Watershed - Little River (GB04)
Little River Watershed

Details

The Little River Watershed is located in northern Oconto and southern Marinette counties on the west shore of Green Bay. The watershed covers 228 square miles (215 in Oconto County, 13 in Marinette County). The Little River is a major tributary to the Oconto River. Agricultural activities comprise the principle land use in the watershed, with 47 percent of the land used as croplands. There are 268 barnyards in the watershed. The Little River Watershed has been designated as a priority watershed project under Wisconsin's Nonpoint Source Water Pollution Abatement Program. A plan for the control of nonpoint source pollution in this watershed was written by DNR and the Marinette and Oconto County Land Conservation Departments in 1986. As of January 1, 1990, 35 percent of the eligible landowners in the watershed implemented best management practices as a part of the cost-sharing program administered by DNR.

Date  1993

Ecological Landscapes for Little River Watershed

Ecological Landscapes

The Litte River Watershed is located primarily within the Northern Lake Michigan Coastal Ecological Landscape which is located in northeastern Wisconsin, and includes Green Bay and the northern part of the Door Peninsula. Its landforms consist of the Niagara escarpment, a prominent dolomite outcropping along the east side of Green Bay, a lacustrine plain along the west side of Green Bay, and ground moraine elsewhere. Low sand dunes and beach ridges that support Great Lakes endemics and many other rare species are found along the Great Lakes shoreline. The influence of Lake Michigan moderates extreme temperatures. Soils are very diverse; in some areas, lacustrine sands are found overlying clays or bedrock within only a few feet of the surface. In the Door Peninsula, soils are typically stony loamy sands to loams. Poorly drained sands are common in the lake plain or in depressions between dunes and beach ridges. On the western side of Green Bay, the ground moraine is composed mostly of moderately well drained, rocky sandy loams, interspersed with lacustrine sands and clays, and peat and muck also common. Historic vegetation included maple-basswood-beech forest, hemlock-hardwood forest, northern white cedar swamp, hardwood-conifer swamp, wet meadows, and coastal marshes. Conifer dominated upland forests that resemble the boreal forest were present along Lake Michigan; they contain a significant component of white spruce and balsam fir. Cliffs, sinkholes, and dolomite ledges are associated with the Niagara Escarpment. Current vegetation consists of more than 60% non-forested land, most of which is in agricultural crops, with smaller amounts of grassland, wetland, shrubland, and urbanized areas. Forested lands are dominated by maple-basswood, with smaller amounts of lowland hardwoods, aspen-birch, and lowland conifers. High quality areas of exposed alkaline bedrock beach occur on the northern Door Peninsula, providing habitat for many rare plants. Several islands lie off the Door Peninsula and these also provide critical habitat for rare species and colonially nesting birds.

Date  2010

Watershed Documents
Watershed Grants
Grant Details
Aquatic Invasives Control
Date
3/15/2021
Waters Involved
Kelly Lake
Status
Complete

Kelly Lake Advancement Assoc: Kelly Lake Ewm Herbicide Barrier Project 2021: The Kelly Lake Advancement Association is sponsoring a project on Kelly Lake for EWM Herbicide Barrier Project 2021.

Project final deliverables include: all data collected, agendas and minutes for planning meetings, and a final report that includes all data, results and outcomes from the project.

Specific project activities include: 1) Herbicide application for EWM control; 2) Herbicide barrier installation and removal; 3) Point Intercept surveys for whole lake and Post-treatment data collection; 4) Clean Boats Clean Waters Inspections.

Special Conditions: 1) All data shall be entered into the Departments SWIMS database; 2) All data collected with Department approved protocols; 3) Herbicide concentration monitoring and Pre and Post-Treatment surveys following Department protocols (https://www.uwsp.edu/cnr-ap/UWEXLakes/Documents/ecology/Aquatic%20Plants/Appendix-D.pdf)

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.

If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Aquatic Invasives Control
Date
3/15/2021
Waters Involved
Unnamed
Status
Complete

Kelly Lake Advancement Assoc: Kelly Lake Ewm Herbicide Barrier Project 2021: The Kelly Lake Advancement Association is sponsoring a project on Kelly Lake for EWM Herbicide Barrier Project 2021.

Project final deliverables include: all data collected, agendas and minutes for planning meetings, and a final report that includes all data, results and outcomes from the project.

Specific project activities include: 1) Herbicide application for EWM control; 2) Herbicide barrier installation and removal; 3) Point Intercept surveys for whole lake and Post-treatment data collection; 4) Clean Boats Clean Waters Inspections.

Special Conditions: 1) All data shall be entered into the Departments SWIMS database; 2) All data collected with Department approved protocols; 3) Herbicide concentration monitoring and Pre and Post-Treatment surveys following Department protocols (https://www.uwsp.edu/cnr-ap/UWEXLakes/Documents/ecology/Aquatic%20Plants/Appendix-D.pdf)

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.

If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Aquatic Invasives Early Detection and Response
Date
7/1/2012
Waters Involved
Kelly Lake
Status
Complete

Kelly Lake Advancement Assoc: Kelly Lake Ewm Response Project: Kelly Lake Advancement Association proposes to control Eurasian Watermilfoil in Kelly Lake by implementing control measures during the period 1012-2015. The project elements and deliverables are specified in the Kelly Lake Advancement Association\2019s Aquatic Invasive Species Control Grant application date November 28, 2012.
The project includes conducting a spring pre-treatment survey and a summer peak biomass post-treatment survey in 2013 and 2014 by a third-party consultant using the DNR Aquatic Plant Treatment Evaluation Protocol htpp:/www4.uwsp.edu/cnr/uwexlakes/ecology/APM/Appendix-D.pdf: controlling Eurasian Watermilfoil with aquatic herbicide treatments; and implementing an aquatic invasive species prevention and control strategy that includes attending the WI Lakes Convention, AIS surveillance and hand pulling. Annual progress reports and a final report summarizing the three-year project will be provided to DNR. Any publications produced as part of the project will incorporate the \201CStop Aquatic Hitchhikers!\201D brand (partnership details can be found at http://www.protectyourwaters.org).
If consultant is to provide the final report, it is recommended that the Grantee provide the DNR Aquatic Invasive Species Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR will be provided both paper and electronic .pdf copies of the final report along with, or prior to, submission of grantee\2019s final payment request. All information associated with this project is subject to public record.


Grant Details
Aquatic Invasives Early Detection and Response
Date
1/1/2014
Waters Involved
Kelly Lake
Status
Complete

Kelly Lake Advancement Assoc: Kelly Lake Ewm Response Ph. Ii: The Kelly Lake Advancement Association proposes to control Eurasian Watermilfoil in Kelly Lake by implementing control measures during the period 2014-2016. The project elements and deliverables are specified in the Kelly Lake Advancement Association\2019s Aquatic Invasive Species Emergency Response Grant application, dated January 31, 2014.

The project includes conducting Point Intercept surveys using the DNR Aquatic Plant Treatment Evaluation Protocol http://www4.uwsp.edu/cnr/uwexlakes/ecology/APM/Appendix-D.pdf , in addition to 3 late summer peak biomass surveys; controlling Eurasian Watermilfoil with aquatic herbicide treatments; and implementing an aquatic invasive species prevention and control strategy that includes soliciting the in-kind volunteer work that is identified in the grant application. Annual progress reports and a final report summarizing the 3-year project will be provided to DNR. Any publications produced as part of the project will incorporate the \201CStop Aquatic Hitchhikers!\201D\2122 brand (partnership details can be found at: http://www.protectyourwaters.org).

If consultant is to provide the final report, it is recommended that the Grantee provide the DNR Aquatic Invasive Species Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR will be provided both paper and electronic. pdf copies of the final report along with, or prior to, submission of grantee\2019s final payment request. All information associated with this project is subject to public record.


Grant Details
Aquatic Invasives Early Detection and Response
Date
1/1/2014
Waters Involved
Unnamed
Status
Complete

Kelly Lake Advancement Assoc: Kelly Lake Ewm Response Ph. Ii: The Kelly Lake Advancement Association proposes to control Eurasian Watermilfoil in Kelly Lake by implementing control measures during the period 2014-2016. The project elements and deliverables are specified in the Kelly Lake Advancement Association\2019s Aquatic Invasive Species Emergency Response Grant application, dated January 31, 2014.

The project includes conducting Point Intercept surveys using the DNR Aquatic Plant Treatment Evaluation Protocol http://www4.uwsp.edu/cnr/uwexlakes/ecology/APM/Appendix-D.pdf , in addition to 3 late summer peak biomass surveys; controlling Eurasian Watermilfoil with aquatic herbicide treatments; and implementing an aquatic invasive species prevention and control strategy that includes soliciting the in-kind volunteer work that is identified in the grant application. Annual progress reports and a final report summarizing the 3-year project will be provided to DNR. Any publications produced as part of the project will incorporate the \201CStop Aquatic Hitchhikers!\201D\2122 brand (partnership details can be found at: http://www.protectyourwaters.org).

If consultant is to provide the final report, it is recommended that the Grantee provide the DNR Aquatic Invasive Species Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR will be provided both paper and electronic. pdf copies of the final report along with, or prior to, submission of grantee\2019s final payment request. All information associated with this project is subject to public record.


Grant Details
Aquatic Invasives Early Detection and Response
Date
4/1/2021
Waters Involved
Unnamed
Status
Complete

Lumberjack Rc&D Council: Continued Reconnaissance Of Butterfly Dock In Gillett: The Lumberjack RC&D is sponsoring a project to comprehensively respond to population of butterfly dock, an NR40 prohibited species, in Oconto County.

Project final deliverables include: all data collected; a final report to include summary of control efforts and size of area treated, list of community education and outreach efforts, log of workshop participants, list of species included in restoration, and before and after photos of successfully restored streambank.

Specific project activities include: 1) Reconnaissance monitoring; 2) Reporting; 3) Control work; 4) Outreach to landowners and nearby landowners, businesses, and local clubs including one-on-one conversations and a formal workshop; 5) Creation of a restoration plan; 6) Implementation of restoration plan.

Special Conditions: 1) Data must be entered into SWIMS database; 2) Volunteer lists, equipment use lists and signatures shall be maintained for reporting in kind volunteer labor and equipment; 3) Final report should build off of the information and format of the Response Framework Report provided on 12/14/2020.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional AIS Coordinator.


Grant Details
Aquatic Invasives Education
Date
2/15/2016
Waters Involved
Kelly Lake
Status
Complete

Kelly Lake Advancement Assoc: Kelly Lake Management Planning Project: The Kelly Lake Advancement Association is sponsoring a project to develop a Comprehensive Lake Management Plan consistent with NR 198.43 for Kelly Lake in Oconto County.

Project final deliverables include: 1)Water Quality and Watershed Analysis, 2)Fishery Data Compilation and Integration, 3)Shoreline Course Woody Habitat Assessment, 4)Aquatic/ Current Aquatic Plant Community Assessment, 5)Aquatic Invasive Aquatic Plant Surveys, 6) Completion of a WDNR \2013Approved Stakeholder Survey, 7)Public Participation in the Planning Process, 8)Clean Boats Clean Waters

Specific project activities include:
1) Water quality using WisCALM comparisons http://dnr.wi.gov/topic/surfacewater/assessments.html
2) Watershed analysis completed primarily with WiLMS and predictive equations.
3) Fishery compilation and integration within management plan
4) Conduct Point Intercept survey consistent with DNR Protocol http://www.uwsp.edu/cnr-ap/UWEXLakes/Documents/ecology/Aquatic%20Plants/PI-Protocol-2010.pdf 30
5) Professional Zebra Mussel monitoring
6) Completion of WDNR-approved social survey using DNR protocol http://intranet.dnr.state.wi.us/int/es/science/socialmanual.htm
7) Clean Boat Clean Water Inspections with a minimum of 200 hours per boat landing
8) Shoreline and course Woody Habitat Assessment per DNR protocol.

Special Conditions:
1) CLMN efforts should not be duplicated and these data shall be included in the trends analysis and final reporting;
2) All data CBCW and CLMN shall be entered into the SWIMS database.


Grant Details
Aquatic Invasives Education
Date
2/15/2016
Waters Involved
Unnamed
Status
Complete

Kelly Lake Advancement Assoc: Kelly Lake Management Planning Project: The Kelly Lake Advancement Association is sponsoring a project to develop a Comprehensive Lake Management Plan consistent with NR 198.43 for Kelly Lake in Oconto County.

Project final deliverables include: 1)Water Quality and Watershed Analysis, 2)Fishery Data Compilation and Integration, 3)Shoreline Course Woody Habitat Assessment, 4)Aquatic/ Current Aquatic Plant Community Assessment, 5)Aquatic Invasive Aquatic Plant Surveys, 6) Completion of a WDNR \2013Approved Stakeholder Survey, 7)Public Participation in the Planning Process, 8)Clean Boats Clean Waters

Specific project activities include:
1) Water quality using WisCALM comparisons http://dnr.wi.gov/topic/surfacewater/assessments.html
2) Watershed analysis completed primarily with WiLMS and predictive equations.
3) Fishery compilation and integration within management plan
4) Conduct Point Intercept survey consistent with DNR Protocol http://www.uwsp.edu/cnr-ap/UWEXLakes/Documents/ecology/Aquatic%20Plants/PI-Protocol-2010.pdf 30
5) Professional Zebra Mussel monitoring
6) Completion of WDNR-approved social survey using DNR protocol http://intranet.dnr.state.wi.us/int/es/science/socialmanual.htm
7) Clean Boat Clean Water Inspections with a minimum of 200 hours per boat landing
8) Shoreline and course Woody Habitat Assessment per DNR protocol.

Special Conditions:
1) CLMN efforts should not be duplicated and these data shall be included in the trends analysis and final reporting;
2) All data CBCW and CLMN shall be entered into the SWIMS database.


Grant Details
Lake Protection Grant
Date
2/19/1996
Waters Involved
Bass Lake
Status
Complete

Marinette County: Res - Bass Lake Restoration Alum Treatment: Marinette County proposes to treat Bass Lake with alum to reduce the effects of sediment phosophorus in the lake. Project activities include treating all waters of Bass Lake in excess of 3 feet deep and conducting pre and post treatment water quality monitoring.

AMENDMENT #1: Marinette County proposes a "5 fold" increase the Alum dose in Bass Lake to provide long term control of P release from enriched sediments.


Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Bear Lake
Status
Complete

Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.


Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Binder Lake
Status
Complete

Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.


Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Birch Lake
Status
Complete

Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.


Grant Details
Lake Protection Grant
Date
4/15/2017
Waters Involved
Bonita Creek
Status
Complete

Chute Lake P & R District: Hlk - Chute Pond Healthy Lakes 2017: Partnering with property owners, Chute Lake Protection & Rehabilitation District #1 is sponsoring a grant to implement water quality and habitat best practices from Wisconsin\2019s Healthy Lakes Implementation Plan. Best practices, including fish sticks, 350 sq. ft. native plantings, diversions, rock infiltration, and/or rain gardens, will be designed and installed according to the Healthy Lakes fact sheets, technical guidance and grant application.

All funded best practices require contracts that must remain in place for 10 years and include the minimum operation and maintenance requirements described in grant condition #16 at the end of this agreement. If the landowner is the grant sponsor this Lake Protection Grant Agreement serves as the contract. If the best practice(s) will be implemented on land other than the sponsor\2019s, a Conservation Contract between the sponsor and landowner describing the 10-year contract period, minimum operation and maintenance details, and data to be collected is required.

The Department may perform site inspections and/or monitoring to ensure project success.

Deliverables include: Signed 10-year landowner Conservation Contract(s) with operation and maintenance requirements; data collected; pre and post project installation photographs; and summary of education activities and publicity/promotion of Healthy Lakes initiative, if applicable.

Special conditions: Project management and technical assistance costs cannot exceed 10% of the state share of the grant award; this does not include implementation labor. Water regulation and/or county zoning permits must be issued before construction, and all regulatory requirements apply. The Healthy Lakes logo should be used for promotion and publicity and DNR recognized as a funding source.

This scope summarizes the scope in the grant application and attachments and does not supersede those application tasks/deliverables.


Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Bullfrog Lake
Status
Complete

Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.


Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Caldron Falls Reservoir*
Status
Complete

Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.


Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Chain Lake
Status
Complete

Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.


Grant Details
Lake Protection Grant
Date
4/15/2017
Waters Involved
Chute Pond
Status
Complete

Chute Lake P & R District: Hlk - Chute Pond Healthy Lakes 2017: Partnering with property owners, Chute Lake Protection & Rehabilitation District #1 is sponsoring a grant to implement water quality and habitat best practices from Wisconsin\2019s Healthy Lakes Implementation Plan. Best practices, including fish sticks, 350 sq. ft. native plantings, diversions, rock infiltration, and/or rain gardens, will be designed and installed according to the Healthy Lakes fact sheets, technical guidance and grant application.

All funded best practices require contracts that must remain in place for 10 years and include the minimum operation and maintenance requirements described in grant condition #16 at the end of this agreement. If the landowner is the grant sponsor this Lake Protection Grant Agreement serves as the contract. If the best practice(s) will be implemented on land other than the sponsor\2019s, a Conservation Contract between the sponsor and landowner describing the 10-year contract period, minimum operation and maintenance details, and data to be collected is required.

The Department may perform site inspections and/or monitoring to ensure project success.

Deliverables include: Signed 10-year landowner Conservation Contract(s) with operation and maintenance requirements; data collected; pre and post project installation photographs; and summary of education activities and publicity/promotion of Healthy Lakes initiative, if applicable.

Special conditions: Project management and technical assistance costs cannot exceed 10% of the state share of the grant award; this does not include implementation labor. Water regulation and/or county zoning permits must be issued before construction, and all regulatory requirements apply. The Healthy Lakes logo should be used for promotion and publicity and DNR recognized as a funding source.

This scope summarizes the scope in the grant application and attachments and does not supersede those application tasks/deliverables.


Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Crab Lake
Status
Complete

Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.


Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Forbes Spring
Status
Complete

Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.


Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Hickey Springs
Status
Complete

Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.


Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Hidden Lake
Status
Complete

Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.


Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Lackawanna Lake
Status
Complete

Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.


Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Lake John
Status
Complete

Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.


Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Lincoln Lake
Status
Complete

Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.


Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Little Bear Lake
Status
Complete

Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.


Grant Details
Lake Protection Grant
Date
4/15/2017
Waters Involved
Little Pickerel Lake
Status
Complete

Pickerel Chain Lakes Association: Lmi - Little Pickerel Aeration Implementation Project: The Pickerel Chain Association proposes to install an aerator in Little Pickerel Lake. The project elements and deliverables are specified in the Pickerel Lake\2019s Protection Grant application, dated February 1, 2017.

This grant will fund the installation of an aeration system in Little Pickerel Lake. The aeration system will be installed in 2017 using PCLA members and assisted by the Oconto County WDNR fisheries staff for placing the airline and diffusers. Providing electric power and completing the on-shore preparation work to house the system compressors will occur in late summer/fall. Placement of the system airlines and diffusers into the lake will occur in the fall of 2017. Signing at all public access points to all three lakes of the chain will be placed prior to the ground freezing and the lake forming an ice cover. Open water safety fencing will be installed using the same type fencing system used on Pickerel Lake and will be placed by PCLA members once safe ice for foot travel is present.

If consultant is to provide the final report, it is recommended that the Grantee provide the DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR will be provided both paper and electronic .pdf copies of the final report along with, or prior to, submission of grantee\2019s final payment request. All information associated with this project is subject to public record.


Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Long Lake
Status
Complete

Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.


Grant Details
Lake Protection Grant
Date
4/1/1996
Waters Involved
McCaslin Lake
Status
Complete

Mccaslin Lake District: Acq-Mccaslin Lake Land Acquisition-Hansen (Parcel A) Property: The Mc Caslin Lake Rehabilitation District will acquire 25.88 acres of lowland, including water frontage and wetlands, on Mc Caslin Lake for lake protection purposes. Long term management goals for this property include preserving it as a quiet natural conservancy area used for passive outdoor recreation and enjoyment. No major development plans are included.


Grant Details
Lake Protection Grant
Date
2/1/1998
Waters Involved
McCaslin Lake
Status
Complete

Mccaslin Lake District: Acq-Mccaslin Lake District Hansen Ii Acq.: The McCaslin Lake District will acquire an additional 38.50 acres of land near McCaslin Lake for conservancy purposes.


Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Miriam Lake
Status
Complete

Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.


Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Moody Lake
Status
Complete

Moody Lake Area Association: Lmi-Moody Lake Aeration Project: Based on an LPL grant awarded to Moody Lake Area Assn, aeration design, cost and installation was analysed and approved by the department. This project will provide aeration of the lake to increase oxygen during times when levels become critically low.


Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Munger Lake
Status
Complete

Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.


Grant Details
Lake Protection Grant
Date
4/15/2017
Waters Involved
North Branch Oconto River
Status
Complete

Chute Lake P & R District: Hlk - Chute Pond Healthy Lakes 2017: Partnering with property owners, Chute Lake Protection & Rehabilitation District #1 is sponsoring a grant to implement water quality and habitat best practices from Wisconsin\2019s Healthy Lakes Implementation Plan. Best practices, including fish sticks, 350 sq. ft. native plantings, diversions, rock infiltration, and/or rain gardens, will be designed and installed according to the Healthy Lakes fact sheets, technical guidance and grant application.

All funded best practices require contracts that must remain in place for 10 years and include the minimum operation and maintenance requirements described in grant condition #16 at the end of this agreement. If the landowner is the grant sponsor this Lake Protection Grant Agreement serves as the contract. If the best practice(s) will be implemented on land other than the sponsor\2019s, a Conservation Contract between the sponsor and landowner describing the 10-year contract period, minimum operation and maintenance details, and data to be collected is required.

The Department may perform site inspections and/or monitoring to ensure project success.

Deliverables include: Signed 10-year landowner Conservation Contract(s) with operation and maintenance requirements; data collected; pre and post project installation photographs; and summary of education activities and publicity/promotion of Healthy Lakes initiative, if applicable.

Special conditions: Project management and technical assistance costs cannot exceed 10% of the state share of the grant award; this does not include implementation labor. Water regulation and/or county zoning permits must be issued before construction, and all regulatory requirements apply. The Healthy Lakes logo should be used for promotion and publicity and DNR recognized as a funding source.

This scope summarizes the scope in the grant application and attachments and does not supersede those application tasks/deliverables.


Grant Details
Lake Protection Grant
Date
4/15/2017
Waters Involved
Pickerel Creek
Status
Complete

Pickerel Chain Lakes Association: Lmi - Little Pickerel Aeration Implementation Project: The Pickerel Chain Association proposes to install an aerator in Little Pickerel Lake. The project elements and deliverables are specified in the Pickerel Lake\2019s Protection Grant application, dated February 1, 2017.

This grant will fund the installation of an aeration system in Little Pickerel Lake. The aeration system will be installed in 2017 using PCLA members and assisted by the Oconto County WDNR fisheries staff for placing the airline and diffusers. Providing electric power and completing the on-shore preparation work to house the system compressors will occur in late summer/fall. Placement of the system airlines and diffusers into the lake will occur in the fall of 2017. Signing at all public access points to all three lakes of the chain will be placed prior to the ground freezing and the lake forming an ice cover. Open water safety fencing will be installed using the same type fencing system used on Pickerel Lake and will be placed by PCLA members once safe ice for foot travel is present.

If consultant is to provide the final report, it is recommended that the Grantee provide the DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR will be provided both paper and electronic .pdf copies of the final report along with, or prior to, submission of grantee\2019s final payment request. All information associated with this project is subject to public record.


Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Pine Ridge Lake
Status
Complete

Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.


Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Sellin Lake
Status
Complete

Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.


Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Sullivan Springs
Status
Complete

Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.


Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Un Spring
Status
Complete

Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.


Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Un Spring - Fish Hatchery
Status
Complete

Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.


Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Un Spring -Fish Hatchery
Status
Complete

Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.


Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Unnamed
Status
Complete

Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.


Grant Details
Lake Protection Grant
Date
4/15/2017
Waters Involved
Unnamed
Status
Complete

Chute Lake P & R District: Hlk - Chute Pond Healthy Lakes 2017: Partnering with property owners, Chute Lake Protection & Rehabilitation District #1 is sponsoring a grant to implement water quality and habitat best practices from Wisconsin\2019s Healthy Lakes Implementation Plan. Best practices, including fish sticks, 350 sq. ft. native plantings, diversions, rock infiltration, and/or rain gardens, will be designed and installed according to the Healthy Lakes fact sheets, technical guidance and grant application.

All funded best practices require contracts that must remain in place for 10 years and include the minimum operation and maintenance requirements described in grant condition #16 at the end of this agreement. If the landowner is the grant sponsor this Lake Protection Grant Agreement serves as the contract. If the best practice(s) will be implemented on land other than the sponsor\2019s, a Conservation Contract between the sponsor and landowner describing the 10-year contract period, minimum operation and maintenance details, and data to be collected is required.

The Department may perform site inspections and/or monitoring to ensure project success.

Deliverables include: Signed 10-year landowner Conservation Contract(s) with operation and maintenance requirements; data collected; pre and post project installation photographs; and summary of education activities and publicity/promotion of Healthy Lakes initiative, if applicable.

Special conditions: Project management and technical assistance costs cannot exceed 10% of the state share of the grant award; this does not include implementation labor. Water regulation and/or county zoning permits must be issued before construction, and all regulatory requirements apply. The Healthy Lakes logo should be used for promotion and publicity and DNR recognized as a funding source.

This scope summarizes the scope in the grant application and attachments and does not supersede those application tasks/deliverables.


Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Waubee Lake
Status
Complete

Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.


Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Wheeler Lake
Status
Complete

Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.


Grant Details
Large Scale Lake Planning
Date
3/15/2021
Waters Involved
Boulder Lake
Status
Complete

Oconto County: Clg - Oconto County Lake Study And Planning, Phase 1, Grant 15: The Oconto County Land and Conservation Department is sponsoring a multi-phased project to develop a County Wide Lake Study and Planning Project for all lakes in Oconto County with public access. This grant includes water quality sample collection and interpretation on Group 6 lakes (Boulder, Round, Long, Pickerel, Halfmoon, Chain).

Project final deliverables include: Water quality sampling, lab analysis, modeling, and reporting for each lake. Updated the bathymetry on each lake. Mini reports created for each lake containing: sections summarizing water quality by season and parameter with brief interpretations and graphs, and updated bathymetry maps. Summary report comparing the individual lakes water quality results with all other lakes in project.

Specific project activities include: 1) Water sampling, lab analysis, and reporting (CLMN when possible); 2) Bathymetry

Special Conditions: 1) CLMN efforts should not be duplicated and these data shall be included in the trends and analysis and final reporting; 2) All CLMN shall be entered into the SWIMS database

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.

If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
3/15/2021
Waters Involved
Boulder Lake
Status
Complete

Oconto County: Clg - Oconto County Lake Study And Planning, Phase 1, Grant 16: Oconto County LCD is sponsoring a phased County Wide Lake Study and Planning Project for all lakes in Oconto County with public access. This grant includes shoreland inventories, aquatic plant surveys, and capacity assessment/building for Group 6 Lakes.

Deliverables: Shoreland inventory and aquatic plant point intercept survey spatial data summarized in tables, graphs, and maps. Mini reports for each lake containing: key maps and graphs with interpretations of shoreland inventory and aquatic plant point intercept survey data. Summary report of all lakes in project comparing: feet shoreland needing restoration; number of structures; sites with erosion; AIS; rake fullness; dominant or unique species; FQI; species lists; etc. Capacity assessment of groups and lake front property owners to identify needs for capacity development through Meet Your Scientist/Capacity Building Meetings. Summary of information shared and important considerations/issue generated at Meet Your Scientist/Capacity Building Meetings.

Activities: 1) Shoreland Inventories; 2) Aquatic Plant Point Intercept Surveys; 3) Meet Your Scientist/Capacity Building Meetings; 4) Project Coordination of field activities and partners.

Special Conditions: Shoreland and Aquatic Plant survey efforts should not be duplicated and this data shall be included in final reporting.

The scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.

If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
3/15/2021
Waters Involved
Chain Lake
Status
Complete

Oconto County: Clg - Oconto County Lake Study And Planning, Phase 1, Grant 15: The Oconto County Land and Conservation Department is sponsoring a multi-phased project to develop a County Wide Lake Study and Planning Project for all lakes in Oconto County with public access. This grant includes water quality sample collection and interpretation on Group 6 lakes (Boulder, Round, Long, Pickerel, Halfmoon, Chain).

Project final deliverables include: Water quality sampling, lab analysis, modeling, and reporting for each lake. Updated the bathymetry on each lake. Mini reports created for each lake containing: sections summarizing water quality by season and parameter with brief interpretations and graphs, and updated bathymetry maps. Summary report comparing the individual lakes water quality results with all other lakes in project.

Specific project activities include: 1) Water sampling, lab analysis, and reporting (CLMN when possible); 2) Bathymetry

Special Conditions: 1) CLMN efforts should not be duplicated and these data shall be included in the trends and analysis and final reporting; 2) All CLMN shall be entered into the SWIMS database

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.

If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
3/15/2021
Waters Involved
Chain Lake
Status
Complete

Oconto County: Clg - Oconto County Lake Study And Planning, Phase 1, Grant 16: Oconto County LCD is sponsoring a phased County Wide Lake Study and Planning Project for all lakes in Oconto County with public access. This grant includes shoreland inventories, aquatic plant surveys, and capacity assessment/building for Group 6 Lakes.

Deliverables: Shoreland inventory and aquatic plant point intercept survey spatial data summarized in tables, graphs, and maps. Mini reports for each lake containing: key maps and graphs with interpretations of shoreland inventory and aquatic plant point intercept survey data. Summary report of all lakes in project comparing: feet shoreland needing restoration; number of structures; sites with erosion; AIS; rake fullness; dominant or unique species; FQI; species lists; etc. Capacity assessment of groups and lake front property owners to identify needs for capacity development through Meet Your Scientist/Capacity Building Meetings. Summary of information shared and important considerations/issue generated at Meet Your Scientist/Capacity Building Meetings.

Activities: 1) Shoreland Inventories; 2) Aquatic Plant Point Intercept Surveys; 3) Meet Your Scientist/Capacity Building Meetings; 4) Project Coordination of field activities and partners.

Special Conditions: Shoreland and Aquatic Plant survey efforts should not be duplicated and this data shall be included in final reporting.

The scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.

If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
3/15/2021
Waters Involved
Halfmoon Lake
Status
Complete

Oconto County: Clg - Oconto County Lake Study And Planning, Phase 1, Grant 15: The Oconto County Land and Conservation Department is sponsoring a multi-phased project to develop a County Wide Lake Study and Planning Project for all lakes in Oconto County with public access. This grant includes water quality sample collection and interpretation on Group 6 lakes (Boulder, Round, Long, Pickerel, Halfmoon, Chain).

Project final deliverables include: Water quality sampling, lab analysis, modeling, and reporting for each lake. Updated the bathymetry on each lake. Mini reports created for each lake containing: sections summarizing water quality by season and parameter with brief interpretations and graphs, and updated bathymetry maps. Summary report comparing the individual lakes water quality results with all other lakes in project.

Specific project activities include: 1) Water sampling, lab analysis, and reporting (CLMN when possible); 2) Bathymetry

Special Conditions: 1) CLMN efforts should not be duplicated and these data shall be included in the trends and analysis and final reporting; 2) All CLMN shall be entered into the SWIMS database

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.

If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
3/15/2021
Waters Involved
Halfmoon Lake
Status
Complete

Oconto County: Clg - Oconto County Lake Study And Planning, Phase 1, Grant 16: Oconto County LCD is sponsoring a phased County Wide Lake Study and Planning Project for all lakes in Oconto County with public access. This grant includes shoreland inventories, aquatic plant surveys, and capacity assessment/building for Group 6 Lakes.

Deliverables: Shoreland inventory and aquatic plant point intercept survey spatial data summarized in tables, graphs, and maps. Mini reports for each lake containing: key maps and graphs with interpretations of shoreland inventory and aquatic plant point intercept survey data. Summary report of all lakes in project comparing: feet shoreland needing restoration; number of structures; sites with erosion; AIS; rake fullness; dominant or unique species; FQI; species lists; etc. Capacity assessment of groups and lake front property owners to identify needs for capacity development through Meet Your Scientist/Capacity Building Meetings. Summary of information shared and important considerations/issue generated at Meet Your Scientist/Capacity Building Meetings.

Activities: 1) Shoreland Inventories; 2) Aquatic Plant Point Intercept Surveys; 3) Meet Your Scientist/Capacity Building Meetings; 4) Project Coordination of field activities and partners.

Special Conditions: Shoreland and Aquatic Plant survey efforts should not be duplicated and this data shall be included in final reporting.

The scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.

If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
3/15/2021
Waters Involved
Long Lake
Status
Complete

Oconto County: Clg - Oconto County Lake Study And Planning, Phase 1, Grant 15: The Oconto County Land and Conservation Department is sponsoring a multi-phased project to develop a County Wide Lake Study and Planning Project for all lakes in Oconto County with public access. This grant includes water quality sample collection and interpretation on Group 6 lakes (Boulder, Round, Long, Pickerel, Halfmoon, Chain).

Project final deliverables include: Water quality sampling, lab analysis, modeling, and reporting for each lake. Updated the bathymetry on each lake. Mini reports created for each lake containing: sections summarizing water quality by season and parameter with brief interpretations and graphs, and updated bathymetry maps. Summary report comparing the individual lakes water quality results with all other lakes in project.

Specific project activities include: 1) Water sampling, lab analysis, and reporting (CLMN when possible); 2) Bathymetry

Special Conditions: 1) CLMN efforts should not be duplicated and these data shall be included in the trends and analysis and final reporting; 2) All CLMN shall be entered into the SWIMS database

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.

If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
3/15/2021
Waters Involved
Long Lake
Status
Complete

Oconto County: Clg - Oconto County Lake Study And Planning, Phase 1, Grant 16: Oconto County LCD is sponsoring a phased County Wide Lake Study and Planning Project for all lakes in Oconto County with public access. This grant includes shoreland inventories, aquatic plant surveys, and capacity assessment/building for Group 6 Lakes.

Deliverables: Shoreland inventory and aquatic plant point intercept survey spatial data summarized in tables, graphs, and maps. Mini reports for each lake containing: key maps and graphs with interpretations of shoreland inventory and aquatic plant point intercept survey data. Summary report of all lakes in project comparing: feet shoreland needing restoration; number of structures; sites with erosion; AIS; rake fullness; dominant or unique species; FQI; species lists; etc. Capacity assessment of groups and lake front property owners to identify needs for capacity development through Meet Your Scientist/Capacity Building Meetings. Summary of information shared and important considerations/issue generated at Meet Your Scientist/Capacity Building Meetings.

Activities: 1) Shoreland Inventories; 2) Aquatic Plant Point Intercept Surveys; 3) Meet Your Scientist/Capacity Building Meetings; 4) Project Coordination of field activities and partners.

Special Conditions: Shoreland and Aquatic Plant survey efforts should not be duplicated and this data shall be included in final reporting.

The scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.

If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
3/15/2021
Waters Involved
Pickerel Creek
Status
Complete

Oconto County: Clg - Oconto County Lake Study And Planning, Phase 1, Grant 15: The Oconto County Land and Conservation Department is sponsoring a multi-phased project to develop a County Wide Lake Study and Planning Project for all lakes in Oconto County with public access. This grant includes water quality sample collection and interpretation on Group 6 lakes (Boulder, Round, Long, Pickerel, Halfmoon, Chain).

Project final deliverables include: Water quality sampling, lab analysis, modeling, and reporting for each lake. Updated the bathymetry on each lake. Mini reports created for each lake containing: sections summarizing water quality by season and parameter with brief interpretations and graphs, and updated bathymetry maps. Summary report comparing the individual lakes water quality results with all other lakes in project.

Specific project activities include: 1) Water sampling, lab analysis, and reporting (CLMN when possible); 2) Bathymetry

Special Conditions: 1) CLMN efforts should not be duplicated and these data shall be included in the trends and analysis and final reporting; 2) All CLMN shall be entered into the SWIMS database

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.

If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
3/15/2021
Waters Involved
Pickerel Creek
Status
Complete

Oconto County: Clg - Oconto County Lake Study And Planning, Phase 1, Grant 16: Oconto County LCD is sponsoring a phased County Wide Lake Study and Planning Project for all lakes in Oconto County with public access. This grant includes shoreland inventories, aquatic plant surveys, and capacity assessment/building for Group 6 Lakes.

Deliverables: Shoreland inventory and aquatic plant point intercept survey spatial data summarized in tables, graphs, and maps. Mini reports for each lake containing: key maps and graphs with interpretations of shoreland inventory and aquatic plant point intercept survey data. Summary report of all lakes in project comparing: feet shoreland needing restoration; number of structures; sites with erosion; AIS; rake fullness; dominant or unique species; FQI; species lists; etc. Capacity assessment of groups and lake front property owners to identify needs for capacity development through Meet Your Scientist/Capacity Building Meetings. Summary of information shared and important considerations/issue generated at Meet Your Scientist/Capacity Building Meetings.

Activities: 1) Shoreland Inventories; 2) Aquatic Plant Point Intercept Surveys; 3) Meet Your Scientist/Capacity Building Meetings; 4) Project Coordination of field activities and partners.

Special Conditions: Shoreland and Aquatic Plant survey efforts should not be duplicated and this data shall be included in final reporting.

The scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.

If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
3/15/2021
Waters Involved
Pickerel Lake
Status
Complete

Oconto County: Clg - Oconto County Lake Study And Planning, Phase 1, Grant 15: The Oconto County Land and Conservation Department is sponsoring a multi-phased project to develop a County Wide Lake Study and Planning Project for all lakes in Oconto County with public access. This grant includes water quality sample collection and interpretation on Group 6 lakes (Boulder, Round, Long, Pickerel, Halfmoon, Chain).

Project final deliverables include: Water quality sampling, lab analysis, modeling, and reporting for each lake. Updated the bathymetry on each lake. Mini reports created for each lake containing: sections summarizing water quality by season and parameter with brief interpretations and graphs, and updated bathymetry maps. Summary report comparing the individual lakes water quality results with all other lakes in project.

Specific project activities include: 1) Water sampling, lab analysis, and reporting (CLMN when possible); 2) Bathymetry

Special Conditions: 1) CLMN efforts should not be duplicated and these data shall be included in the trends and analysis and final reporting; 2) All CLMN shall be entered into the SWIMS database

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.

If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
3/15/2021
Waters Involved
Pickerel Lake
Status
Complete

Oconto County: Clg - Oconto County Lake Study And Planning, Phase 1, Grant 16: Oconto County LCD is sponsoring a phased County Wide Lake Study and Planning Project for all lakes in Oconto County with public access. This grant includes shoreland inventories, aquatic plant surveys, and capacity assessment/building for Group 6 Lakes.

Deliverables: Shoreland inventory and aquatic plant point intercept survey spatial data summarized in tables, graphs, and maps. Mini reports for each lake containing: key maps and graphs with interpretations of shoreland inventory and aquatic plant point intercept survey data. Summary report of all lakes in project comparing: feet shoreland needing restoration; number of structures; sites with erosion; AIS; rake fullness; dominant or unique species; FQI; species lists; etc. Capacity assessment of groups and lake front property owners to identify needs for capacity development through Meet Your Scientist/Capacity Building Meetings. Summary of information shared and important considerations/issue generated at Meet Your Scientist/Capacity Building Meetings.

Activities: 1) Shoreland Inventories; 2) Aquatic Plant Point Intercept Surveys; 3) Meet Your Scientist/Capacity Building Meetings; 4) Project Coordination of field activities and partners.

Special Conditions: Shoreland and Aquatic Plant survey efforts should not be duplicated and this data shall be included in final reporting.

The scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.

If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
3/15/2021
Waters Involved
Round Lake
Status
Complete

Oconto County: Clg - Oconto County Lake Study And Planning, Phase 1, Grant 15: The Oconto County Land and Conservation Department is sponsoring a multi-phased project to develop a County Wide Lake Study and Planning Project for all lakes in Oconto County with public access. This grant includes water quality sample collection and interpretation on Group 6 lakes (Boulder, Round, Long, Pickerel, Halfmoon, Chain).

Project final deliverables include: Water quality sampling, lab analysis, modeling, and reporting for each lake. Updated the bathymetry on each lake. Mini reports created for each lake containing: sections summarizing water quality by season and parameter with brief interpretations and graphs, and updated bathymetry maps. Summary report comparing the individual lakes water quality results with all other lakes in project.

Specific project activities include: 1) Water sampling, lab analysis, and reporting (CLMN when possible); 2) Bathymetry

Special Conditions: 1) CLMN efforts should not be duplicated and these data shall be included in the trends and analysis and final reporting; 2) All CLMN shall be entered into the SWIMS database

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.

If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
3/15/2021
Waters Involved
Round Lake
Status
Complete

Oconto County: Clg - Oconto County Lake Study And Planning, Phase 1, Grant 16: Oconto County LCD is sponsoring a phased County Wide Lake Study and Planning Project for all lakes in Oconto County with public access. This grant includes shoreland inventories, aquatic plant surveys, and capacity assessment/building for Group 6 Lakes.

Deliverables: Shoreland inventory and aquatic plant point intercept survey spatial data summarized in tables, graphs, and maps. Mini reports for each lake containing: key maps and graphs with interpretations of shoreland inventory and aquatic plant point intercept survey data. Summary report of all lakes in project comparing: feet shoreland needing restoration; number of structures; sites with erosion; AIS; rake fullness; dominant or unique species; FQI; species lists; etc. Capacity assessment of groups and lake front property owners to identify needs for capacity development through Meet Your Scientist/Capacity Building Meetings. Summary of information shared and important considerations/issue generated at Meet Your Scientist/Capacity Building Meetings.

Activities: 1) Shoreland Inventories; 2) Aquatic Plant Point Intercept Surveys; 3) Meet Your Scientist/Capacity Building Meetings; 4) Project Coordination of field activities and partners.

Special Conditions: Shoreland and Aquatic Plant survey efforts should not be duplicated and this data shall be included in final reporting.

The scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.

If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
3/15/2021
Waters Involved
Unnamed
Status
Complete

Oconto County: Clg - Oconto County Lake Study And Planning, Phase 1, Grant 15: The Oconto County Land and Conservation Department is sponsoring a multi-phased project to develop a County Wide Lake Study and Planning Project for all lakes in Oconto County with public access. This grant includes water quality sample collection and interpretation on Group 6 lakes (Boulder, Round, Long, Pickerel, Halfmoon, Chain).

Project final deliverables include: Water quality sampling, lab analysis, modeling, and reporting for each lake. Updated the bathymetry on each lake. Mini reports created for each lake containing: sections summarizing water quality by season and parameter with brief interpretations and graphs, and updated bathymetry maps. Summary report comparing the individual lakes water quality results with all other lakes in project.

Specific project activities include: 1) Water sampling, lab analysis, and reporting (CLMN when possible); 2) Bathymetry

Special Conditions: 1) CLMN efforts should not be duplicated and these data shall be included in the trends and analysis and final reporting; 2) All CLMN shall be entered into the SWIMS database

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.

If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
3/15/2021
Waters Involved
Unnamed
Status
Complete

Oconto County: Clg - Oconto County Lake Study And Planning, Phase 1, Grant 16: Oconto County LCD is sponsoring a phased County Wide Lake Study and Planning Project for all lakes in Oconto County with public access. This grant includes shoreland inventories, aquatic plant surveys, and capacity assessment/building for Group 6 Lakes.

Deliverables: Shoreland inventory and aquatic plant point intercept survey spatial data summarized in tables, graphs, and maps. Mini reports for each lake containing: key maps and graphs with interpretations of shoreland inventory and aquatic plant point intercept survey data. Summary report of all lakes in project comparing: feet shoreland needing restoration; number of structures; sites with erosion; AIS; rake fullness; dominant or unique species; FQI; species lists; etc. Capacity assessment of groups and lake front property owners to identify needs for capacity development through Meet Your Scientist/Capacity Building Meetings. Summary of information shared and important considerations/issue generated at Meet Your Scientist/Capacity Building Meetings.

Activities: 1) Shoreland Inventories; 2) Aquatic Plant Point Intercept Surveys; 3) Meet Your Scientist/Capacity Building Meetings; 4) Project Coordination of field activities and partners.

Special Conditions: Shoreland and Aquatic Plant survey efforts should not be duplicated and this data shall be included in final reporting.

The scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.

If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Targeted Runoff - Rural Construction
Date
1/1/2004
Waters Involved
Unnamed
Status
Complete

Marinette County: Kamps Farm Manure Mgmt Proj: to costshare @70% BMPs installed on Kamps farm


Grant Details
Targeted Runoff - Rural Construction
Date
1/1/2005
Waters Involved
Unnamed
Status
Complete

Marinette County: Duralt Bros Farm: Construction and installation of best management practices (BMPs) on the Duralt brothers' farm to abate manure runoff and livestock management issues that directly discharge manure and associated pollutants into adjacent wetland and Thomas Slough Creek.


Monitoring & Projects

Projects including grants, restoration work and studies shown below have occurred in this watershed. Click the links below to read through the text. While these are not an exhaustive list of activities, they provide insight into the management activities happening in this watershed.

Grants and Management Projects
Little River Watershed
Watershed Recommendations
Best Management Practices, Implement
Marinette County Manure Management
Date
Status
This project is a landowner installation of nonpoint source best management practices to contribute to the restoration of Wisconsin's waters and was funded by the 319 grant. Specifically, the grantee will implement: a manure storage system; a barnyard runoff control system; and a waste transfer system.
1/1/2018
In Progress
Projects
 
Best Management Practices, Implement
Marinette County Manure Management
Date
Status
This project is a landowner installation of nonpoint source best management practices to contribute to the restoration of Wisconsin's waters and was funded by the 319 grant. Specifically, the grantee will implement: a manure storage system; a barnyard runoff control system; and roofing.
1/1/2018
In Progress
Projects
 
Best Management Practices, Implement
Marinette County Manure Storage
Date
Status
This project is a landowner installation of nonpoint source best management practices to contribute to the restoration of Wisconsin's waters and was funded by the 319 grant. Specifically, the grantee will implement: a manure storage system; a barnyard runoff control system; and roofing.
1/1/2018
In Progress
Projects
 
Best Management Practices, Implement
Marinette County Manure Management Project
Date
Status
This project is a landowner installation of nonpoint source best management practices to contribute to the restoration of Wisconsin's waters and was funded by the 319 grant. Specifically, the grantee will implement: a manure storage system, a milking center waste control system, and a feed storage runoff control system.
1/1/2016
In Progress
Projects
Documents
 
Best Management Practices, Implement
Marinette County Manure Management Project
Date
Status
This project is a landowner installation of nonpoint source best management practices to contribute to the restoration of Wisconsin's waters and was funded by the 319 grant. Specifically, the grantee will implement: a manure storage system and a feed storage runoff control system to address the following NR 151 Agricultural Performance Standards and Prohibitions: manure storage facilities-new/significant alterations, process wastewater handling, and remedy discharges of manure, sediment and phosphorus in runoff.
1/1/2016
In Progress
Projects
Documents
 
Best Management Practices, Implement
Oconto County Manure Storage Project
Date
Status
This project is a landowner installation of nonpoint source best management practices to contribute to the restoration of Wisconsin's waters and was funded by the 319 grant. Specifically, the grantee will implement: installation of manure management systems to enable the farm operation to meet the respective agricultural performance standards and prohibitions established in NR 151 relating to manure storage facilities-new/significant alterations, manure storage facilities-closure, and process wastewater handling.
1/1/2014
Cancelled
Projects
Documents
 
Monitor Water Quality or Sediment
Monitor Daly Creek for TP
Date
Status
4 days in July 2018 exceeded triggering impairment. Please review. "Temperature data was NOT collected for purposes of assessing against the temperature criteria. Unknown placement of logger and data may not reflect true thermal conditions. Recommend against listing. If listed, the category should be for 5C as this segment of river is subject to warming under natural conditions.
8/21/2019
Proposed
 
Little River WatershedWatershed History Note

The Village of Lena is located in the Little River Watershed in Marinette and Oconto Counties. Originally known as the Maple Valley settlement, Lena owes its location to the railroads. The first white settlers in this vicinity arrived in the late 1870s and consisted primarily of French-Canadian immigrants. As was common in other areas populated by French-Canadians during this era, most of the Maple Valley residents engaged in small-scale logging, concentrating their work and their homes along Jones Creek, a tributary of the Little River. By 1879 the community had become large enough to support a post office and, since the name "Maple Valley" had already been assigned to another Wisconsin post office, the recommendation of a new name fell to Oconto Postmaster George R. Hall. Hall submitted the first name of his future wife (Lena) to the federal postmaster, and the choice was approved. Lena was incorporated as a village in 1921.

Date  2011