Grant Details
Lake Protection Grant
Date
8/1/2002
Waters Involved
Alderley Millpond
Status
Complete
Dodge County: Lco-Dodge Co. Waterway Classification Project: Dodge County Planning & Development Department is interested in revising the Dodge County Shoreland Zoning Regulations and adopting a "waterway" classification system to better regulate and manage the county's water resources.
A full description of the project scope and project deliverables is available in the grant application, which is a part of this aggreement.
The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant appllication.
Grant Details
Lake Protection Grant
Date
8/1/2002
Waters Involved
Beaver Dam Lake
Status
Complete
Dodge County: Lco-Dodge Co. Waterway Classification Project: Dodge County Planning & Development Department is interested in revising the Dodge County Shoreland Zoning Regulations and adopting a "waterway" classification system to better regulate and manage the county's water resources.
A full description of the project scope and project deliverables is available in the grant application, which is a part of this aggreement.
The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant appllication.
Grant Details
Lake Protection Grant
Date
4/15/2015
Waters Involved
Beaver Dam Lake
Status
Complete
Beaver Dam Lake Improvement Association: Hlk-Beaver Dam Healthy Lake: Beaver Dam Lake District will implement best practices described in Wisconsin\2019s 2014-2017 Healthy Lakes Implementation Plan. Practices include: 350 ft2 native plantings, rain gardens, rock infiltration practices, and diversion practices on 5 lakeshore properties, including the City of Beaver Dam\2019s Edgewater Park.
The best practices require a contract to remain in effect for 10 years and must include minimum operation and maintenance requirements and data collection as described in grant condition #17. If best practice(s) are implemented on land owned by the grant Sponsor, this Lake Protection Grant Agreement serves as the contract. If best practice(s) are implemented on land other than the sponsor\2019s, a contract between the sponsor and landowner that abides by grant condition #16 is required.
The Department may require re-payment of project installation costs if the best practice is disturbed or removed. The Sponsor and/or the Department may perform site inspections and/or monitoring to ensure project success.
Deliverables: Best practice location and design information, if not included in the application; signed 10-year landowner contract; pre and post project installation photographs; summary of education activities and publicity/promotion of Healthy Lakes initiative, if applicable.
Special conditions: The state share of each best practice cannot exceed $1,000. The state share of grant administration and technical assistance costs may not exceed 10% of the grant award; technical assistance does not include implementation labor. Funding cannot be used for mitigation or regulatory compliance activities. Water regulation and/or county zoning permits must be issued before construction. The Healthy Lakes logo should be used for promotion and publicity, and DNR recognized as a funding source.
Grant Details
Lake Protection Grant
Date
4/15/2016
Waters Involved
Beaver Dam Lake
Status
Complete
Beaver Dam Lake Improvement Association: Hlk- 319 Match - Beaver Dam Lake Healthy Lake Phase 2: BDLIAt will implement best practices described in Wisconsin\2019s 2014-2017 Healthy Lakes Implementation Plan. Best practices will be designed and installed according to the Healthy Lakes fact sheets and technical guidance. Activities include: implementation of fish sticks, 350 square feet native plantings, diversion practices, infiltration practices, and/or rain gardens on 3 properties.
The best practices require a contract to remain in effect for 10 years and must include minimum operation and maintenance requirements and data collection as described in grant condition #16. If best practice(s) are implemented on land owned by the grant Sponsor, this Lake Protection Grant Agreement serves as the contract. If best practice(s) are implemented on land other than the sponsor\2019s, a contract between the sponsor and landowner that abides by grant condition #16 is required.
The Department may require re-payment of project installation costs if the best practice is disturbed or removed. The Sponsor and/or the Department may perform site inspections and/or monitoring to ensure project success.
Deliverables: Best practice location and design information, if not included in the application; signed 10-year landowner contract; pre and post project installation photographs; summary of education activities and publicity/promotion of Healthy Lakes initiative, if applicable.
Special conditions: The state share of each best practice cannot exceed $1,000. The state share of grant administration and technical assistance costs may not exceed 10% of the grant award; technical assistance does not include implementation labor. Funding cannot be used for mitigation or regulatory compliance activities. Water regulation and/or county zoning permits must be issued before construction. The Healthy Lakes logo should be used for promotion and publicity, and DNR recognized as a funding source.
Grant Details
Lake Protection Grant
Date
8/1/2002
Waters Involved
Chub Lake
Status
Complete
Dodge County: Lco-Dodge Co. Waterway Classification Project: Dodge County Planning & Development Department is interested in revising the Dodge County Shoreland Zoning Regulations and adopting a "waterway" classification system to better regulate and manage the county's water resources.
A full description of the project scope and project deliverables is available in the grant application, which is a part of this aggreement.
The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant appllication.
Grant Details
Lake Protection Grant
Date
8/1/2002
Waters Involved
Collins Lake
Status
Complete
Dodge County: Lco-Dodge Co. Waterway Classification Project: Dodge County Planning & Development Department is interested in revising the Dodge County Shoreland Zoning Regulations and adopting a "waterway" classification system to better regulate and manage the county's water resources.
A full description of the project scope and project deliverables is available in the grant application, which is a part of this aggreement.
The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant appllication.
Grant Details
Lake Protection Grant
Date
8/1/2002
Waters Involved
Crystal Lake
Status
Complete
Dodge County: Lco-Dodge Co. Waterway Classification Project: Dodge County Planning & Development Department is interested in revising the Dodge County Shoreland Zoning Regulations and adopting a "waterway" classification system to better regulate and manage the county's water resources.
A full description of the project scope and project deliverables is available in the grant application, which is a part of this aggreement.
The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant appllication.
Grant Details
Lake Protection Grant
Date
8/1/2002
Waters Involved
Crystal Spring
Status
Complete
Dodge County: Lco-Dodge Co. Waterway Classification Project: Dodge County Planning & Development Department is interested in revising the Dodge County Shoreland Zoning Regulations and adopting a "waterway" classification system to better regulate and manage the county's water resources.
A full description of the project scope and project deliverables is available in the grant application, which is a part of this aggreement.
The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant appllication.
Grant Details
Lake Protection Grant
Date
8/1/2002
Waters Involved
Danville Millpond
Status
Complete
Dodge County: Lco-Dodge Co. Waterway Classification Project: Dodge County Planning & Development Department is interested in revising the Dodge County Shoreland Zoning Regulations and adopting a "waterway" classification system to better regulate and manage the county's water resources.
A full description of the project scope and project deliverables is available in the grant application, which is a part of this aggreement.
The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant appllication.
Grant Details
Lake Protection Grant
Date
8/1/2002
Waters Involved
Fox Lake
Status
Complete
Dodge County: Lco-Dodge Co. Waterway Classification Project: Dodge County Planning & Development Department is interested in revising the Dodge County Shoreland Zoning Regulations and adopting a "waterway" classification system to better regulate and manage the county's water resources.
A full description of the project scope and project deliverables is available in the grant application, which is a part of this aggreement.
The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant appllication.
Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Fox Lake
Status
Complete
Fox Lake Inland Lake P & R District: Lmi-Fishery Mgt & Bio-Manipulation Project: Fox Lake Inland Lake Protection & Rehabilitation District will work to reduce rough fish populations in a continuing attempt to increase abundance of rooted aquatic plants. Progress will also be monitored via a comprehensive fish survey of Fox Lake.
A full description of the project scope and project deliverables is in the grant application, which is a part of this agreement. The DNR will be provided with a final report on the results of this project. Information will be disseminated to the public as described in the grant application.
Scope Amendment January 19, 2005 - remove: rough fish harvest activities from the grant. add: tributary and lake monitoring, SLOH costs associated with that monitoring, completion of an evaluation report of that monitoring. Dollar amount of the grant remains the same. PRS
Scope Amendment: 11/3/06: Expand the lake water quality evaluation project to include preparation of a mgmt. plan for the next phase of the Fox Lake Mgmt. Project. Dollar amount of the grant remains the same. ET
Grant Details
Lake Protection Grant
Date
8/1/2002
Waters Involved
Kekoskee Millpond
Status
Complete
Dodge County: Lco-Dodge Co. Waterway Classification Project: Dodge County Planning & Development Department is interested in revising the Dodge County Shoreland Zoning Regulations and adopting a "waterway" classification system to better regulate and manage the county's water resources.
A full description of the project scope and project deliverables is available in the grant application, which is a part of this aggreement.
The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant appllication.
Grant Details
Lake Protection Grant
Date
8/1/2002
Waters Involved
Lake Emily
Status
Complete
Dodge County: Lco-Dodge Co. Waterway Classification Project: Dodge County Planning & Development Department is interested in revising the Dodge County Shoreland Zoning Regulations and adopting a "waterway" classification system to better regulate and manage the county's water resources.
A full description of the project scope and project deliverables is available in the grant application, which is a part of this aggreement.
The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant appllication.
Grant Details
Lake Protection Grant
Date
5/25/1995
Waters Involved
Lake Wisconsin
Status
Complete
Town Of Lodi: Acq-Lake Wisconsin Okee Community Park Land Acquisition: The Town of Lodi proposes to acquire 8.5 acres of land in the Okee Bay area of Lake Wisconsin for recreational opportunities and lake protection. Eligible costs include acquisition of the parcel, appraisal fee and preparation of an environmental assessment.
Grant Details
Lake Protection Grant
Date
8/1/2002
Waters Involved
Lomira Pond
Status
Complete
Dodge County: Lco-Dodge Co. Waterway Classification Project: Dodge County Planning & Development Department is interested in revising the Dodge County Shoreland Zoning Regulations and adopting a "waterway" classification system to better regulate and manage the county's water resources.
A full description of the project scope and project deliverables is available in the grant application, which is a part of this aggreement.
The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant appllication.
Grant Details
Lake Protection Grant
Date
8/1/2002
Waters Involved
Lost Lake
Status
Complete
Dodge County: Lco-Dodge Co. Waterway Classification Project: Dodge County Planning & Development Department is interested in revising the Dodge County Shoreland Zoning Regulations and adopting a "waterway" classification system to better regulate and manage the county's water resources.
A full description of the project scope and project deliverables is available in the grant application, which is a part of this aggreement.
The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant appllication.
Grant Details
Lake Protection Grant
Date
8/1/2002
Waters Involved
Lowell Millpond
Status
Complete
Dodge County: Lco-Dodge Co. Waterway Classification Project: Dodge County Planning & Development Department is interested in revising the Dodge County Shoreland Zoning Regulations and adopting a "waterway" classification system to better regulate and manage the county's water resources.
A full description of the project scope and project deliverables is available in the grant application, which is a part of this aggreement.
The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant appllication.
Grant Details
Lake Protection Grant
Date
8/1/2002
Waters Involved
Lower Mayville Pond 174
Status
Complete
Dodge County: Lco-Dodge Co. Waterway Classification Project: Dodge County Planning & Development Department is interested in revising the Dodge County Shoreland Zoning Regulations and adopting a "waterway" classification system to better regulate and manage the county's water resources.
A full description of the project scope and project deliverables is available in the grant application, which is a part of this aggreement.
The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant appllication.
Grant Details
Lake Protection Grant
Date
8/1/2002
Waters Involved
Mud Lake
Status
Complete
Dodge County: Lco-Dodge Co. Waterway Classification Project: Dodge County Planning & Development Department is interested in revising the Dodge County Shoreland Zoning Regulations and adopting a "waterway" classification system to better regulate and manage the county's water resources.
A full description of the project scope and project deliverables is available in the grant application, which is a part of this aggreement.
The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant appllication.
Grant Details
Lake Protection Grant
Date
8/1/2002
Waters Involved
Neosho Mill Pond
Status
Complete
Dodge County: Lco-Dodge Co. Waterway Classification Project: Dodge County Planning & Development Department is interested in revising the Dodge County Shoreland Zoning Regulations and adopting a "waterway" classification system to better regulate and manage the county's water resources.
A full description of the project scope and project deliverables is available in the grant application, which is a part of this aggreement.
The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant appllication.
Grant Details
Lake Protection Grant
Date
9/1/2008
Waters Involved
Park Lake
Status
Complete
Columbia County: Lmi-Tmdl Development-Phase Ii-Park Lake: Columbia County Land and Water Conservation Department will conduct phase 2 of its TMDL development program for Park Lake. This phase will focus on continued monitoring along with the use of a graduate student to conduct water quality modeling to allow for final development of a TMDL for Park Lake, a 303(d) listed lake. The objectives of this study are to quantify P export from the watershed, and link water quality with nutrient loss from the land. Project deliverables include 1) monitoring of wetland effectiveness by measuring upstream and downstream flow and concentration; 2) Field-scale Snap-Plus and watershed-scale modeling; 3) simulating water quality changes caused by wetlands in this watershed using Army Corp PRE-WET model; 4) continuation of water quality monitoring/data collection along with targeting water sample collection adjacent to wetlands; 5) information/education efforts throughout project; and 6) compilation, documentation, and recommendations of findings. Education efforts include a news release, providing updates and final presentation through regular and annual meetings of the Lake District.
Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Sinissippi Lake (Hustisford)
Status
Complete
Village Of Hustisford: Lmi-Df-Stream Flow & Wq Monitoring Of Lk Sinissippi: In this project, Lake Sinissippi Association will perform stream monitoring and data analysis in order to better understand the lake.
A full description of the project scope and project deliverables is available in the grant application, which is a part of this aggreement. The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant appllication.
Grant Details
Lake Protection Grant
Date
8/1/2002
Waters Involved
Sinissippi Lake (Hustisford)
Status
Complete
Dodge County: Lco-Dodge Co. Waterway Classification Project: Dodge County Planning & Development Department is interested in revising the Dodge County Shoreland Zoning Regulations and adopting a "waterway" classification system to better regulate and manage the county's water resources.
A full description of the project scope and project deliverables is available in the grant application, which is a part of this aggreement.
The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant appllication.
Grant Details
Lake Protection Grant
Date
8/1/2002
Waters Involved
Theresa Marsh Flowage
Status
Complete
Dodge County: Lco-Dodge Co. Waterway Classification Project: Dodge County Planning & Development Department is interested in revising the Dodge County Shoreland Zoning Regulations and adopting a "waterway" classification system to better regulate and manage the county's water resources.
A full description of the project scope and project deliverables is available in the grant application, which is a part of this aggreement.
The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant appllication.
Grant Details
Lake Protection Grant
Date
8/1/2002
Waters Involved
Un Spring
Status
Complete
Dodge County: Lco-Dodge Co. Waterway Classification Project: Dodge County Planning & Development Department is interested in revising the Dodge County Shoreland Zoning Regulations and adopting a "waterway" classification system to better regulate and manage the county's water resources.
A full description of the project scope and project deliverables is available in the grant application, which is a part of this aggreement.
The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant appllication.
Grant Details
Lake Protection Grant
Date
8/1/2002
Waters Involved
Unnamed
Status
Complete
Dodge County: Lco-Dodge Co. Waterway Classification Project: Dodge County Planning & Development Department is interested in revising the Dodge County Shoreland Zoning Regulations and adopting a "waterway" classification system to better regulate and manage the county's water resources.
A full description of the project scope and project deliverables is available in the grant application, which is a part of this aggreement.
The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant appllication.
Grant Details
Lake Protection Grant
Date
8/1/2002
Waters Involved
Upper Mayville Millpond 172
Status
Complete
Dodge County: Lco-Dodge Co. Waterway Classification Project: Dodge County Planning & Development Department is interested in revising the Dodge County Shoreland Zoning Regulations and adopting a "waterway" classification system to better regulate and manage the county's water resources.
A full description of the project scope and project deliverables is available in the grant application, which is a part of this aggreement.
The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant appllication.
Grant Details
Large Scale Lake Planning
Date
10/1/2001
Waters Involved
Alderley Millpond
Status
Complete
Dodge County: Dodge County Lakes Survey: Dodge County will collect information utilizing a public survey questionnaire in order to determine public opinion about the waters in the county and to see if there is need to conduct a Waterway (Lake & Stream) Classification Project in the future.
A full description of project scope and deliverables is available in the grant application, which is part of this agreement. The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.
Grant Details
Large Scale Lake Planning
Date
10/1/2001
Waters Involved
Beaver Dam Lake
Status
Complete
Dodge County: Dodge County Lakes Survey: Dodge County will collect information utilizing a public survey questionnaire in order to determine public opinion about the waters in the county and to see if there is need to conduct a Waterway (Lake & Stream) Classification Project in the future.
A full description of project scope and deliverables is available in the grant application, which is part of this agreement. The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.
Grant Details
Large Scale Lake Planning
Date
10/1/2001
Waters Involved
Chub Lake
Status
Complete
Dodge County: Dodge County Lakes Survey: Dodge County will collect information utilizing a public survey questionnaire in order to determine public opinion about the waters in the county and to see if there is need to conduct a Waterway (Lake & Stream) Classification Project in the future.
A full description of project scope and deliverables is available in the grant application, which is part of this agreement. The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.
Grant Details
Large Scale Lake Planning
Date
10/1/2001
Waters Involved
Collins Lake
Status
Complete
Dodge County: Dodge County Lakes Survey: Dodge County will collect information utilizing a public survey questionnaire in order to determine public opinion about the waters in the county and to see if there is need to conduct a Waterway (Lake & Stream) Classification Project in the future.
A full description of project scope and deliverables is available in the grant application, which is part of this agreement. The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.
Grant Details
Large Scale Lake Planning
Date
10/1/2001
Waters Involved
Crystal Lake
Status
Complete
Dodge County: Dodge County Lakes Survey: Dodge County will collect information utilizing a public survey questionnaire in order to determine public opinion about the waters in the county and to see if there is need to conduct a Waterway (Lake & Stream) Classification Project in the future.
A full description of project scope and deliverables is available in the grant application, which is part of this agreement. The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.
Grant Details
Large Scale Lake Planning
Date
10/1/2001
Waters Involved
Crystal Spring
Status
Complete
Dodge County: Dodge County Lakes Survey: Dodge County will collect information utilizing a public survey questionnaire in order to determine public opinion about the waters in the county and to see if there is need to conduct a Waterway (Lake & Stream) Classification Project in the future.
A full description of project scope and deliverables is available in the grant application, which is part of this agreement. The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.
Grant Details
Large Scale Lake Planning
Date
10/1/2001
Waters Involved
Danville Millpond
Status
Complete
Dodge County: Dodge County Lakes Survey: Dodge County will collect information utilizing a public survey questionnaire in order to determine public opinion about the waters in the county and to see if there is need to conduct a Waterway (Lake & Stream) Classification Project in the future.
A full description of project scope and deliverables is available in the grant application, which is part of this agreement. The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.
Grant Details
Large Scale Lake Planning
Date
10/1/2001
Waters Involved
Fox Lake
Status
Complete
Dodge County: Dodge County Lakes Survey: Dodge County will collect information utilizing a public survey questionnaire in order to determine public opinion about the waters in the county and to see if there is need to conduct a Waterway (Lake & Stream) Classification Project in the future.
A full description of project scope and deliverables is available in the grant application, which is part of this agreement. The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.
Grant Details
Large Scale Lake Planning
Date
10/1/2001
Waters Involved
Kekoskee Millpond
Status
Complete
Dodge County: Dodge County Lakes Survey: Dodge County will collect information utilizing a public survey questionnaire in order to determine public opinion about the waters in the county and to see if there is need to conduct a Waterway (Lake & Stream) Classification Project in the future.
A full description of project scope and deliverables is available in the grant application, which is part of this agreement. The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.
Grant Details
Large Scale Lake Planning
Date
10/1/2001
Waters Involved
Lake Emily
Status
Complete
Dodge County: Dodge County Lakes Survey: Dodge County will collect information utilizing a public survey questionnaire in order to determine public opinion about the waters in the county and to see if there is need to conduct a Waterway (Lake & Stream) Classification Project in the future.
A full description of project scope and deliverables is available in the grant application, which is part of this agreement. The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.
Grant Details
Large Scale Lake Planning
Date
10/1/2001
Waters Involved
Lomira Pond
Status
Complete
Dodge County: Dodge County Lakes Survey: Dodge County will collect information utilizing a public survey questionnaire in order to determine public opinion about the waters in the county and to see if there is need to conduct a Waterway (Lake & Stream) Classification Project in the future.
A full description of project scope and deliverables is available in the grant application, which is part of this agreement. The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.
Grant Details
Large Scale Lake Planning
Date
10/1/2001
Waters Involved
Lost Lake
Status
Complete
Dodge County: Dodge County Lakes Survey: Dodge County will collect information utilizing a public survey questionnaire in order to determine public opinion about the waters in the county and to see if there is need to conduct a Waterway (Lake & Stream) Classification Project in the future.
A full description of project scope and deliverables is available in the grant application, which is part of this agreement. The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.
Grant Details
Large Scale Lake Planning
Date
10/1/2001
Waters Involved
Lowell Millpond
Status
Complete
Dodge County: Dodge County Lakes Survey: Dodge County will collect information utilizing a public survey questionnaire in order to determine public opinion about the waters in the county and to see if there is need to conduct a Waterway (Lake & Stream) Classification Project in the future.
A full description of project scope and deliverables is available in the grant application, which is part of this agreement. The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.
Grant Details
Large Scale Lake Planning
Date
10/1/2001
Waters Involved
Lower Mayville Pond 174
Status
Complete
Dodge County: Dodge County Lakes Survey: Dodge County will collect information utilizing a public survey questionnaire in order to determine public opinion about the waters in the county and to see if there is need to conduct a Waterway (Lake & Stream) Classification Project in the future.
A full description of project scope and deliverables is available in the grant application, which is part of this agreement. The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.
Grant Details
Large Scale Lake Planning
Date
10/1/2001
Waters Involved
Mud Lake
Status
Complete
Dodge County: Dodge County Lakes Survey: Dodge County will collect information utilizing a public survey questionnaire in order to determine public opinion about the waters in the county and to see if there is need to conduct a Waterway (Lake & Stream) Classification Project in the future.
A full description of project scope and deliverables is available in the grant application, which is part of this agreement. The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.
Grant Details
Large Scale Lake Planning
Date
10/1/2001
Waters Involved
Neosho Mill Pond
Status
Complete
Dodge County: Dodge County Lakes Survey: Dodge County will collect information utilizing a public survey questionnaire in order to determine public opinion about the waters in the county and to see if there is need to conduct a Waterway (Lake & Stream) Classification Project in the future.
A full description of project scope and deliverables is available in the grant application, which is part of this agreement. The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.
Grant Details
Large Scale Lake Planning
Date
10/1/2001
Waters Involved
Sinissippi Lake (Hustisford)
Status
Complete
Dodge County: Dodge County Lakes Survey: Dodge County will collect information utilizing a public survey questionnaire in order to determine public opinion about the waters in the county and to see if there is need to conduct a Waterway (Lake & Stream) Classification Project in the future.
A full description of project scope and deliverables is available in the grant application, which is part of this agreement. The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.
Grant Details
Large Scale Lake Planning
Date
10/1/2001
Waters Involved
Theresa Marsh Flowage
Status
Complete
Dodge County: Dodge County Lakes Survey: Dodge County will collect information utilizing a public survey questionnaire in order to determine public opinion about the waters in the county and to see if there is need to conduct a Waterway (Lake & Stream) Classification Project in the future.
A full description of project scope and deliverables is available in the grant application, which is part of this agreement. The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.
Grant Details
Large Scale Lake Planning
Date
10/1/2001
Waters Involved
Un Spring
Status
Complete
Dodge County: Dodge County Lakes Survey: Dodge County will collect information utilizing a public survey questionnaire in order to determine public opinion about the waters in the county and to see if there is need to conduct a Waterway (Lake & Stream) Classification Project in the future.
A full description of project scope and deliverables is available in the grant application, which is part of this agreement. The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.
Grant Details
Large Scale Lake Planning
Date
10/1/2001
Waters Involved
Unnamed
Status
Complete
Dodge County: Dodge County Lakes Survey: Dodge County will collect information utilizing a public survey questionnaire in order to determine public opinion about the waters in the county and to see if there is need to conduct a Waterway (Lake & Stream) Classification Project in the future.
A full description of project scope and deliverables is available in the grant application, which is part of this agreement. The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.
Grant Details
Large Scale Lake Planning
Date
10/1/2001
Waters Involved
Upper Mayville Millpond 172
Status
Complete
Dodge County: Dodge County Lakes Survey: Dodge County will collect information utilizing a public survey questionnaire in order to determine public opinion about the waters in the county and to see if there is need to conduct a Waterway (Lake & Stream) Classification Project in the future.
A full description of project scope and deliverables is available in the grant application, which is part of this agreement. The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.