPLING
|
|
2020-01-09
|
43
|
Site Activity Status Update Received
|
|
REC'D OFFSITE SAMPLING RESULTS FOR 1215 RAYMOND ST
|
|
2020-01-08
|
43
|
Site Activity Status Update Received
|
|
MONTHLY SOIL VAPOR INTRUSION STUDY UPDATE
|
|
2020-01-06
|
43
|
Site Activity Status Update Received
|
|
OFFSITE SAMPLING 1219 RAYMOND ST, 912 REGENT ST, 1200 ADAMS ST, 1236 LOMBARDI WAY, & 1204 RAYMOND ST
|
|
2020-01-06
|
43
|
Site Activity Status Update Received
|
|
OFFSITE SI SAMPLING RESULTS FOR 1212 RAYMOND ST & 1223 RAMOND ST
|
|
2019-12-20
|
43
|
Site Activity Status Update Received
|
|
REC'D SI SAMPLE RESULTS NOTIFICATION AND VACANT LOT SOIL VAPOR PROBE DATA TRANSMITTAL
|
|
2019-12-18
|
43
|
Site Activity Status Update Received
|
|
REC'D OFFSITE SAMPLING RESULTS FOR 116 RAYMOND ST AND 1218 THE STRAND
|
|
2019-12-12
|
43
|
Site Activity Status Update Received
|
|
REC'D OFFSITE SAMPLING RESULTS FOR 1120 THE STRAND AND 1211 RAYMOND ST
|
|
2019-10-16
|
99
|
Miscellaneous
|
|
SCHEDULE MODIFICATION UPDATE
|
|
2019-09-25
|
43
|
Site Activity Status Update Received
|
|
SSDS COMMISSIONING TRANSMITTAL
|
|
2019-07-31
|
98
|
Technical Assistance Provided
|
|
MEETING SUMMARY.
|
|
2019-07-15
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 1/1/2019 - 6/30/2019
|
|
2019-07-15
|
97
|
Technical Assistance Request Received (fee)
|
|
TECHNICAL ASSISTANCE MEETING REQUEST. REC'D CK#17650, $700
|
|
2019-05-08
|
35
|
Site Investigation Workplan (SIWP) Received (non-fee)
|
|
REVISED ADDITIONAL SIWP
|
|
2019-04-22
|
81
|
Site Investigation Workplan (SIWP) Not Approved
|
|
|
|
2019-04-11
|
198
|
Request for Additional Information (Fee-Based or Closure)
|
|
REQUESTED ADDITIONAL INFORMATION
|
|
2019-04-11
|
199
|
Additional Information Received (Fee-Based or Closure)
|
|
|
|
2019-02-21
|
135
|
Site Investigation Workplan (SIWP) Received (fee)
|
|
REC'D CK #17319 $700.00, REC'D ADD'L SIWP
|
|
2019-01-29
|
98
|
Technical Assistance Provided
|
|
|
|
2019-01-25
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 7/1/2018 - 12/31/2018
|
|
2018-11-19
|
43
|
Site Activity Status Update Received
|
|
ADD'L SAMPLING DATA AND SITE UPDATE RE: VAPOR INTRUSION
|
|
2018-11-19
|
199
|
Additional Information Received (Fee-Based or Closure)
|
|
|
|
2018-11-14
|
99
|
Miscellaneous
|
|
RESPONSE TO 10/15/18 WDNR EMAIL
|
|
2018-10-10
|
99
|
Miscellaneous
|
|
PROJECT MEETING FOLLOWUP
|
|
2018-10-03
|
198
|
Request for Additional Information (Fee-Based or Closure)
|
|
REQUESTED ADDITIONAL INFO
|
|
2018-09-24
|
43
|
Site Activity Status Update Received
|
|
INTERIM SOIL VAPOR INTRUSION STUDY DATA SUMMARY
|
|
2018-09-14
|
97
|
Technical Assistance Request Received (fee)
|
|
REC'D CK #16920 $700.00, MEETING OCT 2, 2018
|
|
2018-07-18
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 1/1/2018 - 6/30/2018
|
|
2018-05-02
|
315
|
Superfund Site Assessment Transmittal Memos
|
|
|
|
2018-05-02
|
354
|
Superfund Site Assessment Other Cleanup Authority (OCA)
|
|
|
|
2018-05-01
|
350
|
Superfund Site Assessment Preliminary Assessment (PA)
|
|
|
|
2018-04-30
|
99
|
Miscellaneous
|
|
FINAL INTERIM SOIL AND GROUNDWATER/SURFACE WATER DATA
|
|
2018-04-26
|
98
|
Technical Assistance Provided
|
|
|
|
2018-04-26
|
43
|
Site Activity Status Update Received
|
|
REC'D FINAL INTERIM SOIL AND GW/SURFACE WATER DATA SUMMAY
|
|
2018-03-05
|
97
|
Technical Assistance Request Received (fee)
|
|
REC'D CK # 16441 $700.00
|
|
2018-02-08
|
99
|
Miscellaneous
|
|
CITY OF WAUKESHA NOTICE
|
|
2018-01-08
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 7/1/2017 - 12/31/2017
|
|
2017-11-16
|
313
|
Superfund Site Assessment Pre-CERCLA Screening (PCS)
|
|
|
|
2017-07-05
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 1/1/2017 - 6/30/2017
|
|
2017-06-21
|
36
|
Site Investigation Workplan (SIWP) Approved
|
|
|
|
2017-05-22
|
35
|
Site Investigation Workplan (SIWP) Received (non-fee)
|
|
SUPPLEMENTAL SITE INVESTIGATION WORK PLAN- REVISION 2
|
|
2017-04-25
|
99
|
Miscellaneous
|
|
COMMENT RESPONSE TO WDNR LETTER
|
|
2017-04-14
|
35
|
Site Investigation Workplan (SIWP) Received (non-fee)
|
|
REC'D SUPPLEMENTAL SI WORKPLAN INFORMATION
|
|
2017-03-15
|
81
|
Site Investigation Workplan (SIWP) Not Approved
|
|
|
|
2017-01-31
|
35
|
Site Investigation Workplan (SIWP) Received (non-fee)
|
|
REC'D SUPPLEMENTAL SI WORK PLAN - REVISION 1 REPORT
|
|
2017-01-09
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 7/1/2016 - 12/31/2016
|
|
2016-11-09
|
81
|
Site Investigation Workplan (SIWP) Not Approved
|
|
|
|
2016-10-03
|
135
|
Site Investigation Workplan (SIWP) Received (fee)
|
|
REC'D CK #1090349 $700.00
|
|
2016-09-21
|
805
|
Historic Waste Site
|
|
FOUNDRY SAND
|
|
2016-08-31
|
43
|
Site Activity Status Update Received
|
|
STATUS REPORT RECIEVED
|
|
2016-08-30
|
97
|
Technical Assistance Request Received (fee)
|
|
REC'D CK#1087375 $700.00 FROM TRC
|
|
2016-08-30
|
98
|
Technical Assistance Provided
|
|
MEETING ON AUGUST 23, 2016
|
|
2016-08-09
|
43
|
Site Activity Status Update Received
|
|
RESPONSE TO JUNE 29 LETTER
|
|
2016-07-08
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 1/1/2016 - 6/30/2016
|
|
2016-06-29
|
140
|
Site Investigation Report (SIR) Not Approved
|
|
|
|
2016-06-29
|
199
|
Additional Information Received (Fee-Based or Closure)
|
|
|
|
2016-01-05
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 7/1/2015 - 12/31/2015
|
|
2015-11-16
|
198
|
Request for Additional Information (Fee-Based or Closure)
|
|
INTERNAL DISCUSSIONS REQUIRED
|
|
2015-09-17
|
137
|
Site Investigation Report (SIR) Received (fee)
|
|
REC'D CK# 4404562153 $1,050.00
|
|
2015-07-07
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 1/1/2015 - 6/30/2015
|
|
2015-03-25
|
81
|
Site Investigation Workplan (SIWP) Not Approved
|
|
|
|
2015-03-12
|
99
|
Miscellaneous
|
|
UPDATE RP FOR SITE TO PUREPOWER TECHNOLOGIES, TODD WEISHOFF, 1401 PERKINS AVE., WAUKESHA, WI 53186
|
|
2015-02-16
|
135
|
Site Investigation Workplan (SIWP) Received (fee)
|
|
REC'D CK# 1041891 $700.00
|
|
2014-09-22
|
97
|
Technical Assistance Request Received (fee)
|
|
|
|
2014-09-22
|
98
|
Technical Assistance Provided
|
|
TECHNICAL ASSISTANCE MEETING
|
|
2014-09-22
|
43
|
Site Activity Status Update Received
|
|
MEETING WITH RP
|
|
2014-06-12
|
200
|
Push Action Taken
|
|
REQUEST FOR STATUS UPDATE
|
|
2012-10-08
|
80
|
Closure Not Recommended
|
|
ADD' L INVESTION NEEDED
|
|
2012-09-04
|
79
|
Case Closure Review Request Received
|
|
REC'D CK #4404097098 $750.00
|
|
2012-08-31
|
99
|
Miscellaneous
|
|
REC'D MONITORING WELL ABANDONMENT FORMS
|
|
2012-07-06
|
99
|
Miscellaneous
|
|
CLOSURE REVIEW FEE REQUESTED
|
|
2012-06-11
|
43
|
Site Activity Status Update Received
|
|
REC'D RPT & FIGURES
|
|
2012-03-26
|
99
|
Miscellaneous
|
|
EXTENSION GRANTED
|
|
2012-03-15
|
43
|
Site Activity Status Update Received
|
|
|
|
2012-03-14
|
43
|
Site Activity Status Update Received
|
|
|
|
2012-01-09
|
200
|
Push Action Taken
|
|
|
|
2001-10-31
|
99
|
Miscellaneous
|
|
THREE WELLS ABAN. FOR CONSTRUCTION PURPOSES
|
|
1999-02-15
|
37
|
Site Investigation Report (SIR) Received (non-fee)
|
|
SUPPLEMENTAL INVEST. RPTS.
|
|
1997-04-22
|
99
|
Miscellaneous
|
|
NFA COMMUNICATION
|
|
1997-04-16
|
99
|
Miscellaneous
|
|
NFA COMMUNICATION
|
|
1996-09-16
|
99
|
Miscellaneous
|
|
SUPPLEMENTAL SOIL AND GW INVESTIGATION
|
|
1996-02-29
|
99
|
Miscellaneous
|
|
ADDL SOIL GW INVESTIGATION
|
|
1995-08-04
|
99
|
Miscellaneous
|
|
REQ TO RECONSIDER NFA DENIED
|
|
1995-07-20
|
99
|
Miscellaneous
|
|
NFA COMMUNICATION
|
|
1993-05-10
|
99
|
Miscellaneous
|
|
MANIFEST INFO 1988, 1992, 1993
|
|
1993-05-05
|
99
|
Miscellaneous
|
|
PRELIM GW INVESTIGATION
|
|
1992-09-02
|
99
|
Miscellaneous
|
|
WORKPLAN FOR GW INVESTIGATION
|
|
1992-08-01
|
43
|
Site Activity Status Update Received
|
|
INITIAL SITE ASSESSMENT AND REMEDIATION PROGRESS RPT
|
|
1992-07-01
|
99
|
Miscellaneous
|
|
INITIAL SITE ASSESSMENT
|
|
1992-06-08
|
2
|
Responsible Party (RP) letter sent
|
|
|