Grant Details
Lake Protection Grant
Date
2/19/1996
Waters Involved
Bass Lake
Status
Complete
Marinette County: Res - Bass Lake Restoration Alum Treatment: Marinette County proposes to treat Bass Lake with alum to reduce the effects of sediment phosophorus in the lake. Project activities include treating all waters of Bass Lake in excess of 3 feet deep and conducting pre and post treatment water quality monitoring.
AMENDMENT #1: Marinette County proposes a "5 fold" increase the Alum dose in Bass Lake to provide long term control of P release from enriched sediments.
Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Bear Lake
Status
Complete
Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.
Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Binder Lake
Status
Complete
Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.
Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Birch Lake
Status
Complete
Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.
Grant Details
Lake Protection Grant
Date
4/15/2017
Waters Involved
Bonita Creek
Status
Complete
Chute Lake P & R District: Hlk - Chute Pond Healthy Lakes 2017: Partnering with property owners, Chute Lake Protection & Rehabilitation District #1 is sponsoring a grant to implement water quality and habitat best practices from Wisconsin\2019s Healthy Lakes Implementation Plan. Best practices, including fish sticks, 350 sq. ft. native plantings, diversions, rock infiltration, and/or rain gardens, will be designed and installed according to the Healthy Lakes fact sheets, technical guidance and grant application.
All funded best practices require contracts that must remain in place for 10 years and include the minimum operation and maintenance requirements described in grant condition #16 at the end of this agreement. If the landowner is the grant sponsor this Lake Protection Grant Agreement serves as the contract. If the best practice(s) will be implemented on land other than the sponsor\2019s, a Conservation Contract between the sponsor and landowner describing the 10-year contract period, minimum operation and maintenance details, and data to be collected is required.
The Department may perform site inspections and/or monitoring to ensure project success.
Deliverables include: Signed 10-year landowner Conservation Contract(s) with operation and maintenance requirements; data collected; pre and post project installation photographs; and summary of education activities and publicity/promotion of Healthy Lakes initiative, if applicable.
Special conditions: Project management and technical assistance costs cannot exceed 10% of the state share of the grant award; this does not include implementation labor. Water regulation and/or county zoning permits must be issued before construction, and all regulatory requirements apply. The Healthy Lakes logo should be used for promotion and publicity and DNR recognized as a funding source.
This scope summarizes the scope in the grant application and attachments and does not supersede those application tasks/deliverables.
Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Bullfrog Lake
Status
Complete
Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.
Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Caldron Falls Reservoir*
Status
Complete
Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.
Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Chain Lake
Status
Complete
Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.
Grant Details
Lake Protection Grant
Date
4/15/2017
Waters Involved
Chute Pond
Status
Complete
Chute Lake P & R District: Hlk - Chute Pond Healthy Lakes 2017: Partnering with property owners, Chute Lake Protection & Rehabilitation District #1 is sponsoring a grant to implement water quality and habitat best practices from Wisconsin\2019s Healthy Lakes Implementation Plan. Best practices, including fish sticks, 350 sq. ft. native plantings, diversions, rock infiltration, and/or rain gardens, will be designed and installed according to the Healthy Lakes fact sheets, technical guidance and grant application.
All funded best practices require contracts that must remain in place for 10 years and include the minimum operation and maintenance requirements described in grant condition #16 at the end of this agreement. If the landowner is the grant sponsor this Lake Protection Grant Agreement serves as the contract. If the best practice(s) will be implemented on land other than the sponsor\2019s, a Conservation Contract between the sponsor and landowner describing the 10-year contract period, minimum operation and maintenance details, and data to be collected is required.
The Department may perform site inspections and/or monitoring to ensure project success.
Deliverables include: Signed 10-year landowner Conservation Contract(s) with operation and maintenance requirements; data collected; pre and post project installation photographs; and summary of education activities and publicity/promotion of Healthy Lakes initiative, if applicable.
Special conditions: Project management and technical assistance costs cannot exceed 10% of the state share of the grant award; this does not include implementation labor. Water regulation and/or county zoning permits must be issued before construction, and all regulatory requirements apply. The Healthy Lakes logo should be used for promotion and publicity and DNR recognized as a funding source.
This scope summarizes the scope in the grant application and attachments and does not supersede those application tasks/deliverables.
Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Crab Lake
Status
Complete
Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.
Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Crane Lake
Status
Complete
Pickerel/Crane Lake Prot & Rehab District: Acq-Pickerel/Crane Lake Property Acquisition: The Pickerel/Crane Lake P&R District has purchased a 46.7 acre parcel of land in the Town of Nashville, Forest County. The property includes 300 feet of frontage on Crane Lake, approximately 33 acres of wetland, an artesian spring, a pond and stream, and several acres of upland. The property will be managed in accordance with the Property Management Plan as outlined in the Land Management Plan attached to the Project Application (Form 8700-283) for this Lake Protection Grant.
Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Forbes Spring
Status
Complete
Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.
Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Hickey Springs
Status
Complete
Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.
Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Hidden Lake
Status
Complete
Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.
Grant Details
Lake Protection Grant
Date
4/15/2015
Waters Involved
Kentuck Lake
Status
Complete
Kentuck Lake P&R District: Lmi-Df-Kentuck Lake Plan Implementation: Water Quality & Ais: Kentuck Lake P&R District is sponsoring a lake protection grant to further assess water quality and manage AIS in Kentuck Lake, in Vilas County.
Project activities include: 1) In-lake water quality assessment; 2) Groundwater assessment; 3) Sediment core collection; 4) EWM and CLP monitoring and mapping; 5) Stakeholder participation planning meeting; 6) Purchase LDO probe; 7) Develop annual report and final report.
Project deliverables include: 1) In-lake, groundwater and sediment core data; 2) EWM and CLP data and mapping; 3) LDO probe; 4) Annual summary and final report.
Specific conditions for this project: Annual summary and final report need Dept review and approval.
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of annual summary, final report, all maps, data and GIS from project.
Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Lackawanna Lake
Status
Complete
Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.
Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Lake John
Status
Complete
Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.
Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Lincoln Lake
Status
Complete
Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.
Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Little Bear Lake
Status
Complete
Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.
Grant Details
Lake Protection Grant
Date
4/15/2017
Waters Involved
Little Pickerel Lake
Status
Complete
Pickerel Chain Lakes Association: Lmi - Little Pickerel Aeration Implementation Project: The Pickerel Chain Association proposes to install an aerator in Little Pickerel Lake. The project elements and deliverables are specified in the Pickerel Lake\2019s Protection Grant application, dated February 1, 2017.
This grant will fund the installation of an aeration system in Little Pickerel Lake. The aeration system will be installed in 2017 using PCLA members and assisted by the Oconto County WDNR fisheries staff for placing the airline and diffusers. Providing electric power and completing the on-shore preparation work to house the system compressors will occur in late summer/fall. Placement of the system airlines and diffusers into the lake will occur in the fall of 2017. Signing at all public access points to all three lakes of the chain will be placed prior to the ground freezing and the lake forming an ice cover. Open water safety fencing will be installed using the same type fencing system used on Pickerel Lake and will be placed by PCLA members once safe ice for foot travel is present.
If consultant is to provide the final report, it is recommended that the Grantee provide the DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR will be provided both paper and electronic .pdf copies of the final report along with, or prior to, submission of grantee\2019s final payment request. All information associated with this project is subject to public record.
Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Long Lake
Status
Complete
Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.
Grant Details
Lake Protection Grant
Date
4/1/1996
Waters Involved
McCaslin Lake
Status
Complete
Mccaslin Lake District: Acq-Mccaslin Lake Land Acquisition-Hansen (Parcel A) Property: The Mc Caslin Lake Rehabilitation District will acquire 25.88 acres of lowland, including water frontage and wetlands, on Mc Caslin Lake for lake protection purposes. Long term management goals for this property include preserving it as a quiet natural conservancy area used for passive outdoor recreation and enjoyment. No major development plans are included.
Grant Details
Lake Protection Grant
Date
2/1/1998
Waters Involved
McCaslin Lake
Status
Complete
Mccaslin Lake District: Acq-Mccaslin Lake District Hansen Ii Acq.: The McCaslin Lake District will acquire an additional 38.50 acres of land near McCaslin Lake for conservancy purposes.
Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Metonga Lake
Status
Complete
Sokaogon Chippewa Community: Zebra Mussel Df Study: This project will continue the study and assessment of the impacts of zebra mussels on Lake Metonga. Specially, water chemistry, phytoplankton, zooplankton, zebra mussels, crayfish, walleye and yellow perch will be studied. The objective of this study is to gain information about the changes within the ecosystem and possible management options.
Deliverables include:
1. An annual progress report
2. A Final report including results, any management recommendations that can be determined from the available data, scientific literature review, summary of methods, results and discussion. The report will include both summarized and raw data.
3. This report will be made public within the community and will be provided to the Department in both hard and electronic copies.
Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Miriam Lake
Status
Complete
Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.
Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Moody Lake
Status
Complete
Moody Lake Area Association: Lmi-Moody Lake Aeration Project: Based on an LPL grant awarded to Moody Lake Area Assn, aeration design, cost and installation was analysed and approved by the department. This project will provide aeration of the lake to increase oxygen during times when levels become critically low.
Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Munger Lake
Status
Complete
Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.
Grant Details
Lake Protection Grant
Date
4/15/2017
Waters Involved
North Branch Oconto River
Status
Complete
Chute Lake P & R District: Hlk - Chute Pond Healthy Lakes 2017: Partnering with property owners, Chute Lake Protection & Rehabilitation District #1 is sponsoring a grant to implement water quality and habitat best practices from Wisconsin\2019s Healthy Lakes Implementation Plan. Best practices, including fish sticks, 350 sq. ft. native plantings, diversions, rock infiltration, and/or rain gardens, will be designed and installed according to the Healthy Lakes fact sheets, technical guidance and grant application.
All funded best practices require contracts that must remain in place for 10 years and include the minimum operation and maintenance requirements described in grant condition #16 at the end of this agreement. If the landowner is the grant sponsor this Lake Protection Grant Agreement serves as the contract. If the best practice(s) will be implemented on land other than the sponsor\2019s, a Conservation Contract between the sponsor and landowner describing the 10-year contract period, minimum operation and maintenance details, and data to be collected is required.
The Department may perform site inspections and/or monitoring to ensure project success.
Deliverables include: Signed 10-year landowner Conservation Contract(s) with operation and maintenance requirements; data collected; pre and post project installation photographs; and summary of education activities and publicity/promotion of Healthy Lakes initiative, if applicable.
Special conditions: Project management and technical assistance costs cannot exceed 10% of the state share of the grant award; this does not include implementation labor. Water regulation and/or county zoning permits must be issued before construction, and all regulatory requirements apply. The Healthy Lakes logo should be used for promotion and publicity and DNR recognized as a funding source.
This scope summarizes the scope in the grant application and attachments and does not supersede those application tasks/deliverables.
Grant Details
Lake Protection Grant
Date
4/15/2017
Waters Involved
Pickerel Creek
Status
Complete
Pickerel Chain Lakes Association: Lmi - Little Pickerel Aeration Implementation Project: The Pickerel Chain Association proposes to install an aerator in Little Pickerel Lake. The project elements and deliverables are specified in the Pickerel Lake\2019s Protection Grant application, dated February 1, 2017.
This grant will fund the installation of an aeration system in Little Pickerel Lake. The aeration system will be installed in 2017 using PCLA members and assisted by the Oconto County WDNR fisheries staff for placing the airline and diffusers. Providing electric power and completing the on-shore preparation work to house the system compressors will occur in late summer/fall. Placement of the system airlines and diffusers into the lake will occur in the fall of 2017. Signing at all public access points to all three lakes of the chain will be placed prior to the ground freezing and the lake forming an ice cover. Open water safety fencing will be installed using the same type fencing system used on Pickerel Lake and will be placed by PCLA members once safe ice for foot travel is present.
If consultant is to provide the final report, it is recommended that the Grantee provide the DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR will be provided both paper and electronic .pdf copies of the final report along with, or prior to, submission of grantee\2019s final payment request. All information associated with this project is subject to public record.
Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Pickerel Lake
Status
Complete
Pickerel/Crane Lake Prot & Rehab District: Res-Pickerell Lake Aeration System: The project will install an aeration system, monitor Dissolved Oxygen throughout the winter, and provide education on sources of nutrient loading into Pickerel Lake. The project will also include an education effort for safety of open water and sources of the problem which have lead to the need for lake aeration.
All required permits will be received prior to equipment installation.
Specific deliverables for this grant project include a final report describing project accomplishments.
The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.
Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Pine Ridge Lake
Status
Complete
Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.
Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Sellin Lake
Status
Complete
Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.
Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Sullivan Springs
Status
Complete
Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.
Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Un Spring
Status
Complete
Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.
Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Un Spring - Fish Hatchery
Status
Complete
Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.
Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Un Spring -Fish Hatchery
Status
Complete
Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.
Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Unnamed
Status
Complete
Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.
Grant Details
Lake Protection Grant
Date
4/15/2015
Waters Involved
Unnamed
Status
Complete
Kentuck Lake P&R District: Lmi-Df-Kentuck Lake Plan Implementation: Water Quality & Ais: Kentuck Lake P&R District is sponsoring a lake protection grant to further assess water quality and manage AIS in Kentuck Lake, in Vilas County.
Project activities include: 1) In-lake water quality assessment; 2) Groundwater assessment; 3) Sediment core collection; 4) EWM and CLP monitoring and mapping; 5) Stakeholder participation planning meeting; 6) Purchase LDO probe; 7) Develop annual report and final report.
Project deliverables include: 1) In-lake, groundwater and sediment core data; 2) EWM and CLP data and mapping; 3) LDO probe; 4) Annual summary and final report.
Specific conditions for this project: Annual summary and final report need Dept review and approval.
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of annual summary, final report, all maps, data and GIS from project.
Grant Details
Lake Protection Grant
Date
4/15/2017
Waters Involved
Unnamed
Status
Complete
Chute Lake P & R District: Hlk - Chute Pond Healthy Lakes 2017: Partnering with property owners, Chute Lake Protection & Rehabilitation District #1 is sponsoring a grant to implement water quality and habitat best practices from Wisconsin\2019s Healthy Lakes Implementation Plan. Best practices, including fish sticks, 350 sq. ft. native plantings, diversions, rock infiltration, and/or rain gardens, will be designed and installed according to the Healthy Lakes fact sheets, technical guidance and grant application.
All funded best practices require contracts that must remain in place for 10 years and include the minimum operation and maintenance requirements described in grant condition #16 at the end of this agreement. If the landowner is the grant sponsor this Lake Protection Grant Agreement serves as the contract. If the best practice(s) will be implemented on land other than the sponsor\2019s, a Conservation Contract between the sponsor and landowner describing the 10-year contract period, minimum operation and maintenance details, and data to be collected is required.
The Department may perform site inspections and/or monitoring to ensure project success.
Deliverables include: Signed 10-year landowner Conservation Contract(s) with operation and maintenance requirements; data collected; pre and post project installation photographs; and summary of education activities and publicity/promotion of Healthy Lakes initiative, if applicable.
Special conditions: Project management and technical assistance costs cannot exceed 10% of the state share of the grant award; this does not include implementation labor. Water regulation and/or county zoning permits must be issued before construction, and all regulatory requirements apply. The Healthy Lakes logo should be used for promotion and publicity and DNR recognized as a funding source.
This scope summarizes the scope in the grant application and attachments and does not supersede those application tasks/deliverables.
Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Waubee Lake
Status
Complete
Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.
Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Wheeler Lake
Status
Complete
Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.
Grant Details
Large Scale Lake Planning
Date
4/1/2011
Waters Involved
Armstrong Creek
Status
Complete
Town Of Blackwell: Algal & Water Quality Assessment & Aquatic Plant Survey For Bear Lake Forest County, Phase 6: The Town of Blackwell is sponsoring a phased large scale lake planning grant project to study Bear Lake in Forest County. Phases 1 and 2 were funded during the February 2010 grant cycle, phases 3 and 4 were funded in August 2010, and Phases 5 and 6 were funded in February 2011. Project partners include the US Forest Service and UW-Stevens Point. The project will focus on developing a Lake Management Plan (LMP) for Bear Lake.
Phase 6 project activities include: 1) Algal assessment; 2) Information and education activities and planning meetings; 3) Water quality sampling and analysis; 4) Develop hydrologic and phosphorous budget; 5) Crayfish and aquatic plant monitoring; 6) Develop LMP.
Project deliverables include: 1) Water chemistry, algae, crayfish, and aquatic plant data; 2) Hydrologic and Phosphorous budget; 3) LMP.
Specific conditions for this project: LMP needs Dept review and approval.
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, data from water quality, algae sampling, and crayfish and aquatic plant monitoring, all maps from project, and all GIS data.
Grant Details
Large Scale Lake Planning
Date
4/1/2011
Waters Involved
Armstrong Creek
Status
Complete
Town Of Blackwell: Algal & Water Quality Assessment & Aquatic Plant Survey For Bear Lake, Forest Co., Phase 5: The Town of Blackwell is sponsoring phased large scale lake planning grant project to study Bear Lake, in Forest County. Phases 1 and 2 were funded during the February 2010 grant cycle, phases 3 and 4 were funded in August 2010, and Phases 5 and 6 were funded in February 2011. Project partners include the US Forest Service and UW-Stevens Point. The project will focus on developing a Lake Management Plan (LMP) for Bear Lake.
Phase 5 project activities include: 1) Algal assessment; 2) Information and education activities and planning meetings; 3) Water quality sampling and analysis; 4) Develop hydrologic and phosphorous budget; 5) Develop LMP.
Project deliverables include: Water chemistry and algae data.
Specific project conditions: LMP needs Dept review and approval.
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, data from water quality and algae sampling, all maps from project, and all GIS data.
Grant Details
Large Scale Lake Planning
Date
4/1/2011
Waters Involved
Bear Creek
Status
Complete
Town Of Blackwell: Algal & Water Quality Assessment & Aquatic Plant Survey For Bear Lake Forest County, Phase 6: The Town of Blackwell is sponsoring a phased large scale lake planning grant project to study Bear Lake in Forest County. Phases 1 and 2 were funded during the February 2010 grant cycle, phases 3 and 4 were funded in August 2010, and Phases 5 and 6 were funded in February 2011. Project partners include the US Forest Service and UW-Stevens Point. The project will focus on developing a Lake Management Plan (LMP) for Bear Lake.
Phase 6 project activities include: 1) Algal assessment; 2) Information and education activities and planning meetings; 3) Water quality sampling and analysis; 4) Develop hydrologic and phosphorous budget; 5) Crayfish and aquatic plant monitoring; 6) Develop LMP.
Project deliverables include: 1) Water chemistry, algae, crayfish, and aquatic plant data; 2) Hydrologic and Phosphorous budget; 3) LMP.
Specific conditions for this project: LMP needs Dept review and approval.
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, data from water quality, algae sampling, and crayfish and aquatic plant monitoring, all maps from project, and all GIS data.
Grant Details
Large Scale Lake Planning
Date
4/1/2011
Waters Involved
Bear Creek
Status
Complete
Town Of Blackwell: Algal & Water Quality Assessment & Aquatic Plant Survey For Bear Lake, Forest Co., Phase 5: The Town of Blackwell is sponsoring phased large scale lake planning grant project to study Bear Lake, in Forest County. Phases 1 and 2 were funded during the February 2010 grant cycle, phases 3 and 4 were funded in August 2010, and Phases 5 and 6 were funded in February 2011. Project partners include the US Forest Service and UW-Stevens Point. The project will focus on developing a Lake Management Plan (LMP) for Bear Lake.
Phase 5 project activities include: 1) Algal assessment; 2) Information and education activities and planning meetings; 3) Water quality sampling and analysis; 4) Develop hydrologic and phosphorous budget; 5) Develop LMP.
Project deliverables include: Water chemistry and algae data.
Specific project conditions: LMP needs Dept review and approval.
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, data from water quality and algae sampling, all maps from project, and all GIS data.
Grant Details
Large Scale Lake Planning
Date
4/1/2011
Waters Involved
Bear Lake
Status
Complete
Town Of Blackwell: Algal & Water Quality Assessment & Aquatic Plant Survey For Bear Lake Forest County, Phase 6: The Town of Blackwell is sponsoring a phased large scale lake planning grant project to study Bear Lake in Forest County. Phases 1 and 2 were funded during the February 2010 grant cycle, phases 3 and 4 were funded in August 2010, and Phases 5 and 6 were funded in February 2011. Project partners include the US Forest Service and UW-Stevens Point. The project will focus on developing a Lake Management Plan (LMP) for Bear Lake.
Phase 6 project activities include: 1) Algal assessment; 2) Information and education activities and planning meetings; 3) Water quality sampling and analysis; 4) Develop hydrologic and phosphorous budget; 5) Crayfish and aquatic plant monitoring; 6) Develop LMP.
Project deliverables include: 1) Water chemistry, algae, crayfish, and aquatic plant data; 2) Hydrologic and Phosphorous budget; 3) LMP.
Specific conditions for this project: LMP needs Dept review and approval.
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, data from water quality, algae sampling, and crayfish and aquatic plant monitoring, all maps from project, and all GIS data.
Grant Details
Large Scale Lake Planning
Date
4/1/2011
Waters Involved
Bear Lake
Status
Complete
Town Of Blackwell: Algal & Water Quality Assessment & Aquatic Plant Survey For Bear Lake, Forest Co., Phase 5: The Town of Blackwell is sponsoring phased large scale lake planning grant project to study Bear Lake, in Forest County. Phases 1 and 2 were funded during the February 2010 grant cycle, phases 3 and 4 were funded in August 2010, and Phases 5 and 6 were funded in February 2011. Project partners include the US Forest Service and UW-Stevens Point. The project will focus on developing a Lake Management Plan (LMP) for Bear Lake.
Phase 5 project activities include: 1) Algal assessment; 2) Information and education activities and planning meetings; 3) Water quality sampling and analysis; 4) Develop hydrologic and phosphorous budget; 5) Develop LMP.
Project deliverables include: Water chemistry and algae data.
Specific project conditions: LMP needs Dept review and approval.
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, data from water quality and algae sampling, all maps from project, and all GIS data.
Grant Details
Large Scale Lake Planning
Date
4/1/2011
Waters Involved
Big Cub Lake
Status
Complete
Town Of Blackwell: Algal & Water Quality Assessment & Aquatic Plant Survey For Bear Lake Forest County, Phase 6: The Town of Blackwell is sponsoring a phased large scale lake planning grant project to study Bear Lake in Forest County. Phases 1 and 2 were funded during the February 2010 grant cycle, phases 3 and 4 were funded in August 2010, and Phases 5 and 6 were funded in February 2011. Project partners include the US Forest Service and UW-Stevens Point. The project will focus on developing a Lake Management Plan (LMP) for Bear Lake.
Phase 6 project activities include: 1) Algal assessment; 2) Information and education activities and planning meetings; 3) Water quality sampling and analysis; 4) Develop hydrologic and phosphorous budget; 5) Crayfish and aquatic plant monitoring; 6) Develop LMP.
Project deliverables include: 1) Water chemistry, algae, crayfish, and aquatic plant data; 2) Hydrologic and Phosphorous budget; 3) LMP.
Specific conditions for this project: LMP needs Dept review and approval.
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, data from water quality, algae sampling, and crayfish and aquatic plant monitoring, all maps from project, and all GIS data.
Grant Details
Large Scale Lake Planning
Date
4/1/2011
Waters Involved
Big Cub Lake
Status
Complete
Town Of Blackwell: Algal & Water Quality Assessment & Aquatic Plant Survey For Bear Lake, Forest Co., Phase 5: The Town of Blackwell is sponsoring phased large scale lake planning grant project to study Bear Lake, in Forest County. Phases 1 and 2 were funded during the February 2010 grant cycle, phases 3 and 4 were funded in August 2010, and Phases 5 and 6 were funded in February 2011. Project partners include the US Forest Service and UW-Stevens Point. The project will focus on developing a Lake Management Plan (LMP) for Bear Lake.
Phase 5 project activities include: 1) Algal assessment; 2) Information and education activities and planning meetings; 3) Water quality sampling and analysis; 4) Develop hydrologic and phosphorous budget; 5) Develop LMP.
Project deliverables include: Water chemistry and algae data.
Specific project conditions: LMP needs Dept review and approval.
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, data from water quality and algae sampling, all maps from project, and all GIS data.
Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Bradley Lake
Status
Complete
Town Of Lincoln: Town Of Lincoln - Forest Co. Waterr Quality & Land Use Plan: The Town of Lincoln is undertaking a town-wide land use and water quality planning initiative. The Land Use and Water Qualtiy Management Plan to be developed will consist of two components (a Poster Plan and a Resource Document) intended to guide Town growth and establish future ordinances and regualtions to properly manage land use and water quality within the Town.
Project deliverables include a Land Use and Water Quality Management Poster Plan, a Land Use and Water Qualtiy Management Plan Resource Document, and Maps.
A copy of the plan and maps will be provided to the Department along with an electronic copy of the plan.
Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Brock Pond
Status
Complete
Town Of Goodman: Town Of Goodman Lake & Land Management Plan: The Town of Goodman proposes a project as the first step in the development of a comprehensive plan for land use for the Town of Goodman. It will be used as a pilot project that will be applied to similar lakes in Marinette County that have a low rate of second home development and that are located in areas that are very rural in nature. This project will collect and assess the types of social, physical and regulatory data that are available for the lakes and their watersheds. The project will identify deficiencies in data and make recommendations for additional data collection that will be the subject of future grant app,ications.
Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Bug Lake
Status
Complete
Town Of Lincoln: Town Of Lincoln - Forest Co. Waterr Quality & Land Use Plan: The Town of Lincoln is undertaking a town-wide land use and water quality planning initiative. The Land Use and Water Qualtiy Management Plan to be developed will consist of two components (a Poster Plan and a Resource Document) intended to guide Town growth and establish future ordinances and regualtions to properly manage land use and water quality within the Town.
Project deliverables include a Land Use and Water Quality Management Poster Plan, a Land Use and Water Qualtiy Management Plan Resource Document, and Maps.
A copy of the plan and maps will be provided to the Department along with an electronic copy of the plan.
Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Camp B Lake
Status
Complete
Town Of Goodman: Town Of Goodman Lake & Land Management Plan: The Town of Goodman proposes a project as the first step in the development of a comprehensive plan for land use for the Town of Goodman. It will be used as a pilot project that will be applied to similar lakes in Marinette County that have a low rate of second home development and that are located in areas that are very rural in nature. This project will collect and assess the types of social, physical and regulatory data that are available for the lakes and their watersheds. The project will identify deficiencies in data and make recommendations for additional data collection that will be the subject of future grant app,ications.
Grant Details
Large Scale Lake Planning
Date
4/1/2011
Waters Involved
Camp Six Lake
Status
Complete
Town Of Blackwell: Algal & Water Quality Assessment & Aquatic Plant Survey For Bear Lake Forest County, Phase 6: The Town of Blackwell is sponsoring a phased large scale lake planning grant project to study Bear Lake in Forest County. Phases 1 and 2 were funded during the February 2010 grant cycle, phases 3 and 4 were funded in August 2010, and Phases 5 and 6 were funded in February 2011. Project partners include the US Forest Service and UW-Stevens Point. The project will focus on developing a Lake Management Plan (LMP) for Bear Lake.
Phase 6 project activities include: 1) Algal assessment; 2) Information and education activities and planning meetings; 3) Water quality sampling and analysis; 4) Develop hydrologic and phosphorous budget; 5) Crayfish and aquatic plant monitoring; 6) Develop LMP.
Project deliverables include: 1) Water chemistry, algae, crayfish, and aquatic plant data; 2) Hydrologic and Phosphorous budget; 3) LMP.
Specific conditions for this project: LMP needs Dept review and approval.
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, data from water quality, algae sampling, and crayfish and aquatic plant monitoring, all maps from project, and all GIS data.
Grant Details
Large Scale Lake Planning
Date
4/1/2011
Waters Involved
Camp Six Lake
Status
Complete
Town Of Blackwell: Algal & Water Quality Assessment & Aquatic Plant Survey For Bear Lake, Forest Co., Phase 5: The Town of Blackwell is sponsoring phased large scale lake planning grant project to study Bear Lake, in Forest County. Phases 1 and 2 were funded during the February 2010 grant cycle, phases 3 and 4 were funded in August 2010, and Phases 5 and 6 were funded in February 2011. Project partners include the US Forest Service and UW-Stevens Point. The project will focus on developing a Lake Management Plan (LMP) for Bear Lake.
Phase 5 project activities include: 1) Algal assessment; 2) Information and education activities and planning meetings; 3) Water quality sampling and analysis; 4) Develop hydrologic and phosphorous budget; 5) Develop LMP.
Project deliverables include: Water chemistry and algae data.
Specific project conditions: LMP needs Dept review and approval.
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, data from water quality and algae sampling, all maps from project, and all GIS data.
Grant Details
Large Scale Lake Planning
Date
4/1/2011
Waters Involved
Catwillow Creek
Status
Complete
Town Of Blackwell: Algal & Water Quality Assessment & Aquatic Plant Survey For Bear Lake Forest County, Phase 6: The Town of Blackwell is sponsoring a phased large scale lake planning grant project to study Bear Lake in Forest County. Phases 1 and 2 were funded during the February 2010 grant cycle, phases 3 and 4 were funded in August 2010, and Phases 5 and 6 were funded in February 2011. Project partners include the US Forest Service and UW-Stevens Point. The project will focus on developing a Lake Management Plan (LMP) for Bear Lake.
Phase 6 project activities include: 1) Algal assessment; 2) Information and education activities and planning meetings; 3) Water quality sampling and analysis; 4) Develop hydrologic and phosphorous budget; 5) Crayfish and aquatic plant monitoring; 6) Develop LMP.
Project deliverables include: 1) Water chemistry, algae, crayfish, and aquatic plant data; 2) Hydrologic and Phosphorous budget; 3) LMP.
Specific conditions for this project: LMP needs Dept review and approval.
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, data from water quality, algae sampling, and crayfish and aquatic plant monitoring, all maps from project, and all GIS data.
Grant Details
Large Scale Lake Planning
Date
4/1/2011
Waters Involved
Catwillow Creek
Status
Complete
Town Of Blackwell: Algal & Water Quality Assessment & Aquatic Plant Survey For Bear Lake, Forest Co., Phase 5: The Town of Blackwell is sponsoring phased large scale lake planning grant project to study Bear Lake, in Forest County. Phases 1 and 2 were funded during the February 2010 grant cycle, phases 3 and 4 were funded in August 2010, and Phases 5 and 6 were funded in February 2011. Project partners include the US Forest Service and UW-Stevens Point. The project will focus on developing a Lake Management Plan (LMP) for Bear Lake.
Phase 5 project activities include: 1) Algal assessment; 2) Information and education activities and planning meetings; 3) Water quality sampling and analysis; 4) Develop hydrologic and phosphorous budget; 5) Develop LMP.
Project deliverables include: Water chemistry and algae data.
Specific project conditions: LMP needs Dept review and approval.
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, data from water quality and algae sampling, all maps from project, and all GIS data.
Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Clark Lake
Status
Complete
Town Of Goodman: Town Of Goodman Lake & Land Management Plan: The Town of Goodman proposes a project as the first step in the development of a comprehensive plan for land use for the Town of Goodman. It will be used as a pilot project that will be applied to similar lakes in Marinette County that have a low rate of second home development and that are located in areas that are very rural in nature. This project will collect and assess the types of social, physical and regulatory data that are available for the lakes and their watersheds. The project will identify deficiencies in data and make recommendations for additional data collection that will be the subject of future grant app,ications.
Grant Details
Large Scale Lake Planning
Date
4/1/2011
Waters Involved
Coldwater Creek
Status
Complete
Town Of Blackwell: Algal & Water Quality Assessment & Aquatic Plant Survey For Bear Lake Forest County, Phase 6: The Town of Blackwell is sponsoring a phased large scale lake planning grant project to study Bear Lake in Forest County. Phases 1 and 2 were funded during the February 2010 grant cycle, phases 3 and 4 were funded in August 2010, and Phases 5 and 6 were funded in February 2011. Project partners include the US Forest Service and UW-Stevens Point. The project will focus on developing a Lake Management Plan (LMP) for Bear Lake.
Phase 6 project activities include: 1) Algal assessment; 2) Information and education activities and planning meetings; 3) Water quality sampling and analysis; 4) Develop hydrologic and phosphorous budget; 5) Crayfish and aquatic plant monitoring; 6) Develop LMP.
Project deliverables include: 1) Water chemistry, algae, crayfish, and aquatic plant data; 2) Hydrologic and Phosphorous budget; 3) LMP.
Specific conditions for this project: LMP needs Dept review and approval.
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, data from water quality, algae sampling, and crayfish and aquatic plant monitoring, all maps from project, and all GIS data.
Grant Details
Large Scale Lake Planning
Date
4/1/2011
Waters Involved
Coldwater Creek
Status
Complete
Town Of Blackwell: Algal & Water Quality Assessment & Aquatic Plant Survey For Bear Lake, Forest Co., Phase 5: The Town of Blackwell is sponsoring phased large scale lake planning grant project to study Bear Lake, in Forest County. Phases 1 and 2 were funded during the February 2010 grant cycle, phases 3 and 4 were funded in August 2010, and Phases 5 and 6 were funded in February 2011. Project partners include the US Forest Service and UW-Stevens Point. The project will focus on developing a Lake Management Plan (LMP) for Bear Lake.
Phase 5 project activities include: 1) Algal assessment; 2) Information and education activities and planning meetings; 3) Water quality sampling and analysis; 4) Develop hydrologic and phosphorous budget; 5) Develop LMP.
Project deliverables include: Water chemistry and algae data.
Specific project conditions: LMP needs Dept review and approval.
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, data from water quality and algae sampling, all maps from project, and all GIS data.
Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Coleman Lake
Status
Complete
Town Of Goodman: Town Of Goodman Lake & Land Management Plan: The Town of Goodman proposes a project as the first step in the development of a comprehensive plan for land use for the Town of Goodman. It will be used as a pilot project that will be applied to similar lakes in Marinette County that have a low rate of second home development and that are located in areas that are very rural in nature. This project will collect and assess the types of social, physical and regulatory data that are available for the lakes and their watersheds. The project will identify deficiencies in data and make recommendations for additional data collection that will be the subject of future grant app,ications.
Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Crooked Lake
Status
Complete
Town Of Goodman: Town Of Goodman Lake & Land Management Plan: The Town of Goodman proposes a project as the first step in the development of a comprehensive plan for land use for the Town of Goodman. It will be used as a pilot project that will be applied to similar lakes in Marinette County that have a low rate of second home development and that are located in areas that are very rural in nature. This project will collect and assess the types of social, physical and regulatory data that are available for the lakes and their watersheds. The project will identify deficiencies in data and make recommendations for additional data collection that will be the subject of future grant app,ications.
Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
DAmour Lake
Status
Complete
Town Of Goodman: Town Of Goodman Lake & Land Management Plan: The Town of Goodman proposes a project as the first step in the development of a comprehensive plan for land use for the Town of Goodman. It will be used as a pilot project that will be applied to similar lakes in Marinette County that have a low rate of second home development and that are located in areas that are very rural in nature. This project will collect and assess the types of social, physical and regulatory data that are available for the lakes and their watersheds. The project will identify deficiencies in data and make recommendations for additional data collection that will be the subject of future grant app,ications.
Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Devils Lake
Status
Complete
Town Of Lincoln: Town Of Lincoln - Forest Co. Waterr Quality & Land Use Plan: The Town of Lincoln is undertaking a town-wide land use and water quality planning initiative. The Land Use and Water Qualtiy Management Plan to be developed will consist of two components (a Poster Plan and a Resource Document) intended to guide Town growth and establish future ordinances and regualtions to properly manage land use and water quality within the Town.
Project deliverables include a Land Use and Water Quality Management Poster Plan, a Land Use and Water Qualtiy Management Plan Resource Document, and Maps.
A copy of the plan and maps will be provided to the Department along with an electronic copy of the plan.
Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Donut Lake
Status
Complete
Town Of Lincoln: Town Of Lincoln - Forest Co. Waterr Quality & Land Use Plan: The Town of Lincoln is undertaking a town-wide land use and water quality planning initiative. The Land Use and Water Qualtiy Management Plan to be developed will consist of two components (a Poster Plan and a Resource Document) intended to guide Town growth and establish future ordinances and regualtions to properly manage land use and water quality within the Town.
Project deliverables include a Land Use and Water Quality Management Poster Plan, a Land Use and Water Qualtiy Management Plan Resource Document, and Maps.
A copy of the plan and maps will be provided to the Department along with an electronic copy of the plan.
Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Duck Lake
Status
Complete
Town Of Lincoln: Town Of Lincoln - Forest Co. Waterr Quality & Land Use Plan: The Town of Lincoln is undertaking a town-wide land use and water quality planning initiative. The Land Use and Water Qualtiy Management Plan to be developed will consist of two components (a Poster Plan and a Resource Document) intended to guide Town growth and establish future ordinances and regualtions to properly manage land use and water quality within the Town.
Project deliverables include a Land Use and Water Quality Management Poster Plan, a Land Use and Water Qualtiy Management Plan Resource Document, and Maps.
A copy of the plan and maps will be provided to the Department along with an electronic copy of the plan.
Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Dvorak Lake
Status
Complete
Town Of Goodman: Town Of Goodman Lake & Land Management Plan: The Town of Goodman proposes a project as the first step in the development of a comprehensive plan for land use for the Town of Goodman. It will be used as a pilot project that will be applied to similar lakes in Marinette County that have a low rate of second home development and that are located in areas that are very rural in nature. This project will collect and assess the types of social, physical and regulatory data that are available for the lakes and their watersheds. The project will identify deficiencies in data and make recommendations for additional data collection that will be the subject of future grant app,ications.
Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Eds Lake
Status
Complete
Town Of Lincoln: Town Of Lincoln - Forest Co. Waterr Quality & Land Use Plan: The Town of Lincoln is undertaking a town-wide land use and water quality planning initiative. The Land Use and Water Qualtiy Management Plan to be developed will consist of two components (a Poster Plan and a Resource Document) intended to guide Town growth and establish future ordinances and regualtions to properly manage land use and water quality within the Town.
Project deliverables include a Land Use and Water Quality Management Poster Plan, a Land Use and Water Qualtiy Management Plan Resource Document, and Maps.
A copy of the plan and maps will be provided to the Department along with an electronic copy of the plan.
Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Goodman Millpond
Status
Complete
Town Of Goodman: Town Of Goodman Lake & Land Management Plan: The Town of Goodman proposes a project as the first step in the development of a comprehensive plan for land use for the Town of Goodman. It will be used as a pilot project that will be applied to similar lakes in Marinette County that have a low rate of second home development and that are located in areas that are very rural in nature. This project will collect and assess the types of social, physical and regulatory data that are available for the lakes and their watersheds. The project will identify deficiencies in data and make recommendations for additional data collection that will be the subject of future grant app,ications.
Grant Details
Large Scale Lake Planning
Date
4/1/2011
Waters Involved
Goose Lake
Status
Complete
Town Of Blackwell: Algal & Water Quality Assessment & Aquatic Plant Survey For Bear Lake Forest County, Phase 6: The Town of Blackwell is sponsoring a phased large scale lake planning grant project to study Bear Lake in Forest County. Phases 1 and 2 were funded during the February 2010 grant cycle, phases 3 and 4 were funded in August 2010, and Phases 5 and 6 were funded in February 2011. Project partners include the US Forest Service and UW-Stevens Point. The project will focus on developing a Lake Management Plan (LMP) for Bear Lake.
Phase 6 project activities include: 1) Algal assessment; 2) Information and education activities and planning meetings; 3) Water quality sampling and analysis; 4) Develop hydrologic and phosphorous budget; 5) Crayfish and aquatic plant monitoring; 6) Develop LMP.
Project deliverables include: 1) Water chemistry, algae, crayfish, and aquatic plant data; 2) Hydrologic and Phosphorous budget; 3) LMP.
Specific conditions for this project: LMP needs Dept review and approval.
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, data from water quality, algae sampling, and crayfish and aquatic plant monitoring, all maps from project, and all GIS data.
Grant Details
Large Scale Lake Planning
Date
4/1/2011
Waters Involved
Goose Lake
Status
Complete
Town Of Blackwell: Algal & Water Quality Assessment & Aquatic Plant Survey For Bear Lake, Forest Co., Phase 5: The Town of Blackwell is sponsoring phased large scale lake planning grant project to study Bear Lake, in Forest County. Phases 1 and 2 were funded during the February 2010 grant cycle, phases 3 and 4 were funded in August 2010, and Phases 5 and 6 were funded in February 2011. Project partners include the US Forest Service and UW-Stevens Point. The project will focus on developing a Lake Management Plan (LMP) for Bear Lake.
Phase 5 project activities include: 1) Algal assessment; 2) Information and education activities and planning meetings; 3) Water quality sampling and analysis; 4) Develop hydrologic and phosphorous budget; 5) Develop LMP.
Project deliverables include: Water chemistry and algae data.
Specific project conditions: LMP needs Dept review and approval.
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, data from water quality and algae sampling, all maps from project, and all GIS data.
Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Ground Hemlock Lake
Status
Complete
Town Of Lincoln: Town Of Lincoln - Forest Co. Waterr Quality & Land Use Plan: The Town of Lincoln is undertaking a town-wide land use and water quality planning initiative. The Land Use and Water Qualtiy Management Plan to be developed will consist of two components (a Poster Plan and a Resource Document) intended to guide Town growth and establish future ordinances and regualtions to properly manage land use and water quality within the Town.
Project deliverables include a Land Use and Water Quality Management Poster Plan, a Land Use and Water Qualtiy Management Plan Resource Document, and Maps.
A copy of the plan and maps will be provided to the Department along with an electronic copy of the plan.
Grant Details
Large Scale Lake Planning
Date
4/1/2011
Waters Involved
Halley Creek
Status
Complete
Town Of Blackwell: Algal & Water Quality Assessment & Aquatic Plant Survey For Bear Lake Forest County, Phase 6: The Town of Blackwell is sponsoring a phased large scale lake planning grant project to study Bear Lake in Forest County. Phases 1 and 2 were funded during the February 2010 grant cycle, phases 3 and 4 were funded in August 2010, and Phases 5 and 6 were funded in February 2011. Project partners include the US Forest Service and UW-Stevens Point. The project will focus on developing a Lake Management Plan (LMP) for Bear Lake.
Phase 6 project activities include: 1) Algal assessment; 2) Information and education activities and planning meetings; 3) Water quality sampling and analysis; 4) Develop hydrologic and phosphorous budget; 5) Crayfish and aquatic plant monitoring; 6) Develop LMP.
Project deliverables include: 1) Water chemistry, algae, crayfish, and aquatic plant data; 2) Hydrologic and Phosphorous budget; 3) LMP.
Specific conditions for this project: LMP needs Dept review and approval.
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, data from water quality, algae sampling, and crayfish and aquatic plant monitoring, all maps from project, and all GIS data.
Grant Details
Large Scale Lake Planning
Date
4/1/2011
Waters Involved
Halley Creek
Status
Complete
Town Of Blackwell: Algal & Water Quality Assessment & Aquatic Plant Survey For Bear Lake, Forest Co., Phase 5: The Town of Blackwell is sponsoring phased large scale lake planning grant project to study Bear Lake, in Forest County. Phases 1 and 2 were funded during the February 2010 grant cycle, phases 3 and 4 were funded in August 2010, and Phases 5 and 6 were funded in February 2011. Project partners include the US Forest Service and UW-Stevens Point. The project will focus on developing a Lake Management Plan (LMP) for Bear Lake.
Phase 5 project activities include: 1) Algal assessment; 2) Information and education activities and planning meetings; 3) Water quality sampling and analysis; 4) Develop hydrologic and phosphorous budget; 5) Develop LMP.
Project deliverables include: Water chemistry and algae data.
Specific project conditions: LMP needs Dept review and approval.
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, data from water quality and algae sampling, all maps from project, and all GIS data.
Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Harvey Pond
Status
Complete
Town Of Goodman: Town Of Goodman Lake & Land Management Plan: The Town of Goodman proposes a project as the first step in the development of a comprehensive plan for land use for the Town of Goodman. It will be used as a pilot project that will be applied to similar lakes in Marinette County that have a low rate of second home development and that are located in areas that are very rural in nature. This project will collect and assess the types of social, physical and regulatory data that are available for the lakes and their watersheds. The project will identify deficiencies in data and make recommendations for additional data collection that will be the subject of future grant app,ications.
Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Hilbert Lake
Status
Complete
Town Of Goodman: Town Of Goodman Lake & Land Management Plan: The Town of Goodman proposes a project as the first step in the development of a comprehensive plan for land use for the Town of Goodman. It will be used as a pilot project that will be applied to similar lakes in Marinette County that have a low rate of second home development and that are located in areas that are very rural in nature. This project will collect and assess the types of social, physical and regulatory data that are available for the lakes and their watersheds. The project will identify deficiencies in data and make recommendations for additional data collection that will be the subject of future grant app,ications.
Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Hobachee Lake
Status
Complete
Town Of Goodman: Town Of Goodman Lake & Land Management Plan: The Town of Goodman proposes a project as the first step in the development of a comprehensive plan for land use for the Town of Goodman. It will be used as a pilot project that will be applied to similar lakes in Marinette County that have a low rate of second home development and that are located in areas that are very rural in nature. This project will collect and assess the types of social, physical and regulatory data that are available for the lakes and their watersheds. The project will identify deficiencies in data and make recommendations for additional data collection that will be the subject of future grant app,ications.
Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Horseshoe Lake
Status
Complete
Town Of Lincoln: Town Of Lincoln - Forest Co. Waterr Quality & Land Use Plan: The Town of Lincoln is undertaking a town-wide land use and water quality planning initiative. The Land Use and Water Qualtiy Management Plan to be developed will consist of two components (a Poster Plan and a Resource Document) intended to guide Town growth and establish future ordinances and regualtions to properly manage land use and water quality within the Town.
Project deliverables include a Land Use and Water Quality Management Poster Plan, a Land Use and Water Qualtiy Management Plan Resource Document, and Maps.
A copy of the plan and maps will be provided to the Department along with an electronic copy of the plan.
Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Indian Springs
Status
Complete
Town Of Lincoln: Town Of Lincoln - Forest Co. Waterr Quality & Land Use Plan: The Town of Lincoln is undertaking a town-wide land use and water quality planning initiative. The Land Use and Water Qualtiy Management Plan to be developed will consist of two components (a Poster Plan and a Resource Document) intended to guide Town growth and establish future ordinances and regualtions to properly manage land use and water quality within the Town.
Project deliverables include a Land Use and Water Quality Management Poster Plan, a Land Use and Water Qualtiy Management Plan Resource Document, and Maps.
A copy of the plan and maps will be provided to the Department along with an electronic copy of the plan.
Grant Details
Large Scale Lake Planning
Date
4/1/2011
Waters Involved
Kazmier Lake
Status
Complete
Town Of Blackwell: Algal & Water Quality Assessment & Aquatic Plant Survey For Bear Lake Forest County, Phase 6: The Town of Blackwell is sponsoring a phased large scale lake planning grant project to study Bear Lake in Forest County. Phases 1 and 2 were funded during the February 2010 grant cycle, phases 3 and 4 were funded in August 2010, and Phases 5 and 6 were funded in February 2011. Project partners include the US Forest Service and UW-Stevens Point. The project will focus on developing a Lake Management Plan (LMP) for Bear Lake.
Phase 6 project activities include: 1) Algal assessment; 2) Information and education activities and planning meetings; 3) Water quality sampling and analysis; 4) Develop hydrologic and phosphorous budget; 5) Crayfish and aquatic plant monitoring; 6) Develop LMP.
Project deliverables include: 1) Water chemistry, algae, crayfish, and aquatic plant data; 2) Hydrologic and Phosphorous budget; 3) LMP.
Specific conditions for this project: LMP needs Dept review and approval.
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, data from water quality, algae sampling, and crayfish and aquatic plant monitoring, all maps from project, and all GIS data.
Grant Details
Large Scale Lake Planning
Date
4/1/2011
Waters Involved
Kazmier Lake
Status
Complete
Town Of Blackwell: Algal & Water Quality Assessment & Aquatic Plant Survey For Bear Lake, Forest Co., Phase 5: The Town of Blackwell is sponsoring phased large scale lake planning grant project to study Bear Lake, in Forest County. Phases 1 and 2 were funded during the February 2010 grant cycle, phases 3 and 4 were funded in August 2010, and Phases 5 and 6 were funded in February 2011. Project partners include the US Forest Service and UW-Stevens Point. The project will focus on developing a Lake Management Plan (LMP) for Bear Lake.
Phase 5 project activities include: 1) Algal assessment; 2) Information and education activities and planning meetings; 3) Water quality sampling and analysis; 4) Develop hydrologic and phosphorous budget; 5) Develop LMP.
Project deliverables include: Water chemistry and algae data.
Specific project conditions: LMP needs Dept review and approval.
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, data from water quality and algae sampling, all maps from project, and all GIS data.
Grant Details
Large Scale Lake Planning
Date
4/1/2011
Waters Involved
Kokots Creek
Status
Complete
Town Of Blackwell: Algal & Water Quality Assessment & Aquatic Plant Survey For Bear Lake Forest County, Phase 6: The Town of Blackwell is sponsoring a phased large scale lake planning grant project to study Bear Lake in Forest County. Phases 1 and 2 were funded during the February 2010 grant cycle, phases 3 and 4 were funded in August 2010, and Phases 5 and 6 were funded in February 2011. Project partners include the US Forest Service and UW-Stevens Point. The project will focus on developing a Lake Management Plan (LMP) for Bear Lake.
Phase 6 project activities include: 1) Algal assessment; 2) Information and education activities and planning meetings; 3) Water quality sampling and analysis; 4) Develop hydrologic and phosphorous budget; 5) Crayfish and aquatic plant monitoring; 6) Develop LMP.
Project deliverables include: 1) Water chemistry, algae, crayfish, and aquatic plant data; 2) Hydrologic and Phosphorous budget; 3) LMP.
Specific conditions for this project: LMP needs Dept review and approval.
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, data from water quality, algae sampling, and crayfish and aquatic plant monitoring, all maps from project, and all GIS data.
Grant Details
Large Scale Lake Planning
Date
4/1/2011
Waters Involved
Kokots Creek
Status
Complete
Town Of Blackwell: Algal & Water Quality Assessment & Aquatic Plant Survey For Bear Lake, Forest Co., Phase 5: The Town of Blackwell is sponsoring phased large scale lake planning grant project to study Bear Lake, in Forest County. Phases 1 and 2 were funded during the February 2010 grant cycle, phases 3 and 4 were funded in August 2010, and Phases 5 and 6 were funded in February 2011. Project partners include the US Forest Service and UW-Stevens Point. The project will focus on developing a Lake Management Plan (LMP) for Bear Lake.
Phase 5 project activities include: 1) Algal assessment; 2) Information and education activities and planning meetings; 3) Water quality sampling and analysis; 4) Develop hydrologic and phosphorous budget; 5) Develop LMP.
Project deliverables include: Water chemistry and algae data.
Specific project conditions: LMP needs Dept review and approval.
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, data from water quality and algae sampling, all maps from project, and all GIS data.
Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
LaFave Lake
Status
Complete
Town Of Goodman: Town Of Goodman Lake & Land Management Plan: The Town of Goodman proposes a project as the first step in the development of a comprehensive plan for land use for the Town of Goodman. It will be used as a pilot project that will be applied to similar lakes in Marinette County that have a low rate of second home development and that are located in areas that are very rural in nature. This project will collect and assess the types of social, physical and regulatory data that are available for the lakes and their watersheds. The project will identify deficiencies in data and make recommendations for additional data collection that will be the subject of future grant app,ications.
Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Lake Lucerne
Status
Complete
Town Of Lincoln: Town Of Lincoln - Forest Co. Waterr Quality & Land Use Plan: The Town of Lincoln is undertaking a town-wide land use and water quality planning initiative. The Land Use and Water Qualtiy Management Plan to be developed will consist of two components (a Poster Plan and a Resource Document) intended to guide Town growth and establish future ordinances and regualtions to properly manage land use and water quality within the Town.
Project deliverables include a Land Use and Water Quality Management Poster Plan, a Land Use and Water Qualtiy Management Plan Resource Document, and Maps.
A copy of the plan and maps will be provided to the Department along with an electronic copy of the plan.
Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Lily Pad Lake
Status
Complete
Town Of Lincoln: Town Of Lincoln - Forest Co. Waterr Quality & Land Use Plan: The Town of Lincoln is undertaking a town-wide land use and water quality planning initiative. The Land Use and Water Qualtiy Management Plan to be developed will consist of two components (a Poster Plan and a Resource Document) intended to guide Town growth and establish future ordinances and regualtions to properly manage land use and water quality within the Town.
Project deliverables include a Land Use and Water Quality Management Poster Plan, a Land Use and Water Qualtiy Management Plan Resource Document, and Maps.
A copy of the plan and maps will be provided to the Department along with an electronic copy of the plan.
Grant Details
Large Scale Lake Planning
Date
4/1/2011
Waters Involved
Little Cub Lake
Status
Complete
Town Of Blackwell: Algal & Water Quality Assessment & Aquatic Plant Survey For Bear Lake Forest County, Phase 6: The Town of Blackwell is sponsoring a phased large scale lake planning grant project to study Bear Lake in Forest County. Phases 1 and 2 were funded during the February 2010 grant cycle, phases 3 and 4 were funded in August 2010, and Phases 5 and 6 were funded in February 2011. Project partners include the US Forest Service and UW-Stevens Point. The project will focus on developing a Lake Management Plan (LMP) for Bear Lake.
Phase 6 project activities include: 1) Algal assessment; 2) Information and education activities and planning meetings; 3) Water quality sampling and analysis; 4) Develop hydrologic and phosphorous budget; 5) Crayfish and aquatic plant monitoring; 6) Develop LMP.
Project deliverables include: 1) Water chemistry, algae, crayfish, and aquatic plant data; 2) Hydrologic and Phosphorous budget; 3) LMP.
Specific conditions for this project: LMP needs Dept review and approval.
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, data from water quality, algae sampling, and crayfish and aquatic plant monitoring, all maps from project, and all GIS data.
Grant Details
Large Scale Lake Planning
Date
4/1/2011
Waters Involved
Little Cub Lake
Status
Complete
Town Of Blackwell: Algal & Water Quality Assessment & Aquatic Plant Survey For Bear Lake, Forest Co., Phase 5: The Town of Blackwell is sponsoring phased large scale lake planning grant project to study Bear Lake, in Forest County. Phases 1 and 2 were funded during the February 2010 grant cycle, phases 3 and 4 were funded in August 2010, and Phases 5 and 6 were funded in February 2011. Project partners include the US Forest Service and UW-Stevens Point. The project will focus on developing a Lake Management Plan (LMP) for Bear Lake.
Phase 5 project activities include: 1) Algal assessment; 2) Information and education activities and planning meetings; 3) Water quality sampling and analysis; 4) Develop hydrologic and phosphorous budget; 5) Develop LMP.
Project deliverables include: Water chemistry and algae data.
Specific project conditions: LMP needs Dept review and approval.
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, data from water quality and algae sampling, all maps from project, and all GIS data.
Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Lost Lake
Status
Complete
Town Of Goodman: Town Of Goodman Lake & Land Management Plan: The Town of Goodman proposes a project as the first step in the development of a comprehensive plan for land use for the Town of Goodman. It will be used as a pilot project that will be applied to similar lakes in Marinette County that have a low rate of second home development and that are located in areas that are very rural in nature. This project will collect and assess the types of social, physical and regulatory data that are available for the lakes and their watersheds. The project will identify deficiencies in data and make recommendations for additional data collection that will be the subject of future grant app,ications.
Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Lost Lake
Status
Complete
Town Of Lincoln: Town Of Lincoln - Forest Co. Waterr Quality & Land Use Plan: The Town of Lincoln is undertaking a town-wide land use and water quality planning initiative. The Land Use and Water Qualtiy Management Plan to be developed will consist of two components (a Poster Plan and a Resource Document) intended to guide Town growth and establish future ordinances and regualtions to properly manage land use and water quality within the Town.
Project deliverables include a Land Use and Water Quality Management Poster Plan, a Land Use and Water Qualtiy Management Plan Resource Document, and Maps.
A copy of the plan and maps will be provided to the Department along with an electronic copy of the plan.
Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Metonga Lake
Status
Complete
Town Of Lincoln: Town Of Lincoln - Forest Co. Waterr Quality & Land Use Plan: The Town of Lincoln is undertaking a town-wide land use and water quality planning initiative. The Land Use and Water Qualtiy Management Plan to be developed will consist of two components (a Poster Plan and a Resource Document) intended to guide Town growth and establish future ordinances and regualtions to properly manage land use and water quality within the Town.
Project deliverables include a Land Use and Water Quality Management Poster Plan, a Land Use and Water Qualtiy Management Plan Resource Document, and Maps.
A copy of the plan and maps will be provided to the Department along with an electronic copy of the plan.
Grant Details
Large Scale Lake Planning
Date
4/1/2011
Waters Involved
Michigan Creek
Status
Complete
Town Of Blackwell: Algal & Water Quality Assessment & Aquatic Plant Survey For Bear Lake Forest County, Phase 6: The Town of Blackwell is sponsoring a phased large scale lake planning grant project to study Bear Lake in Forest County. Phases 1 and 2 were funded during the February 2010 grant cycle, phases 3 and 4 were funded in August 2010, and Phases 5 and 6 were funded in February 2011. Project partners include the US Forest Service and UW-Stevens Point. The project will focus on developing a Lake Management Plan (LMP) for Bear Lake.
Phase 6 project activities include: 1) Algal assessment; 2) Information and education activities and planning meetings; 3) Water quality sampling and analysis; 4) Develop hydrologic and phosphorous budget; 5) Crayfish and aquatic plant monitoring; 6) Develop LMP.
Project deliverables include: 1) Water chemistry, algae, crayfish, and aquatic plant data; 2) Hydrologic and Phosphorous budget; 3) LMP.
Specific conditions for this project: LMP needs Dept review and approval.
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, data from water quality, algae sampling, and crayfish and aquatic plant monitoring, all maps from project, and all GIS data.
Grant Details
Large Scale Lake Planning
Date
4/1/2011
Waters Involved
Michigan Creek
Status
Complete
Town Of Blackwell: Algal & Water Quality Assessment & Aquatic Plant Survey For Bear Lake, Forest Co., Phase 5: The Town of Blackwell is sponsoring phased large scale lake planning grant project to study Bear Lake, in Forest County. Phases 1 and 2 were funded during the February 2010 grant cycle, phases 3 and 4 were funded in August 2010, and Phases 5 and 6 were funded in February 2011. Project partners include the US Forest Service and UW-Stevens Point. The project will focus on developing a Lake Management Plan (LMP) for Bear Lake.
Phase 5 project activities include: 1) Algal assessment; 2) Information and education activities and planning meetings; 3) Water quality sampling and analysis; 4) Develop hydrologic and phosphorous budget; 5) Develop LMP.
Project deliverables include: Water chemistry and algae data.
Specific project conditions: LMP needs Dept review and approval.
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, data from water quality and algae sampling, all maps from project, and all GIS data.
Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Mirror Lake
Status
Complete
Town Of Goodman: Town Of Goodman Lake & Land Management Plan: The Town of Goodman proposes a project as the first step in the development of a comprehensive plan for land use for the Town of Goodman. It will be used as a pilot project that will be applied to similar lakes in Marinette County that have a low rate of second home development and that are located in areas that are very rural in nature. This project will collect and assess the types of social, physical and regulatory data that are available for the lakes and their watersheds. The project will identify deficiencies in data and make recommendations for additional data collection that will be the subject of future grant app,ications.
Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Moon Lake
Status
Complete
Town Of Goodman: Town Of Goodman Lake & Land Management Plan: The Town of Goodman proposes a project as the first step in the development of a comprehensive plan for land use for the Town of Goodman. It will be used as a pilot project that will be applied to similar lakes in Marinette County that have a low rate of second home development and that are located in areas that are very rural in nature. This project will collect and assess the types of social, physical and regulatory data that are available for the lakes and their watersheds. The project will identify deficiencies in data and make recommendations for additional data collection that will be the subject of future grant app,ications.
Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Nadjak Lake
Status
Complete
Town Of Goodman: Town Of Goodman Lake & Land Management Plan: The Town of Goodman proposes a project as the first step in the development of a comprehensive plan for land use for the Town of Goodman. It will be used as a pilot project that will be applied to similar lakes in Marinette County that have a low rate of second home development and that are located in areas that are very rural in nature. This project will collect and assess the types of social, physical and regulatory data that are available for the lakes and their watersheds. The project will identify deficiencies in data and make recommendations for additional data collection that will be the subject of future grant app,ications.
Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
North Pond
Status
Complete
Town Of Goodman: Town Of Goodman Lake & Land Management Plan: The Town of Goodman proposes a project as the first step in the development of a comprehensive plan for land use for the Town of Goodman. It will be used as a pilot project that will be applied to similar lakes in Marinette County that have a low rate of second home development and that are located in areas that are very rural in nature. This project will collect and assess the types of social, physical and regulatory data that are available for the lakes and their watersheds. The project will identify deficiencies in data and make recommendations for additional data collection that will be the subject of future grant app,ications.
Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Oneonta Lake
Status
Complete
Town Of Goodman: Town Of Goodman Lake & Land Management Plan: The Town of Goodman proposes a project as the first step in the development of a comprehensive plan for land use for the Town of Goodman. It will be used as a pilot project that will be applied to similar lakes in Marinette County that have a low rate of second home development and that are located in areas that are very rural in nature. This project will collect and assess the types of social, physical and regulatory data that are available for the lakes and their watersheds. The project will identify deficiencies in data and make recommendations for additional data collection that will be the subject of future grant app,ications.
Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Otter Springs
Status
Complete
Town Of Lincoln: Town Of Lincoln - Forest Co. Waterr Quality & Land Use Plan: The Town of Lincoln is undertaking a town-wide land use and water quality planning initiative. The Land Use and Water Qualtiy Management Plan to be developed will consist of two components (a Poster Plan and a Resource Document) intended to guide Town growth and establish future ordinances and regualtions to properly manage land use and water quality within the Town.
Project deliverables include a Land Use and Water Quality Management Poster Plan, a Land Use and Water Qualtiy Management Plan Resource Document, and Maps.
A copy of the plan and maps will be provided to the Department along with an electronic copy of the plan.
Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Peshtigo Lake
Status
Complete
Town Of Lincoln: Town Of Lincoln - Forest Co. Waterr Quality & Land Use Plan: The Town of Lincoln is undertaking a town-wide land use and water quality planning initiative. The Land Use and Water Qualtiy Management Plan to be developed will consist of two components (a Poster Plan and a Resource Document) intended to guide Town growth and establish future ordinances and regualtions to properly manage land use and water quality within the Town.
Project deliverables include a Land Use and Water Quality Management Poster Plan, a Land Use and Water Qualtiy Management Plan Resource Document, and Maps.
A copy of the plan and maps will be provided to the Department along with an electronic copy of the plan.
Grant Details
Large Scale Lake Planning
Date
4/1/2011
Waters Involved
Peshtigo River
Status
Complete
Town Of Blackwell: Algal & Water Quality Assessment & Aquatic Plant Survey For Bear Lake Forest County, Phase 6: The Town of Blackwell is sponsoring a phased large scale lake planning grant project to study Bear Lake in Forest County. Phases 1 and 2 were funded during the February 2010 grant cycle, phases 3 and 4 were funded in August 2010, and Phases 5 and 6 were funded in February 2011. Project partners include the US Forest Service and UW-Stevens Point. The project will focus on developing a Lake Management Plan (LMP) for Bear Lake.
Phase 6 project activities include: 1) Algal assessment; 2) Information and education activities and planning meetings; 3) Water quality sampling and analysis; 4) Develop hydrologic and phosphorous budget; 5) Crayfish and aquatic plant monitoring; 6) Develop LMP.
Project deliverables include: 1) Water chemistry, algae, crayfish, and aquatic plant data; 2) Hydrologic and Phosphorous budget; 3) LMP.
Specific conditions for this project: LMP needs Dept review and approval.
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, data from water quality, algae sampling, and crayfish and aquatic plant monitoring, all maps from project, and all GIS data.
Grant Details
Large Scale Lake Planning
Date
4/1/2011
Waters Involved
Peshtigo River
Status
Complete
Town Of Blackwell: Algal & Water Quality Assessment & Aquatic Plant Survey For Bear Lake, Forest Co., Phase 5: The Town of Blackwell is sponsoring phased large scale lake planning grant project to study Bear Lake, in Forest County. Phases 1 and 2 were funded during the February 2010 grant cycle, phases 3 and 4 were funded in August 2010, and Phases 5 and 6 were funded in February 2011. Project partners include the US Forest Service and UW-Stevens Point. The project will focus on developing a Lake Management Plan (LMP) for Bear Lake.
Phase 5 project activities include: 1) Algal assessment; 2) Information and education activities and planning meetings; 3) Water quality sampling and analysis; 4) Develop hydrologic and phosphorous budget; 5) Develop LMP.
Project deliverables include: Water chemistry and algae data.
Specific project conditions: LMP needs Dept review and approval.
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, data from water quality and algae sampling, all maps from project, and all GIS data.
Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Petryk Lake
Status
Complete
Town Of Goodman: Town Of Goodman Lake & Land Management Plan: The Town of Goodman proposes a project as the first step in the development of a comprehensive plan for land use for the Town of Goodman. It will be used as a pilot project that will be applied to similar lakes in Marinette County that have a low rate of second home development and that are located in areas that are very rural in nature. This project will collect and assess the types of social, physical and regulatory data that are available for the lakes and their watersheds. The project will identify deficiencies in data and make recommendations for additional data collection that will be the subject of future grant app,ications.
Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Porcupine Lake
Status
Complete
Town Of Goodman: Town Of Goodman Lake & Land Management Plan: The Town of Goodman proposes a project as the first step in the development of a comprehensive plan for land use for the Town of Goodman. It will be used as a pilot project that will be applied to similar lakes in Marinette County that have a low rate of second home development and that are located in areas that are very rural in nature. This project will collect and assess the types of social, physical and regulatory data that are available for the lakes and their watersheds. The project will identify deficiencies in data and make recommendations for additional data collection that will be the subject of future grant app,ications.
Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Pothole Lake
Status
Complete
Town Of Goodman: Town Of Goodman Lake & Land Management Plan: The Town of Goodman proposes a project as the first step in the development of a comprehensive plan for land use for the Town of Goodman. It will be used as a pilot project that will be applied to similar lakes in Marinette County that have a low rate of second home development and that are located in areas that are very rural in nature. This project will collect and assess the types of social, physical and regulatory data that are available for the lakes and their watersheds. The project will identify deficiencies in data and make recommendations for additional data collection that will be the subject of future grant app,ications.
Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Railroad Pond
Status
Complete
Town Of Goodman: Town Of Goodman Lake & Land Management Plan: The Town of Goodman proposes a project as the first step in the development of a comprehensive plan for land use for the Town of Goodman. It will be used as a pilot project that will be applied to similar lakes in Marinette County that have a low rate of second home development and that are located in areas that are very rural in nature. This project will collect and assess the types of social, physical and regulatory data that are available for the lakes and their watersheds. The project will identify deficiencies in data and make recommendations for additional data collection that will be the subject of future grant app,ications.
Grant Details
Large Scale Lake Planning
Date
4/1/2011
Waters Involved
Rat River
Status
Complete
Town Of Blackwell: Algal & Water Quality Assessment & Aquatic Plant Survey For Bear Lake Forest County, Phase 6: The Town of Blackwell is sponsoring a phased large scale lake planning grant project to study Bear Lake in Forest County. Phases 1 and 2 were funded during the February 2010 grant cycle, phases 3 and 4 were funded in August 2010, and Phases 5 and 6 were funded in February 2011. Project partners include the US Forest Service and UW-Stevens Point. The project will focus on developing a Lake Management Plan (LMP) for Bear Lake.
Phase 6 project activities include: 1) Algal assessment; 2) Information and education activities and planning meetings; 3) Water quality sampling and analysis; 4) Develop hydrologic and phosphorous budget; 5) Crayfish and aquatic plant monitoring; 6) Develop LMP.
Project deliverables include: 1) Water chemistry, algae, crayfish, and aquatic plant data; 2) Hydrologic and Phosphorous budget; 3) LMP.
Specific conditions for this project: LMP needs Dept review and approval.
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, data from water quality, algae sampling, and crayfish and aquatic plant monitoring, all maps from project, and all GIS data.
Grant Details
Large Scale Lake Planning
Date
4/1/2011
Waters Involved
Rat River
Status
Complete
Town Of Blackwell: Algal & Water Quality Assessment & Aquatic Plant Survey For Bear Lake, Forest Co., Phase 5: The Town of Blackwell is sponsoring phased large scale lake planning grant project to study Bear Lake, in Forest County. Phases 1 and 2 were funded during the February 2010 grant cycle, phases 3 and 4 were funded in August 2010, and Phases 5 and 6 were funded in February 2011. Project partners include the US Forest Service and UW-Stevens Point. The project will focus on developing a Lake Management Plan (LMP) for Bear Lake.
Phase 5 project activities include: 1) Algal assessment; 2) Information and education activities and planning meetings; 3) Water quality sampling and analysis; 4) Develop hydrologic and phosphorous budget; 5) Develop LMP.
Project deliverables include: Water chemistry and algae data.
Specific project conditions: LMP needs Dept review and approval.
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, data from water quality and algae sampling, all maps from project, and all GIS data.
Grant Details
Large Scale Lake Planning
Date
4/1/2011
Waters Involved
Revolver Lake
Status
Complete
Town Of Blackwell: Algal & Water Quality Assessment & Aquatic Plant Survey For Bear Lake Forest County, Phase 6: The Town of Blackwell is sponsoring a phased large scale lake planning grant project to study Bear Lake in Forest County. Phases 1 and 2 were funded during the February 2010 grant cycle, phases 3 and 4 were funded in August 2010, and Phases 5 and 6 were funded in February 2011. Project partners include the US Forest Service and UW-Stevens Point. The project will focus on developing a Lake Management Plan (LMP) for Bear Lake.
Phase 6 project activities include: 1) Algal assessment; 2) Information and education activities and planning meetings; 3) Water quality sampling and analysis; 4) Develop hydrologic and phosphorous budget; 5) Crayfish and aquatic plant monitoring; 6) Develop LMP.
Project deliverables include: 1) Water chemistry, algae, crayfish, and aquatic plant data; 2) Hydrologic and Phosphorous budget; 3) LMP.
Specific conditions for this project: LMP needs Dept review and approval.
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, data from water quality, algae sampling, and crayfish and aquatic plant monitoring, all maps from project, and all GIS data.
Grant Details
Large Scale Lake Planning
Date
4/1/2011
Waters Involved
Revolver Lake
Status
Complete
Town Of Blackwell: Algal & Water Quality Assessment & Aquatic Plant Survey For Bear Lake, Forest Co., Phase 5: The Town of Blackwell is sponsoring phased large scale lake planning grant project to study Bear Lake, in Forest County. Phases 1 and 2 were funded during the February 2010 grant cycle, phases 3 and 4 were funded in August 2010, and Phases 5 and 6 were funded in February 2011. Project partners include the US Forest Service and UW-Stevens Point. The project will focus on developing a Lake Management Plan (LMP) for Bear Lake.
Phase 5 project activities include: 1) Algal assessment; 2) Information and education activities and planning meetings; 3) Water quality sampling and analysis; 4) Develop hydrologic and phosphorous budget; 5) Develop LMP.
Project deliverables include: Water chemistry and algae data.
Specific project conditions: LMP needs Dept review and approval.
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, data from water quality and algae sampling, all maps from project, and all GIS data.
Grant Details
Large Scale Lake Planning
Date
4/1/2011
Waters Involved
Rock Creek
Status
Complete
Town Of Blackwell: Algal & Water Quality Assessment & Aquatic Plant Survey For Bear Lake Forest County, Phase 6: The Town of Blackwell is sponsoring a phased large scale lake planning grant project to study Bear Lake in Forest County. Phases 1 and 2 were funded during the February 2010 grant cycle, phases 3 and 4 were funded in August 2010, and Phases 5 and 6 were funded in February 2011. Project partners include the US Forest Service and UW-Stevens Point. The project will focus on developing a Lake Management Plan (LMP) for Bear Lake.
Phase 6 project activities include: 1) Algal assessment; 2) Information and education activities and planning meetings; 3) Water quality sampling and analysis; 4) Develop hydrologic and phosphorous budget; 5) Crayfish and aquatic plant monitoring; 6) Develop LMP.
Project deliverables include: 1) Water chemistry, algae, crayfish, and aquatic plant data; 2) Hydrologic and Phosphorous budget; 3) LMP.
Specific conditions for this project: LMP needs Dept review and approval.
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, data from water quality, algae sampling, and crayfish and aquatic plant monitoring, all maps from project, and all GIS data.
Grant Details
Large Scale Lake Planning
Date
4/1/2011
Waters Involved
Rock Creek
Status
Complete
Town Of Blackwell: Algal & Water Quality Assessment & Aquatic Plant Survey For Bear Lake, Forest Co., Phase 5: The Town of Blackwell is sponsoring phased large scale lake planning grant project to study Bear Lake, in Forest County. Phases 1 and 2 were funded during the February 2010 grant cycle, phases 3 and 4 were funded in August 2010, and Phases 5 and 6 were funded in February 2011. Project partners include the US Forest Service and UW-Stevens Point. The project will focus on developing a Lake Management Plan (LMP) for Bear Lake.
Phase 5 project activities include: 1) Algal assessment; 2) Information and education activities and planning meetings; 3) Water quality sampling and analysis; 4) Develop hydrologic and phosphorous budget; 5) Develop LMP.
Project deliverables include: Water chemistry and algae data.
Specific project conditions: LMP needs Dept review and approval.
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, data from water quality and algae sampling, all maps from project, and all GIS data.
Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Round Lake
Status
Complete
Town Of Goodman: Town Of Goodman Lake & Land Management Plan: The Town of Goodman proposes a project as the first step in the development of a comprehensive plan for land use for the Town of Goodman. It will be used as a pilot project that will be applied to similar lakes in Marinette County that have a low rate of second home development and that are located in areas that are very rural in nature. This project will collect and assess the types of social, physical and regulatory data that are available for the lakes and their watersheds. The project will identify deficiencies in data and make recommendations for additional data collection that will be the subject of future grant app,ications.
Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Second Lake
Status
Complete
Town Of Goodman: Town Of Goodman Lake & Land Management Plan: The Town of Goodman proposes a project as the first step in the development of a comprehensive plan for land use for the Town of Goodman. It will be used as a pilot project that will be applied to similar lakes in Marinette County that have a low rate of second home development and that are located in areas that are very rural in nature. This project will collect and assess the types of social, physical and regulatory data that are available for the lakes and their watersheds. The project will identify deficiencies in data and make recommendations for additional data collection that will be the subject of future grant app,ications.
Grant Details
Large Scale Lake Planning
Date
4/1/2011
Waters Involved
Shabodock Creek
Status
Complete
Town Of Blackwell: Algal & Water Quality Assessment & Aquatic Plant Survey For Bear Lake Forest County, Phase 6: The Town of Blackwell is sponsoring a phased large scale lake planning grant project to study Bear Lake in Forest County. Phases 1 and 2 were funded during the February 2010 grant cycle, phases 3 and 4 were funded in August 2010, and Phases 5 and 6 were funded in February 2011. Project partners include the US Forest Service and UW-Stevens Point. The project will focus on developing a Lake Management Plan (LMP) for Bear Lake.
Phase 6 project activities include: 1) Algal assessment; 2) Information and education activities and planning meetings; 3) Water quality sampling and analysis; 4) Develop hydrologic and phosphorous budget; 5) Crayfish and aquatic plant monitoring; 6) Develop LMP.
Project deliverables include: 1) Water chemistry, algae, crayfish, and aquatic plant data; 2) Hydrologic and Phosphorous budget; 3) LMP.
Specific conditions for this project: LMP needs Dept review and approval.
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, data from water quality, algae sampling, and crayfish and aquatic plant monitoring, all maps from project, and all GIS data.
Grant Details
Large Scale Lake Planning
Date
4/1/2011
Waters Involved
Shabodock Creek
Status
Complete
Town Of Blackwell: Algal & Water Quality Assessment & Aquatic Plant Survey For Bear Lake, Forest Co., Phase 5: The Town of Blackwell is sponsoring phased large scale lake planning grant project to study Bear Lake, in Forest County. Phases 1 and 2 were funded during the February 2010 grant cycle, phases 3 and 4 were funded in August 2010, and Phases 5 and 6 were funded in February 2011. Project partners include the US Forest Service and UW-Stevens Point. The project will focus on developing a Lake Management Plan (LMP) for Bear Lake.
Phase 5 project activities include: 1) Algal assessment; 2) Information and education activities and planning meetings; 3) Water quality sampling and analysis; 4) Develop hydrologic and phosphorous budget; 5) Develop LMP.
Project deliverables include: Water chemistry and algae data.
Specific project conditions: LMP needs Dept review and approval.
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, data from water quality and algae sampling, all maps from project, and all GIS data.
Grant Details
Large Scale Lake Planning
Date
4/1/2011
Waters Involved
Shabodock Lake
Status
Complete
Town Of Blackwell: Algal & Water Quality Assessment & Aquatic Plant Survey For Bear Lake Forest County, Phase 6: The Town of Blackwell is sponsoring a phased large scale lake planning grant project to study Bear Lake in Forest County. Phases 1 and 2 were funded during the February 2010 grant cycle, phases 3 and 4 were funded in August 2010, and Phases 5 and 6 were funded in February 2011. Project partners include the US Forest Service and UW-Stevens Point. The project will focus on developing a Lake Management Plan (LMP) for Bear Lake.
Phase 6 project activities include: 1) Algal assessment; 2) Information and education activities and planning meetings; 3) Water quality sampling and analysis; 4) Develop hydrologic and phosphorous budget; 5) Crayfish and aquatic plant monitoring; 6) Develop LMP.
Project deliverables include: 1) Water chemistry, algae, crayfish, and aquatic plant data; 2) Hydrologic and Phosphorous budget; 3) LMP.
Specific conditions for this project: LMP needs Dept review and approval.
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, data from water quality, algae sampling, and crayfish and aquatic plant monitoring, all maps from project, and all GIS data.
Grant Details
Large Scale Lake Planning
Date
4/1/2011
Waters Involved
Shabodock Lake
Status
Complete
Town Of Blackwell: Algal & Water Quality Assessment & Aquatic Plant Survey For Bear Lake, Forest Co., Phase 5: The Town of Blackwell is sponsoring phased large scale lake planning grant project to study Bear Lake, in Forest County. Phases 1 and 2 were funded during the February 2010 grant cycle, phases 3 and 4 were funded in August 2010, and Phases 5 and 6 were funded in February 2011. Project partners include the US Forest Service and UW-Stevens Point. The project will focus on developing a Lake Management Plan (LMP) for Bear Lake.
Phase 5 project activities include: 1) Algal assessment; 2) Information and education activities and planning meetings; 3) Water quality sampling and analysis; 4) Develop hydrologic and phosphorous budget; 5) Develop LMP.
Project deliverables include: Water chemistry and algae data.
Specific project conditions: LMP needs Dept review and approval.
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, data from water quality and algae sampling, all maps from project, and all GIS data.
Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Skunk Lake
Status
Complete
Town Of Lincoln: Town Of Lincoln - Forest Co. Waterr Quality & Land Use Plan: The Town of Lincoln is undertaking a town-wide land use and water quality planning initiative. The Land Use and Water Qualtiy Management Plan to be developed will consist of two components (a Poster Plan and a Resource Document) intended to guide Town growth and establish future ordinances and regualtions to properly manage land use and water quality within the Town.
Project deliverables include a Land Use and Water Quality Management Poster Plan, a Land Use and Water Qualtiy Management Plan Resource Document, and Maps.
A copy of the plan and maps will be provided to the Department along with an electronic copy of the plan.
Grant Details
Large Scale Lake Planning
Date
4/1/2011
Waters Involved
Spencer Creek
Status
Complete
Town Of Blackwell: Algal & Water Quality Assessment & Aquatic Plant Survey For Bear Lake Forest County, Phase 6: The Town of Blackwell is sponsoring a phased large scale lake planning grant project to study Bear Lake in Forest County. Phases 1 and 2 were funded during the February 2010 grant cycle, phases 3 and 4 were funded in August 2010, and Phases 5 and 6 were funded in February 2011. Project partners include the US Forest Service and UW-Stevens Point. The project will focus on developing a Lake Management Plan (LMP) for Bear Lake.
Phase 6 project activities include: 1) Algal assessment; 2) Information and education activities and planning meetings; 3) Water quality sampling and analysis; 4) Develop hydrologic and phosphorous budget; 5) Crayfish and aquatic plant monitoring; 6) Develop LMP.
Project deliverables include: 1) Water chemistry, algae, crayfish, and aquatic plant data; 2) Hydrologic and Phosphorous budget; 3) LMP.
Specific conditions for this project: LMP needs Dept review and approval.
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, data from water quality, algae sampling, and crayfish and aquatic plant monitoring, all maps from project, and all GIS data.
Grant Details
Large Scale Lake Planning
Date
4/1/2011
Waters Involved
Spencer Creek
Status
Complete
Town Of Blackwell: Algal & Water Quality Assessment & Aquatic Plant Survey For Bear Lake, Forest Co., Phase 5: The Town of Blackwell is sponsoring phased large scale lake planning grant project to study Bear Lake, in Forest County. Phases 1 and 2 were funded during the February 2010 grant cycle, phases 3 and 4 were funded in August 2010, and Phases 5 and 6 were funded in February 2011. Project partners include the US Forest Service and UW-Stevens Point. The project will focus on developing a Lake Management Plan (LMP) for Bear Lake.
Phase 5 project activities include: 1) Algal assessment; 2) Information and education activities and planning meetings; 3) Water quality sampling and analysis; 4) Develop hydrologic and phosphorous budget; 5) Develop LMP.
Project deliverables include: Water chemistry and algae data.
Specific project conditions: LMP needs Dept review and approval.
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, data from water quality and algae sampling, all maps from project, and all GIS data.
Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Spring Lake
Status
Complete
Town Of Lincoln: Town Of Lincoln - Forest Co. Waterr Quality & Land Use Plan: The Town of Lincoln is undertaking a town-wide land use and water quality planning initiative. The Land Use and Water Qualtiy Management Plan to be developed will consist of two components (a Poster Plan and a Resource Document) intended to guide Town growth and establish future ordinances and regualtions to properly manage land use and water quality within the Town.
Project deliverables include a Land Use and Water Quality Management Poster Plan, a Land Use and Water Qualtiy Management Plan Resource Document, and Maps.
A copy of the plan and maps will be provided to the Department along with an electronic copy of the plan.
Grant Details
Large Scale Lake Planning
Date
4/1/2011
Waters Involved
Stoney Creek
Status
Complete
Town Of Blackwell: Algal & Water Quality Assessment & Aquatic Plant Survey For Bear Lake Forest County, Phase 6: The Town of Blackwell is sponsoring a phased large scale lake planning grant project to study Bear Lake in Forest County. Phases 1 and 2 were funded during the February 2010 grant cycle, phases 3 and 4 were funded in August 2010, and Phases 5 and 6 were funded in February 2011. Project partners include the US Forest Service and UW-Stevens Point. The project will focus on developing a Lake Management Plan (LMP) for Bear Lake.
Phase 6 project activities include: 1) Algal assessment; 2) Information and education activities and planning meetings; 3) Water quality sampling and analysis; 4) Develop hydrologic and phosphorous budget; 5) Crayfish and aquatic plant monitoring; 6) Develop LMP.
Project deliverables include: 1) Water chemistry, algae, crayfish, and aquatic plant data; 2) Hydrologic and Phosphorous budget; 3) LMP.
Specific conditions for this project: LMP needs Dept review and approval.
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, data from water quality, algae sampling, and crayfish and aquatic plant monitoring, all maps from project, and all GIS data.
Grant Details
Large Scale Lake Planning
Date
4/1/2011
Waters Involved
Stoney Creek
Status
Complete
Town Of Blackwell: Algal & Water Quality Assessment & Aquatic Plant Survey For Bear Lake, Forest Co., Phase 5: The Town of Blackwell is sponsoring phased large scale lake planning grant project to study Bear Lake, in Forest County. Phases 1 and 2 were funded during the February 2010 grant cycle, phases 3 and 4 were funded in August 2010, and Phases 5 and 6 were funded in February 2011. Project partners include the US Forest Service and UW-Stevens Point. The project will focus on developing a Lake Management Plan (LMP) for Bear Lake.
Phase 5 project activities include: 1) Algal assessment; 2) Information and education activities and planning meetings; 3) Water quality sampling and analysis; 4) Develop hydrologic and phosphorous budget; 5) Develop LMP.
Project deliverables include: Water chemistry and algae data.
Specific project conditions: LMP needs Dept review and approval.
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, data from water quality and algae sampling, all maps from project, and all GIS data.
Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Tee Lake
Status
Complete
Town Of Lincoln: Town Of Lincoln - Forest Co. Waterr Quality & Land Use Plan: The Town of Lincoln is undertaking a town-wide land use and water quality planning initiative. The Land Use and Water Qualtiy Management Plan to be developed will consist of two components (a Poster Plan and a Resource Document) intended to guide Town growth and establish future ordinances and regualtions to properly manage land use and water quality within the Town.
Project deliverables include a Land Use and Water Quality Management Poster Plan, a Land Use and Water Qualtiy Management Plan Resource Document, and Maps.
A copy of the plan and maps will be provided to the Department along with an electronic copy of the plan.
Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Trout Lake
Status
Complete
Town Of Goodman: Town Of Goodman Lake & Land Management Plan: The Town of Goodman proposes a project as the first step in the development of a comprehensive plan for land use for the Town of Goodman. It will be used as a pilot project that will be applied to similar lakes in Marinette County that have a low rate of second home development and that are located in areas that are very rural in nature. This project will collect and assess the types of social, physical and regulatory data that are available for the lakes and their watersheds. The project will identify deficiencies in data and make recommendations for additional data collection that will be the subject of future grant app,ications.
Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Un Spring
Status
Complete
Town Of Goodman: Town Of Goodman Lake & Land Management Plan: The Town of Goodman proposes a project as the first step in the development of a comprehensive plan for land use for the Town of Goodman. It will be used as a pilot project that will be applied to similar lakes in Marinette County that have a low rate of second home development and that are located in areas that are very rural in nature. This project will collect and assess the types of social, physical and regulatory data that are available for the lakes and their watersheds. The project will identify deficiencies in data and make recommendations for additional data collection that will be the subject of future grant app,ications.
Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Un Spring
Status
Complete
Town Of Lincoln: Town Of Lincoln - Forest Co. Waterr Quality & Land Use Plan: The Town of Lincoln is undertaking a town-wide land use and water quality planning initiative. The Land Use and Water Qualtiy Management Plan to be developed will consist of two components (a Poster Plan and a Resource Document) intended to guide Town growth and establish future ordinances and regualtions to properly manage land use and water quality within the Town.
Project deliverables include a Land Use and Water Quality Management Poster Plan, a Land Use and Water Qualtiy Management Plan Resource Document, and Maps.
A copy of the plan and maps will be provided to the Department along with an electronic copy of the plan.
Grant Details
Large Scale Lake Planning
Date
4/1/2011
Waters Involved
Un Spring
Status
Complete
Town Of Blackwell: Algal & Water Quality Assessment & Aquatic Plant Survey For Bear Lake Forest County, Phase 6: The Town of Blackwell is sponsoring a phased large scale lake planning grant project to study Bear Lake in Forest County. Phases 1 and 2 were funded during the February 2010 grant cycle, phases 3 and 4 were funded in August 2010, and Phases 5 and 6 were funded in February 2011. Project partners include the US Forest Service and UW-Stevens Point. The project will focus on developing a Lake Management Plan (LMP) for Bear Lake.
Phase 6 project activities include: 1) Algal assessment; 2) Information and education activities and planning meetings; 3) Water quality sampling and analysis; 4) Develop hydrologic and phosphorous budget; 5) Crayfish and aquatic plant monitoring; 6) Develop LMP.
Project deliverables include: 1) Water chemistry, algae, crayfish, and aquatic plant data; 2) Hydrologic and Phosphorous budget; 3) LMP.
Specific conditions for this project: LMP needs Dept review and approval.
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, data from water quality, algae sampling, and crayfish and aquatic plant monitoring, all maps from project, and all GIS data.
Grant Details
Large Scale Lake Planning
Date
4/1/2011
Waters Involved
Un Spring
Status
Complete
Town Of Blackwell: Algal & Water Quality Assessment & Aquatic Plant Survey For Bear Lake, Forest Co., Phase 5: The Town of Blackwell is sponsoring phased large scale lake planning grant project to study Bear Lake, in Forest County. Phases 1 and 2 were funded during the February 2010 grant cycle, phases 3 and 4 were funded in August 2010, and Phases 5 and 6 were funded in February 2011. Project partners include the US Forest Service and UW-Stevens Point. The project will focus on developing a Lake Management Plan (LMP) for Bear Lake.
Phase 5 project activities include: 1) Algal assessment; 2) Information and education activities and planning meetings; 3) Water quality sampling and analysis; 4) Develop hydrologic and phosphorous budget; 5) Develop LMP.
Project deliverables include: Water chemistry and algae data.
Specific project conditions: LMP needs Dept review and approval.
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, data from water quality and algae sampling, all maps from project, and all GIS data.
Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Unnamed
Status
Complete
Town Of Goodman: Town Of Goodman Lake & Land Management Plan: The Town of Goodman proposes a project as the first step in the development of a comprehensive plan for land use for the Town of Goodman. It will be used as a pilot project that will be applied to similar lakes in Marinette County that have a low rate of second home development and that are located in areas that are very rural in nature. This project will collect and assess the types of social, physical and regulatory data that are available for the lakes and their watersheds. The project will identify deficiencies in data and make recommendations for additional data collection that will be the subject of future grant app,ications.
Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Unnamed
Status
Complete
Town Of Lincoln: Town Of Lincoln - Forest Co. Waterr Quality & Land Use Plan: The Town of Lincoln is undertaking a town-wide land use and water quality planning initiative. The Land Use and Water Qualtiy Management Plan to be developed will consist of two components (a Poster Plan and a Resource Document) intended to guide Town growth and establish future ordinances and regualtions to properly manage land use and water quality within the Town.
Project deliverables include a Land Use and Water Quality Management Poster Plan, a Land Use and Water Qualtiy Management Plan Resource Document, and Maps.
A copy of the plan and maps will be provided to the Department along with an electronic copy of the plan.
Grant Details
Large Scale Lake Planning
Date
4/1/2011
Waters Involved
Unnamed
Status
Complete
Town Of Blackwell: Algal & Water Quality Assessment & Aquatic Plant Survey For Bear Lake Forest County, Phase 6: The Town of Blackwell is sponsoring a phased large scale lake planning grant project to study Bear Lake in Forest County. Phases 1 and 2 were funded during the February 2010 grant cycle, phases 3 and 4 were funded in August 2010, and Phases 5 and 6 were funded in February 2011. Project partners include the US Forest Service and UW-Stevens Point. The project will focus on developing a Lake Management Plan (LMP) for Bear Lake.
Phase 6 project activities include: 1) Algal assessment; 2) Information and education activities and planning meetings; 3) Water quality sampling and analysis; 4) Develop hydrologic and phosphorous budget; 5) Crayfish and aquatic plant monitoring; 6) Develop LMP.
Project deliverables include: 1) Water chemistry, algae, crayfish, and aquatic plant data; 2) Hydrologic and Phosphorous budget; 3) LMP.
Specific conditions for this project: LMP needs Dept review and approval.
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, data from water quality, algae sampling, and crayfish and aquatic plant monitoring, all maps from project, and all GIS data.
Grant Details
Large Scale Lake Planning
Date
4/1/2011
Waters Involved
Unnamed
Status
Complete
Town Of Blackwell: Algal & Water Quality Assessment & Aquatic Plant Survey For Bear Lake, Forest Co., Phase 5: The Town of Blackwell is sponsoring phased large scale lake planning grant project to study Bear Lake, in Forest County. Phases 1 and 2 were funded during the February 2010 grant cycle, phases 3 and 4 were funded in August 2010, and Phases 5 and 6 were funded in February 2011. Project partners include the US Forest Service and UW-Stevens Point. The project will focus on developing a Lake Management Plan (LMP) for Bear Lake.
Phase 5 project activities include: 1) Algal assessment; 2) Information and education activities and planning meetings; 3) Water quality sampling and analysis; 4) Develop hydrologic and phosphorous budget; 5) Develop LMP.
Project deliverables include: Water chemistry and algae data.
Specific project conditions: LMP needs Dept review and approval.
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, data from water quality and algae sampling, all maps from project, and all GIS data.
Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Vic Lake
Status
Complete
Town Of Goodman: Town Of Goodman Lake & Land Management Plan: The Town of Goodman proposes a project as the first step in the development of a comprehensive plan for land use for the Town of Goodman. It will be used as a pilot project that will be applied to similar lakes in Marinette County that have a low rate of second home development and that are located in areas that are very rural in nature. This project will collect and assess the types of social, physical and regulatory data that are available for the lakes and their watersheds. The project will identify deficiencies in data and make recommendations for additional data collection that will be the subject of future grant app,ications.
Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Woods Lake
Status
Complete
Town Of Goodman: Town Of Goodman Lake & Land Management Plan: The Town of Goodman proposes a project as the first step in the development of a comprehensive plan for land use for the Town of Goodman. It will be used as a pilot project that will be applied to similar lakes in Marinette County that have a low rate of second home development and that are located in areas that are very rural in nature. This project will collect and assess the types of social, physical and regulatory data that are available for the lakes and their watersheds. The project will identify deficiencies in data and make recommendations for additional data collection that will be the subject of future grant app,ications.
Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Wyman Lake
Status
Complete
Town Of Lincoln: Town Of Lincoln - Forest Co. Waterr Quality & Land Use Plan: The Town of Lincoln is undertaking a town-wide land use and water quality planning initiative. The Land Use and Water Qualtiy Management Plan to be developed will consist of two components (a Poster Plan and a Resource Document) intended to guide Town growth and establish future ordinances and regualtions to properly manage land use and water quality within the Town.
Project deliverables include a Land Use and Water Quality Management Poster Plan, a Land Use and Water Qualtiy Management Plan Resource Document, and Maps.
A copy of the plan and maps will be provided to the Department along with an electronic copy of the plan.
Grant Details
River Planning Grant
Date
7/1/2009
Waters Involved
South Branch Peshtigo River
Status
Complete
Northwoods Land Trust, Inc.: Forest County River Conservation Project: Northwood\2019s Land Trust, Inc. proposes to conduct a direct mail education campaign with all property owners on the priority river and stream segments in Forest County that were identified by the DNR Northern Rivers Initiative. An information packet will be provided highlighting voluntary conservation options those property owners can utilize to protect the priority stream corridors. Those options include conservation easements, land donation, land registry and conservation buyer programs. Individual on site property assessments and conservation planning will be conducted with any landowners who express interest.
The project includes the following goals: 1) Direct mail information packets describing voluntary conservation options private landowners can utilize to protect their properties. This information will include how the options can protect land while also providing income, estate and other tax benefits to landowners. The mailing will include all private property owners with at least 500 feet of natural shoreline on these priority river segments; 2) Conduct on-site follow-up contacts with interested landowners as generated by mailing and media publicity; 3) Encourage interested landowners to voluntarily enter into perpetual land protection agreements or utilize other land protection tools to protect their priority river/stream segments.
Project deliverables include: 1) Copies of color GIS maps of each of the towns with digitized parcel maps will be provided to illustrate the parcels/landowners identified within 500 + feet of existing natural shoreline frontage; 2) A generalized listing of Forest County landowner follow-up contacts by program type will be provided.
The WDNR will be provided electronic and hard copies of all data and or reports/plans generated as a result of this project.
Grant Details
River Protection Grant
Date
4/15/2017
Waters Involved
Spencer Creek
Status
Complete
Trout Unlimited-Wild River Chapter: Spencer Creek - Reconnecting Coldwater Habitat: Wild Rivers Trout Unlimited will be sponsoring a restoration project on Spencer Creek, Forest County, WI. The project will replace an undersized culvert that is restricting flow and, is creating sediment deposition upstream from the culvert and scouring downstream from the culvert. The perched culvert is also impeding fish passage. Replacement of this barrier will reconnect 5 miles of Spencer Creek to the Rat River system and 1.56 miles of Swan Creek.
Project goals: Restore the instream habitat and aquatic connectivity of Spencer Creek. Additional expected project accomplishments include: elimination of impounding conditions upstream from Flanner Road; restoration of natural stream velocities both up and downstream of the road crossing; restoration of trout and other aquatic organism movement throughout the entirety of Spencer Creek and in and out of the Rat River, allowing natural movements to complete life history stages, increase coldwater refuge areas during warm water periods in the Rat River and, increase genetic diversity among the trout population in the entire system; reconnecting 5 miles of Spencer Creek; reconnecting use of 1.56 miles of Swan Creek.
Project deliverables: A post construction report describing monitoring conducted to document changes in velocity, water depth, silt depth, substrate type, invertebrate abundance and a mark and recapture study to ensure that fish are moving through the newly installed culvert. Temp thermistors will also be deployed to document any changes in upstream water temperatures.
Specific conditions for this Project: The WDNR will be provided electronic and hard copies of all data and or reports/plans generated as a result of this project.