02-41-278106 COLONY DRY CLEANERS FMR
Activity Type / Status Jurisdiction
ERP  OPEN DNR RR
Location Name County DNR Region
COLONY DRY CLEANERS FMR MILWAUKEE SOUTHEAST
Address Municipality
10003 W CARMEN AVE MILWAUKEE
PLSS Description Latitude (WGS84) Longitude (WGS84) Google Maps RR Sites Map
SE 1/4 of the SW 1/4 of Sec 29, T08N, R21E 43.1220328 -88.0371508 Click to view on Google Maps using Lat/Long Click to View RR Sites Map
Additional Activity Details Acres
.5
Facility ID PECFA No. EPA ID Start Date End Date
241170270 2001-07-26
Characteristics
Above Ground
Petrol Tank

Drycleaner
EPA
NPL Site
EPA
Superfund
PECFA Funds
Eligible

PFAS

ROW Impact

Sediments
Underground
Petrol Tank
WI DOT
Site
Drycleaner Flag  
Site Files
Name File
0407557840_Site_File.pdf Download PDF Document
Actions and Documents
Date Code Name File Comment
2024-03-27 99 Miscellaneous Download PDF file DELAYS IN SUBMITTAL OF SIWP, DERF COST DISCUSSION
2024-01-30 364 VAL and/or VRSL Exceeded
2024-01-28 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2023 - 12/31/2023
2023-12-19 99 Miscellaneous Download PDF file CHANGE ORDER APPROVED FOR SI WORK PLAN PREPARATION $5,250.00
2023-12-04 112 DERF - Change Order Received Download PDF file CHANGE ORDER FOR SIWP PREPARATION
2023-11-30 99 Miscellaneous Download PDF file DETAILED COST BREAKDOWN NEEDED FOR SIWP PREPARATION
2023-11-02 112 DERF - Change Order Received Download PDF file DERF CHANGE ORDER REQUEST
2023-08-22 99 Miscellaneous Download PDF file REVISED FIGURE W/SANI SEWER UNDER BLDG; CALL ON 8/22-UEC PREPPING SIWP W/DERF
2023-07-30 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 01/01/2023 - 06/30/2023
2023-06-02 140 Site Investigation Report (SIR) Not Approved Download PDF file ADDITIONAL SOIL, GW AND VAPOR INVESTIGATION NEEDED.
2023-04-18 37 Site Investigation Report (SIR) Received (non-fee) Download PDF file SITE INVESTIGATION REPORT (NR 716)
2023-03-07 99 Miscellaneous Download PDF file DHS VAPOR SAMPLES AT DAY CARES NEAR SITE, MAY NOT MEET NR 716 & NR 712 REQUIREMENTS
2023-01-30 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2022 - 12/31/2022
2022-07-26 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2022 - 6/30/2022
2022-01-31 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2021 - 12/31/2021
2021-07-30 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2021 - 6/30/2021
2021-04-06 130 DNR Regulatory Reminder Sent Download PDF file VAPOR INTRUSION AND TCE REMINDER LETTER
2021-01-30 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2020 - 12/31/2020
2020-10-27 130 DNR Regulatory Reminder Sent Download PDF file DERF FUNDING STATUS LTR
2020-08-17 130 DNR Regulatory Reminder Sent Download PDF file EMERGING CONTAMINANTS REMINDER LETTER
2020-07-29 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2020 - 6/30/2020
2020-01-30 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2019 - 12/31/2019
2019-07-30 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2019 - 6/30/2019
2019-03-12 99 Miscellaneous Download PDF file VAPOR TABLE AND FIGURE
2019-02-20 99 Miscellaneous Download PDF file CHANGE ORDER APPROVAL
2019-02-08 112 DERF - Change Order Received Download PDF file
2019-01-31 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2018 - 12/31/2018
2018-07-30 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2018 - 6/30/2018
2018-02-02 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2017 - 12/31/2017
2017-08-08 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2017 - 6/30/2017
2017-01-30 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2016 - 12/31/2016
2016-07-30 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2016 - 6/30/2016
2016-01-30 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2015 - 12/31/2015
2015-07-31 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2015 - 6/30/2015
2015-01-30 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2014 - 12/31/2014
2015-01-13 99 Miscellaneous Download PDF file CHANGE ORDER APPROVED
2015-01-09 112 DERF - Change Order Received Download PDF file CHANGE ORDER FOR CASE CLOSURE AND GIS REGISTRY PREPARATION
2014-09-26 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2014 - 6/30/2014
2014-08-01 218 DERF - Cost Reimbursement Application Approved
2014-06-13 38 Site Investigation Report (SIR) Approved SENT EMAIL
2014-05-01 99 Miscellaneous Download PDF file REIMBURSEMENT CLAIM LTR
2014-03-14 217 DERF - Cost Reimbursement Application Received
2014-03-13 37 Site Investigation Report (SIR) Received (non-fee) Download PDF file REC'D PHASE II SI RPT
2014-03-11 29 Phase II Environmental Site Assessment (ESA) Rpt Received Download PDF file
2014-01-30 130 DNR Regulatory Reminder Sent DERF FUNDING STATUS LTR
2012-06-01 99 Miscellaneous VI LETTER RETURNED - DON FRITZKE DECEASED 2003
2011-09-07 130 DNR Regulatory Reminder Sent Download PDF file Vapor Intrusion (VI) Assessment Notification Ltr Sent
2011-01-24 36 Site Investigation Workplan (SIWP) Approved Download PDF file DERF COSTS APPROVED = $9,080
2010-11-26 112 DERF - Change Order Received Download PDF file SITE INVESTIGATION
2010-11-15 99 Miscellaneous VERBAL UPDATE FROM CONSULTANT - SIR AND CLAIM IN FINAL PREPARATION, BUILDING IS STILL VACANT
2010-05-28 43 Site Activity Status Update Received VERBAL UPDATE RECEIVED FROM CONSULTANT. AWAITING SIR AND CLAIM.
2010-05-25 200 Push Action Taken EMAIL CONSULTANT FOR CASE STATUS UPDATE
2009-10-13 99 Miscellaneous Download PDF file DNR AIR SAMPLE RESULTS LTR
2009-07-14 91 SER First In/First Out (FIFO) Review Process Complete EMAIL RESPONSE TO CONSULTANT
2009-07-13 43 Site Activity Status Update Received Download PDF file AIR SAMPLE RESULTS
2009-07-13 90 SER First In/First Out (FIFO) Review Process Started AIR SAMPLE RESULTS TO REVIEW
2009-05-19 36 Site Investigation Workplan (SIWP) Approved Download PDF file DERF COSTS APPROVED = $4265
2009-05-08 112 DERF - Change Order Received Download PDF file SITE INVESTIGATION
2008-11-12 99 Miscellaneous Download PDF file DATA PACKET REVIEW - REQUIRE ADDTNL SAMPLING
2008-10-24 43 Site Activity Status Update Received Download PDF file DATA PACKET FROM ADDITIONAL SOIL BORINGS
2006-02-13 99 Miscellaneous Download PDF file UST ABANDONMENT
2006-01-24 36 Site Investigation Workplan (SIWP) Approved Download PDF file CHANGE ORDER OK'D FOR ADDTNL $17,535
2006-01-18 35 Site Investigation Workplan (SIWP) Received (non-fee) REVISED SOW FOR CHANGE ORDER REQUEST
2006-01-13 99 Miscellaneous Download PDF file PROPOSAL FOR COMPLETION OF SI AND CLOSURE RPT PREPARATION
2006-01-10 81 Site Investigation Workplan (SIWP) Not Approved FAXED SUGGESTED LOCATIONS
2005-11-10 35 Site Investigation Workplan (SIWP) Received (non-fee) Download PDF file REVISED SOW FOR CHANGE ORDER REQUEST
2005-07-19 81 Site Investigation Workplan (SIWP) Not Approved CHANGE ORDER/SOW REVISION REQ'D
2005-05-06 35 Site Investigation Workplan (SIWP) Received (non-fee) Download PDF file REVISED SOW FOR CHANGE ORDER REQUEST
2005-02-03 81 Site Investigation Workplan (SIWP) Not Approved Download PDF file PM. REQUEST REVISED CHANGE ORDER
2004-11-24 112 DERF - Change Order Received Download PDF file SOW FOR ADDT'NL SI
2004-02-10 99 Miscellaneous Download PDF file CONTAINED IN DETERMINATION LTR
2003-12-04 36 Site Investigation Workplan (SIWP) Approved Download PDF file SI SOW APPROVED FOR $1843 GK.
2003-11-15 112 DERF - Change Order Received SI SOW REC'D
2003-11-14 99 Miscellaneous Download PDF file REC'D WORK PLAN ADDENDUM
2003-07-17 36 Site Investigation Workplan (SIWP) Approved Download PDF file ADD'L SI WORK APPR'D FOR UP TO $10,881. GK.
2003-03-03 112 DERF - Change Order Received Download PDF file SI SOW ADDENDUM REC'D
2002-11-25 99 Miscellaneous Download PDF file SOLID WASTE DISPOSAL
2002-07-23 43 Site Activity Status Update Received Download PDF file STATUS RPT
2002-05-09 99 Miscellaneous Download PDF file ACCESS AGREEMENT
2002-03-15 99 Miscellaneous Download PDF file OFF-SITE ACCESS ASSISTANCE
2002-01-31 35 Site Investigation Workplan (SIWP) Received (non-fee) Download PDF file DERP CONSULTANT SELECTION/SISOW
2001-10-04 110 DERF - Potential Claim Form Approved
2001-08-02 2 Responsible Party (RP) letter sent Download PDF file
2001-07-26 1 Notification of Hazardous Substance Discharge Download PDF file
Substances
Substance Type Amt Released Units
Fuel Oil (F032 WASTE - #2 FUEL OIL) Petroleum 2 Gal
Waste Destination
Destination Comment
OTHER: TRADEBE TREATMENT AND RECYCLING
Responsible Party
US EPA - REGION 5 77 W JACKSON BLVD, CHICAGO, IL 60604
DNR Project Manager
PAUL GRITTNER  paul.grittner@wisconsin.gov