Watershed - Lower Lemonweir River (LW27)
Lower Lemonweir River Watershed

Details

The Lower Lemonweir River Watershed is located in the driftless region of Wisconsin in Juneau County. All the creeks and ditches drain to the Lemonweir River, which then flows into the Wisconsin River. Many of the creeks in the watershed consist of sand and silt substrates, with low gradients and small to moderately sized attached spring ponds. Forest covers the largest percent of land in the watershed, although agriculture also covers a high percent of land. Wetlands account for just over 13% of the watershed, a percent that is higher than most of the watersheds in the Lower Wisconsin Basin. This high number of wetlands could explain why the Lower Lemonweir River Watershed is the second largest producer of cranberries in the Basin.

Date  2002

Population, Land Use

Population in the watershed for the year 2000 was estimated to be close to 9,874. Overall, population growth in the watershed is low.

Date  2002

Nonpoint and Point Sources

Overall, nonpoint source pollution from both urban and rural sources is considered the primary cause of water quality problems in streams in the Lower Lemonweir River watershed. The groundwater in the Lower Lemonweir River Watershed has been ranked as a high priority with respect to nonpoint source pollution reduction. The cause of groundwater contamination from nonpoint sources of pollution may result from over fertilizing and over spreading of manure on agriculture fields. In fact, there are a couple of areas in the watershed that are considered to be atrazine prohibition zones. These areas indicated that elevated levels of atrazine, an herbicide used on corn, has been found in some tested private water wells. Soils are permeable which has allowed atrazine to reach the groundwater in some locations. Some work is being done in this watershed to help clean up the surface and groundwater in this watershed. Nonpoint actives are currently being done on Little Onemile Creek, Onemile Creek and unnamed tributaries to Onemile Creek. Students at Mauston High School, with cooperation from the wildlife management classes and the DNR, are conducting in-stream trout habitat work on Onemile Creek. There are two permitted municipal discharges in the Lower Lemonweir River watershed Mauston and New Lisbon. The municipality of Mauston discharges their wastewater treatment plant to the Lemonweir River while New Lisbon discharges to a tributary flowing to the Lemonweir River.

Date  2002

Ecological Landscapes for Lower Lemonweir River Watershed

Ecological Landscapes

The Lower Lemonweir River Watershed is primarily located in the Central Sand Plains Ecological Landscape which is located in central Wisconsin, occurs on a flat, sandy lake plain, and supports agriculture, forestry, recreation, and wildlife management. The Ecological Landscape formed in and around what was once Glacial Lake Wisconsin, which contained glacial meltwater extending over 1.1 million acres at its highest stage. Soils are primarily sandy lake deposits, some with silt-loam loess caps. Sandstone buttes carved by rapid drainage of the glacial lake, or by wave action when they existed as islands in the lake, are distinctive features of this landscape. The historic vegetation of the area included extensive wetlands of many types, including open bogs, shrub swamps, and sedge meadows. Prairies, oak forests, savannas and barrens also occurred in the Ecological Landscape. An area of more mesic forest with white pine and hemlock was found in the northwest portion, including a significant pinery in eastern Jackson County. Today, nearly half of the Ecological Landscape is nonforested, in agriculture and grassland. Most of the historic wetlands were drained early in the 1900s and are now used for vegetable cropping. The forested portion is mostly oak-dominated forest, followed by aspen and pines. A minor portion is maple-basswood forest and lowland hardwoods. The Lower Lemonweir River Watershed has a variety of good quality habitats and rare plant communities that are listed on the state's Natural Heritage Inventory, (NHI), kept by the Bureau of Endangered Resources. These communities include: dry cliff, dry prairie, dry-mesic prairie, hemlock relict, southern dry forest, southern dry-mesic forest, alder thicket, moist cliff, floodplain forest, northern dry-mesic forest, northern mesic forest, oak barrens, pine barrens, pine relict, northern sedge meadow, northern wet forest, shrub-carr, springs and spring runs, soft, and slow, hard, warm stream.

Date  2002

Recreational Opportunities

The Lower Lemonweir River Watershed contains a wide variety of activities to suit any recreational need. The Wisconsin River follows along the eastern edge of the watershed. This stretch of the river is a maze of braided channels, islands and bluffs. The diverse fisheries in the tributaries to the Wisconsin River offers game fishing to suit any angler. Public easements throughout the watershed allow access to Class I and II trout streams.

Date  2002

Wildlife and Habitat

The watershed is also home for a variety of rare plant and animal species including; 1 species of beetle, 2 species of birds, 4 species of dragonflies, 1 species of fish, 1 species of lizard, 1 species of mussel, and 14 plant species. These plants and animals are also listed on the state's Natural Heritage Inventory.

Date  2002

Watershed Documents
Watershed Grants
Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Amey Pond
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Amey Pond
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Amey Pond
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Arkdale Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Arkdale Lake
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Arkdale Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2009
Waters Involved
Arkdale Lake
Status
Complete

Adams County: Lco-Adams Ordinance Imple. Assistance: The Adams County Land and Water Conservation Department proposes to facilitate revision of the county's Shoreland Protection Ordinance and to train a LWCD staff person to work with shoreland property owners to establish shoreland buffers and other practices necessary to comply with the new shoreland ordinance. Major project elements to include: 1) Staff training, 2) Outreach and counsulting to shoreland property owners, 3) Development of shoreline restoration plans and agreements, 4) Installation oversight, and 5) Update of the county's Riparian Buffer GIS layer to track practice installation.


Grant Details
Lake Protection Grant
Date
9/1/2006
Waters Involved
Big Roche A Cri Creek
Status
Complete

Adams County: Res-Castle Rock Restoration: Adams County proposes to provide up to 75% of the cost of shoreland restoration practices to lake front property owners on Castle Rock Lake. Grant funds will be distributed to fund removal of sea walls, minor bank re-shaping, placement of rip-rap, establishment of vegetative buffers and implementation of individual stormwater management plans.

Special Conditions: 1) Space between rip-rap to be filled with soil and vegetated to facilitate successful access of turtle hatchlings to water. Lupine seed to be of a wild variety compatible with Karner Blue butterflies. 2) Permits to be secured by individual property owners prior to construction.


Grant Details
Lake Protection Grant
Date
9/1/2007
Waters Involved
Big Roche A Cri Creek
Status
Complete

Adams County: Res-Big Roche-A-Cri Restoration 2: Adams County proposes to provide up to 75% of the cost of shoreland restoration practices to lake front property owners with highly erodable shorelines on Big Roche-a-Cri Lake. Grant funds will be distributed to the property owners to install shoreline protection, riparian buffers and stormwater management practices.


Grant Details
Lake Protection Grant
Date
9/1/2009
Waters Involved
Big Roche A Cri Creek
Status
Complete

Adams County: Lco-Adams Ordinance Imple. Assistance: The Adams County Land and Water Conservation Department proposes to facilitate revision of the county's Shoreland Protection Ordinance and to train a LWCD staff person to work with shoreland property owners to establish shoreland buffers and other practices necessary to comply with the new shoreland ordinance. Major project elements to include: 1) Staff training, 2) Outreach and counsulting to shoreland property owners, 3) Development of shoreline restoration plans and agreements, 4) Installation oversight, and 5) Update of the county's Riparian Buffer GIS layer to track practice installation.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Big Roche a Cri
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Big Roche a Cri
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Big Roche a Cri
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2007
Waters Involved
Big Roche a Cri
Status
Complete

Adams County: Res-Big Roche-A-Cri Restoration 2: Adams County proposes to provide up to 75% of the cost of shoreland restoration practices to lake front property owners with highly erodable shorelines on Big Roche-a-Cri Lake. Grant funds will be distributed to the property owners to install shoreline protection, riparian buffers and stormwater management practices.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Big Spring Pond
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Big Spring Pond
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Big Spring Pond
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Camelot Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Camelot Lake
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Camelot Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Camelot Lake
Status
Complete

Adams County: Res-Camelot Lake Restoration: Adams Co. proposes to establish four shoreline protection/restoration sites for demonstration purposes on Camelot Lake, and to cost share on similar practices on 27 privately owned parcels. Major project elements include: 1) riprap and anchored log shoreline stabalization, 2) establishment and maintenance of 35' vegetated buffer strips, 3) stormwater management planning and implementation for structures.


Grant Details
Lake Protection Grant
Date
10/1/2013
Waters Involved
Castle Rock Ditch
Status
Complete

Adams County: Res-Adams Ord. Imp. 2: Adams County proposes to provide educational and technical assistance to the public and Adams County lake organizations for the installation of shoreline buffers on waterways so they comply with the Admas County Shorland, Wetland, and Habitat Protection Ordinance. Major project elements to include: a) outreach and education, b) review of plans, designs, and maintenance agreements, c) development of plans, designs, and agreements, d) inventory of public access points on all project waterways. Project will include notification of riparian property whose property is in conformance with the buffer standard and that the buffer must stay in compliance with the buffer standard. Signed maintenance agreements must be kept on record by Adams County.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Castle Rock Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Castle Rock Lake
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Castle Rock Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2006
Waters Involved
Castle Rock Lake
Status
Complete

Adams County: Res-Castle Rock Restoration: Adams County proposes to provide up to 75% of the cost of shoreland restoration practices to lake front property owners on Castle Rock Lake. Grant funds will be distributed to fund removal of sea walls, minor bank re-shaping, placement of rip-rap, establishment of vegetative buffers and implementation of individual stormwater management plans.

Special Conditions: 1) Space between rip-rap to be filled with soil and vegetated to facilitate successful access of turtle hatchlings to water. Lupine seed to be of a wild variety compatible with Karner Blue butterflies. 2) Permits to be secured by individual property owners prior to construction.


Grant Details
Lake Protection Grant
Date
10/1/2013
Waters Involved
Castle Rock Lake
Status
Complete

Adams County: Res-Adams Ord. Imp. 2: Adams County proposes to provide educational and technical assistance to the public and Adams County lake organizations for the installation of shoreline buffers on waterways so they comply with the Admas County Shorland, Wetland, and Habitat Protection Ordinance. Major project elements to include: a) outreach and education, b) review of plans, designs, and maintenance agreements, c) development of plans, designs, and agreements, d) inventory of public access points on all project waterways. Project will include notification of riparian property whose property is in conformance with the buffer standard and that the buffer must stay in compliance with the buffer standard. Signed maintenance agreements must be kept on record by Adams County.


Grant Details
Lake Protection Grant
Date
10/1/2013
Waters Involved
Castle Rock Lake
Status
Proposed

Adams County: Res-Adams Ord. Imp. 2: Adams County proposes to provide educational and technical assistance to the public and Adams County lake organizations for the installation of shoreline buffers on waterways so they comply with the Admas County Shorland, Wetland, and Habitat Protection Ordinance. Major project elements to include: a) outreach and education, b) review of plans, designs, and maintenance agreements, c) development of plans, designs, and agreements, d) inventory of public access points on all project waterways. Project will include notification of riparian property whose property is in conformance with the buffer standard and that the buffer must stay in compliance with the buffer standard. Signed maintenance agreements must be kept on record by Adams County.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Crooked Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Crooked Lake
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Crooked Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Deep Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Deep Lake
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Deep Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Dorro Couche Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Dorro Couche Lake
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Dorro Couche Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Easton Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Easton Lake
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Easton Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Fawn Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Fawn Lake
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Fawn Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Fenner Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Fenner Lake
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Fenner Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2010
Waters Involved
Fourteenmile Creek
Status
Complete

Adams County: Lco-Shoreland Ordinance Rev.: Adams County proposes to amend or create a shoreland zoning ordinance that complies with the requirements of NR 115, Wisconsin Administrative Code (as revised effective February 1, 2010) and retain existing regulations that exceed the water resource protections of NR 115 or are specific or unique to local needs.

Project deliverables include: 1. Copies of any fact sheets or handouts created for public hearings. 2. A summary of the comments received at public hearings. 3. A certified copy of the County Board-approved updated shoreland ordinance or ordinance language (if integrated into other codes). 4. Any GIS maps of the shoreland zone or shoreland condition surveys related to the project.

Specific conditions for this Project: 1. The WDNR will be provided electronic and hard copies of all data and or reports or surveys generated as a result of this project.



Grant Details
Lake Protection Grant
Date
9/1/2013
Waters Involved
Fourteenmile Creek
Status
Complete

Adams County: Lmi-Tri-Lakes Nutrient Mgmt. Plan: Adams County proposes to develop nutrient management plans for 4,470 acres of crop land within the Tri-Lakes Watershed. Major project elements to include: a) outreach to landowners, b) development of nutrient management plans, c) weekly water sampling, d) water quality analysis, and e) cost share payments.

Amended 1/22/15 to include installation of wind breaks, filter streps, residue and tillage management, and planting cover crops.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Friendship Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Friendship Lake
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Friendship Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Goose Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Goose Lake
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Goose Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Hill Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Hill Lake
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Hill Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Jordan Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Jordan Lake
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Jordan Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2006
Waters Involved
Klein Creek
Status
Complete

Adams County: Res-Castle Rock Restoration: Adams County proposes to provide up to 75% of the cost of shoreland restoration practices to lake front property owners on Castle Rock Lake. Grant funds will be distributed to fund removal of sea walls, minor bank re-shaping, placement of rip-rap, establishment of vegetative buffers and implementation of individual stormwater management plans.

Special Conditions: 1) Space between rip-rap to be filled with soil and vegetated to facilitate successful access of turtle hatchlings to water. Lupine seed to be of a wild variety compatible with Karner Blue butterflies. 2) Permits to be secured by individual property owners prior to construction.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Lake Arrowhead
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Lake Arrowhead
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Lake Arrowhead
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2010
Waters Involved
Lake Arrowhead
Status
Complete

Adams County: Lco-Shoreland Ordinance Rev.: Adams County proposes to amend or create a shoreland zoning ordinance that complies with the requirements of NR 115, Wisconsin Administrative Code (as revised effective February 1, 2010) and retain existing regulations that exceed the water resource protections of NR 115 or are specific or unique to local needs.

Project deliverables include: 1. Copies of any fact sheets or handouts created for public hearings. 2. A summary of the comments received at public hearings. 3. A certified copy of the County Board-approved updated shoreland ordinance or ordinance language (if integrated into other codes). 4. Any GIS maps of the shoreland zone or shoreland condition surveys related to the project.

Specific conditions for this Project: 1. The WDNR will be provided electronic and hard copies of all data and or reports or surveys generated as a result of this project.



Grant Details
Lake Protection Grant
Date
9/1/2013
Waters Involved
Lake Arrowhead
Status
Complete

Adams County: Lmi-Tri-Lakes Nutrient Mgmt. Plan: Adams County proposes to develop nutrient management plans for 4,470 acres of crop land within the Tri-Lakes Watershed. Major project elements to include: a) outreach to landowners, b) development of nutrient management plans, c) weekly water sampling, d) water quality analysis, and e) cost share payments.

Amended 1/22/15 to include installation of wind breaks, filter streps, residue and tillage management, and planting cover crops.


Grant Details
Lake Protection Grant
Date
3/15/1994
Waters Involved
Lake Sherwood
Status
Complete

Adams County: Lco-Lakes Camelot/Sherwood Shoreland Zoning Audit: Adams County proposes to conduct a shoreline zoning audit of Lakes Camelot and Sherwood for the purposes of identification of suspected violations of the Adams County shoreline protection ordinance, establsihment of a current record of all current shoreland uses, and establishing a baseline for the assessment of the effectiveness of permitting and enforcement processes. Project activities will include the location and diagramming of structures within 75 feet of the ordinary highway mark, follow-up questionnaires, file review and the development of a public education on the importance of the shoreline protection ordinance.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Lake Sherwood
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Lake Sherwood
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Lake Sherwood
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2010
Waters Involved
Lemonweir River
Status
Complete

Juneau County: Lco-Shoreland Ordinance Rev.: Juneau County proposes to amend or create a shoreland zoning ordinance that complies with the requirements of NR 115, Wisconsin Administrative Code (as revised effective February 1, 2010) and retain existing regulations that exceed the water resource protections of NR 115 or are specific or unique to local needs.

Project deliverables include: 1. Copies of any fact sheets or handouts created for public hearings. 2. A summary of the comments received at public hearings. 3. A certified copy of the County Board-approved updated shoreland ordinance or ordinance language (if integrated into other codes). 4. Any GIS maps of the shoreland zone or shoreland condition surveys related to the project.

Specific conditions for this Project: The WDNR will be provided electronic and hard copies of all data and or reports or surveys generated as a result of this project.


Grant Details
Lake Protection Grant
Date
9/1/2010
Waters Involved
Lemonweir River -Un Oxbow
Status
Complete

Juneau County: Lco-Shoreland Ordinance Rev.: Juneau County proposes to amend or create a shoreland zoning ordinance that complies with the requirements of NR 115, Wisconsin Administrative Code (as revised effective February 1, 2010) and retain existing regulations that exceed the water resource protections of NR 115 or are specific or unique to local needs.

Project deliverables include: 1. Copies of any fact sheets or handouts created for public hearings. 2. A summary of the comments received at public hearings. 3. A certified copy of the County Board-approved updated shoreland ordinance or ordinance language (if integrated into other codes). 4. Any GIS maps of the shoreland zone or shoreland condition surveys related to the project.

Specific conditions for this Project: The WDNR will be provided electronic and hard copies of all data and or reports or surveys generated as a result of this project.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Little Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Little Lake
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Little Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2006
Waters Involved
Little Roche A Cri Creek
Status
Complete

Adams County: Res-Castle Rock Restoration: Adams County proposes to provide up to 75% of the cost of shoreland restoration practices to lake front property owners on Castle Rock Lake. Grant funds will be distributed to fund removal of sea walls, minor bank re-shaping, placement of rip-rap, establishment of vegetative buffers and implementation of individual stormwater management plans.

Special Conditions: 1) Space between rip-rap to be filled with soil and vegetated to facilitate successful access of turtle hatchlings to water. Lupine seed to be of a wild variety compatible with Karner Blue butterflies. 2) Permits to be secured by individual property owners prior to construction.


Grant Details
Lake Protection Grant
Date
9/1/2006
Waters Involved
Little Yellow River
Status
Complete

Adams County: Res-Castle Rock Restoration: Adams County proposes to provide up to 75% of the cost of shoreland restoration practices to lake front property owners on Castle Rock Lake. Grant funds will be distributed to fund removal of sea walls, minor bank re-shaping, placement of rip-rap, establishment of vegetative buffers and implementation of individual stormwater management plans.

Special Conditions: 1) Space between rip-rap to be filled with soil and vegetated to facilitate successful access of turtle hatchlings to water. Lupine seed to be of a wild variety compatible with Karner Blue butterflies. 2) Permits to be secured by individual property owners prior to construction.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Mason Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Mason Lake
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Mason Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
McCall Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
McCall Lake
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
McCall Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
McDougall Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
McDougall Lake
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
McDougall Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
McGinnis Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
McGinnis Lake
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
McGinnis Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Parker Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Parker Lake
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Parker Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
4/15/2015
Waters Involved
Parker Lake
Status
Complete

Parker Lake Assoc., Inc.: Hlk-Parker Lake Fish Sticks: Parker Lake Association Inc. will implement best practices described in Wisconsin\2019s 2014-2017 Healthy Lakes Implementation Plan. Practices include: Installation of 8 fish stick clusters on the shoreline of Parker Lake.
The best practices require a contract to remain in effect for 10 years and must include minimum operation and maintenance requirements and data collection as described in grant condition #17. If best practice(s) are implemented on land owned by the grant Sponsor, this Lake Protection Grant Agreement serves as the contract. If best practice(s) are implemented on land other than the sponsor\2019s, a contract between the sponsor and landowner that abides by grant condition #16 is required.
The Department may require re-payment of project installation costs if the best practice is disturbed or removed. The Sponsor and/or the Department may perform site inspections and/or monitoring to ensure project success.
Deliverables: Best practice location and design information, if not included in the application; signed 10-year landowner contract; pre and post project installation photographs; summary of education activities and publicity/promotion of Healthy Lakes initiative, if applicable.
Special conditions: The state share of each best practice cannot exceed $1,000. The state share of grant administration and technical assistance costs may not exceed 10% of the grant award; technical assistance does not include implementation labor. Funding cannot be used for mitigation or regulatory compliance activities. Water regulation and/or county zoning permits must be issued before construction. The Healthy Lakes logo should be used for promotion and publicity, and DNR recognized as a funding source.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Patrick Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Patrick Lake
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Patrick Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2006
Waters Involved
Peppermill Creek
Status
Complete

Adams County: Res-Peppermill Restoration: Adams County proposes to provide up to 75% of the cost of shoreland restoration practices to lake front property owners on Peppermill Lake. Grant funds will be distributed to fund establishment of vegetative buffers and implementation of individual stormwater management plans.

Special Condition: Permits to be secured by individual property owners prior to construction.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Peppermill Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Peppermill Lake
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Peppermill Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2006
Waters Involved
Peppermill Lake
Status
Complete

Adams County: Res-Peppermill Restoration: Adams County proposes to provide up to 75% of the cost of shoreland restoration practices to lake front property owners on Peppermill Lake. Grant funds will be distributed to fund establishment of vegetative buffers and implementation of individual stormwater management plans.

Special Condition: Permits to be secured by individual property owners prior to construction.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Petenwell Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Petenwell Lake
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Petenwell Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
10/1/2013
Waters Involved
Petenwell Lake
Status
Complete

Adams County: Res-Adams Ord. Imp. 2: Adams County proposes to provide educational and technical assistance to the public and Adams County lake organizations for the installation of shoreline buffers on waterways so they comply with the Admas County Shorland, Wetland, and Habitat Protection Ordinance. Major project elements to include: a) outreach and education, b) review of plans, designs, and maintenance agreements, c) development of plans, designs, and agreements, d) inventory of public access points on all project waterways. Project will include notification of riparian property whose property is in conformance with the buffer standard and that the buffer must stay in compliance with the buffer standard. Signed maintenance agreements must be kept on record by Adams County.


Grant Details
Lake Protection Grant
Date
10/1/2013
Waters Involved
Petenwell Lake
Status
Proposed

Adams County: Res-Adams Ord. Imp. 2: Adams County proposes to provide educational and technical assistance to the public and Adams County lake organizations for the installation of shoreline buffers on waterways so they comply with the Admas County Shorland, Wetland, and Habitat Protection Ordinance. Major project elements to include: a) outreach and education, b) review of plans, designs, and maintenance agreements, c) development of plans, designs, and agreements, d) inventory of public access points on all project waterways. Project will include notification of riparian property whose property is in conformance with the buffer standard and that the buffer must stay in compliance with the buffer standard. Signed maintenance agreements must be kept on record by Adams County.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Risk Creek Pond
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Risk Creek Pond
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Risk Creek Pond
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Rollers Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Rollers Lake
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Rollers Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Silver Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Silver Lake
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Silver Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Twin Lakes
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Twin Lakes
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Twin Lakes
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Unnamed
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Unnamed
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Unnamed
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2006
Waters Involved
Unnamed
Status
Complete

Adams County: Res-Castle Rock Restoration: Adams County proposes to provide up to 75% of the cost of shoreland restoration practices to lake front property owners on Castle Rock Lake. Grant funds will be distributed to fund removal of sea walls, minor bank re-shaping, placement of rip-rap, establishment of vegetative buffers and implementation of individual stormwater management plans.

Special Conditions: 1) Space between rip-rap to be filled with soil and vegetated to facilitate successful access of turtle hatchlings to water. Lupine seed to be of a wild variety compatible with Karner Blue butterflies. 2) Permits to be secured by individual property owners prior to construction.


Grant Details
Lake Protection Grant
Date
9/1/2010
Waters Involved
Unnamed
Status
Complete

Juneau County: Lco-Shoreland Ordinance Rev.: Juneau County proposes to amend or create a shoreland zoning ordinance that complies with the requirements of NR 115, Wisconsin Administrative Code (as revised effective February 1, 2010) and retain existing regulations that exceed the water resource protections of NR 115 or are specific or unique to local needs.

Project deliverables include: 1. Copies of any fact sheets or handouts created for public hearings. 2. A summary of the comments received at public hearings. 3. A certified copy of the County Board-approved updated shoreland ordinance or ordinance language (if integrated into other codes). 4. Any GIS maps of the shoreland zone or shoreland condition surveys related to the project.

Specific conditions for this Project: The WDNR will be provided electronic and hard copies of all data and or reports or surveys generated as a result of this project.


Grant Details
Lake Protection Grant
Date
9/1/2006
Waters Involved
Wisconsin River
Status
Complete

Adams County: Res-Castle Rock Restoration: Adams County proposes to provide up to 75% of the cost of shoreland restoration practices to lake front property owners on Castle Rock Lake. Grant funds will be distributed to fund removal of sea walls, minor bank re-shaping, placement of rip-rap, establishment of vegetative buffers and implementation of individual stormwater management plans.

Special Conditions: 1) Space between rip-rap to be filled with soil and vegetated to facilitate successful access of turtle hatchlings to water. Lupine seed to be of a wild variety compatible with Karner Blue butterflies. 2) Permits to be secured by individual property owners prior to construction.


Grant Details
Lake Protection Grant
Date
10/1/2013
Waters Involved
Wisconsin River
Status
Complete

Adams County: Res-Adams Ord. Imp. 2: Adams County proposes to provide educational and technical assistance to the public and Adams County lake organizations for the installation of shoreline buffers on waterways so they comply with the Admas County Shorland, Wetland, and Habitat Protection Ordinance. Major project elements to include: a) outreach and education, b) review of plans, designs, and maintenance agreements, c) development of plans, designs, and agreements, d) inventory of public access points on all project waterways. Project will include notification of riparian property whose property is in conformance with the buffer standard and that the buffer must stay in compliance with the buffer standard. Signed maintenance agreements must be kept on record by Adams County.


Grant Details
Lake Protection Grant
Date
10/1/2013
Waters Involved
Wisconsin River
Status
Proposed

Adams County: Res-Adams Ord. Imp. 2: Adams County proposes to provide educational and technical assistance to the public and Adams County lake organizations for the installation of shoreline buffers on waterways so they comply with the Admas County Shorland, Wetland, and Habitat Protection Ordinance. Major project elements to include: a) outreach and education, b) review of plans, designs, and maintenance agreements, c) development of plans, designs, and agreements, d) inventory of public access points on all project waterways. Project will include notification of riparian property whose property is in conformance with the buffer standard and that the buffer must stay in compliance with the buffer standard. Signed maintenance agreements must be kept on record by Adams County.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Wolf Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Wolf Lake
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Wolf Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2009
Waters Involved
Wolf Lake
Status
Complete

Adams County: Res-Adams Restore Cost Share: The Adams County Land Conservation Department proposes to provide 75% cost shares to riparian property owners interested in establishing and maintaining shoreland buffers and rain gardens with native vegetation. Cost share agreements to require that property owners maintain buffers for a minimum of 25 years.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Amey Pond
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Arkdale Lake
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Big Roche a Cri
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Big Spring Pond
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Camelot Lake
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
4/1/2010
Waters Involved
Castle Rock Ditch
Status
Complete

Lake Alice Association, Inc: Lake Alice Stewardship Program Phase Ii - Understanding The Biota Of Lake Alice: Lake Alice Association is sponsoring phased large scale lake planning grants to study Lake Alice, in Lincoln County. The project will focus on developing and updating an Adaptive Lake Management Plan (LMP) for Lake Alice. Phase 2 was funded in this grant cycle and Phases 3-5 will be submitted for funding starting in 2011.

Project activities for Phase 2 include: 1) Educational program, meetings and educational events with lake association and Tomahawk High School students, written educational materials, news releases, and website updates; 2) Point-intercept (PI) aquatic plant survey; 3) Aquatic plant community and substrate mapping; 4) Water quality assessment; 5) Volunteer amphibian monitoring and angler survey; 6) Update LMP.

Project deliverables include: 1) Educational materials and news releases; 2) Aquatic plant community and substrate maps; 3) PI, water quality, amphibian, and angler data; 4) LMP.

Specific conditions for this project: LMP needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP, news releases, any other educational materials/products, all data, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Castle Rock Lake
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Crooked Lake
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
4/1/2010
Waters Involved
Cruson Slough
Status
Complete

Lake Alice Association, Inc: Lake Alice Stewardship Program Phase Ii - Understanding The Biota Of Lake Alice: Lake Alice Association is sponsoring phased large scale lake planning grants to study Lake Alice, in Lincoln County. The project will focus on developing and updating an Adaptive Lake Management Plan (LMP) for Lake Alice. Phase 2 was funded in this grant cycle and Phases 3-5 will be submitted for funding starting in 2011.

Project activities for Phase 2 include: 1) Educational program, meetings and educational events with lake association and Tomahawk High School students, written educational materials, news releases, and website updates; 2) Point-intercept (PI) aquatic plant survey; 3) Aquatic plant community and substrate mapping; 4) Water quality assessment; 5) Volunteer amphibian monitoring and angler survey; 6) Update LMP.

Project deliverables include: 1) Educational materials and news releases; 2) Aquatic plant community and substrate maps; 3) PI, water quality, amphibian, and angler data; 4) LMP.

Specific conditions for this project: LMP needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP, news releases, any other educational materials/products, all data, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
10/1/1997
Waters Involved
Decorah Lake
Status
Complete

City Of Mauston: Lake Decorah Stormwater Quality: The City of Mauston proposes to prepare a stormwater quality and impact study as related to their management plan to protect Lake Decorah. Some of the project activities include: 1) public input and education about the impacts, 2) contour map of the city, 3) map of land features including land uses, existing biological communities, 4) samples from all areas to compare to the map data, 5) develop water quality analysis, 6) evaluate best management practices, 7) review local ordinances and develop long term monitoring stragety. The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be dissemeinated to the public by news letter(s), fact sheet(s), public meeting(s), local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/1997
Waters Involved
Decorah Lake
Status
Complete

City Of Mauston: Lake Decorah Stormwater Quantity: The City of Mauston proposes to prepare a stormwater quantity and impact study as related to their management plan to protect Lake Decorah. Some of the project activities include: 1) public input and education about the impacts, 2) contour map of the city, 3) map of land features including land uses, existing biological communities, 4) samples from all areas to compare to the map data, 5) develop water quantity analysis, 6) evaluate best management practices, 7) review local ordinances and develop long term monitoring strategy. The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by news letter(s), fact sheet(s), public meeting(s), local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Decorah Lake
Status
Complete

City Of Mauston: Lake Decorah Final Report On Phased Planning Project: The City of Mauston proposes to prepare a complete stormwater impact study as related to their management plan to protect Lake Decorah. The final report will present strategies to improve storm water quality and quantity, thus improving Lake Decorah. The final report will include everything listed in the Storm Water Management Plan. The Department will be provided with both a paper copy and an electronic copy of the final report. The project results will be dissemenated to the public by entire report mailings,fact sheets, public meetings, and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
2/15/2020
Waters Involved
Decorah Lake
Status
Complete

City Of Mauston: City Of Mauston: Purpose: Project is phase 1 of alarger project that will provide the necessary information to draft a 9-key Element Plan for the Lemonweir Watershed and a Lake Management Plan for Lake decorah.
Project Activities: 1.Identify non-point sources throught the watershed; 2. Data gap analysis; 3. Develop long-term montioring plan; 4.identify implementation options to achieve load reductions; 5. Aquatic Plant Survey and 6. Identify and develop partnerships.
Project Deliverables: All data collected all outreach and event materials, agendas and minutes from meetings. Specifically: Map of NPS, long-term monitorin plan to stisfy 9-key element plan, aquatic plant report and summary of datagaps.
Special conditions: WDNR Lakes Management Coordinator will be provided with an electronic (pdf or work) copy of all data and maps from the project. This scope summarizes the project detail provided in the applicatoin and eosnot negate tasks/deliveralbes described therein. Data, records and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the rgional Lakes Coordinator.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Deep Lake
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Dorro Couche Lake
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Easton Lake
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Fawn Lake
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Fenner Lake
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Friendship Lake
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Goose Lake
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Hill Lake
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Jordan Lake
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Lake Arrowhead
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
4/1/2010
Waters Involved
Lake Du Bay
Status
Complete

Lake Alice Association, Inc: Lake Alice Stewardship Program Phase Ii - Understanding The Biota Of Lake Alice: Lake Alice Association is sponsoring phased large scale lake planning grants to study Lake Alice, in Lincoln County. The project will focus on developing and updating an Adaptive Lake Management Plan (LMP) for Lake Alice. Phase 2 was funded in this grant cycle and Phases 3-5 will be submitted for funding starting in 2011.

Project activities for Phase 2 include: 1) Educational program, meetings and educational events with lake association and Tomahawk High School students, written educational materials, news releases, and website updates; 2) Point-intercept (PI) aquatic plant survey; 3) Aquatic plant community and substrate mapping; 4) Water quality assessment; 5) Volunteer amphibian monitoring and angler survey; 6) Update LMP.

Project deliverables include: 1) Educational materials and news releases; 2) Aquatic plant community and substrate maps; 3) PI, water quality, amphibian, and angler data; 4) LMP.

Specific conditions for this project: LMP needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP, news releases, any other educational materials/products, all data, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Lake Sherwood
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Lemonweir River
Status
Complete

City Of Mauston: Lake Decorah Final Report On Phased Planning Project: The City of Mauston proposes to prepare a complete stormwater impact study as related to their management plan to protect Lake Decorah. The final report will present strategies to improve storm water quality and quantity, thus improving Lake Decorah. The final report will include everything listed in the Storm Water Management Plan. The Department will be provided with both a paper copy and an electronic copy of the final report. The project results will be dissemenated to the public by entire report mailings,fact sheets, public meetings, and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
2/15/2020
Waters Involved
Lemonweir River
Status
Complete

City Of Mauston: City Of Mauston: Purpose: Project is phase 1 of alarger project that will provide the necessary information to draft a 9-key Element Plan for the Lemonweir Watershed and a Lake Management Plan for Lake decorah.
Project Activities: 1.Identify non-point sources throught the watershed; 2. Data gap analysis; 3. Develop long-term montioring plan; 4.identify implementation options to achieve load reductions; 5. Aquatic Plant Survey and 6. Identify and develop partnerships.
Project Deliverables: All data collected all outreach and event materials, agendas and minutes from meetings. Specifically: Map of NPS, long-term monitorin plan to stisfy 9-key element plan, aquatic plant report and summary of datagaps.
Special conditions: WDNR Lakes Management Coordinator will be provided with an electronic (pdf or work) copy of all data and maps from the project. This scope summarizes the project detail provided in the applicatoin and eosnot negate tasks/deliveralbes described therein. Data, records and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the rgional Lakes Coordinator.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Little Lake
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
4/1/2010
Waters Involved
Little Pine Creek
Status
Complete

Lake Alice Association, Inc: Lake Alice Stewardship Program Phase Ii - Understanding The Biota Of Lake Alice: Lake Alice Association is sponsoring phased large scale lake planning grants to study Lake Alice, in Lincoln County. The project will focus on developing and updating an Adaptive Lake Management Plan (LMP) for Lake Alice. Phase 2 was funded in this grant cycle and Phases 3-5 will be submitted for funding starting in 2011.

Project activities for Phase 2 include: 1) Educational program, meetings and educational events with lake association and Tomahawk High School students, written educational materials, news releases, and website updates; 2) Point-intercept (PI) aquatic plant survey; 3) Aquatic plant community and substrate mapping; 4) Water quality assessment; 5) Volunteer amphibian monitoring and angler survey; 6) Update LMP.

Project deliverables include: 1) Educational materials and news releases; 2) Aquatic plant community and substrate maps; 3) PI, water quality, amphibian, and angler data; 4) LMP.

Specific conditions for this project: LMP needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP, news releases, any other educational materials/products, all data, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Mason Lake
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
McCall Lake
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
McDougall Lake
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
McGinnis Lake
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Parker Lake
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Patrick Lake
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Peppermill Lake
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Petenwell Lake
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Risk Creek Pond
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Rollers Lake
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Silver Lake
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Twin Lakes
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Unnamed
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Unnamed
Status
Complete

City Of Mauston: Lake Decorah Final Report On Phased Planning Project: The City of Mauston proposes to prepare a complete stormwater impact study as related to their management plan to protect Lake Decorah. The final report will present strategies to improve storm water quality and quantity, thus improving Lake Decorah. The final report will include everything listed in the Storm Water Management Plan. The Department will be provided with both a paper copy and an electronic copy of the final report. The project results will be dissemenated to the public by entire report mailings,fact sheets, public meetings, and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
4/1/2010
Waters Involved
Unnamed
Status
Complete

Lake Alice Association, Inc: Lake Alice Stewardship Program Phase Ii - Understanding The Biota Of Lake Alice: Lake Alice Association is sponsoring phased large scale lake planning grants to study Lake Alice, in Lincoln County. The project will focus on developing and updating an Adaptive Lake Management Plan (LMP) for Lake Alice. Phase 2 was funded in this grant cycle and Phases 3-5 will be submitted for funding starting in 2011.

Project activities for Phase 2 include: 1) Educational program, meetings and educational events with lake association and Tomahawk High School students, written educational materials, news releases, and website updates; 2) Point-intercept (PI) aquatic plant survey; 3) Aquatic plant community and substrate mapping; 4) Water quality assessment; 5) Volunteer amphibian monitoring and angler survey; 6) Update LMP.

Project deliverables include: 1) Educational materials and news releases; 2) Aquatic plant community and substrate maps; 3) PI, water quality, amphibian, and angler data; 4) LMP.

Specific conditions for this project: LMP needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP, news releases, any other educational materials/products, all data, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
4/1/2010
Waters Involved
Wisconsin River
Status
Complete

Lake Alice Association, Inc: Lake Alice Stewardship Program Phase Ii - Understanding The Biota Of Lake Alice: Lake Alice Association is sponsoring phased large scale lake planning grants to study Lake Alice, in Lincoln County. The project will focus on developing and updating an Adaptive Lake Management Plan (LMP) for Lake Alice. Phase 2 was funded in this grant cycle and Phases 3-5 will be submitted for funding starting in 2011.

Project activities for Phase 2 include: 1) Educational program, meetings and educational events with lake association and Tomahawk High School students, written educational materials, news releases, and website updates; 2) Point-intercept (PI) aquatic plant survey; 3) Aquatic plant community and substrate mapping; 4) Water quality assessment; 5) Volunteer amphibian monitoring and angler survey; 6) Update LMP.

Project deliverables include: 1) Educational materials and news releases; 2) Aquatic plant community and substrate maps; 3) PI, water quality, amphibian, and angler data; 4) LMP.

Specific conditions for this project: LMP needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP, news releases, any other educational materials/products, all data, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Wolf Lake
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Amey Pond
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Arkdale Lake
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Big Roche a Cri
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Big Spring Pond
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Camelot Lake
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Castle Rock Lake
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Crooked Lake
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2007
Waters Involved
Decorah Lake
Status
Complete

City Of Mauston: Decorah Map: The City of Mauston proposes to contract with the UW-Eau Claire for production of a bathymetric map of Lake Decorah in Juneau County. Major project elements to include: 1) Lake survey, 2) Map development, 3) printing.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Deep Lake
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Dorro Couche Lake
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Easton Lake
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Fawn Lake
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Fenner Lake
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Friendship Lake
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Goose Lake
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Hill Lake
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Jordan Lake
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Lake Arrowhead
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Lake Sherwood
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2007
Waters Involved
Lemonweir River
Status
Complete

City Of Mauston: Decorah Map: The City of Mauston proposes to contract with the UW-Eau Claire for production of a bathymetric map of Lake Decorah in Juneau County. Major project elements to include: 1) Lake survey, 2) Map development, 3) printing.


Grant Details
Small Scale Lake Planning
Date
10/1/2007
Waters Involved
Lemonweir River
Status
Complete

City Of New Lisbon: New Lisbon Map: The City of New Lisbon proposes to produce a bathymetric map of New Lisbon Lake in Juneau County. Major project elements to include: a) lake survey, b) map production, c) printing.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Little Lake
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Mason Lake
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
McCall Lake
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
McDougall Lake
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
McGinnis Lake
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Parker Lake
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Patrick Lake
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Peppermill Lake
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Petenwell Lake
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Risk Creek Pond
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Rollers Lake
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Silver Lake
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Twin Lakes
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Unnamed
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Wolf Lake
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
River Planning Grant
Date
7/1/2007
Waters Involved
Wisconsin River
Status
Complete

Northwoods Land Trust, Inc.: Oneida County River Conservation Project: The Northwoods Land Trust will conduct a direct-mail education campaign to all property owners on priority river and stream segments in Oneida County that were identified by the DNR Northern Rivers Initiative. An information packet will be provided highlighting voluntary conservation options property owners can utilize to protect the priority river and stream corridors. These options include Land Protection Agreement (Conservation Easement), Land Donation, Land Registry and Conservation Buyer programs.

Specific activities include:
* Identify all property owners with natural shoreland frontage along all of the priority river and stream segments in Oneida County.
* Assemble and mail information packets on conservation options to all identified property owners.
* Follow-up contacts with interested landowners to provide legal and technical assistance for conservation options.

Specific products or deliverables include:
* Maps showing parcels with existing natural shoreline.
* Generalized list of landowner follow-up contacts.

It is anticipated this project will result in one or more landowner commitment to donate a conservation easement to permanently protect their river or stream shoreline but this result can not be guaranteed.


Grant Details
River Planning Grant
Date
7/1/2011
Waters Involved
Wisconsin River
Status
Complete

Aldo Leopold Foundation, Inc: Leopold-Pine Island Important Bird Area Public-Private Partnership Along Wi River: The Aldo Leopold Foundation will sponsor a project in the Leopold-Pine Island Important Bird Area (IBA) that encompasses roughly 15,000 acres of public and private lands and 16 miles of Wisconsin River frontage, east of Wisconsin Dells and Portage. Project will include development of shared land management goals and objectives in care of bird and plant communities, including floodplains, forests and wetlands. Project deliverables include: 1.) creating vegetation/habitat/plant community map of IBA. 2.) In combination with 2011 bird survey, analyze and develop more prescriptive land management goals and objectives for IBA partners, neighboring lands through conservation delivery programs. 3.) Host two partner meetings to review opportunities/issues relevant to the partnership and/or local natural resources, share report findings and its relevance for the IBA and partners, 4.) Share the report and land management objectives with conservation partners, 5.) Communicate to general public audience about the IBA public-private partnership.


Grant Details
River Planning Grant
Date
7/1/2012
Waters Involved
Wisconsin River
Status
Complete

Aldo Leopold Foundation, Inc: Leopold-Pine Island Important Bird Area Along Wi River: The Aldo Leopold Foundation will sponsor a project in the Leopold-Pine Island Important Bird Area (IBA) that encompasses roughly 12,000 acres of public and private land and 16 miles of Wisconsin River frontage, east of Wisconsin Dells and Portage. Project deliverables are as follows: 1.) Create family friendly IBA educational materials explaining Aldo Leopold family history and producing educational materials that partners can use during tours, 2.) Utilize Leopold-Pine Island IBA visitors as citizen scientists to assist with collection of data for scientific use. 3.)eBird website and smart phone interface that allows citizen-scientists to record bird observations and attribute them to management units relevant to the adaptive management planning and execution on the IBA, 4.) Maintain Leopold-Pine Island IBA partner relationships by hosting meetings with agenda items consisting of opportunities/issues relevant to the partnership and/or local natural resources.


Grant Details
River Planning Grant
Date
7/1/2013
Waters Involved
Wisconsin River
Status
Complete

Friends Of The Lower Wi Riverway (Flow): Friends Of Lower Wisconsin Riverway: FLOW will undertake a River Planning Project of Organization Building and Outreach. Project deliverables are as follows: 1.) Hire an environmental educator to coordinate outreach activities, volunteer monitoring and data management, and to coordinate AIS activities, 2.) Purchase water quality monitoring instruments and gear for volunteer stream monitoring, 3.) Gather basic water quality data on the Lower Wisconsin River and floodplain lakes and enter the data into SWIMS, 4.) Conduct a recreational use survey using volunteers, 5.) Present educational programs for both adults and public schools.


Monitoring & Projects

Projects including grants, restoration work and studies shown below have occurred in this watershed. Click the links below to read through the text. While these are not an exhaustive list of activities, they provide insight into the management activities happening in this watershed.

Grants and Management Projects
Lower Lemonweir River Watershed
Watershed Recommendations
Dam Safety or Removal
 
Date
Status
Examine the impact of removing the Lemonweir Dam to determine if the removal would eliminate necessary spawning and nursery areas.
1/1/2010
Proposed
 
Habitat Restoration - Shoreland
 
Date
Status
10/1/2013
Proposed
Projects
 
Monitor Aquatic Biology
Monitor biology on WBIC: 1304300
Date
Status
Conduct biological (mIBI or fIBI) monitoring on Unnamed, WBIC: 1304300, AU:5728939
5/21/2016
Proposed
Projects
 
Monitor Fish Tissue
Confirm FCA: IW pre-2000 data
Date
Status
1179900 name Wisconsin River TMDL ID 530 Start Mile 237.05 End Mile 268
11/21/2011
Proposed
 
Monitor Fish Tissue
Confirm FCA: IW pre-2000 data
Date
Status
1179900 name Wisconsin River TMDL ID 530 Start Mile 268 End Mile 289.17
11/21/2011
Proposed
 
Monitor Targeted Area
 
Date
Status
The populations of leopard frogs in the watershed should be surveyed to determine the health and abundance of the frog. If a decline is indicated, more work should be done to determine the potential causes.
1/1/2010
Proposed
 
Stormwater Planning, Implementation
Friendship Stormwater Mgmt Plan - TMDL Analysis & Recs
Date
Status
This project promotes nonpoint source best management practices to contribute to the restoration of Wisconsin?s waters and was funded by the 319 grant. Storm water planning activities will be undertaken by the municipality and will result in the following products: updated storm water management plan for the entire developed urban area; and an updated storm water management plan for new development.
1/1/2018
In Progress
Projects
 
Lower Lemonweir River WatershedWatershed History Note

The Village of New Lisbon is located in the Lower Lemonweir River Watershed. The most important event in New Lisbon's early history was the arrival of the railroad in 1857. New Lisbon became the headquarters for railroad workers who needed a good night's rest. In a few short years the village had roughly four hundred residents and no less than eight hotels. The railroad, together with the sawmills and grain mills on the Lemonweir River, triggered a boom that brought an estimated 2,500 people to the New Lisbon area. Shops and stores, many of them housed in impressive two-story brick buildings lined Bridge and Water Streets. Merchants and other citizens were so confident of New Lisbon's future and so aware of the railroad's importance that they built a half-mile long board sidewalk from the business district to the depot by means of public subscription rather than taxes. Although a railroad town, New Lisbon was also the home port of Juneau County's only steamboat line. The thirty-six foot "White Queen" carried passengers and freight and made special excursions up river to Wigwam Point, Hog Island and the Buckley Bridge. The boat operated daily when the season permitted. The shallow-draft steamer was built only nine-feet wide so it could negotiate the curves and bends of the narrow Lemonweir River. In the early 1900s, New Lisbon became home to one of Juneau County's most unusual businesses, the pearl button factory of Wallace McNeeley. He had learned his trade at Muscatine, Iowa, the pearl button capital of the Mississippi Valley, and found ample stock for his trade in the streams and river of Juneau and Sauk counties. In 1938 a new dam was erected across the Lemonweir River at New Lisbon. It maintained and enlarged the old millpond to give the city a recreational area.