Grant Details
Aquatic Invasives Early Detection and Response
Date
3/24/2008
Waters Involved
Holcombe Flowage
Status
Complete
Lake Holcombe Improvement Association Inc.: Holcombe Ewm: Lake Holcombe Improvement Association proposes to contract with a certified applicator to treat approximately 17 acres of Lake Holcombe and Pine Lake as it enters Holcombe. Major project elements to include liquid herbacide (Weedar) injection.
Grant Details
Aquatic Invasives Early Detection and Response
Date
3/24/2008
Waters Involved
Jump River
Status
Complete
Lake Holcombe Improvement Association Inc.: Holcombe Ewm: Lake Holcombe Improvement Association proposes to contract with a certified applicator to treat approximately 17 acres of Lake Holcombe and Pine Lake as it enters Holcombe. Major project elements to include liquid herbacide (Weedar) injection.
Grant Details
Aquatic Invasives Early Detection and Response
Date
4/1/2009
Waters Involved
Jump River
Status
Complete
Lake Holcombe Improvement Association Inc.: Holcombe Ewm '09: The Lake Holcombe Improvement Association proposes to contract for chemical treatment to control Eurasian Watermilfoil investation in an approx. 10-acre area of Pine Lake, an off-shoot of the Holcombe Flowage in Chippewa County. Other major project elements include hand-pulling in selected areas and Clean Boats Clean Waters outreach, all to be conducted by association volunteers.
Grant Details
Aquatic Invasives Education
Date
10/1/2006
Waters Involved
Chippewa River
Status
Complete
Friends Of Beaver Creek Reserve, Inc.: Regional Ais Specialist: The Friends of the Beaver Creek Reserve propose to establish a regional AIS outreach, monitoring and response function serving all lakes with public boat launches in Eau Claire, Chippewa, Dunn, Barron and Rusk counties over a three-year period. Major project elements to include: 1) Project coordination, 2) Field research, 3) Volunteer training and coordination. Project to be coordinated through the Citizen Science Center at the Beaver Creek Reserve, with significant additional funding through the National Fish and Wildlife Foundation.
Grant Details
Aquatic Invasives Education
Date
10/1/2006
Waters Involved
Holcombe Flowage
Status
Complete
Friends Of Beaver Creek Reserve, Inc.: Regional Ais Specialist: The Friends of the Beaver Creek Reserve propose to establish a regional AIS outreach, monitoring and response function serving all lakes with public boat launches in Eau Claire, Chippewa, Dunn, Barron and Rusk counties over a three-year period. Major project elements to include: 1) Project coordination, 2) Field research, 3) Volunteer training and coordination. Project to be coordinated through the Citizen Science Center at the Beaver Creek Reserve, with significant additional funding through the National Fish and Wildlife Foundation.
Grant Details
Aquatic Invasives Education
Date
10/1/2011
Waters Involved
Holcombe Flowage
Status
Complete
Lake Holcombe Improvement Association Inc.: Holcombe Ais Plan: The Lake Holcombe Improvement Association proposes to develop a lake management plan for Lake Holcombe in Chippewa County. Key project elements to include: 1) GPS lake survey and mapping, 2) Development of lake management plan, 3) Clean Boats, Clean Water activities, 4) Volunteer training, 5) Education and outreach events, 6) map, plan printing and distribution.
Grant Details
Aquatic Invasives Education
Date
10/1/2006
Waters Involved
Jump River
Status
Complete
Friends Of Beaver Creek Reserve, Inc.: Regional Ais Specialist: The Friends of the Beaver Creek Reserve propose to establish a regional AIS outreach, monitoring and response function serving all lakes with public boat launches in Eau Claire, Chippewa, Dunn, Barron and Rusk counties over a three-year period. Major project elements to include: 1) Project coordination, 2) Field research, 3) Volunteer training and coordination. Project to be coordinated through the Citizen Science Center at the Beaver Creek Reserve, with significant additional funding through the National Fish and Wildlife Foundation.
Grant Details
Aquatic Invasives Education
Date
10/1/2006
Waters Involved
Unnamed
Status
Complete
Friends Of Beaver Creek Reserve, Inc.: Regional Ais Specialist: The Friends of the Beaver Creek Reserve propose to establish a regional AIS outreach, monitoring and response function serving all lakes with public boat launches in Eau Claire, Chippewa, Dunn, Barron and Rusk counties over a three-year period. Major project elements to include: 1) Project coordination, 2) Field research, 3) Volunteer training and coordination. Project to be coordinated through the Citizen Science Center at the Beaver Creek Reserve, with significant additional funding through the National Fish and Wildlife Foundation.
Grant Details
Aquatic Invasives Research Grant
Date
4/1/2012
Waters Involved
Holcombe Flowage
Status
Complete
Golden Sands Rc&D: Weevil Rearing 2&3: Golden Sands RC&D proposes to continue it Milfoil Weevil Mass Rearing Study, building on past work on the Holcombe Flowage in Rusk and Chippewa Counties, and expanding its studies to Perch Lake Wissota in St. Croix County, and the Minong Flowage in Douglas and Washburn Counties. Major project elements to include: 1) Volunteer group training, 2) Weevil acquisition, rearing, and release 3) Sample collection and analysis, 4) development of a comprehensive biological control manual, and 5) Final report.
Grant Details
Lake Protection Grant
Date
3/15/2024
Waters Involved
Amacoy Lake
Status
Complete
Rusk County: Hlr - Rusk County Shore Land Protection Program: Partnering with property owners, Rusk County LWCD is sponsoring a grant to implement best practices from Wisconsin\2019s 2019 Healthy Lakes & Rivers Action Plan. Best practices, including fish sticks, 350 sq. ft. native plantings, diversions, rock infiltration, and/or rain gardens, will be designed and installed according to program fact sheets, technical guidance and the grant application.
All funded best practices require contracts that must remain in place for 10 years and include the minimum operation and maintenance requirements described in the special conditions at the end of this agreement. If the landowner is the grant sponsor this Lake Protection Grant Agreement serves as the contract. If the best practice(s) will be implemented on land other than the sponsor\2019s, a contract between the sponsor and landowner describing the 10-year contract period, minimum operation and maintenance details, and data to be collected is required. The Department may perform site inspections and/or monitoring to ensure project success.
Deliverables include: a project summary including data requirements, pre/post photographs, and confirmation of completed design work and landowner contracts. A Healthy Lakes & Rivers Example Report is available to assist you.
Special conditions: Project management and technical assistance cash costs cannot exceed 10% of the state share of the grant award; this does not include implementation labor. Water regulation and/or county zoning permits must be issued before construction. Projects required for regulatory compliance purposes, including shoreland mitigation projects, are not eligible for reimbursement. The Healthy Lakes & Rivers logo should be used for promotion and publicity and DNR recognized as a funding source.
The grantee may request a one-time cost amendment and a one-time time extension. The grantee must notify the department if they wish to add or subtract practices to the scope of this grant agreement.
Grant Details
Lake Protection Grant
Date
9/1/2008
Waters Involved
Axhandle Lake
Status
Complete
West Wisconsin Land Trust: Acq-Axe Handle Easement: WWLT is seeking $200,000 in Lake Protection Grant funding to contribute to the cost of a conservation easement designed to protect a 48.55-acre parcel on Axe Handle Lake from development into rural residential housing (up to 31 lots possible under current Chippewa Co. shoreland zoning). The easement would permanently restrict future development to no more than two residential lots, require that all stormwater from development be infiltrated prior to reaching the lake, and require maintenance of a 100-foot forested vegetative buffer to protect the lake's water quality and natural scenic beauty. The owners of the property have offered to donate the remaining value of the easement (est. $575,000). No public access is provided via the easement other than one educational tour per year. Hunting allowed by owners permission.
Grant Details
Lake Protection Grant
Date
5/15/1995
Waters Involved
Bass Lakes
Status
Complete
Chippewa County: Acq-Bass Lakes/Tram Lake Acquisition-Galgano Property: Chippewa County will acquire 220 acres with frontage on Bass Lakes #1 and #2 and Tram Lake to protect the lake from residential development.
Grant Details
Lake Protection Grant
Date
9/1/2002
Waters Involved
Butternut Lake
Status
Complete
Price County: Lmi-Phase Ii Butternut Wq Assessment/Modeling: The Price County Land Conservation Dept will sponsor a project which will collect all needed data to create a response model for Butternut Lake including a water budget, detailed phosphorus budget, lake water quality modeling and evaluation of groundwater impacts. Deliverables will include all data collected and a final report summarizing the findings.
DNR will be provided with a copy of reports and publications produced in both written and electronic (PDF) format. DNR will also be provided with a summary of all the efforts under this grant that are not included in reports or other written documents.
Grant Details
Lake Protection Grant
Date
9/1/2006
Waters Involved
Cedar Creek
Status
Complete
West Wisconsin Land Trust: Acq-Long Lake (Mills) Easement: West Wisconsin Land Trust proposes to purchase a conservation easement on a 15 acre parcel with approximately 4,000 ft. of shoreline on Long Lake in Chippewa County. Easement reduces the number of developable lots from eight to two and requires maintenance of a 100 ft. natural and forested vegetative buffer aling the shoreline.
Grant Details
Lake Protection Grant
Date
3/15/2024
Waters Involved
Chippewa River
Status
Complete
Rusk County: Hlr - Rusk County Shore Land Protection Program: Partnering with property owners, Rusk County LWCD is sponsoring a grant to implement best practices from Wisconsin\2019s 2019 Healthy Lakes & Rivers Action Plan. Best practices, including fish sticks, 350 sq. ft. native plantings, diversions, rock infiltration, and/or rain gardens, will be designed and installed according to program fact sheets, technical guidance and the grant application.
All funded best practices require contracts that must remain in place for 10 years and include the minimum operation and maintenance requirements described in the special conditions at the end of this agreement. If the landowner is the grant sponsor this Lake Protection Grant Agreement serves as the contract. If the best practice(s) will be implemented on land other than the sponsor\2019s, a contract between the sponsor and landowner describing the 10-year contract period, minimum operation and maintenance details, and data to be collected is required. The Department may perform site inspections and/or monitoring to ensure project success.
Deliverables include: a project summary including data requirements, pre/post photographs, and confirmation of completed design work and landowner contracts. A Healthy Lakes & Rivers Example Report is available to assist you.
Special conditions: Project management and technical assistance cash costs cannot exceed 10% of the state share of the grant award; this does not include implementation labor. Water regulation and/or county zoning permits must be issued before construction. Projects required for regulatory compliance purposes, including shoreland mitigation projects, are not eligible for reimbursement. The Healthy Lakes & Rivers logo should be used for promotion and publicity and DNR recognized as a funding source.
The grantee may request a one-time cost amendment and a one-time time extension. The grantee must notify the department if they wish to add or subtract practices to the scope of this grant agreement.
Grant Details
Lake Protection Grant
Date
3/15/2024
Waters Involved
Clear Lake
Status
Complete
Rusk County: Hlr - Rusk County Shore Land Protection Program: Partnering with property owners, Rusk County LWCD is sponsoring a grant to implement best practices from Wisconsin\2019s 2019 Healthy Lakes & Rivers Action Plan. Best practices, including fish sticks, 350 sq. ft. native plantings, diversions, rock infiltration, and/or rain gardens, will be designed and installed according to program fact sheets, technical guidance and the grant application.
All funded best practices require contracts that must remain in place for 10 years and include the minimum operation and maintenance requirements described in the special conditions at the end of this agreement. If the landowner is the grant sponsor this Lake Protection Grant Agreement serves as the contract. If the best practice(s) will be implemented on land other than the sponsor\2019s, a contract between the sponsor and landowner describing the 10-year contract period, minimum operation and maintenance details, and data to be collected is required. The Department may perform site inspections and/or monitoring to ensure project success.
Deliverables include: a project summary including data requirements, pre/post photographs, and confirmation of completed design work and landowner contracts. A Healthy Lakes & Rivers Example Report is available to assist you.
Special conditions: Project management and technical assistance cash costs cannot exceed 10% of the state share of the grant award; this does not include implementation labor. Water regulation and/or county zoning permits must be issued before construction. Projects required for regulatory compliance purposes, including shoreland mitigation projects, are not eligible for reimbursement. The Healthy Lakes & Rivers logo should be used for promotion and publicity and DNR recognized as a funding source.
The grantee may request a one-time cost amendment and a one-time time extension. The grantee must notify the department if they wish to add or subtract practices to the scope of this grant agreement.
Grant Details
Lake Protection Grant
Date
9/1/2000
Waters Involved
Corbett Lake
Status
Complete
City Of Ladysmith: Res-Corbett Lake Aeration Project: The City of Ladysmith will conduct an improvement project on Corbett Lake, which lies within the corporate limits of the city. This project involves the installation of a system of bottom aerators in the lake. Bottom aerators would be installed at 11 locations in the eastern half of the lake basin. Compressors would be located within Falge Park, which is located along the northern shoreline of Corbett Lake. The park is owned and operated by the City of Ladysmith.
A special condition of this grant project is that the installation and operation of this aeration system must comply with all conditions of the water regulation permit issued by this department for the aeration system.
The City of Ladysmith shall notify the Department of Natural Resources upon completion of the installation of the aeration system.
Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Herde Lake
Status
Complete
Lower Long Lake Foundation, Inc.: Acq-Playter Parcel Purchase: The Lower Long Lake Foundation, Inc. has purchased the 59-acre Playter property on the northeastern shore of Long Lake in Chippewa County. Project involved bargain sale and up-front funding from Chippewa County's Stewardship fund -- funding that will be reimbursed with $50K of the grant award. The property includes 700 ft. of shoreline, and will be maintained for resource protection, lakeshore preservation, environmental education and scientific study.
Grant Details
Lake Protection Grant
Date
5/15/1995
Waters Involved
Holcombe Flowage
Status
Complete
Lake Holcombe Improvement Association Inc.: Lmi-Lake Holcombe Aquatic Ecosystem Assessment: The Lake Holcombe Improvement Association, Inc. will conduct investigations to examine water quality conditions, nutrient/seston fluxes, aquatic macrophyte populations and water quality impacts of hydropower operations in Lake Holcombe. The relative importance o various internal and external nutrient loadings will be evaluated in relation to water quality conditions and phytoplankton biomass in the main basin of the lake and in backwater areas. Dissolved oxygen and stratification patterns in the lake and in the tailwaters in relation to discharged regimes will be evaluated. Variations in dissolved oxygen conditions, water residence time, and the exchange of nutrients/seston will be examined in selected backwaters in relation to dam operations. A bathymetric map will be developed for the lake to facilitate water quality modelling and drawdown impacts. A comprehensive aquatic macrophyte assessment will also be conducted.
Grant Details
Lake Protection Grant
Date
3/15/2024
Waters Involved
Holcombe Flowage
Status
Complete
Rusk County: Hlr - Rusk County Shore Land Protection Program: Partnering with property owners, Rusk County LWCD is sponsoring a grant to implement best practices from Wisconsin\2019s 2019 Healthy Lakes & Rivers Action Plan. Best practices, including fish sticks, 350 sq. ft. native plantings, diversions, rock infiltration, and/or rain gardens, will be designed and installed according to program fact sheets, technical guidance and the grant application.
All funded best practices require contracts that must remain in place for 10 years and include the minimum operation and maintenance requirements described in the special conditions at the end of this agreement. If the landowner is the grant sponsor this Lake Protection Grant Agreement serves as the contract. If the best practice(s) will be implemented on land other than the sponsor\2019s, a contract between the sponsor and landowner describing the 10-year contract period, minimum operation and maintenance details, and data to be collected is required. The Department may perform site inspections and/or monitoring to ensure project success.
Deliverables include: a project summary including data requirements, pre/post photographs, and confirmation of completed design work and landowner contracts. A Healthy Lakes & Rivers Example Report is available to assist you.
Special conditions: Project management and technical assistance cash costs cannot exceed 10% of the state share of the grant award; this does not include implementation labor. Water regulation and/or county zoning permits must be issued before construction. Projects required for regulatory compliance purposes, including shoreland mitigation projects, are not eligible for reimbursement. The Healthy Lakes & Rivers logo should be used for promotion and publicity and DNR recognized as a funding source.
The grantee may request a one-time cost amendment and a one-time time extension. The grantee must notify the department if they wish to add or subtract practices to the scope of this grant agreement.
Grant Details
Lake Protection Grant
Date
3/15/2024
Waters Involved
Jump River
Status
Complete
Rusk County: Hlr - Rusk County Shore Land Protection Program: Partnering with property owners, Rusk County LWCD is sponsoring a grant to implement best practices from Wisconsin\2019s 2019 Healthy Lakes & Rivers Action Plan. Best practices, including fish sticks, 350 sq. ft. native plantings, diversions, rock infiltration, and/or rain gardens, will be designed and installed according to program fact sheets, technical guidance and the grant application.
All funded best practices require contracts that must remain in place for 10 years and include the minimum operation and maintenance requirements described in the special conditions at the end of this agreement. If the landowner is the grant sponsor this Lake Protection Grant Agreement serves as the contract. If the best practice(s) will be implemented on land other than the sponsor\2019s, a contract between the sponsor and landowner describing the 10-year contract period, minimum operation and maintenance details, and data to be collected is required. The Department may perform site inspections and/or monitoring to ensure project success.
Deliverables include: a project summary including data requirements, pre/post photographs, and confirmation of completed design work and landowner contracts. A Healthy Lakes & Rivers Example Report is available to assist you.
Special conditions: Project management and technical assistance cash costs cannot exceed 10% of the state share of the grant award; this does not include implementation labor. Water regulation and/or county zoning permits must be issued before construction. Projects required for regulatory compliance purposes, including shoreland mitigation projects, are not eligible for reimbursement. The Healthy Lakes & Rivers logo should be used for promotion and publicity and DNR recognized as a funding source.
The grantee may request a one-time cost amendment and a one-time time extension. The grantee must notify the department if they wish to add or subtract practices to the scope of this grant agreement.
Grant Details
Lake Protection Grant
Date
9/1/1999
Waters Involved
Lake Hallie, Lake Hallie 2
Status
Complete
Town Of Hallie: Acq-Town Of Hallie Acquistion On Lake Hallie: The Town of Hallie proposes to purchase approximately 22 acres of land on the north end of Lake Hallie. The parcel is currently owned by American Materials Corporation, and is threatened with development. The parcel is an environmentally sensitive area, a major feature of the land is a wetland spring area. This area is a major cold-water source for the lake and provides a unique riparian buffer for several hundred feet of shoreline. The area also provides an extensive area of riparian wildlife habitat.
Grant Details
Lake Protection Grant
Date
9/1/2006
Waters Involved
Larrabee Lake
Status
Complete
West Wisconsin Land Trust: Acq-Larrabee (Munger) Easement: West Wisconsin Land Trust requests $200,000 to purchase a conservation easement on a 24-acre parcel owned by the Munger family on Larrabee Lake in Chippewa County.
Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Long Lake
Status
Complete
Lower Long Lake Foundation, Inc.: Acq-Playter Parcel Purchase: The Lower Long Lake Foundation, Inc. has purchased the 59-acre Playter property on the northeastern shore of Long Lake in Chippewa County. Project involved bargain sale and up-front funding from Chippewa County's Stewardship fund -- funding that will be reimbursed with $50K of the grant award. The property includes 700 ft. of shoreline, and will be maintained for resource protection, lakeshore preservation, environmental education and scientific study.
Grant Details
Lake Protection Grant
Date
9/1/2000
Waters Involved
Pixley Flowage
Status
Complete
Price County: Acq-Price County-Smith Lake Land Acquisition: Price County will acquire 93.5 acres of land with 6,800 feet of undeveloped frontage on Smith Lake, a flowage of the Flambeau River.
Grant Details
Lake Protection Grant
Date
7/1/1998
Waters Involved
Rib Lake
Status
Complete
Rib Lake Inland Lakes P & R District: Lmi-Fd-Rib Lake Rehabilitation/Sediment Analysis, 1998-99: Rib Lake Inland Lake Protection District proposes to conduct a diagnostic/feasibility study of lake bottom sediments as a preliminary step to a possible sunken log retrieval and/or dredging project in Rib Lake.
Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Taylor Lake
Status
Complete
West Wisconsin Land Trust: Acq-Taylor-Snake Easement: West Wisconsin Land Trust seeks funding toward the purchase of a conservation easement on two parcels with frontage on Herde Lake: One (126 acres) sharing frontage on Taylor Lake, and another (155 acres) with frontage on Snake and several unnamed, wild lakes.
Grant Details
Lake Protection Grant
Date
9/1/2008
Waters Involved
Triple Lakes
Status
Complete
West Wisconsin Land Trust: Acq-Herde Iii, Triple Lakes Easements: WWLT is seeking $200,000 in Lake Protection funding to contribute to the cost of two conservation easements: one secured on a 30-acre parcel on Herde Lake, and the other on a 740-acre parcel that includes frontage on, or entirely encompasses, 14 lakes including the Triple Lakes, and Henneman, Logger, Chick, Calkins North and Taylor lakes in Chippewa County. The Herde Lake easement allows no development on the property (which had been subdivided to accommodate 11 condominium lots) and requires maintenance of a 100 ft. forested vegetative shoreline buffer strip to protect the lake's water quality and natural scenic beauty. The Triple Lakes easement extinguishes a condominium plat approval allowing for development of up to 181 lakefront lots allowing, instead, development of 13 residential lots and requiring maintenance of 75' (min.) vegetative buffer strips on all lake shorelines.
Grant Details
Lake Protection Grant
Date
9/1/2010
Waters Involved
Unnamed
Status
Complete
Chippewa County: Lco-Shoreland Ordinance Rev.: Chippewa County proposes to amend or create a shoreland zoning ordinance that complies with the requirements of NR 115, Wisconsin Administrative Code (as revised effective February 1, 2010) and retain existing regulations that exceed the water resource protections of NR 115 or are specific or unique to local needs.
Project deliverables include: 1. Copies of any fact sheets or handouts created for public hearings. 2. A summary of the comments received at public hearings. 3. A certified copy of the County Board-approved updated shoreland ordinance or ordinance language (if integrated into other codes). 4. Any GIS maps of the shoreland zone or shoreland condition surveys related to the project.
Specific conditions for this Project: 1. The WDNR will be provided electronic and hard copies of all data and or reports or surveys generated as a result of this project.
Grant Details
Lake Protection Grant
Date
3/15/2024
Waters Involved
Unnamed
Status
Complete
Rusk County: Hlr - Rusk County Shore Land Protection Program: Partnering with property owners, Rusk County LWCD is sponsoring a grant to implement best practices from Wisconsin\2019s 2019 Healthy Lakes & Rivers Action Plan. Best practices, including fish sticks, 350 sq. ft. native plantings, diversions, rock infiltration, and/or rain gardens, will be designed and installed according to program fact sheets, technical guidance and the grant application.
All funded best practices require contracts that must remain in place for 10 years and include the minimum operation and maintenance requirements described in the special conditions at the end of this agreement. If the landowner is the grant sponsor this Lake Protection Grant Agreement serves as the contract. If the best practice(s) will be implemented on land other than the sponsor\2019s, a contract between the sponsor and landowner describing the 10-year contract period, minimum operation and maintenance details, and data to be collected is required. The Department may perform site inspections and/or monitoring to ensure project success.
Deliverables include: a project summary including data requirements, pre/post photographs, and confirmation of completed design work and landowner contracts. A Healthy Lakes & Rivers Example Report is available to assist you.
Special conditions: Project management and technical assistance cash costs cannot exceed 10% of the state share of the grant award; this does not include implementation labor. Water regulation and/or county zoning permits must be issued before construction. Projects required for regulatory compliance purposes, including shoreland mitigation projects, are not eligible for reimbursement. The Healthy Lakes & Rivers logo should be used for promotion and publicity and DNR recognized as a funding source.
The grantee may request a one-time cost amendment and a one-time time extension. The grantee must notify the department if they wish to add or subtract practices to the scope of this grant agreement.
Grant Details
Large Scale Lake Planning
Date
10/1/2005
Waters Involved
Holcombe Flowage
Status
Complete
Friends Of Beaver Creek Reserve, Inc.: Holcombe Drawdown Recovery: The Friends of Beaver Creek Reserve propose to survey aquatic plant growth in Lake Holcombe, in Chippewa County, to see if elimination of regular winter drawdowns has contributed to increased aquatic plant health and diversity. Major project elements to include: 1) Aquatic plant sampling, 2) GIS map development, 3) Data evaluation, 4) Final report.
Grant Details
Small Scale Lake Planning
Date
2/15/2015
Waters Involved
Chippewa River
Status
Complete
Lake Holcombe Improvement Association Inc.: Hammit Bay Algae: The Lake Holcombe Improvement Association proposes to hire a consulting firm to design and document proposed installation of a culvert to increase water flow between Hammet Bay and Lake Holcombe, thus reducing potential growth of Blue Green Algae. Major project elements to include: 1) Consulting Services, 2) Final Report.
Grant Details
Small Scale Lake Planning
Date
2/15/2015
Waters Involved
Holcombe Flowage
Status
Complete
Lake Holcombe Improvement Association Inc.: Hammit Bay Algae: The Lake Holcombe Improvement Association proposes to hire a consulting firm to design and document proposed installation of a culvert to increase water flow between Hammet Bay and Lake Holcombe, thus reducing potential growth of Blue Green Algae. Major project elements to include: 1) Consulting Services, 2) Final Report.
Grant Details
Small Scale Lake Planning
Date
2/15/2015
Waters Involved
Jump River
Status
Complete
Lake Holcombe Improvement Association Inc.: Hammit Bay Algae: The Lake Holcombe Improvement Association proposes to hire a consulting firm to design and document proposed installation of a culvert to increase water flow between Hammet Bay and Lake Holcombe, thus reducing potential growth of Blue Green Algae. Major project elements to include: 1) Consulting Services, 2) Final Report.
Grant Details
River Planning Grant
Date
10/18/2000
Waters Involved
Jump River
Status
Complete
Friends Of The Jump River, Inc.: Jump River Water Quality Monitoring Study: The Friends of the Jump River, Inc., will conduct a project which will include the following components:
water quality monitoring including 8 sites, monitoing during high flow and base flow;
macroinvertebrate population monitoring;
education and training of volunteers for resource monitoring
compilation of historical and current management plans for the watershed
development of a strategic action plan
education and outreach of public regarding the resource
outreach efforts to expand the organizaton membership and develop partnerships with existing committies and government organizations.
Specific deliverable for this project include water quality monitoring results, macroinvertebrate sample results, a strategic action plan.
The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the strategic action plan. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.
Grant Details
River Protection Grant
Date
4/15/2015
Waters Involved
Duroy Lake
Status
Complete
Price County: Weger Streambank Protection, Elk River: Price County is sponsoring a project to restore 250 feet of shoreline habitat along the Elk River. There is an unstable 25 foot face that is actively eroding and needs to be stabilized. Fish, wildlife habitat and water quality will be improved.
Project goals: 1) Reduce sediment and nutrient delivery; 2) Reduce instream sedimentation to improve fish spawning habitat; 3) Restore shore land habitat for wildlife; 4) Improve water quality; 5) Protect existing resources.
Project deliverables is a final report that includes: 1) Documentation that the project was completed; 2) Copies of final engineering plans; 3) Before and after photo documentation.
Specific conditions for this Project: The WDNR will be provided electronic and hard copies of all data and or reports/plans generated as a result of this project.
Grant Details
River Protection Grant
Date
4/15/2015
Waters Involved
Elk Lake
Status
Complete
Price County: Weger Streambank Protection, Elk River: Price County is sponsoring a project to restore 250 feet of shoreline habitat along the Elk River. There is an unstable 25 foot face that is actively eroding and needs to be stabilized. Fish, wildlife habitat and water quality will be improved.
Project goals: 1) Reduce sediment and nutrient delivery; 2) Reduce instream sedimentation to improve fish spawning habitat; 3) Restore shore land habitat for wildlife; 4) Improve water quality; 5) Protect existing resources.
Project deliverables is a final report that includes: 1) Documentation that the project was completed; 2) Copies of final engineering plans; 3) Before and after photo documentation.
Specific conditions for this Project: The WDNR will be provided electronic and hard copies of all data and or reports/plans generated as a result of this project.
Grant Details
River Protection Grant
Date
4/15/2015
Waters Involved
Elk River
Status
Complete
Price County: Weger Streambank Protection, Elk River: Price County is sponsoring a project to restore 250 feet of shoreline habitat along the Elk River. There is an unstable 25 foot face that is actively eroding and needs to be stabilized. Fish, wildlife habitat and water quality will be improved.
Project goals: 1) Reduce sediment and nutrient delivery; 2) Reduce instream sedimentation to improve fish spawning habitat; 3) Restore shore land habitat for wildlife; 4) Improve water quality; 5) Protect existing resources.
Project deliverables is a final report that includes: 1) Documentation that the project was completed; 2) Copies of final engineering plans; 3) Before and after photo documentation.
Specific conditions for this Project: The WDNR will be provided electronic and hard copies of all data and or reports/plans generated as a result of this project.
Grant Details
River Protection Grant
Date
4/15/2015
Waters Involved
Grassy Lake
Status
Complete
Price County: Weger Streambank Protection, Elk River: Price County is sponsoring a project to restore 250 feet of shoreline habitat along the Elk River. There is an unstable 25 foot face that is actively eroding and needs to be stabilized. Fish, wildlife habitat and water quality will be improved.
Project goals: 1) Reduce sediment and nutrient delivery; 2) Reduce instream sedimentation to improve fish spawning habitat; 3) Restore shore land habitat for wildlife; 4) Improve water quality; 5) Protect existing resources.
Project deliverables is a final report that includes: 1) Documentation that the project was completed; 2) Copies of final engineering plans; 3) Before and after photo documentation.
Specific conditions for this Project: The WDNR will be provided electronic and hard copies of all data and or reports/plans generated as a result of this project.
Grant Details
River Protection Grant
Date
4/15/2015
Waters Involved
Lac Sault Dore
Status
Complete
Price County: Weger Streambank Protection, Elk River: Price County is sponsoring a project to restore 250 feet of shoreline habitat along the Elk River. There is an unstable 25 foot face that is actively eroding and needs to be stabilized. Fish, wildlife habitat and water quality will be improved.
Project goals: 1) Reduce sediment and nutrient delivery; 2) Reduce instream sedimentation to improve fish spawning habitat; 3) Restore shore land habitat for wildlife; 4) Improve water quality; 5) Protect existing resources.
Project deliverables is a final report that includes: 1) Documentation that the project was completed; 2) Copies of final engineering plans; 3) Before and after photo documentation.
Specific conditions for this Project: The WDNR will be provided electronic and hard copies of all data and or reports/plans generated as a result of this project.
Grant Details
River Protection Grant
Date
4/15/2015
Waters Involved
Long Lake
Status
Complete
Price County: Weger Streambank Protection, Elk River: Price County is sponsoring a project to restore 250 feet of shoreline habitat along the Elk River. There is an unstable 25 foot face that is actively eroding and needs to be stabilized. Fish, wildlife habitat and water quality will be improved.
Project goals: 1) Reduce sediment and nutrient delivery; 2) Reduce instream sedimentation to improve fish spawning habitat; 3) Restore shore land habitat for wildlife; 4) Improve water quality; 5) Protect existing resources.
Project deliverables is a final report that includes: 1) Documentation that the project was completed; 2) Copies of final engineering plans; 3) Before and after photo documentation.
Specific conditions for this Project: The WDNR will be provided electronic and hard copies of all data and or reports/plans generated as a result of this project.
Grant Details
River Protection Grant
Date
4/15/2015
Waters Involved
Musser Flowage
Status
Complete
Price County: Weger Streambank Protection, Elk River: Price County is sponsoring a project to restore 250 feet of shoreline habitat along the Elk River. There is an unstable 25 foot face that is actively eroding and needs to be stabilized. Fish, wildlife habitat and water quality will be improved.
Project goals: 1) Reduce sediment and nutrient delivery; 2) Reduce instream sedimentation to improve fish spawning habitat; 3) Restore shore land habitat for wildlife; 4) Improve water quality; 5) Protect existing resources.
Project deliverables is a final report that includes: 1) Documentation that the project was completed; 2) Copies of final engineering plans; 3) Before and after photo documentation.
Specific conditions for this Project: The WDNR will be provided electronic and hard copies of all data and or reports/plans generated as a result of this project.
Grant Details
River Protection Grant
Date
4/15/2015
Waters Involved
Unnamed
Status
Complete
Price County: Weger Streambank Protection, Elk River: Price County is sponsoring a project to restore 250 feet of shoreline habitat along the Elk River. There is an unstable 25 foot face that is actively eroding and needs to be stabilized. Fish, wildlife habitat and water quality will be improved.
Project goals: 1) Reduce sediment and nutrient delivery; 2) Reduce instream sedimentation to improve fish spawning habitat; 3) Restore shore land habitat for wildlife; 4) Improve water quality; 5) Protect existing resources.
Project deliverables is a final report that includes: 1) Documentation that the project was completed; 2) Copies of final engineering plans; 3) Before and after photo documentation.
Specific conditions for this Project: The WDNR will be provided electronic and hard copies of all data and or reports/plans generated as a result of this project.