WIDNR on FaceBook  WIDNR on Twitter  WIDNR on YouTube  WIDNR on Instagram  WIDNR on LinkedIn  WIDNR Podcast  WIDNR on Pinterest

ENVIRONMENTAL CLEANUP & BROWNFIELDS REDEVELOPMENT
BRRTS on the Web

Click the Location Name or FID below to view the Location Details page. If additional Activities are present at this location, they may be accessed from Location Details.

ACTIVITY DETAILS

 
02-08-585360 CALUMET VILLAGE
Activity Type / Status Jurisdiction
ERP  CLOSED DNR RR
Location Name County DNR Region
PEERLESS LAUNDERERS & CLEANERS CALUMET NORTHEAST
Address Municipality
1717 E CALUMET ST APPLETON
PLSS Description Latitude (WGS84) Longitude (WGS84) Google Maps RR Sites Map
NW 1/4 of the NW 1/4 of Sec 05, T20N, R18E 44.2436784 -88.3788788 Click to view on Google Maps using Lat/Long Click to View RR Sites Map
Additional Activity Details Acres
Electronic Only - No Hard File 1
Facility ID PECFA No. EPA ID Start Date End Date
445081010 2020-02-26 2023-01-13
Characteristics
Above Ground
Petrol Tank

Drycleaner
EPA
NPL Site
EPA
Superfund
PECFA Funds
Eligible

PFAS

ROW Impact

Sediments
Underground
Petrol Tank
WI DOT
Site
Drycleaner Flag  
Actions and Documents
Date Code Name File Comment
2023-01-13 11 Activity Closed
2023-01-13 56 Continuing Obligation(s) Applied Download PDF file RESIDUAL SOIL CONTAMINATION, RESIDUAL GW CONTAMINATION, CAP MAINTENANCE & STRUCTURAL IMPEDIMENT
2023-01-13 222 Continuing Obligation - Maintain Cap Over Contaminated Area CAP REQUIRED FOR GROUNDWATER PROTECTION IN AREA OF MW-2; MAINTAIN EXISTING BUILDING & SURFACE COVER
2023-01-13 224 Continuing Obligation - Structural Impediment to Cleanup CURRENT SITE BUILDING IS A STRUCTURAL IMPEDIMENT FOR COMPLETING THE SITE INVESTIGATION
2023-01-13 226 Continuing Obligation - Vapor Intrusion Response FOR RESIDUAL CVOC CONTAMINATION
2023-01-13 232 Continuing Obligation - Residual Soil Contamination
2023-01-13 236 Continuing Obligation - Residual GW Contamination
2022-12-14 190 Remaining Actions Needed Requirements Met or Docs Received Download PDF file WELL ABANDONMENT FORMS AND WASTE DOCUMENTATION
2022-12-08 84 Remaining Actions Needed Download PDF file MONITORING WELL ABANDONMENT; INVESTIGATIVE WASTE DISPOSAL
2022-10-17 79 Case Closure Review Request Received Indicates multiple files are linked to this action AUTO-ENTERED
2022-10-05 779 Case Closure Review Fee Received
2022-10-05 700 Database Fee Paid for Groundwater Continuing Obligation(s)
2022-10-05 710 Database Fee Paid for Soil Continuing Obligation(s)
2022-07-26 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2022 - 6/30/2022
2022-07-06 43 Site Activity Status Update Received Download PDF file SOIL, GROUNDWATER, VAPOR RESULTS & UPDATED TABLES & FIGURE
2022-06-09 30 Site Investigation Workplan (SIWP) Notice to Proceed (NTP) Download PDF file
2022-06-03 35 Site Investigation Workplan (SIWP) Received (non-fee) Download PDF file ADDITIONAL MONITORING WELL, ADDITIONAL SOIL BORINGS, & ADDITIONAL VAPOR PORT PROPOSED
2022-05-19 140 Site Investigation Report (SIR) Not Approved Download PDF file ADDITIONAL MONITORING WELL, ADDITIONAL SOIL INVESTIGATION & ADDITIONAL VAPOR PORT REQUESTED
2022-05-19 118 PFAS Sampling Not Required At This Time SEE AC 140 OF SAME DATE FOR DOCUMENTATION
2022-04-15 137 Site Investigation Report (SIR) Received (fee) Download PDF file
2022-04-15 114 PFAS Scoping Statement Received SEE AC 137 DATED 4/15/2022 FOR DOCUMENTATION
2022-01-31 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2021 - 12/31/2021
2021-09-15 43 Site Activity Status Update Received Download PDF file AUGUST GROUNDWATER RESULTS
2021-08-04 43 Site Activity Status Update Received Download PDF file SOIL & GROUNDWATER RESULTS
2021-08-04 43 Site Activity Status Update Received Download PDF file VAPOR INVESTIGATION RESULTS
2021-07-30 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2021 - 6/30/2021
2021-06-22 43 Site Activity Status Update Received Download PDF file JUNE GROUNDWATER RESULTS
2021-04-06 130 DNR Regulatory Reminder Sent Download PDF file VAPOR INTRUSION AND TCE REMINDER LETTER
2021-01-28 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2020 - 12/31/2020
2021-01-26 43 Site Activity Status Update Received Download PDF file GROUNDWATER MONITORING RESULTS (JAN 2021)
2020-11-04 43 Site Activity Status Update Received Download PDF file SI SAMPLE RESULTS; SOIL & GROUNDWATER
2020-10-14 43 Site Activity Status Update Received FINAL STATE LEAD INVOICE RECEIVED FOR PROPOSAL 2018 SOW & BUDGET (VIA EMAIL)
2020-08-17 130 DNR Regulatory Reminder Sent Download PDF file EMERGING CONTAMINANTS REMINDER LETTER
2020-07-30 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2020 - 6/30/2020
2020-07-30 43 Site Activity Status Update Received Download PDF file VAPOR RESULTS & UPDATED SAMPLE LOCATION MAP
2020-07-15 43 Site Activity Status Update Received Download PDF file GW SAMPLING RESULTS (JULY 2020)
2020-05-05 43 Site Activity Status Update Received Download PDF file GW SAMPLING UPDATE (APR 2020)
2020-03-27 30 Site Investigation Workplan (SIWP) Notice to Proceed (NTP) Download PDF file
2020-03-26 35 Site Investigation Workplan (SIWP) Received (non-fee) Download PDF file
2020-03-11 2 Responsible Party (RP) letter sent Download PDF file
2020-02-26 1 Notification of Hazardous Substance Discharge Download PDF file SITE ASSESSMENT - 11/21/2019
2020-02-26 29 Phase II Environmental Site Assessment (ESA) Rpt Received SEE AC 1 FOR DOCUMENTATION
Substances
Substance Type Amt Released Units
Tetrachloroethene (Perchloroethylene) VOC
Trichloroethylene Industrial Chem
Vapor Intrusion Continuing Obligation(s)
(E) Future Redevelopment of Property – Vapor Control Technology Required for Construction: DNR requires notification prior to new building construction or building modifications. Potential for vapor intrusion exists due to residual contamination. Vapor control technologies are required to be installed or modified, and verified protective unless a vapor evaluation is accepted by DNR.
Responsible Party
BRIDGEVIEW ASSOCIATES LLP 3305 N BALLARD RD STE C, APPLETON, WI 54911
For More Information on this Activity
Northeast Region Contact: Denise Danelski  denise.danelski@wisconsin.gov
585360 | 02-08-585360
BOTW Release 4.14 | 09/17/2024 | Release Notes  Help  Disclaimers  Glossary of Terms  Supplemental Pages