Watershed - New Wood River (UW32)
New Wood River Watershed

Details

The New Wood River Watershed is located in Lincoln, Price and Taylor counties. It is 74,069 acres in size and includes 150 miles of streams and rivers, 267 acres of lakes and 17,302 acres of wetlands. The watershed is dominated by forest (71%) and wetland (23%) and is ranked low for nonpoint source issues affecting water quality.

Date  2010

Ecological Landscapes for New Wood River Watershed

Ecological Landscapes

The North Central Forest Ecological Landscape occupies much of the northern third of Wisconsin. Its landforms are characterized by end and ground moraines with some pitted outwash and bedrock controlled areas. Kettle depressions and steep ridges are found in the northern portion. Two prominent areas in this Ecological Landscape are the Penokee-Gogebic Iron Range in the north extending into Michigan, and Timm's Hill, the highest point in Wisconsin (1,951 feet) in the south. Soils consist of sandy loam, sand, and silts. The vegetation is mainly forest, with many wetlands and some agriculture, though the growing season is not as favorable as it is in southern Wisconsin. Lake Superior greatly influences the northern portion of the Ecological Landscape especially during the winter season, producing greater snowfall than in most areas in Wisconsin. The historic vegetation was primarily hemlock-hardwood forest dominated by hemlock, sugar maple, and yellow birch. There were some smaller areas of white and red pine forest scattered throughout the Ecological Landscape, and individual white pines trees were a component of the hemlock-hardwood forest. Harvesting hemlock to support the tanneries was common at the turn of the century, and the species soon became a minor component of forests due to over-harvesting and lack of regeneration. Currently, forests cover approximately 80% of this Ecological Landscape. The northern hardwood forest is dominant, made up of sugar maple, basswood, and red maple, and also including some scattered hemlock and white pine pockets within stands. The aspen-birch forest type group is also relatively abundant, followed by spruce-fir. A variety of wetland community types also are present, both forested and non-forested.

Date  2010

Watershed Grants
Grant Details
Lake Protection Grant
Date
9/1/2002
Waters Involved
Butternut Lake
Status
Complete

Price County: Lmi-Phase Ii Butternut Wq Assessment/Modeling: The Price County Land Conservation Dept will sponsor a project which will collect all needed data to create a response model for Butternut Lake including a water budget, detailed phosphorus budget, lake water quality modeling and evaluation of groundwater impacts. Deliverables will include all data collected and a final report summarizing the findings.

DNR will be provided with a copy of reports and publications produced in both written and electronic (PDF) format. DNR will also be provided with a summary of all the efforts under this grant that are not included in reports or other written documents.


Grant Details
Lake Protection Grant
Date
9/1/2000
Waters Involved
Pixley Flowage
Status
Complete

Price County: Acq-Price County-Smith Lake Land Acquisition: Price County will acquire 93.5 acres of land with 6,800 feet of undeveloped frontage on Smith Lake, a flowage of the Flambeau River.


Grant Details
Lake Protection Grant
Date
7/1/1998
Waters Involved
Rib Lake
Status
Complete

Rib Lake Inland Lakes P & R District: Lmi-Fd-Rib Lake Rehabilitation/Sediment Analysis, 1998-99: Rib Lake Inland Lake Protection District proposes to conduct a diagnostic/feasibility study of lake bottom sediments as a preliminary step to a possible sunken log retrieval and/or dredging project in Rib Lake.


Grant Details
Large Scale Lake Planning
Date
4/1/2010
Waters Involved
Castle Rock Ditch
Status
Complete

Lake Alice Association, Inc: Lake Alice Stewardship Program Phase Ii - Understanding The Biota Of Lake Alice: Lake Alice Association is sponsoring phased large scale lake planning grants to study Lake Alice, in Lincoln County. The project will focus on developing and updating an Adaptive Lake Management Plan (LMP) for Lake Alice. Phase 2 was funded in this grant cycle and Phases 3-5 will be submitted for funding starting in 2011.

Project activities for Phase 2 include: 1) Educational program, meetings and educational events with lake association and Tomahawk High School students, written educational materials, news releases, and website updates; 2) Point-intercept (PI) aquatic plant survey; 3) Aquatic plant community and substrate mapping; 4) Water quality assessment; 5) Volunteer amphibian monitoring and angler survey; 6) Update LMP.

Project deliverables include: 1) Educational materials and news releases; 2) Aquatic plant community and substrate maps; 3) PI, water quality, amphibian, and angler data; 4) LMP.

Specific conditions for this project: LMP needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP, news releases, any other educational materials/products, all data, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
4/1/2010
Waters Involved
Cruson Slough
Status
Complete

Lake Alice Association, Inc: Lake Alice Stewardship Program Phase Ii - Understanding The Biota Of Lake Alice: Lake Alice Association is sponsoring phased large scale lake planning grants to study Lake Alice, in Lincoln County. The project will focus on developing and updating an Adaptive Lake Management Plan (LMP) for Lake Alice. Phase 2 was funded in this grant cycle and Phases 3-5 will be submitted for funding starting in 2011.

Project activities for Phase 2 include: 1) Educational program, meetings and educational events with lake association and Tomahawk High School students, written educational materials, news releases, and website updates; 2) Point-intercept (PI) aquatic plant survey; 3) Aquatic plant community and substrate mapping; 4) Water quality assessment; 5) Volunteer amphibian monitoring and angler survey; 6) Update LMP.

Project deliverables include: 1) Educational materials and news releases; 2) Aquatic plant community and substrate maps; 3) PI, water quality, amphibian, and angler data; 4) LMP.

Specific conditions for this project: LMP needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP, news releases, any other educational materials/products, all data, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
4/1/2010
Waters Involved
Lake Du Bay
Status
Complete

Lake Alice Association, Inc: Lake Alice Stewardship Program Phase Ii - Understanding The Biota Of Lake Alice: Lake Alice Association is sponsoring phased large scale lake planning grants to study Lake Alice, in Lincoln County. The project will focus on developing and updating an Adaptive Lake Management Plan (LMP) for Lake Alice. Phase 2 was funded in this grant cycle and Phases 3-5 will be submitted for funding starting in 2011.

Project activities for Phase 2 include: 1) Educational program, meetings and educational events with lake association and Tomahawk High School students, written educational materials, news releases, and website updates; 2) Point-intercept (PI) aquatic plant survey; 3) Aquatic plant community and substrate mapping; 4) Water quality assessment; 5) Volunteer amphibian monitoring and angler survey; 6) Update LMP.

Project deliverables include: 1) Educational materials and news releases; 2) Aquatic plant community and substrate maps; 3) PI, water quality, amphibian, and angler data; 4) LMP.

Specific conditions for this project: LMP needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP, news releases, any other educational materials/products, all data, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
4/1/2010
Waters Involved
Little Pine Creek
Status
Complete

Lake Alice Association, Inc: Lake Alice Stewardship Program Phase Ii - Understanding The Biota Of Lake Alice: Lake Alice Association is sponsoring phased large scale lake planning grants to study Lake Alice, in Lincoln County. The project will focus on developing and updating an Adaptive Lake Management Plan (LMP) for Lake Alice. Phase 2 was funded in this grant cycle and Phases 3-5 will be submitted for funding starting in 2011.

Project activities for Phase 2 include: 1) Educational program, meetings and educational events with lake association and Tomahawk High School students, written educational materials, news releases, and website updates; 2) Point-intercept (PI) aquatic plant survey; 3) Aquatic plant community and substrate mapping; 4) Water quality assessment; 5) Volunteer amphibian monitoring and angler survey; 6) Update LMP.

Project deliverables include: 1) Educational materials and news releases; 2) Aquatic plant community and substrate maps; 3) PI, water quality, amphibian, and angler data; 4) LMP.

Specific conditions for this project: LMP needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP, news releases, any other educational materials/products, all data, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
4/1/2010
Waters Involved
Unnamed
Status
Complete

Lake Alice Association, Inc: Lake Alice Stewardship Program Phase Ii - Understanding The Biota Of Lake Alice: Lake Alice Association is sponsoring phased large scale lake planning grants to study Lake Alice, in Lincoln County. The project will focus on developing and updating an Adaptive Lake Management Plan (LMP) for Lake Alice. Phase 2 was funded in this grant cycle and Phases 3-5 will be submitted for funding starting in 2011.

Project activities for Phase 2 include: 1) Educational program, meetings and educational events with lake association and Tomahawk High School students, written educational materials, news releases, and website updates; 2) Point-intercept (PI) aquatic plant survey; 3) Aquatic plant community and substrate mapping; 4) Water quality assessment; 5) Volunteer amphibian monitoring and angler survey; 6) Update LMP.

Project deliverables include: 1) Educational materials and news releases; 2) Aquatic plant community and substrate maps; 3) PI, water quality, amphibian, and angler data; 4) LMP.

Specific conditions for this project: LMP needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP, news releases, any other educational materials/products, all data, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
4/1/2010
Waters Involved
Wisconsin River
Status
Complete

Lake Alice Association, Inc: Lake Alice Stewardship Program Phase Ii - Understanding The Biota Of Lake Alice: Lake Alice Association is sponsoring phased large scale lake planning grants to study Lake Alice, in Lincoln County. The project will focus on developing and updating an Adaptive Lake Management Plan (LMP) for Lake Alice. Phase 2 was funded in this grant cycle and Phases 3-5 will be submitted for funding starting in 2011.

Project activities for Phase 2 include: 1) Educational program, meetings and educational events with lake association and Tomahawk High School students, written educational materials, news releases, and website updates; 2) Point-intercept (PI) aquatic plant survey; 3) Aquatic plant community and substrate mapping; 4) Water quality assessment; 5) Volunteer amphibian monitoring and angler survey; 6) Update LMP.

Project deliverables include: 1) Educational materials and news releases; 2) Aquatic plant community and substrate maps; 3) PI, water quality, amphibian, and angler data; 4) LMP.

Specific conditions for this project: LMP needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP, news releases, any other educational materials/products, all data, all maps from project, and all GIS data.


Grant Details
River Protection Grant
Date
4/15/2015
Waters Involved
Duroy Lake
Status
Complete

Price County: Weger Streambank Protection, Elk River: Price County is sponsoring a project to restore 250 feet of shoreline habitat along the Elk River. There is an unstable 25 foot face that is actively eroding and needs to be stabilized. Fish, wildlife habitat and water quality will be improved.

Project goals: 1) Reduce sediment and nutrient delivery; 2) Reduce instream sedimentation to improve fish spawning habitat; 3) Restore shore land habitat for wildlife; 4) Improve water quality; 5) Protect existing resources.

Project deliverables is a final report that includes: 1) Documentation that the project was completed; 2) Copies of final engineering plans; 3) Before and after photo documentation.

Specific conditions for this Project: The WDNR will be provided electronic and hard copies of all data and or reports/plans generated as a result of this project.


Grant Details
River Protection Grant
Date
4/15/2015
Waters Involved
Elk Lake
Status
Complete

Price County: Weger Streambank Protection, Elk River: Price County is sponsoring a project to restore 250 feet of shoreline habitat along the Elk River. There is an unstable 25 foot face that is actively eroding and needs to be stabilized. Fish, wildlife habitat and water quality will be improved.

Project goals: 1) Reduce sediment and nutrient delivery; 2) Reduce instream sedimentation to improve fish spawning habitat; 3) Restore shore land habitat for wildlife; 4) Improve water quality; 5) Protect existing resources.

Project deliverables is a final report that includes: 1) Documentation that the project was completed; 2) Copies of final engineering plans; 3) Before and after photo documentation.

Specific conditions for this Project: The WDNR will be provided electronic and hard copies of all data and or reports/plans generated as a result of this project.


Grant Details
River Protection Grant
Date
4/15/2015
Waters Involved
Elk River
Status
Complete

Price County: Weger Streambank Protection, Elk River: Price County is sponsoring a project to restore 250 feet of shoreline habitat along the Elk River. There is an unstable 25 foot face that is actively eroding and needs to be stabilized. Fish, wildlife habitat and water quality will be improved.

Project goals: 1) Reduce sediment and nutrient delivery; 2) Reduce instream sedimentation to improve fish spawning habitat; 3) Restore shore land habitat for wildlife; 4) Improve water quality; 5) Protect existing resources.

Project deliverables is a final report that includes: 1) Documentation that the project was completed; 2) Copies of final engineering plans; 3) Before and after photo documentation.

Specific conditions for this Project: The WDNR will be provided electronic and hard copies of all data and or reports/plans generated as a result of this project.


Grant Details
River Protection Grant
Date
4/15/2015
Waters Involved
Grassy Lake
Status
Complete

Price County: Weger Streambank Protection, Elk River: Price County is sponsoring a project to restore 250 feet of shoreline habitat along the Elk River. There is an unstable 25 foot face that is actively eroding and needs to be stabilized. Fish, wildlife habitat and water quality will be improved.

Project goals: 1) Reduce sediment and nutrient delivery; 2) Reduce instream sedimentation to improve fish spawning habitat; 3) Restore shore land habitat for wildlife; 4) Improve water quality; 5) Protect existing resources.

Project deliverables is a final report that includes: 1) Documentation that the project was completed; 2) Copies of final engineering plans; 3) Before and after photo documentation.

Specific conditions for this Project: The WDNR will be provided electronic and hard copies of all data and or reports/plans generated as a result of this project.


Grant Details
River Protection Grant
Date
4/15/2015
Waters Involved
Lac Sault Dore
Status
Complete

Price County: Weger Streambank Protection, Elk River: Price County is sponsoring a project to restore 250 feet of shoreline habitat along the Elk River. There is an unstable 25 foot face that is actively eroding and needs to be stabilized. Fish, wildlife habitat and water quality will be improved.

Project goals: 1) Reduce sediment and nutrient delivery; 2) Reduce instream sedimentation to improve fish spawning habitat; 3) Restore shore land habitat for wildlife; 4) Improve water quality; 5) Protect existing resources.

Project deliverables is a final report that includes: 1) Documentation that the project was completed; 2) Copies of final engineering plans; 3) Before and after photo documentation.

Specific conditions for this Project: The WDNR will be provided electronic and hard copies of all data and or reports/plans generated as a result of this project.


Grant Details
River Protection Grant
Date
4/15/2015
Waters Involved
Long Lake
Status
Complete

Price County: Weger Streambank Protection, Elk River: Price County is sponsoring a project to restore 250 feet of shoreline habitat along the Elk River. There is an unstable 25 foot face that is actively eroding and needs to be stabilized. Fish, wildlife habitat and water quality will be improved.

Project goals: 1) Reduce sediment and nutrient delivery; 2) Reduce instream sedimentation to improve fish spawning habitat; 3) Restore shore land habitat for wildlife; 4) Improve water quality; 5) Protect existing resources.

Project deliverables is a final report that includes: 1) Documentation that the project was completed; 2) Copies of final engineering plans; 3) Before and after photo documentation.

Specific conditions for this Project: The WDNR will be provided electronic and hard copies of all data and or reports/plans generated as a result of this project.


Grant Details
River Protection Grant
Date
4/15/2015
Waters Involved
Musser Flowage
Status
Complete

Price County: Weger Streambank Protection, Elk River: Price County is sponsoring a project to restore 250 feet of shoreline habitat along the Elk River. There is an unstable 25 foot face that is actively eroding and needs to be stabilized. Fish, wildlife habitat and water quality will be improved.

Project goals: 1) Reduce sediment and nutrient delivery; 2) Reduce instream sedimentation to improve fish spawning habitat; 3) Restore shore land habitat for wildlife; 4) Improve water quality; 5) Protect existing resources.

Project deliverables is a final report that includes: 1) Documentation that the project was completed; 2) Copies of final engineering plans; 3) Before and after photo documentation.

Specific conditions for this Project: The WDNR will be provided electronic and hard copies of all data and or reports/plans generated as a result of this project.


Grant Details
River Protection Grant
Date
4/15/2015
Waters Involved
Unnamed
Status
Complete

Price County: Weger Streambank Protection, Elk River: Price County is sponsoring a project to restore 250 feet of shoreline habitat along the Elk River. There is an unstable 25 foot face that is actively eroding and needs to be stabilized. Fish, wildlife habitat and water quality will be improved.

Project goals: 1) Reduce sediment and nutrient delivery; 2) Reduce instream sedimentation to improve fish spawning habitat; 3) Restore shore land habitat for wildlife; 4) Improve water quality; 5) Protect existing resources.

Project deliverables is a final report that includes: 1) Documentation that the project was completed; 2) Copies of final engineering plans; 3) Before and after photo documentation.

Specific conditions for this Project: The WDNR will be provided electronic and hard copies of all data and or reports/plans generated as a result of this project.


Monitoring & Projects

Projects including grants, restoration work and studies shown below have occurred in this watershed. Click the links below to read through the text. While these are not an exhaustive list of activities, they provide insight into the management activities happening in this watershed.

Grants and Management Projects
New Wood River Watershed
Watershed Recommendations
Monitor Aquatic Biology
Monitor biology on WBIC: 1504300
Date
Status
Conduct biological (mIBI or fIBI) monitoring on Bauers Creek, WBIC: 1504300, AU:12631
5/21/2016
Proposed
Projects
 
Monitor Fish Tissue
Confirm FCA: IW pre-2000 data
Date
Status
1179900 name Wisconsin River TMDL ID 622 Start Mile 57.66 End Mile 90.94
11/21/2011
Proposed
 
New Wood River WatershedWatershed History Note