Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Amey Pond
Status
Complete
Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.
DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.
Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Amey Pond
Status
Complete
Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Amey Pond
Status
Complete
Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.
Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Arkdale Lake
Status
Complete
Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.
DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.
Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Arkdale Lake
Status
Complete
Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Arkdale Lake
Status
Complete
Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.
Grant Details
Lake Protection Grant
Date
9/1/2009
Waters Involved
Arkdale Lake
Status
Complete
Adams County: Lco-Adams Ordinance Imple. Assistance: The Adams County Land and Water Conservation Department proposes to facilitate revision of the county's Shoreland Protection Ordinance and to train a LWCD staff person to work with shoreland property owners to establish shoreland buffers and other practices necessary to comply with the new shoreland ordinance. Major project elements to include: 1) Staff training, 2) Outreach and counsulting to shoreland property owners, 3) Development of shoreline restoration plans and agreements, 4) Installation oversight, and 5) Update of the county's Riparian Buffer GIS layer to track practice installation.
Grant Details
Lake Protection Grant
Date
9/1/2006
Waters Involved
Big Roche A Cri Creek
Status
Complete
Adams County: Res-Castle Rock Restoration: Adams County proposes to provide up to 75% of the cost of shoreland restoration practices to lake front property owners on Castle Rock Lake. Grant funds will be distributed to fund removal of sea walls, minor bank re-shaping, placement of rip-rap, establishment of vegetative buffers and implementation of individual stormwater management plans.
Special Conditions: 1) Space between rip-rap to be filled with soil and vegetated to facilitate successful access of turtle hatchlings to water. Lupine seed to be of a wild variety compatible with Karner Blue butterflies. 2) Permits to be secured by individual property owners prior to construction.
Grant Details
Lake Protection Grant
Date
9/1/2007
Waters Involved
Big Roche A Cri Creek
Status
Complete
Adams County: Res-Big Roche-A-Cri Restoration 2: Adams County proposes to provide up to 75% of the cost of shoreland restoration practices to lake front property owners with highly erodable shorelines on Big Roche-a-Cri Lake. Grant funds will be distributed to the property owners to install shoreline protection, riparian buffers and stormwater management practices.
Grant Details
Lake Protection Grant
Date
9/1/2009
Waters Involved
Big Roche A Cri Creek
Status
Complete
Adams County: Lco-Adams Ordinance Imple. Assistance: The Adams County Land and Water Conservation Department proposes to facilitate revision of the county's Shoreland Protection Ordinance and to train a LWCD staff person to work with shoreland property owners to establish shoreland buffers and other practices necessary to comply with the new shoreland ordinance. Major project elements to include: 1) Staff training, 2) Outreach and counsulting to shoreland property owners, 3) Development of shoreline restoration plans and agreements, 4) Installation oversight, and 5) Update of the county's Riparian Buffer GIS layer to track practice installation.
Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Big Roche a Cri
Status
Complete
Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.
DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.
Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Big Roche a Cri
Status
Complete
Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Big Roche a Cri
Status
Complete
Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.
Grant Details
Lake Protection Grant
Date
9/1/2007
Waters Involved
Big Roche a Cri
Status
Complete
Adams County: Res-Big Roche-A-Cri Restoration 2: Adams County proposes to provide up to 75% of the cost of shoreland restoration practices to lake front property owners with highly erodable shorelines on Big Roche-a-Cri Lake. Grant funds will be distributed to the property owners to install shoreline protection, riparian buffers and stormwater management practices.
Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Big Spring Pond
Status
Complete
Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.
DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.
Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Big Spring Pond
Status
Complete
Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Big Spring Pond
Status
Complete
Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.
Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Camelot Lake
Status
Complete
Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.
DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.
Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Camelot Lake
Status
Complete
Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Camelot Lake
Status
Complete
Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Camelot Lake
Status
Complete
Adams County: Res-Camelot Lake Restoration: Adams Co. proposes to establish four shoreline protection/restoration sites for demonstration purposes on Camelot Lake, and to cost share on similar practices on 27 privately owned parcels. Major project elements include: 1) riprap and anchored log shoreline stabalization, 2) establishment and maintenance of 35' vegetated buffer strips, 3) stormwater management planning and implementation for structures.
Grant Details
Lake Protection Grant
Date
10/1/2013
Waters Involved
Castle Rock Ditch
Status
Complete
Adams County: Res-Adams Ord. Imp. 2: Adams County proposes to provide educational and technical assistance to the public and Adams County lake organizations for the installation of shoreline buffers on waterways so they comply with the Admas County Shorland, Wetland, and Habitat Protection Ordinance. Major project elements to include: a) outreach and education, b) review of plans, designs, and maintenance agreements, c) development of plans, designs, and agreements, d) inventory of public access points on all project waterways. Project will include notification of riparian property whose property is in conformance with the buffer standard and that the buffer must stay in compliance with the buffer standard. Signed maintenance agreements must be kept on record by Adams County.
Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Castle Rock Lake
Status
Complete
Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.
DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.
Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Castle Rock Lake
Status
Complete
Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Castle Rock Lake
Status
Complete
Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.
Grant Details
Lake Protection Grant
Date
9/1/2006
Waters Involved
Castle Rock Lake
Status
Complete
Adams County: Res-Castle Rock Restoration: Adams County proposes to provide up to 75% of the cost of shoreland restoration practices to lake front property owners on Castle Rock Lake. Grant funds will be distributed to fund removal of sea walls, minor bank re-shaping, placement of rip-rap, establishment of vegetative buffers and implementation of individual stormwater management plans.
Special Conditions: 1) Space between rip-rap to be filled with soil and vegetated to facilitate successful access of turtle hatchlings to water. Lupine seed to be of a wild variety compatible with Karner Blue butterflies. 2) Permits to be secured by individual property owners prior to construction.
Grant Details
Lake Protection Grant
Date
10/1/2013
Waters Involved
Castle Rock Lake
Status
Complete
Adams County: Res-Adams Ord. Imp. 2: Adams County proposes to provide educational and technical assistance to the public and Adams County lake organizations for the installation of shoreline buffers on waterways so they comply with the Admas County Shorland, Wetland, and Habitat Protection Ordinance. Major project elements to include: a) outreach and education, b) review of plans, designs, and maintenance agreements, c) development of plans, designs, and agreements, d) inventory of public access points on all project waterways. Project will include notification of riparian property whose property is in conformance with the buffer standard and that the buffer must stay in compliance with the buffer standard. Signed maintenance agreements must be kept on record by Adams County.
Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Crooked Lake
Status
Complete
Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.
DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.
Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Crooked Lake
Status
Complete
Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Crooked Lake
Status
Complete
Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.
Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Deep Lake
Status
Complete
Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.
DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.
Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Deep Lake
Status
Complete
Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Deep Lake
Status
Complete
Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.
Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Devils Lake
Status
Complete
Friends Of Devil'S Lake State Park: Res-Of Devil'S Lake By Bottom Water Withdrawl: Friends of Devil's Lake State Park, Inc. will construct and begin operating a siphon pipe system for the purpose of withdrawing P-rich bottom water from Devil's Lake over approximately a 15-year period.
A full description of the project scope and project deliverables is available in the grant application, which is a part of this aggreement.
The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant appllication.
Grant Details
Lake Protection Grant
Date
9/1/2009
Waters Involved
Devils Lake
Status
Complete
Friends Of Devil'S Lake State Park: Lmi-Devil'S Lake Bottom Withdrawal Pipe Alterations: The Friends of Devil's Lake State Park propose this project to reconstruct the siphon pipe system at Devil's Lake State Park, Sauk County, by lowering the portion of the siphon that is above the ordinary high water mark (OHWM) lake level so that the pipe will flow as a gravity feed flow system whenever the lake level is above the OHWM. This entails digging up about 900' of the pipe, and lowering the highest point. An additional butterfly flow valve will be installed to provide control of the pipe for safety and operational purposes. Deliverables of this project will be a brief final report documenting that the project was completed, including photos of the project during construction.
Special condition: The Sponsor agrees to abide by the "Conditions of Approval" contained in the Chapter 30 Regulated Activities manual code approval issued by the Department of Natural Resources on 6/6/06.
Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Dorro Couche Lake
Status
Complete
Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.
DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.
Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Dorro Couche Lake
Status
Complete
Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Dorro Couche Lake
Status
Complete
Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.
Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Easton Lake
Status
Complete
Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.
DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.
Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Easton Lake
Status
Complete
Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Easton Lake
Status
Complete
Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.
Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Fawn Lake
Status
Complete
Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.
DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.
Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Fawn Lake
Status
Complete
Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Fawn Lake
Status
Complete
Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.
Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Fenner Lake
Status
Complete
Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.
DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.
Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Fenner Lake
Status
Complete
Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Fenner Lake
Status
Complete
Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.
Grant Details
Lake Protection Grant
Date
9/1/2010
Waters Involved
Fourteenmile Creek
Status
Complete
Adams County: Lco-Shoreland Ordinance Rev.: Adams County proposes to amend or create a shoreland zoning ordinance that complies with the requirements of NR 115, Wisconsin Administrative Code (as revised effective February 1, 2010) and retain existing regulations that exceed the water resource protections of NR 115 or are specific or unique to local needs.
Project deliverables include: 1. Copies of any fact sheets or handouts created for public hearings. 2. A summary of the comments received at public hearings. 3. A certified copy of the County Board-approved updated shoreland ordinance or ordinance language (if integrated into other codes). 4. Any GIS maps of the shoreland zone or shoreland condition surveys related to the project.
Specific conditions for this Project: 1. The WDNR will be provided electronic and hard copies of all data and or reports or surveys generated as a result of this project.
Grant Details
Lake Protection Grant
Date
9/1/2013
Waters Involved
Fourteenmile Creek
Status
Complete
Adams County: Lmi-Tri-Lakes Nutrient Mgmt. Plan: Adams County proposes to develop nutrient management plans for 4,470 acres of crop land within the Tri-Lakes Watershed. Major project elements to include: a) outreach to landowners, b) development of nutrient management plans, c) weekly water sampling, d) water quality analysis, and e) cost share payments.
Amended 1/22/15 to include installation of wind breaks, filter streps, residue and tillage management, and planting cover crops.
Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Friendship Lake
Status
Complete
Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.
DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.
Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Friendship Lake
Status
Complete
Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Friendship Lake
Status
Complete
Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.
Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Goose Lake
Status
Complete
Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.
DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.
Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Goose Lake
Status
Complete
Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Goose Lake
Status
Complete
Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.
Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Hill Lake
Status
Complete
Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.
DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.
Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Hill Lake
Status
Complete
Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Hill Lake
Status
Complete
Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.
Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Jordan Lake
Status
Complete
Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.
DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.
Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Jordan Lake
Status
Complete
Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Jordan Lake
Status
Complete
Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.
Grant Details
Lake Protection Grant
Date
9/1/2006
Waters Involved
Klein Creek
Status
Complete
Adams County: Res-Castle Rock Restoration: Adams County proposes to provide up to 75% of the cost of shoreland restoration practices to lake front property owners on Castle Rock Lake. Grant funds will be distributed to fund removal of sea walls, minor bank re-shaping, placement of rip-rap, establishment of vegetative buffers and implementation of individual stormwater management plans.
Special Conditions: 1) Space between rip-rap to be filled with soil and vegetated to facilitate successful access of turtle hatchlings to water. Lupine seed to be of a wild variety compatible with Karner Blue butterflies. 2) Permits to be secured by individual property owners prior to construction.
Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Lake Arrowhead
Status
Complete
Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.
DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.
Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Lake Arrowhead
Status
Complete
Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Lake Arrowhead
Status
Complete
Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.
Grant Details
Lake Protection Grant
Date
9/1/2010
Waters Involved
Lake Arrowhead
Status
Complete
Adams County: Lco-Shoreland Ordinance Rev.: Adams County proposes to amend or create a shoreland zoning ordinance that complies with the requirements of NR 115, Wisconsin Administrative Code (as revised effective February 1, 2010) and retain existing regulations that exceed the water resource protections of NR 115 or are specific or unique to local needs.
Project deliverables include: 1. Copies of any fact sheets or handouts created for public hearings. 2. A summary of the comments received at public hearings. 3. A certified copy of the County Board-approved updated shoreland ordinance or ordinance language (if integrated into other codes). 4. Any GIS maps of the shoreland zone or shoreland condition surveys related to the project.
Specific conditions for this Project: 1. The WDNR will be provided electronic and hard copies of all data and or reports or surveys generated as a result of this project.
Grant Details
Lake Protection Grant
Date
9/1/2013
Waters Involved
Lake Arrowhead
Status
Complete
Adams County: Lmi-Tri-Lakes Nutrient Mgmt. Plan: Adams County proposes to develop nutrient management plans for 4,470 acres of crop land within the Tri-Lakes Watershed. Major project elements to include: a) outreach to landowners, b) development of nutrient management plans, c) weekly water sampling, d) water quality analysis, and e) cost share payments.
Amended 1/22/15 to include installation of wind breaks, filter streps, residue and tillage management, and planting cover crops.
Grant Details
Lake Protection Grant
Date
3/15/1994
Waters Involved
Lake Sherwood
Status
Complete
Adams County: Lco-Lakes Camelot/Sherwood Shoreland Zoning Audit: Adams County proposes to conduct a shoreline zoning audit of Lakes Camelot and Sherwood for the purposes of identification of suspected violations of the Adams County shoreline protection ordinance, establsihment of a current record of all current shoreland uses, and establishing a baseline for the assessment of the effectiveness of permitting and enforcement processes. Project activities will include the location and diagramming of structures within 75 feet of the ordinary highway mark, follow-up questionnaires, file review and the development of a public education on the importance of the shoreline protection ordinance.
Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Lake Sherwood
Status
Complete
Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.
DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.
Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Lake Sherwood
Status
Complete
Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Lake Sherwood
Status
Complete
Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.
Grant Details
Lake Protection Grant
Date
5/25/1995
Waters Involved
Lake Wisconsin
Status
Complete
Town Of Lodi: Acq-Lake Wisconsin Okee Community Park Land Acquisition: The Town of Lodi proposes to acquire 8.5 acres of land in the Okee Bay area of Lake Wisconsin for recreational opportunities and lake protection. Eligible costs include acquisition of the parcel, appraisal fee and preparation of an environmental assessment.
Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Lake Wisconsin
Status
Complete
Town Of Merrimac: Acq-Clingman Property Land Acquisition: The Town of Merrimac will purchase the Clingman Property on Lake Wisconsin in the County of Sauk (approx. 15.1 acres). The Town of Merrimac will comply with the approved Regional Management Plan.
Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Little Lake
Status
Complete
Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.
DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.
Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Little Lake
Status
Complete
Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Little Lake
Status
Complete
Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.
Grant Details
Lake Protection Grant
Date
9/1/2006
Waters Involved
Little Roche A Cri Creek
Status
Complete
Adams County: Res-Castle Rock Restoration: Adams County proposes to provide up to 75% of the cost of shoreland restoration practices to lake front property owners on Castle Rock Lake. Grant funds will be distributed to fund removal of sea walls, minor bank re-shaping, placement of rip-rap, establishment of vegetative buffers and implementation of individual stormwater management plans.
Special Conditions: 1) Space between rip-rap to be filled with soil and vegetated to facilitate successful access of turtle hatchlings to water. Lupine seed to be of a wild variety compatible with Karner Blue butterflies. 2) Permits to be secured by individual property owners prior to construction.
Grant Details
Lake Protection Grant
Date
9/1/2006
Waters Involved
Little Yellow River
Status
Complete
Adams County: Res-Castle Rock Restoration: Adams County proposes to provide up to 75% of the cost of shoreland restoration practices to lake front property owners on Castle Rock Lake. Grant funds will be distributed to fund removal of sea walls, minor bank re-shaping, placement of rip-rap, establishment of vegetative buffers and implementation of individual stormwater management plans.
Special Conditions: 1) Space between rip-rap to be filled with soil and vegetated to facilitate successful access of turtle hatchlings to water. Lupine seed to be of a wild variety compatible with Karner Blue butterflies. 2) Permits to be secured by individual property owners prior to construction.
Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Mason Lake
Status
Complete
Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.
DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.
Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Mason Lake
Status
Complete
Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Mason Lake
Status
Complete
Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.
Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
McCall Lake
Status
Complete
Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.
DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.
Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
McCall Lake
Status
Complete
Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
McCall Lake
Status
Complete
Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.
Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
McDougall Lake
Status
Complete
Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.
DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.
Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
McDougall Lake
Status
Complete
Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
McDougall Lake
Status
Complete
Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.
Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
McGinnis Lake
Status
Complete
Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.
DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.
Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
McGinnis Lake
Status
Complete
Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
McGinnis Lake
Status
Complete
Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.
Grant Details
Lake Protection Grant
Date
9/1/2008
Waters Involved
Park Lake
Status
Complete
Columbia County: Lmi-Tmdl Development-Phase Ii-Park Lake: Columbia County Land and Water Conservation Department will conduct phase 2 of its TMDL development program for Park Lake. This phase will focus on continued monitoring along with the use of a graduate student to conduct water quality modeling to allow for final development of a TMDL for Park Lake, a 303(d) listed lake. The objectives of this study are to quantify P export from the watershed, and link water quality with nutrient loss from the land. Project deliverables include 1) monitoring of wetland effectiveness by measuring upstream and downstream flow and concentration; 2) Field-scale Snap-Plus and watershed-scale modeling; 3) simulating water quality changes caused by wetlands in this watershed using Army Corp PRE-WET model; 4) continuation of water quality monitoring/data collection along with targeting water sample collection adjacent to wetlands; 5) information/education efforts throughout project; and 6) compilation, documentation, and recommendations of findings. Education efforts include a news release, providing updates and final presentation through regular and annual meetings of the Lake District.
Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Parker Lake
Status
Complete
Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.
DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.
Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Parker Lake
Status
Complete
Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Parker Lake
Status
Complete
Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.
Grant Details
Lake Protection Grant
Date
4/15/2015
Waters Involved
Parker Lake
Status
Complete
Parker Lake Assoc., Inc.: Hlk-Parker Lake Fish Sticks: Parker Lake Association Inc. will implement best practices described in Wisconsin\2019s 2014-2017 Healthy Lakes Implementation Plan. Practices include: Installation of 8 fish stick clusters on the shoreline of Parker Lake.
The best practices require a contract to remain in effect for 10 years and must include minimum operation and maintenance requirements and data collection as described in grant condition #17. If best practice(s) are implemented on land owned by the grant Sponsor, this Lake Protection Grant Agreement serves as the contract. If best practice(s) are implemented on land other than the sponsor\2019s, a contract between the sponsor and landowner that abides by grant condition #16 is required.
The Department may require re-payment of project installation costs if the best practice is disturbed or removed. The Sponsor and/or the Department may perform site inspections and/or monitoring to ensure project success.
Deliverables: Best practice location and design information, if not included in the application; signed 10-year landowner contract; pre and post project installation photographs; summary of education activities and publicity/promotion of Healthy Lakes initiative, if applicable.
Special conditions: The state share of each best practice cannot exceed $1,000. The state share of grant administration and technical assistance costs may not exceed 10% of the grant award; technical assistance does not include implementation labor. Funding cannot be used for mitigation or regulatory compliance activities. Water regulation and/or county zoning permits must be issued before construction. The Healthy Lakes logo should be used for promotion and publicity, and DNR recognized as a funding source.
Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Patrick Lake
Status
Complete
Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.
DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.
Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Patrick Lake
Status
Complete
Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Patrick Lake
Status
Complete
Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.
Grant Details
Lake Protection Grant
Date
9/1/2006
Waters Involved
Peppermill Creek
Status
Complete
Adams County: Res-Peppermill Restoration: Adams County proposes to provide up to 75% of the cost of shoreland restoration practices to lake front property owners on Peppermill Lake. Grant funds will be distributed to fund establishment of vegetative buffers and implementation of individual stormwater management plans.
Special Condition: Permits to be secured by individual property owners prior to construction.
Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Peppermill Lake
Status
Complete
Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.
DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.
Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Peppermill Lake
Status
Complete
Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Peppermill Lake
Status
Complete
Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.
Grant Details
Lake Protection Grant
Date
9/1/2006
Waters Involved
Peppermill Lake
Status
Complete
Adams County: Res-Peppermill Restoration: Adams County proposes to provide up to 75% of the cost of shoreland restoration practices to lake front property owners on Peppermill Lake. Grant funds will be distributed to fund establishment of vegetative buffers and implementation of individual stormwater management plans.
Special Condition: Permits to be secured by individual property owners prior to construction.
Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Petenwell Lake
Status
Complete
Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.
DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.
Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Petenwell Lake
Status
Complete
Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Petenwell Lake
Status
Complete
Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.
Grant Details
Lake Protection Grant
Date
10/1/2013
Waters Involved
Petenwell Lake
Status
Complete
Adams County: Res-Adams Ord. Imp. 2: Adams County proposes to provide educational and technical assistance to the public and Adams County lake organizations for the installation of shoreline buffers on waterways so they comply with the Admas County Shorland, Wetland, and Habitat Protection Ordinance. Major project elements to include: a) outreach and education, b) review of plans, designs, and maintenance agreements, c) development of plans, designs, and agreements, d) inventory of public access points on all project waterways. Project will include notification of riparian property whose property is in conformance with the buffer standard and that the buffer must stay in compliance with the buffer standard. Signed maintenance agreements must be kept on record by Adams County.
Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Risk Creek Pond
Status
Complete
Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.
DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.
Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Risk Creek Pond
Status
Complete
Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Risk Creek Pond
Status
Complete
Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.
Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Rollers Lake
Status
Complete
Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.
DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.
Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Rollers Lake
Status
Complete
Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Rollers Lake
Status
Complete
Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.
Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Silver Lake
Status
Complete
Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.
DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.
Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Silver Lake
Status
Complete
Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Silver Lake
Status
Complete
Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.
Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Twin Lakes
Status
Complete
Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.
DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.
Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Twin Lakes
Status
Complete
Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Twin Lakes
Status
Complete
Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.
Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Unnamed
Status
Complete
Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.
DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.
Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Unnamed
Status
Complete
Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Unnamed
Status
Complete
Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.
Grant Details
Lake Protection Grant
Date
9/1/2006
Waters Involved
Unnamed
Status
Complete
Adams County: Res-Castle Rock Restoration: Adams County proposes to provide up to 75% of the cost of shoreland restoration practices to lake front property owners on Castle Rock Lake. Grant funds will be distributed to fund removal of sea walls, minor bank re-shaping, placement of rip-rap, establishment of vegetative buffers and implementation of individual stormwater management plans.
Special Conditions: 1) Space between rip-rap to be filled with soil and vegetated to facilitate successful access of turtle hatchlings to water. Lupine seed to be of a wild variety compatible with Karner Blue butterflies. 2) Permits to be secured by individual property owners prior to construction.
Grant Details
Lake Protection Grant
Date
9/1/2006
Waters Involved
Wisconsin River
Status
Complete
Adams County: Res-Castle Rock Restoration: Adams County proposes to provide up to 75% of the cost of shoreland restoration practices to lake front property owners on Castle Rock Lake. Grant funds will be distributed to fund removal of sea walls, minor bank re-shaping, placement of rip-rap, establishment of vegetative buffers and implementation of individual stormwater management plans.
Special Conditions: 1) Space between rip-rap to be filled with soil and vegetated to facilitate successful access of turtle hatchlings to water. Lupine seed to be of a wild variety compatible with Karner Blue butterflies. 2) Permits to be secured by individual property owners prior to construction.
Grant Details
Lake Protection Grant
Date
10/1/2013
Waters Involved
Wisconsin River
Status
Complete
Adams County: Res-Adams Ord. Imp. 2: Adams County proposes to provide educational and technical assistance to the public and Adams County lake organizations for the installation of shoreline buffers on waterways so they comply with the Admas County Shorland, Wetland, and Habitat Protection Ordinance. Major project elements to include: a) outreach and education, b) review of plans, designs, and maintenance agreements, c) development of plans, designs, and agreements, d) inventory of public access points on all project waterways. Project will include notification of riparian property whose property is in conformance with the buffer standard and that the buffer must stay in compliance with the buffer standard. Signed maintenance agreements must be kept on record by Adams County.
Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Wolf Lake
Status
Complete
Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.
DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.
Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Wolf Lake
Status
Complete
Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Wolf Lake
Status
Complete
Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.
Grant Details
Lake Protection Grant
Date
9/1/2009
Waters Involved
Wolf Lake
Status
Complete
Adams County: Res-Adams Restore Cost Share: The Adams County Land Conservation Department proposes to provide 75% cost shares to riparian property owners interested in establishing and maintaining shoreland buffers and rain gardens with native vegetation. Cost share agreements to require that property owners maintain buffers for a minimum of 25 years.
Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Amey Pond
Status
Complete
Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.
Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Arkdale Lake
Status
Complete
Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.
Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Big Roche a Cri
Status
Complete
Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.
Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Big Spring Pond
Status
Complete
Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.
Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Camelot Lake
Status
Complete
Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.
Grant Details
Large Scale Lake Planning
Date
4/1/2010
Waters Involved
Castle Rock Ditch
Status
Complete
Lake Alice Association, Inc: Lake Alice Stewardship Program Phase Ii - Understanding The Biota Of Lake Alice: Lake Alice Association is sponsoring phased large scale lake planning grants to study Lake Alice, in Lincoln County. The project will focus on developing and updating an Adaptive Lake Management Plan (LMP) for Lake Alice. Phase 2 was funded in this grant cycle and Phases 3-5 will be submitted for funding starting in 2011.
Project activities for Phase 2 include: 1) Educational program, meetings and educational events with lake association and Tomahawk High School students, written educational materials, news releases, and website updates; 2) Point-intercept (PI) aquatic plant survey; 3) Aquatic plant community and substrate mapping; 4) Water quality assessment; 5) Volunteer amphibian monitoring and angler survey; 6) Update LMP.
Project deliverables include: 1) Educational materials and news releases; 2) Aquatic plant community and substrate maps; 3) PI, water quality, amphibian, and angler data; 4) LMP.
Specific conditions for this project: LMP needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP, news releases, any other educational materials/products, all data, all maps from project, and all GIS data.
Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Castle Rock Lake
Status
Complete
Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.
Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Crooked Lake
Status
Complete
Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.
Grant Details
Large Scale Lake Planning
Date
4/1/2010
Waters Involved
Cruson Slough
Status
Complete
Lake Alice Association, Inc: Lake Alice Stewardship Program Phase Ii - Understanding The Biota Of Lake Alice: Lake Alice Association is sponsoring phased large scale lake planning grants to study Lake Alice, in Lincoln County. The project will focus on developing and updating an Adaptive Lake Management Plan (LMP) for Lake Alice. Phase 2 was funded in this grant cycle and Phases 3-5 will be submitted for funding starting in 2011.
Project activities for Phase 2 include: 1) Educational program, meetings and educational events with lake association and Tomahawk High School students, written educational materials, news releases, and website updates; 2) Point-intercept (PI) aquatic plant survey; 3) Aquatic plant community and substrate mapping; 4) Water quality assessment; 5) Volunteer amphibian monitoring and angler survey; 6) Update LMP.
Project deliverables include: 1) Educational materials and news releases; 2) Aquatic plant community and substrate maps; 3) PI, water quality, amphibian, and angler data; 4) LMP.
Specific conditions for this project: LMP needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP, news releases, any other educational materials/products, all data, all maps from project, and all GIS data.
Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Deep Lake
Status
Complete
Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.
Grant Details
Large Scale Lake Planning
Date
2/6/1992
Waters Involved
Devils Lake
Status
Complete
Town Of Baraboo: Devil'S Lake Phosphorus Reduction & Hydrologic Study: 1) Conduct sediment coring and bottom water withdrawal experiments to evaluate these techniques to reduce phosphorus concentrations in the lake sediments and thereby reduce the rate of internal phosphorus cycling in the lake. 2) Conduct a hydrologicstudy of the lake to determine inflow and outflow rates, and calibrate a water budget model designed to stimulate lake stage. 3) USGS will prepare a draft report, summarizing the model simulations described in 2 above, in 1993. The final report will bepublished in 1994. 4) USGS is contributing a matching $12,500.00. DNR will receive copies of all reports. Informatio will be disseminated to the public by local newspaper articles and public meetings. Project results will be reposited at DNR and USGScomputer databases, Agency and University libraries and scientific journals.
Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Devils Lake
Status
Complete
Friends Of Devil'S Lake State Park: Devil'S Lake Swimmers Itch Study: Researchers will monitor densities of cercaria and snails thoughout the growing season. They will monitor lake conditions to determine how lake productivity relates to swimmers itch. They will survey of Devils Lake users. The resulting sociological, biological, and chemical data will be available to managers to develop a comprehensive plan for managing swimmers itch in Devils Lake and provide a template for other lakes with this problem.
A full description of project deliverables and project scope are available in the grant application, which is part of this agreement.
The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.
Grant Details
Large Scale Lake Planning
Date
10/1/2000
Waters Involved
Devils Lake
Status
Complete
Friends Of Devil'S Lake State Park: Hydrologic Analysis Of Water Diversion And Pumping:
The Friend's of Devil's Lake will conduct a hydrologic analysis of water diversion and pumping options to reduce internal phosphorus recycling from the bottom sediments in Devil's Lake.
A full description of project scope and deliverables is available in the grant application, which is part of this agreement.
The DNR will be provided with both a paper copy andan electronic copy of the final report. Information will be disseminated to the public as described in the grant application.
Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Dorro Couche Lake
Status
Complete
Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.
Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Easton Lake
Status
Complete
Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.
Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Fawn Lake
Status
Complete
Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.
Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Fenner Lake
Status
Complete
Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.
Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Friendship Lake
Status
Complete
Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.
Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Goose Lake
Status
Complete
Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.
Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Hill Lake
Status
Complete
Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.
Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Jordan Lake
Status
Complete
Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.
Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Lake Arrowhead
Status
Complete
Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.
Grant Details
Large Scale Lake Planning
Date
4/1/2010
Waters Involved
Lake Du Bay
Status
Complete
Lake Alice Association, Inc: Lake Alice Stewardship Program Phase Ii - Understanding The Biota Of Lake Alice: Lake Alice Association is sponsoring phased large scale lake planning grants to study Lake Alice, in Lincoln County. The project will focus on developing and updating an Adaptive Lake Management Plan (LMP) for Lake Alice. Phase 2 was funded in this grant cycle and Phases 3-5 will be submitted for funding starting in 2011.
Project activities for Phase 2 include: 1) Educational program, meetings and educational events with lake association and Tomahawk High School students, written educational materials, news releases, and website updates; 2) Point-intercept (PI) aquatic plant survey; 3) Aquatic plant community and substrate mapping; 4) Water quality assessment; 5) Volunteer amphibian monitoring and angler survey; 6) Update LMP.
Project deliverables include: 1) Educational materials and news releases; 2) Aquatic plant community and substrate maps; 3) PI, water quality, amphibian, and angler data; 4) LMP.
Specific conditions for this project: LMP needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP, news releases, any other educational materials/products, all data, all maps from project, and all GIS data.
Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Lake Sherwood
Status
Complete
Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.
Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Little Lake
Status
Complete
Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.
Grant Details
Large Scale Lake Planning
Date
4/1/2010
Waters Involved
Little Pine Creek
Status
Complete
Lake Alice Association, Inc: Lake Alice Stewardship Program Phase Ii - Understanding The Biota Of Lake Alice: Lake Alice Association is sponsoring phased large scale lake planning grants to study Lake Alice, in Lincoln County. The project will focus on developing and updating an Adaptive Lake Management Plan (LMP) for Lake Alice. Phase 2 was funded in this grant cycle and Phases 3-5 will be submitted for funding starting in 2011.
Project activities for Phase 2 include: 1) Educational program, meetings and educational events with lake association and Tomahawk High School students, written educational materials, news releases, and website updates; 2) Point-intercept (PI) aquatic plant survey; 3) Aquatic plant community and substrate mapping; 4) Water quality assessment; 5) Volunteer amphibian monitoring and angler survey; 6) Update LMP.
Project deliverables include: 1) Educational materials and news releases; 2) Aquatic plant community and substrate maps; 3) PI, water quality, amphibian, and angler data; 4) LMP.
Specific conditions for this project: LMP needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP, news releases, any other educational materials/products, all data, all maps from project, and all GIS data.
Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Mason Lake
Status
Complete
Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.
Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
McCall Lake
Status
Complete
Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.
Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
McDougall Lake
Status
Complete
Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.
Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
McGinnis Lake
Status
Complete
Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.
Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Parker Lake
Status
Complete
Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.
Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Patrick Lake
Status
Complete
Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.
Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Peppermill Lake
Status
Complete
Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.
Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Petenwell Lake
Status
Complete
Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.
Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Risk Creek Pond
Status
Complete
Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.
Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Rollers Lake
Status
Complete
Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.
Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Silver Lake
Status
Complete
Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.
Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Twin Lakes
Status
Complete
Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.
Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Unnamed
Status
Complete
Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.
Grant Details
Large Scale Lake Planning
Date
4/1/2010
Waters Involved
Unnamed
Status
Complete
Lake Alice Association, Inc: Lake Alice Stewardship Program Phase Ii - Understanding The Biota Of Lake Alice: Lake Alice Association is sponsoring phased large scale lake planning grants to study Lake Alice, in Lincoln County. The project will focus on developing and updating an Adaptive Lake Management Plan (LMP) for Lake Alice. Phase 2 was funded in this grant cycle and Phases 3-5 will be submitted for funding starting in 2011.
Project activities for Phase 2 include: 1) Educational program, meetings and educational events with lake association and Tomahawk High School students, written educational materials, news releases, and website updates; 2) Point-intercept (PI) aquatic plant survey; 3) Aquatic plant community and substrate mapping; 4) Water quality assessment; 5) Volunteer amphibian monitoring and angler survey; 6) Update LMP.
Project deliverables include: 1) Educational materials and news releases; 2) Aquatic plant community and substrate maps; 3) PI, water quality, amphibian, and angler data; 4) LMP.
Specific conditions for this project: LMP needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP, news releases, any other educational materials/products, all data, all maps from project, and all GIS data.
Grant Details
Large Scale Lake Planning
Date
4/1/2010
Waters Involved
Wisconsin River
Status
Complete
Lake Alice Association, Inc: Lake Alice Stewardship Program Phase Ii - Understanding The Biota Of Lake Alice: Lake Alice Association is sponsoring phased large scale lake planning grants to study Lake Alice, in Lincoln County. The project will focus on developing and updating an Adaptive Lake Management Plan (LMP) for Lake Alice. Phase 2 was funded in this grant cycle and Phases 3-5 will be submitted for funding starting in 2011.
Project activities for Phase 2 include: 1) Educational program, meetings and educational events with lake association and Tomahawk High School students, written educational materials, news releases, and website updates; 2) Point-intercept (PI) aquatic plant survey; 3) Aquatic plant community and substrate mapping; 4) Water quality assessment; 5) Volunteer amphibian monitoring and angler survey; 6) Update LMP.
Project deliverables include: 1) Educational materials and news releases; 2) Aquatic plant community and substrate maps; 3) PI, water quality, amphibian, and angler data; 4) LMP.
Specific conditions for this project: LMP needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP, news releases, any other educational materials/products, all data, all maps from project, and all GIS data.
Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Wolf Lake
Status
Complete
Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.
Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Amey Pond
Status
Complete
Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.
The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.
Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Arkdale Lake
Status
Complete
Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.
The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.
Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Big Roche a Cri
Status
Complete
Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.
The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.
Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Big Spring Pond
Status
Complete
Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.
The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.
Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Camelot Lake
Status
Complete
Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.
The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.
Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Castle Rock Lake
Status
Complete
Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.
The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.
Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Crooked Lake
Status
Complete
Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.
The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.
Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Deep Lake
Status
Complete
Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.
The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.
Grant Details
Small Scale Lake Planning
Date
4/1/2008
Waters Involved
Devils Lake
Status
Complete
Friends Of Devil'S Lake: Devil'S Lake Plant Survey & Apm Plan: The Friends of Devil's Lake State Park will sponsor a project to quantify Eurasian Water Milfoil (EWM) colonies in Devil's Lake, Sauk County. Selective, manual eradication efforts by divers will severely suppress the population, if not completely eliminate EWM from the lake if possible. A secondary goal will be the preparation of an aquatic plant management (APM) plan designed to protect the native plant community and develop a long-term strategy for preventing re-expansion of EWM in the lake. The following project deliverables are expected: 1) a completed APM plan; 2) documentation of existing EWM colonies based on GPS locations, colony counts and biomass measurements collected immediately before the manual pulling of all plants found; 3) data sharing which will involve public presentations, facts sheets, and press release to increase public awareness for the need to prevent the spread of exotic species.
Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Dorro Couche Lake
Status
Complete
Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.
The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.
Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Easton Lake
Status
Complete
Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.
The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.
Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Fawn Lake
Status
Complete
Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.
The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.
Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Fenner Lake
Status
Complete
Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.
The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.
Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Friendship Lake
Status
Complete
Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.
The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.
Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Goose Lake
Status
Complete
Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.
The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.
Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Hill Lake
Status
Complete
Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.
The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.
Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Jordan Lake
Status
Complete
Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.
The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.
Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Lake Arrowhead
Status
Complete
Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.
The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.
Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Lake Sherwood
Status
Complete
Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.
The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.
Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Little Lake
Status
Complete
Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.
The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.
Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Mason Lake
Status
Complete
Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.
The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.
Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
McCall Lake
Status
Complete
Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.
The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.
Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
McDougall Lake
Status
Complete
Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.
The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.
Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
McGinnis Lake
Status
Complete
Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.
The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.
Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Parker Lake
Status
Complete
Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.
The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.
Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Patrick Lake
Status
Complete
Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.
The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.
Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Peppermill Lake
Status
Complete
Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.
The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.
Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Petenwell Lake
Status
Complete
Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.
The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.
Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Risk Creek Pond
Status
Complete
Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.
The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.
Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Rollers Lake
Status
Complete
Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.
The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.
Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Silver Lake
Status
Complete
Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.
The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.
Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Twin Lakes
Status
Complete
Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.
The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.
Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Unnamed
Status
Complete
Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.
The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.
Grant Details
Small Scale Lake Planning
Date
4/1/2008
Waters Involved
Unnamed
Status
Complete
Friends Of Devil'S Lake: Devil'S Lake Plant Survey & Apm Plan: The Friends of Devil's Lake State Park will sponsor a project to quantify Eurasian Water Milfoil (EWM) colonies in Devil's Lake, Sauk County. Selective, manual eradication efforts by divers will severely suppress the population, if not completely eliminate EWM from the lake if possible. A secondary goal will be the preparation of an aquatic plant management (APM) plan designed to protect the native plant community and develop a long-term strategy for preventing re-expansion of EWM in the lake. The following project deliverables are expected: 1) a completed APM plan; 2) documentation of existing EWM colonies based on GPS locations, colony counts and biomass measurements collected immediately before the manual pulling of all plants found; 3) data sharing which will involve public presentations, facts sheets, and press release to increase public awareness for the need to prevent the spread of exotic species.
Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Wolf Lake
Status
Complete
Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.
The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.
Grant Details
Urban Nonpoint - Stormwater Planning
Date
10/1/2005
Waters Involved
Wisconsin River
Status
Complete
City Of Portage: Storm Water Management Study: To develop municipal runoff ordinances in compliance with Chapter NR151, map the area's drainage systems, develop a stormwater management plan, provide for public involvement & education, and examine options for dedicated revenue sources.
Grant Details
River Planning Grant
Date
10/18/2000
Waters Involved
Baraboo River
Status
Complete
Citizens For Waterfront Revitalization: Baraboo River Strategic Planning: Citizens for Waterfront Revitalization will organize and involve the many groups and state agencies that have been involved with the Baraboo River in order to create a comprehensive plan for the Baraboo Rapids Area of the river. This will enable these groups to put the efforts of their combined memberships into working on common goals in an orderly fashion.
A full description of the project scope and deliverables is available in the grant application, which is part of this agreement. The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.
Grant Details
River Planning Grant
Date
7/1/2002
Waters Involved
Baraboo River
Status
Complete
Sauk County Land Conservation Department: Farming & Conservation Together-Lower Baraboo River: Sauk County Land Conservation will utilize the grant funds to support a conservation specialist who will coordinate Farming and Conservation Together (FACT), further building FACT as a river protection initiative and improving the health of the Lower Baraboo River.
A full description of project scope and deliverables is available in the grant application, which is part of this agreement. The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.
Grant Details
River Planning Grant
Date
7/1/2003
Waters Involved
Baraboo River
Status
Complete
Columbia County: Farming Conservation Together In The Lwr Baraboo Rvr Area: The Columbia County Land and Water Conservation Department together with the Farming and Conservation Together (FACT) committee will continue to work with landowners on an individual basis to implement conservation practices and restore wetlands while maintaining compatible agricultural operations. They will expand and coordinate voluntary programs for landowners, provide conservation agricultural practice demonstration sites and habitat restoration sites, work with landowners to control and abate wildlife damage, and protect private property rights of landowners by maintaining voluntary involvement in programs. A full description of the project scope and deliverables is available in the grant application which is part of this agreement. The LWCD will disseminate information to the public as described in the grant application.
The DNR will be provided with both a paper copy and an electronic copy of the final report.
Grant Details
River Planning Grant
Date
7/1/2009
Waters Involved
Wisconsin River
Status
Complete
Aldo Leopold Foundation, Inc: Wisconsin River-Land Protection Planning Project: Aldo Leopold Foundation, Inc, will conduct a project to identify critical properties from a strategic and conservation perspective. The final report/product will be a prioritized land protection plan for the land health conservation area along the Wisconsin River (Wisconsin Dells to Portage). Specific components and activities covered by this grant include: 1) Narrative Overview, 2) Real Estate Assessment and Value Estimates 3) Draft Conservation Easements (with legal counsel review) 4) GIS Mapping and other Analysis, Planning, Resarch and Assessment Associated with the objectives of this project.
Grant Details
River Planning Grant
Date
7/1/2011
Waters Involved
Wisconsin River
Status
Complete
Aldo Leopold Foundation, Inc: Leopold-Pine Island Important Bird Area Public-Private Partnership Along Wi River: The Aldo Leopold Foundation will sponsor a project in the Leopold-Pine Island Important Bird Area (IBA) that encompasses roughly 15,000 acres of public and private lands and 16 miles of Wisconsin River frontage, east of Wisconsin Dells and Portage. Project will include development of shared land management goals and objectives in care of bird and plant communities, including floodplains, forests and wetlands. Project deliverables include: 1.) creating vegetation/habitat/plant community map of IBA. 2.) In combination with 2011 bird survey, analyze and develop more prescriptive land management goals and objectives for IBA partners, neighboring lands through conservation delivery programs. 3.) Host two partner meetings to review opportunities/issues relevant to the partnership and/or local natural resources, share report findings and its relevance for the IBA and partners, 4.) Share the report and land management objectives with conservation partners, 5.) Communicate to general public audience about the IBA public-private partnership.
Grant Details
River Planning Grant
Date
7/1/2012
Waters Involved
Wisconsin River
Status
Complete
Aldo Leopold Foundation, Inc: Leopold-Pine Island Important Bird Area Along Wi River: The Aldo Leopold Foundation will sponsor a project in the Leopold-Pine Island Important Bird Area (IBA) that encompasses roughly 12,000 acres of public and private land and 16 miles of Wisconsin River frontage, east of Wisconsin Dells and Portage. Project deliverables are as follows: 1.) Create family friendly IBA educational materials explaining Aldo Leopold family history and producing educational materials that partners can use during tours, 2.) Utilize Leopold-Pine Island IBA visitors as citizen scientists to assist with collection of data for scientific use. 3.)eBird website and smart phone interface that allows citizen-scientists to record bird observations and attribute them to management units relevant to the adaptive management planning and execution on the IBA, 4.) Maintain Leopold-Pine Island IBA partner relationships by hosting meetings with agenda items consisting of opportunities/issues relevant to the partnership and/or local natural resources.