02-16-275446
SUPERIOR WATER LIGHT & POWER PLT (MGP)
|
Activity Type / Status | Jurisdiction |
---|---|
ERP / OPEN | DNR RR |
Location Name | County | DNR Region |
---|---|---|
SUPERIOR WATER LIGHT & POWER CO | DOUGLAS | NORTHERN |
Address | Municipality |
---|---|
WINTER ST & USH 53 | SUPERIOR |
PLSS Description | Latitude (WGS84) | Longitude (WGS84) | Google Maps | RR Sites Map |
---|---|---|---|---|
SW 1/4 of the NW 1/4 of Sec 13, T49N, R14W | 46.7297225 | -92.0736357 |
![]() |
![]() |
Additional Activity Details | Acres |
---|---|
UNKNOWN |
Facility ID | PECFA No. | EPA ID | Start Date | End Date |
---|---|---|---|---|
2001-11-01 |
Above Ground Petrol Tank |
Drycleaner |
EPA NPL Site |
EPA Superfund |
PECFA Funds Eligible |
PFAS |
ROW Impact |
Sediments |
Underground Petrol Tank |
WI DOT Site |
---|---|---|---|---|---|---|---|---|---|
![]() |
Date | Code | Name | File | Comment | |
---|---|---|---|---|---|
2024-07-16 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 1/1/2024 - 6/30/2024 | |
2024-07-01 | 99 | Miscellaneous |
![]() |
AIR SPARGE RESTART PLAN | |
2024-06-12 | 43 | Site Activity Status Update Received |
![]() |
FIRTS QUARTER 2024 OMM RPT | |
2024-05-29 | 99 | Miscellaneous |
![]() |
DNR COMMENTS ON UPLAND CONSTRUCTION COMPLETION | |
2024-03-29 | 39 | Remedial Action Options Report (RAOR) Received (non-fee) |
![]() |
RAOR RPT REC'D | |
2024-02-01 | 151 | Remedial Action (RA) Documentation Report Received (non-fee) |
![]() |
CONSTRUCTION COMPLETION RPT REC'D - 1 TO 4 | |
2024-01-05 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 7/1/2023 - 12/31/2023 | |
2023-07-24 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 01/01/2023 - 06/30/2023 | |
2023-06-29 | 99 | Miscellaneous |
![]() |
REC'D RESPONSE TO DNR'S ACCESS LTR | |
2023-06-20 | 99 | Miscellaneous |
![]() |
GRAYMONT/LAKEHEAD CONCRETE ACCESS LETTER | |
2023-06-20 | 99 | Miscellaneous |
![]() |
LAKEHEAD CONCRETE ACCESS LETTER | |
2023-05-15 | 99 | Miscellaneous |
![]() |
STRUCTURAL IMPEDIMENT REMOVAL INVESTIGATION & REMEDIAL ACTION PLAN REC'D | |
2023-05-15 | 99 | Miscellaneous |
![]() |
DNR RESPONSE TO STRUCTURAL IMPEDIMENT REMOVAL SIWP AND RAP | |
2023-04-14 | 99 | Miscellaneous |
![]() |
UPLAND CONSTRUCTION SCHEDULE UPDATE | |
2023-04-12 | 99 | Miscellaneous |
![]() |
EMAIL DISUCUSSING REMOVAL OF STRUCTURAL IMPEDIMENT, CHANGING CO'S AND ADDTIONAL INVESTIGATION | |
2023-04-12 | 37 | Site Investigation Report (SIR) Received (non-fee) |
![]() |
REMEDIAL INVESTIGATION SUMMARY FOR ENTIRE C STREET SLIP MGP AND MERCURY IMPACTED SEDIMENTS | |
2023-03-10 | 147 | Remedial Action (RA) Design Report Received (non-fee) |
![]() |
REVISED 100% DESIGN AND DESIGN FOR CONSTRUCTION RPTS REC'D | |
2023-03-01 | 99 | Miscellaneous |
![]() |
SHPO LETTER | |
2023-02-27 | 193 | CO Modification Notice to Proceed (NTP) |
![]() |
CO MOD NTP EMAIL SENT | |
2023-02-27 | 37 | Site Investigation Report (SIR) Received (non-fee) |
![]() |
SUPPLEMENTAL SITE INVESTIGATION RPT C STREET SLIP SEDIMENTS | |
2023-02-24 | 191 | CO Modification Notification Received (non-fee) |
![]() |
CO MOD NOTIFICATION REC'D | |
2023-01-17 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 7/1/2022 - 12/31/2022 | |
2022-12-29 | 56 | Continuing Obligation(s) Applied |
![]() |
CO APPLIED AT REMEDIAL ACTION APPROVAL - (THIS IS NOT A CLOSURE REVIEW) | |
2022-12-29 | 220 | Continuing Obligation - Soil at Industrial Levels | |||
2022-12-29 | 224 | Continuing Obligation - Structural Impediment to Cleanup | |||
2022-12-29 | 232 | Continuing Obligation - Residual Soil Contamination | |||
2022-12-29 | 236 | Continuing Obligation - Residual GW Contamination | |||
2022-12-29 | 234 | Continuing Obligation - Monitoring Well Needs Abandonment | - CONTINUED MONITORING IS REQUIRED AT THIS SITE | ||
2022-12-29 | 226 | Continuing Obligation - Vapor Intrusion Response | |||
2022-12-29 | 149 | Remedial Action (RA) Design Report Approved |
![]() |
RAP DESIGN APPR | |
2022-12-28 | 99 | Miscellaneous |
![]() |
FIGURES FOR CORRECTED LOCATION OF MW-29 AND CORRECTED DEPTH OF MW-3B & 4B | |
2022-12-27 | 99 | Miscellaneous |
![]() |
PROPOSED MW-29 RELOCATION | |
2022-12-22 | 99 | Miscellaneous |
![]() |
DNR SOURCE CONTROL LETTER FOR GLNPO | |
2022-12-20 | 99 | Miscellaneous |
![]() |
DNR REQ - UPDATE ON BUILDING STATUS | |
2022-12-14 | 99 | Miscellaneous |
![]() |
SWL&P RESPONSE TO DNR'S 12/19/22 EMAIL | |
2022-12-09 | 99 | Miscellaneous |
![]() |
SLIP RECONTAMINATION EVALUATION REQ SENT | |
2022-11-29 | 710 | Database Fee Paid for Soil Continuing Obligation(s) | CK # 532767 - CO APPLIED AT REMEDIAL ACTION APPROVAL - (THIS IS NOT A CLOSURE REVIEW) | ||
2022-11-29 | 700 | Database Fee Paid for Groundwater Continuing Obligation(s) | CK # 532767 - CO APPLIED AT REMEDIAL ACTION APPROVAL - (THIS IS NOT A CLOSURE REVIEW) | ||
2022-11-04 | 99 | Miscellaneous |
![]() |
C STREET SLIP DATA USABILITY ASSESSMENT | |
2022-10-17 | 148 | Remedial Action Design Report Received (fee) |
![]() |
CK # 532751 - 100% UPLAND REMEDIAL ACITON DESIGN PART 2 OF 2 | |
2022-09-13 | 99 | Miscellaneous |
![]() |
CITY OF SUPERIOR 100 PERCENT DESIGN COMMENTS | |
2022-08-15 | 99 | Miscellaneous |
![]() |
GRAYMONT COMMENTS ON SW&P UPLAND DESIGN | |
2022-07-26 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 1/1/2022 - 6/30/2022 | |
2022-07-07 | 82 | Remedial Action Options Report (RAOR) Not Approved |
![]() |
DNR COMMENTS ON DRAFT RAOR FOR SEDIMENTS | |
2022-06-03 | 99 | Miscellaneous |
![]() |
CITY OF SUPERIOR RESPONSE TO CO NOTIFICATION | |
2022-06-03 | 99 | Miscellaneous |
![]() |
GRAYMONT RESPONSE TO CO NOTIFICATION | |
2022-06-03 | 99 | Miscellaneous |
![]() |
BNSF RESPONSE TO CO NOTIFICATION | |
2022-05-05 | 143 | Remedial Action Options Report (RAOR) Received (fee) |
![]() |
ACH - RAOR FOR SEDIMENT | |
2022-05-05 | 99 | Miscellaneous |
![]() |
DNR REPSONSE TO SUGGESTED REVISIONS 90% DESIGN | |
2022-05-05 | 99 | Miscellaneous | OFF SITE PROPERTY OWNER NOTIFICATIONS | ||
2022-05-05 | 99 | Miscellaneous |
![]() |
OFF SITE PROPERTY OWNER NOTIFICATIONS | |
2022-04-12 | 99 | Miscellaneous | 90 PERCENT DESIGN NEW DRAFT | ||
2022-04-07 | 99 | Miscellaneous |
![]() |
DNR RESPONSE TO SWL&P 3/29/20 SBMITTAL | |
2022-04-01 | 99 | Miscellaneous |
![]() |
MARCH 31, 2022 MEETING SLIDES | |
2022-03-29 | 99 | Miscellaneous |
![]() |
SWL&P RESONSE TO DNR'S 90 PERCENT DESIGN COMMENTS | |
2022-03-10 | 99 | Miscellaneous |
![]() |
DRAFT CO NOTIFICATIONS | |
2022-03-10 | 99 | Miscellaneous | DNR COMMENTS ON DRAFT CO NOTIFICATIONS | ||
2022-03-07 | 99 | Miscellaneous |
![]() |
03-07-22 DNR SWL&P GLNPO MEETING PRESENTATION | |
2022-03-04 | 99 | Miscellaneous |
![]() |
02-07-22 DNR SWL&P GLNPO MEETING PRESENTATION | |
2022-03-03 | 99 | Miscellaneous |
![]() |
SEDIMENT PRE DESIGN INVESTIGATION RESULTS | |
2022-01-26 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 7/1/2021 - 12/31/2021 | |
2021-12-23 | 150 | Remedial Action (RA) Design Report Not Approved |
![]() |
RAP NOT APPROVED - 90% DESIGN REPORT REVIEW DNR COMMENTS | |
2021-12-03 | 99 | Miscellaneous | USPS DOCUMENTATION AND DNR RESPONSE | ||
2021-11-08 | 99 | Miscellaneous |
![]() |
WIS STATS & ADMIN CODE | |
2021-10-22 | 99 | Miscellaneous |
![]() |
DNR EMAIL REQUESTING PIEZOMETERS | |
2021-10-01 | 99 | Miscellaneous |
![]() |
SLIDES FROM 9/22/21 MEETING | |
2021-09-27 | 99 | Miscellaneous |
![]() |
INJECTION EXEMPTION EVALUATION | |
2021-09-14 | 148 | Remedial Action Design Report Received (fee) |
![]() |
ACH | |
2021-08-12 | 99 | Miscellaneous |
![]() |
60 RAP PERCENT DESIGN NOTICE TO PROCEED | |
2021-07-23 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 1/1/2021 - 6/30/2021 | |
2021-05-24 | 99 | Miscellaneous |
![]() |
SWL&P RESPONSE TO DNR COMMENTS ON 60% DESIGN REPORT | |
2021-04-20 | 149 | Remedial Action (RA) Design Report Approved |
![]() |
60 PERCENT DESIGN REPORT DNR COMMENTS | |
2021-04-06 | 130 | DNR Regulatory Reminder Sent |
![]() |
VAPOR INTRUSION AND TCE REMINDER LETTER | |
2021-03-23 | 148 | Remedial Action Design Report Received (fee) |
![]() |
ACH | |
2021-01-28 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 7/1/2020 - 12/31/2020 | |
2021-01-28 | 40 | Remedial Action Options Report (RAOR) Approved |
![]() |
RAOR APPR - UPLAND AREA | |
2021-01-21 | 99 | Miscellaneous |
![]() |
FIGURE SHOWING PROPOSED PAH EXCAVATION AREA | |
2021-01-08 | 143 | Remedial Action Options Report (RAOR) Received (fee) |
![]() |
FINAL RAOR REC'D - NO FEE | |
2021-01-08 | 99 | Miscellaneous |
![]() |
DNR COMMENTS ON PROPOSED GLLA PROJECT | |
2020-12-14 | 99 | Miscellaneous |
![]() |
FOTH PRESENTATION FOR 12-14-20 MEETING | |
2020-12-07 | 99 | Miscellaneous |
![]() |
FOTH PRESENTATION FOR 12-7-20 MEETING | |
2020-12-01 | 82 | Remedial Action Options Report (RAOR) Not Approved |
![]() |
RAOR NOT APPR | |
2020-12-01 | 99 | Miscellaneous |
![]() |
PRE DESIGN INVESTIGATION BORING LOGS | |
2020-11-30 | 99 | Miscellaneous |
![]() |
GROUNDWATER FORMS AND FIELD NOTES | |
2020-11-16 | 143 | Remedial Action Options Report (RAOR) Received (fee) |
![]() |
CK # 7912 - (DRAFT RAOR) | |
2020-08-27 | 99 | Miscellaneous |
![]() |
PDI INVESTIGATION BORING ABANDONMENT FORMS | |
2020-08-17 | 130 | DNR Regulatory Reminder Sent |
![]() |
EMERGING CONTAMINANTS REMINDER LETTER | |
2020-07-15 | 99 | Miscellaneous |
![]() |
REDESIGN INVESTIGATION UPDATE AND DNR RESPONSE | |
2020-07-15 | 99 | Miscellaneous | PDI STATUS UPDATE | ||
2020-07-09 | 99 | Miscellaneous |
![]() |
PDI FIELDWORK UPDATE & MODIFICATIONS | |
2020-07-08 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 1/1/2020 - 6/30/2020 | |
2020-07-06 | 99 | Miscellaneous |
![]() |
PDI SCOPE MODIFICATION DNR EMAIL | |
2020-07-02 | 99 | Miscellaneous |
![]() |
PDI SCOPE MOFICIATION | |
2020-04-06 | 99 | Miscellaneous |
![]() |
SEDIMENT INVESTIGATION RESULTS | |
2020-04-03 | 99 | Miscellaneous |
![]() |
DNR EMAIL TO SWL&P | |
2020-03-17 | 99 | Miscellaneous |
![]() |
SWLP RESPONSE LTR REC'D | |
2020-03-02 | 98 | Technical Assistance Provided |
![]() |
PRE-DESIGN WORK PLAN APPROVAL | |
2020-02-07 | 97 | Technical Assistance Request Received (fee) |
![]() |
ACH - TECH ASSIST PRE-DESIGN INVESTIGATION WP REC'D | |
2020-01-08 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 7/1/2019 - 12/31/2019 | |
2019-11-27 | 99 | Miscellaneous |
![]() |
DRAFT PRE-DESIGN INVESTIGATION WP REC'D | |
2019-10-18 | 99 | Miscellaneous |
![]() |
WORK SCHEDULE CHANGE NOTICE REC'D | |
2019-07-25 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 1/1/2019 - 6/30/2019 | |
2019-06-27 | 38 | Site Investigation Report (SIR) Approved |
![]() |
SIR APPROVED | |
2019-06-04 | 199 | Additional Information Received (Fee-Based or Closure) |
![]() |
SIR CLARIFICATION REC'D | |
2019-04-29 | 198 | Request for Additional Information (Fee-Based or Closure) | ADDT'L INFO REQ | ||
2019-03-28 | 137 | Site Investigation Report (SIR) Received (fee) |
![]() |
ACH PAYMENT REC'D | |
2019-03-27 | 37 | Site Investigation Report (SIR) Received (non-fee) |
![]() |
SITE INVESTIGATION RPT REC'D - 1 OF 2 | |
2019-03-27 | 99 | Miscellaneous |
![]() |
SITE INVESTIGATION RPT REC'D 2 OF 2 | |
2019-01-24 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 7/1/2018 - 12/31/2018 | |
2018-07-02 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 1/1/2018 - 6/30/2018 | |
2018-01-03 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 7/1/2017 - 12/31/2017 | |
2017-12-08 | 38 | Site Investigation Report (SIR) Approved |
![]() |
||
2017-11-14 | 199 | Additional Information Received (Fee-Based or Closure) |
![]() |
INFO REC'D | |
2017-11-14 | 99 | Miscellaneous |
![]() |
REC'D CORRESPONDENCE FROM RP RE: LIMESTONE CLARIFICATION | |
2017-11-13 | 99 | Miscellaneous |
![]() |
DNR SUPPLEMENTAL SITE INVESTIGATION COMMENTS | |
2017-10-30 | 198 | Request for Additional Information (Fee-Based or Closure) | ADDT'L INFO REQUESTED | ||
2017-09-20 | 137 | Site Investigation Report (SIR) Received (fee) |
![]() |
CK # 4157 | |
2017-07-17 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 1/1/2017 - 6/30/2017 | |
2017-03-06 | 97 | Technical Assistance Request Received (fee) | CK # 190731 | ||
2017-03-06 | 98 | Technical Assistance Provided | LTR SENT 11/14/16 | ||
2017-01-20 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 7/1/2016 - 12/31/2016 | |
2016-11-14 | 99 | Miscellaneous |
![]() |
SOIL MGMT APPROVAL LTR SENT | |
2016-11-10 | 99 | Miscellaneous |
![]() |
CONTAMINATED SOIL MANAGEMENT PLAN | |
2016-09-12 | 36 | Site Investigation Workplan (SIWP) Approved |
![]() |
SI WORK PLAN APPROVAL | |
2016-09-02 | 135 | Site Investigation Workplan (SIWP) Received (fee) |
![]() |
CK # 3880 | |
2016-08-03 | 99 | Miscellaneous |
![]() |
REMEDIAL DESIGN INVESTIGATION WORK PLAN | |
2016-07-18 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 1/1/2016 - 6/30/2016 | |
2016-02-01 | 99 | Miscellaneous |
![]() |
EPA SITE CHARACTERIZATION RPT - SUPERIOR WATERFRONT | |
2016-01-29 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 7/1/2015 - 12/31/2015 | |
2015-07-21 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 1/1/2015 - 6/30/2015 | |
2015-03-01 | 43 | Site Activity Status Update Received |
![]() |
2013 - 2014 GW MONITORING RPT REC'D - DRAFT | |
2015-01-06 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 7/1/2014 - 12/31/2014 | |
2015-01-06 | 99 | Miscellaneous |
![]() |
NR700 SEMI ANNUAL REPORT CONFIRMATION | |
2014-11-21 | 99 | Miscellaneous |
![]() |
DNR DREDGING EMAIL CORRESPNDENCE | |
2014-11-03 | 99 | Miscellaneous |
![]() |
DNR EMAIL AOC SITE RANKING | |
2014-09-15 | 195 | Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met |
![]() |
Period: 1/1/2014 - 6/30/2014 | |
2013-09-03 | 98 | Technical Assistance Provided |
![]() |
REVIEW LTR SENT | |
2013-06-24 | 97 | Technical Assistance Request Received (fee) | CK # 103796 | ||
2013-01-15 | 43 | Site Activity Status Update Received |
![]() |
2012 ANNUAL GW MONITORING RPT | |
2012-06-15 | 43 | Site Activity Status Update Received |
![]() |
2011 ANNUAL GW MONITORING RPT | |
2011-09-07 | 130 | DNR Regulatory Reminder Sent |
![]() |
Vapor Intrusion (VI) Assessment Notification Ltr Sent | |
2011-05-31 | 99 | Miscellaneous |
![]() |
DNR REVIEW OF PROPOSED RAP | |
2011-03-04 | 99 | Miscellaneous |
![]() |
MONITORING WELL ABANDONMENT FORMS | |
2011-02-10 | 43 | Site Activity Status Update Received |
![]() |
GW MONITORING RPT | |
2010-06-10 | 99 | Miscellaneous |
![]() |
RESPONSE TO SEDIMENT RESULTS - DNR REVIEW OF SEDIMENT INVESTIGATION | |
2010-04-06 | 37 | Site Investigation Report (SIR) Received (non-fee) |
![]() |
SEDIMENT INVESTIGATION RESULTS | |
2009-11-04 | 43 | Site Activity Status Update Received | GW MONITORING RPT | ||
2009-10-27 | 99 | Miscellaneous |
![]() |
GW MONITORING REPORT RECD. | |
2009-07-06 | 151 | Remedial Action (RA) Documentation Report Received (non-fee) |
![]() |
SOIL EXCAVATION REMEDIAL ACTION COMPLETION RPT REC'D | |
2008-04-07 | 143 | Remedial Action Options Report (RAOR) Received (fee) |
![]() |
$500 SUPERIOR WATER LIGHT $& POWER CHECK # 84218 RECD. DUNN | |
2008-03-10 | 39 | Remedial Action Options Report (RAOR) Received (non-fee) |
![]() |
REPORT SUBMITTED ON CD | |
2007-07-01 | 37 | Site Investigation Report (SIR) Received (non-fee) | PHASE 2 PART 4 | ||
2007-06-21 | 37 | Site Investigation Report (SIR) Received (non-fee) |
![]() |
PHASE II, PART IV OF SITE INVESTIGATION | |
2006-12-04 | 43 | Site Activity Status Update Received |
![]() |
||
2006-12-04 | 43 | Site Activity Status Update Received | |||
2005-10-04 | 97 | Technical Assistance Request Received (fee) | $500 SUPERIOR WATER LIGHT & POWER CO CHECK # 75427. DUNN. | ||
2005-10-04 | 98 | Technical Assistance Provided | $500 SUPERIOR WATER LIGHT & POWER CO CHECK # 75427. DUNN. | ||
2005-09-26 | 99 | Miscellaneous |
![]() |
REVIEW FEE COVER LETTER | |
2005-09-13 | 35 | Site Investigation Workplan (SIWP) Received (non-fee) |
![]() |
WP FOR PHASE II, PART IV | |
2005-04-01 | 37 | Site Investigation Report (SIR) Received (non-fee) |
![]() |
FINAL REPORT FOR PHASE II & III | |
2004-10-01 | 43 | Site Activity Status Update Received |
![]() |
ACCESS AGREEMENTS OBTAINED | |
2004-03-26 | 37 | Site Investigation Report (SIR) Received (non-fee) |
![]() |
SEDIMENT SI. ONE HARD COPY, ONE ELECTRONIC COPY | |
2003-12-19 | 35 | Site Investigation Workplan (SIWP) Received (non-fee) | |||
2003-12-18 | 99 | Miscellaneous |
![]() |
SITE INVESTIGATION WP - COVER LETTER | |
2003-11-21 | 99 | Miscellaneous |
![]() |
RECOMMENDATIONS FOR FURTHER INVESTIGATION | |
2003-03-03 | 35 | Site Investigation Workplan (SIWP) Received (non-fee) |
![]() |
RPT #6 - SEDIMENT INVESTIGATION WORK PLAN-ENSR | |
2003-02-21 | 99 | Miscellaneous | RPT #9 - COMPARATIVE ANALYSIS OF EIGHT SOIL SAMPLES - GTI | ||
2003-02-21 | 37 | Site Investigation Report (SIR) Received (non-fee) |
![]() |
SIR - PHASE II, PART II | |
2003-02-21 | 37 | Site Investigation Report (SIR) Received (non-fee) |
![]() |
SIR APPENDICES- PHASE II, PART II | |
2003-02-20 | 35 | Site Investigation Workplan (SIWP) Received (non-fee) | SIR RCVD ENSR CONSULTANTS | ||
2003-02-19 | 37 | Site Investigation Report (SIR) Received (non-fee) | RPT #7 - VOL I, PHASE II, PART II SITE INVESTIGATION REPORT | ||
2003-02-10 | 99 | Miscellaneous |
![]() |
GTI CHEMICAL FINGERPRINTING | |
2003-02-07 | 37 | Site Investigation Report (SIR) Received (non-fee) | RPT #8 - VOL II, PHASE II, PART II - FORENSIC APPENDICES A-F - GTI | ||
2003-02-01 | 99 | Miscellaneous |
![]() |
GTI COMPARATIVE ANALYSIS | |
2002-07-17 | 99 | Miscellaneous | RPT#5 PHASE II, PART II WORKPLAN | ||
2002-07-17 | 35 | Site Investigation Workplan (SIWP) Received (non-fee) |
![]() |
SIWP PHASE 2, PART 2 | |
2002-05-13 | 43 | Site Activity Status Update Received |
![]() |
RPT #4 - GROUNDWATER MONITORING REPORT | |
2002-03-28 | 99 | Miscellaneous |
![]() |
RP NOTICE ACKNOWLEDGMENT OF RECEIPT - SWL & P | |
2002-02-21 | 2 | Responsible Party (RP) letter sent |
![]() |
||
2002-01-23 | 37 | Site Investigation Report (SIR) Received (non-fee) |
![]() |
SIR REC'D | |
2002-01-10 | 99 | Miscellaneous | WILL SEND WP FOR NEXT STAGE | ||
2002-01-01 | 29 | Phase II Environmental Site Assessment (ESA) Rpt Received | RPT #3 - PHASE II SITE INVESTIGATION REPORT.ENSR | ||
2001-11-02 | 35 | Site Investigation Workplan (SIWP) Received (non-fee) |
![]() |
SIWP REC'D | |
2001-11-01 | 1 | Notification of Hazardous Substance Discharge |
![]() |
||
2001-11-01 | 28 | Phase I Environmental Site Assessment (ESA) Rpt Received |
![]() |
RPT #1- PHASE I ESA REPORT.ENSR | |
2001-11-01 | 99 | Miscellaneous |
![]() |
RPT #2 - PHASE II INVESTIGATION WORK PLAN.ENSR | |
2001-08-15 | 99 | Miscellaneous | SPILL REPORT | ||
2001-08-01 | 99 | Miscellaneous |
![]() |
SITE HISTORY | |
2001-06-28 | 99 | Miscellaneous |
![]() |
MEETING SUMMARY | |
2001-06-26 | 99 | Miscellaneous |
![]() |
DNR MEMO RE: 02-16-000014 | |
2001-05-30 | 99 | Miscellaneous |
![]() |
DNR MEETING INVITATION | |
2001-03-08 | 99 | Miscellaneous |
![]() |
DNR MEMO | |
2001-01-11 | 99 | Miscellaneous |
![]() |
DNR MEMO | |
2001-01-11 | 99 | Miscellaneous |
![]() |
DNR PRELIMINARY SEDIMENT EVALUATION | |
2001-01-02 | 99 | Miscellaneous |
![]() |
DNR MEMO | |
2000-11-08 | 99 | Miscellaneous |
![]() |
WSLOH LAB REPORTS REC'D | |
2000-09-19 | 99 | Miscellaneous |
![]() |
WSLOH LAB REPORTS REC'D | |
2000-07-27 | 99 | Miscellaneous |
![]() |
DNR SEDIMENT SAMPLING MEMO | |
2000-07-12 | 99 | Miscellaneous |
![]() |
1994 EPA SAMPLING SUMMARY | |
2000-05-23 | 99 | Miscellaneous |
![]() |
SUPERIOR WWTP GEOTECHNICAL EXPLORATION | |
1997-12-01 | 99 | Miscellaneous |
![]() |
USPA SEDIMENT ASSESSMENT OF HOTSPOT AREAS IN THE DULUTH/SUPERIOR HARBOR |
Type | Related Activity |
---|---|
ERP to Spill | 04-16-588178 SUPERIOR WATER LIGHT AND POWER SPILL |
Reasons when Action Code 234 is Present |
---|
CONTINUED MONITORING IS REQUIRED AT THIS SITE |
Substance | Type | Amt Released | Units |
---|---|---|---|
Polynuclear Aromatic Hydrocarbons | Petroleum | ||
Polynuclear Aromatic Hydrocarbons (coal tar) | Petroleum | ||
Volatile Organic Compounds | VOC |
(B) Compounds of Concern in Use – Commercial/Industrial Restriction: Property use restricted to commercial or industrial. Notification of DNR required for change in property use to residential use. Vapor evaluation is required. Further cleanup may be required. |
(E) Future Redevelopment of Property – Vapor Control Technology Required for Construction: DNR requires notification prior to new building construction or building modifications. Potential for vapor intrusion exists due to residual contamination. Vapor control technologies are required to be installed or modified, and verified protective unless a vapor evaluation is accepted by DNR. |
JAMISON MEHLE 2915 HILL AVE, SUPERIOR, WI 54880 |
SUPERIOR WATER LIGHT & POWER 2915 HILL AVE, SUPERIOR, WI 54880 |
JOHN SAGER john.sager@wisconsin.gov |