Grant Details
Aquatic Invasives Education
Date
10/1/2009
Waters Involved
Amnicon Lake
Status
Complete
Amnicon/Dowling Lake Management District: Amnicon/Dowling Ais Education And Prevention Project: The Amnicon/Dowling Lake Protective Association is sponsoring an AIS prevention & education project which includes inspection of boats at the public boat landings utilizing paid inspectors & volunteers; information brochures will be mailed to lake residents; maintaining AIS educational information at the landing.
Activities include: Boat inspections implementing a Clean Boat/Clean Water program; educational activites.
Deliverables include a paper and electronic copy of comprehensive Report including:
1) Final Report summarizing accomplishments/progress of the project including a watercraft inspection report including time and number of people reached; CB/CW survey results; daily results will be entered into the DNR CB/CW database.
2) Copy of brochures & educational materials sent in mailings.
3) AIS related materials generated or paid for by this grant.
Special conditions: The project sponsor shall immediately contact the DNR if a new aquatic invasive species infestation is found.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional AIS Coordinator. The DNR is to receive both paper and electronic copies of the final report.
Grant Details
Aquatic Invasives Education
Date
10/1/2011
Waters Involved
Amnicon Lake
Status
Complete
Amnicon/Dowling Lake Management District: Amnicon Dowling Aquatic Plant Management Planning: The Amnicon-Dowling Lake Management District is sponsoring a AIS prevention and education project to complete an aquatic plant management plan for both lakes including a point intercept (PI) plant study, paleocore study, expanded CLMN monitoring, Purple Loosestrife management, training, public awareness, lake user survey, and monitoring for invasive plants.
Deliverables include a comprehensive report with: 1) Summary of program accomplishments/progress; 2) Watercraft inspection report including time & number of people reached; 3) Report on expanded Citizen Lake Monitoring; results entered into the SWIMS database; 4) Report on early season CLP study and late season PI study; 5) Report on paleocore studies; 6) Report on PL management; 7) Verification of workshops and/or training such as agendas and attendance lists; 8) Details on public outreach with copies of project educational materials; 9) Report on monitoring observations of any detected invasive species with appropriate maps; 10) Aquatic Plant Management Plan; 11) AIS related materials generated or paid for by this grant.
Special project conditions: WDNR\2019s Aquatic Plant Management in Wisconsin guidance should be followed for point-intercept and/or aquatic management plan development. The sponsor shall immediately contact the DNR if a new aquatic invasive species is found.
This scope summarizes details provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the AIS Coordinator. It is recommended that Grantee provide AIS Coordinator with a draft final report. If consultant is to provide final report, it is recommended that Grantee provide the AIS Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
10/1/2009
Waters Involved
Amnicon River
Status
Complete
Amnicon/Dowling Lake Management District: Amnicon/Dowling Ais Education And Prevention Project: The Amnicon/Dowling Lake Protective Association is sponsoring an AIS prevention & education project which includes inspection of boats at the public boat landings utilizing paid inspectors & volunteers; information brochures will be mailed to lake residents; maintaining AIS educational information at the landing.
Activities include: Boat inspections implementing a Clean Boat/Clean Water program; educational activites.
Deliverables include a paper and electronic copy of comprehensive Report including:
1) Final Report summarizing accomplishments/progress of the project including a watercraft inspection report including time and number of people reached; CB/CW survey results; daily results will be entered into the DNR CB/CW database.
2) Copy of brochures & educational materials sent in mailings.
3) AIS related materials generated or paid for by this grant.
Special conditions: The project sponsor shall immediately contact the DNR if a new aquatic invasive species infestation is found.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional AIS Coordinator. The DNR is to receive both paper and electronic copies of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Arnold Creek
Status
Complete
Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.
Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.
Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Bird Sanctuary Lake
Status
Complete
Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.
Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.
Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Buckety Creek
Status
Complete
Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.
Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.
Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Carlson Creek
Status
Complete
Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.
Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.
Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Cranberry Creek
Status
Complete
Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.
Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.
Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Crotte Creek
Status
Complete
Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.
Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.
Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
10/1/2009
Waters Involved
Dowling Lake
Status
Complete
Amnicon/Dowling Lake Management District: Amnicon/Dowling Ais Education And Prevention Project: The Amnicon/Dowling Lake Protective Association is sponsoring an AIS prevention & education project which includes inspection of boats at the public boat landings utilizing paid inspectors & volunteers; information brochures will be mailed to lake residents; maintaining AIS educational information at the landing.
Activities include: Boat inspections implementing a Clean Boat/Clean Water program; educational activites.
Deliverables include a paper and electronic copy of comprehensive Report including:
1) Final Report summarizing accomplishments/progress of the project including a watercraft inspection report including time and number of people reached; CB/CW survey results; daily results will be entered into the DNR CB/CW database.
2) Copy of brochures & educational materials sent in mailings.
3) AIS related materials generated or paid for by this grant.
Special conditions: The project sponsor shall immediately contact the DNR if a new aquatic invasive species infestation is found.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional AIS Coordinator. The DNR is to receive both paper and electronic copies of the final report.
Grant Details
Aquatic Invasives Education
Date
10/1/2011
Waters Involved
Dowling Lake
Status
Complete
Amnicon/Dowling Lake Management District: Amnicon Dowling Aquatic Plant Management Planning: The Amnicon-Dowling Lake Management District is sponsoring a AIS prevention and education project to complete an aquatic plant management plan for both lakes including a point intercept (PI) plant study, paleocore study, expanded CLMN monitoring, Purple Loosestrife management, training, public awareness, lake user survey, and monitoring for invasive plants.
Deliverables include a comprehensive report with: 1) Summary of program accomplishments/progress; 2) Watercraft inspection report including time & number of people reached; 3) Report on expanded Citizen Lake Monitoring; results entered into the SWIMS database; 4) Report on early season CLP study and late season PI study; 5) Report on paleocore studies; 6) Report on PL management; 7) Verification of workshops and/or training such as agendas and attendance lists; 8) Details on public outreach with copies of project educational materials; 9) Report on monitoring observations of any detected invasive species with appropriate maps; 10) Aquatic Plant Management Plan; 11) AIS related materials generated or paid for by this grant.
Special project conditions: WDNR\2019s Aquatic Plant Management in Wisconsin guidance should be followed for point-intercept and/or aquatic management plan development. The sponsor shall immediately contact the DNR if a new aquatic invasive species is found.
This scope summarizes details provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the AIS Coordinator. It is recommended that Grantee provide AIS Coordinator with a draft final report. If consultant is to provide final report, it is recommended that Grantee provide the AIS Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Eau Claire River
Status
Complete
Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.
Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.
Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Eau Claire River Flowage
Status
Complete
Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.
Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.
Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Ericson Creek
Status
Complete
Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.
Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.
Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Flamang Lake
Status
Complete
Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.
Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.
Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Flat Lake
Status
Complete
Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.
Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.
Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Little Simms Lake
Status
Complete
Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.
Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.
Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Lord Creek
Status
Complete
Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.
Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.
Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Lower Eau Claire Lake
Status
Complete
Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.
Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.
Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Lower Ox Creek
Status
Complete
Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.
Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.
Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Lower Ox Lake
Status
Complete
Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.
Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.
Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Lund Lake
Status
Complete
Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.
Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.
Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Metzger Lake
Status
Complete
Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.
Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.
Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Moose Branch Flowage
Status
Complete
Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.
Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.
Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Moose River
Status
Complete
Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.
Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.
Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Mud Creek
Status
Complete
Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.
Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.
Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Mud Lake
Status
Complete
Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.
Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.
Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
One Mile Lake
Status
Complete
Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.
Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.
Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Saint Croix River
Status
Complete
Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.
Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.
Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Sheosh Creek
Status
Complete
Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.
Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.
Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Simms Lake
Status
Complete
Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.
Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.
Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Spring Creek
Status
Complete
Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.
Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.
Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
St Croix Flowage
Status
Complete
Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.
Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.
Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Swenson Lake
Status
Complete
Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.
Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.
Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Un Spring
Status
Complete
Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.
Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.
Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Unnamed
Status
Complete
Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.
Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.
Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
10/1/2009
Waters Involved
Unnamed
Status
Complete
Amnicon/Dowling Lake Management District: Amnicon/Dowling Ais Education And Prevention Project: The Amnicon/Dowling Lake Protective Association is sponsoring an AIS prevention & education project which includes inspection of boats at the public boat landings utilizing paid inspectors & volunteers; information brochures will be mailed to lake residents; maintaining AIS educational information at the landing.
Activities include: Boat inspections implementing a Clean Boat/Clean Water program; educational activites.
Deliverables include a paper and electronic copy of comprehensive Report including:
1) Final Report summarizing accomplishments/progress of the project including a watercraft inspection report including time and number of people reached; CB/CW survey results; daily results will be entered into the DNR CB/CW database.
2) Copy of brochures & educational materials sent in mailings.
3) AIS related materials generated or paid for by this grant.
Special conditions: The project sponsor shall immediately contact the DNR if a new aquatic invasive species infestation is found.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional AIS Coordinator. The DNR is to receive both paper and electronic copies of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Upper Ox Creek
Status
Complete
Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.
Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.
Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Upper Ox Creek -Un Channel
Status
Complete
Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.
Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.
Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Upper Ox Lake
Status
Complete
Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.
Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.
Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Whiteside Lake
Status
Complete
Town Of Barnes: Eau Claire Lakes-Barnes Area Ais Education, Prevention, & Planning Project 2007-2008: The T. of Barnes will sponsor an AIS prevention project on the Eau Claire Chain & lakes in the Towns of Barnes, Highland & Gordon with boat monitoring inspections at three major landings on 11 Eau Claire Chain lakes, & one landing on 14 other lakes. Inspections will be performed Fridays between May 25 & Aug. 31, Saturday & Sunday between May 5 & Sept. 3 & July 2-4. The project includes a coordinator to train, schedule, & oversee paid & volunteer inspectors; CBCW workshops; a plant identification workshop; public education including public contact, distribution of education materials, informational meetings, articles in association & property owner newsletters & on T. of Barnes website, presentations to the T. of Barnes AIS Committee; surveys of boat landing signs & maintenance. Recommendations for local ordinances or changes will be submitted to the T. of Barnes AIS committee.
Project deliverables include a comprehensive report including: 1) Documentation of grant administration time and services. 2) Training session and workshop agendas. 3) Watercraft inspection report including time & number of people reached. CB/CW survey results data will be entered on the CB/CW database. 4) Sign survey report. 5) Aquatic plant survey report, graphs and maps. 6) Minutes of meetings with local ordinance reviewes. 8) Articles or newsletters. 9) AIS education materials.
Special conditions for this project: The project sponsor shall contact the DNR in the event of a new aquatic invasive species infestation.
This scope is intended to summarize the grant application and does not supersede application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report.
Grant Details
Clean Boats, Clean Waters
Date
2/15/2013
Waters Involved
Amnicon Lake
Status
Complete
Amnicon/Dowling Lake Management District: Amnicon/Dowling Lake Management District 2016 Clean Boats Clean Waters: The Amnicon/Dowling Lake Management District is sponsoring a Clean Boats Clean Waters project in 2016 at one public boat landing on Amnicon Lake.
Grant Details
Clean Boats, Clean Waters
Date
2/15/2017
Waters Involved
Amnicon Lake
Status
Complete
Amnicon/Dowling Lake Management District: Amnicon/Dowling Lake Management District 2017 Cbcw: Amnicon/Dowling Lake Management District is sponsoring a Clean Boats Clean Waters project in 2017 at 0 single public boat landings and 1 public boat landing pairs on AMNICON LAKE, DOWLING LAKE.
Grant Details
Clean Boats, Clean Waters
Date
2/15/2019
Waters Involved
Amnicon Lake
Status
Complete
Amnicon/Dowling Lake Management District: Amnicon/Dowling Lake Management District 2019 Cbcw: Amnicon/Dowling Lake Management District is sponsoring a Clean Boats Clean Waters project in 2019 at 0 single public boat landings and 1 public boat landing pairs on AMNICON LAKE (MAIN LANDING), DOWLING LAKE.
Grant Details
Clean Boats, Clean Waters
Date
2/15/2020
Waters Involved
Amnicon Lake
Status
Complete
Amnicon/Dowling Lake Management District: Amnicon/Dowling Lake Management District 2020 Cbcw: Amnicon/Dowling Lake Management District is sponsoring a Clean Boats Clean Waters project in 2020 at 0 single public boat landings and 1 public boat landing pairs on AMNICON/DOWLING (MAIN LANDING, MAIN LANDING).
Grant Details
Clean Boats, Clean Waters
Date
2/15/2013
Waters Involved
Amnicon River
Status
Complete
Amnicon/Dowling Lake Management District: Amnicon/Dowling Lake Management District 2016 Clean Boats Clean Waters: The Amnicon/Dowling Lake Management District is sponsoring a Clean Boats Clean Waters project in 2016 at one public boat landing on Amnicon Lake.
Grant Details
Clean Boats, Clean Waters
Date
2/15/2017
Waters Involved
Amnicon River
Status
Complete
Amnicon/Dowling Lake Management District: Amnicon/Dowling Lake Management District 2017 Cbcw: Amnicon/Dowling Lake Management District is sponsoring a Clean Boats Clean Waters project in 2017 at 0 single public boat landings and 1 public boat landing pairs on AMNICON LAKE, DOWLING LAKE.
Grant Details
Clean Boats, Clean Waters
Date
2/15/2019
Waters Involved
Amnicon River
Status
Complete
Amnicon/Dowling Lake Management District: Amnicon/Dowling Lake Management District 2019 Cbcw: Amnicon/Dowling Lake Management District is sponsoring a Clean Boats Clean Waters project in 2019 at 0 single public boat landings and 1 public boat landing pairs on AMNICON LAKE (MAIN LANDING), DOWLING LAKE.
Grant Details
Clean Boats, Clean Waters
Date
2/15/2020
Waters Involved
Amnicon River
Status
Complete
Amnicon/Dowling Lake Management District: Amnicon/Dowling Lake Management District 2020 Cbcw: Amnicon/Dowling Lake Management District is sponsoring a Clean Boats Clean Waters project in 2020 at 0 single public boat landings and 1 public boat landing pairs on AMNICON/DOWLING (MAIN LANDING, MAIN LANDING).
Grant Details
Clean Boats, Clean Waters
Date
2/15/2017
Waters Involved
Dowling Lake
Status
Complete
Amnicon/Dowling Lake Management District: Amnicon/Dowling Lake Management District 2017 Cbcw: Amnicon/Dowling Lake Management District is sponsoring a Clean Boats Clean Waters project in 2017 at 0 single public boat landings and 1 public boat landing pairs on AMNICON LAKE, DOWLING LAKE.
Grant Details
Clean Boats, Clean Waters
Date
2/15/2020
Waters Involved
Dowling Lake
Status
Complete
Amnicon/Dowling Lake Management District: Amnicon/Dowling Lake Management District 2020 Cbcw: Amnicon/Dowling Lake Management District is sponsoring a Clean Boats Clean Waters project in 2020 at 0 single public boat landings and 1 public boat landing pairs on AMNICON/DOWLING (MAIN LANDING, MAIN LANDING).
Grant Details
Clean Boats, Clean Waters
Date
2/15/2017
Waters Involved
Unnamed
Status
Complete
Amnicon/Dowling Lake Management District: Amnicon/Dowling Lake Management District 2017 Cbcw: Amnicon/Dowling Lake Management District is sponsoring a Clean Boats Clean Waters project in 2017 at 0 single public boat landings and 1 public boat landing pairs on AMNICON LAKE, DOWLING LAKE.
Grant Details
Clean Boats, Clean Waters
Date
2/15/2020
Waters Involved
Unnamed
Status
Complete
Amnicon/Dowling Lake Management District: Amnicon/Dowling Lake Management District 2020 Cbcw: Amnicon/Dowling Lake Management District is sponsoring a Clean Boats Clean Waters project in 2020 at 0 single public boat landings and 1 public boat landing pairs on AMNICON/DOWLING (MAIN LANDING, MAIN LANDING).
Grant Details
Lake Protection Grant
Date
4/15/2015
Waters Involved
Cranberry Creek
Status
Complete
Minong Flowage Association: Hlk-Minong Flowage: Fish-Sticks Dan Maxwell: Minong Flowage Association will implement best practices described in Wisconsin\2019s 2014-2017 Healthy Lakes Implementation Plan. Practices include: fish sticks 1 lakeshore property.
The best practices require a contract to remain in effect for 10 years and must include minimum operation and maintenance requirements and data collection as described in grant condition #17. If best practice(s) are implemented on land owned by the grant Sponsor, this Lake Protection Grant Agreement serves as the contract. If best practice(s) are implemented on land other than the sponsor\2019s, a contract between the sponsor and landowner that abides by grant condition #17 is required.
The Department may require re-payment of project installation costs if the best practice is disturbed or removed. The Sponsor and/or the Department may perform site inspections and/or monitoring to ensure project success.
Deliverables: Best practice location and design information, if not included in the application; signed 10-year landowner contract; pre and post project installation photographs; summary of education activities and publicity/promotion of Healthy Lakes initiative, if applicable.
Special conditions: The state share of each best practice cannot exceed $1,000. The state share of grant administration and technical assistance costs may not exceed 10% of the grant award; technical assistance does not include implementation labor. Funding cannot be used for mitigation or regulatory compliance activities. Water regulation and/or county zoning permits must be issued before construction. The Healthy Lakes logo should be used for promotion and publicity, and DNR recognized as a funding source.
Grant Details
Lake Protection Grant
Date
4/15/2017
Waters Involved
Lake Nebagamon
Status
Complete
Village Of Lake Nebagamon: Lmi-Stormwater Runoff Boat Landing Lake Nebagamon: The Village of Lake Nebagamon is sponsoring a project to implement engineered stormwater best practices at the lake\2019s public boat landing downtown. The Project also includes community outreach and tours to share the project results.
Deliverables include: construction specs and plans, 25-year operation & maintenance plan with pre/post photos, and an outreach summary.
The specific objectives, metrics, and deliverables for the listed activities are included in the application and supporting materials, and this scope is not intended to replace or supersede those documents.
Grant Details
Lake Protection Grant
Date
4/15/2017
Waters Involved
Minnesuing Creek
Status
Complete
Village Of Lake Nebagamon: Lmi-Stormwater Runoff Boat Landing Lake Nebagamon: The Village of Lake Nebagamon is sponsoring a project to implement engineered stormwater best practices at the lake\2019s public boat landing downtown. The Project also includes community outreach and tours to share the project results.
Deliverables include: construction specs and plans, 25-year operation & maintenance plan with pre/post photos, and an outreach summary.
The specific objectives, metrics, and deliverables for the listed activities are included in the application and supporting materials, and this scope is not intended to replace or supersede those documents.
Grant Details
Lake Protection Grant
Date
4/15/2015
Waters Involved
Minong Flowage
Status
Complete
Minong Flowage Association: Hlk-Minong Flowage: Fish-Sticks Dan Maxwell: Minong Flowage Association will implement best practices described in Wisconsin\2019s 2014-2017 Healthy Lakes Implementation Plan. Practices include: fish sticks 1 lakeshore property.
The best practices require a contract to remain in effect for 10 years and must include minimum operation and maintenance requirements and data collection as described in grant condition #17. If best practice(s) are implemented on land owned by the grant Sponsor, this Lake Protection Grant Agreement serves as the contract. If best practice(s) are implemented on land other than the sponsor\2019s, a contract between the sponsor and landowner that abides by grant condition #17 is required.
The Department may require re-payment of project installation costs if the best practice is disturbed or removed. The Sponsor and/or the Department may perform site inspections and/or monitoring to ensure project success.
Deliverables: Best practice location and design information, if not included in the application; signed 10-year landowner contract; pre and post project installation photographs; summary of education activities and publicity/promotion of Healthy Lakes initiative, if applicable.
Special conditions: The state share of each best practice cannot exceed $1,000. The state share of grant administration and technical assistance costs may not exceed 10% of the grant award; technical assistance does not include implementation labor. Funding cannot be used for mitigation or regulatory compliance activities. Water regulation and/or county zoning permits must be issued before construction. The Healthy Lakes logo should be used for promotion and publicity, and DNR recognized as a funding source.
Grant Details
Lake Protection Grant
Date
4/15/2017
Waters Involved
Nebagamon Creek
Status
Complete
Village Of Lake Nebagamon: Lmi-Stormwater Runoff Boat Landing Lake Nebagamon: The Village of Lake Nebagamon is sponsoring a project to implement engineered stormwater best practices at the lake\2019s public boat landing downtown. The Project also includes community outreach and tours to share the project results.
Deliverables include: construction specs and plans, 25-year operation & maintenance plan with pre/post photos, and an outreach summary.
The specific objectives, metrics, and deliverables for the listed activities are included in the application and supporting materials, and this scope is not intended to replace or supersede those documents.
Grant Details
Lake Protection Grant
Date
11/27/1996
Waters Involved
St Croix Flowage
Status
Complete
Douglas County: Acq-Upper St Croix Flowage Land Acquisition-Bell Trust/Wilcox Is: Douglas County will acquire approximately 128 acres (six parcels) of land located on the Gordon/St. Croix Flowage to protect the headwaters of the St. Croix Scenic Riverway. The properties include primarily wooded acreage located along both the southern shore of the flowage and Wilcox Island along the northern shore. A legal description of the parcels is attached. The property will be managed by the County Forestry Department as either special use areas to preserve and protect the water quality and wildlife habitat of the flowage or as county forest lands. The primary goals of the property's management plan are 1) to preserve and protect the water quality of the flowage and the high quality fishery and wildlife habitat, rich in both aquatic and terrestial bio-diversity 2) to protect the southern shoreline of the flowage from further development, and 3) to protect and maintain as a unique benchmark stand the old growth red and white pine stand on Wilcox Island. The property will be open for public access and use but intensive access or recreational provisions are not planned.
Grant Details
Lake Protection Grant
Date
4/15/2015
Waters Involved
Totagatic River
Status
Complete
Minong Flowage Association: Hlk-Minong Flowage: Fish-Sticks Dan Maxwell: Minong Flowage Association will implement best practices described in Wisconsin\2019s 2014-2017 Healthy Lakes Implementation Plan. Practices include: fish sticks 1 lakeshore property.
The best practices require a contract to remain in effect for 10 years and must include minimum operation and maintenance requirements and data collection as described in grant condition #17. If best practice(s) are implemented on land owned by the grant Sponsor, this Lake Protection Grant Agreement serves as the contract. If best practice(s) are implemented on land other than the sponsor\2019s, a contract between the sponsor and landowner that abides by grant condition #17 is required.
The Department may require re-payment of project installation costs if the best practice is disturbed or removed. The Sponsor and/or the Department may perform site inspections and/or monitoring to ensure project success.
Deliverables: Best practice location and design information, if not included in the application; signed 10-year landowner contract; pre and post project installation photographs; summary of education activities and publicity/promotion of Healthy Lakes initiative, if applicable.
Special conditions: The state share of each best practice cannot exceed $1,000. The state share of grant administration and technical assistance costs may not exceed 10% of the grant award; technical assistance does not include implementation labor. Funding cannot be used for mitigation or regulatory compliance activities. Water regulation and/or county zoning permits must be issued before construction. The Healthy Lakes logo should be used for promotion and publicity, and DNR recognized as a funding source.
Grant Details
Lake Protection Grant
Date
4/15/2017
Waters Involved
Unnamed
Status
Complete
Village Of Lake Nebagamon: Lmi-Stormwater Runoff Boat Landing Lake Nebagamon: The Village of Lake Nebagamon is sponsoring a project to implement engineered stormwater best practices at the lake\2019s public boat landing downtown. The Project also includes community outreach and tours to share the project results.
Deliverables include: construction specs and plans, 25-year operation & maintenance plan with pre/post photos, and an outreach summary.
The specific objectives, metrics, and deliverables for the listed activities are included in the application and supporting materials, and this scope is not intended to replace or supersede those documents.
Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Whitefish Lake
Status
Complete
Whitefish Lake Conservation Organization, In: Lmi-Whitefish Lake Diagnostic & Feasibility Study: The Whitefish Lake Conservation Organization, in cooperation with the US Geological Survey, Wis. Dept. of Nat. Res., and private consultants, will conduct a comprehensive diagnostic/feasibility study of Silver Lake and it's watershed and develop a lake management plan.
The project includes the following activities; (1) the USGS will conduct an assessment of the lake's hydrology and water quality and model lake responses to management scenarios, (2) the DNR [Integ. Sci. Serv.] will conduct a lake bottom sediment core study to determine historical conditions and changes in lake water quality over time, (3) consultant Susan Cray Borman will conduct an aquatic plant survey and develop management recommendations, and (4) consultant Eric Olson will coordinate and compile the results of these studies into planning reports and action plans as well as provide for project public communication, input (through surveys and working groups) and education.
Project deliverables include: l. Detailed hydrologic and nutrient budgets, including simulations of alternative development scenarios in a published technical report. 2. Detailed aquatic plant survey and report. 3. A lake core paleoecological study and report. 4. Two interim planning reports synthesizing and summarizing the findings of the other studies, and 5. A comprehensive lake management plan for Whitefish Lake.
Specific conditions for this project include: The installation of all stream and lake gauging stations must receive the approval and/or permit from the Department of Natural Resources water regulation section.
The Department of Natural Resources will be provided with electronic and paper copies of the annual and final reports of the results of this study and the lake management plan. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Whitefish Lake
Status
Complete
West Wisconsin Land Trust: Acq-Whitefish Lake - Griggs Shore: West Wisconsin Land Trust will sponsor a project to acquire a conservation easement on 37 acres including approximately 1/2 mile of shoreland on Whitefish Lake and 4,500 feet of shoreline frontage on a large wetland.
Grant Details
Large Scale Lake Planning
Date
3/24/1994
Waters Involved
Amnicon Lake
Status
Complete
Amnicon/Dowling Lake Management District: Amnicon Lake Management Planning: Conduct water quality sampling. Conduct aquatic plant survey of lake. Conduct an aerial photography survey of lake shoreline. Conduct a periphyton survey in lake. Conduct a shoreline conductivity profile survey. The grantee will disseminateinformation to the public by newsletter, local newspaper articles, public meetings and summary report mailings. Project results will be reposited at Trilakes Civic Club, 7872 S. County Rd. A, Superior, WI, 54880.
Grant Details
Large Scale Lake Planning
Date
4/1/1996
Waters Involved
Amnicon Lake
Status
Complete
Amnicon/Dowling Lake Management District: Amnicon Lake Water Quality Monitoring And Assessment: The Amnicon/Dowling Lake Management and Sanitary District proposes to continue the water quality monitoring on Amnicon lake and continue their lake management planning process. Project activities include 1) monitoring lake water quality from April to November, 2) monitoring and evaluating four "Hot Spot" sites for potential harmful runoff during precipitation events, 3) monitoring eight existing shoreline wells to characterize groundwater quality and potential lake impacts, 4) install eight seepage meters around the lake and monitor quality of groundwater entering the lake, 5) evaluate previously identified areas of concern and make recommendations for the implementation of "Best Management Practices" where indicated, and 6) analyze and characterize the lake sediments. A final report will be prepared describing the project results. A paper copy and an electronic copy of the final report will be provided to the Department of Natural Resources. Information on the project will be disseminated to the public by newsletter, public meeting, and summary report mailing.
Grant Details
Large Scale Lake Planning
Date
4/1/1997
Waters Involved
Amnicon Lake
Status
Complete
Amnicon/Dowling Lake Management District: Amnicon Lake Water Quality Monitoring: The Amnicon/Dowling Lake Management & Sanitation District proposes to conduct water quality monitoring on Amnicon Lake, including the purchase of water quality monitoring equipment. Project activities also include providing water quality sampling training to volunteers, providing a groundtruthing review session to volunteers, analyzing groundtruthing results, and preparing a final report. The Department of Natural Resource will be provided with a paper copy and an electronic copy of the final report. Information about the project will be disseminated to the public by newsletter, public meeting, summary report mailings, and local newspaper article.
Grant Details
Large Scale Lake Planning
Date
4/1/2003
Waters Involved
Amnicon Lake
Status
Complete
Amnicon/Dowling Lake Management District: Amnicon Lake Comprehensive Lake Management Plan Development: The Amnicon/Dowling Lake Management & Sanitary District will conduct a comprehensive lake management planning project involving a study and evaluation of Amnicon Lake in Douglas County. Project activities include; conducting a review and research of all available reports, records, maps, etc., conducting a shoreline inventory, conducting a watershed assessment, conducting a surface runoff assessment, conducting lake and stream water quality monitoring, conducting lake bottom sediment monitoring, calculating a lake water budget, preparing a lake nutrient budget, conducting computer modeling of lake water quality data and information, and preparing a final comprehensive lake Management Plan/Report.
Specific deliverables for this grant project include:
? A comprehensive lake management plan for Amnicon Lake including the project activity results.
The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.
Grant Details
Large Scale Lake Planning
Date
3/15/2021
Waters Involved
Amnicon Lake
Status
Complete
Amnicon/Dowling Lake Management District: Comp-Amnicon Dowling Lake Management District Comprehensive Plan: Project Scope and Description of Deliverables
The Amnicon Dowling Lake Management District is sponsoring a project to develop a Strategic Plan. Activities include professional technical assistance & training for volunteer monitoring (AIS & BMPs), a gap analysis, public participation & strategic planning, and education & outreach.
Project final deliverables include: a summary of training & volunteer monitoring efforts; agendas and minutes for planning meetings; public engagement examples; and a strategic plan that includes methodologies, results, and management alternatives discussion.
Special Conditions: 1) Monitoring data shall be entered into the SWIMS database; and 2) Draft sociological/user surveys and shoreline/BMP assessments must be reviewed and approved by the Department before being initiated.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.
If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
3/15/2021
Waters Involved
Amnicon River
Status
Complete
Amnicon/Dowling Lake Management District: Comp-Amnicon Dowling Lake Management District Comprehensive Plan: Project Scope and Description of Deliverables
The Amnicon Dowling Lake Management District is sponsoring a project to develop a Strategic Plan. Activities include professional technical assistance & training for volunteer monitoring (AIS & BMPs), a gap analysis, public participation & strategic planning, and education & outreach.
Project final deliverables include: a summary of training & volunteer monitoring efforts; agendas and minutes for planning meetings; public engagement examples; and a strategic plan that includes methodologies, results, and management alternatives discussion.
Special Conditions: 1) Monitoring data shall be entered into the SWIMS database; and 2) Draft sociological/user surveys and shoreline/BMP assessments must be reviewed and approved by the Department before being initiated.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.
If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
4/1/2000
Waters Involved
Deer Lake
Status
Complete
Town Of Oakland: Tw. Oakland, Watershed & Land Use Plan: The Town of Oakland will conduct a watershed and land use planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Oakland in Douglas County. Project activities will include the formation of a Citizen Planning Committee, establishing the scope of the town planning project, conducting I & E and listening public meetings, and developing goals and policies for long-range land use and shorelands protection planning.
Specific deliverables for this grant project will include:
1) Copies of meetings notes, I & E materials, survey results, and newspaper notices.
2) Copies of all resource maps developed during project
3) A copy of the final report for this project
The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.
Grant Details
Large Scale Lake Planning
Date
3/23/1994
Waters Involved
Dowling Lake
Status
Complete
Amnicon/Dowling Lake Management District: Dowling Lake Management Planning: 1) Conduct water quality sampling. 2) Conduct aquatic plant survey of lake. 3) Conduct an aerial photography survey of the lake. 4) Conduct a periphyton survey in lake. 5) Conduct a shoreline conductivity profile survey. 6) Prepare a finalreport that includes tasks 1 - 5 listed above. 7) DNR shall receive copies of the final report. Information will be disseminated to the public by newsletter, local newspaper articles, public meetings, and summary report mailings. Project results willbe reposited at Tri-Lakes Civic Club - 7872 S. County Rd. A, Superior, WI 54880.
Grant Details
Large Scale Lake Planning
Date
4/1/1996
Waters Involved
Dowling Lake
Status
Complete
Amnicon/Dowling Lake Management District: Dowling Lake Water Quality Monitoring And Assessment: The Amnicon/Dowling Lake Management District proposes to continue the water quality monitoring on Dowling Lake and continue their lake management planning process. Project activities include 1) monitoring lake water quality from April to November, 2) monitoring and evaluating "Hot Spot" sites for potential harmful runoff duirng precipitation events, 3) monitor six existing shoreline wells to characterize goundwater quality and potential lake impacts, 4) install six seepage meters around the lake and monitor quality of groundwater entering the lake, 5) evaluate previously identified areas of concern and make recommendations for the implementation of "Best Management Practices" where indicated, and 6) analyze and characterize the lake sediments. A final report will be prepared describing the project results. A paper copy and an electronic copy of the final report will be provided to the Department of Natural Resources. Information on the project will be disseminated to the public by newsletter, public meeting, and summary report mailing. end.
Grant Details
Large Scale Lake Planning
Date
4/1/1997
Waters Involved
Dowling Lake
Status
Complete
Amnicon/Dowling Lake Management District: Dowling Lake Water Quality Monitoring: The Amnicon/Dowling Lake Management & Sanitary District proposes to conduct water quality monitoring on Dowling Lake, including the purchase of water quality monitoring equipment. Project activities also include providing water quality sampling training to volunteers, providing a groundtruthing review session to volunteers, analyzing groundtruthing results, and preparing a final report. The Department of Natural Resources will be provided with a paper copy and an electronic copy of the final report. Information about the project will be disseminated to the public by newsletter, public meeting, summary report mailings, and local newspaper article.
Grant Details
Large Scale Lake Planning
Date
4/1/2000
Waters Involved
Dowling Lake
Status
Complete
Town Of Oakland: Tw. Oakland, Watershed & Land Use Plan: The Town of Oakland will conduct a watershed and land use planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Oakland in Douglas County. Project activities will include the formation of a Citizen Planning Committee, establishing the scope of the town planning project, conducting I & E and listening public meetings, and developing goals and policies for long-range land use and shorelands protection planning.
Specific deliverables for this grant project will include:
1) Copies of meetings notes, I & E materials, survey results, and newspaper notices.
2) Copies of all resource maps developed during project
3) A copy of the final report for this project
The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.
Grant Details
Large Scale Lake Planning
Date
4/1/2003
Waters Involved
Dowling Lake
Status
Complete
Amnicon/Dowling Lake Management District: Dowling Lake Comprehensive Lake Management Plan Development Project: The Amnicon/Dowling Lake Management & Sanitary District will conduct a comprehensive lake management planning project involving a study and evaluation of Dowling Lake in Douglas County. Project activities include; conducting a review and research of all available reports, records, maps, etc., conducting a shoreline inventory, conducting a watershed assessment, conducting a surface runoff assessment, conducting lake and stream water quality monitoring, conducting lake bottom sediment monitoring, calculating a lake water budget, preparing a lake nutrient budget, conducting computer modeling of lake water quality data and information, and preparing a final comprehensive lake Management Plan/Report.
Specific deliverables for this grant project include:
? A comprehensive lake management plan for Dowling Lake including the project activity results.
The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.
Grant Details
Large Scale Lake Planning
Date
2/15/2019
Waters Involved
Dowling Lake
Status
Complete
Amnicon/Dowling Lake Management District: Dowling Lake Water Quality Improvement Planning Project: Amnicon-Dowling Management District is sponsoring a comprehensive lake monitoring and management planning project on Dowling Lake. Activities include: aquatic plant, shoreland, water quality and quantity, and tributary loading monitoring; shoreland/land use mapping and modeling; social surveying; and planning with local stakeholders. Results will be compared to historical information and studies.
Final deliverables include: monitoring and modeling results, including maps and electronic data sheets; survey summary report; and a water quality improvement plan.
Special Conditions: WDNR\2019s monitoring protocols should be used and all data not automated via SLOH should be entered into SWIMS.
The specific objectives, metrics, and deliverables for the listed activities are included in the application and supporting materials, and this scope is not intended to replace or supersede those documents.
Grant Details
Large Scale Lake Planning
Date
3/15/2021
Waters Involved
Dowling Lake
Status
Complete
Amnicon/Dowling Lake Management District: Comp-Amnicon Dowling Lake Management District Comprehensive Plan: Project Scope and Description of Deliverables
The Amnicon Dowling Lake Management District is sponsoring a project to develop a Strategic Plan. Activities include professional technical assistance & training for volunteer monitoring (AIS & BMPs), a gap analysis, public participation & strategic planning, and education & outreach.
Project final deliverables include: a summary of training & volunteer monitoring efforts; agendas and minutes for planning meetings; public engagement examples; and a strategic plan that includes methodologies, results, and management alternatives discussion.
Special Conditions: 1) Monitoring data shall be entered into the SWIMS database; and 2) Draft sociological/user surveys and shoreline/BMP assessments must be reviewed and approved by the Department before being initiated.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.
If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
4/1/2000
Waters Involved
Lake Newman
Status
Complete
Town Of Oakland: Tw. Oakland, Watershed & Land Use Plan: The Town of Oakland will conduct a watershed and land use planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Oakland in Douglas County. Project activities will include the formation of a Citizen Planning Committee, establishing the scope of the town planning project, conducting I & E and listening public meetings, and developing goals and policies for long-range land use and shorelands protection planning.
Specific deliverables for this grant project will include:
1) Copies of meetings notes, I & E materials, survey results, and newspaper notices.
2) Copies of all resource maps developed during project
3) A copy of the final report for this project
The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.
Grant Details
Large Scale Lake Planning
Date
4/1/2000
Waters Involved
Long Lake
Status
Complete
Town Of Oakland: Tw. Oakland, Watershed & Land Use Plan: The Town of Oakland will conduct a watershed and land use planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Oakland in Douglas County. Project activities will include the formation of a Citizen Planning Committee, establishing the scope of the town planning project, conducting I & E and listening public meetings, and developing goals and policies for long-range land use and shorelands protection planning.
Specific deliverables for this grant project will include:
1) Copies of meetings notes, I & E materials, survey results, and newspaper notices.
2) Copies of all resource maps developed during project
3) A copy of the final report for this project
The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.
Grant Details
Large Scale Lake Planning
Date
4/1/2000
Waters Involved
Lyman Lake
Status
Complete
Town Of Oakland: Tw. Oakland, Watershed & Land Use Plan: The Town of Oakland will conduct a watershed and land use planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Oakland in Douglas County. Project activities will include the formation of a Citizen Planning Committee, establishing the scope of the town planning project, conducting I & E and listening public meetings, and developing goals and policies for long-range land use and shorelands protection planning.
Specific deliverables for this grant project will include:
1) Copies of meetings notes, I & E materials, survey results, and newspaper notices.
2) Copies of all resource maps developed during project
3) A copy of the final report for this project
The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.
Grant Details
Large Scale Lake Planning
Date
4/1/2000
Waters Involved
Moose Lake
Status
Complete
Town Of Oakland: Tw. Oakland, Watershed & Land Use Plan: The Town of Oakland will conduct a watershed and land use planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Oakland in Douglas County. Project activities will include the formation of a Citizen Planning Committee, establishing the scope of the town planning project, conducting I & E and listening public meetings, and developing goals and policies for long-range land use and shorelands protection planning.
Specific deliverables for this grant project will include:
1) Copies of meetings notes, I & E materials, survey results, and newspaper notices.
2) Copies of all resource maps developed during project
3) A copy of the final report for this project
The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.
Grant Details
Large Scale Lake Planning
Date
4/1/2000
Waters Involved
One Buck Lake
Status
Complete
Town Of Oakland: Tw. Oakland, Watershed & Land Use Plan: The Town of Oakland will conduct a watershed and land use planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Oakland in Douglas County. Project activities will include the formation of a Citizen Planning Committee, establishing the scope of the town planning project, conducting I & E and listening public meetings, and developing goals and policies for long-range land use and shorelands protection planning.
Specific deliverables for this grant project will include:
1) Copies of meetings notes, I & E materials, survey results, and newspaper notices.
2) Copies of all resource maps developed during project
3) A copy of the final report for this project
The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.
Grant Details
Large Scale Lake Planning
Date
4/1/2000
Waters Involved
Round Lake
Status
Complete
Town Of Oakland: Tw. Oakland, Watershed & Land Use Plan: The Town of Oakland will conduct a watershed and land use planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Oakland in Douglas County. Project activities will include the formation of a Citizen Planning Committee, establishing the scope of the town planning project, conducting I & E and listening public meetings, and developing goals and policies for long-range land use and shorelands protection planning.
Specific deliverables for this grant project will include:
1) Copies of meetings notes, I & E materials, survey results, and newspaper notices.
2) Copies of all resource maps developed during project
3) A copy of the final report for this project
The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.
Grant Details
Large Scale Lake Planning
Date
4/1/2000
Waters Involved
Scout Lake
Status
Complete
Town Of Oakland: Tw. Oakland, Watershed & Land Use Plan: The Town of Oakland will conduct a watershed and land use planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Oakland in Douglas County. Project activities will include the formation of a Citizen Planning Committee, establishing the scope of the town planning project, conducting I & E and listening public meetings, and developing goals and policies for long-range land use and shorelands protection planning.
Specific deliverables for this grant project will include:
1) Copies of meetings notes, I & E materials, survey results, and newspaper notices.
2) Copies of all resource maps developed during project
3) A copy of the final report for this project
The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.
Grant Details
Large Scale Lake Planning
Date
4/1/2000
Waters Involved
Three Buck Lakes, Lower
Status
Complete
Town Of Oakland: Tw. Oakland, Watershed & Land Use Plan: The Town of Oakland will conduct a watershed and land use planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Oakland in Douglas County. Project activities will include the formation of a Citizen Planning Committee, establishing the scope of the town planning project, conducting I & E and listening public meetings, and developing goals and policies for long-range land use and shorelands protection planning.
Specific deliverables for this grant project will include:
1) Copies of meetings notes, I & E materials, survey results, and newspaper notices.
2) Copies of all resource maps developed during project
3) A copy of the final report for this project
The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.
Grant Details
Large Scale Lake Planning
Date
4/1/2000
Waters Involved
Three Buck Lakes, Upper
Status
Complete
Town Of Oakland: Tw. Oakland, Watershed & Land Use Plan: The Town of Oakland will conduct a watershed and land use planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Oakland in Douglas County. Project activities will include the formation of a Citizen Planning Committee, establishing the scope of the town planning project, conducting I & E and listening public meetings, and developing goals and policies for long-range land use and shorelands protection planning.
Specific deliverables for this grant project will include:
1) Copies of meetings notes, I & E materials, survey results, and newspaper notices.
2) Copies of all resource maps developed during project
3) A copy of the final report for this project
The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.
Grant Details
Large Scale Lake Planning
Date
4/1/2000
Waters Involved
Three Bucks Lakes
Status
Complete
Town Of Oakland: Tw. Oakland, Watershed & Land Use Plan: The Town of Oakland will conduct a watershed and land use planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Oakland in Douglas County. Project activities will include the formation of a Citizen Planning Committee, establishing the scope of the town planning project, conducting I & E and listening public meetings, and developing goals and policies for long-range land use and shorelands protection planning.
Specific deliverables for this grant project will include:
1) Copies of meetings notes, I & E materials, survey results, and newspaper notices.
2) Copies of all resource maps developed during project
3) A copy of the final report for this project
The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.
Grant Details
Large Scale Lake Planning
Date
4/1/2000
Waters Involved
Unnamed
Status
Complete
Town Of Oakland: Tw. Oakland, Watershed & Land Use Plan: The Town of Oakland will conduct a watershed and land use planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Township of Oakland in Douglas County. Project activities will include the formation of a Citizen Planning Committee, establishing the scope of the town planning project, conducting I & E and listening public meetings, and developing goals and policies for long-range land use and shorelands protection planning.
Specific deliverables for this grant project will include:
1) Copies of meetings notes, I & E materials, survey results, and newspaper notices.
2) Copies of all resource maps developed during project
3) A copy of the final report for this project
The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.
Grant Details
Large Scale Lake Planning
Date
2/15/2019
Waters Involved
Unnamed
Status
Complete
Amnicon/Dowling Lake Management District: Dowling Lake Water Quality Improvement Planning Project: Amnicon-Dowling Management District is sponsoring a comprehensive lake monitoring and management planning project on Dowling Lake. Activities include: aquatic plant, shoreland, water quality and quantity, and tributary loading monitoring; shoreland/land use mapping and modeling; social surveying; and planning with local stakeholders. Results will be compared to historical information and studies.
Final deliverables include: monitoring and modeling results, including maps and electronic data sheets; survey summary report; and a water quality improvement plan.
Special Conditions: WDNR\2019s monitoring protocols should be used and all data not automated via SLOH should be entered into SWIMS.
The specific objectives, metrics, and deliverables for the listed activities are included in the application and supporting materials, and this scope is not intended to replace or supersede those documents.
Grant Details
Large Scale Lake Planning
Date
3/15/2021
Waters Involved
Unnamed
Status
Complete
Amnicon/Dowling Lake Management District: Comp-Amnicon Dowling Lake Management District Comprehensive Plan: Project Scope and Description of Deliverables
The Amnicon Dowling Lake Management District is sponsoring a project to develop a Strategic Plan. Activities include professional technical assistance & training for volunteer monitoring (AIS & BMPs), a gap analysis, public participation & strategic planning, and education & outreach.
Project final deliverables include: a summary of training & volunteer monitoring efforts; agendas and minutes for planning meetings; public engagement examples; and a strategic plan that includes methodologies, results, and management alternatives discussion.
Special Conditions: 1) Monitoring data shall be entered into the SWIMS database; and 2) Draft sociological/user surveys and shoreline/BMP assessments must be reviewed and approved by the Department before being initiated.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.
If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.