Watershed - Lower Oconto River (GB03)
Lower Oconto River Watershed

Details

The Lower Oconto River watershed lies in central Oconto County with small portions of the watershed extending into northern Shawano and eastern Menominee counties. The communities of Oconto. Oconto Falls, Gillett and Suring lie within the watershed. Three hydroelectric dams operate in this watershed. The Wisconsin Electric Power company and Scott Paper Company dams at Oconto Falls operate with run-of-river flows. The Oconto Electric cooperative dam at Stiles operates as a modified peaking operation. This watershed ranked medium in the nonpoint source priority watershed selection process. This was primarily due to the lack of nonpoint source water pollution monitoring data.

Date  1993

Ecological Landscapes for Lower Oconto River Watershed

Ecological Landscapes

The western third of the Lower Oconto River Watershed is located in the Northeast Sands Ecological Watershed and the eastern two-thirds are in the Northern Lake Michigan Coastal Ecological Watershed. The Northern Lake Michigan Coastal Ecological Landscape is located in northeastern Wisconsin, and includes Green Bay and the northern part of the Door Peninsula. Its landforms consist of the Niagara escarpment, a prominent dolomite outcropping along the east side of Green Bay, a lacustrine plain along the west side of Green Bay, and ground moraine elsewhere. Low sand dunes and beach ridges that support Great Lakes endemics and many other rare species are found along the Great Lakes shoreline. The influence of Lake Michigan moderates extreme temperatures. Soils are very diverse; in some areas, lacustrine sands are found overlying clays or bedrock within only a few feet of the surface. In the Door Peninsula, soils are typically stony loamy sands to loams. Poorly drained sands are common in the lake plain or in depressions between dunes and beach ridges. On the western side of Green Bay, the ground moraine is composed mostly of moderately well drained, rocky sandy loams, interspersed with lacustrine sands and clays, and peat and muck also common. The Northeast Sands Ecological Landscape occupies a relatively narrow, vertical band of land in northeast Wisconsin. This landscape formed in glacial outwash sand plains (some of them pitted), and has steep outcropping Precambrian bedrock knolls of basalt, rhyolite, or granite. Sandy ground moraines and end moraines are also interspersed in the landscape. Historically, extensive oak/jack pine barrens and jack pine forests were found in the outwash sand portions of this Ecological Landscape. Moraines supported forests of hardwoods, red pine, and white pine. Outwash plains often contained pitted depressions, resulting in numerous wetlands and kettle lakes. Most of this Ecological Landscape is still forested; aspen predominates, followed by northern hardwoods. Jack pine remains on the outwash plains along with northern pin oak. There are several important occurrences of jack pine/oak barren communities. A small percentage of this Ecological Landscape contains spruce-fir-cedar forest and lowland hardwood forest. The Brazeau Swamp is one of the best representations of large cedar swamp forests in northern Wisconsin. Historic vegetation included maple-basswood-beech forest, hemlock-hardwood forest, northern white cedar swamp, hardwood-conifer swamp, wet meadows, and coastal marshes. Conifer dominated upland forests that resemble the boreal forest were present along Lake Michigan; they contain a significant component of white spruce and balsam fir. Cliffs, sinkholes, and dolomite ledges are associated with the Niagara Escarpment. Current vegetation consists of more than 60% non-forested land, most of which is in agricultural crops, with smaller amounts of grassland, wetland, shrubland, and urbanized areas. Forested lands are dominated by maple-basswood, with smaller amounts of lowland hardwoods, aspen-birch, and lowland conifers. High quality areas of exposed alkaline bedrock beach occur on the northern Door Peninsula, providing habitat for many rare plants. Several islands lie off the Door Peninsula and these also provide critical habitat for rare species and colonially nesting birds.

Date  2010

Watershed Documents
Watershed Grants
Grant Details
Aquatic Invasives Control
Date
4/15/2015
Waters Involved
Berry Lake
Status
Complete

Berry Lake Property Owners Assn Inc: Berry Lake Ais Control: The Berry Lake Property Owners Association proposes to control Hybrid Watermilfoil and Phragmites in Berry Lake by implementing control measures during the period 2015-2018. The project elements and deliverables are specified in the Berry Lake Property Owners Association Grant application, dated January 29, 2015.

The project includes conducting Point Intercept surveys using the DNR Aquatic Plant Treatment Evaluation Protocol http://www4.uwsp.edu/cnr/uwexlakes/ecology/APM/Appendix-D.pdf ,in addition to 3 peak biomass surveys and lake bathymetry mapping; controlling Hybrid Watermilfoil and Phragmites with aquatic herbicide treatments and hand pulling coordination; and implementing an aquatic invasive species prevention and control strategy that includes soliciting the in-kind volunteer work that is identified in the grant application. The project also consists of purchasing a dissolved oxygen meter for monitoring oxygen levels. Annual progress reports and a final report summarizing the 3-year project will be provided to DNR. Any publications produced as part of the project will incorporate the \201CStop Aquatic Hitchhikers!\201D\2122 brand (partnership details can be found at: http://www.protectyourwaters.org).

If consultant is to provide the final report, it is recommended that the Grantee provide the DNR Aquatic Invasive Species Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR will be provided both paper and electronic. pdf copies of the final report along with, or prior to, submission of grantee\2019s final payment request. All information associated with this project is subject to public record.


Grant Details
Aquatic Invasives Control
Date
3/15/2022
Waters Involved
Berry Lake
Status
Complete

Berry Lake Property Owners Assn Inc: Berry Lake 2022-2023 Ewm Monitoring & Management: The Berry Lake Property Owner\2019s Association is sponsoring a project to develop a 2022-2023 EWM Monitoring & Management Project.

Project final deliverables include: all data collected, agendas and minutes for planning meetings, including methodologies, results, and management alternatives discussion with an implementation plan.

Specific project activities include: 1) 2022 Pretreatment Survey & Dosing Strategy Finalization; 2) 2022 Herbicide Concentration Monitoring (Design & Data management and analysis); 3) 2022/2023 Communication & Spatial Data Transmission with Applicator; 4) 2022 Late-Season EWM Mapping Survey) 5) 2023 Communication & Spatial Data Transmission with Hand Harvesting Firm; 6) 2022 Sub-Sample Point-intercept Survey (Late-Summer PostTreat of 2022 Sites 7) 2023 Sub-Sample Point-Intercept Survey (Late-Summer PostTreat of 2022 Sites) Per DNR Protocol; 8) 2023 Whole-Lake Point-Intercept Survey 9) 2021-2023 Final EWM Management & Control Strategy Assessment Report (Winter 2023-2024).

Special Conditions: 1) All data shall be entered into the SWIMS database. 2) All lakewide aquatic plant point Intercept surveys and/or sub polygon surveys shall be conducted according to WDNR\2019s \2018Recommended Baseline Monitoring of Aquatic Plants in WI\2019 Protocol PUB-SS-1068 2010

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.

If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Aquatic Invasives Control
Date
10/1/2007
Waters Involved
Blacksmith Lake
Status
Complete

Legend Lake P & R District: Legend Lake Ewm Treatment Plan: The Legend Lake Protection and Rehabilitation District proposes to control Eurasian water-milfoil (EWM) through chemical treatment and preventative measures in Wah-Toh-Sah, Skice, Sapokesik, Pywaosit lakes during the period 2007 - 2009. The project elements and deliverables are specified in the Legend Lake Protection and Rehabilitation District's Aquatic invasive Species Control Grant Application, dated August 01, 2007. The project includes treating Eurasian water Milfoil; hand-pulling and hand-raking of Eurasian Water Milfoil; annual pre- and post-treatment monitoring and education; continue to use volunteers to conduct the "clean boats clean waters" program. Watercraft inspection records will be entered into the State's online Watercraft Inspection Database. One mid-term progress report and a final report summarizing the two-year project will be provided to DNR.

The grantee will provide the DNR Aquatic Invasive Species Coordinator with a draft of the final report for comment on report adequacy prior to requesting final reimbursement. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to, submission of grantee's final payment request. AMENDMENT #1: Remove Wah-Toh-Sah and Skice Lakes from this project.


Grant Details
Aquatic Invasives Control
Date
4/1/2008
Waters Involved
Blacksmith Lake
Status
Complete

Legend Lake P & R District: Legend Lake Ewm Control Project: The Legend Lake Protection and Rehabilitation District proposes to control Eurasian Water-milfoil (EWM) through chemical treatment and preventative measures in the Wahtosah/Skice basins during the period 2008-2009. The project elements and deliverables are specified in the District's Aquatic Invasive Species Grant application, dated January 30, 2008. The project includes conducting pre-treatment surveys annually to monitor the extent of EWM and efficacy of the previous year's treatment; treating EWM infested areas with aquatic herbicides; conducting education and prevention activities to prevent further AIS infestations, and conducting watercraft inspections. Watercraft inspection records will be entered into the State's online Watercraft Inspection Database. Annual progress reports and a final report summarizing the two-year project will be provided to DNR.

If consultant is to provide the final report, it is recommended the Grantee provide the DNR Aquatic Invasive Species Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to, submission of grantee's final payment request.


Grant Details
Aquatic Invasives Control
Date
4/1/2012
Waters Involved
Blacksmith Lake
Status
Proposed

Legend Lake P & R District: Legend Lake Ais Control Project: The Legend Lake P&R District proposes to manage invasive species on Legend Lake during the period of 2012. The project elements and deliverables are specified within their control grant application dated January 27, 2012. All project requirements are listed below.

*The approved project is for Eurasian Watermilfoil control and monitoring for the year of 2012. Years 2013-2014 are not funded at this time.

This project requires that the following actions be completed: 1) Invasive species management following approved strategy within management plan and grant proposal. 2) Clean Boats Clean Waters (CBCW)- a minimum of 200 hrs.- all data entered into SWIMS by October 1. 3) Citizen Lake Monitoring Network (CLMN) Early Detection Monitoring for invasive species- all data to be entered into SWIMS by October 1. 4) Handpulling of invasive species 500 hr.- all hours to be recorded on volunteer log worksheet. 5) Conduct pre-/post- treatment surveys according to department protocol. 6) Augmented enforcement with local law enforcement- all hours to be recorded.

Annual progress reports and a final report summarizing this project is requirement and will be provided to the DNR. Please provide both paper and electronic .pdf copies of the final report along with, or prior to, submission of the grantee\2019s final payment request. If a consultant is to provide the final report, it is recommended that the Grantee provide the DNR AIS Coordinator with a draft for comment on report adequacy prior to making the final payment to the consultant.

Any publications produced as part of the project will incorporate the \201CStop Aquatic Hitchhikers!\201D\2122 brand (partnership details can be found at: http://www.protectyourwaters.org).


Grant Details
Aquatic Invasives Control
Date
10/1/2007
Waters Involved
Little Blacksmith Lake
Status
Complete

Legend Lake P & R District: Legend Lake Ewm Treatment Plan: The Legend Lake Protection and Rehabilitation District proposes to control Eurasian water-milfoil (EWM) through chemical treatment and preventative measures in Wah-Toh-Sah, Skice, Sapokesik, Pywaosit lakes during the period 2007 - 2009. The project elements and deliverables are specified in the Legend Lake Protection and Rehabilitation District's Aquatic invasive Species Control Grant Application, dated August 01, 2007. The project includes treating Eurasian water Milfoil; hand-pulling and hand-raking of Eurasian Water Milfoil; annual pre- and post-treatment monitoring and education; continue to use volunteers to conduct the "clean boats clean waters" program. Watercraft inspection records will be entered into the State's online Watercraft Inspection Database. One mid-term progress report and a final report summarizing the two-year project will be provided to DNR.

The grantee will provide the DNR Aquatic Invasive Species Coordinator with a draft of the final report for comment on report adequacy prior to requesting final reimbursement. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to, submission of grantee's final payment request. AMENDMENT #1: Remove Wah-Toh-Sah and Skice Lakes from this project.


Grant Details
Aquatic Invasives Control
Date
4/1/2008
Waters Involved
Little Blacksmith Lake
Status
Complete

Legend Lake P & R District: Legend Lake Ewm Control Project: The Legend Lake Protection and Rehabilitation District proposes to control Eurasian Water-milfoil (EWM) through chemical treatment and preventative measures in the Wahtosah/Skice basins during the period 2008-2009. The project elements and deliverables are specified in the District's Aquatic Invasive Species Grant application, dated January 30, 2008. The project includes conducting pre-treatment surveys annually to monitor the extent of EWM and efficacy of the previous year's treatment; treating EWM infested areas with aquatic herbicides; conducting education and prevention activities to prevent further AIS infestations, and conducting watercraft inspections. Watercraft inspection records will be entered into the State's online Watercraft Inspection Database. Annual progress reports and a final report summarizing the two-year project will be provided to DNR.

If consultant is to provide the final report, it is recommended the Grantee provide the DNR Aquatic Invasive Species Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to, submission of grantee's final payment request.


Grant Details
Aquatic Invasives Control
Date
4/1/2012
Waters Involved
Little Blacksmith Lake
Status
Proposed

Legend Lake P & R District: Legend Lake Ais Control Project: The Legend Lake P&R District proposes to manage invasive species on Legend Lake during the period of 2012. The project elements and deliverables are specified within their control grant application dated January 27, 2012. All project requirements are listed below.

*The approved project is for Eurasian Watermilfoil control and monitoring for the year of 2012. Years 2013-2014 are not funded at this time.

This project requires that the following actions be completed: 1) Invasive species management following approved strategy within management plan and grant proposal. 2) Clean Boats Clean Waters (CBCW)- a minimum of 200 hrs.- all data entered into SWIMS by October 1. 3) Citizen Lake Monitoring Network (CLMN) Early Detection Monitoring for invasive species- all data to be entered into SWIMS by October 1. 4) Handpulling of invasive species 500 hr.- all hours to be recorded on volunteer log worksheet. 5) Conduct pre-/post- treatment surveys according to department protocol. 6) Augmented enforcement with local law enforcement- all hours to be recorded.

Annual progress reports and a final report summarizing this project is requirement and will be provided to the DNR. Please provide both paper and electronic .pdf copies of the final report along with, or prior to, submission of the grantee\2019s final payment request. If a consultant is to provide the final report, it is recommended that the Grantee provide the DNR AIS Coordinator with a draft for comment on report adequacy prior to making the final payment to the consultant.

Any publications produced as part of the project will incorporate the \201CStop Aquatic Hitchhikers!\201D\2122 brand (partnership details can be found at: http://www.protectyourwaters.org).


Grant Details
Aquatic Invasives Control
Date
3/15/2021
Waters Involved
Machickanee Flowage (Stiles)
Status
Complete

Machickanee Flowage Advancement Association: Machickanee Flowage Drawdown: Machickanee Advancement Association is partnering with Oconto Electric Coop (OEC) to conduct a partial drawdown for EWM control and sediment compactions. The goals of the drawdown are to reduce the occurrence of Eursian Watermilfoil/Hybrid Watermilfoil by 75%, increase sediment compaction by 50%, and enhance the natural community.

Project final deliverables include: Pre- and Post-drawdown water quality sampling and lab analysis data submittal. A final report including: pre- and post-water quality data, stranded organism recovery and relocation report, and archeology survey of shoreline report.

Specific project activities include: 1) Pre- and Post-drawdown water quality sampling, lab analysis, and reporting; 2) Stranded organism recovery and relocation (fish and mussel); 3) Archeology survey of shoreline

Special Conditions: All water quality data shall be entered into the SWIMS database

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.

If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Aquatic Invasives Control
Date
10/1/2007
Waters Involved
Moshawquit Lake
Status
Complete

Legend Lake P & R District: Legend Lake Ewm Treatment Plan: The Legend Lake Protection and Rehabilitation District proposes to control Eurasian water-milfoil (EWM) through chemical treatment and preventative measures in Wah-Toh-Sah, Skice, Sapokesik, Pywaosit lakes during the period 2007 - 2009. The project elements and deliverables are specified in the Legend Lake Protection and Rehabilitation District's Aquatic invasive Species Control Grant Application, dated August 01, 2007. The project includes treating Eurasian water Milfoil; hand-pulling and hand-raking of Eurasian Water Milfoil; annual pre- and post-treatment monitoring and education; continue to use volunteers to conduct the "clean boats clean waters" program. Watercraft inspection records will be entered into the State's online Watercraft Inspection Database. One mid-term progress report and a final report summarizing the two-year project will be provided to DNR.

The grantee will provide the DNR Aquatic Invasive Species Coordinator with a draft of the final report for comment on report adequacy prior to requesting final reimbursement. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to, submission of grantee's final payment request. AMENDMENT #1: Remove Wah-Toh-Sah and Skice Lakes from this project.


Grant Details
Aquatic Invasives Control
Date
4/1/2008
Waters Involved
Moshawquit Lake
Status
Complete

Legend Lake P & R District: Legend Lake Ewm Control Project: The Legend Lake Protection and Rehabilitation District proposes to control Eurasian Water-milfoil (EWM) through chemical treatment and preventative measures in the Wahtosah/Skice basins during the period 2008-2009. The project elements and deliverables are specified in the District's Aquatic Invasive Species Grant application, dated January 30, 2008. The project includes conducting pre-treatment surveys annually to monitor the extent of EWM and efficacy of the previous year's treatment; treating EWM infested areas with aquatic herbicides; conducting education and prevention activities to prevent further AIS infestations, and conducting watercraft inspections. Watercraft inspection records will be entered into the State's online Watercraft Inspection Database. Annual progress reports and a final report summarizing the two-year project will be provided to DNR.

If consultant is to provide the final report, it is recommended the Grantee provide the DNR Aquatic Invasive Species Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to, submission of grantee's final payment request.


Grant Details
Aquatic Invasives Control
Date
3/15/2021
Waters Involved
Oconto River
Status
Complete

Machickanee Flowage Advancement Association: Machickanee Flowage Drawdown: Machickanee Advancement Association is partnering with Oconto Electric Coop (OEC) to conduct a partial drawdown for EWM control and sediment compactions. The goals of the drawdown are to reduce the occurrence of Eursian Watermilfoil/Hybrid Watermilfoil by 75%, increase sediment compaction by 50%, and enhance the natural community.

Project final deliverables include: Pre- and Post-drawdown water quality sampling and lab analysis data submittal. A final report including: pre- and post-water quality data, stranded organism recovery and relocation report, and archeology survey of shoreline report.

Specific project activities include: 1) Pre- and Post-drawdown water quality sampling, lab analysis, and reporting; 2) Stranded organism recovery and relocation (fish and mussel); 3) Archeology survey of shoreline

Special Conditions: All water quality data shall be entered into the SWIMS database

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.

If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Aquatic Invasives Control
Date
10/1/2007
Waters Involved
Pestiga Lake
Status
Complete

Legend Lake P & R District: Legend Lake Ewm Treatment Plan: The Legend Lake Protection and Rehabilitation District proposes to control Eurasian water-milfoil (EWM) through chemical treatment and preventative measures in Wah-Toh-Sah, Skice, Sapokesik, Pywaosit lakes during the period 2007 - 2009. The project elements and deliverables are specified in the Legend Lake Protection and Rehabilitation District's Aquatic invasive Species Control Grant Application, dated August 01, 2007. The project includes treating Eurasian water Milfoil; hand-pulling and hand-raking of Eurasian Water Milfoil; annual pre- and post-treatment monitoring and education; continue to use volunteers to conduct the "clean boats clean waters" program. Watercraft inspection records will be entered into the State's online Watercraft Inspection Database. One mid-term progress report and a final report summarizing the two-year project will be provided to DNR.

The grantee will provide the DNR Aquatic Invasive Species Coordinator with a draft of the final report for comment on report adequacy prior to requesting final reimbursement. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to, submission of grantee's final payment request. AMENDMENT #1: Remove Wah-Toh-Sah and Skice Lakes from this project.


Grant Details
Aquatic Invasives Control
Date
4/1/2008
Waters Involved
Pestiga Lake
Status
Complete

Legend Lake P & R District: Legend Lake Ewm Control Project: The Legend Lake Protection and Rehabilitation District proposes to control Eurasian Water-milfoil (EWM) through chemical treatment and preventative measures in the Wahtosah/Skice basins during the period 2008-2009. The project elements and deliverables are specified in the District's Aquatic Invasive Species Grant application, dated January 30, 2008. The project includes conducting pre-treatment surveys annually to monitor the extent of EWM and efficacy of the previous year's treatment; treating EWM infested areas with aquatic herbicides; conducting education and prevention activities to prevent further AIS infestations, and conducting watercraft inspections. Watercraft inspection records will be entered into the State's online Watercraft Inspection Database. Annual progress reports and a final report summarizing the two-year project will be provided to DNR.

If consultant is to provide the final report, it is recommended the Grantee provide the DNR Aquatic Invasive Species Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to, submission of grantee's final payment request.


Grant Details
Aquatic Invasives Control
Date
4/1/2012
Waters Involved
Pestiga Lake
Status
Proposed

Legend Lake P & R District: Legend Lake Ais Control Project: The Legend Lake P&R District proposes to manage invasive species on Legend Lake during the period of 2012. The project elements and deliverables are specified within their control grant application dated January 27, 2012. All project requirements are listed below.

*The approved project is for Eurasian Watermilfoil control and monitoring for the year of 2012. Years 2013-2014 are not funded at this time.

This project requires that the following actions be completed: 1) Invasive species management following approved strategy within management plan and grant proposal. 2) Clean Boats Clean Waters (CBCW)- a minimum of 200 hrs.- all data entered into SWIMS by October 1. 3) Citizen Lake Monitoring Network (CLMN) Early Detection Monitoring for invasive species- all data to be entered into SWIMS by October 1. 4) Handpulling of invasive species 500 hr.- all hours to be recorded on volunteer log worksheet. 5) Conduct pre-/post- treatment surveys according to department protocol. 6) Augmented enforcement with local law enforcement- all hours to be recorded.

Annual progress reports and a final report summarizing this project is requirement and will be provided to the DNR. Please provide both paper and electronic .pdf copies of the final report along with, or prior to, submission of the grantee\2019s final payment request. If a consultant is to provide the final report, it is recommended that the Grantee provide the DNR AIS Coordinator with a draft for comment on report adequacy prior to making the final payment to the consultant.

Any publications produced as part of the project will incorporate the \201CStop Aquatic Hitchhikers!\201D\2122 brand (partnership details can be found at: http://www.protectyourwaters.org).


Grant Details
Aquatic Invasives Control
Date
10/1/2007
Waters Involved
Pywaosit Lake
Status
Complete

Legend Lake P & R District: Legend Lake Ewm Treatment Plan: The Legend Lake Protection and Rehabilitation District proposes to control Eurasian water-milfoil (EWM) through chemical treatment and preventative measures in Wah-Toh-Sah, Skice, Sapokesik, Pywaosit lakes during the period 2007 - 2009. The project elements and deliverables are specified in the Legend Lake Protection and Rehabilitation District's Aquatic invasive Species Control Grant Application, dated August 01, 2007. The project includes treating Eurasian water Milfoil; hand-pulling and hand-raking of Eurasian Water Milfoil; annual pre- and post-treatment monitoring and education; continue to use volunteers to conduct the "clean boats clean waters" program. Watercraft inspection records will be entered into the State's online Watercraft Inspection Database. One mid-term progress report and a final report summarizing the two-year project will be provided to DNR.

The grantee will provide the DNR Aquatic Invasive Species Coordinator with a draft of the final report for comment on report adequacy prior to requesting final reimbursement. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to, submission of grantee's final payment request. AMENDMENT #1: Remove Wah-Toh-Sah and Skice Lakes from this project.


Grant Details
Aquatic Invasives Control
Date
4/1/2008
Waters Involved
Pywaosit Lake
Status
Complete

Legend Lake P & R District: Legend Lake Ewm Control Project: The Legend Lake Protection and Rehabilitation District proposes to control Eurasian Water-milfoil (EWM) through chemical treatment and preventative measures in the Wahtosah/Skice basins during the period 2008-2009. The project elements and deliverables are specified in the District's Aquatic Invasive Species Grant application, dated January 30, 2008. The project includes conducting pre-treatment surveys annually to monitor the extent of EWM and efficacy of the previous year's treatment; treating EWM infested areas with aquatic herbicides; conducting education and prevention activities to prevent further AIS infestations, and conducting watercraft inspections. Watercraft inspection records will be entered into the State's online Watercraft Inspection Database. Annual progress reports and a final report summarizing the two-year project will be provided to DNR.

If consultant is to provide the final report, it is recommended the Grantee provide the DNR Aquatic Invasive Species Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to, submission of grantee's final payment request.


Grant Details
Aquatic Invasives Control
Date
4/1/2012
Waters Involved
Pywaosit Lake
Status
Complete

Legend Lake P & R District: Legend Lake Ais Control Project: The Legend Lake P&R District proposes to manage invasive species on Legend Lake during the period of 2012. The project elements and deliverables are specified within their control grant application dated January 27, 2012. All project requirements are listed below.

*The approved project is for Eurasian Watermilfoil control and monitoring for the year of 2012. Years 2013-2014 are not funded at this time.

This project requires that the following actions be completed: 1) Invasive species management following approved strategy within management plan and grant proposal. 2) Clean Boats Clean Waters (CBCW)- a minimum of 200 hrs.- all data entered into SWIMS by October 1. 3) Citizen Lake Monitoring Network (CLMN) Early Detection Monitoring for invasive species- all data to be entered into SWIMS by October 1. 4) Handpulling of invasive species 500 hr.- all hours to be recorded on volunteer log worksheet. 5) Conduct pre-/post- treatment surveys according to department protocol. 6) Augmented enforcement with local law enforcement- all hours to be recorded.

Annual progress reports and a final report summarizing this project is requirement and will be provided to the DNR. Please provide both paper and electronic .pdf copies of the final report along with, or prior to, submission of the grantee\2019s final payment request. If a consultant is to provide the final report, it is recommended that the Grantee provide the DNR AIS Coordinator with a draft for comment on report adequacy prior to making the final payment to the consultant.

Any publications produced as part of the project will incorporate the \201CStop Aquatic Hitchhikers!\201D\2122 brand (partnership details can be found at: http://www.protectyourwaters.org).


Grant Details
Aquatic Invasives Control
Date
4/1/2013
Waters Involved
Pywaosit Lake
Status
Complete

Legend Lake P & R District: Sapokesick & Pywaosit Ewm Control: Legend Lake Protection and Rehabilitation District proposes to control Eurasian Watermilfoil in Sapokesick & Pywaosit lakes by implementing control measures during the period 2013. The project elements and deliverables are specified in the TPPRD\2019s Aquatic Invasive Species Control Grant application, dated February 1, 2013.

The project includes conducting one Point Intercept Survey (post-treatment) in 2013 using the DNR Aquatic Plant Treatment Evaluation Protocol http://www4.uwsp.edu/cnr/uwexlakes/ecology/APM/Appendix-D.pdf ; controlling Eurasian Watermilfoil with aquatic herbicide treatments; continue to work with The Menominee County Sherriff\2019s Department to conduct augmented AIS enforcement and also assist with the already existing Clean Boats, Clean Waters program; train volunteers with current Citizen lake Monitoring AIS protocol; continue with hand-pulling efforts. A final report summarizing the one-year project will be provided to DNR. The report format for the plant data will use the spread sheet developed by the Department, including all the raw data. All CLMN data will be entered into the state website. Any publications produced as part of the project will incorporate the \201CStop Aquatic Hitchhikers!\201D\2122 brand (partnership details can be found at: http://www.protectyourwaters.org).

If consultant is to provide the final report, it is recommended that the Grantee provide the DNR Aquatic Invasive Species Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR will be provided both paper and electronic .pdf copies of the final report along with, or prior to, submission of grantee\2019s final payment request. All information associated with this project is subject to public record.


Grant Details
Aquatic Invasives Control
Date
4/15/2015
Waters Involved
Pywaosit Lake
Status
Complete

Legend Lake P & R District: Management Of Ais In Legend Lake: The Legend Lake Protection and Rehabilitation District proposes to control Eurasian Watermilfoil and Curlyleaf Pondweed in Legend Lake by implementing control measures during 2015. The project elements and deliverables are specified in Legend Lakes grant application dated February 1, 2015.
The project includes conducting;Spring AIS mapping survey, Polygon PI survey (pre-treatment; 544 points; EWM/HWM/CLP), Summer AIS mapping survey DASH, Polygon PI survey (post treatment;544 points; all species), Full PI survey \2013 System \2013wide, Fall AIS mapping survey
Polygon PI survey (post-treatment; 544 points ;EWM/HWM)
Point Intercept surveys using the DNR Aquatic Plant Treatment Evaluation Protocol http://www4.uwsp.edu/cnr/uwexlakes/ecology/APM/Appendix-D.pdf ,will be utilized, in addition to creating the AIS distribution maps. Grant deliverables also consist of shipping water quality samples, dissolved oxygen and temperature meter, residual sample analysis, sensitivity testing, milfoil DNA analysis, permit fee, DASH construction, DASH operation and labor, contracted DASH services, meeting/presentation, progress report, and plan update. Annual progress reports and a final report summarizing the project will be provided to DNR. Any publications produced as part of the project will incorporate the \201CStop Aquatic Hitchhikers!\201D\2122 brand (partnership details can be found at: http://www.protectyourwaters.org).

If consultant is to provide the final report, it is recommended that the Grantee provide the DNR Aquatic Invasive Species Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR will be provided both paper and electronic. pdf copies of the final report along with, or prior to, submission of grantee\2019s final payment request. All information associated with this project is subject to public record.


Grant Details
Aquatic Invasives Control
Date
10/1/2007
Waters Involved
Sapokesick Lake
Status
Complete

Legend Lake P & R District: Legend Lake Ewm Treatment Plan: The Legend Lake Protection and Rehabilitation District proposes to control Eurasian water-milfoil (EWM) through chemical treatment and preventative measures in Wah-Toh-Sah, Skice, Sapokesik, Pywaosit lakes during the period 2007 - 2009. The project elements and deliverables are specified in the Legend Lake Protection and Rehabilitation District's Aquatic invasive Species Control Grant Application, dated August 01, 2007. The project includes treating Eurasian water Milfoil; hand-pulling and hand-raking of Eurasian Water Milfoil; annual pre- and post-treatment monitoring and education; continue to use volunteers to conduct the "clean boats clean waters" program. Watercraft inspection records will be entered into the State's online Watercraft Inspection Database. One mid-term progress report and a final report summarizing the two-year project will be provided to DNR.

The grantee will provide the DNR Aquatic Invasive Species Coordinator with a draft of the final report for comment on report adequacy prior to requesting final reimbursement. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to, submission of grantee's final payment request. AMENDMENT #1: Remove Wah-Toh-Sah and Skice Lakes from this project.


Grant Details
Aquatic Invasives Control
Date
4/1/2008
Waters Involved
Sapokesick Lake
Status
Complete

Legend Lake P & R District: Legend Lake Ewm Control Project: The Legend Lake Protection and Rehabilitation District proposes to control Eurasian Water-milfoil (EWM) through chemical treatment and preventative measures in the Wahtosah/Skice basins during the period 2008-2009. The project elements and deliverables are specified in the District's Aquatic Invasive Species Grant application, dated January 30, 2008. The project includes conducting pre-treatment surveys annually to monitor the extent of EWM and efficacy of the previous year's treatment; treating EWM infested areas with aquatic herbicides; conducting education and prevention activities to prevent further AIS infestations, and conducting watercraft inspections. Watercraft inspection records will be entered into the State's online Watercraft Inspection Database. Annual progress reports and a final report summarizing the two-year project will be provided to DNR.

If consultant is to provide the final report, it is recommended the Grantee provide the DNR Aquatic Invasive Species Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to, submission of grantee's final payment request.


Grant Details
Aquatic Invasives Control
Date
4/1/2012
Waters Involved
Sapokesick Lake
Status
Proposed

Legend Lake P & R District: Legend Lake Ais Control Project: The Legend Lake P&R District proposes to manage invasive species on Legend Lake during the period of 2012. The project elements and deliverables are specified within their control grant application dated January 27, 2012. All project requirements are listed below.

*The approved project is for Eurasian Watermilfoil control and monitoring for the year of 2012. Years 2013-2014 are not funded at this time.

This project requires that the following actions be completed: 1) Invasive species management following approved strategy within management plan and grant proposal. 2) Clean Boats Clean Waters (CBCW)- a minimum of 200 hrs.- all data entered into SWIMS by October 1. 3) Citizen Lake Monitoring Network (CLMN) Early Detection Monitoring for invasive species- all data to be entered into SWIMS by October 1. 4) Handpulling of invasive species 500 hr.- all hours to be recorded on volunteer log worksheet. 5) Conduct pre-/post- treatment surveys according to department protocol. 6) Augmented enforcement with local law enforcement- all hours to be recorded.

Annual progress reports and a final report summarizing this project is requirement and will be provided to the DNR. Please provide both paper and electronic .pdf copies of the final report along with, or prior to, submission of the grantee\2019s final payment request. If a consultant is to provide the final report, it is recommended that the Grantee provide the DNR AIS Coordinator with a draft for comment on report adequacy prior to making the final payment to the consultant.

Any publications produced as part of the project will incorporate the \201CStop Aquatic Hitchhikers!\201D\2122 brand (partnership details can be found at: http://www.protectyourwaters.org).


Grant Details
Aquatic Invasives Control
Date
4/1/2013
Waters Involved
Sapokesick Lake
Status
Complete

Legend Lake P & R District: Sapokesick & Pywaosit Ewm Control: Legend Lake Protection and Rehabilitation District proposes to control Eurasian Watermilfoil in Sapokesick & Pywaosit lakes by implementing control measures during the period 2013. The project elements and deliverables are specified in the TPPRD\2019s Aquatic Invasive Species Control Grant application, dated February 1, 2013.

The project includes conducting one Point Intercept Survey (post-treatment) in 2013 using the DNR Aquatic Plant Treatment Evaluation Protocol http://www4.uwsp.edu/cnr/uwexlakes/ecology/APM/Appendix-D.pdf ; controlling Eurasian Watermilfoil with aquatic herbicide treatments; continue to work with The Menominee County Sherriff\2019s Department to conduct augmented AIS enforcement and also assist with the already existing Clean Boats, Clean Waters program; train volunteers with current Citizen lake Monitoring AIS protocol; continue with hand-pulling efforts. A final report summarizing the one-year project will be provided to DNR. The report format for the plant data will use the spread sheet developed by the Department, including all the raw data. All CLMN data will be entered into the state website. Any publications produced as part of the project will incorporate the \201CStop Aquatic Hitchhikers!\201D\2122 brand (partnership details can be found at: http://www.protectyourwaters.org).

If consultant is to provide the final report, it is recommended that the Grantee provide the DNR Aquatic Invasive Species Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR will be provided both paper and electronic .pdf copies of the final report along with, or prior to, submission of grantee\2019s final payment request. All information associated with this project is subject to public record.


Grant Details
Aquatic Invasives Control
Date
10/1/2007
Waters Involved
Skice Lake
Status
Complete

Legend Lake P & R District: Legend Lake Ewm Treatment Plan: The Legend Lake Protection and Rehabilitation District proposes to control Eurasian water-milfoil (EWM) through chemical treatment and preventative measures in Wah-Toh-Sah, Skice, Sapokesik, Pywaosit lakes during the period 2007 - 2009. The project elements and deliverables are specified in the Legend Lake Protection and Rehabilitation District's Aquatic invasive Species Control Grant Application, dated August 01, 2007. The project includes treating Eurasian water Milfoil; hand-pulling and hand-raking of Eurasian Water Milfoil; annual pre- and post-treatment monitoring and education; continue to use volunteers to conduct the "clean boats clean waters" program. Watercraft inspection records will be entered into the State's online Watercraft Inspection Database. One mid-term progress report and a final report summarizing the two-year project will be provided to DNR.

The grantee will provide the DNR Aquatic Invasive Species Coordinator with a draft of the final report for comment on report adequacy prior to requesting final reimbursement. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to, submission of grantee's final payment request. AMENDMENT #1: Remove Wah-Toh-Sah and Skice Lakes from this project.


Grant Details
Aquatic Invasives Control
Date
4/1/2008
Waters Involved
Skice Lake
Status
Complete

Legend Lake P & R District: Legend Lake Ewm Control Project: The Legend Lake Protection and Rehabilitation District proposes to control Eurasian Water-milfoil (EWM) through chemical treatment and preventative measures in the Wahtosah/Skice basins during the period 2008-2009. The project elements and deliverables are specified in the District's Aquatic Invasive Species Grant application, dated January 30, 2008. The project includes conducting pre-treatment surveys annually to monitor the extent of EWM and efficacy of the previous year's treatment; treating EWM infested areas with aquatic herbicides; conducting education and prevention activities to prevent further AIS infestations, and conducting watercraft inspections. Watercraft inspection records will be entered into the State's online Watercraft Inspection Database. Annual progress reports and a final report summarizing the two-year project will be provided to DNR.

If consultant is to provide the final report, it is recommended the Grantee provide the DNR Aquatic Invasive Species Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to, submission of grantee's final payment request.


Grant Details
Aquatic Invasives Control
Date
10/1/2007
Waters Involved
Spring Lake
Status
Complete

Legend Lake P & R District: Legend Lake Ewm Treatment Plan: The Legend Lake Protection and Rehabilitation District proposes to control Eurasian water-milfoil (EWM) through chemical treatment and preventative measures in Wah-Toh-Sah, Skice, Sapokesik, Pywaosit lakes during the period 2007 - 2009. The project elements and deliverables are specified in the Legend Lake Protection and Rehabilitation District's Aquatic invasive Species Control Grant Application, dated August 01, 2007. The project includes treating Eurasian water Milfoil; hand-pulling and hand-raking of Eurasian Water Milfoil; annual pre- and post-treatment monitoring and education; continue to use volunteers to conduct the "clean boats clean waters" program. Watercraft inspection records will be entered into the State's online Watercraft Inspection Database. One mid-term progress report and a final report summarizing the two-year project will be provided to DNR.

The grantee will provide the DNR Aquatic Invasive Species Coordinator with a draft of the final report for comment on report adequacy prior to requesting final reimbursement. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to, submission of grantee's final payment request. AMENDMENT #1: Remove Wah-Toh-Sah and Skice Lakes from this project.


Grant Details
Aquatic Invasives Control
Date
4/1/2008
Waters Involved
Spring Lake
Status
Complete

Legend Lake P & R District: Legend Lake Ewm Control Project: The Legend Lake Protection and Rehabilitation District proposes to control Eurasian Water-milfoil (EWM) through chemical treatment and preventative measures in the Wahtosah/Skice basins during the period 2008-2009. The project elements and deliverables are specified in the District's Aquatic Invasive Species Grant application, dated January 30, 2008. The project includes conducting pre-treatment surveys annually to monitor the extent of EWM and efficacy of the previous year's treatment; treating EWM infested areas with aquatic herbicides; conducting education and prevention activities to prevent further AIS infestations, and conducting watercraft inspections. Watercraft inspection records will be entered into the State's online Watercraft Inspection Database. Annual progress reports and a final report summarizing the two-year project will be provided to DNR.

If consultant is to provide the final report, it is recommended the Grantee provide the DNR Aquatic Invasive Species Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to, submission of grantee's final payment request.


Grant Details
Aquatic Invasives Control
Date
4/1/2012
Waters Involved
Spring Lake
Status
Proposed

Legend Lake P & R District: Legend Lake Ais Control Project: The Legend Lake P&R District proposes to manage invasive species on Legend Lake during the period of 2012. The project elements and deliverables are specified within their control grant application dated January 27, 2012. All project requirements are listed below.

*The approved project is for Eurasian Watermilfoil control and monitoring for the year of 2012. Years 2013-2014 are not funded at this time.

This project requires that the following actions be completed: 1) Invasive species management following approved strategy within management plan and grant proposal. 2) Clean Boats Clean Waters (CBCW)- a minimum of 200 hrs.- all data entered into SWIMS by October 1. 3) Citizen Lake Monitoring Network (CLMN) Early Detection Monitoring for invasive species- all data to be entered into SWIMS by October 1. 4) Handpulling of invasive species 500 hr.- all hours to be recorded on volunteer log worksheet. 5) Conduct pre-/post- treatment surveys according to department protocol. 6) Augmented enforcement with local law enforcement- all hours to be recorded.

Annual progress reports and a final report summarizing this project is requirement and will be provided to the DNR. Please provide both paper and electronic .pdf copies of the final report along with, or prior to, submission of the grantee\2019s final payment request. If a consultant is to provide the final report, it is recommended that the Grantee provide the DNR AIS Coordinator with a draft for comment on report adequacy prior to making the final payment to the consultant.

Any publications produced as part of the project will incorporate the \201CStop Aquatic Hitchhikers!\201D\2122 brand (partnership details can be found at: http://www.protectyourwaters.org).


Grant Details
Aquatic Invasives Control
Date
10/1/2007
Waters Involved
Unnamed
Status
Complete

Legend Lake P & R District: Legend Lake Ewm Treatment Plan: The Legend Lake Protection and Rehabilitation District proposes to control Eurasian water-milfoil (EWM) through chemical treatment and preventative measures in Wah-Toh-Sah, Skice, Sapokesik, Pywaosit lakes during the period 2007 - 2009. The project elements and deliverables are specified in the Legend Lake Protection and Rehabilitation District's Aquatic invasive Species Control Grant Application, dated August 01, 2007. The project includes treating Eurasian water Milfoil; hand-pulling and hand-raking of Eurasian Water Milfoil; annual pre- and post-treatment monitoring and education; continue to use volunteers to conduct the "clean boats clean waters" program. Watercraft inspection records will be entered into the State's online Watercraft Inspection Database. One mid-term progress report and a final report summarizing the two-year project will be provided to DNR.

The grantee will provide the DNR Aquatic Invasive Species Coordinator with a draft of the final report for comment on report adequacy prior to requesting final reimbursement. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to, submission of grantee's final payment request. AMENDMENT #1: Remove Wah-Toh-Sah and Skice Lakes from this project.


Grant Details
Aquatic Invasives Control
Date
4/1/2008
Waters Involved
Unnamed
Status
Complete

Legend Lake P & R District: Legend Lake Ewm Control Project: The Legend Lake Protection and Rehabilitation District proposes to control Eurasian Water-milfoil (EWM) through chemical treatment and preventative measures in the Wahtosah/Skice basins during the period 2008-2009. The project elements and deliverables are specified in the District's Aquatic Invasive Species Grant application, dated January 30, 2008. The project includes conducting pre-treatment surveys annually to monitor the extent of EWM and efficacy of the previous year's treatment; treating EWM infested areas with aquatic herbicides; conducting education and prevention activities to prevent further AIS infestations, and conducting watercraft inspections. Watercraft inspection records will be entered into the State's online Watercraft Inspection Database. Annual progress reports and a final report summarizing the two-year project will be provided to DNR.

If consultant is to provide the final report, it is recommended the Grantee provide the DNR Aquatic Invasive Species Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to, submission of grantee's final payment request.


Grant Details
Aquatic Invasives Early Detection and Response
Date
8/1/2007
Waters Involved
Berry Lake
Status
Complete

Town Of Underhill: Berry Lake Ewm Control Project: The Town of Underhill proposes to control Eurasian Water-Milfoil (EWM) by implementing control measures during the period 2007-2009. The project elements and deliverables are specified in the Town of Underhill's AIS Control Grant application dated May 15, 2008. The project includes conducting pre- and post-treatment surveys and monitoring, and mapping the extent of EMS; controlling EWM with aquatic herbicide treatments; implementing an AIS prevention strategy that includes educational workshops, and conducting watercraft inspection. A progress report and final report summarizing the three-year project will be provided to DNR. Watercraft inspection records will be entered into the State's online Watercraft Inspection Database.

If a consultant is to provide the final report, it is recommended that the grantee provide the DNR AIS Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR will be provided both paper and electronic .pdf copies of the final report along with, or prior to, submission of grantee's final payment request.


Grant Details
Aquatic Invasives Early Detection and Response
Date
1/1/2010
Waters Involved
Blacksmith Lake
Status
Complete

Legend Lake P & R District: Legend Lake Curly Leaf Pondweed Rapid Response Treatment: Legend Lake Protection and Rehabilitation District (LLPRD) proposes to control Curly Leaf Pondweed in Legend Lake by implementing control measures during the period 2010-2012. The project elements and deliverables are specified in the LLPRD\2019s Aquatic Invasive Species Control Grant application, dated December 30, 2009. The project includes conducting pre- and post-treatment surveys; controlling Curly Leaf Pondweed with aquatic herbicide treatments; and implementing an aquatic invasive species prevention strategy that includes developing an information & education program. Annual progress reports and a final report summarizing the two-year project will be provided to DNR. Any publications produced as part of the project will incorporate the \201CStop Aquatic Hitchhikers!\201D\2122 brand (partnership details can be found at: http://www.protectyourwaters.org). If consultant is to provide the final report, it is recommended that the Grantee provide the DNR Aquatic Invasive Species Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR will be provided both paper and electronic .pdf copies of the final report along with, or prior to, submission of grantee\2019s final payment request.


Grant Details
Aquatic Invasives Early Detection and Response
Date
2/15/2016
Waters Involved
Finnegan Lake
Status
Complete

Town Of Gillett: Finnegan Lake Ais-Edr Rapid Response: The Town of Gillett proposes to control Hybrid Watermilfoil in Finnegan Lake by implementing control measures during the period 2016-2019. The project elements and deliverables are specified in the Town of Gillett\2019s Aquatic Invasive Species Emergency Response Grant application.

The project includes conducting three Point Intercept surveys using the DNR Aquatic Plant Treatment Evaluation Protocol http://www4.uwsp.edu/cnr/uwexlakes/ecology/APM/Appendix-D.pdf . Three late summer HWM Peak Biomass Surveys and three Acoustic Surveys; controlling Eurasian Watermilfoil with aquatic herbicide treatments and hand pulling; and implementing an aquatic invasive species prevention and control strategy that includes, soliciting the in-kind volunteer work that is identified in the grant application. Chemical concentration monitoring will also be performed to determine concentration readings. Annual progress reports and a final report summarizing the 3-year project will be provided to DNR. Any publications produced as part of the project will incorporate the \201CStop Aquatic Hitchhikers!\201D\2122 brand (partnership details can be found at: http://www.protectyourwaters.org).

If consultant is to provide the final report, it is recommended that the Grantee provide the DNR Aquatic Invasive Species Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR will be provided both paper and electronic. pdf copies of the final report along with, or prior to, submission of grantee\2019s final payment request. All information associated with this project is subject to public record.


Grant Details
Aquatic Invasives Early Detection and Response
Date
1/1/2010
Waters Involved
Little Blacksmith Lake
Status
Complete

Legend Lake P & R District: Legend Lake Curly Leaf Pondweed Rapid Response Treatment: Legend Lake Protection and Rehabilitation District (LLPRD) proposes to control Curly Leaf Pondweed in Legend Lake by implementing control measures during the period 2010-2012. The project elements and deliverables are specified in the LLPRD\2019s Aquatic Invasive Species Control Grant application, dated December 30, 2009. The project includes conducting pre- and post-treatment surveys; controlling Curly Leaf Pondweed with aquatic herbicide treatments; and implementing an aquatic invasive species prevention strategy that includes developing an information & education program. Annual progress reports and a final report summarizing the two-year project will be provided to DNR. Any publications produced as part of the project will incorporate the \201CStop Aquatic Hitchhikers!\201D\2122 brand (partnership details can be found at: http://www.protectyourwaters.org). If consultant is to provide the final report, it is recommended that the Grantee provide the DNR Aquatic Invasive Species Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR will be provided both paper and electronic .pdf copies of the final report along with, or prior to, submission of grantee\2019s final payment request.


Grant Details
Aquatic Invasives Early Detection and Response
Date
11/1/2009
Waters Involved
Moshawquit Lake
Status
Complete

Menominee County: Moshawquit Lake Ewm Management Project: Menominee County proposes to control Eurasian Water-milfoil (EWM) in Moshawquit Lake by implementing control measures during the period 2010-2012. The project elements and deliverables are specified in the Menominee County Aquatic Invasive Species Control Grant application, dated March 31,2010. The project includes conducting pre- and post-treatment surveys and mapping the extent of EWM, including a DNR approved Point Index survey; controlling EWM with aquatic herbicide treatments; and implementing an aquatic invasive species prevention strategy that includes developing an awareness & education program. Annual progress reports and a final report summarizing the three-year project will be provided to DNR.

If consultant is to provide the final report, it is recommended that the Grantee provide the DNR Aquatic Invasive Species Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR will be provided both paper and electronic .pdf copies of the final report along with, or prior to, submission of grantee\2019s final payment request. Any publications produced as part of the project will incorporate the \201CStop Aquatic Hitchhikers!\201D\2122 brand.


Grant Details
Aquatic Invasives Early Detection and Response
Date
1/1/2010
Waters Involved
Moshawquit Lake
Status
Complete

Legend Lake P & R District: Legend Lake Curly Leaf Pondweed Rapid Response Treatment: Legend Lake Protection and Rehabilitation District (LLPRD) proposes to control Curly Leaf Pondweed in Legend Lake by implementing control measures during the period 2010-2012. The project elements and deliverables are specified in the LLPRD\2019s Aquatic Invasive Species Control Grant application, dated December 30, 2009. The project includes conducting pre- and post-treatment surveys; controlling Curly Leaf Pondweed with aquatic herbicide treatments; and implementing an aquatic invasive species prevention strategy that includes developing an information & education program. Annual progress reports and a final report summarizing the two-year project will be provided to DNR. Any publications produced as part of the project will incorporate the \201CStop Aquatic Hitchhikers!\201D\2122 brand (partnership details can be found at: http://www.protectyourwaters.org). If consultant is to provide the final report, it is recommended that the Grantee provide the DNR Aquatic Invasive Species Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR will be provided both paper and electronic .pdf copies of the final report along with, or prior to, submission of grantee\2019s final payment request.


Grant Details
Aquatic Invasives Early Detection and Response
Date
11/22/2011
Waters Involved
Moshawquit Lake
Status
Complete

Menominee County: Moshawquit Lake Clp Management: Moshawquit Lake Association proposes to chemically manage curlyleaf pondweed on Moshawquit Lake during the period of February 1, 2012- December 31,2013. The project elements and deliverables are specified within their control grant application dated. All project requirements are listed below.

This project requires: adherence to treatment strategies approved by the department, pre-/post- treatment monitoring, annual P/I surveys, sub P/I surveys within treatment areas, residual monitoring(Aquathol K analysis and/or Rhodamine dye) and core sampling or underwater video to help evaluate turion production. Handpulling of CLP is also required under this grant, please record all handpulling hours.

Annual progress reports and a final report summarizing this project is requirement and will be provided to the DNR. Please provide both paper and electronic .pdf copies of the final report along with, or prior to, submission of the grantee\2019s final payment request. If a consultant is to provide the final report, it is recommended that the Grantee provide the DNR AIS Coordinator with a draft for comment on report adequacy prior to making the final payment to the consultant.

Any publications produced as part of the project will incorporate the \201CStop Aquatic Hitchhikers!\201D\2122 brand ( partnership details can be found at: http://www.protectyourwaters.org).

Amendment #3 - The project has been amended to include construction of a DASH unit or contracting out a DASH. At least one Moshawquit Lake Association member or lake resident will be trained and will conduct Citizen Lake Monitoring (CLMN) following department protocols during the duration of the project. A map identifying the DASH locations will be submitted to the Department as a requirement of the permit application.


Grant Details
Aquatic Invasives Early Detection and Response
Date
1/1/2010
Waters Involved
Pestiga Lake
Status
Complete

Legend Lake P & R District: Legend Lake Curly Leaf Pondweed Rapid Response Treatment: Legend Lake Protection and Rehabilitation District (LLPRD) proposes to control Curly Leaf Pondweed in Legend Lake by implementing control measures during the period 2010-2012. The project elements and deliverables are specified in the LLPRD\2019s Aquatic Invasive Species Control Grant application, dated December 30, 2009. The project includes conducting pre- and post-treatment surveys; controlling Curly Leaf Pondweed with aquatic herbicide treatments; and implementing an aquatic invasive species prevention strategy that includes developing an information & education program. Annual progress reports and a final report summarizing the two-year project will be provided to DNR. Any publications produced as part of the project will incorporate the \201CStop Aquatic Hitchhikers!\201D\2122 brand (partnership details can be found at: http://www.protectyourwaters.org). If consultant is to provide the final report, it is recommended that the Grantee provide the DNR Aquatic Invasive Species Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR will be provided both paper and electronic .pdf copies of the final report along with, or prior to, submission of grantee\2019s final payment request.


Grant Details
Aquatic Invasives Early Detection and Response
Date
1/1/2010
Waters Involved
Pywaosit Lake
Status
Complete

Legend Lake P & R District: Legend Lake Curly Leaf Pondweed Rapid Response Treatment: Legend Lake Protection and Rehabilitation District (LLPRD) proposes to control Curly Leaf Pondweed in Legend Lake by implementing control measures during the period 2010-2012. The project elements and deliverables are specified in the LLPRD\2019s Aquatic Invasive Species Control Grant application, dated December 30, 2009. The project includes conducting pre- and post-treatment surveys; controlling Curly Leaf Pondweed with aquatic herbicide treatments; and implementing an aquatic invasive species prevention strategy that includes developing an information & education program. Annual progress reports and a final report summarizing the two-year project will be provided to DNR. Any publications produced as part of the project will incorporate the \201CStop Aquatic Hitchhikers!\201D\2122 brand (partnership details can be found at: http://www.protectyourwaters.org). If consultant is to provide the final report, it is recommended that the Grantee provide the DNR Aquatic Invasive Species Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR will be provided both paper and electronic .pdf copies of the final report along with, or prior to, submission of grantee\2019s final payment request.


Grant Details
Aquatic Invasives Early Detection and Response
Date
1/1/2010
Waters Involved
Sapokesick Lake
Status
Complete

Legend Lake P & R District: Legend Lake Curly Leaf Pondweed Rapid Response Treatment: Legend Lake Protection and Rehabilitation District (LLPRD) proposes to control Curly Leaf Pondweed in Legend Lake by implementing control measures during the period 2010-2012. The project elements and deliverables are specified in the LLPRD\2019s Aquatic Invasive Species Control Grant application, dated December 30, 2009. The project includes conducting pre- and post-treatment surveys; controlling Curly Leaf Pondweed with aquatic herbicide treatments; and implementing an aquatic invasive species prevention strategy that includes developing an information & education program. Annual progress reports and a final report summarizing the two-year project will be provided to DNR. Any publications produced as part of the project will incorporate the \201CStop Aquatic Hitchhikers!\201D\2122 brand (partnership details can be found at: http://www.protectyourwaters.org). If consultant is to provide the final report, it is recommended that the Grantee provide the DNR Aquatic Invasive Species Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR will be provided both paper and electronic .pdf copies of the final report along with, or prior to, submission of grantee\2019s final payment request.


Grant Details
Aquatic Invasives Early Detection and Response
Date
1/1/2010
Waters Involved
Skice Lake
Status
Complete

Legend Lake P & R District: Legend Lake Curly Leaf Pondweed Rapid Response Treatment: Legend Lake Protection and Rehabilitation District (LLPRD) proposes to control Curly Leaf Pondweed in Legend Lake by implementing control measures during the period 2010-2012. The project elements and deliverables are specified in the LLPRD\2019s Aquatic Invasive Species Control Grant application, dated December 30, 2009. The project includes conducting pre- and post-treatment surveys; controlling Curly Leaf Pondweed with aquatic herbicide treatments; and implementing an aquatic invasive species prevention strategy that includes developing an information & education program. Annual progress reports and a final report summarizing the two-year project will be provided to DNR. Any publications produced as part of the project will incorporate the \201CStop Aquatic Hitchhikers!\201D\2122 brand (partnership details can be found at: http://www.protectyourwaters.org). If consultant is to provide the final report, it is recommended that the Grantee provide the DNR Aquatic Invasive Species Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR will be provided both paper and electronic .pdf copies of the final report along with, or prior to, submission of grantee\2019s final payment request.


Grant Details
Aquatic Invasives Early Detection and Response
Date
1/1/2010
Waters Involved
Spring Lake
Status
Complete

Legend Lake P & R District: Legend Lake Curly Leaf Pondweed Rapid Response Treatment: Legend Lake Protection and Rehabilitation District (LLPRD) proposes to control Curly Leaf Pondweed in Legend Lake by implementing control measures during the period 2010-2012. The project elements and deliverables are specified in the LLPRD\2019s Aquatic Invasive Species Control Grant application, dated December 30, 2009. The project includes conducting pre- and post-treatment surveys; controlling Curly Leaf Pondweed with aquatic herbicide treatments; and implementing an aquatic invasive species prevention strategy that includes developing an information & education program. Annual progress reports and a final report summarizing the two-year project will be provided to DNR. Any publications produced as part of the project will incorporate the \201CStop Aquatic Hitchhikers!\201D\2122 brand (partnership details can be found at: http://www.protectyourwaters.org). If consultant is to provide the final report, it is recommended that the Grantee provide the DNR Aquatic Invasive Species Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR will be provided both paper and electronic .pdf copies of the final report along with, or prior to, submission of grantee\2019s final payment request.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Blacksmith Lake
Status
Complete

Legend Lake P & R District: Legend Lake Ewm Education, Prevention & Planning Project Ph 1: The Legend Lake Protection and Rehabilitation District proposes to conduct aquatic invasive species education and prevention activities during the period 2008-2009. The project elements and deliverables are specified in the District's Aquatic Invasive Species Control Grant application, dated January 30, 2008. The project includes Pre and Post treatment monitoring of EWM, dissolved oxygen monitoring, water quality monitoring,2, 4-D assays, aquatic plant surveys, and EWM distribution mapping.

A yearly progress report and a final report summarizing the project will be provided to DNR. If consultant is to provide the final report, it is recommended the Grantee provide the DNR Aquatic Invasive Species Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to, submission of grantee's final payment request.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Blacksmith Lake
Status
Complete

Legend Lake P & R District: Legend Lake Ewm Education, Prevention & Planning Project Ph 2: The Legend Lake Protection Rehabilitation District proposes to conduct boater education and boat inspection by implementing the "Clean Boats, Clean Waters" watercraft inspection program during the period 2008-2012. The project elements and deliverables are specified in the Legend Lake Protection Rehabilitation District's
Aquatic Invasive Species Control Grant application, dated January 30, 2008. The project includes to recruit, train and schedule volunteers; educate boaters about aquatic invasive species and the measures to prevent their spread; and entering data into the State's online Watercraft Inspection Database. A final report summarizing the project will be provided to DNR. Watercraft inspection records will be entered into the State's online Watercraft Inspection Database.

If consultant is to provide the final report, it is recommended the Grantee provide the DNR Aquatic Invasive Species Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to, submission of grantee's final payment request.


Grant Details
Aquatic Invasives Education
Date
3/15/2024
Waters Involved
Blacksmith Lake
Status
Complete

Legend Lake P & R District: Comp - Legend Lake 2025 Comprehensive Management Plan - Aquatic Plant Surveys Phase (1 Of 3): The Legend Lake Protection and Rehabilitation District is sponsoring a project to update the comprehensive, AIS Control, and mechanical harvesting plans for Legend Lake.

Activities: 1. Gather and analyze historical and current ecological data for comparisons, to identify threats, determine the goals and values of stakeholders, and present realistic management actions.
2. Include goals and actions aimed at restoring ecological lake functions, protecting high value lake attributes, and increasing the district's capacity to implement the plan.

Deliverables: 1. Perform an aquatic plant survey and share results.

Conditions: The aquatic plant survey must conform with Hauxwell, J., S. Knight, K. Wagner, A. Mikulyuk, M. Nault, M. Porzky and S. Chase. 2010. Recommended baseline monitoring of aquatic plants in Wisconsin: sampling design, field and laboratory procedures, data entry and analysis, and applications. Wisconsin Department of Natural Resources Bureau of Science Services, PUB-SS-1068 2010. Madison, Wisconsin, USA.

This scope summarizes details provided in the application and does not negate tasks and/or deliverables described therein. Data, reports, surveys, and supporting information, including photos, maps and GIS data, must be submitted to the DNR Biologist in electronic format and in any other format they specify.

If a consultant provides a final report, it is recommended that the Grantee provide the DNR Biologist with a draft for comment on report adequacy prior to making a final payment to the consultant. Include electronic copy of the final report along with or prior to submission of grantee's final payment request.


Grant Details
Aquatic Invasives Education
Date
3/15/2024
Waters Involved
Blacksmith Lake
Status
Complete

Legend Lake P & R District: Comp - Legend Lake 2025 Comprehensive Management Plan - Biological Studies Phase (2 Of 3): The Legend Lake Proection and Rehabilitation District is sponsoring a project to update the comprehensive, AIS Control, and mechanical harvesting plans for Legend Lake.

Activities: 1. Gather and analyze historical and current ecological data for comparisons, to identify threats, determine the goals and values of stakeholders, and present realistic management actions.
2. Include goals and actions aimed at restoring ecological lake functions, protecting high value lake attributes, and increasing the district's capacity to implement the plan.

Deliverables: 1. Collect water Quality samples 2. Perform watershed modeling 3. Compile fishery data 4. Analyze and relay the results to the stakeholders.

Conditions: Water quality analysis results would be delivered in presentations and within the management plan\2019s report sections, following WISCALM protocols.

This scope summarizes details provided in the application and does not negate tasks and/or deliverables described therein. Data, reports, surveys, and supporting information, including photos, maps and GIS data, must be submitted to the DNR Biologist in electronic format and in any other format they specify.

If a consultant provides a final report, it is recommended that the Grantee provide the DNR Biologist with a draft for comment on report adequacy prior to making a final payment to the consultant. Include electronic copy of the final report along with or prior to submission of grantee's final payment request.


Grant Details
Aquatic Invasives Education
Date
3/15/2024
Waters Involved
Blacksmith Lake
Status
Complete

Legend Lake P & R District: Comp - Legend Lake 2025 Comprehensive Management Plan - Public Participation & Reporting Phase (3): The Legend Lake Protection and Rehabilitation District is sponsoring a project to update the comprehensive, AIS Control, and mechanical harvesting plans for Legend Lake.

Activities: Completion of a WDNR-approved stakeholder survey, sent to all 1,800 LLPRD members. District members are either riparian property owners or those with deeded access to the system though their beach club system.

Deliverables: 1) Survey results, along with any appropriate comparisons with the previous survey. 2) Completion of comprehensive lake management plan.

Conditions: Stakeholder survey will be in accordance with the DNR\2019s social scientist.

This scope summarizes details provided in the application and does not negate tasks and/or deliverables described therein. Data, reports, surveys, and supporting information, including photos, maps and GIS data, must be submitted to the DNR Biologist in electronic format and in any other format they specify.

If a consultant provides a final report, it is recommended that the Grantee provide the DNR Biologist with a draft for comment on report adequacy prior to making a final payment to the consultant. Include electronic copy of the final report along with or prior to submission of grantee's final payment request.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Little Blacksmith Lake
Status
Complete

Legend Lake P & R District: Legend Lake Ewm Education, Prevention & Planning Project Ph 1: The Legend Lake Protection and Rehabilitation District proposes to conduct aquatic invasive species education and prevention activities during the period 2008-2009. The project elements and deliverables are specified in the District's Aquatic Invasive Species Control Grant application, dated January 30, 2008. The project includes Pre and Post treatment monitoring of EWM, dissolved oxygen monitoring, water quality monitoring,2, 4-D assays, aquatic plant surveys, and EWM distribution mapping.

A yearly progress report and a final report summarizing the project will be provided to DNR. If consultant is to provide the final report, it is recommended the Grantee provide the DNR Aquatic Invasive Species Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to, submission of grantee's final payment request.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Little Blacksmith Lake
Status
Complete

Legend Lake P & R District: Legend Lake Ewm Education, Prevention & Planning Project Ph 2: The Legend Lake Protection Rehabilitation District proposes to conduct boater education and boat inspection by implementing the "Clean Boats, Clean Waters" watercraft inspection program during the period 2008-2012. The project elements and deliverables are specified in the Legend Lake Protection Rehabilitation District's
Aquatic Invasive Species Control Grant application, dated January 30, 2008. The project includes to recruit, train and schedule volunteers; educate boaters about aquatic invasive species and the measures to prevent their spread; and entering data into the State's online Watercraft Inspection Database. A final report summarizing the project will be provided to DNR. Watercraft inspection records will be entered into the State's online Watercraft Inspection Database.

If consultant is to provide the final report, it is recommended the Grantee provide the DNR Aquatic Invasive Species Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to, submission of grantee's final payment request.


Grant Details
Aquatic Invasives Education
Date
3/15/2024
Waters Involved
Little Blacksmith Lake
Status
Complete

Legend Lake P & R District: Comp - Legend Lake 2025 Comprehensive Management Plan - Aquatic Plant Surveys Phase (1 Of 3): The Legend Lake Protection and Rehabilitation District is sponsoring a project to update the comprehensive, AIS Control, and mechanical harvesting plans for Legend Lake.

Activities: 1. Gather and analyze historical and current ecological data for comparisons, to identify threats, determine the goals and values of stakeholders, and present realistic management actions.
2. Include goals and actions aimed at restoring ecological lake functions, protecting high value lake attributes, and increasing the district's capacity to implement the plan.

Deliverables: 1. Perform an aquatic plant survey and share results.

Conditions: The aquatic plant survey must conform with Hauxwell, J., S. Knight, K. Wagner, A. Mikulyuk, M. Nault, M. Porzky and S. Chase. 2010. Recommended baseline monitoring of aquatic plants in Wisconsin: sampling design, field and laboratory procedures, data entry and analysis, and applications. Wisconsin Department of Natural Resources Bureau of Science Services, PUB-SS-1068 2010. Madison, Wisconsin, USA.

This scope summarizes details provided in the application and does not negate tasks and/or deliverables described therein. Data, reports, surveys, and supporting information, including photos, maps and GIS data, must be submitted to the DNR Biologist in electronic format and in any other format they specify.

If a consultant provides a final report, it is recommended that the Grantee provide the DNR Biologist with a draft for comment on report adequacy prior to making a final payment to the consultant. Include electronic copy of the final report along with or prior to submission of grantee's final payment request.


Grant Details
Aquatic Invasives Education
Date
3/15/2024
Waters Involved
Little Blacksmith Lake
Status
Complete

Legend Lake P & R District: Comp - Legend Lake 2025 Comprehensive Management Plan - Biological Studies Phase (2 Of 3): The Legend Lake Proection and Rehabilitation District is sponsoring a project to update the comprehensive, AIS Control, and mechanical harvesting plans for Legend Lake.

Activities: 1. Gather and analyze historical and current ecological data for comparisons, to identify threats, determine the goals and values of stakeholders, and present realistic management actions.
2. Include goals and actions aimed at restoring ecological lake functions, protecting high value lake attributes, and increasing the district's capacity to implement the plan.

Deliverables: 1. Collect water Quality samples 2. Perform watershed modeling 3. Compile fishery data 4. Analyze and relay the results to the stakeholders.

Conditions: Water quality analysis results would be delivered in presentations and within the management plan\2019s report sections, following WISCALM protocols.

This scope summarizes details provided in the application and does not negate tasks and/or deliverables described therein. Data, reports, surveys, and supporting information, including photos, maps and GIS data, must be submitted to the DNR Biologist in electronic format and in any other format they specify.

If a consultant provides a final report, it is recommended that the Grantee provide the DNR Biologist with a draft for comment on report adequacy prior to making a final payment to the consultant. Include electronic copy of the final report along with or prior to submission of grantee's final payment request.


Grant Details
Aquatic Invasives Education
Date
3/15/2024
Waters Involved
Little Blacksmith Lake
Status
Complete

Legend Lake P & R District: Comp - Legend Lake 2025 Comprehensive Management Plan - Public Participation & Reporting Phase (3): The Legend Lake Protection and Rehabilitation District is sponsoring a project to update the comprehensive, AIS Control, and mechanical harvesting plans for Legend Lake.

Activities: Completion of a WDNR-approved stakeholder survey, sent to all 1,800 LLPRD members. District members are either riparian property owners or those with deeded access to the system though their beach club system.

Deliverables: 1) Survey results, along with any appropriate comparisons with the previous survey. 2) Completion of comprehensive lake management plan.

Conditions: Stakeholder survey will be in accordance with the DNR\2019s social scientist.

This scope summarizes details provided in the application and does not negate tasks and/or deliverables described therein. Data, reports, surveys, and supporting information, including photos, maps and GIS data, must be submitted to the DNR Biologist in electronic format and in any other format they specify.

If a consultant provides a final report, it is recommended that the Grantee provide the DNR Biologist with a draft for comment on report adequacy prior to making a final payment to the consultant. Include electronic copy of the final report along with or prior to submission of grantee's final payment request.


Grant Details
Aquatic Invasives Education
Date
2/15/2020
Waters Involved
Machickanee Flowage (Stiles)
Status
Complete

Machickanee Flowage Advancement Association: Machickanee Flowage Drawdown: The Machickanee Flowage Advancement Association is sponsoring a project to drawdown the Machickanee Flowage and the results will be used to update the Machickanee flowage Adaptive Management Plan.

Project final deliverables include: all data collected, agendas and minutes for planning meetings, and a lake management plan that includes methodologies, results, and management alternatives discussion with an implementation plan.

Specific project activities include: 1) Lakewide aquatic plant point Intercept surveys shall be conducted according to WDNR\2019s \201CRecommended Baseline Monitoring of Aquatic Plants in WI Protocol\201D. 2) Oconto county will take pre and post sediment elevations and consultant will analyze results 3) Results will be integrated into current plan

Special Conditions: 1) Lakewide aquatic plant point Intercept surveys shall be conducted according to WDNR\2019s \201CRecommended Baseline Monitoring of Aquatic Plants in WI Protocol\201D.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.

If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Moshawquit Lake
Status
Complete

Legend Lake P & R District: Legend Lake Ewm Education, Prevention & Planning Project Ph 1: The Legend Lake Protection and Rehabilitation District proposes to conduct aquatic invasive species education and prevention activities during the period 2008-2009. The project elements and deliverables are specified in the District's Aquatic Invasive Species Control Grant application, dated January 30, 2008. The project includes Pre and Post treatment monitoring of EWM, dissolved oxygen monitoring, water quality monitoring,2, 4-D assays, aquatic plant surveys, and EWM distribution mapping.

A yearly progress report and a final report summarizing the project will be provided to DNR. If consultant is to provide the final report, it is recommended the Grantee provide the DNR Aquatic Invasive Species Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to, submission of grantee's final payment request.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Moshawquit Lake
Status
Complete

Legend Lake P & R District: Legend Lake Ewm Education, Prevention & Planning Project Ph 2: The Legend Lake Protection Rehabilitation District proposes to conduct boater education and boat inspection by implementing the "Clean Boats, Clean Waters" watercraft inspection program during the period 2008-2012. The project elements and deliverables are specified in the Legend Lake Protection Rehabilitation District's
Aquatic Invasive Species Control Grant application, dated January 30, 2008. The project includes to recruit, train and schedule volunteers; educate boaters about aquatic invasive species and the measures to prevent their spread; and entering data into the State's online Watercraft Inspection Database. A final report summarizing the project will be provided to DNR. Watercraft inspection records will be entered into the State's online Watercraft Inspection Database.

If consultant is to provide the final report, it is recommended the Grantee provide the DNR Aquatic Invasive Species Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to, submission of grantee's final payment request.


Grant Details
Aquatic Invasives Education
Date
3/15/2023
Waters Involved
Moshawquit Lake
Status
Complete

Waterways Assoc. Menominee & Shawano Cty: Moshawquit Lake Updated Aquatic Plant Management Plan: The Waterways Association of Menominee and Shawano Counties (WAMSCO) is sponsoring a project to update the Aquatic Plant Management Plan (APM) for Moshawquit Lake.

Deliverables: all data from point intercept (PI) surveys and associated maps, Eurasian water milfoil (EWM) bed survey data and maps, sub-PI pre- and post-treatment results in 2024, materials presented at public planning meeting, and final APM for Moshawquit Lake.

Activities: 1) 2023 and 2024 whole-lake PI surveys; 2) EWM bed survey to delineate bed location, density, size, and average depth; 3) pre- and post- treatment sub-PI survey in 2024 if herbicide treatment is needed and permitted; 4) Healthy Lakes site visits at 5 properties on Moshawquit Lake for planning purposes; 5) at least 2 meetings in fall 2023 including a public planning meeting to determine plant management goals and educate participants, and follow-up meeting discussing results of the planning meeting; 6) final APM Plan written by consultant for Moshawquit Lake that includes descriptions of historical actions, current management objectives, plant survey results, and public comments on the plan.

Special Conditions: PI surveys shall be conducted according to: Baseline Monitoring of Aquatic Plants in Wisconsin: Sampling Design, Field and Laboratory Procedures, Data Entry and Analysis Lakes, Publication number PUB-SS-1068 2010. If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy before making final payment to the consultant. DNR to receive an electronic .pdf copy of the final report along with, or before submission of grantee's final payment request.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.


Grant Details
Aquatic Invasives Education
Date
2/15/2020
Waters Involved
Oconto River
Status
Complete

Machickanee Flowage Advancement Association: Machickanee Flowage Drawdown: The Machickanee Flowage Advancement Association is sponsoring a project to drawdown the Machickanee Flowage and the results will be used to update the Machickanee flowage Adaptive Management Plan.

Project final deliverables include: all data collected, agendas and minutes for planning meetings, and a lake management plan that includes methodologies, results, and management alternatives discussion with an implementation plan.

Specific project activities include: 1) Lakewide aquatic plant point Intercept surveys shall be conducted according to WDNR\2019s \201CRecommended Baseline Monitoring of Aquatic Plants in WI Protocol\201D. 2) Oconto county will take pre and post sediment elevations and consultant will analyze results 3) Results will be integrated into current plan

Special Conditions: 1) Lakewide aquatic plant point Intercept surveys shall be conducted according to WDNR\2019s \201CRecommended Baseline Monitoring of Aquatic Plants in WI Protocol\201D.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.

If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Pestiga Lake
Status
Complete

Legend Lake P & R District: Legend Lake Ewm Education, Prevention & Planning Project Ph 1: The Legend Lake Protection and Rehabilitation District proposes to conduct aquatic invasive species education and prevention activities during the period 2008-2009. The project elements and deliverables are specified in the District's Aquatic Invasive Species Control Grant application, dated January 30, 2008. The project includes Pre and Post treatment monitoring of EWM, dissolved oxygen monitoring, water quality monitoring,2, 4-D assays, aquatic plant surveys, and EWM distribution mapping.

A yearly progress report and a final report summarizing the project will be provided to DNR. If consultant is to provide the final report, it is recommended the Grantee provide the DNR Aquatic Invasive Species Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to, submission of grantee's final payment request.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Pestiga Lake
Status
Complete

Legend Lake P & R District: Legend Lake Ewm Education, Prevention & Planning Project Ph 2: The Legend Lake Protection Rehabilitation District proposes to conduct boater education and boat inspection by implementing the "Clean Boats, Clean Waters" watercraft inspection program during the period 2008-2012. The project elements and deliverables are specified in the Legend Lake Protection Rehabilitation District's
Aquatic Invasive Species Control Grant application, dated January 30, 2008. The project includes to recruit, train and schedule volunteers; educate boaters about aquatic invasive species and the measures to prevent their spread; and entering data into the State's online Watercraft Inspection Database. A final report summarizing the project will be provided to DNR. Watercraft inspection records will be entered into the State's online Watercraft Inspection Database.

If consultant is to provide the final report, it is recommended the Grantee provide the DNR Aquatic Invasive Species Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to, submission of grantee's final payment request.


Grant Details
Aquatic Invasives Education
Date
3/15/2024
Waters Involved
Pestiga Lake
Status
Complete

Legend Lake P & R District: Comp - Legend Lake 2025 Comprehensive Management Plan - Aquatic Plant Surveys Phase (1 Of 3): The Legend Lake Protection and Rehabilitation District is sponsoring a project to update the comprehensive, AIS Control, and mechanical harvesting plans for Legend Lake.

Activities: 1. Gather and analyze historical and current ecological data for comparisons, to identify threats, determine the goals and values of stakeholders, and present realistic management actions.
2. Include goals and actions aimed at restoring ecological lake functions, protecting high value lake attributes, and increasing the district's capacity to implement the plan.

Deliverables: 1. Perform an aquatic plant survey and share results.

Conditions: The aquatic plant survey must conform with Hauxwell, J., S. Knight, K. Wagner, A. Mikulyuk, M. Nault, M. Porzky and S. Chase. 2010. Recommended baseline monitoring of aquatic plants in Wisconsin: sampling design, field and laboratory procedures, data entry and analysis, and applications. Wisconsin Department of Natural Resources Bureau of Science Services, PUB-SS-1068 2010. Madison, Wisconsin, USA.

This scope summarizes details provided in the application and does not negate tasks and/or deliverables described therein. Data, reports, surveys, and supporting information, including photos, maps and GIS data, must be submitted to the DNR Biologist in electronic format and in any other format they specify.

If a consultant provides a final report, it is recommended that the Grantee provide the DNR Biologist with a draft for comment on report adequacy prior to making a final payment to the consultant. Include electronic copy of the final report along with or prior to submission of grantee's final payment request.


Grant Details
Aquatic Invasives Education
Date
3/15/2024
Waters Involved
Pestiga Lake
Status
Complete

Legend Lake P & R District: Comp - Legend Lake 2025 Comprehensive Management Plan - Biological Studies Phase (2 Of 3): The Legend Lake Proection and Rehabilitation District is sponsoring a project to update the comprehensive, AIS Control, and mechanical harvesting plans for Legend Lake.

Activities: 1. Gather and analyze historical and current ecological data for comparisons, to identify threats, determine the goals and values of stakeholders, and present realistic management actions.
2. Include goals and actions aimed at restoring ecological lake functions, protecting high value lake attributes, and increasing the district's capacity to implement the plan.

Deliverables: 1. Collect water Quality samples 2. Perform watershed modeling 3. Compile fishery data 4. Analyze and relay the results to the stakeholders.

Conditions: Water quality analysis results would be delivered in presentations and within the management plan\2019s report sections, following WISCALM protocols.

This scope summarizes details provided in the application and does not negate tasks and/or deliverables described therein. Data, reports, surveys, and supporting information, including photos, maps and GIS data, must be submitted to the DNR Biologist in electronic format and in any other format they specify.

If a consultant provides a final report, it is recommended that the Grantee provide the DNR Biologist with a draft for comment on report adequacy prior to making a final payment to the consultant. Include electronic copy of the final report along with or prior to submission of grantee's final payment request.


Grant Details
Aquatic Invasives Education
Date
3/15/2024
Waters Involved
Pestiga Lake
Status
Complete

Legend Lake P & R District: Comp - Legend Lake 2025 Comprehensive Management Plan - Public Participation & Reporting Phase (3): The Legend Lake Protection and Rehabilitation District is sponsoring a project to update the comprehensive, AIS Control, and mechanical harvesting plans for Legend Lake.

Activities: Completion of a WDNR-approved stakeholder survey, sent to all 1,800 LLPRD members. District members are either riparian property owners or those with deeded access to the system though their beach club system.

Deliverables: 1) Survey results, along with any appropriate comparisons with the previous survey. 2) Completion of comprehensive lake management plan.

Conditions: Stakeholder survey will be in accordance with the DNR\2019s social scientist.

This scope summarizes details provided in the application and does not negate tasks and/or deliverables described therein. Data, reports, surveys, and supporting information, including photos, maps and GIS data, must be submitted to the DNR Biologist in electronic format and in any other format they specify.

If a consultant provides a final report, it is recommended that the Grantee provide the DNR Biologist with a draft for comment on report adequacy prior to making a final payment to the consultant. Include electronic copy of the final report along with or prior to submission of grantee's final payment request.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Pywaosit Lake
Status
Complete

Legend Lake P & R District: Legend Lake Ewm Education, Prevention & Planning Project Ph 1: The Legend Lake Protection and Rehabilitation District proposes to conduct aquatic invasive species education and prevention activities during the period 2008-2009. The project elements and deliverables are specified in the District's Aquatic Invasive Species Control Grant application, dated January 30, 2008. The project includes Pre and Post treatment monitoring of EWM, dissolved oxygen monitoring, water quality monitoring,2, 4-D assays, aquatic plant surveys, and EWM distribution mapping.

A yearly progress report and a final report summarizing the project will be provided to DNR. If consultant is to provide the final report, it is recommended the Grantee provide the DNR Aquatic Invasive Species Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to, submission of grantee's final payment request.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Pywaosit Lake
Status
Complete

Legend Lake P & R District: Legend Lake Ewm Education, Prevention & Planning Project Ph 2: The Legend Lake Protection Rehabilitation District proposes to conduct boater education and boat inspection by implementing the "Clean Boats, Clean Waters" watercraft inspection program during the period 2008-2012. The project elements and deliverables are specified in the Legend Lake Protection Rehabilitation District's
Aquatic Invasive Species Control Grant application, dated January 30, 2008. The project includes to recruit, train and schedule volunteers; educate boaters about aquatic invasive species and the measures to prevent their spread; and entering data into the State's online Watercraft Inspection Database. A final report summarizing the project will be provided to DNR. Watercraft inspection records will be entered into the State's online Watercraft Inspection Database.

If consultant is to provide the final report, it is recommended the Grantee provide the DNR Aquatic Invasive Species Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to, submission of grantee's final payment request.


Grant Details
Aquatic Invasives Education
Date
3/15/2024
Waters Involved
Pywaosit Lake
Status
Complete

Legend Lake P & R District: Comp - Legend Lake 2025 Comprehensive Management Plan - Aquatic Plant Surveys Phase (1 Of 3): The Legend Lake Protection and Rehabilitation District is sponsoring a project to update the comprehensive, AIS Control, and mechanical harvesting plans for Legend Lake.

Activities: 1. Gather and analyze historical and current ecological data for comparisons, to identify threats, determine the goals and values of stakeholders, and present realistic management actions.
2. Include goals and actions aimed at restoring ecological lake functions, protecting high value lake attributes, and increasing the district's capacity to implement the plan.

Deliverables: 1. Perform an aquatic plant survey and share results.

Conditions: The aquatic plant survey must conform with Hauxwell, J., S. Knight, K. Wagner, A. Mikulyuk, M. Nault, M. Porzky and S. Chase. 2010. Recommended baseline monitoring of aquatic plants in Wisconsin: sampling design, field and laboratory procedures, data entry and analysis, and applications. Wisconsin Department of Natural Resources Bureau of Science Services, PUB-SS-1068 2010. Madison, Wisconsin, USA.

This scope summarizes details provided in the application and does not negate tasks and/or deliverables described therein. Data, reports, surveys, and supporting information, including photos, maps and GIS data, must be submitted to the DNR Biologist in electronic format and in any other format they specify.

If a consultant provides a final report, it is recommended that the Grantee provide the DNR Biologist with a draft for comment on report adequacy prior to making a final payment to the consultant. Include electronic copy of the final report along with or prior to submission of grantee's final payment request.


Grant Details
Aquatic Invasives Education
Date
3/15/2024
Waters Involved
Pywaosit Lake
Status
Complete

Legend Lake P & R District: Comp - Legend Lake 2025 Comprehensive Management Plan - Biological Studies Phase (2 Of 3): The Legend Lake Proection and Rehabilitation District is sponsoring a project to update the comprehensive, AIS Control, and mechanical harvesting plans for Legend Lake.

Activities: 1. Gather and analyze historical and current ecological data for comparisons, to identify threats, determine the goals and values of stakeholders, and present realistic management actions.
2. Include goals and actions aimed at restoring ecological lake functions, protecting high value lake attributes, and increasing the district's capacity to implement the plan.

Deliverables: 1. Collect water Quality samples 2. Perform watershed modeling 3. Compile fishery data 4. Analyze and relay the results to the stakeholders.

Conditions: Water quality analysis results would be delivered in presentations and within the management plan\2019s report sections, following WISCALM protocols.

This scope summarizes details provided in the application and does not negate tasks and/or deliverables described therein. Data, reports, surveys, and supporting information, including photos, maps and GIS data, must be submitted to the DNR Biologist in electronic format and in any other format they specify.

If a consultant provides a final report, it is recommended that the Grantee provide the DNR Biologist with a draft for comment on report adequacy prior to making a final payment to the consultant. Include electronic copy of the final report along with or prior to submission of grantee's final payment request.


Grant Details
Aquatic Invasives Education
Date
3/15/2024
Waters Involved
Pywaosit Lake
Status
Complete

Legend Lake P & R District: Comp - Legend Lake 2025 Comprehensive Management Plan - Public Participation & Reporting Phase (3): The Legend Lake Protection and Rehabilitation District is sponsoring a project to update the comprehensive, AIS Control, and mechanical harvesting plans for Legend Lake.

Activities: Completion of a WDNR-approved stakeholder survey, sent to all 1,800 LLPRD members. District members are either riparian property owners or those with deeded access to the system though their beach club system.

Deliverables: 1) Survey results, along with any appropriate comparisons with the previous survey. 2) Completion of comprehensive lake management plan.

Conditions: Stakeholder survey will be in accordance with the DNR\2019s social scientist.

This scope summarizes details provided in the application and does not negate tasks and/or deliverables described therein. Data, reports, surveys, and supporting information, including photos, maps and GIS data, must be submitted to the DNR Biologist in electronic format and in any other format they specify.

If a consultant provides a final report, it is recommended that the Grantee provide the DNR Biologist with a draft for comment on report adequacy prior to making a final payment to the consultant. Include electronic copy of the final report along with or prior to submission of grantee's final payment request.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Sapokesick Lake
Status
Complete

Legend Lake P & R District: Legend Lake Ewm Education, Prevention & Planning Project Ph 1: The Legend Lake Protection and Rehabilitation District proposes to conduct aquatic invasive species education and prevention activities during the period 2008-2009. The project elements and deliverables are specified in the District's Aquatic Invasive Species Control Grant application, dated January 30, 2008. The project includes Pre and Post treatment monitoring of EWM, dissolved oxygen monitoring, water quality monitoring,2, 4-D assays, aquatic plant surveys, and EWM distribution mapping.

A yearly progress report and a final report summarizing the project will be provided to DNR. If consultant is to provide the final report, it is recommended the Grantee provide the DNR Aquatic Invasive Species Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to, submission of grantee's final payment request.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Sapokesick Lake
Status
Complete

Legend Lake P & R District: Legend Lake Ewm Education, Prevention & Planning Project Ph 2: The Legend Lake Protection Rehabilitation District proposes to conduct boater education and boat inspection by implementing the "Clean Boats, Clean Waters" watercraft inspection program during the period 2008-2012. The project elements and deliverables are specified in the Legend Lake Protection Rehabilitation District's
Aquatic Invasive Species Control Grant application, dated January 30, 2008. The project includes to recruit, train and schedule volunteers; educate boaters about aquatic invasive species and the measures to prevent their spread; and entering data into the State's online Watercraft Inspection Database. A final report summarizing the project will be provided to DNR. Watercraft inspection records will be entered into the State's online Watercraft Inspection Database.

If consultant is to provide the final report, it is recommended the Grantee provide the DNR Aquatic Invasive Species Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to, submission of grantee's final payment request.


Grant Details
Aquatic Invasives Education
Date
3/15/2024
Waters Involved
Sapokesick Lake
Status
Complete

Legend Lake P & R District: Comp - Legend Lake 2025 Comprehensive Management Plan - Aquatic Plant Surveys Phase (1 Of 3): The Legend Lake Protection and Rehabilitation District is sponsoring a project to update the comprehensive, AIS Control, and mechanical harvesting plans for Legend Lake.

Activities: 1. Gather and analyze historical and current ecological data for comparisons, to identify threats, determine the goals and values of stakeholders, and present realistic management actions.
2. Include goals and actions aimed at restoring ecological lake functions, protecting high value lake attributes, and increasing the district's capacity to implement the plan.

Deliverables: 1. Perform an aquatic plant survey and share results.

Conditions: The aquatic plant survey must conform with Hauxwell, J., S. Knight, K. Wagner, A. Mikulyuk, M. Nault, M. Porzky and S. Chase. 2010. Recommended baseline monitoring of aquatic plants in Wisconsin: sampling design, field and laboratory procedures, data entry and analysis, and applications. Wisconsin Department of Natural Resources Bureau of Science Services, PUB-SS-1068 2010. Madison, Wisconsin, USA.

This scope summarizes details provided in the application and does not negate tasks and/or deliverables described therein. Data, reports, surveys, and supporting information, including photos, maps and GIS data, must be submitted to the DNR Biologist in electronic format and in any other format they specify.

If a consultant provides a final report, it is recommended that the Grantee provide the DNR Biologist with a draft for comment on report adequacy prior to making a final payment to the consultant. Include electronic copy of the final report along with or prior to submission of grantee's final payment request.


Grant Details
Aquatic Invasives Education
Date
3/15/2024
Waters Involved
Sapokesick Lake
Status
Complete

Legend Lake P & R District: Comp - Legend Lake 2025 Comprehensive Management Plan - Biological Studies Phase (2 Of 3): The Legend Lake Proection and Rehabilitation District is sponsoring a project to update the comprehensive, AIS Control, and mechanical harvesting plans for Legend Lake.

Activities: 1. Gather and analyze historical and current ecological data for comparisons, to identify threats, determine the goals and values of stakeholders, and present realistic management actions.
2. Include goals and actions aimed at restoring ecological lake functions, protecting high value lake attributes, and increasing the district's capacity to implement the plan.

Deliverables: 1. Collect water Quality samples 2. Perform watershed modeling 3. Compile fishery data 4. Analyze and relay the results to the stakeholders.

Conditions: Water quality analysis results would be delivered in presentations and within the management plan\2019s report sections, following WISCALM protocols.

This scope summarizes details provided in the application and does not negate tasks and/or deliverables described therein. Data, reports, surveys, and supporting information, including photos, maps and GIS data, must be submitted to the DNR Biologist in electronic format and in any other format they specify.

If a consultant provides a final report, it is recommended that the Grantee provide the DNR Biologist with a draft for comment on report adequacy prior to making a final payment to the consultant. Include electronic copy of the final report along with or prior to submission of grantee's final payment request.


Grant Details
Aquatic Invasives Education
Date
3/15/2024
Waters Involved
Sapokesick Lake
Status
Complete

Legend Lake P & R District: Comp - Legend Lake 2025 Comprehensive Management Plan - Public Participation & Reporting Phase (3): The Legend Lake Protection and Rehabilitation District is sponsoring a project to update the comprehensive, AIS Control, and mechanical harvesting plans for Legend Lake.

Activities: Completion of a WDNR-approved stakeholder survey, sent to all 1,800 LLPRD members. District members are either riparian property owners or those with deeded access to the system though their beach club system.

Deliverables: 1) Survey results, along with any appropriate comparisons with the previous survey. 2) Completion of comprehensive lake management plan.

Conditions: Stakeholder survey will be in accordance with the DNR\2019s social scientist.

This scope summarizes details provided in the application and does not negate tasks and/or deliverables described therein. Data, reports, surveys, and supporting information, including photos, maps and GIS data, must be submitted to the DNR Biologist in electronic format and in any other format they specify.

If a consultant provides a final report, it is recommended that the Grantee provide the DNR Biologist with a draft for comment on report adequacy prior to making a final payment to the consultant. Include electronic copy of the final report along with or prior to submission of grantee's final payment request.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Skice Lake
Status
Complete

Legend Lake P & R District: Legend Lake Ewm Education, Prevention & Planning Project Ph 1: The Legend Lake Protection and Rehabilitation District proposes to conduct aquatic invasive species education and prevention activities during the period 2008-2009. The project elements and deliverables are specified in the District's Aquatic Invasive Species Control Grant application, dated January 30, 2008. The project includes Pre and Post treatment monitoring of EWM, dissolved oxygen monitoring, water quality monitoring,2, 4-D assays, aquatic plant surveys, and EWM distribution mapping.

A yearly progress report and a final report summarizing the project will be provided to DNR. If consultant is to provide the final report, it is recommended the Grantee provide the DNR Aquatic Invasive Species Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to, submission of grantee's final payment request.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Skice Lake
Status
Complete

Legend Lake P & R District: Legend Lake Ewm Education, Prevention & Planning Project Ph 2: The Legend Lake Protection Rehabilitation District proposes to conduct boater education and boat inspection by implementing the "Clean Boats, Clean Waters" watercraft inspection program during the period 2008-2012. The project elements and deliverables are specified in the Legend Lake Protection Rehabilitation District's
Aquatic Invasive Species Control Grant application, dated January 30, 2008. The project includes to recruit, train and schedule volunteers; educate boaters about aquatic invasive species and the measures to prevent their spread; and entering data into the State's online Watercraft Inspection Database. A final report summarizing the project will be provided to DNR. Watercraft inspection records will be entered into the State's online Watercraft Inspection Database.

If consultant is to provide the final report, it is recommended the Grantee provide the DNR Aquatic Invasive Species Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to, submission of grantee's final payment request.


Grant Details
Aquatic Invasives Education
Date
3/15/2024
Waters Involved
Skice Lake
Status
Complete

Legend Lake P & R District: Comp - Legend Lake 2025 Comprehensive Management Plan - Aquatic Plant Surveys Phase (1 Of 3): The Legend Lake Protection and Rehabilitation District is sponsoring a project to update the comprehensive, AIS Control, and mechanical harvesting plans for Legend Lake.

Activities: 1. Gather and analyze historical and current ecological data for comparisons, to identify threats, determine the goals and values of stakeholders, and present realistic management actions.
2. Include goals and actions aimed at restoring ecological lake functions, protecting high value lake attributes, and increasing the district's capacity to implement the plan.

Deliverables: 1. Perform an aquatic plant survey and share results.

Conditions: The aquatic plant survey must conform with Hauxwell, J., S. Knight, K. Wagner, A. Mikulyuk, M. Nault, M. Porzky and S. Chase. 2010. Recommended baseline monitoring of aquatic plants in Wisconsin: sampling design, field and laboratory procedures, data entry and analysis, and applications. Wisconsin Department of Natural Resources Bureau of Science Services, PUB-SS-1068 2010. Madison, Wisconsin, USA.

This scope summarizes details provided in the application and does not negate tasks and/or deliverables described therein. Data, reports, surveys, and supporting information, including photos, maps and GIS data, must be submitted to the DNR Biologist in electronic format and in any other format they specify.

If a consultant provides a final report, it is recommended that the Grantee provide the DNR Biologist with a draft for comment on report adequacy prior to making a final payment to the consultant. Include electronic copy of the final report along with or prior to submission of grantee's final payment request.


Grant Details
Aquatic Invasives Education
Date
3/15/2024
Waters Involved
Skice Lake
Status
Complete

Legend Lake P & R District: Comp - Legend Lake 2025 Comprehensive Management Plan - Biological Studies Phase (2 Of 3): The Legend Lake Proection and Rehabilitation District is sponsoring a project to update the comprehensive, AIS Control, and mechanical harvesting plans for Legend Lake.

Activities: 1. Gather and analyze historical and current ecological data for comparisons, to identify threats, determine the goals and values of stakeholders, and present realistic management actions.
2. Include goals and actions aimed at restoring ecological lake functions, protecting high value lake attributes, and increasing the district's capacity to implement the plan.

Deliverables: 1. Collect water Quality samples 2. Perform watershed modeling 3. Compile fishery data 4. Analyze and relay the results to the stakeholders.

Conditions: Water quality analysis results would be delivered in presentations and within the management plan\2019s report sections, following WISCALM protocols.

This scope summarizes details provided in the application and does not negate tasks and/or deliverables described therein. Data, reports, surveys, and supporting information, including photos, maps and GIS data, must be submitted to the DNR Biologist in electronic format and in any other format they specify.

If a consultant provides a final report, it is recommended that the Grantee provide the DNR Biologist with a draft for comment on report adequacy prior to making a final payment to the consultant. Include electronic copy of the final report along with or prior to submission of grantee's final payment request.


Grant Details
Aquatic Invasives Education
Date
3/15/2024
Waters Involved
Skice Lake
Status
Complete

Legend Lake P & R District: Comp - Legend Lake 2025 Comprehensive Management Plan - Public Participation & Reporting Phase (3): The Legend Lake Protection and Rehabilitation District is sponsoring a project to update the comprehensive, AIS Control, and mechanical harvesting plans for Legend Lake.

Activities: Completion of a WDNR-approved stakeholder survey, sent to all 1,800 LLPRD members. District members are either riparian property owners or those with deeded access to the system though their beach club system.

Deliverables: 1) Survey results, along with any appropriate comparisons with the previous survey. 2) Completion of comprehensive lake management plan.

Conditions: Stakeholder survey will be in accordance with the DNR\2019s social scientist.

This scope summarizes details provided in the application and does not negate tasks and/or deliverables described therein. Data, reports, surveys, and supporting information, including photos, maps and GIS data, must be submitted to the DNR Biologist in electronic format and in any other format they specify.

If a consultant provides a final report, it is recommended that the Grantee provide the DNR Biologist with a draft for comment on report adequacy prior to making a final payment to the consultant. Include electronic copy of the final report along with or prior to submission of grantee's final payment request.


Grant Details
Aquatic Invasives Education
Date
4/1/2004
Waters Involved
Spring Lake
Status
Complete

Legend Lake P & R District: Legend Lake Aquatic Invasive Species Study: Legend Lake Protection and Rehabilitation District proposed to conduct an aquatic plant survey and develop an aquatic plant management plan based on the survey. The survey and plan are being conducted to implement an Eurasian Watermilfoil (EWM) management strategy. The plant survey will reflect the location of DNR determined sensitive areas, aquatic plant communities and the distribution and abundance of EWM. Data to be collected and evaluated includes species present, estimates of species abundance, maximum rooting depth and plant distribution. Density ratings will be assigned at each transect. The consultant will present a draft aquatic plant management plan to the lake district and Department of Natural Resources for final plan approval. An open house and public information meeting will be held to discuss the results of the plant survey and to gather public input on the proposed plan. The survey results and management plan will be disseminated to the lake residents via the lake newsletter.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Spring Lake
Status
Complete

Legend Lake P & R District: Legend Lake Ewm Education, Prevention & Planning Project Ph 1: The Legend Lake Protection and Rehabilitation District proposes to conduct aquatic invasive species education and prevention activities during the period 2008-2009. The project elements and deliverables are specified in the District's Aquatic Invasive Species Control Grant application, dated January 30, 2008. The project includes Pre and Post treatment monitoring of EWM, dissolved oxygen monitoring, water quality monitoring,2, 4-D assays, aquatic plant surveys, and EWM distribution mapping.

A yearly progress report and a final report summarizing the project will be provided to DNR. If consultant is to provide the final report, it is recommended the Grantee provide the DNR Aquatic Invasive Species Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to, submission of grantee's final payment request.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Spring Lake
Status
Complete

Legend Lake P & R District: Legend Lake Ewm Education, Prevention & Planning Project Ph 2: The Legend Lake Protection Rehabilitation District proposes to conduct boater education and boat inspection by implementing the "Clean Boats, Clean Waters" watercraft inspection program during the period 2008-2012. The project elements and deliverables are specified in the Legend Lake Protection Rehabilitation District's
Aquatic Invasive Species Control Grant application, dated January 30, 2008. The project includes to recruit, train and schedule volunteers; educate boaters about aquatic invasive species and the measures to prevent their spread; and entering data into the State's online Watercraft Inspection Database. A final report summarizing the project will be provided to DNR. Watercraft inspection records will be entered into the State's online Watercraft Inspection Database.

If consultant is to provide the final report, it is recommended the Grantee provide the DNR Aquatic Invasive Species Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to, submission of grantee's final payment request.


Grant Details
Aquatic Invasives Education
Date
3/15/2024
Waters Involved
Spring Lake
Status
Complete

Legend Lake P & R District: Comp - Legend Lake 2025 Comprehensive Management Plan - Aquatic Plant Surveys Phase (1 Of 3): The Legend Lake Protection and Rehabilitation District is sponsoring a project to update the comprehensive, AIS Control, and mechanical harvesting plans for Legend Lake.

Activities: 1. Gather and analyze historical and current ecological data for comparisons, to identify threats, determine the goals and values of stakeholders, and present realistic management actions.
2. Include goals and actions aimed at restoring ecological lake functions, protecting high value lake attributes, and increasing the district's capacity to implement the plan.

Deliverables: 1. Perform an aquatic plant survey and share results.

Conditions: The aquatic plant survey must conform with Hauxwell, J., S. Knight, K. Wagner, A. Mikulyuk, M. Nault, M. Porzky and S. Chase. 2010. Recommended baseline monitoring of aquatic plants in Wisconsin: sampling design, field and laboratory procedures, data entry and analysis, and applications. Wisconsin Department of Natural Resources Bureau of Science Services, PUB-SS-1068 2010. Madison, Wisconsin, USA.

This scope summarizes details provided in the application and does not negate tasks and/or deliverables described therein. Data, reports, surveys, and supporting information, including photos, maps and GIS data, must be submitted to the DNR Biologist in electronic format and in any other format they specify.

If a consultant provides a final report, it is recommended that the Grantee provide the DNR Biologist with a draft for comment on report adequacy prior to making a final payment to the consultant. Include electronic copy of the final report along with or prior to submission of grantee's final payment request.


Grant Details
Aquatic Invasives Education
Date
3/15/2024
Waters Involved
Spring Lake
Status
Complete

Legend Lake P & R District: Comp - Legend Lake 2025 Comprehensive Management Plan - Biological Studies Phase (2 Of 3): The Legend Lake Proection and Rehabilitation District is sponsoring a project to update the comprehensive, AIS Control, and mechanical harvesting plans for Legend Lake.

Activities: 1. Gather and analyze historical and current ecological data for comparisons, to identify threats, determine the goals and values of stakeholders, and present realistic management actions.
2. Include goals and actions aimed at restoring ecological lake functions, protecting high value lake attributes, and increasing the district's capacity to implement the plan.

Deliverables: 1. Collect water Quality samples 2. Perform watershed modeling 3. Compile fishery data 4. Analyze and relay the results to the stakeholders.

Conditions: Water quality analysis results would be delivered in presentations and within the management plan\2019s report sections, following WISCALM protocols.

This scope summarizes details provided in the application and does not negate tasks and/or deliverables described therein. Data, reports, surveys, and supporting information, including photos, maps and GIS data, must be submitted to the DNR Biologist in electronic format and in any other format they specify.

If a consultant provides a final report, it is recommended that the Grantee provide the DNR Biologist with a draft for comment on report adequacy prior to making a final payment to the consultant. Include electronic copy of the final report along with or prior to submission of grantee's final payment request.


Grant Details
Aquatic Invasives Education
Date
3/15/2024
Waters Involved
Spring Lake
Status
Complete

Legend Lake P & R District: Comp - Legend Lake 2025 Comprehensive Management Plan - Public Participation & Reporting Phase (3): The Legend Lake Protection and Rehabilitation District is sponsoring a project to update the comprehensive, AIS Control, and mechanical harvesting plans for Legend Lake.

Activities: Completion of a WDNR-approved stakeholder survey, sent to all 1,800 LLPRD members. District members are either riparian property owners or those with deeded access to the system though their beach club system.

Deliverables: 1) Survey results, along with any appropriate comparisons with the previous survey. 2) Completion of comprehensive lake management plan.

Conditions: Stakeholder survey will be in accordance with the DNR\2019s social scientist.

This scope summarizes details provided in the application and does not negate tasks and/or deliverables described therein. Data, reports, surveys, and supporting information, including photos, maps and GIS data, must be submitted to the DNR Biologist in electronic format and in any other format they specify.

If a consultant provides a final report, it is recommended that the Grantee provide the DNR Biologist with a draft for comment on report adequacy prior to making a final payment to the consultant. Include electronic copy of the final report along with or prior to submission of grantee's final payment request.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Unnamed
Status
Complete

Legend Lake P & R District: Legend Lake Ewm Education, Prevention & Planning Project Ph 1: The Legend Lake Protection and Rehabilitation District proposes to conduct aquatic invasive species education and prevention activities during the period 2008-2009. The project elements and deliverables are specified in the District's Aquatic Invasive Species Control Grant application, dated January 30, 2008. The project includes Pre and Post treatment monitoring of EWM, dissolved oxygen monitoring, water quality monitoring,2, 4-D assays, aquatic plant surveys, and EWM distribution mapping.

A yearly progress report and a final report summarizing the project will be provided to DNR. If consultant is to provide the final report, it is recommended the Grantee provide the DNR Aquatic Invasive Species Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to, submission of grantee's final payment request.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Unnamed
Status
Complete

Legend Lake P & R District: Legend Lake Ewm Education, Prevention & Planning Project Ph 2: The Legend Lake Protection Rehabilitation District proposes to conduct boater education and boat inspection by implementing the "Clean Boats, Clean Waters" watercraft inspection program during the period 2008-2012. The project elements and deliverables are specified in the Legend Lake Protection Rehabilitation District's
Aquatic Invasive Species Control Grant application, dated January 30, 2008. The project includes to recruit, train and schedule volunteers; educate boaters about aquatic invasive species and the measures to prevent their spread; and entering data into the State's online Watercraft Inspection Database. A final report summarizing the project will be provided to DNR. Watercraft inspection records will be entered into the State's online Watercraft Inspection Database.

If consultant is to provide the final report, it is recommended the Grantee provide the DNR Aquatic Invasive Species Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to, submission of grantee's final payment request.


Grant Details
Aquatic Invasives Maintenance and Containment
Date
12/14/2009
Waters Involved
Blacksmith Lake
Status
Complete

Legend Lake P & R District: Legend Lake Permit Fee Reimbursement: Permit fee reimbursement for the maintenance and containment of aquatic invasive species on Legend Lake.


Grant Details
Aquatic Invasives Maintenance and Containment
Date
12/13/2010
Waters Involved
Blacksmith Lake
Status
Complete

Legend Lake P & R District: Legend Lake Permit Fee Reimbursement: Permit fee reimbursement for the maintenance and containment of aquatic invasive species on Legend Lake.


Grant Details
Aquatic Invasives Maintenance and Containment
Date
12/19/2011
Waters Involved
Blacksmith Lake
Status
Complete

Legend Lake P & R District: Legend Lake Permit Fee Reimbursement: Permit fee reimbursement for the maintenance and containment of aquatic invasive species on Legend Lake.


Grant Details
Aquatic Invasives Maintenance and Containment
Date
12/14/2009
Waters Involved
Little Blacksmith Lake
Status
Complete

Legend Lake P & R District: Legend Lake Permit Fee Reimbursement: Permit fee reimbursement for the maintenance and containment of aquatic invasive species on Legend Lake.


Grant Details
Aquatic Invasives Maintenance and Containment
Date
12/13/2010
Waters Involved
Little Blacksmith Lake
Status
Complete

Legend Lake P & R District: Legend Lake Permit Fee Reimbursement: Permit fee reimbursement for the maintenance and containment of aquatic invasive species on Legend Lake.


Grant Details
Aquatic Invasives Maintenance and Containment
Date
12/19/2011
Waters Involved
Little Blacksmith Lake
Status
Complete

Legend Lake P & R District: Legend Lake Permit Fee Reimbursement: Permit fee reimbursement for the maintenance and containment of aquatic invasive species on Legend Lake.


Grant Details
Aquatic Invasives Maintenance and Containment
Date
12/14/2009
Waters Involved
Moshawquit Lake
Status
Complete

Legend Lake P & R District: Legend Lake Permit Fee Reimbursement: Permit fee reimbursement for the maintenance and containment of aquatic invasive species on Legend Lake.


Grant Details
Aquatic Invasives Maintenance and Containment
Date
12/14/2009
Waters Involved
Pestiga Lake
Status
Complete

Legend Lake P & R District: Legend Lake Permit Fee Reimbursement: Permit fee reimbursement for the maintenance and containment of aquatic invasive species on Legend Lake.


Grant Details
Aquatic Invasives Maintenance and Containment
Date
12/13/2010
Waters Involved
Pestiga Lake
Status
Complete

Legend Lake P & R District: Legend Lake Permit Fee Reimbursement: Permit fee reimbursement for the maintenance and containment of aquatic invasive species on Legend Lake.


Grant Details
Aquatic Invasives Maintenance and Containment
Date
12/19/2011
Waters Involved
Pestiga Lake
Status
Complete

Legend Lake P & R District: Legend Lake Permit Fee Reimbursement: Permit fee reimbursement for the maintenance and containment of aquatic invasive species on Legend Lake.


Grant Details
Aquatic Invasives Maintenance and Containment
Date
12/14/2009
Waters Involved
Pywaosit Lake
Status
Complete

Legend Lake P & R District: Legend Lake Permit Fee Reimbursement: Permit fee reimbursement for the maintenance and containment of aquatic invasive species on Legend Lake.


Grant Details
Aquatic Invasives Maintenance and Containment
Date
12/13/2010
Waters Involved
Pywaosit Lake
Status
Complete

Legend Lake P & R District: Legend Lake Permit Fee Reimbursement: Permit fee reimbursement for the maintenance and containment of aquatic invasive species on Legend Lake.


Grant Details
Aquatic Invasives Maintenance and Containment
Date
12/19/2011
Waters Involved
Pywaosit Lake
Status
Complete

Legend Lake P & R District: Legend Lake Permit Fee Reimbursement: Permit fee reimbursement for the maintenance and containment of aquatic invasive species on Legend Lake.


Grant Details
Aquatic Invasives Maintenance and Containment
Date
12/14/2009
Waters Involved
Sapokesick Lake
Status
Complete

Legend Lake P & R District: Legend Lake Permit Fee Reimbursement: Permit fee reimbursement for the maintenance and containment of aquatic invasive species on Legend Lake.


Grant Details
Aquatic Invasives Maintenance and Containment
Date
12/13/2010
Waters Involved
Sapokesick Lake
Status
Complete

Legend Lake P & R District: Legend Lake Permit Fee Reimbursement: Permit fee reimbursement for the maintenance and containment of aquatic invasive species on Legend Lake.


Grant Details
Aquatic Invasives Maintenance and Containment
Date
12/19/2011
Waters Involved
Sapokesick Lake
Status
Complete

Legend Lake P & R District: Legend Lake Permit Fee Reimbursement: Permit fee reimbursement for the maintenance and containment of aquatic invasive species on Legend Lake.


Grant Details
Aquatic Invasives Maintenance and Containment
Date
12/14/2009
Waters Involved
Skice Lake
Status
Complete

Legend Lake P & R District: Legend Lake Permit Fee Reimbursement: Permit fee reimbursement for the maintenance and containment of aquatic invasive species on Legend Lake.


Grant Details
Aquatic Invasives Maintenance and Containment
Date
12/13/2010
Waters Involved
Skice Lake
Status
Complete

Legend Lake P & R District: Legend Lake Permit Fee Reimbursement: Permit fee reimbursement for the maintenance and containment of aquatic invasive species on Legend Lake.


Grant Details
Aquatic Invasives Maintenance and Containment
Date
12/19/2011
Waters Involved
Skice Lake
Status
Complete

Legend Lake P & R District: Legend Lake Permit Fee Reimbursement: Permit fee reimbursement for the maintenance and containment of aquatic invasive species on Legend Lake.


Grant Details
Aquatic Invasives Maintenance and Containment
Date
12/14/2009
Waters Involved
Spring Lake
Status
Complete

Legend Lake P & R District: Legend Lake Permit Fee Reimbursement: Permit fee reimbursement for the maintenance and containment of aquatic invasive species on Legend Lake.


Grant Details
Aquatic Invasives Maintenance and Containment
Date
12/13/2010
Waters Involved
Spring Lake
Status
Complete

Legend Lake P & R District: Legend Lake Permit Fee Reimbursement: Permit fee reimbursement for the maintenance and containment of aquatic invasive species on Legend Lake.


Grant Details
Aquatic Invasives Maintenance and Containment
Date
12/19/2011
Waters Involved
Spring Lake
Status
Complete

Legend Lake P & R District: Legend Lake Permit Fee Reimbursement: Permit fee reimbursement for the maintenance and containment of aquatic invasive species on Legend Lake.


Grant Details
Clean Boats, Clean Waters
Date
4/1/2013
Waters Involved
Blacksmith Lake
Status
Complete

Legend Lake P & R District: Legend Lake Clean Boats Clean Waters Program 2013: Legend Lake P&R District is sponsoring a Clean Boats Clean Water landing inspection program at 3 public boat landings in 2013.


Grant Details
Clean Boats, Clean Waters
Date
4/1/2014
Waters Involved
Blacksmith Lake
Status
Complete

Legend Lake P & R District: Legend Lake Clean Boats Clean Waters Project 2014: Legend Lake Protection and Rehabilitation District will sponsor a Clean Boats Clean Water landing inspection program at 3 public accesses in 2014.


Grant Details
Clean Boats, Clean Waters
Date
4/1/2014
Waters Involved
Little Blacksmith Lake
Status
Complete

Legend Lake P & R District: Legend Lake Clean Boats Clean Waters Project 2014: Legend Lake Protection and Rehabilitation District will sponsor a Clean Boats Clean Water landing inspection program at 3 public accesses in 2014.


Grant Details
Clean Boats, Clean Waters
Date
4/1/2014
Waters Involved
Pestiga Lake
Status
Complete

Legend Lake P & R District: Legend Lake Clean Boats Clean Waters Project 2014: Legend Lake Protection and Rehabilitation District will sponsor a Clean Boats Clean Water landing inspection program at 3 public accesses in 2014.


Grant Details
Clean Boats, Clean Waters
Date
4/1/2014
Waters Involved
Pywaosit Lake
Status
Complete

Legend Lake P & R District: Legend Lake Clean Boats Clean Waters Project 2014: Legend Lake Protection and Rehabilitation District will sponsor a Clean Boats Clean Water landing inspection program at 3 public accesses in 2014.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2015
Waters Involved
Pywaosit Lake
Status
Complete

Legend Lake P & R District: Legend Lake Clean Boats Clean Waters Project 2015: Legend Lake Protection & Rehabilitation District will sponsor a Clean Boats Clean Water landing inspection program at 3 public access in 2015


Grant Details
Clean Boats, Clean Waters
Date
2/15/2016
Waters Involved
Pywaosit Lake
Status
Proposed

Legend Lake P & R District: Legend Lake Protection & Rehabilitation District 2016 Clean Boats Clean Waters: The Legend Lake Protection & Rehabilitation District is sponsoring a Clean Boats Clean Waters project in 2016 at three public boat landing on Legend Lake.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2017
Waters Involved
Pywaosit Lake
Status
Complete

Legend Lake P & R District: Legend Lake P & R District 2017 Cbcw: Legend Lake P & R District is sponsoring a Clean Boats Clean Waters project in 2017 at 3 single public boat landings and 0 public boat landing pairs on LEGEND LAKE, LEGEND LAKE, LEGEND LAKE.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2019
Waters Involved
Pywaosit Lake
Status
Complete

Legend Lake P & R District: Legend Lake P & R District 2019 Cbcw: Legend Lake P & R District is sponsoring a Clean Boats Clean Waters project in 2019 at 3 single public boat landings and 0 public boat landing pairs on LEGEND LAKE (LAKE LODGE), LEGEND LAKE(RUNNING BEAR), LEGEND LAKE (DAM #3).


Grant Details
Clean Boats, Clean Waters
Date
4/1/2014
Waters Involved
Sapokesick Lake
Status
Complete

Legend Lake P & R District: Legend Lake Clean Boats Clean Waters Project 2014: Legend Lake Protection and Rehabilitation District will sponsor a Clean Boats Clean Water landing inspection program at 3 public accesses in 2014.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2016
Waters Involved
Sapokesick Lake
Status
Proposed

Legend Lake P & R District: Legend Lake Protection & Rehabilitation District 2016 Clean Boats Clean Waters: The Legend Lake Protection & Rehabilitation District is sponsoring a Clean Boats Clean Waters project in 2016 at three public boat landing on Legend Lake.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2017
Waters Involved
Sapokesick Lake
Status
Complete

Legend Lake P & R District: Legend Lake P & R District 2017 Cbcw: Legend Lake P & R District is sponsoring a Clean Boats Clean Waters project in 2017 at 3 single public boat landings and 0 public boat landing pairs on LEGEND LAKE, LEGEND LAKE, LEGEND LAKE.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2019
Waters Involved
Sapokesick Lake
Status
Complete

Legend Lake P & R District: Legend Lake P & R District 2019 Cbcw: Legend Lake P & R District is sponsoring a Clean Boats Clean Waters project in 2019 at 3 single public boat landings and 0 public boat landing pairs on LEGEND LAKE (LAKE LODGE), LEGEND LAKE(RUNNING BEAR), LEGEND LAKE (DAM #3).


Grant Details
Clean Boats, Clean Waters
Date
4/1/2014
Waters Involved
Skice Lake
Status
Complete

Legend Lake P & R District: Legend Lake Clean Boats Clean Waters Project 2014: Legend Lake Protection and Rehabilitation District will sponsor a Clean Boats Clean Water landing inspection program at 3 public accesses in 2014.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2016
Waters Involved
Skice Lake
Status
Complete

Legend Lake P & R District: Legend Lake Protection & Rehabilitation District 2016 Clean Boats Clean Waters: The Legend Lake Protection & Rehabilitation District is sponsoring a Clean Boats Clean Waters project in 2016 at three public boat landing on Legend Lake.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2017
Waters Involved
Skice Lake
Status
Complete

Legend Lake P & R District: Legend Lake P & R District 2017 Cbcw: Legend Lake P & R District is sponsoring a Clean Boats Clean Waters project in 2017 at 3 single public boat landings and 0 public boat landing pairs on LEGEND LAKE, LEGEND LAKE, LEGEND LAKE.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2019
Waters Involved
Skice Lake
Status
Complete

Legend Lake P & R District: Legend Lake P & R District 2019 Cbcw: Legend Lake P & R District is sponsoring a Clean Boats Clean Waters project in 2019 at 3 single public boat landings and 0 public boat landing pairs on LEGEND LAKE (LAKE LODGE), LEGEND LAKE(RUNNING BEAR), LEGEND LAKE (DAM #3).


Grant Details
Clean Boats, Clean Waters
Date
4/1/2014
Waters Involved
Spring Lake
Status
Complete

Legend Lake P & R District: Legend Lake Clean Boats Clean Waters Project 2014: Legend Lake Protection and Rehabilitation District will sponsor a Clean Boats Clean Water landing inspection program at 3 public accesses in 2014.


Grant Details
Clean Boats, Clean Waters
Date
4/1/2014
Waters Involved
Unnamed
Status
Complete

Legend Lake P & R District: Legend Lake Clean Boats Clean Waters Project 2014: Legend Lake Protection and Rehabilitation District will sponsor a Clean Boats Clean Water landing inspection program at 3 public accesses in 2014.


Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Bear Lake
Status
Complete

Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.


Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Binder Lake
Status
Complete

Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.


Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Birch Lake
Status
Complete

Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.


Grant Details
Lake Protection Grant
Date
4/15/2017
Waters Involved
Bonita Creek
Status
Complete

Chute Lake P & R District: Hlk - Chute Pond Healthy Lakes 2017: Partnering with property owners, Chute Lake Protection & Rehabilitation District #1 is sponsoring a grant to implement water quality and habitat best practices from Wisconsin\2019s Healthy Lakes Implementation Plan. Best practices, including fish sticks, 350 sq. ft. native plantings, diversions, rock infiltration, and/or rain gardens, will be designed and installed according to the Healthy Lakes fact sheets, technical guidance and grant application.

All funded best practices require contracts that must remain in place for 10 years and include the minimum operation and maintenance requirements described in grant condition #16 at the end of this agreement. If the landowner is the grant sponsor this Lake Protection Grant Agreement serves as the contract. If the best practice(s) will be implemented on land other than the sponsor\2019s, a Conservation Contract between the sponsor and landowner describing the 10-year contract period, minimum operation and maintenance details, and data to be collected is required.

The Department may perform site inspections and/or monitoring to ensure project success.

Deliverables include: Signed 10-year landowner Conservation Contract(s) with operation and maintenance requirements; data collected; pre and post project installation photographs; and summary of education activities and publicity/promotion of Healthy Lakes initiative, if applicable.

Special conditions: Project management and technical assistance costs cannot exceed 10% of the state share of the grant award; this does not include implementation labor. Water regulation and/or county zoning permits must be issued before construction, and all regulatory requirements apply. The Healthy Lakes logo should be used for promotion and publicity and DNR recognized as a funding source.

This scope summarizes the scope in the grant application and attachments and does not supersede those application tasks/deliverables.


Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Bullfrog Lake
Status
Complete

Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.


Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Caldron Falls Reservoir*
Status
Complete

Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.


Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Chain Lake
Status
Complete

Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.


Grant Details
Lake Protection Grant
Date
4/15/2017
Waters Involved
Chute Pond
Status
Complete

Chute Lake P & R District: Hlk - Chute Pond Healthy Lakes 2017: Partnering with property owners, Chute Lake Protection & Rehabilitation District #1 is sponsoring a grant to implement water quality and habitat best practices from Wisconsin\2019s Healthy Lakes Implementation Plan. Best practices, including fish sticks, 350 sq. ft. native plantings, diversions, rock infiltration, and/or rain gardens, will be designed and installed according to the Healthy Lakes fact sheets, technical guidance and grant application.

All funded best practices require contracts that must remain in place for 10 years and include the minimum operation and maintenance requirements described in grant condition #16 at the end of this agreement. If the landowner is the grant sponsor this Lake Protection Grant Agreement serves as the contract. If the best practice(s) will be implemented on land other than the sponsor\2019s, a Conservation Contract between the sponsor and landowner describing the 10-year contract period, minimum operation and maintenance details, and data to be collected is required.

The Department may perform site inspections and/or monitoring to ensure project success.

Deliverables include: Signed 10-year landowner Conservation Contract(s) with operation and maintenance requirements; data collected; pre and post project installation photographs; and summary of education activities and publicity/promotion of Healthy Lakes initiative, if applicable.

Special conditions: Project management and technical assistance costs cannot exceed 10% of the state share of the grant award; this does not include implementation labor. Water regulation and/or county zoning permits must be issued before construction, and all regulatory requirements apply. The Healthy Lakes logo should be used for promotion and publicity and DNR recognized as a funding source.

This scope summarizes the scope in the grant application and attachments and does not supersede those application tasks/deliverables.


Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Crab Lake
Status
Complete

Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.


Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Forbes Spring
Status
Complete

Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.


Grant Details
Lake Protection Grant
Date
4/15/2015
Waters Involved
Grass Lake
Status
Complete

Town Of Belle Plaine: Hlk-Clover Leaf Healthy Lakes: The Town of Belle Plaine will implement best practices described in Wisconsin\2019s 2014-2017 Healthy Lakes Implementation Plan on the Cloverleaf Lakes. Practices include: fish sticks, 350 ft2 native plantings, and rain gardens on at least 12 properties, including the Gibson Island and Round Lake Park demonstration sites.
The best practices require a contract to remain in effect for 10 years and must include minimum operation and maintenance requirements and data collection as described in grant condition #16. If best practice(s) are implemented on land owned by the grant Sponsor, this Lake Protection Grant Agreement serves as the contract. If best practice(s) are implemented on land other than the sponsor\2019s, a contract between the sponsor and landowner that abides by grant condition #16 is required.
The Department may require re-payment of project installation costs if the best practice is disturbed or removed. The Sponsor and/or the Department may perform site inspections and/or monitoring to ensure project success.
Deliverables: Best practice location and design information, if not included in the application; signed 10-year landowner contract; pre and post project installation photographs; summary of education activities and publicity/promotion of Healthy Lakes initiative, if applicable.
Special conditions: The state share of each best practice cannot exceed $1,000. The state share of grant administration and technical assistance costs may not exceed 10% of the grant award; technical assistance does not include implementation labor. Funding cannot be used for mitigation or regulatory compliance activities. Water regulation and/or county zoning permits must be issued before construction. The Healthy Lakes logo should be used for promotion and publicity, and DNR recognized as a funding source.


Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Hickey Springs
Status
Complete

Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.


Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Hidden Lake
Status
Complete

Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.


Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Lackawanna Lake
Status
Complete

Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.


Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Lake John
Status
Complete

Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.


Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Lincoln Lake
Status
Complete

Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.


Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Little Bear Lake
Status
Complete

Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.


Grant Details
Lake Protection Grant
Date
4/15/2017
Waters Involved
Little Pickerel Lake
Status
Complete

Pickerel Chain Lakes Association: Lmi - Little Pickerel Aeration Implementation Project: The Pickerel Chain Association proposes to install an aerator in Little Pickerel Lake. The project elements and deliverables are specified in the Pickerel Lake\2019s Protection Grant application, dated February 1, 2017.

This grant will fund the installation of an aeration system in Little Pickerel Lake. The aeration system will be installed in 2017 using PCLA members and assisted by the Oconto County WDNR fisheries staff for placing the airline and diffusers. Providing electric power and completing the on-shore preparation work to house the system compressors will occur in late summer/fall. Placement of the system airlines and diffusers into the lake will occur in the fall of 2017. Signing at all public access points to all three lakes of the chain will be placed prior to the ground freezing and the lake forming an ice cover. Open water safety fencing will be installed using the same type fencing system used on Pickerel Lake and will be placed by PCLA members once safe ice for foot travel is present.

If consultant is to provide the final report, it is recommended that the Grantee provide the DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR will be provided both paper and electronic .pdf copies of the final report along with, or prior to, submission of grantee\2019s final payment request. All information associated with this project is subject to public record.


Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Long Lake
Status
Complete

Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.


Grant Details
Lake Protection Grant
Date
2/27/1996
Waters Involved
Loon Lake
Status
Complete

Loon Lake Management District: Acq-Loon Lake Land Acquisition - Bertrand Property: The Loon Lake Wescott Management District will acquire 89.25 acres of primarily lowland with approximately 1/2 mile of frontage on Loon Lake. The district will maintain the land in a wild and natural condition to protect the water quality of Loon Lake. Eligible costs include acuqisition of the parcel, appraisal, and recording fees.


Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Loon Lake
Status
Complete

Loon Lake Management District: Acq-Loon Lake Land Acquisition: The Loon Lake Wescott Management District proposes to purchase 32.1 acres of vacantland with approximately 1/4 mile of frontage on Loon Lake. The Management District will keep it in its naturally landscaped state for conservancy purposes.


Grant Details
Lake Protection Grant
Date
4/15/2017
Waters Involved
Machickanee Flowage (Stiles)
Status
Complete

Machickanee Flowage Advancement Association: Hlk - Machickanee Flowage Habitat Enhancement Project: Partnering with property owners, Machickanee Advancement Association is sponsoring a grant to implement water quality and habitat best practices from Wisconsin\2019s Healthy Lakes Implementation Plan. Best practices, including fish sticks, 350 sq. ft. native plantings, diversions, rock infiltration, and/or rain gardens, will be designed and installed according to the Healthy Lakes fact sheets, technical guidance and grant application.

All funded best practices require contracts that must remain in place for 10 years and include the minimum operation and maintenance requirements described in grant condition #16 at the end of this agreement. If the landowner is the grant sponsor this Lake Protection Grant Agreement serves as the contract. If the best practice(s) will be implemented on land other than the sponsor\2019s, a Conservation Contract between the sponsor and landowner describing the 10-year contract period, minimum operation and maintenance details, and data to be collected is required.

The Department may perform site inspections and/or monitoring to ensure project success.

Deliverables include: Signed 10-year landowner Conservation Contract(s) with operation and maintenance requirements; data collected; pre and post project installation photographs; and summary of education activities and publicity/promotion of Healthy Lakes initiative, if applicable.

Special conditions: Project management and technical assistance costs cannot exceed 10% of the state share of the grant award; this does not include implementation labor. Water regulation and/or county zoning permits must be issued before construction, and all regulatory requirements apply. The Healthy Lakes logo should be used for promotion and publicity and DNR recognized as a funding source.

This scope summarizes the scope in the grant application and attachments and does not supersede those application tasks/deliverables.


Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Miriam Lake
Status
Complete

Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.


Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Moody Lake
Status
Complete

Moody Lake Area Association: Lmi-Moody Lake Aeration Project: Based on an LPL grant awarded to Moody Lake Area Assn, aeration design, cost and installation was analysed and approved by the department. This project will provide aeration of the lake to increase oxygen during times when levels become critically low.


Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Munger Lake
Status
Complete

Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.


Grant Details
Lake Protection Grant
Date
4/15/2017
Waters Involved
North Branch Oconto River
Status
Complete

Chute Lake P & R District: Hlk - Chute Pond Healthy Lakes 2017: Partnering with property owners, Chute Lake Protection & Rehabilitation District #1 is sponsoring a grant to implement water quality and habitat best practices from Wisconsin\2019s Healthy Lakes Implementation Plan. Best practices, including fish sticks, 350 sq. ft. native plantings, diversions, rock infiltration, and/or rain gardens, will be designed and installed according to the Healthy Lakes fact sheets, technical guidance and grant application.

All funded best practices require contracts that must remain in place for 10 years and include the minimum operation and maintenance requirements described in grant condition #16 at the end of this agreement. If the landowner is the grant sponsor this Lake Protection Grant Agreement serves as the contract. If the best practice(s) will be implemented on land other than the sponsor\2019s, a Conservation Contract between the sponsor and landowner describing the 10-year contract period, minimum operation and maintenance details, and data to be collected is required.

The Department may perform site inspections and/or monitoring to ensure project success.

Deliverables include: Signed 10-year landowner Conservation Contract(s) with operation and maintenance requirements; data collected; pre and post project installation photographs; and summary of education activities and publicity/promotion of Healthy Lakes initiative, if applicable.

Special conditions: Project management and technical assistance costs cannot exceed 10% of the state share of the grant award; this does not include implementation labor. Water regulation and/or county zoning permits must be issued before construction, and all regulatory requirements apply. The Healthy Lakes logo should be used for promotion and publicity and DNR recognized as a funding source.

This scope summarizes the scope in the grant application and attachments and does not supersede those application tasks/deliverables.


Grant Details
Lake Protection Grant
Date
4/15/2017
Waters Involved
Oconto River
Status
Complete

Machickanee Flowage Advancement Association: Hlk - Machickanee Flowage Habitat Enhancement Project: Partnering with property owners, Machickanee Advancement Association is sponsoring a grant to implement water quality and habitat best practices from Wisconsin\2019s Healthy Lakes Implementation Plan. Best practices, including fish sticks, 350 sq. ft. native plantings, diversions, rock infiltration, and/or rain gardens, will be designed and installed according to the Healthy Lakes fact sheets, technical guidance and grant application.

All funded best practices require contracts that must remain in place for 10 years and include the minimum operation and maintenance requirements described in grant condition #16 at the end of this agreement. If the landowner is the grant sponsor this Lake Protection Grant Agreement serves as the contract. If the best practice(s) will be implemented on land other than the sponsor\2019s, a Conservation Contract between the sponsor and landowner describing the 10-year contract period, minimum operation and maintenance details, and data to be collected is required.

The Department may perform site inspections and/or monitoring to ensure project success.

Deliverables include: Signed 10-year landowner Conservation Contract(s) with operation and maintenance requirements; data collected; pre and post project installation photographs; and summary of education activities and publicity/promotion of Healthy Lakes initiative, if applicable.

Special conditions: Project management and technical assistance costs cannot exceed 10% of the state share of the grant award; this does not include implementation labor. Water regulation and/or county zoning permits must be issued before construction, and all regulatory requirements apply. The Healthy Lakes logo should be used for promotion and publicity and DNR recognized as a funding source.

This scope summarizes the scope in the grant application and attachments and does not supersede those application tasks/deliverables.


Grant Details
Lake Protection Grant
Date
4/15/2017
Waters Involved
Pickerel Creek
Status
Complete

Pickerel Chain Lakes Association: Lmi - Little Pickerel Aeration Implementation Project: The Pickerel Chain Association proposes to install an aerator in Little Pickerel Lake. The project elements and deliverables are specified in the Pickerel Lake\2019s Protection Grant application, dated February 1, 2017.

This grant will fund the installation of an aeration system in Little Pickerel Lake. The aeration system will be installed in 2017 using PCLA members and assisted by the Oconto County WDNR fisheries staff for placing the airline and diffusers. Providing electric power and completing the on-shore preparation work to house the system compressors will occur in late summer/fall. Placement of the system airlines and diffusers into the lake will occur in the fall of 2017. Signing at all public access points to all three lakes of the chain will be placed prior to the ground freezing and the lake forming an ice cover. Open water safety fencing will be installed using the same type fencing system used on Pickerel Lake and will be placed by PCLA members once safe ice for foot travel is present.

If consultant is to provide the final report, it is recommended that the Grantee provide the DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR will be provided both paper and electronic .pdf copies of the final report along with, or prior to, submission of grantee\2019s final payment request. All information associated with this project is subject to public record.


Grant Details
Lake Protection Grant
Date
4/15/2015
Waters Involved
Pine Lake
Status
Complete

Town Of Belle Plaine: Hlk-Clover Leaf Healthy Lakes: The Town of Belle Plaine will implement best practices described in Wisconsin\2019s 2014-2017 Healthy Lakes Implementation Plan on the Cloverleaf Lakes. Practices include: fish sticks, 350 ft2 native plantings, and rain gardens on at least 12 properties, including the Gibson Island and Round Lake Park demonstration sites.
The best practices require a contract to remain in effect for 10 years and must include minimum operation and maintenance requirements and data collection as described in grant condition #16. If best practice(s) are implemented on land owned by the grant Sponsor, this Lake Protection Grant Agreement serves as the contract. If best practice(s) are implemented on land other than the sponsor\2019s, a contract between the sponsor and landowner that abides by grant condition #16 is required.
The Department may require re-payment of project installation costs if the best practice is disturbed or removed. The Sponsor and/or the Department may perform site inspections and/or monitoring to ensure project success.
Deliverables: Best practice location and design information, if not included in the application; signed 10-year landowner contract; pre and post project installation photographs; summary of education activities and publicity/promotion of Healthy Lakes initiative, if applicable.
Special conditions: The state share of each best practice cannot exceed $1,000. The state share of grant administration and technical assistance costs may not exceed 10% of the grant award; technical assistance does not include implementation labor. Funding cannot be used for mitigation or regulatory compliance activities. Water regulation and/or county zoning permits must be issued before construction. The Healthy Lakes logo should be used for promotion and publicity, and DNR recognized as a funding source.


Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Pine Ridge Lake
Status
Complete

Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Round Lake
Status
Complete

Town Of Belle Plaine: Acq-Town Of Belle Plaine Land Acquisition (Stieg): The Town of Belle Plaine proposes to purchase 10 acres of land known as the Stieg parcel.


Grant Details
Lake Protection Grant
Date
4/15/2015
Waters Involved
Round Lake
Status
Complete

Town Of Belle Plaine: Hlk-Clover Leaf Healthy Lakes: The Town of Belle Plaine will implement best practices described in Wisconsin\2019s 2014-2017 Healthy Lakes Implementation Plan on the Cloverleaf Lakes. Practices include: fish sticks, 350 ft2 native plantings, and rain gardens on at least 12 properties, including the Gibson Island and Round Lake Park demonstration sites.
The best practices require a contract to remain in effect for 10 years and must include minimum operation and maintenance requirements and data collection as described in grant condition #16. If best practice(s) are implemented on land owned by the grant Sponsor, this Lake Protection Grant Agreement serves as the contract. If best practice(s) are implemented on land other than the sponsor\2019s, a contract between the sponsor and landowner that abides by grant condition #16 is required.
The Department may require re-payment of project installation costs if the best practice is disturbed or removed. The Sponsor and/or the Department may perform site inspections and/or monitoring to ensure project success.
Deliverables: Best practice location and design information, if not included in the application; signed 10-year landowner contract; pre and post project installation photographs; summary of education activities and publicity/promotion of Healthy Lakes initiative, if applicable.
Special conditions: The state share of each best practice cannot exceed $1,000. The state share of grant administration and technical assistance costs may not exceed 10% of the grant award; technical assistance does not include implementation labor. Funding cannot be used for mitigation or regulatory compliance activities. Water regulation and/or county zoning permits must be issued before construction. The Healthy Lakes logo should be used for promotion and publicity, and DNR recognized as a funding source.


Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Sellin Lake
Status
Complete

Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.


Grant Details
Lake Protection Grant
Date
7/1/2005
Waters Involved
Shawano Lake
Status
Complete

Shawano County: Lmi-Shawano Lake Diagnostic Feasibility Study: Shawano County proposes to conduct a diagnostic and feasibility study to better understand the ecosystem of Shawano Lake and its watershed, to educate and inform the public about this ecosystem, to establish a management partnership to identify appropriate management options, and to implement a management strategy. The objectives of the study include: determine the current water quality in Shawano Lake, understand how/where watershed land uses impact water quality, identify the importance of internal sources of phosphorus, assess the influence of aquatic plants on lake water quality, foster a cooperative and active community focused on Shawano Lake and its watershed, develop community and agency agreement on effective management options, and implement the management strategy. The project elements and deliverables will be completed as described in the project proposal submitted to the Department and dated April 28, 2005.


Grant Details
Lake Protection Grant
Date
4/15/2017
Waters Involved
Splinter Creek
Status
Complete

Machickanee Flowage Advancement Association: Hlk - Machickanee Flowage Habitat Enhancement Project: Partnering with property owners, Machickanee Advancement Association is sponsoring a grant to implement water quality and habitat best practices from Wisconsin\2019s Healthy Lakes Implementation Plan. Best practices, including fish sticks, 350 sq. ft. native plantings, diversions, rock infiltration, and/or rain gardens, will be designed and installed according to the Healthy Lakes fact sheets, technical guidance and grant application.

All funded best practices require contracts that must remain in place for 10 years and include the minimum operation and maintenance requirements described in grant condition #16 at the end of this agreement. If the landowner is the grant sponsor this Lake Protection Grant Agreement serves as the contract. If the best practice(s) will be implemented on land other than the sponsor\2019s, a Conservation Contract between the sponsor and landowner describing the 10-year contract period, minimum operation and maintenance details, and data to be collected is required.

The Department may perform site inspections and/or monitoring to ensure project success.

Deliverables include: Signed 10-year landowner Conservation Contract(s) with operation and maintenance requirements; data collected; pre and post project installation photographs; and summary of education activities and publicity/promotion of Healthy Lakes initiative, if applicable.

Special conditions: Project management and technical assistance costs cannot exceed 10% of the state share of the grant award; this does not include implementation labor. Water regulation and/or county zoning permits must be issued before construction, and all regulatory requirements apply. The Healthy Lakes logo should be used for promotion and publicity and DNR recognized as a funding source.

This scope summarizes the scope in the grant application and attachments and does not supersede those application tasks/deliverables.


Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Sullivan Springs
Status
Complete

Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.


Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Un Spring
Status
Complete

Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.


Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Un Spring - Fish Hatchery
Status
Complete

Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.


Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Un Spring -Fish Hatchery
Status
Complete

Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.


Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Unnamed
Status
Complete

Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.


Grant Details
Lake Protection Grant
Date
4/15/2017
Waters Involved
Unnamed
Status
Complete

Chute Lake P & R District: Hlk - Chute Pond Healthy Lakes 2017: Partnering with property owners, Chute Lake Protection & Rehabilitation District #1 is sponsoring a grant to implement water quality and habitat best practices from Wisconsin\2019s Healthy Lakes Implementation Plan. Best practices, including fish sticks, 350 sq. ft. native plantings, diversions, rock infiltration, and/or rain gardens, will be designed and installed according to the Healthy Lakes fact sheets, technical guidance and grant application.

All funded best practices require contracts that must remain in place for 10 years and include the minimum operation and maintenance requirements described in grant condition #16 at the end of this agreement. If the landowner is the grant sponsor this Lake Protection Grant Agreement serves as the contract. If the best practice(s) will be implemented on land other than the sponsor\2019s, a Conservation Contract between the sponsor and landowner describing the 10-year contract period, minimum operation and maintenance details, and data to be collected is required.

The Department may perform site inspections and/or monitoring to ensure project success.

Deliverables include: Signed 10-year landowner Conservation Contract(s) with operation and maintenance requirements; data collected; pre and post project installation photographs; and summary of education activities and publicity/promotion of Healthy Lakes initiative, if applicable.

Special conditions: Project management and technical assistance costs cannot exceed 10% of the state share of the grant award; this does not include implementation labor. Water regulation and/or county zoning permits must be issued before construction, and all regulatory requirements apply. The Healthy Lakes logo should be used for promotion and publicity and DNR recognized as a funding source.

This scope summarizes the scope in the grant application and attachments and does not supersede those application tasks/deliverables.


Grant Details
Lake Protection Grant
Date
4/15/2017
Waters Involved
Unnamed
Status
Complete

Machickanee Flowage Advancement Association: Hlk - Machickanee Flowage Habitat Enhancement Project: Partnering with property owners, Machickanee Advancement Association is sponsoring a grant to implement water quality and habitat best practices from Wisconsin\2019s Healthy Lakes Implementation Plan. Best practices, including fish sticks, 350 sq. ft. native plantings, diversions, rock infiltration, and/or rain gardens, will be designed and installed according to the Healthy Lakes fact sheets, technical guidance and grant application.

All funded best practices require contracts that must remain in place for 10 years and include the minimum operation and maintenance requirements described in grant condition #16 at the end of this agreement. If the landowner is the grant sponsor this Lake Protection Grant Agreement serves as the contract. If the best practice(s) will be implemented on land other than the sponsor\2019s, a Conservation Contract between the sponsor and landowner describing the 10-year contract period, minimum operation and maintenance details, and data to be collected is required.

The Department may perform site inspections and/or monitoring to ensure project success.

Deliverables include: Signed 10-year landowner Conservation Contract(s) with operation and maintenance requirements; data collected; pre and post project installation photographs; and summary of education activities and publicity/promotion of Healthy Lakes initiative, if applicable.

Special conditions: Project management and technical assistance costs cannot exceed 10% of the state share of the grant award; this does not include implementation labor. Water regulation and/or county zoning permits must be issued before construction, and all regulatory requirements apply. The Healthy Lakes logo should be used for promotion and publicity and DNR recognized as a funding source.

This scope summarizes the scope in the grant application and attachments and does not supersede those application tasks/deliverables.


Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Waubee Lake
Status
Complete

Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.


Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Wheeler Lake
Status
Complete

Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Wilson Lake
Status
Complete

Shawano County: Acq-Kluck Land Acquisition On Wilson Lake: Shawano County proposes to purchase 71 acres of land known as the Kluck parcel on Wilson Lake for conservancy purposes.


Grant Details
Large Scale Lake Planning
Date
4/1/2007
Waters Involved
Berry Lake
Status
Complete

Ne Wisconsin Audobon Society: Berry Lake Sediment Core Study: The Northeastern Wisconsin Audobon Society proposes to conduct a Phase 2 Berry Lake appraisal and develop lake objectives. The project will include Paleolimnological lake sediment coring analysis via contract with ISS; watershed appraisal, delineation and pollutant loading estimates; and a public I&E initiative including news releases and field events. Reports will be written to summarize the findings of the appraisals and community adopted objectives based on the findings for eventual inclusion into a comprehensive management plan. This scope is intended to summarize the more specific scope, as provided in the grant application and does not supersede the specific scope elements described with in the application.


Grant Details
Large Scale Lake Planning
Date
4/1/2007
Waters Involved
Berry Lake
Status
Complete

Town Of Underhill: Berry Lake Biological Inventory Project: The Town of Underhill proposes to conduct a Phase 1 Berry Lake appraisal and develop lake objectives. This project will include a community survey to determine perspectives, problems, needs, and population dynamics; fish survey to appraise the existing condition of the fishery; bioinventory of watershed areas especially sensitive or critical habitat areas; water quality appraisal to establish trophic condition of the lake; and objectives relative to the above appraisals will be developed and adopted via community process. Reports will be written summarizing the findings of the appraisals and community adopted objectives based on the findings for eventual inclusion into a comprehensive management plan. This scope is intended to summarize the more specific scope, as provided in the grant application and does not supersede the specific scope elements described with in the application.


Grant Details
Large Scale Lake Planning
Date
10/1/2008
Waters Involved
Berry Lake
Status
Complete

Menominee County: Berry Lake Groundwater & Topographic Survey: Menominee County proposes to conduct a groundwater and topographic survey on Berry Lake. The project will consist of the following: Groundwater appraisal; Develop water and nutrient budget for groundwatershed; Establish groundwater boundary; Identify inflow/outflow zones and quantify; and Present groundwater findings to public via forum.

The above elements will be conducted in partnership with partners identified in grant scope and incorporated into a final report with recommendations following the citizen participation process.


Grant Details
Large Scale Lake Planning
Date
4/1/2014
Waters Involved
Berry Lake
Status
Complete

Berry Lake Property Owners Assn Inc: Comprehensive Management Plan: The Berry Lake Property Owners Association proposes to create a Comprehensive Management Plan for Berry Lake by during the period 2014-2016. The project elements and deliverables are specified in the Berry Lake Property Owners Association\2019s Grant application, dated January 1, 2014.

The project will produce; the drainage area definition (watershed) for the lake; the potential point-sources of pollution that may be affecting the lake; the areas of the lake\2019s watershed that may be supplying excessive amounts of sediment and nutrients; a determination of plant community diversity for the lake and how the lake\2019s diversity compares with other lakes in the region; an identification and location of important plant communities (emergent, submergent, floating-leaf) within the lake and a listing of the dominant species within those communities; the identification and location of any rare or threatened plant species within the lake; a determination of where exotic plant species occur in and around the lake; abundance of plant species relative to each other; a summary and analysis of specific chemicals found in the lake, how these concentrations compare with other lakes in the region, and what these concentrations indicate concerning the health of the lake; an analysis of the limiting plant nutrient in the lake; the trophic state of the lake; an analysis of condition within the lake prior to settlement; an analysis of aquatic plant management alternatives; a summary of recent historic fisheries data, biological information relating to specific fish species, an how it applies to the management plan; (see comments for balance of scope)


Grant Details
Large Scale Lake Planning
Date
10/29/1992
Waters Involved
Little Blacksmith Lake
Status
Complete

Legend Lake P & R District: Blacksmith, Little Blacksmith Lakes Watershed Gis System: Develop a geographic information system for the lake watershed. Map the extent and depth of soft lake sediments and analyze sediments.Quantify nutrient concentrations of aquatic plants. Estimate nutrient removal by weed harvesting and relate to sediment chemistry.Information will be disseminated to the public by newsletter and public meeting.


Grant Details
Large Scale Lake Planning
Date
10/22/1991
Waters Involved
Machickanee Flowage (Stiles)
Status
Complete

Machickanee Flowage Advancement Association: Machickanee Flowage Lake Management Planning: ASSEMBLE AND REVIEW DATA, INITIATE A WATER MONITORING PROGRAM, MONITOR AGRICULTURE-RELATED NONPOINT SOURCE LOADS, CONDUCT MACROPHYTE STUDY, ANALYZE IMPACT OF POINT SOURCE POLLUTERS. PREPARE BASE MAPS OF THE LAKE AND ITS WATERSHED. DRAFT FINAL REPORT ANDDISSEMINATE INFORMATION.


Grant Details
Large Scale Lake Planning
Date
10/25/1993
Waters Involved
Machickanee Flowage (Stiles)
Status
Complete

Machickanee Flowage Advancement Association: Water Quality Monitoring & Watershed Data Collection: Conduct water quality monitoring for parameters and on schedule as described in work element 2 of the application; 2) identify areas within watershed that are prone to nutrient and/or sediment runoff; 3) conduct an aquatic plant survey and develop an aquatic plant management plan; and 4)prepare a final report.


Grant Details
Large Scale Lake Planning
Date
4/1/2000
Waters Involved
Pywaosit Lake
Status
Complete

Legend Lake P & R District: Legend Lake Communications Plan: The Legend Lake Protection and Rehabilitation District proposes to form a Communications Network for the surrounding lake residents and communities. The project will consist of developing 4 quarterly newsletters, web site and email address for the District, conducting a water quality monitoring workshop, compiling water quality test results and a final report of the project.

The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.


Grant Details
Large Scale Lake Planning
Date
10/29/1992
Waters Involved
Sapokesick Lake
Status
Complete

Legend Lake P & R District: Pywaosit, Sapokesick Lakes Watershed Gis System: Develop a geographic information system for the lake watershed. Map the extent and depth of soft lake sediments and analyze sediments.Quantify nutrient concentrations of aquatic plants. Estimate nutrient removal by weed harvesting and relate to sediment chemistry.Disseminate information to the public by newsletter and public meeting.


Grant Details
Large Scale Lake Planning
Date
4/1/2000
Waters Involved
Sapokesick Lake
Status
Complete

Legend Lake P & R District: Legend Lake Communications Plan: The Legend Lake Protection and Rehabilitation District proposes to form a Communications Network for the surrounding lake residents and communities. The project will consist of developing 4 quarterly newsletters, web site and email address for the District, conducting a water quality monitoring workshop, compiling water quality test results and a final report of the project.

The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.


Grant Details
Large Scale Lake Planning
Date
10/29/1992
Waters Involved
Skice Lake
Status
Complete

Legend Lake P & R District: Watosah/Skice Lakes Watershed Gis And Sediment Analysis: Develop a geographic information system for the lake watershed. Map the extent and depth of soft lake sediments and analyze sediments.Quantify nutrient concentrations of aquatic plants. Estimate nutrient removal by weed harvesting and relate to sediment chemistry.Information will be disseminated to the public by newsletter and public meeting.


Grant Details
Large Scale Lake Planning
Date
10/29/1992
Waters Involved
Spring Lake
Status
Complete

Legend Lake P & R District: Spring, Pestigo Lakes Watershed Gis System & Sediment Study: Develop a geographic information system for the lake watershed. Map the extent and depth of soft lake sediments and analyze sediments.Quantify nutrient concentrations of aquatic plants. Estimate nutrient removal by weed harvesting and relate to sediment chemistry.Disseminate information to the public by newsletter and public meeting.


Monitoring & Projects

Projects including grants, restoration work and studies shown below have occurred in this watershed. Click the links below to read through the text. While these are not an exhaustive list of activities, they provide insight into the management activities happening in this watershed.

Grants and Management Projects
Lower Oconto River Watershed
Watershed Recommendations
Best Management Practices, Implement
Shawano County Nonpoint Source BMPs
Date
Status
This project is an installation of nonpoint source best management practices to contribute to the restoration of Wisconsin?s waters and was funded by the 319 grant.
11/10/2017
In Progress
Projects
Documents
 
Best Management Practices, Implement
Oconto County Manure Storage Project
Date
Status
This project is a landowner installation of nonpoint source best management practices to contribute to the restoration of Wisconsin's waters and was funded by the 319 grant. Specifically, the grantee will implement: installation of manure management systems to enable the farm operation to meet the respective agricultural performance standards and prohibitions established in NR 151 relating to manure storage facilities-new/significant alterations, manure storage facilities-closure, and process wastewater handling.
1/1/2014
Cancelled
Projects
Documents
 
Monitor Fish Tissue
Confirm FCA: IW pre-2000 data
Date
Status
440200 name Oconto River TMDL ID 173 Start Mile 10.41 End Mile 14.63
11/21/2011
Proposed
 
Monitor Fish Tissue
Confirm FCA: IW pre-2000 data
Date
Status
440200 name Oconto River TMDL ID 173 Start Mile 0 End Mile 9.94
11/21/2011
Proposed
 
Monitor Fish Tissue
Confirm FCA: IW pre-2000 data
Date
Status
11/4/2011
Proposed
Projects
 
Monitor Water Quality or Sediment
Monitor Un. Stream (448300) for fish/bugs
Date
Status
2 survey stations sampled on Splinter Creek within the same AU. The DS station is good to excellent in 3 surveys and the upstream station is poor in 2 surveys. Would not recommend based on this level of survey effort at upstream station in relation to downstream station. Follow-up surveys should be completed to determine if this designation is warranted or if the US sample location is not representative of the stream conditions.
8/21/2019
Proposed
 
Lower Oconto River WatershedWatershed History Note

The Lower Oconto River played an important role in the lumbering history of Wisconsin. In 1950, Russell Wicke of Suring shared his memories of the annual log drive. The logs were cut in the woods during the winter and when spring came and the ice began to thaw and break on the rivers, the log drive began. Because Suring was located on one of the principal waterways of the log drive in the lumbering area, it became an important center, for logs were driven down the North Branch, the South Branch and the Peshtigo Brook on their way to the sawmills in Oconto. The log drivers were to be quick, daring and rugged men. Armed with peavies, long pike poles, heavy high shoes with calked soles, these woodsmen had to cleverly direct and guide thousands of logs on their slow course from the forest where they were cut to the sawmill where they would be made into lumber. Often times, in spite of the skill of the drivers, the logs would become jammed in the stream, sometimes piling up to the height of seven and eight feet. To break such a jam was difficult and dangerous. Usually there was a key log in the breaking of the jam. To dislodge this log and jump clear of the breaking force behind it required great skill. Sometimes the jam would break loose with a sudden rushing, roaring and driving force that left little time to escape from being swept into the whirling mass of water and logs. An expert driver was able to jump from one whirling log to another and ride those logs in spite of their rapid motion in the stream. The log drivers were followed by large rafts, constructed of logs, on which tents were pitched. One such raft and tent was used as the cook’s shanty while others were sleeping shanties for the log drivers. Sometimes only the cook’s shanty was aboard a raft and the men pitched the tents serving as sleeping quarters on the bank of the stream down which they were driving.

Date  2010