Grant Details
Aquatic Invasives Education
Date
4/1/2013
Waters Involved
Antigo Lake (Kellog Pond)
Status
Complete
Antigo Lake District: Antigo Lakes Ais Control & Prevention Project: Phase 1 2013-2016: The Antigo Lakes Inland Lakes Protection & Rehabilitation District is sponsoring a project which focuses on the control and monitoring of the Curly-leaf Pondweed (CLP) infestation within Antigo Lake. Treatment strategies will be implemented over the next two years.
The project includes the following goals: 1) Pretreatment confirmation and refinement Survey (Spring 2013, 2014); 2) Quantitative CLP Monitoring (sub-sample PI survey)(Summer 2013, 2014); 3) Early season AIS survey (2013, 2014); 4) Pre/Post evaluation monitoring (2013, 2014); 5) Treatment letter report and future treatment planning (2013, 2014); 5) Informational meeting (winter 2014).
Project deliverables include: 1) A final report will be completed discussing the results of the surveys and recommended treatment strategies for 2014; 2) Antigo Lake Aquatic Plant Management Plan update.
Specific conditions for this Project: 1) The WDNR will be provided electronic and hard copies of all data and or reports/plans generated as a result of this project; 2) Make sure lake association members are informed about this project; 3) Provide hard copy of point intercept data in proper spreadsheet format.
Grant Details
Aquatic Invasives Education
Date
4/1/2013
Waters Involved
Spring Brook
Status
Complete
Antigo Lake District: Antigo Lakes Ais Control & Prevention Project: Phase 1 2013-2016: The Antigo Lakes Inland Lakes Protection & Rehabilitation District is sponsoring a project which focuses on the control and monitoring of the Curly-leaf Pondweed (CLP) infestation within Antigo Lake. Treatment strategies will be implemented over the next two years.
The project includes the following goals: 1) Pretreatment confirmation and refinement Survey (Spring 2013, 2014); 2) Quantitative CLP Monitoring (sub-sample PI survey)(Summer 2013, 2014); 3) Early season AIS survey (2013, 2014); 4) Pre/Post evaluation monitoring (2013, 2014); 5) Treatment letter report and future treatment planning (2013, 2014); 5) Informational meeting (winter 2014).
Project deliverables include: 1) A final report will be completed discussing the results of the surveys and recommended treatment strategies for 2014; 2) Antigo Lake Aquatic Plant Management Plan update.
Specific conditions for this Project: 1) The WDNR will be provided electronic and hard copies of all data and or reports/plans generated as a result of this project; 2) Make sure lake association members are informed about this project; 3) Provide hard copy of point intercept data in proper spreadsheet format.
Grant Details
Aquatic Invasives Education
Date
5/1/2004
Waters Involved
Unnamed
Status
Complete
Post Lakes P & R District: Aquatic Invasive Education - Langlade Co. Waterways: The Post Lake P&R District, in cooperation with the Langlade County Waterways Association (LCWA) will sponsor an aquatic invasive species education project which will create a flyer as an insert in the local papers that cover Langlade County. This flyer will be given to local lake associations for distribution to their members. Also, the flyer will go in the Shoreline Friends packets. This project is an expansion of a previous purple loosestrife education project, which will now be expanded to include all aquatic invasives. This project also covers the cost of booth rental for county fair and Post Lake Fair. Volunteers will donate their time to man the booths. The project also includes a Langlade County Youth Fair and Adopt-A-Lake programs in the White Lake and Elcho School districts.
A final report shall be provided to the Department at the end of the grant period, which will include copies of the flyer and any adds developed as a part of the project in addition to a summary of all activities accomplished through the project.
Grant Details
Lake Protection Grant
Date
9/1/2013
Waters Involved
Big Bass Lake
Status
Complete
Marathon County: Lco-Marathon Class 7: Marathon County proposes to continue toward completion of its Phase II efforts to classify 11 lakes in eastern Marathon County. Major project elements to include: 1) Develop lake management plans, 2) Establish planning committees, 3) Review and revise shoreland zoning ordinance, 4) Hold one-day water forum, and 5) Develop guide for Zoning Board of Adjustment members.
Grant Details
Lake Protection Grant
Date
9/1/2010
Waters Involved
Big Eau Pleine Reservoir
Status
Complete
Marathon County: Lco-Shoreland Ordinance Rev.: Marathon County proposes to amend or create a shoreland zoning ordinance that complies with the requirements of NR 115, Wisconsin Administrative Code (as revised effective February 1, 2010) and retain existing regulations that exceed the water resource protections of NR 115 or are specific or unique to local needs.
Project deliverables include: 1. Copies of any fact sheets or handouts created for public hearings. 2. A summary of the comments received at public hearings. 3. A certified copy of the County Board-approved updated shoreland ordinance or ordinance language (if integrated into other codes). 4. Any GIS maps of the shoreland zone or shoreland condition surveys related to the project.
Specific conditions for this Project: 1. The WDNR will be provided electronic and hard copies of all data and or reports or surveys generated as a result of this project.
Grant Details
Lake Protection Grant
Date
9/1/2010
Waters Involved
Big Eau Pleine River
Status
Complete
Marathon County: Lco-Shoreland Ordinance Rev.: Marathon County proposes to amend or create a shoreland zoning ordinance that complies with the requirements of NR 115, Wisconsin Administrative Code (as revised effective February 1, 2010) and retain existing regulations that exceed the water resource protections of NR 115 or are specific or unique to local needs.
Project deliverables include: 1. Copies of any fact sheets or handouts created for public hearings. 2. A summary of the comments received at public hearings. 3. A certified copy of the County Board-approved updated shoreland ordinance or ordinance language (if integrated into other codes). 4. Any GIS maps of the shoreland zone or shoreland condition surveys related to the project.
Specific conditions for this Project: 1. The WDNR will be provided electronic and hard copies of all data and or reports or surveys generated as a result of this project.
Grant Details
Lake Protection Grant
Date
9/1/2002
Waters Involved
Lawrence Lake
Status
Complete
Langlade County: Acq-Langlade County-Lawrence Lake Acquisition: Langlade County shall participate in the Lakes Protection Program by purchasing approximately 320 acres of land including frontage on Lawrence Lake.
Grant Details
Lake Protection Grant
Date
7/12/2010
Waters Involved
Mission Lake
Status
Complete
Marathon County: Lco-Marathon Class 2: Marathon County proposes to conduct detailed studies of 11 lakes in the Eastern part of Marathon County for the purpose of classifying them and developing plans for their future management. major project elements in this phased project include: 1) data collection, 2) outreach, 3) management planning and 4) plan implementation.
Grant Details
Lake Protection Grant
Date
4/15/2017
Waters Involved
Mission Lake
Status
Complete
Deer Lake Conservancy Inc: Lower Rock Creek Acquisition: The Deer Lake Conservancy has purchased 32.10 acres of undeveloped property on Deer Lake in Polk County. The parcel includes approximately 500 feet of shoreline, a riparian wetland and has Rock Creek flowing through the property. The property is adjacent to existing Conservancy owned property. Trails will be developed connecting with existing trails of the adjacent property.
Grant Details
Lake Protection Grant
Date
9/1/2012
Waters Involved
Mud Lake
Status
Complete
Marathon County: Lco-Marathon Class 5: Marathon County proposes to continue toward completion of its Phase _ efforts to classify 11 lakes in eastern Marathon County. Major project elements to include: 1) Water quality sampling and analysis, 2) Fisheries and aquatic species analysis, 3) Habitat, shoreland and paleolimnological surveys, 4) cultural surveys and outreach, 5) build-out assessment and monitoring.
Grant Details
Lake Protection Grant
Date
9/1/2012
Waters Involved
Mud Lake
Status
Complete
Marathon County: Lco-Marathon Class 6: Marathon County proposes to continue toward completion of its Phase 1 efforts to classify 11 lakes in eastern Marathon County. Major project elements to include: 1) Water quality sampling and analysis, 2) Fisheries and aquatic species analysis, 3) Habitat, shoreland and paleolimnological surveys, 4) Cultural surveys and outreach, 5) Build-out assessment and monitoring.
Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Pickerel Lake
Status
Complete
Pickerel/Crane Lake Prot & Rehab District: Res-Pickerell Lake Aeration System: The project will install an aeration system, monitor Dissolved Oxygen throughout the winter, and provide education on sources of nutrient loading into Pickerel Lake. The project will also include an education effort for safety of open water and sources of the problem which have lead to the need for lake aeration.
All required permits will be received prior to equipment installation.
Specific deliverables for this grant project include a final report describing project accomplishments.
The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.
Grant Details
Lake Protection Grant
Date
7/12/2010
Waters Involved
Unnamed
Status
Complete
Marathon County: Lco-Marathon Class 2: Marathon County proposes to conduct detailed studies of 11 lakes in the Eastern part of Marathon County for the purpose of classifying them and developing plans for their future management. major project elements in this phased project include: 1) data collection, 2) outreach, 3) management planning and 4) plan implementation.
Grant Details
Lake Protection Grant
Date
4/15/2017
Waters Involved
Unnamed
Status
Complete
Deer Lake Conservancy Inc: Lower Rock Creek Acquisition: The Deer Lake Conservancy has purchased 32.10 acres of undeveloped property on Deer Lake in Polk County. The parcel includes approximately 500 feet of shoreline, a riparian wetland and has Rock Creek flowing through the property. The property is adjacent to existing Conservancy owned property. Trails will be developed connecting with existing trails of the adjacent property.
Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Antigo Lake (Kellog Pond)
Status
Complete
Antigo Lake District: Antigo Lake District Water Quality Management Plan: The Antigo Lake District proposes to collect samples of stormwater outfalls under normal and storm water runoff conditions. They will also create maps of stormwater inlets, outlets, and associated drainage areas. Their final plan will include a section on the recommended preventative, remedial, and rehabilitation measures to minimize stormwater impacts, as well as a section focusing strictly on the future growth areas within the district. The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by a summary reporting mailing, a public meeting, fact sheet distributions, and through various public media.
Grant Details
Large Scale Lake Planning
Date
4/1/2001
Waters Involved
Antigo Lake (Kellog Pond)
Status
Complete
Antigo Lake District: Antigo Lake District - Fairgrounds Runoff Maint. Plan: The Antigo Lake District will enhance the current stormwater monitoring and management plan by focusing on the county fairgrounds (racetrack) and loading for nearby stormwater collection basins. The project will determine stormwater treatment alternatives to reduce sediment loading into Spring Brook and Antigo Lake from the racetrack.
Deliverables:
1. Detailed data on drainage are of fairgrounds and other contributing basins.
2. Map of all current stormwater systems and summary of how effective they are.
3. A written document outlining recommended measures to solve the sediment loading problem off the fairgrounds including, specific technical designs for recommended method(s), implementation strategy, economic analysis, and cost share programs available.
The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.
Grant Details
Large Scale Lake Planning
Date
4/1/2010
Waters Involved
Antigo Lake (Kellog Pond)
Status
Complete
Antigo Lake District: Antigo Lake Management Planning Project, Phase 1: Antigo Lakes Inland P&R District is sponsoring phased large scale lake planning grants to study Antigo Lake, in Langlade County. The project will focus on developing a Lake Management Plan (LMP) for Antigo Lake.
Phase 1 project activities include: 1) Stakeholder participation \2013 kick-off meeting, stakeholder survey, planning meetings (up to 2), wrap-up meeting, news release(s), and newsletter article; 2) Water quality sampling and analysis (Secchi, P, Chla, DO, temp, N, and Calcium); 3) Shoreline assessment; 4) Watershed assessment and P load modeling.
Project deliverables include: 1) Stakeholder survey, news release(s), and newsletter article; 2) Shoreland and water chemistry data; 3) Watershed maps and modeling data.
Specific conditions for this project: Draft of stakeholder survey needs to be submitted to Lakes Management Coordinator for review and approval before sending to public
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of news release(s), newsletter article, stakeholder survey, data from watershed assessment, shoreland assessment, and water quality sampling, all maps from project, and all GIS data.
Grant Details
Large Scale Lake Planning
Date
4/1/2010
Waters Involved
Antigo Lake (Kellog Pond)
Status
Complete
Antigo Lake District: Antigo Lake Management Planning Project, Phase 2: Antigo Lakes P&R District is sponsoring phased large scale lake planning grants to study Antigo Lake, in Langlade County. The project will focus on developing a Lake Management Plan (LMP) for Antigo Lake.
Phase 2 project activities include: 1) Point-intercept (PI) aquatic plant survey, community mapping and analysis; 2) Curly-leaf pondweed survey; 3) Develop LMP.
Project deliverables include: 1) PI data; 2) Aquatic plant community maps; 3) Two sets of aquatic plant vouchers; 4) LMP.
Specific conditions for this project: LMP needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP, data from PI survey, all maps from project, all GIS data, and vouchers.
Grant Details
Large Scale Lake Planning
Date
4/1/2010
Waters Involved
Antigo Lake (Kellog Pond)
Status
Proposed
Antigo Lake District: Antigo Lake Management Planning Project, Phase 1: Antigo Lakes Inland P&R District is sponsoring phased large scale lake planning grants to study Antigo Lake, in Langlade County. The project will focus on developing a Lake Management Plan (LMP) for Antigo Lake.
Phase 1 project activities include: 1) Stakeholder participation \2013 kick-off meeting, stakeholder survey, planning meetings (up to 2), wrap-up meeting, news release(s), and newsletter article; 2) Water quality sampling and analysis (Secchi, P, Chla, DO, temp, N, and Calcium); 3) Shoreline assessment; 4) Watershed assessment and P load modeling.
Project deliverables include: 1) Stakeholder survey, news release(s), and newsletter article; 2) Shoreland and water chemistry data; 3) Watershed maps and modeling data.
Specific conditions for this project: Draft of stakeholder survey needs to be submitted to Lakes Management Coordinator for review and approval before sending to public
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of news release(s), newsletter article, stakeholder survey, data from watershed assessment, shoreland assessment, and water quality sampling, all maps from project, and all GIS data.
Grant Details
Large Scale Lake Planning
Date
4/1/2010
Waters Involved
Antigo Lake (Kellog Pond)
Status
Proposed
Antigo Lake District: Antigo Lake Management Planning Project, Phase 2: Antigo Lakes P&R District is sponsoring phased large scale lake planning grants to study Antigo Lake, in Langlade County. The project will focus on developing a Lake Management Plan (LMP) for Antigo Lake.
Phase 2 project activities include: 1) Point-intercept (PI) aquatic plant survey, community mapping and analysis; 2) Curly-leaf pondweed survey; 3) Develop LMP.
Project deliverables include: 1) PI data; 2) Aquatic plant community maps; 3) Two sets of aquatic plant vouchers; 4) LMP.
Specific conditions for this project: LMP needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP, data from PI survey, all maps from project, all GIS data, and vouchers.
Grant Details
Large Scale Lake Planning
Date
4/1/2010
Waters Involved
Spring Brook
Status
Complete
Antigo Lake District: Antigo Lake Management Planning Project, Phase 1: Antigo Lakes Inland P&R District is sponsoring phased large scale lake planning grants to study Antigo Lake, in Langlade County. The project will focus on developing a Lake Management Plan (LMP) for Antigo Lake.
Phase 1 project activities include: 1) Stakeholder participation \2013 kick-off meeting, stakeholder survey, planning meetings (up to 2), wrap-up meeting, news release(s), and newsletter article; 2) Water quality sampling and analysis (Secchi, P, Chla, DO, temp, N, and Calcium); 3) Shoreline assessment; 4) Watershed assessment and P load modeling.
Project deliverables include: 1) Stakeholder survey, news release(s), and newsletter article; 2) Shoreland and water chemistry data; 3) Watershed maps and modeling data.
Specific conditions for this project: Draft of stakeholder survey needs to be submitted to Lakes Management Coordinator for review and approval before sending to public
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of news release(s), newsletter article, stakeholder survey, data from watershed assessment, shoreland assessment, and water quality sampling, all maps from project, and all GIS data.
Grant Details
Large Scale Lake Planning
Date
4/1/2010
Waters Involved
Spring Brook
Status
Complete
Antigo Lake District: Antigo Lake Management Planning Project, Phase 2: Antigo Lakes P&R District is sponsoring phased large scale lake planning grants to study Antigo Lake, in Langlade County. The project will focus on developing a Lake Management Plan (LMP) for Antigo Lake.
Phase 2 project activities include: 1) Point-intercept (PI) aquatic plant survey, community mapping and analysis; 2) Curly-leaf pondweed survey; 3) Develop LMP.
Project deliverables include: 1) PI data; 2) Aquatic plant community maps; 3) Two sets of aquatic plant vouchers; 4) LMP.
Specific conditions for this project: LMP needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP, data from PI survey, all maps from project, all GIS data, and vouchers.