Grant Details
Lake Protection Grant
Date
9/1/2010
Waters Involved
Coe Hollow Creek
Status
Complete
Vernon County: Lco-Shoreland Ordinance Rev.: Vernon County proposes to amend or create a shoreland zoning ordinance that complies with the requirements of NR 115, Wisconsin Administrative Code (as revised effective February 1, 2010) and retain existing regulations that exceed the water resource protections of NR 115 or are specific or unique to local needs.
Project deliverables include: 1. Copies of any fact sheets or handouts created for public hearings. 2. A summary of the comments received at public hearings. 3. A certified copy of the County Board-approved updated shoreland ordinance or ordinance language (if integrated into other codes). 4. Any GIS maps of the shoreland zone or shoreland condition surveys related to the project.
Specific conditions for this Project: The WDNR will be provided electronic and hard copies of all data and or reports or surveys generated as a result of this project.
Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Devils Lake
Status
Complete
Friends Of Devil'S Lake State Park: Res-Of Devil'S Lake By Bottom Water Withdrawl: Friends of Devil's Lake State Park, Inc. will construct and begin operating a siphon pipe system for the purpose of withdrawing P-rich bottom water from Devil's Lake over approximately a 15-year period.
A full description of the project scope and project deliverables is available in the grant application, which is a part of this aggreement.
The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant appllication.
Grant Details
Lake Protection Grant
Date
9/1/2009
Waters Involved
Devils Lake
Status
Complete
Friends Of Devil'S Lake State Park: Lmi-Devil'S Lake Bottom Withdrawal Pipe Alterations: The Friends of Devil's Lake State Park propose this project to reconstruct the siphon pipe system at Devil's Lake State Park, Sauk County, by lowering the portion of the siphon that is above the ordinary high water mark (OHWM) lake level so that the pipe will flow as a gravity feed flow system whenever the lake level is above the OHWM. This entails digging up about 900' of the pipe, and lowering the highest point. An additional butterfly flow valve will be installed to provide control of the pipe for safety and operational purposes. Deliverables of this project will be a brief final report documenting that the project was completed, including photos of the project during construction.
Special condition: The Sponsor agrees to abide by the "Conditions of Approval" contained in the Chapter 30 Regulated Activities manual code approval issued by the Department of Natural Resources on 6/6/06.
Grant Details
Lake Protection Grant
Date
2/1/1999
Waters Involved
Field Veterans Memorial Lake
Status
Complete
Vernon County: Lmi-Hillsboro Lake Improvement: The Vernon County Land Conservation Department proposes to reduce sedimentation to Hillsboro Lake by 1404 tons over a five year period through implementation of Best Management Practices approved, but unlikely to be funded at any time soon, by the state's Nonpoint Source Program. High Residue Management, Conservation Cropping Plans, Grassed Waterway, Critical Area Stabalization, Grade Stabalization Structures, Streambank Riprapping, Streambank Fencing, Stream Crossings and Streambank Shaping and Seeding.
Grant Details
Lake Protection Grant
Date
9/1/2010
Waters Involved
Lake Tomah
Status
Complete
Monroe County: Lco-Shoreland Ordinance Rev.: Monroe County proposes to amend or create a shoreland zoning ordinance that complies with the requirements of NR 115, Wisconsin Administrative Code (as revised effective February 1, 2010) and retain existing regulations that exceed the water resource protections of NR 115 or are specific or unique to local needs.
Project deliverables include: 1. Copies of any fact sheets or handouts created for public hearings. 2. A summary of the comments received at public hearings. 3. A certified copy of the County Board-approved updated shoreland ordinance or ordinance language (if integrated into other codes). 4. Any GIS maps of the shoreland zone or shoreland condition surveys related to the project.
Specific conditions for this Project: The WDNR will be provided electronic and hard copies of all data and or reports or surveys generated as a result of this project.
Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Lake Wisconsin
Status
Complete
Town Of Merrimac: Acq-Clingman Property Land Acquisition: The Town of Merrimac will purchase the Clingman Property on Lake Wisconsin in the County of Sauk (approx. 15.1 acres). The Town of Merrimac will comply with the approved Regional Management Plan.
Grant Details
Lake Protection Grant
Date
9/1/2010
Waters Involved
Lemonweir River
Status
Complete
Juneau County: Lco-Shoreland Ordinance Rev.: Juneau County proposes to amend or create a shoreland zoning ordinance that complies with the requirements of NR 115, Wisconsin Administrative Code (as revised effective February 1, 2010) and retain existing regulations that exceed the water resource protections of NR 115 or are specific or unique to local needs.
Project deliverables include: 1. Copies of any fact sheets or handouts created for public hearings. 2. A summary of the comments received at public hearings. 3. A certified copy of the County Board-approved updated shoreland ordinance or ordinance language (if integrated into other codes). 4. Any GIS maps of the shoreland zone or shoreland condition surveys related to the project.
Specific conditions for this Project: The WDNR will be provided electronic and hard copies of all data and or reports or surveys generated as a result of this project.
Grant Details
Lake Protection Grant
Date
9/1/2010
Waters Involved
Lemonweir River -Un Oxbow
Status
Complete
Juneau County: Lco-Shoreland Ordinance Rev.: Juneau County proposes to amend or create a shoreland zoning ordinance that complies with the requirements of NR 115, Wisconsin Administrative Code (as revised effective February 1, 2010) and retain existing regulations that exceed the water resource protections of NR 115 or are specific or unique to local needs.
Project deliverables include: 1. Copies of any fact sheets or handouts created for public hearings. 2. A summary of the comments received at public hearings. 3. A certified copy of the County Board-approved updated shoreland ordinance or ordinance language (if integrated into other codes). 4. Any GIS maps of the shoreland zone or shoreland condition surveys related to the project.
Specific conditions for this Project: The WDNR will be provided electronic and hard copies of all data and or reports or surveys generated as a result of this project.
Grant Details
Lake Protection Grant
Date
9/1/2010
Waters Involved
Sidie Hollow Lake
Status
Complete
Vernon County: Lco-Shoreland Ordinance Rev.: Vernon County proposes to amend or create a shoreland zoning ordinance that complies with the requirements of NR 115, Wisconsin Administrative Code (as revised effective February 1, 2010) and retain existing regulations that exceed the water resource protections of NR 115 or are specific or unique to local needs.
Project deliverables include: 1. Copies of any fact sheets or handouts created for public hearings. 2. A summary of the comments received at public hearings. 3. A certified copy of the County Board-approved updated shoreland ordinance or ordinance language (if integrated into other codes). 4. Any GIS maps of the shoreland zone or shoreland condition surveys related to the project.
Specific conditions for this Project: The WDNR will be provided electronic and hard copies of all data and or reports or surveys generated as a result of this project.
Grant Details
Lake Protection Grant
Date
9/1/2010
Waters Involved
South Fork Lemonweir River
Status
Complete
Monroe County: Lco-Shoreland Ordinance Rev.: Monroe County proposes to amend or create a shoreland zoning ordinance that complies with the requirements of NR 115, Wisconsin Administrative Code (as revised effective February 1, 2010) and retain existing regulations that exceed the water resource protections of NR 115 or are specific or unique to local needs.
Project deliverables include: 1. Copies of any fact sheets or handouts created for public hearings. 2. A summary of the comments received at public hearings. 3. A certified copy of the County Board-approved updated shoreland ordinance or ordinance language (if integrated into other codes). 4. Any GIS maps of the shoreland zone or shoreland condition surveys related to the project.
Specific conditions for this Project: The WDNR will be provided electronic and hard copies of all data and or reports or surveys generated as a result of this project.
Grant Details
Lake Protection Grant
Date
9/1/2010
Waters Involved
Unnamed
Status
Complete
Juneau County: Lco-Shoreland Ordinance Rev.: Juneau County proposes to amend or create a shoreland zoning ordinance that complies with the requirements of NR 115, Wisconsin Administrative Code (as revised effective February 1, 2010) and retain existing regulations that exceed the water resource protections of NR 115 or are specific or unique to local needs.
Project deliverables include: 1. Copies of any fact sheets or handouts created for public hearings. 2. A summary of the comments received at public hearings. 3. A certified copy of the County Board-approved updated shoreland ordinance or ordinance language (if integrated into other codes). 4. Any GIS maps of the shoreland zone or shoreland condition surveys related to the project.
Specific conditions for this Project: The WDNR will be provided electronic and hard copies of all data and or reports or surveys generated as a result of this project.
Grant Details
Lake Protection Grant
Date
2/1/1999
Waters Involved
West Branch Baraboo River
Status
Complete
Vernon County: Lmi-Hillsboro Lake Improvement: The Vernon County Land Conservation Department proposes to reduce sedimentation to Hillsboro Lake by 1404 tons over a five year period through implementation of Best Management Practices approved, but unlikely to be funded at any time soon, by the state's Nonpoint Source Program. High Residue Management, Conservation Cropping Plans, Grassed Waterway, Critical Area Stabalization, Grade Stabalization Structures, Streambank Riprapping, Streambank Fencing, Stream Crossings and Streambank Shaping and Seeding.
Grant Details
Large Scale Lake Planning
Date
12/20/1990
Waters Involved
Field Veterans Memorial Lake
Status
Complete
City Of Hillsboro: Hillsboro Comprehensive Lake Management Plan Development: Develop a management plan for the lake and watershed. Project components include: public information and education activities; land resources assessment; water resources appraisal; inventory and analysis of livestock operations,winter manure spreading pollution sources, streambank erosion, upstream sediment and nutrient sources; assessment of sediment trap option and dredging option; development of fisheries management plan; printing and dissemination of lake management planinformation through newsletter, public meetings, and local newspaper article. Management Plan will be reposited at the Vernon County Land Conservation Department.
Grant Details
Large Scale Lake Planning
Date
10/29/1992
Waters Involved
Field Veterans Memorial Lake
Status
Complete
City Of Hillsboro: Field Veterans Memorial Lake Sedimentation Study: 1) Conduct sediment coring and analyses using methods specified in application. 2) Prepare construction plans and specifications for dredging project.3) Disseminate information to the public by local newspaper articles and public meetings.
Grant Details
Large Scale Lake Planning
Date
12/20/1990
Waters Involved
South Branch Creek
Status
Complete
City Of Hillsboro: Hillsboro Comprehensive Lake Management Plan Development: Develop a management plan for the lake and watershed. Project components include: public information and education activities; land resources assessment; water resources appraisal; inventory and analysis of livestock operations,winter manure spreading pollution sources, streambank erosion, upstream sediment and nutrient sources; assessment of sediment trap option and dredging option; development of fisheries management plan; printing and dissemination of lake management planinformation through newsletter, public meetings, and local newspaper article. Management Plan will be reposited at the Vernon County Land Conservation Department.
Grant Details
Large Scale Lake Planning
Date
12/20/1990
Waters Involved
West Branch Baraboo River
Status
Complete
City Of Hillsboro: Hillsboro Comprehensive Lake Management Plan Development: Develop a management plan for the lake and watershed. Project components include: public information and education activities; land resources assessment; water resources appraisal; inventory and analysis of livestock operations,winter manure spreading pollution sources, streambank erosion, upstream sediment and nutrient sources; assessment of sediment trap option and dredging option; development of fisheries management plan; printing and dissemination of lake management planinformation through newsletter, public meetings, and local newspaper article. Management Plan will be reposited at the Vernon County Land Conservation Department.
Grant Details
River Protection Grant
Date
7/1/2004
Waters Involved
Bishop Br
Status
Complete
Vernon County Lwcd: Bishops Branch Restoration: Vernon County proposes to restore some 2600 linear feet of Bishops Branch, a tributary to the West Fork of the Kickapoo River, in the Town of Liberty.
Major project elements to include 1) placement of lunker structures, boulders, and rock weirs in the stream, 2) deepening of pools, 3) placement of riprap, and 4) revegitation of the streambank.