Grant Details
Lake Protection Grant
Date
9/1/2013
Waters Involved
Big Bass Lake
Status
Complete
Marathon County: Lco-Marathon Class 7: Marathon County proposes to continue toward completion of its Phase II efforts to classify 11 lakes in eastern Marathon County. Major project elements to include: 1) Develop lake management plans, 2) Establish planning committees, 3) Review and revise shoreland zoning ordinance, 4) Hold one-day water forum, and 5) Develop guide for Zoning Board of Adjustment members.
Grant Details
Lake Protection Grant
Date
9/1/2010
Waters Involved
Big Eau Pleine Reservoir
Status
Complete
Marathon County: Lco-Shoreland Ordinance Rev.: Marathon County proposes to amend or create a shoreland zoning ordinance that complies with the requirements of NR 115, Wisconsin Administrative Code (as revised effective February 1, 2010) and retain existing regulations that exceed the water resource protections of NR 115 or are specific or unique to local needs.
Project deliverables include: 1. Copies of any fact sheets or handouts created for public hearings. 2. A summary of the comments received at public hearings. 3. A certified copy of the County Board-approved updated shoreland ordinance or ordinance language (if integrated into other codes). 4. Any GIS maps of the shoreland zone or shoreland condition surveys related to the project.
Specific conditions for this Project: 1. The WDNR will be provided electronic and hard copies of all data and or reports or surveys generated as a result of this project.
Grant Details
Lake Protection Grant
Date
9/1/2010
Waters Involved
Big Eau Pleine River
Status
Complete
Marathon County: Lco-Shoreland Ordinance Rev.: Marathon County proposes to amend or create a shoreland zoning ordinance that complies with the requirements of NR 115, Wisconsin Administrative Code (as revised effective February 1, 2010) and retain existing regulations that exceed the water resource protections of NR 115 or are specific or unique to local needs.
Project deliverables include: 1. Copies of any fact sheets or handouts created for public hearings. 2. A summary of the comments received at public hearings. 3. A certified copy of the County Board-approved updated shoreland ordinance or ordinance language (if integrated into other codes). 4. Any GIS maps of the shoreland zone or shoreland condition surveys related to the project.
Specific conditions for this Project: 1. The WDNR will be provided electronic and hard copies of all data and or reports or surveys generated as a result of this project.
Grant Details
Lake Protection Grant
Date
7/12/2010
Waters Involved
Mission Lake
Status
Complete
Marathon County: Lco-Marathon Class 2: Marathon County proposes to conduct detailed studies of 11 lakes in the Eastern part of Marathon County for the purpose of classifying them and developing plans for their future management. major project elements in this phased project include: 1) data collection, 2) outreach, 3) management planning and 4) plan implementation.
Grant Details
Lake Protection Grant
Date
4/15/2017
Waters Involved
Mission Lake
Status
Complete
Deer Lake Conservancy Inc: Lower Rock Creek Acquisition: The Deer Lake Conservancy has purchased 32.10 acres of undeveloped property on Deer Lake in Polk County. The parcel includes approximately 500 feet of shoreline, a riparian wetland and has Rock Creek flowing through the property. The property is adjacent to existing Conservancy owned property. Trails will be developed connecting with existing trails of the adjacent property.
Grant Details
Lake Protection Grant
Date
9/1/2012
Waters Involved
Mud Lake
Status
Complete
Marathon County: Lco-Marathon Class 5: Marathon County proposes to continue toward completion of its Phase _ efforts to classify 11 lakes in eastern Marathon County. Major project elements to include: 1) Water quality sampling and analysis, 2) Fisheries and aquatic species analysis, 3) Habitat, shoreland and paleolimnological surveys, 4) cultural surveys and outreach, 5) build-out assessment and monitoring.
Grant Details
Lake Protection Grant
Date
9/1/2012
Waters Involved
Mud Lake
Status
Complete
Marathon County: Lco-Marathon Class 6: Marathon County proposes to continue toward completion of its Phase 1 efforts to classify 11 lakes in eastern Marathon County. Major project elements to include: 1) Water quality sampling and analysis, 2) Fisheries and aquatic species analysis, 3) Habitat, shoreland and paleolimnological surveys, 4) Cultural surveys and outreach, 5) Build-out assessment and monitoring.
Grant Details
Lake Protection Grant
Date
7/1/1998
Waters Involved
Rib Lake
Status
Complete
Rib Lake Inland Lakes P & R District: Lmi-Fd-Rib Lake Rehabilitation/Sediment Analysis, 1998-99: Rib Lake Inland Lake Protection District proposes to conduct a diagnostic/feasibility study of lake bottom sediments as a preliminary step to a possible sunken log retrieval and/or dredging project in Rib Lake.
Grant Details
Lake Protection Grant
Date
7/12/2010
Waters Involved
Unnamed
Status
Complete
Marathon County: Lco-Marathon Class 2: Marathon County proposes to conduct detailed studies of 11 lakes in the Eastern part of Marathon County for the purpose of classifying them and developing plans for their future management. major project elements in this phased project include: 1) data collection, 2) outreach, 3) management planning and 4) plan implementation.
Grant Details
Lake Protection Grant
Date
4/15/2017
Waters Involved
Unnamed
Status
Complete
Deer Lake Conservancy Inc: Lower Rock Creek Acquisition: The Deer Lake Conservancy has purchased 32.10 acres of undeveloped property on Deer Lake in Polk County. The parcel includes approximately 500 feet of shoreline, a riparian wetland and has Rock Creek flowing through the property. The property is adjacent to existing Conservancy owned property. Trails will be developed connecting with existing trails of the adjacent property.
Grant Details
Large Scale Lake Planning
Date
4/1/1996
Waters Involved
Rib Lake
Status
Complete
Rib Lake Inland Lakes P & R District: Rib Lake Water Quality Monitoring And Lake Data Collection: The Rib Lake Inland Lake Protection & Rehabilitation District proposes to 1) research historical lake data, 2) conduct water chemistry analyses (resulting in sampling map and report), 3) perform a plankton analysis (resulting in summary report), 4) perform an aquatic plant community analysis (resulting in map and written interpretation), 5) perform a fisheries analysis (resulting in map and report), 6) perform a sediment analysis(resulting map and report), and 7) perform a land and watershed assessment (resulting in watershed and lake area maps and summary report). A final report will be prepared and a paper copy and an electronic copy of the report provided to the Department on Natural Resources. Information on the project results will be disseminated to the public by newsletter mailing, fact sheet distribution, public meeting, local newspaper article, and TV/radio spot. end.
Grant Details
Large Scale Lake Planning
Date
10/1/1996
Waters Involved
Rib Lake
Status
Complete
Rib Lake Inland Lakes P & R District: Rib Lake Comprehensive Lake Management Planning: The Rib Lake Inland Lake Protection and Rehabilitation District proposes to continue the comprehensive lake management planning process. Phase 2 project activities include 1) evaluate the data collected during Phase 1, 2) conduct public informational meetings to gather input for lake management alternatives, 3) develop a lake management plan, and 4) produce a final report summarizing field work, analyzing lake management alternatives, and recommending a course of action. The Department of Natural Resources will be provided with a paper copy and an electronic copy of the final report. Information about the project will be disseminated to the public by public meeting, local newspaper articles, TV/radio spots, and poster displays.