Watershed - Lower Yellow (Juneau Co.) River (CW02)
Lower Yellow (Juneau Co.) River Watershed

Details

The Lower Yellow River Watershed is located in Juneau, Wood and Jackson counties. The watershed is approximately 167,075 acres in size with 65,343 acres of wetland. The watershed is dominated by wetlands and forests. This watershed was ranked using the Nonpoint Source Priority Watershed Selection Criteria. Based on surface and ground water data, the overall ranking is low. The majority of the watershed streams are ditched. Very little information about current use classification is available. A portion of the watershed lies within the Necedah National Wildlife Refuge. The refuge was established as a breeding ground for migratory birds and other wildlife. Historically the land in and around the refuge was once a vast open peat bog with scattered islands of savanna and woodland. Once settlers arrived, the land use surrounding the refuge drastically changed.

Date  2002

Ecological Landscapes for Lower Yellow (Juneau Co.) River Watershed

Ecological Landscapes

The Central Sand Plains Ecological Landscape, located in central Wisconsin, occurs on a flat, sandy lake plain, and supports agriculture, forestry, recreation, and wildlife management. The Ecological Landscape formed in and around what was once Glacial Lake Wisconsin, which contained glacial meltwater extending over 1.1 million acres at its highest stage. Soils are primarily sandy lake deposits, some with silt-loam loess caps. Sandstone buttes carved by rapid drainage of the glacial lake, or by wave action when they existed as islands in the lake, are distinctive features of this landscape. The historic vegetation of the area included extensive wetlands of many types, including open bogs, shrub swamps, and sedge meadows. Prairies, oak forests, savannas and barrens also occurred in the Ecological Landscape. An area of more mesic forest with white pine and hemlock was found in the northwest portion, including a significant pinery in eastern Jackson County. Today, nearly half of the Ecological Landscape is nonforested, in agriculture and grassland. Most of the historic wetlands were drained early in the 1900s and are now used for vegetable cropping. The forested portion is mostly oak-dominated forest, followed by aspen and pines. A minor portion is maple-basswood forest and lowland hardwoods.

Date  2010

Watershed Documents
Watershed Grants
Grant Details
Aquatic Invasives Education
Date
10/1/2006
Waters Involved
Petenwell Lake
Status
Complete

Adams County: Adams Ais Specialist: Adams County proposes to fund a full-time Aquatic Invasive Species Specialist position within its Land and Water Conservation Dept. for the purpose of providing educational and technical assistance to the public and lake organizations seeking to prevent and control AIS infestations in Adams County Lakes. Major project elements to include: 1) Establishment of Clean Boats, Clean Waters program on 22 lakes, 2) Establishment of AIS monitoring program for 22 lakes, 3) Providing assistance in implementation of AIS education and control elements of individual lake management plans.


Grant Details
Aquatic Invasives Education
Date
10/1/2006
Waters Involved
Wisconsin River
Status
Complete

Adams County: Adams Ais Specialist: Adams County proposes to fund a full-time Aquatic Invasive Species Specialist position within its Land and Water Conservation Dept. for the purpose of providing educational and technical assistance to the public and lake organizations seeking to prevent and control AIS infestations in Adams County Lakes. Major project elements to include: 1) Establishment of Clean Boats, Clean Waters program on 22 lakes, 2) Establishment of AIS monitoring program for 22 lakes, 3) Providing assistance in implementation of AIS education and control elements of individual lake management plans.


Grant Details
Clean Boats, Clean Waters
Date
4/1/2014
Waters Involved
Castle Rock Lake
Status
Complete

Golden Sands Rc&D: Pentenwell/Castle Rock Flowage 2014 Clean Boats Clean Waters Project: The Golden Sands RC&D Council is sponsoring a Clean Boats Clean Waters project for the Pentenwell/Castle Rock Flowage. The project includes a CBCW program at 2 public landings and is being done in cooperation with the flowage association.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2015
Waters Involved
Castle Rock Lake
Status
Complete

Golden Sands Rc&D: Golden Sands Rc&D Petenwell & Castle Rock Flowages: The Golden Sands RC&D is sponsoring a 2015 Clean Boats Clean Water project including 4 public landings on the Petenwell and Castle Rock Flowages.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2016
Waters Involved
Castle Rock Lake
Status
Complete

Golden Sands Rc&D: Golden Sands Rc&D Council, Inc. 2016 Clean Boats Clean Waters: The Golden Sands RC&D Council, Inc. is sponsoring a Clean Boats Clean Waters project in 2016 at two public boat landing on Petenwell and Castle Rock Flowages.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2015
Waters Involved
Petenwell Lake
Status
Complete

Golden Sands Rc&D: Golden Sands Rc&D Petenwell & Castle Rock Flowages: The Golden Sands RC&D is sponsoring a 2015 Clean Boats Clean Water project including 4 public landings on the Petenwell and Castle Rock Flowages.


Grant Details
Clean Boats, Clean Waters
Date
4/1/2014
Waters Involved
Wisconsin River
Status
Complete

Golden Sands Rc&D: Pentenwell/Castle Rock Flowage 2014 Clean Boats Clean Waters Project: The Golden Sands RC&D Council is sponsoring a Clean Boats Clean Waters project for the Pentenwell/Castle Rock Flowage. The project includes a CBCW program at 2 public landings and is being done in cooperation with the flowage association.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2015
Waters Involved
Wisconsin River
Status
Complete

Golden Sands Rc&D: Golden Sands Rc&D Petenwell & Castle Rock Flowages: The Golden Sands RC&D is sponsoring a 2015 Clean Boats Clean Water project including 4 public landings on the Petenwell and Castle Rock Flowages.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2016
Waters Involved
Wisconsin River
Status
Complete

Golden Sands Rc&D: Golden Sands Rc&D Council, Inc. 2016 Clean Boats Clean Waters: The Golden Sands RC&D Council, Inc. is sponsoring a Clean Boats Clean Waters project in 2016 at two public boat landing on Petenwell and Castle Rock Flowages.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Amey Pond
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Amey Pond
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Amey Pond
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Arkdale Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Arkdale Lake
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Arkdale Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2009
Waters Involved
Arkdale Lake
Status
Complete

Adams County: Lco-Adams Ordinance Imple. Assistance: The Adams County Land and Water Conservation Department proposes to facilitate revision of the county's Shoreland Protection Ordinance and to train a LWCD staff person to work with shoreland property owners to establish shoreland buffers and other practices necessary to comply with the new shoreland ordinance. Major project elements to include: 1) Staff training, 2) Outreach and counsulting to shoreland property owners, 3) Development of shoreline restoration plans and agreements, 4) Installation oversight, and 5) Update of the county's Riparian Buffer GIS layer to track practice installation.


Grant Details
Lake Protection Grant
Date
9/1/2006
Waters Involved
Big Roche A Cri Creek
Status
Complete

Adams County: Res-Castle Rock Restoration: Adams County proposes to provide up to 75% of the cost of shoreland restoration practices to lake front property owners on Castle Rock Lake. Grant funds will be distributed to fund removal of sea walls, minor bank re-shaping, placement of rip-rap, establishment of vegetative buffers and implementation of individual stormwater management plans.

Special Conditions: 1) Space between rip-rap to be filled with soil and vegetated to facilitate successful access of turtle hatchlings to water. Lupine seed to be of a wild variety compatible with Karner Blue butterflies. 2) Permits to be secured by individual property owners prior to construction.


Grant Details
Lake Protection Grant
Date
9/1/2007
Waters Involved
Big Roche A Cri Creek
Status
Complete

Adams County: Res-Big Roche-A-Cri Restoration 2: Adams County proposes to provide up to 75% of the cost of shoreland restoration practices to lake front property owners with highly erodable shorelines on Big Roche-a-Cri Lake. Grant funds will be distributed to the property owners to install shoreline protection, riparian buffers and stormwater management practices.


Grant Details
Lake Protection Grant
Date
9/1/2009
Waters Involved
Big Roche A Cri Creek
Status
Complete

Adams County: Lco-Adams Ordinance Imple. Assistance: The Adams County Land and Water Conservation Department proposes to facilitate revision of the county's Shoreland Protection Ordinance and to train a LWCD staff person to work with shoreland property owners to establish shoreland buffers and other practices necessary to comply with the new shoreland ordinance. Major project elements to include: 1) Staff training, 2) Outreach and counsulting to shoreland property owners, 3) Development of shoreline restoration plans and agreements, 4) Installation oversight, and 5) Update of the county's Riparian Buffer GIS layer to track practice installation.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Big Roche a Cri
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Big Roche a Cri
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Big Roche a Cri
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2007
Waters Involved
Big Roche a Cri
Status
Complete

Adams County: Res-Big Roche-A-Cri Restoration 2: Adams County proposes to provide up to 75% of the cost of shoreland restoration practices to lake front property owners with highly erodable shorelines on Big Roche-a-Cri Lake. Grant funds will be distributed to the property owners to install shoreline protection, riparian buffers and stormwater management practices.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Big Spring Pond
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Big Spring Pond
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Big Spring Pond
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2010
Waters Involved
Buena Vista Creek
Status
Complete

Wood County: Lco-Shoreland Ordinance Rev.: Wood County proposes to amend or create a shoreland zoning ordinance that complies with the requirements of NR 115, Wisconsin Administrative Code (as revised effective February 1, 2010) and retain existing regulations that exceed the water resource protections of NR 115 or are specific or unique to local needs.

Project deliverables include: 1. Copies of any fact sheets or handouts created for public hearings. 2. A summary of the comments received at public hearings. 3. A certified copy of the County Board-approved updated shoreland ordinance or ordinance language (if integrated into other codes). 4. Any GIS maps of the shoreland zone or shoreland condition surveys related to the project.

Specific conditions for this Project: The WDNR will be provided electronic and hard copies of all data and or reports or surveys generated as a result of this project.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Camelot Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Camelot Lake
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Camelot Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Camelot Lake
Status
Complete

Adams County: Res-Camelot Lake Restoration: Adams Co. proposes to establish four shoreline protection/restoration sites for demonstration purposes on Camelot Lake, and to cost share on similar practices on 27 privately owned parcels. Major project elements include: 1) riprap and anchored log shoreline stabalization, 2) establishment and maintenance of 35' vegetated buffer strips, 3) stormwater management planning and implementation for structures.


Grant Details
Lake Protection Grant
Date
3/15/2021
Waters Involved
Camelot Lake
Status
Complete

Adams County: 319 Match - Lmi - 14-Mile Watershed 9-Key Elements Plan Implementation: Goals: 1) Hire a LWCD staff person to work with property owners and partners in the 14-mile watershed 2) Work with 14-Mile watershed LWCD's to build partnerships with property owners and agriculture 3) Work to achieve a 35% reduction of phosphorus to meet 9-Key Element plan and Wisconsin River TMDL goals 4) Assist other county and state staff to build partnerships with the WPVGA, 14-Mile Creek Watershed Alliance, Tri-Lakes Management District and agricultural interests 5) Conduct 10 different site visits per year to implement BMP's 6) Create educational opportunities with landowners for BMP's, Soil Health and a producer led watershed group 7) Inventory 65 miles of ditches and streams for nutrient control options 8) Work with agencies to direct cost sharing funds to partners. Project deliverables: 1) Minimum of three year position for staff person 2) Assigned area is beyond county boundaries for travel and tasks 3) Annual reports on the goals in the application and scope 4) Track acreage and duration of BMP installations and reduction of nutrient loading 5) Track 9-Key Element Plan completed goals 6) Track educational meetings and speakers 7) Complete report with data, maps, BMP's and modelled/empirical reductions of nutrients 8) Attend 14-Mile Creek Watershed Alliance, Tri-Lakes Management District and other partner meetings. Specific conditions: 1) Complete summary of the project and recommend any improvements on forms provided 2) Participate in semi-annual or annual progress report meetings with DNR and County Conservationist, that include: a list of practices to reduce nonpoint source pollution installed since during the period for which you are seeking reimbursement. For each practice, include date installed, cost and estimated load reductions for N, P, and Sediment lb/yr; a 1-2 paragraph narrative description of project status, including project milestones, accomplishments, and roadblocks encountered.


Grant Details
Lake Protection Grant
Date
10/1/2013
Waters Involved
Castle Rock Ditch
Status
Complete

Adams County: Res-Adams Ord. Imp. 2: Adams County proposes to provide educational and technical assistance to the public and Adams County lake organizations for the installation of shoreline buffers on waterways so they comply with the Admas County Shorland, Wetland, and Habitat Protection Ordinance. Major project elements to include: a) outreach and education, b) review of plans, designs, and maintenance agreements, c) development of plans, designs, and agreements, d) inventory of public access points on all project waterways. Project will include notification of riparian property whose property is in conformance with the buffer standard and that the buffer must stay in compliance with the buffer standard. Signed maintenance agreements must be kept on record by Adams County.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Castle Rock Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Castle Rock Lake
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Castle Rock Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2006
Waters Involved
Castle Rock Lake
Status
Complete

Adams County: Res-Castle Rock Restoration: Adams County proposes to provide up to 75% of the cost of shoreland restoration practices to lake front property owners on Castle Rock Lake. Grant funds will be distributed to fund removal of sea walls, minor bank re-shaping, placement of rip-rap, establishment of vegetative buffers and implementation of individual stormwater management plans.

Special Conditions: 1) Space between rip-rap to be filled with soil and vegetated to facilitate successful access of turtle hatchlings to water. Lupine seed to be of a wild variety compatible with Karner Blue butterflies. 2) Permits to be secured by individual property owners prior to construction.


Grant Details
Lake Protection Grant
Date
10/1/2013
Waters Involved
Castle Rock Lake
Status
Complete

Adams County: Res-Adams Ord. Imp. 2: Adams County proposes to provide educational and technical assistance to the public and Adams County lake organizations for the installation of shoreline buffers on waterways so they comply with the Admas County Shorland, Wetland, and Habitat Protection Ordinance. Major project elements to include: a) outreach and education, b) review of plans, designs, and maintenance agreements, c) development of plans, designs, and agreements, d) inventory of public access points on all project waterways. Project will include notification of riparian property whose property is in conformance with the buffer standard and that the buffer must stay in compliance with the buffer standard. Signed maintenance agreements must be kept on record by Adams County.


Grant Details
Lake Protection Grant
Date
10/1/2013
Waters Involved
Castle Rock Lake
Status
Proposed

Adams County: Res-Adams Ord. Imp. 2: Adams County proposes to provide educational and technical assistance to the public and Adams County lake organizations for the installation of shoreline buffers on waterways so they comply with the Admas County Shorland, Wetland, and Habitat Protection Ordinance. Major project elements to include: a) outreach and education, b) review of plans, designs, and maintenance agreements, c) development of plans, designs, and agreements, d) inventory of public access points on all project waterways. Project will include notification of riparian property whose property is in conformance with the buffer standard and that the buffer must stay in compliance with the buffer standard. Signed maintenance agreements must be kept on record by Adams County.


Grant Details
Lake Protection Grant
Date
9/1/2006
Waters Involved
Chester Creek
Status
Complete

Adams County: Res-Petenwell Restoration: Adams County proposes to provide up to 75% of the cost of shoreland restoration practices to lake front property owners on the Petenwell Flowage. Grant funds will be distributed to fund removal of sea walls, minor bank re-shaping, placement of rip-rap, establishment of vegetative buffers and implementation if individual stormwater management plans.

Special Conditions: 1) Lupine seed to be wild for compatibility with Karner Blues. 2) Soil to be filled in between rip-rap to facilitate turtle hatchlings access to water. 3) Permits to be secured by individual property owners prior to construction.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Crooked Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Crooked Lake
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Crooked Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Deep Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Deep Lake
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Deep Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Dorro Couche Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Dorro Couche Lake
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Dorro Couche Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Easton Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Easton Lake
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Easton Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Fawn Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Fawn Lake
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Fawn Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Fenner Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Fenner Lake
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Fenner Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2006
Waters Involved
Fourteenmile Creek
Status
Complete

Adams County: Res-Petenwell Restoration: Adams County proposes to provide up to 75% of the cost of shoreland restoration practices to lake front property owners on the Petenwell Flowage. Grant funds will be distributed to fund removal of sea walls, minor bank re-shaping, placement of rip-rap, establishment of vegetative buffers and implementation if individual stormwater management plans.

Special Conditions: 1) Lupine seed to be wild for compatibility with Karner Blues. 2) Soil to be filled in between rip-rap to facilitate turtle hatchlings access to water. 3) Permits to be secured by individual property owners prior to construction.


Grant Details
Lake Protection Grant
Date
9/1/2010
Waters Involved
Fourteenmile Creek
Status
Complete

Adams County: Lco-Shoreland Ordinance Rev.: Adams County proposes to amend or create a shoreland zoning ordinance that complies with the requirements of NR 115, Wisconsin Administrative Code (as revised effective February 1, 2010) and retain existing regulations that exceed the water resource protections of NR 115 or are specific or unique to local needs.

Project deliverables include: 1. Copies of any fact sheets or handouts created for public hearings. 2. A summary of the comments received at public hearings. 3. A certified copy of the County Board-approved updated shoreland ordinance or ordinance language (if integrated into other codes). 4. Any GIS maps of the shoreland zone or shoreland condition surveys related to the project.

Specific conditions for this Project: 1. The WDNR will be provided electronic and hard copies of all data and or reports or surveys generated as a result of this project.



Grant Details
Lake Protection Grant
Date
9/1/2013
Waters Involved
Fourteenmile Creek
Status
Complete

Adams County: Lmi-Tri-Lakes Nutrient Mgmt. Plan: Adams County proposes to develop nutrient management plans for 4,470 acres of crop land within the Tri-Lakes Watershed. Major project elements to include: a) outreach to landowners, b) development of nutrient management plans, c) weekly water sampling, d) water quality analysis, and e) cost share payments.

Amended 1/22/15 to include installation of wind breaks, filter streps, residue and tillage management, and planting cover crops.


Grant Details
Lake Protection Grant
Date
3/15/2021
Waters Involved
Fourteenmile Creek
Status
Complete

Adams County: 319 Match - Lmi - 14-Mile Watershed 9-Key Elements Plan Implementation: Goals: 1) Hire a LWCD staff person to work with property owners and partners in the 14-mile watershed 2) Work with 14-Mile watershed LWCD's to build partnerships with property owners and agriculture 3) Work to achieve a 35% reduction of phosphorus to meet 9-Key Element plan and Wisconsin River TMDL goals 4) Assist other county and state staff to build partnerships with the WPVGA, 14-Mile Creek Watershed Alliance, Tri-Lakes Management District and agricultural interests 5) Conduct 10 different site visits per year to implement BMP's 6) Create educational opportunities with landowners for BMP's, Soil Health and a producer led watershed group 7) Inventory 65 miles of ditches and streams for nutrient control options 8) Work with agencies to direct cost sharing funds to partners. Project deliverables: 1) Minimum of three year position for staff person 2) Assigned area is beyond county boundaries for travel and tasks 3) Annual reports on the goals in the application and scope 4) Track acreage and duration of BMP installations and reduction of nutrient loading 5) Track 9-Key Element Plan completed goals 6) Track educational meetings and speakers 7) Complete report with data, maps, BMP's and modelled/empirical reductions of nutrients 8) Attend 14-Mile Creek Watershed Alliance, Tri-Lakes Management District and other partner meetings. Specific conditions: 1) Complete summary of the project and recommend any improvements on forms provided 2) Participate in semi-annual or annual progress report meetings with DNR and County Conservationist, that include: a list of practices to reduce nonpoint source pollution installed since during the period for which you are seeking reimbursement. For each practice, include date installed, cost and estimated load reductions for N, P, and Sediment lb/yr; a 1-2 paragraph narrative description of project status, including project milestones, accomplishments, and roadblocks encountered.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Friendship Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Friendship Lake
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Friendship Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Goose Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Goose Lake
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Goose Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Hill Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Hill Lake
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Hill Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Jordan Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Jordan Lake
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Jordan Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2006
Waters Involved
Klein Creek
Status
Complete

Adams County: Res-Castle Rock Restoration: Adams County proposes to provide up to 75% of the cost of shoreland restoration practices to lake front property owners on Castle Rock Lake. Grant funds will be distributed to fund removal of sea walls, minor bank re-shaping, placement of rip-rap, establishment of vegetative buffers and implementation of individual stormwater management plans.

Special Conditions: 1) Space between rip-rap to be filled with soil and vegetated to facilitate successful access of turtle hatchlings to water. Lupine seed to be of a wild variety compatible with Karner Blue butterflies. 2) Permits to be secured by individual property owners prior to construction.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Lake Arrowhead
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Lake Arrowhead
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Lake Arrowhead
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2010
Waters Involved
Lake Arrowhead
Status
Complete

Adams County: Lco-Shoreland Ordinance Rev.: Adams County proposes to amend or create a shoreland zoning ordinance that complies with the requirements of NR 115, Wisconsin Administrative Code (as revised effective February 1, 2010) and retain existing regulations that exceed the water resource protections of NR 115 or are specific or unique to local needs.

Project deliverables include: 1. Copies of any fact sheets or handouts created for public hearings. 2. A summary of the comments received at public hearings. 3. A certified copy of the County Board-approved updated shoreland ordinance or ordinance language (if integrated into other codes). 4. Any GIS maps of the shoreland zone or shoreland condition surveys related to the project.

Specific conditions for this Project: 1. The WDNR will be provided electronic and hard copies of all data and or reports or surveys generated as a result of this project.



Grant Details
Lake Protection Grant
Date
9/1/2013
Waters Involved
Lake Arrowhead
Status
Complete

Adams County: Lmi-Tri-Lakes Nutrient Mgmt. Plan: Adams County proposes to develop nutrient management plans for 4,470 acres of crop land within the Tri-Lakes Watershed. Major project elements to include: a) outreach to landowners, b) development of nutrient management plans, c) weekly water sampling, d) water quality analysis, and e) cost share payments.

Amended 1/22/15 to include installation of wind breaks, filter streps, residue and tillage management, and planting cover crops.


Grant Details
Lake Protection Grant
Date
3/15/2021
Waters Involved
Lake Arrowhead
Status
Complete

Adams County: 319 Match - Lmi - 14-Mile Watershed 9-Key Elements Plan Implementation: Goals: 1) Hire a LWCD staff person to work with property owners and partners in the 14-mile watershed 2) Work with 14-Mile watershed LWCD's to build partnerships with property owners and agriculture 3) Work to achieve a 35% reduction of phosphorus to meet 9-Key Element plan and Wisconsin River TMDL goals 4) Assist other county and state staff to build partnerships with the WPVGA, 14-Mile Creek Watershed Alliance, Tri-Lakes Management District and agricultural interests 5) Conduct 10 different site visits per year to implement BMP's 6) Create educational opportunities with landowners for BMP's, Soil Health and a producer led watershed group 7) Inventory 65 miles of ditches and streams for nutrient control options 8) Work with agencies to direct cost sharing funds to partners. Project deliverables: 1) Minimum of three year position for staff person 2) Assigned area is beyond county boundaries for travel and tasks 3) Annual reports on the goals in the application and scope 4) Track acreage and duration of BMP installations and reduction of nutrient loading 5) Track 9-Key Element Plan completed goals 6) Track educational meetings and speakers 7) Complete report with data, maps, BMP's and modelled/empirical reductions of nutrients 8) Attend 14-Mile Creek Watershed Alliance, Tri-Lakes Management District and other partner meetings. Specific conditions: 1) Complete summary of the project and recommend any improvements on forms provided 2) Participate in semi-annual or annual progress report meetings with DNR and County Conservationist, that include: a list of practices to reduce nonpoint source pollution installed since during the period for which you are seeking reimbursement. For each practice, include date installed, cost and estimated load reductions for N, P, and Sediment lb/yr; a 1-2 paragraph narrative description of project status, including project milestones, accomplishments, and roadblocks encountered.


Grant Details
Lake Protection Grant
Date
3/15/1994
Waters Involved
Lake Sherwood
Status
Complete

Adams County: Lco-Lakes Camelot/Sherwood Shoreland Zoning Audit: Adams County proposes to conduct a shoreline zoning audit of Lakes Camelot and Sherwood for the purposes of identification of suspected violations of the Adams County shoreline protection ordinance, establsihment of a current record of all current shoreland uses, and establishing a baseline for the assessment of the effectiveness of permitting and enforcement processes. Project activities will include the location and diagramming of structures within 75 feet of the ordinary highway mark, follow-up questionnaires, file review and the development of a public education on the importance of the shoreline protection ordinance.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Lake Sherwood
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Lake Sherwood
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Lake Sherwood
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
3/15/2021
Waters Involved
Lake Sherwood
Status
Complete

Adams County: 319 Match - Lmi - 14-Mile Watershed 9-Key Elements Plan Implementation: Goals: 1) Hire a LWCD staff person to work with property owners and partners in the 14-mile watershed 2) Work with 14-Mile watershed LWCD's to build partnerships with property owners and agriculture 3) Work to achieve a 35% reduction of phosphorus to meet 9-Key Element plan and Wisconsin River TMDL goals 4) Assist other county and state staff to build partnerships with the WPVGA, 14-Mile Creek Watershed Alliance, Tri-Lakes Management District and agricultural interests 5) Conduct 10 different site visits per year to implement BMP's 6) Create educational opportunities with landowners for BMP's, Soil Health and a producer led watershed group 7) Inventory 65 miles of ditches and streams for nutrient control options 8) Work with agencies to direct cost sharing funds to partners. Project deliverables: 1) Minimum of three year position for staff person 2) Assigned area is beyond county boundaries for travel and tasks 3) Annual reports on the goals in the application and scope 4) Track acreage and duration of BMP installations and reduction of nutrient loading 5) Track 9-Key Element Plan completed goals 6) Track educational meetings and speakers 7) Complete report with data, maps, BMP's and modelled/empirical reductions of nutrients 8) Attend 14-Mile Creek Watershed Alliance, Tri-Lakes Management District and other partner meetings. Specific conditions: 1) Complete summary of the project and recommend any improvements on forms provided 2) Participate in semi-annual or annual progress report meetings with DNR and County Conservationist, that include: a list of practices to reduce nonpoint source pollution installed since during the period for which you are seeking reimbursement. For each practice, include date installed, cost and estimated load reductions for N, P, and Sediment lb/yr; a 1-2 paragraph narrative description of project status, including project milestones, accomplishments, and roadblocks encountered.


Grant Details
Lake Protection Grant
Date
9/1/2010
Waters Involved
Lemonweir River
Status
Complete

Juneau County: Lco-Shoreland Ordinance Rev.: Juneau County proposes to amend or create a shoreland zoning ordinance that complies with the requirements of NR 115, Wisconsin Administrative Code (as revised effective February 1, 2010) and retain existing regulations that exceed the water resource protections of NR 115 or are specific or unique to local needs.

Project deliverables include: 1. Copies of any fact sheets or handouts created for public hearings. 2. A summary of the comments received at public hearings. 3. A certified copy of the County Board-approved updated shoreland ordinance or ordinance language (if integrated into other codes). 4. Any GIS maps of the shoreland zone or shoreland condition surveys related to the project.

Specific conditions for this Project: The WDNR will be provided electronic and hard copies of all data and or reports or surveys generated as a result of this project.


Grant Details
Lake Protection Grant
Date
9/1/2010
Waters Involved
Lemonweir River -Un Oxbow
Status
Complete

Juneau County: Lco-Shoreland Ordinance Rev.: Juneau County proposes to amend or create a shoreland zoning ordinance that complies with the requirements of NR 115, Wisconsin Administrative Code (as revised effective February 1, 2010) and retain existing regulations that exceed the water resource protections of NR 115 or are specific or unique to local needs.

Project deliverables include: 1. Copies of any fact sheets or handouts created for public hearings. 2. A summary of the comments received at public hearings. 3. A certified copy of the County Board-approved updated shoreland ordinance or ordinance language (if integrated into other codes). 4. Any GIS maps of the shoreland zone or shoreland condition surveys related to the project.

Specific conditions for this Project: The WDNR will be provided electronic and hard copies of all data and or reports or surveys generated as a result of this project.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Little Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Little Lake
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Little Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2006
Waters Involved
Little Roche A Cri Creek
Status
Complete

Adams County: Res-Castle Rock Restoration: Adams County proposes to provide up to 75% of the cost of shoreland restoration practices to lake front property owners on Castle Rock Lake. Grant funds will be distributed to fund removal of sea walls, minor bank re-shaping, placement of rip-rap, establishment of vegetative buffers and implementation of individual stormwater management plans.

Special Conditions: 1) Space between rip-rap to be filled with soil and vegetated to facilitate successful access of turtle hatchlings to water. Lupine seed to be of a wild variety compatible with Karner Blue butterflies. 2) Permits to be secured by individual property owners prior to construction.


Grant Details
Lake Protection Grant
Date
9/1/2006
Waters Involved
Little Yellow River
Status
Complete

Adams County: Res-Castle Rock Restoration: Adams County proposes to provide up to 75% of the cost of shoreland restoration practices to lake front property owners on Castle Rock Lake. Grant funds will be distributed to fund removal of sea walls, minor bank re-shaping, placement of rip-rap, establishment of vegetative buffers and implementation of individual stormwater management plans.

Special Conditions: 1) Space between rip-rap to be filled with soil and vegetated to facilitate successful access of turtle hatchlings to water. Lupine seed to be of a wild variety compatible with Karner Blue butterflies. 2) Permits to be secured by individual property owners prior to construction.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Mason Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Mason Lake
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Mason Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
McCall Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
McCall Lake
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
McCall Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
McDougall Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
McDougall Lake
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
McDougall Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
McGinnis Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
McGinnis Lake
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
McGinnis Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2010
Waters Involved
Nepco Lake
Status
Complete

Wood County: Lco-Shoreland Ordinance Rev.: Wood County proposes to amend or create a shoreland zoning ordinance that complies with the requirements of NR 115, Wisconsin Administrative Code (as revised effective February 1, 2010) and retain existing regulations that exceed the water resource protections of NR 115 or are specific or unique to local needs.

Project deliverables include: 1. Copies of any fact sheets or handouts created for public hearings. 2. A summary of the comments received at public hearings. 3. A certified copy of the County Board-approved updated shoreland ordinance or ordinance language (if integrated into other codes). 4. Any GIS maps of the shoreland zone or shoreland condition surveys related to the project.

Specific conditions for this Project: The WDNR will be provided electronic and hard copies of all data and or reports or surveys generated as a result of this project.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Parker Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Parker Lake
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Parker Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
4/15/2015
Waters Involved
Parker Lake
Status
Complete

Parker Lake Assoc., Inc.: Hlk-Parker Lake Fish Sticks: Parker Lake Association Inc. will implement best practices described in Wisconsin\2019s 2014-2017 Healthy Lakes Implementation Plan. Practices include: Installation of 8 fish stick clusters on the shoreline of Parker Lake.
The best practices require a contract to remain in effect for 10 years and must include minimum operation and maintenance requirements and data collection as described in grant condition #17. If best practice(s) are implemented on land owned by the grant Sponsor, this Lake Protection Grant Agreement serves as the contract. If best practice(s) are implemented on land other than the sponsor\2019s, a contract between the sponsor and landowner that abides by grant condition #16 is required.
The Department may require re-payment of project installation costs if the best practice is disturbed or removed. The Sponsor and/or the Department may perform site inspections and/or monitoring to ensure project success.
Deliverables: Best practice location and design information, if not included in the application; signed 10-year landowner contract; pre and post project installation photographs; summary of education activities and publicity/promotion of Healthy Lakes initiative, if applicable.
Special conditions: The state share of each best practice cannot exceed $1,000. The state share of grant administration and technical assistance costs may not exceed 10% of the grant award; technical assistance does not include implementation labor. Funding cannot be used for mitigation or regulatory compliance activities. Water regulation and/or county zoning permits must be issued before construction. The Healthy Lakes logo should be used for promotion and publicity, and DNR recognized as a funding source.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Patrick Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Patrick Lake
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Patrick Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2006
Waters Involved
Peppermill Creek
Status
Complete

Adams County: Res-Peppermill Restoration: Adams County proposes to provide up to 75% of the cost of shoreland restoration practices to lake front property owners on Peppermill Lake. Grant funds will be distributed to fund establishment of vegetative buffers and implementation of individual stormwater management plans.

Special Condition: Permits to be secured by individual property owners prior to construction.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Peppermill Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Peppermill Lake
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Peppermill Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2006
Waters Involved
Peppermill Lake
Status
Complete

Adams County: Res-Peppermill Restoration: Adams County proposes to provide up to 75% of the cost of shoreland restoration practices to lake front property owners on Peppermill Lake. Grant funds will be distributed to fund establishment of vegetative buffers and implementation of individual stormwater management plans.

Special Condition: Permits to be secured by individual property owners prior to construction.


Grant Details
Lake Protection Grant
Date
9/10/1997
Waters Involved
Petenwell Lake
Status
Complete

Golden Sands: Lmi-Petenwell Flowage Water Quality Monitoring: Golden Sands Resource Conservation and Development Council, Inc. proposes to complete the second year of funding for water quality modeling of the Petenwell Flowage. The models being used in applying the methodology on Petenwell Flowage include: 1) the Flux Reservoir loading Model, 2) Profile Model, 3) Bathtub Model. Implementation of this plan will provide information on the following: 1) water/nutrient budget for the Petenwell Flowage, 2) sources of nutrients, 3) effects of nutrient reduction, and 4) prediction of the total maximum daily loads necessary to reach desired target nutrient levels. A working Model will be provided as well as a finel report will be available for interested parties.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Petenwell Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Petenwell Lake
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Petenwell Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2006
Waters Involved
Petenwell Lake
Status
Complete

Adams County: Res-Petenwell Restoration: Adams County proposes to provide up to 75% of the cost of shoreland restoration practices to lake front property owners on the Petenwell Flowage. Grant funds will be distributed to fund removal of sea walls, minor bank re-shaping, placement of rip-rap, establishment of vegetative buffers and implementation if individual stormwater management plans.

Special Conditions: 1) Lupine seed to be wild for compatibility with Karner Blues. 2) Soil to be filled in between rip-rap to facilitate turtle hatchlings access to water. 3) Permits to be secured by individual property owners prior to construction.


Grant Details
Lake Protection Grant
Date
10/1/2013
Waters Involved
Petenwell Lake
Status
Complete

Adams County: Res-Adams Ord. Imp. 2: Adams County proposes to provide educational and technical assistance to the public and Adams County lake organizations for the installation of shoreline buffers on waterways so they comply with the Admas County Shorland, Wetland, and Habitat Protection Ordinance. Major project elements to include: a) outreach and education, b) review of plans, designs, and maintenance agreements, c) development of plans, designs, and agreements, d) inventory of public access points on all project waterways. Project will include notification of riparian property whose property is in conformance with the buffer standard and that the buffer must stay in compliance with the buffer standard. Signed maintenance agreements must be kept on record by Adams County.


Grant Details
Lake Protection Grant
Date
10/1/2013
Waters Involved
Petenwell Lake
Status
Proposed

Adams County: Res-Adams Ord. Imp. 2: Adams County proposes to provide educational and technical assistance to the public and Adams County lake organizations for the installation of shoreline buffers on waterways so they comply with the Admas County Shorland, Wetland, and Habitat Protection Ordinance. Major project elements to include: a) outreach and education, b) review of plans, designs, and maintenance agreements, c) development of plans, designs, and agreements, d) inventory of public access points on all project waterways. Project will include notification of riparian property whose property is in conformance with the buffer standard and that the buffer must stay in compliance with the buffer standard. Signed maintenance agreements must be kept on record by Adams County.


Grant Details
Lake Protection Grant
Date
3/15/2021
Waters Involved
Petenwell Lake
Status
Complete

Adams County: 319 Match - Lmi - 14-Mile Watershed 9-Key Elements Plan Implementation: Goals: 1) Hire a LWCD staff person to work with property owners and partners in the 14-mile watershed 2) Work with 14-Mile watershed LWCD's to build partnerships with property owners and agriculture 3) Work to achieve a 35% reduction of phosphorus to meet 9-Key Element plan and Wisconsin River TMDL goals 4) Assist other county and state staff to build partnerships with the WPVGA, 14-Mile Creek Watershed Alliance, Tri-Lakes Management District and agricultural interests 5) Conduct 10 different site visits per year to implement BMP's 6) Create educational opportunities with landowners for BMP's, Soil Health and a producer led watershed group 7) Inventory 65 miles of ditches and streams for nutrient control options 8) Work with agencies to direct cost sharing funds to partners. Project deliverables: 1) Minimum of three year position for staff person 2) Assigned area is beyond county boundaries for travel and tasks 3) Annual reports on the goals in the application and scope 4) Track acreage and duration of BMP installations and reduction of nutrient loading 5) Track 9-Key Element Plan completed goals 6) Track educational meetings and speakers 7) Complete report with data, maps, BMP's and modelled/empirical reductions of nutrients 8) Attend 14-Mile Creek Watershed Alliance, Tri-Lakes Management District and other partner meetings. Specific conditions: 1) Complete summary of the project and recommend any improvements on forms provided 2) Participate in semi-annual or annual progress report meetings with DNR and County Conservationist, that include: a list of practices to reduce nonpoint source pollution installed since during the period for which you are seeking reimbursement. For each practice, include date installed, cost and estimated load reductions for N, P, and Sediment lb/yr; a 1-2 paragraph narrative description of project status, including project milestones, accomplishments, and roadblocks encountered.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Risk Creek Pond
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Risk Creek Pond
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Risk Creek Pond
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Rollers Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Rollers Lake
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Rollers Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Silver Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Silver Lake
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Silver Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Twin Lakes
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Twin Lakes
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Twin Lakes
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Unnamed
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Unnamed
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Unnamed
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2006
Waters Involved
Unnamed
Status
Complete

Adams County: Res-Castle Rock Restoration: Adams County proposes to provide up to 75% of the cost of shoreland restoration practices to lake front property owners on Castle Rock Lake. Grant funds will be distributed to fund removal of sea walls, minor bank re-shaping, placement of rip-rap, establishment of vegetative buffers and implementation of individual stormwater management plans.

Special Conditions: 1) Space between rip-rap to be filled with soil and vegetated to facilitate successful access of turtle hatchlings to water. Lupine seed to be of a wild variety compatible with Karner Blue butterflies. 2) Permits to be secured by individual property owners prior to construction.


Grant Details
Lake Protection Grant
Date
9/1/2006
Waters Involved
Unnamed
Status
Complete

Adams County: Res-Petenwell Restoration: Adams County proposes to provide up to 75% of the cost of shoreland restoration practices to lake front property owners on the Petenwell Flowage. Grant funds will be distributed to fund removal of sea walls, minor bank re-shaping, placement of rip-rap, establishment of vegetative buffers and implementation if individual stormwater management plans.

Special Conditions: 1) Lupine seed to be wild for compatibility with Karner Blues. 2) Soil to be filled in between rip-rap to facilitate turtle hatchlings access to water. 3) Permits to be secured by individual property owners prior to construction.


Grant Details
Lake Protection Grant
Date
9/1/2010
Waters Involved
Unnamed
Status
Complete

Juneau County: Lco-Shoreland Ordinance Rev.: Juneau County proposes to amend or create a shoreland zoning ordinance that complies with the requirements of NR 115, Wisconsin Administrative Code (as revised effective February 1, 2010) and retain existing regulations that exceed the water resource protections of NR 115 or are specific or unique to local needs.

Project deliverables include: 1. Copies of any fact sheets or handouts created for public hearings. 2. A summary of the comments received at public hearings. 3. A certified copy of the County Board-approved updated shoreland ordinance or ordinance language (if integrated into other codes). 4. Any GIS maps of the shoreland zone or shoreland condition surveys related to the project.

Specific conditions for this Project: The WDNR will be provided electronic and hard copies of all data and or reports or surveys generated as a result of this project.


Grant Details
Lake Protection Grant
Date
3/15/2021
Waters Involved
Unnamed
Status
Complete

Adams County: 319 Match - Lmi - 14-Mile Watershed 9-Key Elements Plan Implementation: Goals: 1) Hire a LWCD staff person to work with property owners and partners in the 14-mile watershed 2) Work with 14-Mile watershed LWCD's to build partnerships with property owners and agriculture 3) Work to achieve a 35% reduction of phosphorus to meet 9-Key Element plan and Wisconsin River TMDL goals 4) Assist other county and state staff to build partnerships with the WPVGA, 14-Mile Creek Watershed Alliance, Tri-Lakes Management District and agricultural interests 5) Conduct 10 different site visits per year to implement BMP's 6) Create educational opportunities with landowners for BMP's, Soil Health and a producer led watershed group 7) Inventory 65 miles of ditches and streams for nutrient control options 8) Work with agencies to direct cost sharing funds to partners. Project deliverables: 1) Minimum of three year position for staff person 2) Assigned area is beyond county boundaries for travel and tasks 3) Annual reports on the goals in the application and scope 4) Track acreage and duration of BMP installations and reduction of nutrient loading 5) Track 9-Key Element Plan completed goals 6) Track educational meetings and speakers 7) Complete report with data, maps, BMP's and modelled/empirical reductions of nutrients 8) Attend 14-Mile Creek Watershed Alliance, Tri-Lakes Management District and other partner meetings. Specific conditions: 1) Complete summary of the project and recommend any improvements on forms provided 2) Participate in semi-annual or annual progress report meetings with DNR and County Conservationist, that include: a list of practices to reduce nonpoint source pollution installed since during the period for which you are seeking reimbursement. For each practice, include date installed, cost and estimated load reductions for N, P, and Sediment lb/yr; a 1-2 paragraph narrative description of project status, including project milestones, accomplishments, and roadblocks encountered.


Grant Details
Lake Protection Grant
Date
5/15/1995
Waters Involved
Wazee Lake
Status
Complete

Jackson County: Res-Wazee Lake Stormwater Drainage & Fish Habitat Improvement: Jackson County will initiate the first phase of improvements to the Wazee Lake shoreland that will improve water access, expand recreation opportunities, enhance fish habitat, and restore wetland complexes for lake protection.

Further detail is provided on the attached project cost estimate worksheet, Form 8700-244.


Grant Details
Lake Protection Grant
Date
9/1/2006
Waters Involved
Wisconsin River
Status
Complete

Adams County: Res-Castle Rock Restoration: Adams County proposes to provide up to 75% of the cost of shoreland restoration practices to lake front property owners on Castle Rock Lake. Grant funds will be distributed to fund removal of sea walls, minor bank re-shaping, placement of rip-rap, establishment of vegetative buffers and implementation of individual stormwater management plans.

Special Conditions: 1) Space between rip-rap to be filled with soil and vegetated to facilitate successful access of turtle hatchlings to water. Lupine seed to be of a wild variety compatible with Karner Blue butterflies. 2) Permits to be secured by individual property owners prior to construction.


Grant Details
Lake Protection Grant
Date
9/1/2006
Waters Involved
Wisconsin River
Status
Complete

Adams County: Res-Petenwell Restoration: Adams County proposes to provide up to 75% of the cost of shoreland restoration practices to lake front property owners on the Petenwell Flowage. Grant funds will be distributed to fund removal of sea walls, minor bank re-shaping, placement of rip-rap, establishment of vegetative buffers and implementation if individual stormwater management plans.

Special Conditions: 1) Lupine seed to be wild for compatibility with Karner Blues. 2) Soil to be filled in between rip-rap to facilitate turtle hatchlings access to water. 3) Permits to be secured by individual property owners prior to construction.


Grant Details
Lake Protection Grant
Date
10/1/2013
Waters Involved
Wisconsin River
Status
Complete

Adams County: Res-Adams Ord. Imp. 2: Adams County proposes to provide educational and technical assistance to the public and Adams County lake organizations for the installation of shoreline buffers on waterways so they comply with the Admas County Shorland, Wetland, and Habitat Protection Ordinance. Major project elements to include: a) outreach and education, b) review of plans, designs, and maintenance agreements, c) development of plans, designs, and agreements, d) inventory of public access points on all project waterways. Project will include notification of riparian property whose property is in conformance with the buffer standard and that the buffer must stay in compliance with the buffer standard. Signed maintenance agreements must be kept on record by Adams County.


Grant Details
Lake Protection Grant
Date
10/1/2013
Waters Involved
Wisconsin River
Status
Proposed

Adams County: Res-Adams Ord. Imp. 2: Adams County proposes to provide educational and technical assistance to the public and Adams County lake organizations for the installation of shoreline buffers on waterways so they comply with the Admas County Shorland, Wetland, and Habitat Protection Ordinance. Major project elements to include: a) outreach and education, b) review of plans, designs, and maintenance agreements, c) development of plans, designs, and agreements, d) inventory of public access points on all project waterways. Project will include notification of riparian property whose property is in conformance with the buffer standard and that the buffer must stay in compliance with the buffer standard. Signed maintenance agreements must be kept on record by Adams County.


Grant Details
Lake Protection Grant
Date
3/15/2021
Waters Involved
Wisconsin River
Status
Complete

Adams County: 319 Match - Lmi - 14-Mile Watershed 9-Key Elements Plan Implementation: Goals: 1) Hire a LWCD staff person to work with property owners and partners in the 14-mile watershed 2) Work with 14-Mile watershed LWCD's to build partnerships with property owners and agriculture 3) Work to achieve a 35% reduction of phosphorus to meet 9-Key Element plan and Wisconsin River TMDL goals 4) Assist other county and state staff to build partnerships with the WPVGA, 14-Mile Creek Watershed Alliance, Tri-Lakes Management District and agricultural interests 5) Conduct 10 different site visits per year to implement BMP's 6) Create educational opportunities with landowners for BMP's, Soil Health and a producer led watershed group 7) Inventory 65 miles of ditches and streams for nutrient control options 8) Work with agencies to direct cost sharing funds to partners. Project deliverables: 1) Minimum of three year position for staff person 2) Assigned area is beyond county boundaries for travel and tasks 3) Annual reports on the goals in the application and scope 4) Track acreage and duration of BMP installations and reduction of nutrient loading 5) Track 9-Key Element Plan completed goals 6) Track educational meetings and speakers 7) Complete report with data, maps, BMP's and modelled/empirical reductions of nutrients 8) Attend 14-Mile Creek Watershed Alliance, Tri-Lakes Management District and other partner meetings. Specific conditions: 1) Complete summary of the project and recommend any improvements on forms provided 2) Participate in semi-annual or annual progress report meetings with DNR and County Conservationist, that include: a list of practices to reduce nonpoint source pollution installed since during the period for which you are seeking reimbursement. For each practice, include date installed, cost and estimated load reductions for N, P, and Sediment lb/yr; a 1-2 paragraph narrative description of project status, including project milestones, accomplishments, and roadblocks encountered.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Wolf Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Wolf Lake
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Wolf Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2009
Waters Involved
Wolf Lake
Status
Complete

Adams County: Res-Adams Restore Cost Share: The Adams County Land Conservation Department proposes to provide 75% cost shares to riparian property owners interested in establishing and maintaining shoreland buffers and rain gardens with native vegetation. Cost share agreements to require that property owners maintain buffers for a minimum of 25 years.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Amey Pond
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Arkdale Lake
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Big Roche a Cri
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Big Spring Pond
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Camelot Lake
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
4/1/2010
Waters Involved
Castle Rock Ditch
Status
Complete

Lake Alice Association, Inc: Lake Alice Stewardship Program Phase Ii - Understanding The Biota Of Lake Alice: Lake Alice Association is sponsoring phased large scale lake planning grants to study Lake Alice, in Lincoln County. The project will focus on developing and updating an Adaptive Lake Management Plan (LMP) for Lake Alice. Phase 2 was funded in this grant cycle and Phases 3-5 will be submitted for funding starting in 2011.

Project activities for Phase 2 include: 1) Educational program, meetings and educational events with lake association and Tomahawk High School students, written educational materials, news releases, and website updates; 2) Point-intercept (PI) aquatic plant survey; 3) Aquatic plant community and substrate mapping; 4) Water quality assessment; 5) Volunteer amphibian monitoring and angler survey; 6) Update LMP.

Project deliverables include: 1) Educational materials and news releases; 2) Aquatic plant community and substrate maps; 3) PI, water quality, amphibian, and angler data; 4) LMP.

Specific conditions for this project: LMP needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP, news releases, any other educational materials/products, all data, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Castle Rock Lake
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Crooked Lake
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
4/1/2010
Waters Involved
Cruson Slough
Status
Complete

Lake Alice Association, Inc: Lake Alice Stewardship Program Phase Ii - Understanding The Biota Of Lake Alice: Lake Alice Association is sponsoring phased large scale lake planning grants to study Lake Alice, in Lincoln County. The project will focus on developing and updating an Adaptive Lake Management Plan (LMP) for Lake Alice. Phase 2 was funded in this grant cycle and Phases 3-5 will be submitted for funding starting in 2011.

Project activities for Phase 2 include: 1) Educational program, meetings and educational events with lake association and Tomahawk High School students, written educational materials, news releases, and website updates; 2) Point-intercept (PI) aquatic plant survey; 3) Aquatic plant community and substrate mapping; 4) Water quality assessment; 5) Volunteer amphibian monitoring and angler survey; 6) Update LMP.

Project deliverables include: 1) Educational materials and news releases; 2) Aquatic plant community and substrate maps; 3) PI, water quality, amphibian, and angler data; 4) LMP.

Specific conditions for this project: LMP needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP, news releases, any other educational materials/products, all data, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Deep Lake
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Dorro Couche Lake
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Easton Lake
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Fawn Lake
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Fenner Lake
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Friendship Lake
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Goose Lake
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Hill Lake
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Jordan Lake
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Lake Arrowhead
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
4/1/2010
Waters Involved
Lake Du Bay
Status
Complete

Lake Alice Association, Inc: Lake Alice Stewardship Program Phase Ii - Understanding The Biota Of Lake Alice: Lake Alice Association is sponsoring phased large scale lake planning grants to study Lake Alice, in Lincoln County. The project will focus on developing and updating an Adaptive Lake Management Plan (LMP) for Lake Alice. Phase 2 was funded in this grant cycle and Phases 3-5 will be submitted for funding starting in 2011.

Project activities for Phase 2 include: 1) Educational program, meetings and educational events with lake association and Tomahawk High School students, written educational materials, news releases, and website updates; 2) Point-intercept (PI) aquatic plant survey; 3) Aquatic plant community and substrate mapping; 4) Water quality assessment; 5) Volunteer amphibian monitoring and angler survey; 6) Update LMP.

Project deliverables include: 1) Educational materials and news releases; 2) Aquatic plant community and substrate maps; 3) PI, water quality, amphibian, and angler data; 4) LMP.

Specific conditions for this project: LMP needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP, news releases, any other educational materials/products, all data, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Lake Sherwood
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Little Lake
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
4/1/2010
Waters Involved
Little Pine Creek
Status
Complete

Lake Alice Association, Inc: Lake Alice Stewardship Program Phase Ii - Understanding The Biota Of Lake Alice: Lake Alice Association is sponsoring phased large scale lake planning grants to study Lake Alice, in Lincoln County. The project will focus on developing and updating an Adaptive Lake Management Plan (LMP) for Lake Alice. Phase 2 was funded in this grant cycle and Phases 3-5 will be submitted for funding starting in 2011.

Project activities for Phase 2 include: 1) Educational program, meetings and educational events with lake association and Tomahawk High School students, written educational materials, news releases, and website updates; 2) Point-intercept (PI) aquatic plant survey; 3) Aquatic plant community and substrate mapping; 4) Water quality assessment; 5) Volunteer amphibian monitoring and angler survey; 6) Update LMP.

Project deliverables include: 1) Educational materials and news releases; 2) Aquatic plant community and substrate maps; 3) PI, water quality, amphibian, and angler data; 4) LMP.

Specific conditions for this project: LMP needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP, news releases, any other educational materials/products, all data, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Mason Lake
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
McCall Lake
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
McDougall Lake
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
McGinnis Lake
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Parker Lake
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Patrick Lake
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Peppermill Lake
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Petenwell Lake
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
3/28/1996
Waters Involved
Petenwell Lake
Status
Complete

Golden Sands: Petenwell Flowage Water Quality Modeling: Golden Sands proposes to conduct water quality modeling on the Petenwell Flowage to identify nutrient loads. Project activities include 1)applying the FLUX, BATHTUB, and PROFILE models, resulting in model outputs and data summaries; 2) determining water and nutrient budgets, resulting in a report; 3) predicting the effects of nutrient reductions on other in-lake environmental variables, resulting in a report; and 4) specifying the total maximum daily loads needed to reach target nutrient levels, resulting in a report. The sponsor will disseminate information to the public about the results of the project by public meeting and summary report mailing. The sponsor will also provide the Department of Natural Resources with a paper copy of the final report. End.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Risk Creek Pond
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Rollers Lake
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Silver Lake
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Twin Lakes
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Unnamed
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
4/1/2010
Waters Involved
Unnamed
Status
Complete

Lake Alice Association, Inc: Lake Alice Stewardship Program Phase Ii - Understanding The Biota Of Lake Alice: Lake Alice Association is sponsoring phased large scale lake planning grants to study Lake Alice, in Lincoln County. The project will focus on developing and updating an Adaptive Lake Management Plan (LMP) for Lake Alice. Phase 2 was funded in this grant cycle and Phases 3-5 will be submitted for funding starting in 2011.

Project activities for Phase 2 include: 1) Educational program, meetings and educational events with lake association and Tomahawk High School students, written educational materials, news releases, and website updates; 2) Point-intercept (PI) aquatic plant survey; 3) Aquatic plant community and substrate mapping; 4) Water quality assessment; 5) Volunteer amphibian monitoring and angler survey; 6) Update LMP.

Project deliverables include: 1) Educational materials and news releases; 2) Aquatic plant community and substrate maps; 3) PI, water quality, amphibian, and angler data; 4) LMP.

Specific conditions for this project: LMP needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP, news releases, any other educational materials/products, all data, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
4/1/2010
Waters Involved
Wisconsin River
Status
Complete

Lake Alice Association, Inc: Lake Alice Stewardship Program Phase Ii - Understanding The Biota Of Lake Alice: Lake Alice Association is sponsoring phased large scale lake planning grants to study Lake Alice, in Lincoln County. The project will focus on developing and updating an Adaptive Lake Management Plan (LMP) for Lake Alice. Phase 2 was funded in this grant cycle and Phases 3-5 will be submitted for funding starting in 2011.

Project activities for Phase 2 include: 1) Educational program, meetings and educational events with lake association and Tomahawk High School students, written educational materials, news releases, and website updates; 2) Point-intercept (PI) aquatic plant survey; 3) Aquatic plant community and substrate mapping; 4) Water quality assessment; 5) Volunteer amphibian monitoring and angler survey; 6) Update LMP.

Project deliverables include: 1) Educational materials and news releases; 2) Aquatic plant community and substrate maps; 3) PI, water quality, amphibian, and angler data; 4) LMP.

Specific conditions for this project: LMP needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP, news releases, any other educational materials/products, all data, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Wolf Lake
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Amey Pond
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Arkdale Lake
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Big Roche a Cri
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Big Spring Pond
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Camelot Lake
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Castle Rock Lake
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2008
Waters Involved
Castle Rock Lake
Status
Complete

Juneau County: Pacrs Org. Development: The Juneau Co. Land and Water Resources Dept. proposes to fund a position to facilitate enhancements in the organizational development of Petenwell and Castle Rock Stewards (PACRS), a group formed in 2007 to address water quality, habitat and species diversity concerns within the Petenwell and Castle Rock Flowages in Juneau and Adams Counties. Major project elements to include: 1) outreach to organizations and businesses, 2) development of articles of incorporation and by-laws, 3) securing 501(c)3 certification from the IRS.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Crooked Lake
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Deep Lake
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Dorro Couche Lake
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Easton Lake
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Fawn Lake
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Fenner Lake
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Friendship Lake
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Goose Lake
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Hill Lake
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Jordan Lake
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Lake Arrowhead
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Lake Sherwood
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Little Lake
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Mason Lake
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
McCall Lake
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
McDougall Lake
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
McGinnis Lake
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
2/15/2015
Waters Involved
Necedah Lake
Status
Complete

Village Of Necedah: Necedah Plan, Plants: The Village of Necedah proposes to initiate comprehensive management planning for Necedah Lake and Pond and to conduct an aquatic plant survey of the lake to help with that planning. Major project objectives include: 1) Planning sessions, 2) Plant survey, 3) Water quality data collection, 4) Final report.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Parker Lake
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Patrick Lake
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Peppermill Lake
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Petenwell Lake
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Risk Creek Pond
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Rollers Lake
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Silver Lake
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Twin Lakes
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Unnamed
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2008
Waters Involved
Wisconsin River
Status
Complete

Juneau County: Pacrs Org. Development: The Juneau Co. Land and Water Resources Dept. proposes to fund a position to facilitate enhancements in the organizational development of Petenwell and Castle Rock Stewards (PACRS), a group formed in 2007 to address water quality, habitat and species diversity concerns within the Petenwell and Castle Rock Flowages in Juneau and Adams Counties. Major project elements to include: 1) outreach to organizations and businesses, 2) development of articles of incorporation and by-laws, 3) securing 501(c)3 certification from the IRS.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Wolf Lake
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
2/15/2015
Waters Involved
Yellow River
Status
Complete

Village Of Necedah: Necedah Plan, Plants: The Village of Necedah proposes to initiate comprehensive management planning for Necedah Lake and Pond and to conduct an aquatic plant survey of the lake to help with that planning. Major project objectives include: 1) Planning sessions, 2) Plant survey, 3) Water quality data collection, 4) Final report.


Grant Details
River Planning Grant
Date
7/1/2013
Waters Involved
Castle Rock Lake
Status
Complete

Petenwell & Castle Rock Stewards: Pacrs Edu-Outreach: The Petenwell and Castle Rock Stewards (PACRS) propose to initiate a public education campaign to inform members of the public about the organization's work on behalf of improved water quality on the Petenwell and Castle Rock flowages in Adams and Juneau counties. Major project elements to include: a) signage at public boat landings, b) distribution of informative place mats to area restaurants, c) development of future communications planning, d) water quality monitoring, and e) development of an annual report.


Grant Details
River Planning Grant
Date
7/1/2013
Waters Involved
Petenwell Lake
Status
Complete

Petenwell & Castle Rock Stewards: Pacrs Edu-Outreach: The Petenwell and Castle Rock Stewards (PACRS) propose to initiate a public education campaign to inform members of the public about the organization's work on behalf of improved water quality on the Petenwell and Castle Rock flowages in Adams and Juneau counties. Major project elements to include: a) signage at public boat landings, b) distribution of informative place mats to area restaurants, c) development of future communications planning, d) water quality monitoring, and e) development of an annual report.


Grant Details
River Planning Grant
Date
7/1/2007
Waters Involved
Wisconsin River
Status
Complete

Sauk Prairie River Projects Assoc. Ltd: Lower Wisconsin River-Fisheries Education Project: The primary goal of this project is to produce and distribute an educational poster about the unusual and rare nongame fish species found in various Lower Wisconsin River sloughs. Information collected from the sampling conducted in backwater sloughs (see RP-141-08) will be incorporated into the final poster and widely distributed.

Please note: Final report deliverables help us ensure that the grant has been satisfactorily completed, and that state dollars are being spent wisely. Every deliverable, no matter how minor, must be completed in order to receive full reimbursement for the state share of costs. Ranking questions used to obtain this award, and specific deliverables mentioned in your grant description, constitute final report deliverables. If any deliverable is not adequately provided in the final report, only partial reimbursement, at the department's discretion, will be made. The only exception will be if there is a well-justified and department-approved scope amendment. If you have any question about what a specific ranking question or other deliverable means, please contact your river coordinator BEFORE you sign this agreement.


Grant Details
River Planning Grant
Date
7/1/2013
Waters Involved
Wisconsin River
Status
Complete

Petenwell & Castle Rock Stewards: Pacrs Edu-Outreach: The Petenwell and Castle Rock Stewards (PACRS) propose to initiate a public education campaign to inform members of the public about the organization's work on behalf of improved water quality on the Petenwell and Castle Rock flowages in Adams and Juneau counties. Major project elements to include: a) signage at public boat landings, b) distribution of informative place mats to area restaurants, c) development of future communications planning, d) water quality monitoring, and e) development of an annual report.


Grant Details
River Protection Grant
Date
3/15/2023
Waters Involved
West Branch Little Yellow River
Status
Complete

Friends Of The Necedah National Wildlife Ref: Rr - Restoration Of The West Branch Of The Little Yellow River: The Friends of the Necedah Wildlife Refuge will work with the USFWS, to restore 1.5 miles of the West Branch of the Little Yellow River in Juneau County.

Project final deliverables include: 1) Restore the natural stream channel from the current artificial ditched network, 2) Increase connectivity between the river and floodplain, 3) Improve connectivity of the river for fish and wildlife, 4) install 5 ditch plugs and 5) supply DNR with aerial photos and presentation materials.

Specific project activities include: 1) continue the efforts from previous restoration projects, 2) complete all surveying, planning, permitting requirements, 3) Continue WAV protocols with the Necedah Charter School, 4) track groundwater inputs/movements, and 5) assess biological integrity via DNR IBI protocols.

Special Conditions: Allow for a tour of the project area for DNR personnel and maintain records of WAV activities for future reference. Any appropriate data collected to be uploaded to SWIMS.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.


Monitoring & Projects

Projects including grants, restoration work and studies shown below have occurred in this watershed. Click the links below to read through the text. While these are not an exhaustive list of activities, they provide insight into the management activities happening in this watershed.

Grants and Management Projects
Lower Yellow (Juneau Co.) River Watershed
Watershed Recommendations
Best Management Practices, Implement
WI Rapids Storm Water Management Plan Update
Date
Status
This project is an installation of nonpoint source best management practices to contribute to the restoration of Wisconsin's waters and was funded by the 319 grant. Storm water planning activities will be undertaken by the municipality and will result in the following products: updated storm water management plan for the developed urban area.
1/1/2016
In Progress
Projects
Documents
 
Habitat Restoration - Shoreland
 
Date
Status
10/1/2013
Proposed
Projects
 
Monitor Aquatic Biology
Monitor biology on WBIC: 1353000
Date
Status
Conduct biological (mIBI or fIBI) monitoring on Unnamed, WBIC: 1353000, AU:12206
5/21/2016
Proposed
Projects
 
Monitor Baseline Survey
 
Date
Status
Fish and Aquatic Habitat Staff should conduct baseline non-wadable monitoring within the Lower Yellow River
1/1/2010
Proposed
 
Monitor Fish Tissue
Confirm FCA: IW pre-2000 data
Date
Status
1179900 name Wisconsin River TMDL ID 530 Start Mile 268 End Mile 289.17
11/21/2011
Proposed
 
Monitor Fish Tissue
Confirm FCA: IW pre-2000 data
Date
Status
1179900 name Wisconsin River TMDL ID 530 Start Mile 237.05 End Mile 268
11/21/2011
Proposed
 
Monitor Water Quality or Sediment
Little Yellow River TP
Date
Status
TP may exceed; further monitoring recommended. AU: 12191; ID: 10031885
5/1/2018
Proposed
Projects
 
Monitor Water Quality or Sediment
Unnamed Creek Biology fIBI
Date
Status
Only assessment result is "poor". Further monitoring recommended. AU: 12211; Station ID: 10043509
5/1/2018
Proposed
Projects
 
Stormwater Planning, Implementation
Friendship Stormwater Mgmt Plan - TMDL Analysis & Recs
Date
Status
This project promotes nonpoint source best management practices to contribute to the restoration of Wisconsin?s waters and was funded by the 319 grant. Storm water planning activities will be undertaken by the municipality and will result in the following products: updated storm water management plan for the entire developed urban area; and an updated storm water management plan for new development.
1/1/2018
In Progress
Projects
 
TMDL Implementation
Wisconsin TMDL Projects
Date
Status
Wisconsin River TMDL monitoring, evaluation, planning, implementation.
4/1/2009
In Progress
Projects
 
Urban Growth Planning
Wisconsin Rapids, Wood County
Date
Status
SSA Planning and Updates for Wisconsin Rapids
4/1/2011
In Progress
Projects
 
Lower Yellow (Juneau Co.) River WatershedWatershed History Note

A portion of the Lower Yellow River Watershed in Juneau County lies within the Necedah National Wildlife Refuge. The 43,656-acre refuge was established in 1939 as a refuge and breeding ground for migratory birds and other wildlife. Historically the land in and around the refuge was once a vast open peat bog with scattered islands of savanna and woodland. Once settlers arrived, the land use surrounding the refuge drastically changed. Fires from logging slash burned uncontrollably throughout the area. By the 1930's, the peat was mostly gone and many farmers were looking for land with richer soils and longer growing seasons. Although agriculture proved economically unsuccessful, more than 94 miles of ditches and intermittent streams were left behind. Today they are used for water control. Biologists adjust the water level on impoundments, drawing down the water in the spring and re-flooding in the fall. This cycle of drying and flooding increases the growth of plants that feed migratory waterfowl and shorebirds. A mosaic habitat of sedge meadow, savanna, and pine-oak forest is an island of refugeĀ—home to ringed boghaunter dragonflies, whooping cranes, trumpeter swans, wolves, Karner blue butterflies, badgers, and red-headed woodpeckers. Each species and habitat is monitored and maintained by the U.S. Fish and Wildlife Service.

Date  2010

Watershed History Note

A portion of the watershed lies within the Necedah National Wildlife Refuge. The refuge was established as a breeding ground for migratory birds and other wildlife. Historically the land in and around the refuge was once a vast open peat bog with scattered islands of savanna and woodland. Once settlers arrived, the land use surrounding the refuge drastically changed. Fires from logging slash burned uncontrollably throughout the area. By the 1930's, the peat was mostly gone and many farmers were looking for land with richer soils and longer growing seasons. Although agriculture proved economically unsuccessful, more than 94 miles of ditches and intermittent streams were left behind. Today they are used for water control.

Date  2002