ENVIRONMENTAL CLEANUP & BROWNFIELDS REDEVELOPMENT
BRRTS on the Web

Click the Location Name or FID below to view the Location Details page. If additional Activities are present at this location, they may be accessed from Location Details.

ACTIVITY DETAILS

 
02-37-000294 KRAFT CLEANERS
Activity Type / Status Jurisdiction
ERP  CLOSED DNR RR
Location Name County DNR Region
MARSCHALL PROP (FORMER KRAFT CLEANERS) MARATHON WEST CNTRL
Address Municipality
303 S 2ND AVE WAUSAU
PLSS Description Latitude (WGS84) Longitude (WGS84) Google Maps RR Sites Map
SW 1/4 of the SE 1/4 of Sec 26, T29N, R07E 44.9605486 -89.6377777 Click to view on Google Maps using Lat/Long Click to View RR Sites Map
Additional Location Description
305 S 2ND AVE; 307 S 2ND AVE
Additional Activity Details Acres
.5
Facility ID PECFA No. EPA ID Start Date End Date
737081510 1992-06-23 2020-12-11
Characteristics
Above Ground
Petrol Tank

Drycleaner
EPA
NPL Site
EPA
Superfund
PECFA Funds
Eligible

PFAS

ROW Impact

Sediments
Underground
Petrol Tank
WI DOT
Site
Drycleaner Flag   ROW Impact flag
Actions
Date Code Name File Comment
2021-11-17 99 Miscellaneous Download PDF file 113 GALLON VMS RESPONSIBILITY
2021-02-08 217 DERF - Cost Reimbursement Application Received
2021-01-22 99 Miscellaneous Download PDF file REALLOCATION OF IA FUNDS APPROVED
2020-12-11 11 Activity Closed
2020-12-11 56 Continuing Obligation(s) Applied Download PDF file
2020-12-11 222 Continuing Obligation - Maintain Cap Over Contaminated Area
2020-12-11 226 Continuing Obligation - Vapor Intrusion Response
2020-12-11 232 Continuing Obligation - Residual Soil Contamination
2020-12-11 236 Continuing Obligation - Residual GW Contamination
2020-12-11 46 Impacted Right-of-Way (ROW) Notification S 2ND AVE; CALLON ST; CLARK ST; STEWART AVE; MUNICIPAL ALLEY
2020-12-11 66 Continuing Obligations (COs) Apply at Off-site Property(ies)
2020-11-09 199 Additional Information Received (Fee-Based or Closure)
2020-10-27 130 DNR Regulatory Reminder Sent Download PDF file DERF FUNDING STATUS LTR
2020-09-30 99 Miscellaneous Download PDF file MW ABANDONMENT FORMS RECEIVED
2020-08-17 130 DNR Regulatory Reminder Sent Download PDF file EMERGING CONTAMINANTS REMINDER LETTER
2020-08-17 130 DNR Regulatory Reminder Sent Download PDF file EMERGING CONTAMINANTS REMINDER LETTER
2020-07-01 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2020 - 6/30/2020
2020-06-25 198 Request for Additional Information (Fee-Based or Closure) REQUESTED CLOSURE PACKET CHANGES
2020-06-18 199 Additional Information Received (Fee-Based or Closure) REQUESTED CLOSURE PACKET CHANGES
2020-06-04 198 Request for Additional Information (Fee-Based or Closure) REQUESTED ADDITIONAL INFORMATION ABOUT VAPOR MONITORING SYSTEM
2020-05-19 99 Miscellaneous Download PDF file POST-CLOSURE VMS AGREEMENT WITH ADJACENT LANDOWNERS
2020-03-02 199 Additional Information Received (Fee-Based or Closure) AR Restart
2020-01-03 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2019 - 12/31/2019
2019-12-05 43 Site Activity Status Update Received Download PDF file ASPHALT PAVEMENT CAP INSTALLATION
2019-12-04 43 Site Activity Status Update Received Download PDF file SUB-SLAB VAPOR SAMPLE RESULTS; 301 S 2ND AVE
2019-09-12 79 Case Closure Review Request Received AUTO-ENTERED
2019-09-12 198 Request for Additional Information (Fee-Based or Closure) AR PAUSE - NO CLOSURE PACKET RECEIVED
2019-08-20 700 Database Fee Paid for Groundwater Continuing Obligation(s)
2019-08-20 710 Database Fee Paid for Soil Continuing Obligation(s)
2019-08-20 779 Case Closure Review Fee Received CASE CLOSURE REQUEST RECEIVED 02/03/2020, FEE RECEIVED 08/20/2019
2019-07-29 218 DERF - Cost Reimbursement Application Approved DC-672
2019-07-29 217 DERF - Cost Reimbursement Application Received DC-697
2019-07-02 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2019 - 6/30/2019
2019-06-24 151 Remedial Action (RA) Documentation Report Received (non-fee) Download PDF file REPORT OF LIMITED REMEDIAL EXCAVATION
2019-05-13 217 DERF - Cost Reimbursement Application Received
2019-01-11 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2018 - 12/31/2018
2018-08-28 99 Miscellaneous Download PDF file CO #16 APPROVED
2018-08-28 288 DERF - Cost Reimbursement Paid
2018-08-23 218 DERF - Cost Reimbursement Application Approved
2018-08-15 112 DERF - Change Order Received Download PDF file CO #16
2018-07-02 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2018 - 6/30/2018
2018-02-09 43 Site Activity Status Update Received Download PDF file CONFIRMATION SOIL BORINGS REPORT (UPDATED)
2018-02-09 99 Miscellaneous Download PDF file VARIANCE REQUEST APPROVED
2018-01-03 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2017 - 12/31/2017
2017-12-21 288 DERF - Cost Reimbursement Paid DC-635 $91,533.99 PAID
2017-10-19 217 DERF - Cost Reimbursement Application Received SI REIMBURESEMENT APPLICATION #3
2017-07-24 43 Site Activity Status Update Received Download PDF file REPORT OF GW NATURAL ATTENUATION MONITORING RECEIVED
2017-07-13 99 Miscellaneous Download PDF file CHANGE ORDER #15 APPROVED
2017-07-07 112 DERF - Change Order Received Download PDF file CHANGE ORDER #15 RECEIVED FOR INTERIM ACTION
2017-07-06 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2017 - 6/30/2017
2017-06-23 43 Site Activity Status Update Received Download PDF file SOIL BORINGS REPORT - INTERIM ACTION
2017-03-30 43 Site Activity Status Update Received RECEIVED CONFIRMATION SOIL SAMPLING PLAN
2017-02-21 92 Operation & Maintenance (O&M) Report Received (non-fee) Download PDF file 2016 SVE SYSTEM OM&M REPORT RECEIVED
2017-01-13 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2016 - 12/31/2016
2016-11-23 37 Site Investigation Report (SIR) Received (non-fee)
2016-11-11 214 DERF - Interim Action Workplan Approved CHANGE ORDER #14, INTERIM ACTION - CONFIRMATION SOIL SAMPLEING $12,586.00
2016-10-31 112 DERF - Change Order Received CHANGE ORDER #14, CONFIRMATION SOIL SAMPLING $12,586.00
2016-10-31 213 DERF - Interim Action Workplan Received CHANGE ORDER #14, INTERIM ACTION-CONFIRMATION SOIL SAMPLING $12,586.00
2016-09-21 99 Miscellaneous CONSULTANT LABOR RATE VARIANCE APPROVED
2016-09-13 99 Miscellaneous CONSULTANT LABOR RATE VARIANCE REQUESTED
2016-08-09 43 Site Activity Status Update Received REPORT OF 2ND AVE CONSTRUCTION OVERSITE
2016-08-02 218 DERF - Cost Reimbursement Application Approved APPROVAL FOR IA 2. EXPECTED PAY DATE AUG 2018
2016-07-13 217 DERF - Cost Reimbursement Application Received SI REIMBURSEMENT APPLICATION #2 RECEIVED
2016-07-12 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2016 - 6/30/2016
2016-06-15 218 DERF - Cost Reimbursement Application Approved
2016-06-15 218 DERF - Cost Reimbursement Application Approved
2016-04-20 99 Miscellaneous SVE SYSTEM RESTARTED
2016-03-17 217 DERF - Cost Reimbursement Application Received INTERIM ACTION CLAIM #2 RECEIVED
2016-03-01 99 Miscellaneous CO #13 APPROVED
2016-02-23 112 DERF - Change Order Received
2016-01-20 92 Operation & Maintenance (O&M) Report Received (non-fee) SEMI-ANNUAL SVE SYSTEM O&M REPORT RECEIVED
2016-01-08 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2015 - 12/31/2015
2015-12-04 99 Miscellaneous CO# 12 (REV. 1) APPROVED
2015-12-04 99 Miscellaneous CO#12 APPROVED FOR MONITORING AND SI: $99.786
2015-09-29 98 Technical Assistance Provided
2015-09-10 99 Miscellaneous CHANGE ORDER #11 APPROVED FOR ASPHALT WORK FOR $3365.00
2015-09-09 99 Miscellaneous MEETING TO DISCUSS STATUS. ADDL MW'S NEEDED. FULL SVE SYSTEM RUNNING. NEED TO EVALUATE VI MONITORING
2015-09-01 43 Site Activity Status Update Received GW DATA SUBMITED. PROPOSING ADDITIONAL WELLS TO FINISH SITE INVESTIGATION
2015-08-26 113 DERF - Bid Review Request Received CHANGE ORDER #11 SUBMITTED FOR PATCHING ASPHALT PARKING LOT FROM SVE SYSTEM CONSTRUCTION
2015-08-17 97 Technical Assistance Request Received (fee) CH# 14416253
2015-08-14 99 Miscellaneous SOIL MANAGEMENT PLAN SUBMITTED FOR SECOND AVENUE CONSTRUCTION.
2015-07-14 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2015 - 6/30/2015
2015-07-02 151 Remedial Action (RA) Documentation Report Received (non-fee) CONSTRUCTION REPORT SUBMITTED FOR THE SVE SYSTEM
2015-05-29 43 Site Activity Status Update Received Download PDF file ADDITIONAL SOIL DATA SUBMITTED
2015-05-11 99 Miscellaneous SECURITY FENCE INSTALLED AROUND SVE TRAILER
2015-05-11 99 Miscellaneous SECURITY FENCE INSTALLED AROUND THE SVE TRAILER
2015-05-04 99 Miscellaneous CHANGE ORDER #10 APPROVED
2015-05-04 99 Miscellaneous CHANGE ORDER #10 APPROVED
2015-05-04 99 Miscellaneous CHANGE ORDER #10 APPROVED
2015-05-01 112 DERF - Change Order Received CHANGE ORDER #10 SUBMITTED FOR SVE SYSTEM FENCE INSTALLATION & 1 YEAR RENTAL
2015-05-01 112 DERF - Change Order Received CHANGE ORDER #10 SUBMITTED FOR SECURITY FENCE FOR SVE SYSTEMS TRAILER
2015-05-01 112 DERF - Change Order Received CHANGE ORDER #10 SUBMITTED FOR SECURITY FENCE FOR SVE SYSTEM'S TRAILER
2015-03-24 43 Site Activity Status Update Received ADDITIONAL SOIL AND GROUNDWATER DATA SUBMITTED
2015-03-16 43 Site Activity Status Update Received VAPOR INTRUSTION SAMPLING RESULTS SUBMITTED
2015-03-12 99 Miscellaneous SVE WELL INSTALLATION SCHEDULED FOR 04/08/2015
2015-02-26 217 DERF - Cost Reimbursement Application Received IA #1
2015-02-18 99 Miscellaneous SOIL VORING WORK SCHEDULED FOR LAST WEEK OF FEBRUARY
2015-01-30 99 Miscellaneous MTG TO DISCUSS CHANGE ORDERS AND CLAIMS
2015-01-14 99 Miscellaneous VARIANCE REQUEST APPROVED
2015-01-13 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2014 - 12/31/2014
2015-01-13 112 DERF - Change Order Received CHANGE ORDER #9 SUBMITTED FOR SI WORK AND VAPOR INTRUSION SAMPLING
2015-01-08 99 Miscellaneous ADDITIONAL INFORMATION SUBMITTED FOR VARIANCE
2015-01-07 99 Miscellaneous MET WITH CONSULTANT TO DISCUSS VARIANCE REQUEST AND SVE SYSTEM ISSUES.
2014-12-22 99 Miscellaneous REQUEST ADDITIONAL INFORMATION ON LABOR RATE VARIANCE REQUEST
2014-12-15 92 Operation & Maintenance (O&M) Report Received (non-fee) SVE SEMI ANNUAL O&M REPORT SUBMITTED
2014-12-10 217 DERF - Cost Reimbursement Application Received INTERIM ACTION REIMBURSEMENT CLAIM
2014-11-26 218 DERF - Cost Reimbursement Application Approved IMMEDIATE ACTION REIMBURSEMENT
2014-11-18 99 Miscellaneous MTG WITH CDA AND CONSULTANT TO DISCUSS CO#8 FOR SVE SYSTEM INSTALL.
2014-11-13 99 Miscellaneous REVISED CHANGE ORDER #8 SUBMITTED
2014-11-13 99 Miscellaneous CHANGE ORDER #8 APPROVED
2014-11-04 99 Miscellaneous APPROVE REQUEST TO REDUCE MONTHLY MANOMETER READINGS TO QUARTERLY
2014-10-31 112 DERF - Change Order Received INTERIM ACTION SVE CHANGE ORDER #8 SUBMITTED
2014-10-31 99 Miscellaneous VARIANCE REQUEST FOR LABOR RATE CHANGES SUBMITTED
2014-10-15 217 DERF - Cost Reimbursement Application Received
2014-09-30 99 Miscellaneous REQUEST VARIANCE TO 724.13(2)(M) FOR REDUCING MANOMETER READINGS FROM MONTHLY TO QUARTERLY
2014-09-25 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2014 - 6/30/2014
2014-09-22 99 Miscellaneous MEETING HELD WITH CDA, THEIR CONSULTANT AND DNR TO DISCUSS SITE STATUS
2014-08-26 99 Miscellaneous CONFERENCE CALL TO DISCUSS SITE STATUS AND NEXT STEPS INCLUDING FINISHING THE SI
2014-08-26 147 Remedial Action (RA) Design Report Received (non-fee) DESIGN REPORT SUBMITTED FOR INTERIM ACTION
2014-08-04 43 Site Activity Status Update Received SUB-SLAB AND INDOOR AIR SAMPLE RESULTS SUBMITTED
2014-07-30 99 Miscellaneous ADDENDUM TO MITIGATION/SVE SYSTEM OPERATION & MTC PLAN SUBMITTED.
2014-07-30 99 Miscellaneous ADDENDUM TO O&M PLAN FOR VMS AT CALLON STREET LOCATION
2014-07-14 99 Miscellaneous O&M PLAN MISSING INFORMATION. REQUESTED ADDL INFORMATION AS REQUIRED IN 724.13 WIS ADM CODE
2014-07-11 99 Miscellaneous OPERATION & MAINTENANCE PLAN FOR VAPOR MITIGATION SYSTEM SUBMITTED
2014-06-26 99 Miscellaneous CHANGE ORDER #7 APPROVED
2014-06-17 99 Miscellaneous INTERIM SVE SYSTEM STARTED
2014-06-04 214 DERF - Interim Action Workplan Approved SVE INTERIM ACTION
2014-06-03 99 Miscellaneous MITIGATION SYSTEM STARTED
2014-05-30 213 DERF - Interim Action Workplan Received SAOIL VAPOR EXTRACTION PLAN
2014-05-20 99 Miscellaneous CONFERENCE CALL TO DISCUSS NOTIFICATION LETTERS
2014-05-09 99 Miscellaneous NON MONETARY CHANGE ORDER #5 APPROVED. ADDRESS LIST SUBMITTED
2014-04-30 99 Miscellaneous ADDITIONAL INFORMATION SUBMITTED FOR CHANGE ORDER #5
2014-04-28 99 Miscellaneous CHANGE ORDER #6 APPROVED
2014-04-25 112 DERF - Change Order Received REVISED CHANGE ORDER #6 SUBMITTED
2014-04-10 99 Miscellaneous MEETING WITH CONSULTANT, WAUSAU CDA AND HEALTH DEPARTMENTS TO DISCUSS VAPOR INTRUSION.
2014-02-28 99 Miscellaneous SITE VISITS FOR POTENTIAL INDOOR AIR SAMPLING
2014-02-06 99 Miscellaneous MET WITH WAUSAU CDA AND THEIR CONSULTANT TO DISCUSS NEXT STEPS
2014-01-30 130 DNR Regulatory Reminder Sent DERF FUNDING STATUS LTR
2014-01-15 99 Miscellaneous CHANGE ORDER #3 APPROVED FOR ADDITIONAL SUB-SLAB SAMPLING & REPORTING
2013-12-06 112 DERF - Change Order Received ADDITIONAL VAPOR INTRUSTION ACTIVITIES
2013-12-05 99 Miscellaneous REQUESTED ADDITIONAL INFORMATION FOR CHANGE ORDER#3
2013-12-03 99 Miscellaneous MET WITH CITY TO DISCUSS SITE STATUS
2013-10-03 99 Miscellaneous SITE VISITS TO SURROUNDING PROPERTY OWNERS TO EVALUATE SUB-SLAB SAMPLING
2013-08-16 99 Miscellaneous SIGNED ACCESS AGREEMENTS SUBMITTED
2013-06-11 218 DERF - Cost Reimbursement Application Approved DERF CLAIM PAYMENT $40,346.50
2013-06-10 99 Miscellaneous MTG W/CONSULTANT, COMMUNITY DEVELOPMENT AUTHORITY AND CITY TO DISCUSS NEXT PHASE OF ACTIVITIES
2013-05-24 99 Miscellaneous CHANGE ORDER #2 APPROVED
2013-05-07 99 Miscellaneous DISCUSSION WITH CONSULTANT REGARDING MISSING CLAIM ITEMS. WILL SUBMIT WITHIN THE NEXT WEEK.
2013-03-09 99 Miscellaneous AUDIT DEADLINE EXTENDED DUE TO MISSING INFO AND CHANGE IN CONSULTANT STAFF
2013-02-07 99 Miscellaneous 94
2013-01-29 99 Miscellaneous CONFERENCE CALL TO DISCUSS SOIL AND VAPOR RESULTS
2013-01-08 99 Miscellaneous APPROVE INCREASE IN CONSULTANTS UNIT RATES
2012-12-28 217 DERF - Cost Reimbursement Application Received
2012-09-13 99 Miscellaneous MTG WITH THE CITY, CDA AND CONSULTANT-DISCUSS PROJECT PLANS. CDA WILL SUBMIT REIMBURSEMENT CLAIMS
2012-08-07 38 Site Investigation Report (SIR) Approved
2012-08-07 38 Site Investigation Report (SIR) Approved NEED ADDITIONAL SOIL & GW SITE INVESTIGATION
2011-12-12 98 Technical Assistance Provided HAZARDOUS WASTE DETERMINATION APPROVED
2011-12-11 199 Additional Information Received (Fee-Based or Closure)
2011-11-11 198 Request for Additional Information (Fee-Based or Closure) REQUESTED INFO ON HAZ WASTE DISPOSAL
2011-09-07 130 DNR Regulatory Reminder Sent Download PDF file Vapor Intrusion (VI) Assessment Notification Ltr Sent
2011-08-01 199 Additional Information Received (Fee-Based or Closure) CLARIFICATION SUBMITTED
2011-07-13 198 Request for Additional Information (Fee-Based or Closure) REQUESTED CLARIFICATION ON TABLES
2011-04-01 199 Additional Information Received (Fee-Based or Closure) ADDITIONAL INFORMATION FOR CONTAINED OUT DETERMINATION RCVD
2011-03-25 198 Request for Additional Information (Fee-Based or Closure) ASKED FOR CLARIFICATION & PROVIDED SI REVIEW COMMENTS
2011-02-28 37 Site Investigation Report (SIR) Received (non-fee) GW PLUME NOT DEFINED COMPLETELY.
2011-01-24 97 Technical Assistance Request Received (fee) CK #014077621
2011-01-24 216 DERF - Contained-in Rulings Review Request Received FEE WILL BE SUBMITTED AT A LATER DATE
2009-09-15 99 Miscellaneous CHANGE ORDER #1 APPROVED.
2009-08-13 112 DERF - Change Order Received RP SUBMITTED MODIFIED CHANGE ORDERS.
2009-02-26 99 Miscellaneous ADD'L QUESTIONS FOR CONSULTANT RE; CHANGE ORDERS.
2009-02-23 112 DERF - Change Order Received MODIFIED WORKPLAN & COSTS SUBMITTED FOR ADD'L SITE INVESTIGATION WORK.
2009-02-02 99 Miscellaneous DENIED CHANGE ORDER FOR ADD'L INFORMATION.
2009-01-26 112 DERF - Change Order Received COST ESTIMATE FOR ADD'L WELLS AND SOIL BORNINGS.
2008-12-22 99 Miscellaneous MTG WITH CITY AND CONSULTANT TO DISCUSS ADD'L SITE INVESTIGATION.
2008-12-22 99 Miscellaneous EXTENT OF SOIL & GW CONTAMINATION NOT DEFINED.
2008-08-27 36 Site Investigation Workplan (SIWP) Approved APPROVAL LETTER FOR WORK PLAN AND COST SENT OUT.
2008-08-04 99 Miscellaneous FORM 4400-212 SUBMITTED. STS CHOSEN AS THE CONSULTANT.
2008-08-04 99 Miscellaneous CONSULTANT & COSTS APPROVED.
2008-07-03 35 Site Investigation Workplan (SIWP) Received (non-fee)
2008-06-17 113 DERF - Bid Review Request Received BIDS REC'D FROM 4 CONSULTANTS
2008-06-11 99 Miscellaneous PRE-BID SITE VISIT.
2008-05-23 99 Miscellaneous REQUESTS FOR PROPOSALS SENT OUT. PROPOSALS DUE JUNE 17, 2008.
2007-09-12 111 DERF - Site Investigation Scoping Report Received SITE SCOPING INFORMATION.
2007-06-13 110 DERF - Potential Claim Form Approved
2007-05-24 99 Miscellaneous POTENTIAL CLAIM NOTIFICATION REC'D.
2007-03-29 99 Miscellaneous SIGNED SAG GRANT AGREEMENT. GRANT PERIOD FROM 3/29/07 TO 3/29/08.
2006-09-27 99 Miscellaneous MET WITH CITY TO DISCUSS STATUS & CITY'S ACQUIRING THE PROPERTY.
2006-08-16 35 Site Investigation Workplan (SIWP) Received (non-fee) WORKPLAN FOR MONITORING WELL INSTALLATION.
1999-07-21 99 Miscellaneous DNR REQUESTS COMPLETE SI BEFORE SUBMITTING FOR CLOSURE
1999-04-05 99 Miscellaneous REQUEST TO RECONSIDER CLOSURE
1998-09-14 35 Site Investigation Workplan (SIWP) Received (non-fee) ADD'L SOILS WORK
1996-07-01 80 Closure Not Recommended SI-DE
1995-10-31 99 Miscellaneous REQUEST TO RECONSIDER CLOSURE
1995-08-01 99 Miscellaneous PROVIDE FINANCIAL INFO FOR ABILITY TO PAY
1995-07-24 80 Closure Not Recommended SI-DE
1995-04-27 43 Site Activity Status Update Received ATTEMPTED TO INSTALL MW
1995-04-26 179 Case Closure Review Request Received (non-fee)
1994-03-01 35 Site Investigation Workplan (SIWP) Received (non-fee) INSTALL MONITORING WELLS
1993-05-18 99 Miscellaneous LETTER CONTACT - DENY CLOSURE REQUEST.
1993-05-18 80 Closure Not Recommended REVIEWED FOR CLOSURE/NC
1992-09-14 33 Tank System Site Assessment (TSSA) Report Received TANK CLOSURE/SA REPORT RECEIVED.
1992-06-23 1 Notification of Hazardous Substance Discharge
1992-05-27 99 Miscellaneous LETTER CONTACT: TANK PULL PROCEDURES.
1992-05-07 99 Miscellaneous TANKS PULLED. PETROLEUM & SOLVENT.
1992-05-07 99 Miscellaneous PHONE CONVERSATION RE: TANK PULL STARTED.
1992-02-04 99 Miscellaneous RP RESPONSE; REQUEST EXTENSION.
1991-12-09 99 Miscellaneous DNR REQUESTS REMOVAL OF UST'S
1991-12-09 2 Responsible Party (RP) letter sent
1991-12-09 99 Miscellaneous LETTER TO MS. MARSCHALL FROM RICH BROWN.
1991-12-09 99 Miscellaneous PHONE CONVERSATION RE: WHERE ARE TANKS LOCATED.
1991-12-06 99 Miscellaneous PHONE CONVERSATION; USTS CONTAIN GAS & SOLVENT.
1991-12-02 99 Miscellaneous PHONE CONVERSATION RE: MONEY FOR CLEANUP.
1991-11-20 99 Miscellaneous TELEPHONE CONVERSATION; 5 USTS AT CLEANERS.
1991-11-20 99 Miscellaneous LUST TRACKING FORM
Relationships to Other Activities
Click Activity Below to View Details
Type Related Activity
Affected by Property -> 02-09-000267 NATIONAL PRESTO (SF NPL)
Monitoring Well Remains at Closure
Reasons when Action Code 234 is Present
MW WAS NOT ABLE TO BE LOCATED
For More Information on this Activity