Grant Details
Lake Protection Grant
Date
9/1/2002
Waters Involved
Butternut Lake
Status
Complete
Price County: Lmi-Phase Ii Butternut Wq Assessment/Modeling: The Price County Land Conservation Dept will sponsor a project which will collect all needed data to create a response model for Butternut Lake including a water budget, detailed phosphorus budget, lake water quality modeling and evaluation of groundwater impacts. Deliverables will include all data collected and a final report summarizing the findings.
DNR will be provided with a copy of reports and publications produced in both written and electronic (PDF) format. DNR will also be provided with a summary of all the efforts under this grant that are not included in reports or other written documents.
Grant Details
Lake Protection Grant
Date
9/1/2000
Waters Involved
Pixley Flowage
Status
Complete
Price County: Acq-Price County-Smith Lake Land Acquisition: Price County will acquire 93.5 acres of land with 6,800 feet of undeveloped frontage on Smith Lake, a flowage of the Flambeau River.
Grant Details
Lake Protection Grant
Date
7/1/1998
Waters Involved
Rib Lake
Status
Complete
Rib Lake Inland Lakes P & R District: Lmi-Fd-Rib Lake Rehabilitation/Sediment Analysis, 1998-99: Rib Lake Inland Lake Protection District proposes to conduct a diagnostic/feasibility study of lake bottom sediments as a preliminary step to a possible sunken log retrieval and/or dredging project in Rib Lake.
Grant Details
River Protection Grant
Date
4/15/2015
Waters Involved
Duroy Lake
Status
Complete
Price County: Weger Streambank Protection, Elk River: Price County is sponsoring a project to restore 250 feet of shoreline habitat along the Elk River. There is an unstable 25 foot face that is actively eroding and needs to be stabilized. Fish, wildlife habitat and water quality will be improved.
Project goals: 1) Reduce sediment and nutrient delivery; 2) Reduce instream sedimentation to improve fish spawning habitat; 3) Restore shore land habitat for wildlife; 4) Improve water quality; 5) Protect existing resources.
Project deliverables is a final report that includes: 1) Documentation that the project was completed; 2) Copies of final engineering plans; 3) Before and after photo documentation.
Specific conditions for this Project: The WDNR will be provided electronic and hard copies of all data and or reports/plans generated as a result of this project.
Grant Details
River Protection Grant
Date
4/15/2015
Waters Involved
Elk Lake
Status
Complete
Price County: Weger Streambank Protection, Elk River: Price County is sponsoring a project to restore 250 feet of shoreline habitat along the Elk River. There is an unstable 25 foot face that is actively eroding and needs to be stabilized. Fish, wildlife habitat and water quality will be improved.
Project goals: 1) Reduce sediment and nutrient delivery; 2) Reduce instream sedimentation to improve fish spawning habitat; 3) Restore shore land habitat for wildlife; 4) Improve water quality; 5) Protect existing resources.
Project deliverables is a final report that includes: 1) Documentation that the project was completed; 2) Copies of final engineering plans; 3) Before and after photo documentation.
Specific conditions for this Project: The WDNR will be provided electronic and hard copies of all data and or reports/plans generated as a result of this project.
Grant Details
River Protection Grant
Date
4/15/2015
Waters Involved
Elk River
Status
Complete
Price County: Weger Streambank Protection, Elk River: Price County is sponsoring a project to restore 250 feet of shoreline habitat along the Elk River. There is an unstable 25 foot face that is actively eroding and needs to be stabilized. Fish, wildlife habitat and water quality will be improved.
Project goals: 1) Reduce sediment and nutrient delivery; 2) Reduce instream sedimentation to improve fish spawning habitat; 3) Restore shore land habitat for wildlife; 4) Improve water quality; 5) Protect existing resources.
Project deliverables is a final report that includes: 1) Documentation that the project was completed; 2) Copies of final engineering plans; 3) Before and after photo documentation.
Specific conditions for this Project: The WDNR will be provided electronic and hard copies of all data and or reports/plans generated as a result of this project.
Grant Details
River Protection Grant
Date
4/15/2015
Waters Involved
Grassy Lake
Status
Complete
Price County: Weger Streambank Protection, Elk River: Price County is sponsoring a project to restore 250 feet of shoreline habitat along the Elk River. There is an unstable 25 foot face that is actively eroding and needs to be stabilized. Fish, wildlife habitat and water quality will be improved.
Project goals: 1) Reduce sediment and nutrient delivery; 2) Reduce instream sedimentation to improve fish spawning habitat; 3) Restore shore land habitat for wildlife; 4) Improve water quality; 5) Protect existing resources.
Project deliverables is a final report that includes: 1) Documentation that the project was completed; 2) Copies of final engineering plans; 3) Before and after photo documentation.
Specific conditions for this Project: The WDNR will be provided electronic and hard copies of all data and or reports/plans generated as a result of this project.
Grant Details
River Protection Grant
Date
4/15/2015
Waters Involved
Lac Sault Dore
Status
Complete
Price County: Weger Streambank Protection, Elk River: Price County is sponsoring a project to restore 250 feet of shoreline habitat along the Elk River. There is an unstable 25 foot face that is actively eroding and needs to be stabilized. Fish, wildlife habitat and water quality will be improved.
Project goals: 1) Reduce sediment and nutrient delivery; 2) Reduce instream sedimentation to improve fish spawning habitat; 3) Restore shore land habitat for wildlife; 4) Improve water quality; 5) Protect existing resources.
Project deliverables is a final report that includes: 1) Documentation that the project was completed; 2) Copies of final engineering plans; 3) Before and after photo documentation.
Specific conditions for this Project: The WDNR will be provided electronic and hard copies of all data and or reports/plans generated as a result of this project.
Grant Details
River Protection Grant
Date
4/15/2015
Waters Involved
Long Lake
Status
Complete
Price County: Weger Streambank Protection, Elk River: Price County is sponsoring a project to restore 250 feet of shoreline habitat along the Elk River. There is an unstable 25 foot face that is actively eroding and needs to be stabilized. Fish, wildlife habitat and water quality will be improved.
Project goals: 1) Reduce sediment and nutrient delivery; 2) Reduce instream sedimentation to improve fish spawning habitat; 3) Restore shore land habitat for wildlife; 4) Improve water quality; 5) Protect existing resources.
Project deliverables is a final report that includes: 1) Documentation that the project was completed; 2) Copies of final engineering plans; 3) Before and after photo documentation.
Specific conditions for this Project: The WDNR will be provided electronic and hard copies of all data and or reports/plans generated as a result of this project.
Grant Details
River Protection Grant
Date
4/15/2015
Waters Involved
Musser Flowage
Status
Complete
Price County: Weger Streambank Protection, Elk River: Price County is sponsoring a project to restore 250 feet of shoreline habitat along the Elk River. There is an unstable 25 foot face that is actively eroding and needs to be stabilized. Fish, wildlife habitat and water quality will be improved.
Project goals: 1) Reduce sediment and nutrient delivery; 2) Reduce instream sedimentation to improve fish spawning habitat; 3) Restore shore land habitat for wildlife; 4) Improve water quality; 5) Protect existing resources.
Project deliverables is a final report that includes: 1) Documentation that the project was completed; 2) Copies of final engineering plans; 3) Before and after photo documentation.
Specific conditions for this Project: The WDNR will be provided electronic and hard copies of all data and or reports/plans generated as a result of this project.
Grant Details
River Protection Grant
Date
4/15/2015
Waters Involved
Unnamed
Status
Complete
Price County: Weger Streambank Protection, Elk River: Price County is sponsoring a project to restore 250 feet of shoreline habitat along the Elk River. There is an unstable 25 foot face that is actively eroding and needs to be stabilized. Fish, wildlife habitat and water quality will be improved.
Project goals: 1) Reduce sediment and nutrient delivery; 2) Reduce instream sedimentation to improve fish spawning habitat; 3) Restore shore land habitat for wildlife; 4) Improve water quality; 5) Protect existing resources.
Project deliverables is a final report that includes: 1) Documentation that the project was completed; 2) Copies of final engineering plans; 3) Before and after photo documentation.
Specific conditions for this Project: The WDNR will be provided electronic and hard copies of all data and or reports/plans generated as a result of this project.