Grant Details
Aquatic Invasives Education
Date
10/1/2009
Waters Involved
Peshtigo Flowage 1086
Status
Complete
City Of Peshtigo: Peshtigo Flowage Ais Education, Planning & Prevention Project: The City of Peshtigo proposes to develop a Comprehensive Aquatic Plant Management (APM) by December 2011, which will focus on native plant protection and prevention, and control of aquatic invasive species (AIS). The project elements and deliverables are specified in the City of Peshtigo\2019s Aquatic Invasive Species Control Grant application, dated July 22, 2009. The project will; conduct a point/intercept survey of the aquatic plant community in Peshtigo Flowage using WDNR aquatic plant survey methodology; determine the extent, distribution and density of Eurasian water-milfoil and any other AIS; prepare and develop an APM Plan consistent with DNR guidelines, including an AIS prevention and control plan; educate lake users of native plant protection and AIS prevention and control measures; and implement the \201CClean Boats, Clean Waters\201D watercraft inspection program. Watercraft inspectors will attend a current \201CClean Boats, Clean Waters\201D training session sponsored by UW-Extension staff. Watercraft inspection records will be entered into the State\2019s online Watercraft Inspection Database. The final report will include the Peshtigo Flowage\2019s Aquatic Plant Management Plan that meets the requirements of Wisconsin Chapter NR198.43(1). If consultant is to provide the final report, it is recommended the Grantee provide the DNR Aquatic Invasive Species Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to, submission of grantee\2019s final payment request.
Grant Details
Habitat
Date
10/1/2010
Waters Involved
Lake Michigan
Status
Proposed
Winegar Pond Invasive Species Control In A Green Bay Wetland: Winegar Pond is a 120-acre Lake Michigan coastal wetland located near the mouth of the Peshtigo River in the Green Bay of Wisconsin. The wetland is owned and managed by the Wisconsin Department of Natural Resources as part of the Green Bay West Shores Wildlife Area - Peshtigo Harbor Unit. The wetland has a natural hydrologic connection to the Peshtigo River through a narrow tributary channel and to Green Bay through an approximately 100 foot shallow swale. We intend to install two fish passage structures that will prevent seasonal migration by carp but allow adult native gamefish to reproduce and annually recruit juvenile gamefish with access to the Peshtigo River and Green Bay. Each spring, adult non-native common carp (Cyprinus carpio) invade Winegar Pond to spawn. Shallow depths and warm spring run-off events that flow through Winegar Pond make it an attractive area for increased carp spawning activity. As a result, carp uproot vegetation and reduce water quality via increased turbidity, destroying native emergent and submerged aquatic plant communities. This has also promoted the invasion of non-native phragmites (Phragmites australis) resulting in a negative impact on native fish recruitment and reduced migratory bird nesting success. In addition to the fish passage structures, we will chemically treat and manage 100 acres of existing stands of phragmites directly adjacent to Winegar Pond.
Grant Details
Lake Protection Grant
Date
2/19/1996
Waters Involved
Bass Lake
Status
Complete
Marinette County: Res - Bass Lake Restoration Alum Treatment: Marinette County proposes to treat Bass Lake with alum to reduce the effects of sediment phosophorus in the lake. Project activities include treating all waters of Bass Lake in excess of 3 feet deep and conducting pre and post treatment water quality monitoring.
AMENDMENT #1: Marinette County proposes a "5 fold" increase the Alum dose in Bass Lake to provide long term control of P release from enriched sediments.
Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Bear Lake
Status
Complete
Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.
Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Binder Lake
Status
Complete
Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.
Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Birch Lake
Status
Complete
Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.
Grant Details
Lake Protection Grant
Date
4/15/2017
Waters Involved
Bonita Creek
Status
Complete
Chute Lake P & R District: Hlk - Chute Pond Healthy Lakes 2017: Partnering with property owners, Chute Lake Protection & Rehabilitation District #1 is sponsoring a grant to implement water quality and habitat best practices from Wisconsin\2019s Healthy Lakes Implementation Plan. Best practices, including fish sticks, 350 sq. ft. native plantings, diversions, rock infiltration, and/or rain gardens, will be designed and installed according to the Healthy Lakes fact sheets, technical guidance and grant application.
All funded best practices require contracts that must remain in place for 10 years and include the minimum operation and maintenance requirements described in grant condition #16 at the end of this agreement. If the landowner is the grant sponsor this Lake Protection Grant Agreement serves as the contract. If the best practice(s) will be implemented on land other than the sponsor\2019s, a Conservation Contract between the sponsor and landowner describing the 10-year contract period, minimum operation and maintenance details, and data to be collected is required.
The Department may perform site inspections and/or monitoring to ensure project success.
Deliverables include: Signed 10-year landowner Conservation Contract(s) with operation and maintenance requirements; data collected; pre and post project installation photographs; and summary of education activities and publicity/promotion of Healthy Lakes initiative, if applicable.
Special conditions: Project management and technical assistance costs cannot exceed 10% of the state share of the grant award; this does not include implementation labor. Water regulation and/or county zoning permits must be issued before construction, and all regulatory requirements apply. The Healthy Lakes logo should be used for promotion and publicity and DNR recognized as a funding source.
This scope summarizes the scope in the grant application and attachments and does not supersede those application tasks/deliverables.
Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Bullfrog Lake
Status
Complete
Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.
Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Caldron Falls Reservoir*
Status
Complete
Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.
Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Chain Lake
Status
Complete
Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.
Grant Details
Lake Protection Grant
Date
4/15/2017
Waters Involved
Chute Pond
Status
Complete
Chute Lake P & R District: Hlk - Chute Pond Healthy Lakes 2017: Partnering with property owners, Chute Lake Protection & Rehabilitation District #1 is sponsoring a grant to implement water quality and habitat best practices from Wisconsin\2019s Healthy Lakes Implementation Plan. Best practices, including fish sticks, 350 sq. ft. native plantings, diversions, rock infiltration, and/or rain gardens, will be designed and installed according to the Healthy Lakes fact sheets, technical guidance and grant application.
All funded best practices require contracts that must remain in place for 10 years and include the minimum operation and maintenance requirements described in grant condition #16 at the end of this agreement. If the landowner is the grant sponsor this Lake Protection Grant Agreement serves as the contract. If the best practice(s) will be implemented on land other than the sponsor\2019s, a Conservation Contract between the sponsor and landowner describing the 10-year contract period, minimum operation and maintenance details, and data to be collected is required.
The Department may perform site inspections and/or monitoring to ensure project success.
Deliverables include: Signed 10-year landowner Conservation Contract(s) with operation and maintenance requirements; data collected; pre and post project installation photographs; and summary of education activities and publicity/promotion of Healthy Lakes initiative, if applicable.
Special conditions: Project management and technical assistance costs cannot exceed 10% of the state share of the grant award; this does not include implementation labor. Water regulation and/or county zoning permits must be issued before construction, and all regulatory requirements apply. The Healthy Lakes logo should be used for promotion and publicity and DNR recognized as a funding source.
This scope summarizes the scope in the grant application and attachments and does not supersede those application tasks/deliverables.
Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Crab Lake
Status
Complete
Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.
Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Forbes Spring
Status
Complete
Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.
Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Hickey Springs
Status
Complete
Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.
Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Hidden Lake
Status
Complete
Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.
Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Lackawanna Lake
Status
Complete
Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.
Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Lake John
Status
Complete
Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.
Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Lincoln Lake
Status
Complete
Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.
Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Little Bear Lake
Status
Complete
Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.
Grant Details
Lake Protection Grant
Date
4/15/2017
Waters Involved
Little Pickerel Lake
Status
Complete
Pickerel Chain Lakes Association: Lmi - Little Pickerel Aeration Implementation Project: The Pickerel Chain Association proposes to install an aerator in Little Pickerel Lake. The project elements and deliverables are specified in the Pickerel Lake\2019s Protection Grant application, dated February 1, 2017.
This grant will fund the installation of an aeration system in Little Pickerel Lake. The aeration system will be installed in 2017 using PCLA members and assisted by the Oconto County WDNR fisheries staff for placing the airline and diffusers. Providing electric power and completing the on-shore preparation work to house the system compressors will occur in late summer/fall. Placement of the system airlines and diffusers into the lake will occur in the fall of 2017. Signing at all public access points to all three lakes of the chain will be placed prior to the ground freezing and the lake forming an ice cover. Open water safety fencing will be installed using the same type fencing system used on Pickerel Lake and will be placed by PCLA members once safe ice for foot travel is present.
If consultant is to provide the final report, it is recommended that the Grantee provide the DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR will be provided both paper and electronic .pdf copies of the final report along with, or prior to, submission of grantee\2019s final payment request. All information associated with this project is subject to public record.
Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Long Lake
Status
Complete
Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.
Grant Details
Lake Protection Grant
Date
4/1/1996
Waters Involved
McCaslin Lake
Status
Complete
Mccaslin Lake District: Acq-Mccaslin Lake Land Acquisition-Hansen (Parcel A) Property: The Mc Caslin Lake Rehabilitation District will acquire 25.88 acres of lowland, including water frontage and wetlands, on Mc Caslin Lake for lake protection purposes. Long term management goals for this property include preserving it as a quiet natural conservancy area used for passive outdoor recreation and enjoyment. No major development plans are included.
Grant Details
Lake Protection Grant
Date
2/1/1998
Waters Involved
McCaslin Lake
Status
Complete
Mccaslin Lake District: Acq-Mccaslin Lake District Hansen Ii Acq.: The McCaslin Lake District will acquire an additional 38.50 acres of land near McCaslin Lake for conservancy purposes.
Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Miriam Lake
Status
Complete
Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.
Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Moody Lake
Status
Complete
Moody Lake Area Association: Lmi-Moody Lake Aeration Project: Based on an LPL grant awarded to Moody Lake Area Assn, aeration design, cost and installation was analysed and approved by the department. This project will provide aeration of the lake to increase oxygen during times when levels become critically low.
Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Munger Lake
Status
Complete
Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.
Grant Details
Lake Protection Grant
Date
4/15/2017
Waters Involved
North Branch Oconto River
Status
Complete
Chute Lake P & R District: Hlk - Chute Pond Healthy Lakes 2017: Partnering with property owners, Chute Lake Protection & Rehabilitation District #1 is sponsoring a grant to implement water quality and habitat best practices from Wisconsin\2019s Healthy Lakes Implementation Plan. Best practices, including fish sticks, 350 sq. ft. native plantings, diversions, rock infiltration, and/or rain gardens, will be designed and installed according to the Healthy Lakes fact sheets, technical guidance and grant application.
All funded best practices require contracts that must remain in place for 10 years and include the minimum operation and maintenance requirements described in grant condition #16 at the end of this agreement. If the landowner is the grant sponsor this Lake Protection Grant Agreement serves as the contract. If the best practice(s) will be implemented on land other than the sponsor\2019s, a Conservation Contract between the sponsor and landowner describing the 10-year contract period, minimum operation and maintenance details, and data to be collected is required.
The Department may perform site inspections and/or monitoring to ensure project success.
Deliverables include: Signed 10-year landowner Conservation Contract(s) with operation and maintenance requirements; data collected; pre and post project installation photographs; and summary of education activities and publicity/promotion of Healthy Lakes initiative, if applicable.
Special conditions: Project management and technical assistance costs cannot exceed 10% of the state share of the grant award; this does not include implementation labor. Water regulation and/or county zoning permits must be issued before construction, and all regulatory requirements apply. The Healthy Lakes logo should be used for promotion and publicity and DNR recognized as a funding source.
This scope summarizes the scope in the grant application and attachments and does not supersede those application tasks/deliverables.
Grant Details
Lake Protection Grant
Date
4/15/2017
Waters Involved
Pickerel Creek
Status
Complete
Pickerel Chain Lakes Association: Lmi - Little Pickerel Aeration Implementation Project: The Pickerel Chain Association proposes to install an aerator in Little Pickerel Lake. The project elements and deliverables are specified in the Pickerel Lake\2019s Protection Grant application, dated February 1, 2017.
This grant will fund the installation of an aeration system in Little Pickerel Lake. The aeration system will be installed in 2017 using PCLA members and assisted by the Oconto County WDNR fisheries staff for placing the airline and diffusers. Providing electric power and completing the on-shore preparation work to house the system compressors will occur in late summer/fall. Placement of the system airlines and diffusers into the lake will occur in the fall of 2017. Signing at all public access points to all three lakes of the chain will be placed prior to the ground freezing and the lake forming an ice cover. Open water safety fencing will be installed using the same type fencing system used on Pickerel Lake and will be placed by PCLA members once safe ice for foot travel is present.
If consultant is to provide the final report, it is recommended that the Grantee provide the DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR will be provided both paper and electronic .pdf copies of the final report along with, or prior to, submission of grantee\2019s final payment request. All information associated with this project is subject to public record.
Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Pine Ridge Lake
Status
Complete
Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.
Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Sellin Lake
Status
Complete
Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.
Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Sullivan Springs
Status
Complete
Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.
Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Un Spring
Status
Complete
Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.
Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Un Spring - Fish Hatchery
Status
Complete
Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.
Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Un Spring -Fish Hatchery
Status
Complete
Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.
Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Unnamed
Status
Complete
Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.
Grant Details
Lake Protection Grant
Date
4/15/2017
Waters Involved
Unnamed
Status
Complete
Chute Lake P & R District: Hlk - Chute Pond Healthy Lakes 2017: Partnering with property owners, Chute Lake Protection & Rehabilitation District #1 is sponsoring a grant to implement water quality and habitat best practices from Wisconsin\2019s Healthy Lakes Implementation Plan. Best practices, including fish sticks, 350 sq. ft. native plantings, diversions, rock infiltration, and/or rain gardens, will be designed and installed according to the Healthy Lakes fact sheets, technical guidance and grant application.
All funded best practices require contracts that must remain in place for 10 years and include the minimum operation and maintenance requirements described in grant condition #16 at the end of this agreement. If the landowner is the grant sponsor this Lake Protection Grant Agreement serves as the contract. If the best practice(s) will be implemented on land other than the sponsor\2019s, a Conservation Contract between the sponsor and landowner describing the 10-year contract period, minimum operation and maintenance details, and data to be collected is required.
The Department may perform site inspections and/or monitoring to ensure project success.
Deliverables include: Signed 10-year landowner Conservation Contract(s) with operation and maintenance requirements; data collected; pre and post project installation photographs; and summary of education activities and publicity/promotion of Healthy Lakes initiative, if applicable.
Special conditions: Project management and technical assistance costs cannot exceed 10% of the state share of the grant award; this does not include implementation labor. Water regulation and/or county zoning permits must be issued before construction, and all regulatory requirements apply. The Healthy Lakes logo should be used for promotion and publicity and DNR recognized as a funding source.
This scope summarizes the scope in the grant application and attachments and does not supersede those application tasks/deliverables.
Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Waubee Lake
Status
Complete
Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.
Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Wheeler Lake
Status
Complete
Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.
Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Bagley Flowage 1061
Status
Complete
City Of Peshtigo: Peshtigo Flowage Riparian Study And Education: The City of Peshtigo proposes to develop a plan for the Peshtigo Flowage and provide nutrient loadings from land use in the drainage areas, along with riparian shoreline factors which affect water quality and aquatic plant habitat. Tributary monitoring, in-lake sampling, aquatic plant surveys will also be conducted.
Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Peshtigo River
Status
Complete
City Of Peshtigo: Peshtigo Flow/Trout Crk Nonpoint Source Project: The City of Peshtigo proposes to develop a plan to ID nutrient loadings from land use in the drainage area of Trout Creek Pond. Delineation of land use in the watershed will also be conducted. Tributary monitoring, in-lake sampling, aquatic plant surveys will also be conducted. Extensive public involvement including input by schools in the area will be a part of the project. News releases, public meetings and other outreach programs will be incorporated into the project. Funding from a variety of sources will also be a part of the effort. A steering committee made up of local representatives, officials and the public will guide the project. The DNR will be provided two paper copies and an electronic copy of the report.
Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Peshtigo River
Status
Complete
City Of Peshtigo: Peshtigo Flowage Riparian Study And Education: The City of Peshtigo proposes to develop a plan for the Peshtigo Flowage and provide nutrient loadings from land use in the drainage areas, along with riparian shoreline factors which affect water quality and aquatic plant habitat. Tributary monitoring, in-lake sampling, aquatic plant surveys will also be conducted.
Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Sucker Brook
Status
Complete
City Of Peshtigo: Peshtigo Flow/Trout Crk Nonpoint Source Project: The City of Peshtigo proposes to develop a plan to ID nutrient loadings from land use in the drainage area of Trout Creek Pond. Delineation of land use in the watershed will also be conducted. Tributary monitoring, in-lake sampling, aquatic plant surveys will also be conducted. Extensive public involvement including input by schools in the area will be a part of the project. News releases, public meetings and other outreach programs will be incorporated into the project. Funding from a variety of sources will also be a part of the effort. A steering committee made up of local representatives, officials and the public will guide the project. The DNR will be provided two paper copies and an electronic copy of the report.
Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Trout Creek
Status
Complete
City Of Peshtigo: Peshtigo Flow/Trout Crk Nonpoint Source Project: The City of Peshtigo proposes to develop a plan to ID nutrient loadings from land use in the drainage area of Trout Creek Pond. Delineation of land use in the watershed will also be conducted. Tributary monitoring, in-lake sampling, aquatic plant surveys will also be conducted. Extensive public involvement including input by schools in the area will be a part of the project. News releases, public meetings and other outreach programs will be incorporated into the project. Funding from a variety of sources will also be a part of the effort. A steering committee made up of local representatives, officials and the public will guide the project. The DNR will be provided two paper copies and an electronic copy of the report.
Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Trout Creek
Status
Complete
City Of Peshtigo: Peshtigo Flowage Riparian Study And Education: The City of Peshtigo proposes to develop a plan for the Peshtigo Flowage and provide nutrient loadings from land use in the drainage areas, along with riparian shoreline factors which affect water quality and aquatic plant habitat. Tributary monitoring, in-lake sampling, aquatic plant surveys will also be conducted.
Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Unnamed
Status
Complete
City Of Peshtigo: Peshtigo Flowage Riparian Study And Education: The City of Peshtigo proposes to develop a plan for the Peshtigo Flowage and provide nutrient loadings from land use in the drainage areas, along with riparian shoreline factors which affect water quality and aquatic plant habitat. Tributary monitoring, in-lake sampling, aquatic plant surveys will also be conducted.
Grant Details
Targeted Runoff - Rural Construction
Date
1/1/2003
Waters Involved
Bundy Creek
Status
Complete
Marinette County: Harpor 03: to c-s installation of BMPs
Grant Details
Targeted Runoff - Rural Construction
Date
1/1/2003
Waters Involved
Bundy Creek
Status
Complete
Marinette County: Hartwig 03: to c-s landowner installation of BMPs @70%
Grant Details
Targeted Runoff - Rural Construction
Date
1/1/2004
Waters Involved
Bundy Creek
Status
Complete
Marinette County: Schwittay (Delores) Farm Ro Proj: to costshare at 70% BMP installations on Dorthy Schwittay farm
Grant Details
Targeted Runoff - Rural Construction
Date
1/1/2004
Waters Involved
Bundy Creek
Status
Complete
Marinette County: Schwittay (John) Farm Ro Proj: to costshare at 70% John Schwittay runoff management improvements
Grant Details
Targeted Runoff - Rural Construction
Date
1/1/2005
Waters Involved
Bundy Creek
Status
Complete
Marinette County: Jeremy Schwittay Farm: Construction and installation of best management practices (BMPs) on the Jeremy Schwittay farm to abate manure runoff and livestock management issues that directly discharge manure and associated pollutants into Bundy Creek.
Grant Details
Targeted Runoff - Rural Construction
Date
1/1/2002
Waters Involved
Peshtigo River
Status
Complete
Marinette County: Denston-01 Trm: to provide TRM cost-sharing to eligible landowners
Grant Details
Targeted Runoff - Rural Construction
Date
1/1/2003
Waters Involved
Peshtigo River
Status
Complete
Marinette County: Pesh 03: to c-s @70% landowner installation of BMPs
Grant Details
Targeted Runoff - Rural Construction
Date
1/1/2004
Waters Involved
Unnamed
Status
Complete
Marinette County: Drees Farm Runoff Mgmt Proj: to costshare at 70% BMP installation on Drees farm
Grant Details
Targeted Runoff - Rural Construction
Date
1/1/2004
Waters Involved
Unnamed
Status
Complete
Marinette County: Strutz Manure Runoff Project: to costshare at 70% Strutz Farm BMPs
Grant Details
Targeted Runoff - Rural Construction
Date
1/1/2005
Waters Involved
Unnamed
Status
Complete
Marinette County: Rohde Farm Manure Storage: Construction and installation of best management practices (BMPs) on the Rohde farm to abate manure runoff and livestock management issues that directly discharge manure and associated pollutants into an adjacent wetland and thence into Bundy Creek.
Grant Details
Targeted Runoff - Rural Construction
Date
1/1/2008
Waters Involved
Unnamed
Status
Complete
Marinette County: Mark Carviou Farm: To cost-share barnyard control, manure management and clean water diversion practices to bring farm operations into compliance with the Agricultural Performance Standards and Prohibitions relating to elimination of winter spreading, manure storage and prevention of direct runoff from a feedlot or stored manure into waters of the state under NR 151.08.
Grant Details
Urban Nonpoint - Stormwater Construction
Date
9/18/2003
Waters Involved
Peshtigo River
Status
Complete
City Of Peshtigo: Peshtigo River Detention Pond: to costshare at 50% land acquisition, design & construction of Peshtigo River Pond