2024-07-16
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 1/1/2024 - 6/30/2024
|
|
2024-03-18
|
43
|
Site Activity Status Update Received
|
|
PRE-DESIGN INVESTIGATION DATA SUBMITTAL
|
|
2024-02-15
|
43
|
Site Activity Status Update Received
|
|
PRE-DESIGN INVESTIGATION, DNAPL DELINEATION
|
|
2024-02-09
|
43
|
Site Activity Status Update Received
|
|
PRE-DESIGN INVESTIGATION, DEPOT ROAD SAMPLING
|
|
2024-01-22
|
43
|
Site Activity Status Update Received
|
|
PRE-DESIGN DATA TECHNICAL MEMORANDUM
|
|
2024-01-09
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 7/1/2023 - 12/31/2023
|
|
2024-01-08
|
43
|
Site Activity Status Update Received
|
|
GROUNDWATER SAMPLING DATA SUBMITTAL
|
|
2023-12-19
|
43
|
Site Activity Status Update Received
|
|
PRE-DESIGN INVESTIGATION, SOIL SAMPLING RESULTS FROM DEPOT ROAD
|
|
2023-11-21
|
43
|
Site Activity Status Update Received
|
|
PRE-DESIGN INVESTIGATION - DEPOT ROAD
|
|
2023-11-16
|
43
|
Site Activity Status Update Received
|
|
LABORATORY DATA SUBMITTAL AS PART OF PRE-DESIGN TREATABILITY STUDY
|
|
2023-10-13
|
43
|
Site Activity Status Update Received
|
|
DATA SUBMITTAL FOR INITIAL DEPOT ROAD SOIL SAMPLING
|
|
2023-07-13
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 01/01/2023 - 06/30/2023
|
|
2023-06-29
|
99
|
Miscellaneous
|
|
DNR RESPONSE AS TO WHY 10 PPM CLEAN-UP LEVEL FOR PCBS IS APPROPRIATE
|
|
2023-05-16
|
147
|
Remedial Action (RA) Design Report Received (non-fee)
|
|
REMEDIAL ACTION PLAN
|
|
2023-01-24
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 7/1/2022 - 12/31/2022
|
|
2022-07-06
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 1/1/2022 - 6/30/2022
|
|
2022-04-06
|
82
|
Remedial Action Options Report (RAOR) Not Approved
|
|
UPDATED REVIEW LETTER SENT: REQUESTED ADDITIONAL INFORMATION - RAOR NOT APPROVED (BEAZER PORTION)
|
|
2022-04-06
|
125
|
Interim Action Plan Not Approved
|
|
UPDATED REVIEW LETTER SENT: REQUESTED ADDITIONAL INFORMATION - IAWP NOT APPROVED (BEAZER PORTION)
|
|
2022-02-15
|
99
|
Miscellaneous
|
|
RESCINDED REVIEW LETTER (DATED JAN. 21, 2022) FOR REMEDIAL ACTION OPTIONS REPORT - BEAZER PORTION
|
|
2022-02-15
|
99
|
Miscellaneous
|
|
RESCINDED REVIEW LETTER (DATED JAN. 21, 2022) FOR INTERIM ACTION WORK PLAN - BEAZER PORTION
|
|
2022-02-10
|
82
|
Remedial Action Options Report (RAOR) Not Approved
|
|
REQUESTED ADDITIONAL INFORMATION - CONNELL PORTION OF RAOR (REV 2) AND PRE-DESIGN SAMPLING WORK PLAN
|
|
2022-01-26
|
99
|
Miscellaneous
|
|
RECVD ADD'L INFO - SEWER MAPS TO SUPPLEMENT RAOR ADDENDUM/PRE-DESIGN WK PLAN REV 2: CONNELL PORTION
|
|
2022-01-21
|
82
|
Remedial Action Options Report (RAOR) Not Approved
|
|
REQUESTED ADDITIONAL REMEDIATION ACTIVITIES - BEAZER PORTION
|
|
2022-01-21
|
125
|
Interim Action Plan Not Approved
|
|
|
|
2022-01-04
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 7/1/2021 - 12/31/2021
|
|
2021-12-16
|
123
|
Interim Action Plan Received (fee)
|
|
REC'D CK #197144200 $1050
|
|
2021-12-03
|
99
|
Miscellaneous
|
|
REQUESTED REVIEW FEE FOR IAWP (BEAZER'S PORTION)
|
|
2021-12-02
|
143
|
Remedial Action Options Report (RAOR) Received (fee)
|
|
REC'D CK #197140163 $1050, RAOR REVISED
|
|
2021-12-01
|
99
|
Miscellaneous
|
|
REQUESTED REVIEW FEES FOR REVISED RAOR AND REVISED INTERIM ACTION WORK PLAN (IAWP) - BEAZER PORTION
|
|
2021-11-23
|
99
|
Miscellaneous
|
|
REQUESTED ADDITIONAL INFORMATION - CONNELL RAOR REVISION 2
|
|
2021-10-19
|
99
|
Miscellaneous
|
|
RESPONSE TO BEAZER INTERIM ACTION WORK PLAN
|
|
2021-09-30
|
39
|
Remedial Action Options Report (RAOR) Received (non-fee)
|
|
CONNELL RAOR REVISION 2
|
|
2021-09-30
|
122
|
Interim Action Plan Received (non-fee)
|
|
BEAZER
|
|
2021-09-30
|
99
|
Miscellaneous
|
|
RESPONSE LETTER REGARDING VPLE WITHDRAWAL
|
|
2021-09-30
|
99
|
Miscellaneous
|
|
RESPONSE TO COMMENT LETTER
|
|
2021-09-29
|
99
|
Miscellaneous
|
|
RECVD BEAZER'S RESPONSE TO DNR LETTER RE: NOTICE OF REMOVAL FROM VPLE PROGRAM
|
|
2021-08-31
|
82
|
Remedial Action Options Report (RAOR) Not Approved
|
|
REQUESTED ADD'L INFO - BEAZER PORTION OF REVISED IAWP AND REVISED RAOR
|
|
2021-08-31
|
3
|
Notice of Noncompliance (NON) Issued
|
|
NOTICE OF NONCOMPLIANCE (NON) ISSUED TO BEAZER (NON IS INCLUDED IN THE AC 82 LETTER DATED 31AUG2021)
|
|
2021-08-31
|
99
|
Miscellaneous
|
|
BEAZER SITE REMOVED FROM VPLE PROGRAM
|
|
2021-07-09
|
82
|
Remedial Action Options Report (RAOR) Not Approved
|
|
REQUESTED ADD'L INFO - CONNELL PORTION OF RAOR AND PRE-DESIGN SAMPLING WORK PLAN
|
|
2021-07-08
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 1/1/2021 - 6/30/2021
|
|
2021-07-01
|
39
|
Remedial Action Options Report (RAOR) Received (non-fee)
|
|
REVISED RAOR
|
|
2021-06-14
|
99
|
Miscellaneous
|
|
RESPONSE TO REQUEST FOR VIRTUAL MEETING TO DISCUSS REVISED INTERIM ACTION WORK PLAN - BEAZER PORTION
|
|
2021-06-11
|
99
|
Miscellaneous
|
|
RCVD REQUEST FOR VIRTUAL MEETING TO DISCUSS REVISED INTERIM ACTION WORK PLAN - BEAZER PORTION
|
|
2021-05-28
|
99
|
Miscellaneous
|
|
APPROVED TIMELINE EXTENSION REQUEST (BEAZER PORTION)
|
|
2021-05-27
|
99
|
Miscellaneous
|
|
REQUESTED ADD'L INFO FOR THE 30-DAY EXTENSION REQUEST (FROM 01JUN2021) TO SUBMIT REVISED RAOR
|
|
2021-05-27
|
99
|
Miscellaneous
|
|
RECVD ADD'L INFO FOR THE 30-DAY EXTENSION REQUEST (FROM 01JUN2021) TO SUBMIT REVISED RAOR
|
|
2021-05-26
|
99
|
Miscellaneous
|
|
RECVD REQ. FOR 30-DAY EXTENSION TO SUBMIT REVISED RAOR (REVISED RAOR ORIGINAL DUE DATE: 01JUN2021)
|
|
2021-05-03
|
122
|
Interim Action Plan Received (non-fee)
|
|
REVISED INTERIM ACTION WORK PLAN
|
|
2021-05-03
|
99
|
Miscellaneous
|
|
RESPONSE TO MARCH 3, 2021 REVIEW OF INTERIM ACTION WORK PLAN
|
|
2021-04-06
|
130
|
DNR Regulatory Reminder Sent
|
|
VAPOR INTRUSION AND TCE REMINDER LETTER
|
|
2021-03-03
|
125
|
Interim Action Plan Not Approved
|
|
REQUESTED REVISED INTERIM ACTION WORK PLAN; REVISED RAOR; AND RADR - BEAZER PORTION
|
|
2021-01-11
|
39
|
Remedial Action Options Report (RAOR) Received (non-fee)
|
|
RAOR FOR CONNELL PORTION OF SITE
|
|
2021-01-07
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 7/1/2020 - 12/31/2020
|
|
2020-12-21
|
122
|
Interim Action Plan Received (non-fee)
|
|
|
|
2020-12-16
|
99
|
Miscellaneous
|
|
DNR PROVIDED RESPONSE TO BEAZER REGARDING CLARIFICATION REQUEST OF WKPLN
|
|
2020-12-14
|
99
|
Miscellaneous
|
|
BEAZER REQ. DNR TO CLARIFY WHETHER INTERIM ACTION WKPLN OR IMMEDIATE ACTION WKPLN WAS BEING REQ'ETD
|
|
2020-11-23
|
99
|
Miscellaneous
|
|
RECVD MEETING REQUEST FROM BEAZER IN RESPONSE TO THE LETTER FROM THE DNR DATED 19NOV2020
|
|
2020-11-19
|
99
|
Miscellaneous
|
|
PROVIDED RESPONSE TO BEAZER'S MEETING REQUEST (SEE P.3: BEAZER LTR RE SITE COND & PROGRESS IN VLPE)
|
|
2020-10-30
|
99
|
Miscellaneous
|
|
RECVD MEETING REQUEST FROM BEAZER
|
|
2020-10-16
|
99
|
Miscellaneous
|
|
LETTER SENT - REVIEW OF BEAZER'S SEPTEMBER 3, 2020 RESPONSE TO DNR'S AUGUST 3, 2020 LETTER
|
|
2020-09-03
|
99
|
Miscellaneous
|
|
RESPONSE TO AUGUST 3, 2020 REVIEW OF UPDATED SITE INVESTIGATION FIGURES
|
|
2020-08-17
|
130
|
DNR Regulatory Reminder Sent
|
|
EMERGING CONTAMINANTS REMINDER LETTER
|
|
2020-08-03
|
99
|
Miscellaneous
|
|
REVIEW LETTER FOR BEAZER 'S UPDATED SITE INVESTIGATION FIGURES - REQUESTED ADDITIONAL INFORMATION
|
|
2020-07-22
|
99
|
Miscellaneous
|
|
RESPONSE - PRE-REMEDIATION NON-LISTED WASTE DETERMINATION REQUEST BY BEAZER EAST - BEAZER PORTION
|
|
2020-07-06
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 1/1/2020 - 6/30/2020
|
|
2020-06-19
|
99
|
Miscellaneous
|
|
PROVIDED RESPNSE TO REQUEST FOR PUTTING INTERIM REMEDIAL ACTION WORK PLAN ON HOLD - BEAZER PORTION
|
|
2020-06-15
|
99
|
Miscellaneous
|
|
RECVD 3D FIGURE OF OBSERVED TAR - BEAZER PORTION
|
|
2020-06-15
|
99
|
Miscellaneous
|
|
RECVD 3D TAR SCREEN SHOTS - BEAZER PORTION
|
|
2020-06-15
|
99
|
Miscellaneous
|
|
RECVD 3D FIGURE WITH BOREHOLES REMOVED THAT HAD NO OBSERVED TAR - BEAZER PORTION
|
|
2020-06-15
|
99
|
Miscellaneous
|
|
RECVD REQUEST FOR PUTTING INTERIM REMEDIAL ACTION WORK PLAN ON HOLD - BEAZER PORTION
|
|
2020-06-11
|
99
|
Miscellaneous
|
|
RECD REVISED FIGURES - BEAZER PORTION
|
|
2020-06-10
|
82
|
Remedial Action Options Report (RAOR) Not Approved
|
|
REQUESTED ADDITIONAL INFORMATION - CONNELL'S PORTION OF RAOR AND PRE-DESIGN SAMPLING PLAN
|
|
2020-05-29
|
99
|
Miscellaneous
|
|
RECVD REQUEST FOR NON-LISTED HAZARDOUS WASTE DETERMINATION BY BEAZER EAST - BEAZER PORTION
|
|
2020-05-21
|
99
|
Miscellaneous
|
|
ENVIRONMENTAL ENFORCEMENT AND REMEDIATION & REDEVELOPMENT PROGRAMS' CORRESPONDENCE
|
|
2020-05-14
|
99
|
Miscellaneous
|
|
PROVIDED ALTERNATE DATES/TIMES TO BEAZER FOR THE TECHNICAL CONFERENCE CALL
|
|
2020-05-11
|
99
|
Miscellaneous
|
|
RECVD REQUEST FROM BEAZER - TECHNICAL CONFERENCE CALL
|
|
2020-05-05
|
99
|
Miscellaneous
|
|
PROVIDED RESPONSE TO BEAZER'S MARCH 6, 2020 LETTER
|
|
2020-04-22
|
99
|
Miscellaneous
|
|
ENVIRONMENTAL ENFORCEMENT (EE) AND REMEDIATION & REDEVELOPMENT (RR) PROGRAMS CORRESPONDENCE
|
|
2020-03-19
|
43
|
Site Activity Status Update Received
|
|
Q1 2020 GW SAMPLING
|
|
2020-03-16
|
39
|
Remedial Action Options Report (RAOR) Received (non-fee)
|
|
RECVD CONNELL'S PORTION OF ADDENDUM TO RAOR AND PRE-DESIGN SAMPLING WORK PLAN
|
|
2020-03-06
|
99
|
Miscellaneous
|
|
RECVD BEAZER'S RESPONSE TO JANUARY 8, 2020, COMMENT LETTER FROM THE DNR TO MIKE SLENSKA OF BEAZER
|
|
2020-01-15
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 7/1/2019 - 12/31/2019
|
|
2020-01-08
|
140
|
Site Investigation Report (SIR) Not Approved
|
|
REQUESTED ADDITIONAL INFORMATION - SSIR (TAR RELATED CONTAMINANTS); NOT APPROVED
|
|
2020-01-06
|
199
|
Additional Information Received (Fee-Based or Closure)
|
|
RECVD ADD'L INPUT FOR REVIEW OF SUPPL. SITE INVESTIGATION REPORT (SSIR) - TAR RELATED CONTAMINANTS
|
|
2019-09-26
|
99
|
Miscellaneous
|
|
PROVIDED RESPONSE TO REQUEST FROM CONNELL ABOUT SITE UPDATE
|
|
2019-09-23
|
99
|
Miscellaneous
|
|
RECVD REQUEST FROM CONNELL REGARDING SITE UPDATE
|
|
2019-07-03
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 1/1/2019 - 6/30/2019
|
|
2019-03-06
|
198
|
Request for Additional Information (Fee-Based or Closure)
|
|
PAUSED FOR ADDITIONAL INPUT
|
|
2019-02-08
|
137
|
Site Investigation Report (SIR) Received (fee)
|
|
REC'D SUPPLEMENTAL SIR
|
|
2019-01-28
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 7/1/2018 - 12/31/2018
|
|
2018-08-10
|
99
|
Miscellaneous
|
|
RESPONSE TO ADDENDUM REQUEST
|
|
2018-08-09
|
99
|
Miscellaneous
|
|
RCVD ADDENDUM REQ TO EMAIL FROM NRT/OBG (11-22-2017) TO HELP IN REVISION OF CONNELL'S ROAR PORTION
|
|
2018-08-08
|
99
|
Miscellaneous
|
|
PROVIDED RESPONSE TO EMAIL FROM NRT/OBG (DATED NOVEMBER 22, 2017)
|
|
2018-07-13
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 1/1/2018 - 6/30/2018
|
|
2018-07-10
|
99
|
Miscellaneous
|
|
RCVD RESPONSE TO CONDITIONAL SIWP APPROVAL
|
|
2018-06-29
|
36
|
Site Investigation Workplan (SIWP) Approved
|
|
APPROVED REVISED SUPPLEMENTAL SITE INVESTIGATION WORKPLAN WITH CONDITIONS
|
|
2018-06-04
|
35
|
Site Investigation Workplan (SIWP) Received (non-fee)
|
|
RECVD REVISED SUPPLEMENTAL SITE INVESTIGATION WORKPLAN (WORKPLAN REVISION DATE JUNE 15, 2018)
|
|
2018-05-15
|
36
|
Site Investigation Workplan (SIWP) Approved
|
|
APPROVED SUPPLEMENTAL SITE INVESTIGATION WORKPLAN WITH CONDITIONS
|
|
2018-02-28
|
-
|
Site Investigation
|
|
|
|
2018-02-28
|
-
|
Site Investigation
|
|
|
|
2018-02-28
|
-
|
Site Investigation
|
|
|
|
2018-02-28
|
-
|
Site Investigation
|
|
|
|
2018-02-28
|
-
|
Site Investigation
|
|
|
|
2018-02-28
|
-
|
Site Investigation
|
|
|
|
2018-02-28
|
-
|
Site Investigation
|
|
|
|
2018-02-28
|
-
|
Site Investigation
|
|
|
|
2018-01-26
|
99
|
Miscellaneous
|
|
RESPONDED VIA EMAIL TO VOICEMAIL FROM CONSULTANT (1/26/18) REGARDING EMAIL FROM 11/22/17
|
|
2018-01-05
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 7/1/2017 - 12/31/2017
|
|
2017-11-22
|
99
|
Miscellaneous
|
|
REC'D REQUEST RE: CLARIFICATION FOR CAPPING/FILLING OF WETLAND
|
|
2017-10-25
|
99
|
Miscellaneous
|
|
VPLE ROAR REVIEW RESPONSE LTR - CONNELL
|
|
2017-09-12
|
99
|
Miscellaneous
|
|
RCVD MEETING SUMMARY NOTES OF AUGUST 17, 2017; MEETING HELD BETWEEN WDNR AND BEAZER EAST, INC.
|
|
2017-09-12
|
99
|
Miscellaneous
|
|
RESPONSE TO EMAIL: RE: SI/RAP REVIEW REQUEST - CONNELL
|
|
2017-09-07
|
43
|
Site Activity Status Update Received
|
|
RCVD GROUNDWATER SAMPLING RESULTS FROM JUNE 2017
|
|
2017-09-06
|
35
|
Site Investigation Workplan (SIWP) Received (non-fee)
|
|
REC'D SUPPLEMENTAL SI WORK PLAN - BEAZER
|
|
2017-09-01
|
99
|
Miscellaneous
|
|
REC'D BEAZER RESPONSE TO ENFORCEMENT CONFERENCE SUMMARY LETTER
|
|
2017-08-29
|
99
|
Miscellaneous
|
|
SENT RESPONSE LETTER TO BEAZER RELATED TO THE 8/17/2017 MEETING
|
|
2017-08-17
|
99
|
Miscellaneous
|
|
DNR HELD TECHNICAL MEETING WITH BEAZER
|
|
2017-07-26
|
4
|
Enforcement Conference Held
|
|
MEETING HELD WITH BEAZER - SUMMARY LETTER DATED 08/14/17
|
|
2017-07-14
|
14
|
Notice of Violation (NOV) Issued
|
|
NOV LETTER TO BEAZER
|
|
2017-07-14
|
99
|
Miscellaneous
|
|
RESPONSE TO SUPPLEMENTAL INFOMATION FOR REVIEW OF REMEDIAL ACTION OPTIONS REPORT
|
|
2017-07-10
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 1/1/2017 - 6/30/2017
|
|
2017-06-12
|
-
|
Site Investigation
|
|
|
|
2017-06-12
|
-
|
Site Investigation
|
|
|
|
2017-06-12
|
-
|
Site Investigation
|
|
|
|
2017-06-12
|
-
|
Site Investigation
|
|
|
|
2017-06-12
|
-
|
Site Investigation
|
|
|
|
2017-06-12
|
-
|
Site Investigation
|
|
|
|
2017-06-09
|
-
|
Site Investigation
|
|
|
|
2017-05-08
|
43
|
Site Activity Status Update Received
|
|
RECVD SITE INVESTIGATION SAMPLE RESULTS NOTIFICATION
|
|
2017-04-24
|
99
|
Miscellaneous
|
|
RCVD BORING LOGS (B1 THROUGH B20) FROM JUNE 2010 PHASE II ESA
|
|
2017-04-21
|
99
|
Miscellaneous
|
|
REQUESTED BORING LOGS (B1 - B20) FROM JUNE 2010 PHASE II ESA
|
|
2017-04-21
|
99
|
Miscellaneous
|
|
RECVD FROM THE CITY OF OAK CREEK - PROPOSED FUTURE USE OF THE SITE
|
|
2017-04-20
|
99
|
Miscellaneous
|
|
REQUESTED A PROPOSED REDEVELOPMENT PLAN (FROM THE CITY OF OAK CREEK) FOR THE SITE
|
|
2017-03-31
|
43
|
Site Activity Status Update Received
|
|
RCVD RESPONSE TO DNR COMMENT LTR DATED 12/21/2016, REGARDING REVIEW OF REMEDIAL ACTION OPTION REPORT
|
|
2017-03-16
|
99
|
Miscellaneous
|
|
REQUESTED "1996 CORRECTIVE ACTION REPORT" BY RMT, REGARDING TAR IN THE CATCH BASINS & STORM SEWERS
|
|
2017-02-24
|
99
|
Miscellaneous
|
|
RCVD UPDATED DATA TABLES: WATER LEVEL (TABLE 3); WELL CONSTR. (TABLE 1) & TAR THICKNESS (TABLE B8)
|
|
2017-01-24
|
805
|
Historic Waste Site
|
|
ASH AND COAL
|
|
2017-01-12
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 7/1/2016 - 12/31/2016
|
|
2016-12-21
|
82
|
Remedial Action Options Report (RAOR) Not Approved
|
|
FINAL RAOR RESPONSE
|
|
2016-12-20
|
99
|
Miscellaneous
|
|
|
|
2016-11-28
|
43
|
Site Activity Status Update Received
|
|
REC'D SAMPLE RESULTS NOTIFICATION
|
|
2016-07-18
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 1/1/2016 - 6/30/2016
|
|
2016-07-01
|
99
|
Miscellaneous
|
|
CONDUCTED SITE INSPECTION OF THE AREA TO RECEIVE SOIL FOR STOCKPILE PRIOR TO BRINGING SOILS ON SITE
|
|
2016-07-01
|
99
|
Miscellaneous
|
|
IDENTIFIED SOME AREAS OF CONCERN ON THE SITE THAT NEEDED O BE ADDRESSED PRIOR TO SOIL STOCKPILING
|
|
2016-07-01
|
99
|
Miscellaneous
|
|
RCVD INFO - ACTIVITIES CONDUCTED TO ADDRESS IDENTIFIED AREAS OF CONCERN, PRIOR TO STOCKPILING.
|
|
2016-06-24
|
99
|
Miscellaneous
|
|
APPROVED PROPOSED SOIL BORROW SOURCE FOR STOCKPILING ON-SITE AND USE FOR FUTURE CAPPING - LTR SENT
|
|
2016-06-22
|
99
|
Miscellaneous
|
|
RCVD REQUEST FROM RP (MIKE KELLOGG - CONNELL LIMITED PARTNERSHIP) FOR EXPEDITED REVIEW
|
|
2016-06-21
|
43
|
Site Activity Status Update Received
|
|
RECVD UPDATED INFORMATION FOR PROPOSED REVISED STOCKPILE LOCATION
|
|
2016-06-20
|
99
|
Miscellaneous
|
|
REQUESTED ADD'L INFO TO COMPLETE THE REVIEW OF THE PROPOSED ALTERNATE STOCHPILE LOCATION
|
|
2016-06-17
|
99
|
Miscellaneous
|
|
RCVD REVISED EROSION CONTROL MAP
|
|
2016-06-17
|
99
|
Miscellaneous
|
|
RCVD PROPOSAL FOR ALTERNATE SOIL STOCKPILE LOCATION (ALT. LOCATION REQ. WAS FROM CITY OF OAK CREEK)
|
|
2016-06-08
|
99
|
Miscellaneous
|
|
REC'D ADDENDUM TO SOIL RESULTS AND SMP SUBMITTAL-RESULTS OF RETESTED ARSENIC SOIL SAMPLE
|
|
2016-06-08
|
99
|
Miscellaneous
|
|
REC'D REQ. TO USEPA TO DETERMINE IF BORROW SOILS MEET TSCA RULES FOR LIQ. LIMIT; PLASTICITY; P200
|
|
2016-06-08
|
99
|
Miscellaneous
|
|
USEPA APPROVED BORROW SOURCE SOIL - MATERIAL MEETS THE TSCA CRITERIA FOR CAPPING PCBS
|
|
2016-06-03
|
99
|
Miscellaneous
|
|
REC'D ADD'L INFO: SOIL SAMPLING RESULTS FOR USE AS CAPPING MATERIAL; AND SOIL MANAGEMENT PLAN
|
|
2016-05-17
|
99
|
Miscellaneous
|
|
CONDITIONAL APPROVAL - BORROW SOURCE/SOIL SAMPLING PLAN FOR STOCKPILING ON-SITE
|
|
2016-05-11
|
99
|
Miscellaneous
|
|
REC'D ADD'L INFO FOR BORROW SOURCE/SOIL SAMPLING PLAN TO BE STOCKPILED AND USED ON-SITE FOR CAPPING
|
|
2016-05-09
|
98
|
Technical Assistance Provided
|
|
|
|
2016-04-29
|
43
|
Site Activity Status Update Received
|
|
REC'D SAMPLE RESULTS NOTIFICATION
|
|
2016-04-29
|
97
|
Technical Assistance Request Received (fee)
|
|
FEE PAID UNDER VPLE #06-41-560068
|
|
2016-01-06
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 7/1/2015 - 12/31/2015
|
|
2015-10-01
|
99
|
Miscellaneous
|
|
DEPT. HELD MEETING WITH BEAZER & OTHERS; RE: REMEDIAL OPTIONS FOR THE SITE
|
|
2015-10-01
|
99
|
Miscellaneous
|
|
DNR WILL PREPARE WRITTEN RESPONSE TO RPS REGARDING RAP FOR THE SITE
|
|
2015-08-24
|
99
|
Miscellaneous
|
|
REC'D SUMMARY TABLE - SUBMERGED WELL SCREENS WITH THE WATER LEVELS AND GROUNDWATER ANALYTICAL DATA
|
|
2015-08-21
|
99
|
Miscellaneous
|
|
REQ'D ADD'L INFO. - EVALUATION OF MONITORING WELL NETWORK WITH REGARDS TO SUBMERGED WELL SCREENS
|
|
2015-08-19
|
99
|
Miscellaneous
|
|
REC'D SI PRT ADDENDUM RE: TABLE 3 GW ELEVATION
|
|
2015-08-12
|
82
|
Remedial Action Options Report (RAOR) Not Approved
|
|
PRELIMINARY RAOR RESPONSE
|
|
2015-07-02
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 1/1/2015 - 6/30/2015
|
|
2015-06-04
|
99
|
Miscellaneous
|
|
REC'D SI REPORT ADDENDUM FOR OFFSITE PROPERTY (THE CITY OF OAK CREEK UTILITY CORRIDOR LOT 1)
|
|
2015-05-08
|
99
|
Miscellaneous
|
|
REC'D EMAIL - COPY OF LETTER SENT TO USEPA REQUESTING TSCA COORDINATED APPROVAL
|
|
2015-04-10
|
99
|
Miscellaneous
|
|
SENT EMAIL TO CONSULTANT - ROAR WILL BE REVIEWED WHEN OFF-SITE INVESTIGATION IS COMPLETED
|
|
2015-04-03
|
99
|
Miscellaneous
|
|
UPDATED OCP PCB NOTICE #1, NOTIFICATION OF A PCB CONTAMINATION SITE SENT TO EPA (SEE EMAIL 4/3/15)
|
|
2015-04-03
|
99
|
Miscellaneous
|
|
EPA CONCURS THAT SITE MAY BE CLASSIFIED AS TYPE C (SEE EMAIL FROM PETER RAMANAUSKAS DATED 4/3/15)
|
|
2015-04-03
|
99
|
Miscellaneous
|
|
WDNR CONCURS THAT SITE MAY BE CLASSIFIED AS TYPE C SITE (SEE EMAIL FROM WDNR TO NRT DATED 4/3/15)
|
|
2015-03-23
|
99
|
Miscellaneous
|
|
REC'D SOIL SAMPLE RESULTS
|
|
2015-02-19
|
99
|
Miscellaneous
|
|
REC'D GW SAMPLE RESULTS
|
|
2015-02-10
|
99
|
Miscellaneous
|
|
REC'D SOIL SAMPLING RESULTS
|
|
2015-02-05
|
99
|
Miscellaneous
|
|
WAITING FOR ADD'L INFO
|
|
2015-01-05
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 7/1/2014 - 12/31/2014
|
|
2015-01-02
|
39
|
Remedial Action Options Report (RAOR) Received (non-fee)
|
|
REC'D REMEDIAL ACTION OPTIONS REPT
|
|
2014-10-30
|
35
|
Site Investigation Workplan (SIWP) Received (non-fee)
|
|
|
|
2014-09-22
|
38
|
Site Investigation Report (SIR) Approved
|
|
LTR SENT-APPROVED SI ON-SITE (METALS & PCBS) ; REQUSTED ADD'L SI OFF-SITE
|
|
2014-08-09
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 1/1/2014 - 6/30/2014
|
|
2014-07-22
|
99
|
Miscellaneous
|
|
REC'D ADD'L INFO (SEE MAIL DATED 7/22/14)
|
|
2014-07-03
|
99
|
Miscellaneous
|
|
DEPT. PROVIDED INPUT DURING TECHNICAL MEETING
|
|
2014-06-11
|
99
|
Miscellaneous
|
|
REQUESTED ADD'L INFO; DEPT SENT EMAIL (6/11/14)REQUESTING FACE TO FACE TECHNICAL MEETING.
|
|
2014-06-10
|
99
|
Miscellaneous
|
|
RECV'D REVISED TABLES FOR AREAS OF CONCERN
|
|
2014-05-05
|
99
|
Miscellaneous
|
|
REC'D ADD'L FIGURES FRO AREAS OF CONCERN
|
|
2014-04-24
|
99
|
Miscellaneous
|
|
APPROVED SAMPLE MAP OF THE ONE AOC AND REQ'D MAPS FOR ADD'L AOCS (SEE EMAIL OF 4/24/14)
|
|
2014-04-17
|
99
|
Miscellaneous
|
|
REC'D SAMPLE MAP OF ONE OF THE AREAS OF CONCERN (AOC) FOR REVIEW AND INPUT
|
|
2014-03-28
|
140
|
Site Investigation Report (SIR) Not Approved
|
|
REQ'D ADD'L INFO - LETTER SENT
|
|
2014-02-18
|
99
|
Miscellaneous
|
|
REC'D COPY OF CLEANUP REPORT-BUILDING CONCRETE WALLS, PITS AND TSCA LEVEL CONCRETE
|
|
2014-01-28
|
99
|
Miscellaneous
|
|
REC'D REVISED FIGURES C4 AMD C8 AND THE CDS
|
|
2014-01-14
|
37
|
Site Investigation Report (SIR) Received (non-fee)
|
|
REC'D COMBINED SI REPORT FOR THE FRM KOOPERS TAR PLANT AND WABASH ALLOYS SITE
|
|
2014-01-14
|
99
|
Miscellaneous
|
|
RCVD DEPOT ROAD PCBS AND METALS INCLUDED IN SIR FROM JANUARY 14, 2014
|
|
2013-07-19
|
99
|
Miscellaneous
|
|
LTR SENT-APPROVED REQUEST TO BRING FILL SOILS ONTO THE PROPERTY
|
|
2013-07-09
|
99
|
Miscellaneous
|
|
REC'D ADD'L INFO
|
|
2013-06-26
|
99
|
Miscellaneous
|
|
REQ'D ADD'L INFO FOR THE EMERALD PARK FILL SOIL TO BE BROUGHT ONTO THE WABASH ALLOYS SITE
|
|
2013-06-24
|
99
|
Miscellaneous
|
|
REC'D SUBMITTAL TO BRING FILL SOILS FROM EMERALD LF SOIL BORROW SOURCE ONTO WABASH ALLOYS SITE
|
|
2013-06-07
|
99
|
Miscellaneous
|
|
REC'D NOTIFICATION TO BRING FILL FROM SOUTHRIDGE - WALMART SITE ONTO FORMER WABASH ALLOYS SITE
|
|
2013-06-07
|
99
|
Miscellaneous
|
|
REQ'D ADD'L INFO (SEE EMAIL DATED 6/7/13)
|
|
2013-05-16
|
99
|
Miscellaneous
|
|
CONCURRED WITH NARRATIVE OF SUBMITTAL (SEE EMAIL DATED 5/16/13)
|
|
2013-05-15
|
99
|
Miscellaneous
|
|
REC'D SUBMITTAL FOR TECH ASSISTANCE MEETING HELD 5/7/13 (SEE EMAIL DATED 5/16/13)
|
|
2013-05-02
|
43
|
Site Activity Status Update Received
|
|
REC'D STATUS UPDATE OF SI WORKPLAN SUBMITTED TO THE DNR ON 12/10/12; REVISED DATE 1/31/13
|
|
2013-05-02
|
99
|
Miscellaneous
|
|
REC'D CD - SELF IMPLEMENTING PROCEDURE; BLDG CONCRETE WALLS, PITS AND TSCA LEVEL CONCRETE PLAN
|
|
2013-04-29
|
99
|
Miscellaneous
|
|
OCP PCB NOTICE #1, NOTIFICATION OF A PCB CONTAMINATION SITE SENT TO EPA
|
|
2013-04-29
|
99
|
Miscellaneous
|
|
OCP PCB NOTICE 2 FORM - COVER PAGE FOR USE WHEN SENDING SIR, RAOR & RAOR RESPONSES TO EPA FOR REVIEW
|
|
2013-04-23
|
99
|
Miscellaneous
|
|
LTR SENT; REVIEWED PHASE I AND PHASE II ESAS
|
|
2013-04-10
|
99
|
Miscellaneous
|
|
REQUESTED MTG TO DISCUSS PHASE 1 ESA REVIEW BY VPLE COMMITTEE (SEE COMMITTEE NOTES DATED 4/10/13)
|
|
2013-03-13
|
28
|
Phase I Environmental Site Assessment (ESA) Rpt Received
|
|
REC'D PHASE I ESA UPDATE
|
|
2013-02-22
|
149
|
Remedial Action (RA) Design Report Approved
|
|
APPROVED BLDG DEMOLITION RAP (SEE EMAIL DATED 2-22-13)
|
|
2013-02-05
|
29
|
Phase II Environmental Site Assessment (ESA) Rpt Received
|
|
|
|
2013-01-31
|
43
|
Site Activity Status Update Received
|
|
REC'D REVISED SI WORKPLAN DISCUSSED DURING CONF CALL ON 1-30-13; (SEE EMAIL DATED DATED 1-31-13)
|
|
2013-01-30
|
99
|
Miscellaneous
|
|
CONFERENCE CALL WITH TETRA TECH (BEAZER); RE: REVISED SI WORKPLAN
|
|
2013-01-30
|
43
|
Site Activity Status Update Received
|
|
REC'D EMAIL DATED 1/30/13 - SOIL SAMPLING ACTIVITY PLAN BY NRT ALONG WITH BEAZER/TETRA TECH
|
|
2013-01-29
|
98
|
Technical Assistance Provided
|
|
SEE EMAIL FROM NRT DATED 1/29/13.
|
|
2013-01-25
|
36
|
Site Investigation Workplan (SIWP) Approved
|
|
CONDITIONAL APPROVAL, SEE FILE MEMO DATED 01/28/13.
|
|
2013-01-14
|
43
|
Site Activity Status Update Received
|
|
REC'D REVISION TO SI WORKPLAN DATED DEC. 7, 2012 (TARGHOST TECHNOLOGY WOULD NOT BE USED).
|
|
2012-12-14
|
97
|
Technical Assistance Request Received (fee)
|
|
REC'D CK# 028403 $500.00
|
|
2012-12-11
|
135
|
Site Investigation Workplan (SIWP) Received (fee)
|
|
REC'D CK# 1596796 $500.00 ADDENDUM
|
|
2012-10-18
|
97
|
Technical Assistance Request Received (fee)
|
|
REC'D CK #28242 $500.00
|
|
2012-10-18
|
98
|
Technical Assistance Provided
|
|
PROVIDED TECH ASSISTANCE MEETING ON 10/10/12
|
|
2012-10-04
|
147
|
Remedial Action (RA) Design Report Received (non-fee)
|
|
REC'D RAP FOR FACILITY DEMOLITION
|
|
2012-10-04
|
147
|
Remedial Action (RA) Design Report Received (non-fee)
|
|
REC'D RAP FOR PCBS AND METALS
|
|
2012-09-14
|
98
|
Technical Assistance Provided
|
|
SEE EMAIL DATED 9/14/12 SENT TO CONSULTANT
|
|
2012-07-17
|
97
|
Technical Assistance Request Received (fee)
|
|
REC'D CK #1304374 $500.00
|
|
2012-06-08
|
98
|
Technical Assistance Provided
|
|
SEE EMAIL DATED 6/8/12
|
|
2012-04-24
|
99
|
Miscellaneous
|
|
REC'D REVISED MAP
|
|
2012-04-17
|
97
|
Technical Assistance Request Received (fee)
|
|
REC'D CK# 1544942 $500.00
|
|
2011-11-16
|
99
|
Miscellaneous
|
|
LTR SENT REQUESTING MORE INFO ON VARIANCE WELL REQUEST
|
|
2011-11-16
|
36
|
Site Investigation Workplan (SIWP) Approved
|
|
CONDITIONAL APPROVAL-REQUESTED MORE INFO, LTR SENT
|
|
2011-09-27
|
99
|
Miscellaneous
|
|
REC'D NEW CONTACT INFO FOR PROPERTY
|
|
2011-09-26
|
35
|
Site Investigation Workplan (SIWP) Received (non-fee)
|
|
|
|
2011-09-14
|
30
|
Site Investigation Workplan (SIWP) Notice to Proceed (NTP)
|
|
CONDITIONAL APPROVAL - EMAIL SENT
|
|
2011-09-14
|
36
|
Site Investigation Workplan (SIWP) Approved
|
|
CONDITIONAL APPROVAL SEE EMAIL DATED 9-14-11
|
|
2011-09-09
|
35
|
Site Investigation Workplan (SIWP) Received (non-fee)
|
|
REC'D REVISED SI WORK PLAN VIA EMAIL
|
|
2011-09-07
|
130
|
DNR Regulatory Reminder Sent
|
|
Vapor Intrusion (VI) Assessment Notification Ltr Sent
|
|
2011-08-17
|
91
|
SER First In/First Out (FIFO) Review Process Complete
|
|
NEED ADD'L INF; SEE EMAIL DATED 08-17-11
|
|
2011-08-10
|
90
|
SER First In/First Out (FIFO) Review Process Started
|
|
REC'D ADD'L INF - SI REPT FOR WATER UTILITY CORRIDOR
|
|
2011-08-03
|
36
|
Site Investigation Workplan (SIWP) Approved
|
|
CONDITIONAL SI WORK PLAN APPROVAL-SEE LTR DATED 08-03-11
|
|
2011-07-29
|
135
|
Site Investigation Workplan (SIWP) Received (fee)
|
|
CK# 1465928 $500.00
|
|
2011-06-29
|
90
|
SER First In/First Out (FIFO) Review Process Started
|
|
RECV'D BY EMAIL - SUMMARY OF PROPOSED INVESTIGATION SAMPLING BY BEAZER
|
|
2011-06-09
|
28
|
Phase I Environmental Site Assessment (ESA) Rpt Received
|
|
REC'D COPY OF PHASE I ESA (CD)
|
|
2011-01-03
|
99
|
Miscellaneous
|
|
RECV'D PHASE II ESA WORK PLAN (PHASE II ESA RECV'D 9-23-10)
|
|
2011-01-03
|
99
|
Miscellaneous
|
|
RECV'D PHASE II ESA LABORATORY ANALYTICAL REPORT (APPENDIX A)
|
|
2010-11-09
|
91
|
SER First In/First Out (FIFO) Review Process Complete
|
|
LETTER SENT - RESPONSE TO BEAZER'S REVISED SI WORK PLAN
|
|
2010-11-03
|
90
|
SER First In/First Out (FIFO) Review Process Started
|
|
RECVD REVISED PHASE II SITE INVESTIGATION FROM CONNELL, LLC
|
|
2010-10-19
|
91
|
SER First In/First Out (FIFO) Review Process Complete
|
|
|
|
2010-09-23
|
29
|
Phase II Environmental Site Assessment (ESA) Rpt Received
|
|
RECV'D PHASE II SI REPORT FROM CONNELL LTD. PARTNERSHIP PREPARED BY RMT, INC.
|
|
2010-09-23
|
90
|
SER First In/First Out (FIFO) Review Process Started
|
|
RECVD PHASE II SI REPORT (BY EMAIL) CONDUCTED BY CONNELL, LLC.
|
|
2010-09-20
|
91
|
SER First In/First Out (FIFO) Review Process Complete
|
|
|
|
2010-09-20
|
81
|
Site Investigation Workplan (SIWP) Not Approved
|
|
|
|
2010-09-17
|
28
|
Phase I Environmental Site Assessment (ESA) Rpt Received
|
|
RECV'D PHASE I ESA (CD - R FORMAT) FROM THE CITY OF OAK CREEK
|
|
2010-08-02
|
35
|
Site Investigation Workplan (SIWP) Received (non-fee)
|
|
RECV'D REVISED SI WORKPLAN FROM BEAZER'S CONSULTANT (GEO TRANS, INC.)
|
|
2010-08-02
|
90
|
SER First In/First Out (FIFO) Review Process Started
|
|
RECVD SI WORKPLAN FROM BEAZER CONSULTANT (GEO TRANS INC.)
|
|
2010-06-28
|
99
|
Miscellaneous
|
|
LETTER FROM DEPT TO BEAZER 'S ATTY (MS. GERGENS) TO SUBMIT REVISED SI WORK PLAN BY AUGUST 2, 2010
|
|
2010-01-26
|
99
|
Miscellaneous
|
|
RECV'D EMAIL FROM CONSULTANT - BEAZER HAS INSTRUCTED HIM TO WAIT FOR OUR RESPONSE
|
|
2009-12-16
|
81
|
Site Investigation Workplan (SIWP) Not Approved
|
|
LETTER SENT
|
|
2009-07-08
|
99
|
Miscellaneous
|
|
RECVD LETTER FROM CONNELL INDICATING WILLINGNESS TO ENTER INTO ACCESS AGREMENT WITH BEAZER
|
|
2009-06-11
|
35
|
Site Investigation Workplan (SIWP) Received (non-fee)
|
|
RECV'D SI WORK PLAN FROM BEAZER'S CONSULTANT (GEO TRANS, INC.)
|
|
2009-05-23
|
99
|
Miscellaneous
|
|
RECVD LETTER FROM CONNELL INDICATING WILLINGNESS TO PARTICIPATE IN THE SITE INVESTIGATION
|
|
2009-05-21
|
99
|
Miscellaneous
|
|
ENFORCEMENT SUMMARY LETTER SENT TO CONNELL
|
|
2009-04-20
|
4
|
Enforcement Conference Held
|
|
LETTER SENT TO BEAZER EAST INC.; KOPPERS & CONNELL - SUMMARY LETTER DATED 05/12/09
|
|
2009-04-20
|
14
|
Notice of Violation (NOV) Issued
|
|
LETTER SENT TO BEAZER EAST; KOPPERS & CONNELL
|
|
2008-10-09
|
99
|
Miscellaneous
|
|
RECVD LETTER FROM WABASH INDICATING THEY ARE NOT RESPONSIBLE FOR THE CONTAMINATION
|
|
2008-09-18
|
99
|
Miscellaneous
|
|
RCVD LETTER FROM BEAZER EAST, INC - BEAZER INDICATES THEY ARE NOT RESPONSIBLE FOR THE CONTAMINATION
|
|
2008-09-04
|
99
|
Miscellaneous
|
|
SENT LETTER TO BEAZER; CONNELL - SUMMARY OF JULY 17, 2008 MEETING B/W WDNR AND BEAZER
|
|
2008-04-17
|
99
|
Miscellaneous
|
|
RCVD LETTER FROM KOPPERS INDICATING THEY ARE NOT RESPONSIBLE FOR THE CONTAMINATION
|
|
2008-04-07
|
2
|
Responsible Party (RP) letter sent
|
|
TICKLER RP LETTER TO BEAZER; CONNELL LLC; WABASH ALLOYS AND KOPPERS
|
|
1998-12-03
|
99
|
Miscellaneous
|
|
COPY OF ASPHALTIC PAVEMENT COVER CONSTRUTION REPORT REC'D FROM CONSULTANT ON 9/30/2011
|
|
1994-11-01
|
2
|
Responsible Party (RP) letter sent
|
|
|
|
1991-06-10
|
1
|
Notification of Hazardous Substance Discharge
|
|
|
|
1989-10-26
|
99
|
Miscellaneous
|
|
COPY OF WABASH ALLOYS FILL REMOVAL REPORT REC'D FROM CONSULTANT ON 9/30/2011
|
|
1989-07-17
|
99
|
Miscellaneous
|
|
COPY OF WASTE CHARACTERIZATION REPORT REC'D FROM CONSULTANT ON 09/30/2011
|
|
1980-08-14
|
99
|
Miscellaneous
|
|
COPY OF ORIGINAL REMEDIAL ACTION WORK PLAN REC'D FROM CONSULTANT ON 9/30/2011
|