Grant Details
Aquatic Invasives Early Detection and Response
Date
2/28/2005
Waters Involved
Seven Island Lake
Status
Complete
Lincoln County: Euraisan Water Milfoil Control & Information & Education, Seven Island Lake: Lincoln County in cooperation with the Seven Island Lake Association, will sponsor a project to manually remove approximately three acres of eurasian water-milfoil in Seven Island Lakel. During the spring of 2005, with the hope of early eradication, divers will remove EWM. The Association will also develop an EWM monitoring plan, to be used during summer and fall of 2005 to check for the spread of EWM. They will monitor for EWM throughout the summer and remove remaining milfoil during the fall of 2005. The Lincoln County Lakes Association and Seven Island Lake Association will partner to sponsor an aquatic invasive workshop. This workshop will provide an educational component to teach area residents of the dangers of aquatic invasive species, control/prevention measures, and will provide periodic project updates.
Products:
1) Pioneer beds of eurasian water-milfoil will be manually removed, using scuba divers, during the spring and/or fall of 2005.
2) Pre and post treatment surveys mapping the location and densities of EWM, will be conducted.
3) An AIS monitoring plan will be developed for Seven Island Lake.
4) An AIS workshop will be held to disseminate information to the public.
5) A final report will be made available to the DNR, Lincoln County Land Conservation Dept., local lake associations, districts, and media.
Grant Details
Aquatic Invasives Education
Date
2/15/2017
Waters Involved
Fish Lake
Status
Complete
Fish Lake Property Owners Assoc: Aquatic Invasive Species Prevention: Fish Lake Property Owners Association is sponsoring a project to increase watercraft inspection and boat landing surveillance. Activities include installation of an automated camera system, approved watercraft inspection alternative (100 hours/year), AIS monitoring, and sign installation at the landing. Deliverables include: camera system results summary, CBCW data entered, monitoring results and maps, and photos of camera system and signs.
Special condition: DNR forms should be used for recording AIS monitoring results, including the absence of species.
The specific objectives, metrics, and deliverables for the listed activities are included in the application and supporting materials, and this scope is not intended to replace or supersede those documents. The Department may request quarterly progress reports.
Grant Details
Aquatic Invasives Education
Date
3/15/2023
Waters Involved
Lake Pesobic
Status
Complete
Pesobic Lake Assoc: Pesobic Lake Aquatic Plant Management Plan Update - Phase 3: The Pesobic Lake Association (PLA) is sponsoring a project which will focus on updating aquatic plant and aquatic invasive species (AIS) information and collecting shoreland and shallows habitat data. This information will be used to create an Aquatic Plant Management Plan (APMP) for Pesobic Lake.
Project final deliverables include: 1) Data from aquatic plant survey, shoreland and shallows habitat surveys, AIS survey; 2) Education meetings and materials; 4) Annual reports; and 5) an APMP including a shoreland restoration and protection strategy and AIS rapid response plan.
Specific project activities include: 1) Conduct an aquatic plant point-intercept (PI) survey (following DNR protocol); 2) Conduct shoreland and shallows habitat surveys (following DNR protocol); 3) Conduct AIS survey (following DNR protocol); 4) Develop an (APMP) including a shoreland restoration and protection strategy and AIS rapid response plan.
Special Conditions: 1) DNR Lake Biologist will be provided with a copy of reports and/or management plans; data from aquatic plant, shoreland and shallows habitat (including parcel photos), and AIS surveys; all maps and GIS data; and 2) DNR Lake Biologist will be invited to management planning meetings.
This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.
Grant Details
Lake Protection Grant
Date
2/1/1998
Waters Involved
Alice Lake
Status
Complete
Town Of Hazelhurst: Lco-Hazelhurst Land & Water Protection Program: Town of Hazelhurst proposes to develop a comprehensive land use plan and implementation strategies to address the land and water issues in the Town. The Town proposes to work closely with Oneida County?s lake classification program to create a land use plan that matches appropriate land uses with the specific class of lakes in the watershed. An overall educational component for both citizens and local officials will be part of the project deliverables along with the following components; 1) a vision statement, 2) Socio- Economic profile, 3) assess housing characteristics, 4) inventory and map community facilities and services, 5) complete inventory of transportation systems, 6) research and analyze physical and biological characteristics of land and water resources, 7) complete an accurate land use inventory with future projections, 8) implementation strategies will be based on protection of the town?s nature resource base and encouraged to make the best use of that resource.
Grant Details
Lake Protection Grant
Date
7/1/2000
Waters Involved
Bass Lake
Status
Complete
Town Of Pine Lake: Lmi-Town Of Pine Lake Land & Water Protection Program: The Town of Pine Lake will develop a comprehensive land use plan with implementation strategies to address land and water issues in the town.
Activities associated with this project include; facilitated public meetings and workshop; town wide survey; draft and final reports; developmentof maps and exhibits for public informational meetings; development and mailing of a poster plan; project management/coordination.
Project deliverables for this project include copies of all maps, and a copy of the final comprehensive land use plan.
The Department of Natural Resources will be provided with both a paper copy and an electronic copy of all project products and periodic reports on the progress of the project.
Grant Details
Lake Protection Grant
Date
7/1/2000
Waters Involved
Bass Lake T37n R09e S30
Status
Complete
Town Of Pine Lake: Lmi-Town Of Pine Lake Land & Water Protection Program: The Town of Pine Lake will develop a comprehensive land use plan with implementation strategies to address land and water issues in the town.
Activities associated with this project include; facilitated public meetings and workshop; town wide survey; draft and final reports; developmentof maps and exhibits for public informational meetings; development and mailing of a poster plan; project management/coordination.
Project deliverables for this project include copies of all maps, and a copy of the final comprehensive land use plan.
The Department of Natural Resources will be provided with both a paper copy and an electronic copy of all project products and periodic reports on the progress of the project.
Grant Details
Lake Protection Grant
Date
2/1/1998
Waters Involved
Bear Lake
Status
Complete
Town Of Hazelhurst: Lco-Hazelhurst Land & Water Protection Program: Town of Hazelhurst proposes to develop a comprehensive land use plan and implementation strategies to address the land and water issues in the Town. The Town proposes to work closely with Oneida County?s lake classification program to create a land use plan that matches appropriate land uses with the specific class of lakes in the watershed. An overall educational component for both citizens and local officials will be part of the project deliverables along with the following components; 1) a vision statement, 2) Socio- Economic profile, 3) assess housing characteristics, 4) inventory and map community facilities and services, 5) complete inventory of transportation systems, 6) research and analyze physical and biological characteristics of land and water resources, 7) complete an accurate land use inventory with future projections, 8) implementation strategies will be based on protection of the town?s nature resource base and encouraged to make the best use of that resource.
Grant Details
Lake Protection Grant
Date
2/1/1998
Waters Involved
Bearskin Lake
Status
Complete
Town Of Hazelhurst: Lco-Hazelhurst Land & Water Protection Program: Town of Hazelhurst proposes to develop a comprehensive land use plan and implementation strategies to address the land and water issues in the Town. The Town proposes to work closely with Oneida County?s lake classification program to create a land use plan that matches appropriate land uses with the specific class of lakes in the watershed. An overall educational component for both citizens and local officials will be part of the project deliverables along with the following components; 1) a vision statement, 2) Socio- Economic profile, 3) assess housing characteristics, 4) inventory and map community facilities and services, 5) complete inventory of transportation systems, 6) research and analyze physical and biological characteristics of land and water resources, 7) complete an accurate land use inventory with future projections, 8) implementation strategies will be based on protection of the town?s nature resource base and encouraged to make the best use of that resource.
Grant Details
Lake Protection Grant
Date
8/1/2000
Waters Involved
Bearskin Lake
Status
Complete
Big Bearskin Lake Association: Res-Big Bearskin Lake Improvement Program: The Big Bearskin Lake Association will conduct a lake water quality improvement program with the goal of increasing water clarity and resulting sechi disc readings This project will use barley straw to inhibit blue-green algae growth in the lake. Anticipated results include improvement in water transparency and aquatic plant growth and distribution through out the lake.
Specific activities of this project include the installation of the straw bales, water quality monitoring, and aquatic plant survey, and development of a final report.
Specific deliverables for this grant project will include:
final report
The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.
Grant Details
Lake Protection Grant
Date
7/1/2000
Waters Involved
Bertram Lake
Status
Complete
Town Of Pine Lake: Lmi-Town Of Pine Lake Land & Water Protection Program: The Town of Pine Lake will develop a comprehensive land use plan with implementation strategies to address land and water issues in the town.
Activities associated with this project include; facilitated public meetings and workshop; town wide survey; draft and final reports; developmentof maps and exhibits for public informational meetings; development and mailing of a poster plan; project management/coordination.
Project deliverables for this project include copies of all maps, and a copy of the final comprehensive land use plan.
The Department of Natural Resources will be provided with both a paper copy and an electronic copy of all project products and periodic reports on the progress of the project.
Grant Details
Lake Protection Grant
Date
7/1/2000
Waters Involved
Boom Lake
Status
Complete
Town Of Pine Lake: Lmi-Town Of Pine Lake Land & Water Protection Program: The Town of Pine Lake will develop a comprehensive land use plan with implementation strategies to address land and water issues in the town.
Activities associated with this project include; facilitated public meetings and workshop; town wide survey; draft and final reports; developmentof maps and exhibits for public informational meetings; development and mailing of a poster plan; project management/coordination.
Project deliverables for this project include copies of all maps, and a copy of the final comprehensive land use plan.
The Department of Natural Resources will be provided with both a paper copy and an electronic copy of all project products and periodic reports on the progress of the project.
Grant Details
Lake Protection Grant
Date
7/1/2000
Waters Involved
Box Lake
Status
Complete
Town Of Pine Lake: Lmi-Town Of Pine Lake Land & Water Protection Program: The Town of Pine Lake will develop a comprehensive land use plan with implementation strategies to address land and water issues in the town.
Activities associated with this project include; facilitated public meetings and workshop; town wide survey; draft and final reports; developmentof maps and exhibits for public informational meetings; development and mailing of a poster plan; project management/coordination.
Project deliverables for this project include copies of all maps, and a copy of the final comprehensive land use plan.
The Department of Natural Resources will be provided with both a paper copy and an electronic copy of all project products and periodic reports on the progress of the project.
Grant Details
Lake Protection Grant
Date
7/1/2000
Waters Involved
Clear Lake
Status
Complete
Town Of Pine Lake: Lmi-Town Of Pine Lake Land & Water Protection Program: The Town of Pine Lake will develop a comprehensive land use plan with implementation strategies to address land and water issues in the town.
Activities associated with this project include; facilitated public meetings and workshop; town wide survey; draft and final reports; developmentof maps and exhibits for public informational meetings; development and mailing of a poster plan; project management/coordination.
Project deliverables for this project include copies of all maps, and a copy of the final comprehensive land use plan.
The Department of Natural Resources will be provided with both a paper copy and an electronic copy of all project products and periodic reports on the progress of the project.
Grant Details
Lake Protection Grant
Date
7/1/2000
Waters Involved
Crystal Lake
Status
Complete
Town Of Pine Lake: Lmi-Town Of Pine Lake Land & Water Protection Program: The Town of Pine Lake will develop a comprehensive land use plan with implementation strategies to address land and water issues in the town.
Activities associated with this project include; facilitated public meetings and workshop; town wide survey; draft and final reports; developmentof maps and exhibits for public informational meetings; development and mailing of a poster plan; project management/coordination.
Project deliverables for this project include copies of all maps, and a copy of the final comprehensive land use plan.
The Department of Natural Resources will be provided with both a paper copy and an electronic copy of all project products and periodic reports on the progress of the project.
Grant Details
Lake Protection Grant
Date
2/1/1998
Waters Involved
Dollar Lake
Status
Complete
Town Of Hazelhurst: Lco-Hazelhurst Land & Water Protection Program: Town of Hazelhurst proposes to develop a comprehensive land use plan and implementation strategies to address the land and water issues in the Town. The Town proposes to work closely with Oneida County?s lake classification program to create a land use plan that matches appropriate land uses with the specific class of lakes in the watershed. An overall educational component for both citizens and local officials will be part of the project deliverables along with the following components; 1) a vision statement, 2) Socio- Economic profile, 3) assess housing characteristics, 4) inventory and map community facilities and services, 5) complete inventory of transportation systems, 6) research and analyze physical and biological characteristics of land and water resources, 7) complete an accurate land use inventory with future projections, 8) implementation strategies will be based on protection of the town?s nature resource base and encouraged to make the best use of that resource.
Grant Details
Lake Protection Grant
Date
7/1/2000
Waters Involved
Douglas Lake
Status
Complete
Town Of Pine Lake: Lmi-Town Of Pine Lake Land & Water Protection Program: The Town of Pine Lake will develop a comprehensive land use plan with implementation strategies to address land and water issues in the town.
Activities associated with this project include; facilitated public meetings and workshop; town wide survey; draft and final reports; developmentof maps and exhibits for public informational meetings; development and mailing of a poster plan; project management/coordination.
Project deliverables for this project include copies of all maps, and a copy of the final comprehensive land use plan.
The Department of Natural Resources will be provided with both a paper copy and an electronic copy of all project products and periodic reports on the progress of the project.
Grant Details
Lake Protection Grant
Date
7/1/2000
Waters Involved
Doyle Lake
Status
Complete
Town Of Pine Lake: Lmi-Town Of Pine Lake Land & Water Protection Program: The Town of Pine Lake will develop a comprehensive land use plan with implementation strategies to address land and water issues in the town.
Activities associated with this project include; facilitated public meetings and workshop; town wide survey; draft and final reports; developmentof maps and exhibits for public informational meetings; development and mailing of a poster plan; project management/coordination.
Project deliverables for this project include copies of all maps, and a copy of the final comprehensive land use plan.
The Department of Natural Resources will be provided with both a paper copy and an electronic copy of all project products and periodic reports on the progress of the project.
Grant Details
Lake Protection Grant
Date
2/1/1998
Waters Involved
Dugout Lake
Status
Complete
Town Of Hazelhurst: Lco-Hazelhurst Land & Water Protection Program: Town of Hazelhurst proposes to develop a comprehensive land use plan and implementation strategies to address the land and water issues in the Town. The Town proposes to work closely with Oneida County?s lake classification program to create a land use plan that matches appropriate land uses with the specific class of lakes in the watershed. An overall educational component for both citizens and local officials will be part of the project deliverables along with the following components; 1) a vision statement, 2) Socio- Economic profile, 3) assess housing characteristics, 4) inventory and map community facilities and services, 5) complete inventory of transportation systems, 6) research and analyze physical and biological characteristics of land and water resources, 7) complete an accurate land use inventory with future projections, 8) implementation strategies will be based on protection of the town?s nature resource base and encouraged to make the best use of that resource.
Grant Details
Lake Protection Grant
Date
3/15/2021
Waters Involved
Enterprise Lake
Status
Complete
Langlade County: Hlr - Langlade County Healthy Lakes 2021: Partnering with property owners, Langlade County is sponsoring a grant to implement best practices from Wisconsin\2019s 2019 Healthy Lakes & Rivers Action Plan. Best practices, including fish sticks, 350 sq. ft. native plantings, diversions, rock infiltration, and/or rain gardens, will be designed and installed according to program fact sheets, technical guidance and the grant application.
All funded best practices require contracts that must remain in place for 10 years and include the minimum operation and maintenance requirements described in the special conditions at the end of this agreement. If the landowner is the grant sponsor this Lake Protection Grant Agreement serves as the contract. If the best practice(s) will be implemented on land other than the sponsor\2019s, a contract between the sponsor and landowner describing the 10-year contract period, minimum operation and maintenance details, and data to be collected is required. The Department may perform site inspections and/or monitoring to ensure project success.
Deliverables include: a project summary including data requirements, pre/post photographs, and confirmation of completed design work and landowner contracts. A Healthy Lakes & Rivers Example Report is available to assist you.
Special conditions: Project management and technical assistance cash costs cannot exceed 10% of the state share of the grant award; this does not include implementation labor. Water regulation and/or county zoning permits must be issued before construction. Projects required for regulatory compliance purposes, including shoreland mitigation projects, are not eligible for reimbursement. The Healthy Lakes & Rivers logo should be used for promotion and publicity and DNR recognized as a funding source.
Grant Details
Lake Protection Grant
Date
2/1/1998
Waters Involved
Foster Lake
Status
Complete
Town Of Hazelhurst: Lco-Hazelhurst Land & Water Protection Program: Town of Hazelhurst proposes to develop a comprehensive land use plan and implementation strategies to address the land and water issues in the Town. The Town proposes to work closely with Oneida County?s lake classification program to create a land use plan that matches appropriate land uses with the specific class of lakes in the watershed. An overall educational component for both citizens and local officials will be part of the project deliverables along with the following components; 1) a vision statement, 2) Socio- Economic profile, 3) assess housing characteristics, 4) inventory and map community facilities and services, 5) complete inventory of transportation systems, 6) research and analyze physical and biological characteristics of land and water resources, 7) complete an accurate land use inventory with future projections, 8) implementation strategies will be based on protection of the town?s nature resource base and encouraged to make the best use of that resource.
Grant Details
Lake Protection Grant
Date
2/1/1998
Waters Involved
Garth Lake
Status
Complete
Town Of Hazelhurst: Lco-Hazelhurst Land & Water Protection Program: Town of Hazelhurst proposes to develop a comprehensive land use plan and implementation strategies to address the land and water issues in the Town. The Town proposes to work closely with Oneida County?s lake classification program to create a land use plan that matches appropriate land uses with the specific class of lakes in the watershed. An overall educational component for both citizens and local officials will be part of the project deliverables along with the following components; 1) a vision statement, 2) Socio- Economic profile, 3) assess housing characteristics, 4) inventory and map community facilities and services, 5) complete inventory of transportation systems, 6) research and analyze physical and biological characteristics of land and water resources, 7) complete an accurate land use inventory with future projections, 8) implementation strategies will be based on protection of the town?s nature resource base and encouraged to make the best use of that resource.
Grant Details
Lake Protection Grant
Date
10/28/1997
Waters Involved
Hanson Lake
Status
Complete
City Of Rhinelander: Acq-Hanson Lake Land Acquisition: City of Rhinelander will acquire ~16 acres of land with 428.65 feet of frontage on Hanson Lake. The acquisition will help protect the lake from some current shoreland erosion. This acquisition will also provide passive recreation when plans are completed to make the property part of the park system.
Grant Details
Lake Protection Grant
Date
2/1/1998
Waters Involved
Hughitt Lake
Status
Complete
Town Of Hazelhurst: Lco-Hazelhurst Land & Water Protection Program: Town of Hazelhurst proposes to develop a comprehensive land use plan and implementation strategies to address the land and water issues in the Town. The Town proposes to work closely with Oneida County?s lake classification program to create a land use plan that matches appropriate land uses with the specific class of lakes in the watershed. An overall educational component for both citizens and local officials will be part of the project deliverables along with the following components; 1) a vision statement, 2) Socio- Economic profile, 3) assess housing characteristics, 4) inventory and map community facilities and services, 5) complete inventory of transportation systems, 6) research and analyze physical and biological characteristics of land and water resources, 7) complete an accurate land use inventory with future projections, 8) implementation strategies will be based on protection of the town?s nature resource base and encouraged to make the best use of that resource.
Grant Details
Lake Protection Grant
Date
2/1/1998
Waters Involved
Katherine Lake
Status
Complete
Town Of Hazelhurst: Lco-Hazelhurst Land & Water Protection Program: Town of Hazelhurst proposes to develop a comprehensive land use plan and implementation strategies to address the land and water issues in the Town. The Town proposes to work closely with Oneida County?s lake classification program to create a land use plan that matches appropriate land uses with the specific class of lakes in the watershed. An overall educational component for both citizens and local officials will be part of the project deliverables along with the following components; 1) a vision statement, 2) Socio- Economic profile, 3) assess housing characteristics, 4) inventory and map community facilities and services, 5) complete inventory of transportation systems, 6) research and analyze physical and biological characteristics of land and water resources, 7) complete an accurate land use inventory with future projections, 8) implementation strategies will be based on protection of the town?s nature resource base and encouraged to make the best use of that resource.
Grant Details
Lake Protection Grant
Date
2/1/1998
Waters Involved
Kitty Springs
Status
Complete
Town Of Hazelhurst: Lco-Hazelhurst Land & Water Protection Program: Town of Hazelhurst proposes to develop a comprehensive land use plan and implementation strategies to address the land and water issues in the Town. The Town proposes to work closely with Oneida County?s lake classification program to create a land use plan that matches appropriate land uses with the specific class of lakes in the watershed. An overall educational component for both citizens and local officials will be part of the project deliverables along with the following components; 1) a vision statement, 2) Socio- Economic profile, 3) assess housing characteristics, 4) inventory and map community facilities and services, 5) complete inventory of transportation systems, 6) research and analyze physical and biological characteristics of land and water resources, 7) complete an accurate land use inventory with future projections, 8) implementation strategies will be based on protection of the town?s nature resource base and encouraged to make the best use of that resource.
Grant Details
Lake Protection Grant
Date
7/1/2000
Waters Involved
Lake Creek
Status
Complete
Town Of Pine Lake: Lmi-Town Of Pine Lake Land & Water Protection Program: The Town of Pine Lake will develop a comprehensive land use plan with implementation strategies to address land and water issues in the town.
Activities associated with this project include; facilitated public meetings and workshop; town wide survey; draft and final reports; developmentof maps and exhibits for public informational meetings; development and mailing of a poster plan; project management/coordination.
Project deliverables for this project include copies of all maps, and a copy of the final comprehensive land use plan.
The Department of Natural Resources will be provided with both a paper copy and an electronic copy of all project products and periodic reports on the progress of the project.
Grant Details
Lake Protection Grant
Date
2/1/1998
Waters Involved
Lake Seventeen
Status
Complete
Town Of Hazelhurst: Lco-Hazelhurst Land & Water Protection Program: Town of Hazelhurst proposes to develop a comprehensive land use plan and implementation strategies to address the land and water issues in the Town. The Town proposes to work closely with Oneida County?s lake classification program to create a land use plan that matches appropriate land uses with the specific class of lakes in the watershed. An overall educational component for both citizens and local officials will be part of the project deliverables along with the following components; 1) a vision statement, 2) Socio- Economic profile, 3) assess housing characteristics, 4) inventory and map community facilities and services, 5) complete inventory of transportation systems, 6) research and analyze physical and biological characteristics of land and water resources, 7) complete an accurate land use inventory with future projections, 8) implementation strategies will be based on protection of the town?s nature resource base and encouraged to make the best use of that resource.
Grant Details
Lake Protection Grant
Date
9/1/2002
Waters Involved
Lawrence Lake
Status
Complete
Langlade County: Acq-Langlade County-Lawrence Lake Acquisition: Langlade County shall participate in the Lakes Protection Program by purchasing approximately 320 acres of land including frontage on Lawrence Lake.
Grant Details
Lake Protection Grant
Date
2/1/1998
Waters Involved
Lee Lake
Status
Complete
Town Of Hazelhurst: Lco-Hazelhurst Land & Water Protection Program: Town of Hazelhurst proposes to develop a comprehensive land use plan and implementation strategies to address the land and water issues in the Town. The Town proposes to work closely with Oneida County?s lake classification program to create a land use plan that matches appropriate land uses with the specific class of lakes in the watershed. An overall educational component for both citizens and local officials will be part of the project deliverables along with the following components; 1) a vision statement, 2) Socio- Economic profile, 3) assess housing characteristics, 4) inventory and map community facilities and services, 5) complete inventory of transportation systems, 6) research and analyze physical and biological characteristics of land and water resources, 7) complete an accurate land use inventory with future projections, 8) implementation strategies will be based on protection of the town?s nature resource base and encouraged to make the best use of that resource.
Grant Details
Lake Protection Grant
Date
7/1/2000
Waters Involved
Little Bertram Lake
Status
Complete
Town Of Pine Lake: Lmi-Town Of Pine Lake Land & Water Protection Program: The Town of Pine Lake will develop a comprehensive land use plan with implementation strategies to address land and water issues in the town.
Activities associated with this project include; facilitated public meetings and workshop; town wide survey; draft and final reports; developmentof maps and exhibits for public informational meetings; development and mailing of a poster plan; project management/coordination.
Project deliverables for this project include copies of all maps, and a copy of the final comprehensive land use plan.
The Department of Natural Resources will be provided with both a paper copy and an electronic copy of all project products and periodic reports on the progress of the project.
Grant Details
Lake Protection Grant
Date
2/1/1998
Waters Involved
Lost Lake
Status
Complete
Town Of Hazelhurst: Lco-Hazelhurst Land & Water Protection Program: Town of Hazelhurst proposes to develop a comprehensive land use plan and implementation strategies to address the land and water issues in the Town. The Town proposes to work closely with Oneida County?s lake classification program to create a land use plan that matches appropriate land uses with the specific class of lakes in the watershed. An overall educational component for both citizens and local officials will be part of the project deliverables along with the following components; 1) a vision statement, 2) Socio- Economic profile, 3) assess housing characteristics, 4) inventory and map community facilities and services, 5) complete inventory of transportation systems, 6) research and analyze physical and biological characteristics of land and water resources, 7) complete an accurate land use inventory with future projections, 8) implementation strategies will be based on protection of the town?s nature resource base and encouraged to make the best use of that resource.
Grant Details
Lake Protection Grant
Date
3/15/2021
Waters Involved
Lower Clear Lake
Status
Complete
Langlade County: Hlr - Langlade County Healthy Lakes 2021: Partnering with property owners, Langlade County is sponsoring a grant to implement best practices from Wisconsin\2019s 2019 Healthy Lakes & Rivers Action Plan. Best practices, including fish sticks, 350 sq. ft. native plantings, diversions, rock infiltration, and/or rain gardens, will be designed and installed according to program fact sheets, technical guidance and the grant application.
All funded best practices require contracts that must remain in place for 10 years and include the minimum operation and maintenance requirements described in the special conditions at the end of this agreement. If the landowner is the grant sponsor this Lake Protection Grant Agreement serves as the contract. If the best practice(s) will be implemented on land other than the sponsor\2019s, a contract between the sponsor and landowner describing the 10-year contract period, minimum operation and maintenance details, and data to be collected is required. The Department may perform site inspections and/or monitoring to ensure project success.
Deliverables include: a project summary including data requirements, pre/post photographs, and confirmation of completed design work and landowner contracts. A Healthy Lakes & Rivers Example Report is available to assist you.
Special conditions: Project management and technical assistance cash costs cannot exceed 10% of the state share of the grant award; this does not include implementation labor. Water regulation and/or county zoning permits must be issued before construction. Projects required for regulatory compliance purposes, including shoreland mitigation projects, are not eligible for reimbursement. The Healthy Lakes & Rivers logo should be used for promotion and publicity and DNR recognized as a funding source.
Grant Details
Lake Protection Grant
Date
2/1/1998
Waters Involved
Lower Kaubashine Lake
Status
Complete
Town Of Hazelhurst: Lco-Hazelhurst Land & Water Protection Program: Town of Hazelhurst proposes to develop a comprehensive land use plan and implementation strategies to address the land and water issues in the Town. The Town proposes to work closely with Oneida County?s lake classification program to create a land use plan that matches appropriate land uses with the specific class of lakes in the watershed. An overall educational component for both citizens and local officials will be part of the project deliverables along with the following components; 1) a vision statement, 2) Socio- Economic profile, 3) assess housing characteristics, 4) inventory and map community facilities and services, 5) complete inventory of transportation systems, 6) research and analyze physical and biological characteristics of land and water resources, 7) complete an accurate land use inventory with future projections, 8) implementation strategies will be based on protection of the town?s nature resource base and encouraged to make the best use of that resource.
Grant Details
Lake Protection Grant
Date
2/1/1998
Waters Involved
McCormick Lake
Status
Complete
Town Of Hazelhurst: Lco-Hazelhurst Land & Water Protection Program: Town of Hazelhurst proposes to develop a comprehensive land use plan and implementation strategies to address the land and water issues in the Town. The Town proposes to work closely with Oneida County?s lake classification program to create a land use plan that matches appropriate land uses with the specific class of lakes in the watershed. An overall educational component for both citizens and local officials will be part of the project deliverables along with the following components; 1) a vision statement, 2) Socio- Economic profile, 3) assess housing characteristics, 4) inventory and map community facilities and services, 5) complete inventory of transportation systems, 6) research and analyze physical and biological characteristics of land and water resources, 7) complete an accurate land use inventory with future projections, 8) implementation strategies will be based on protection of the town?s nature resource base and encouraged to make the best use of that resource.
Grant Details
Lake Protection Grant
Date
2/1/1998
Waters Involved
Miller Lake
Status
Complete
Town Of Hazelhurst: Lco-Hazelhurst Land & Water Protection Program: Town of Hazelhurst proposes to develop a comprehensive land use plan and implementation strategies to address the land and water issues in the Town. The Town proposes to work closely with Oneida County?s lake classification program to create a land use plan that matches appropriate land uses with the specific class of lakes in the watershed. An overall educational component for both citizens and local officials will be part of the project deliverables along with the following components; 1) a vision statement, 2) Socio- Economic profile, 3) assess housing characteristics, 4) inventory and map community facilities and services, 5) complete inventory of transportation systems, 6) research and analyze physical and biological characteristics of land and water resources, 7) complete an accurate land use inventory with future projections, 8) implementation strategies will be based on protection of the town?s nature resource base and encouraged to make the best use of that resource.
Grant Details
Lake Protection Grant
Date
7/1/2000
Waters Involved
Minnow Lake
Status
Complete
Town Of Pine Lake: Lmi-Town Of Pine Lake Land & Water Protection Program: The Town of Pine Lake will develop a comprehensive land use plan with implementation strategies to address land and water issues in the town.
Activities associated with this project include; facilitated public meetings and workshop; town wide survey; draft and final reports; developmentof maps and exhibits for public informational meetings; development and mailing of a poster plan; project management/coordination.
Project deliverables for this project include copies of all maps, and a copy of the final comprehensive land use plan.
The Department of Natural Resources will be provided with both a paper copy and an electronic copy of all project products and periodic reports on the progress of the project.
Grant Details
Lake Protection Grant
Date
3/15/2021
Waters Involved
Moccasin Lake
Status
Complete
Langlade County: Hlr - Langlade County Healthy Lakes 2021: Partnering with property owners, Langlade County is sponsoring a grant to implement best practices from Wisconsin\2019s 2019 Healthy Lakes & Rivers Action Plan. Best practices, including fish sticks, 350 sq. ft. native plantings, diversions, rock infiltration, and/or rain gardens, will be designed and installed according to program fact sheets, technical guidance and the grant application.
All funded best practices require contracts that must remain in place for 10 years and include the minimum operation and maintenance requirements described in the special conditions at the end of this agreement. If the landowner is the grant sponsor this Lake Protection Grant Agreement serves as the contract. If the best practice(s) will be implemented on land other than the sponsor\2019s, a contract between the sponsor and landowner describing the 10-year contract period, minimum operation and maintenance details, and data to be collected is required. The Department may perform site inspections and/or monitoring to ensure project success.
Deliverables include: a project summary including data requirements, pre/post photographs, and confirmation of completed design work and landowner contracts. A Healthy Lakes & Rivers Example Report is available to assist you.
Special conditions: Project management and technical assistance cash costs cannot exceed 10% of the state share of the grant award; this does not include implementation labor. Water regulation and/or county zoning permits must be issued before construction. Projects required for regulatory compliance purposes, including shoreland mitigation projects, are not eligible for reimbursement. The Healthy Lakes & Rivers logo should be used for promotion and publicity and DNR recognized as a funding source.
Grant Details
Lake Protection Grant
Date
7/1/2000
Waters Involved
Moen Lake
Status
Complete
Town Of Pine Lake: Lmi-Town Of Pine Lake Land & Water Protection Program: The Town of Pine Lake will develop a comprehensive land use plan with implementation strategies to address land and water issues in the town.
Activities associated with this project include; facilitated public meetings and workshop; town wide survey; draft and final reports; developmentof maps and exhibits for public informational meetings; development and mailing of a poster plan; project management/coordination.
Project deliverables for this project include copies of all maps, and a copy of the final comprehensive land use plan.
The Department of Natural Resources will be provided with both a paper copy and an electronic copy of all project products and periodic reports on the progress of the project.
Grant Details
Lake Protection Grant
Date
7/1/2000
Waters Involved
Mud Lake
Status
Complete
Town Of Pine Lake: Lmi-Town Of Pine Lake Land & Water Protection Program: The Town of Pine Lake will develop a comprehensive land use plan with implementation strategies to address land and water issues in the town.
Activities associated with this project include; facilitated public meetings and workshop; town wide survey; draft and final reports; developmentof maps and exhibits for public informational meetings; development and mailing of a poster plan; project management/coordination.
Project deliverables for this project include copies of all maps, and a copy of the final comprehensive land use plan.
The Department of Natural Resources will be provided with both a paper copy and an electronic copy of all project products and periodic reports on the progress of the project.
Grant Details
Lake Protection Grant
Date
9/1/1999
Waters Involved
Muskellunge Lake
Status
Complete
Muskellunge Lake Protection & Rehab District: Res- Muskellunge Lake Fish Habitat Improvement: The District will implement recommendations from an earlier Planning Grant project by constructing and placing 27 fish habitat shelters and snags on the bed of the lake.
Grant Details
Lake Protection Grant
Date
2/1/1998
Waters Involved
Myrtle Lake
Status
Complete
Town Of Hazelhurst: Lco-Hazelhurst Land & Water Protection Program: Town of Hazelhurst proposes to develop a comprehensive land use plan and implementation strategies to address the land and water issues in the Town. The Town proposes to work closely with Oneida County?s lake classification program to create a land use plan that matches appropriate land uses with the specific class of lakes in the watershed. An overall educational component for both citizens and local officials will be part of the project deliverables along with the following components; 1) a vision statement, 2) Socio- Economic profile, 3) assess housing characteristics, 4) inventory and map community facilities and services, 5) complete inventory of transportation systems, 6) research and analyze physical and biological characteristics of land and water resources, 7) complete an accurate land use inventory with future projections, 8) implementation strategies will be based on protection of the town?s nature resource base and encouraged to make the best use of that resource.
Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Pickerel Lake
Status
Complete
Pickerel/Crane Lake Prot & Rehab District: Res-Pickerell Lake Aeration System: The project will install an aeration system, monitor Dissolved Oxygen throughout the winter, and provide education on sources of nutrient loading into Pickerel Lake. The project will also include an education effort for safety of open water and sources of the problem which have lead to the need for lake aeration.
All required permits will be received prior to equipment installation.
Specific deliverables for this grant project include a final report describing project accomplishments.
The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.
Grant Details
Lake Protection Grant
Date
7/1/2000
Waters Involved
Pine Lake
Status
Complete
Town Of Pine Lake: Lmi-Town Of Pine Lake Land & Water Protection Program: The Town of Pine Lake will develop a comprehensive land use plan with implementation strategies to address land and water issues in the town.
Activities associated with this project include; facilitated public meetings and workshop; town wide survey; draft and final reports; developmentof maps and exhibits for public informational meetings; development and mailing of a poster plan; project management/coordination.
Project deliverables for this project include copies of all maps, and a copy of the final comprehensive land use plan.
The Department of Natural Resources will be provided with both a paper copy and an electronic copy of all project products and periodic reports on the progress of the project.
Grant Details
Lake Protection Grant
Date
7/1/2000
Waters Involved
Rhinelander Flowage
Status
Complete
Town Of Pine Lake: Lmi-Town Of Pine Lake Land & Water Protection Program: The Town of Pine Lake will develop a comprehensive land use plan with implementation strategies to address land and water issues in the town.
Activities associated with this project include; facilitated public meetings and workshop; town wide survey; draft and final reports; developmentof maps and exhibits for public informational meetings; development and mailing of a poster plan; project management/coordination.
Project deliverables for this project include copies of all maps, and a copy of the final comprehensive land use plan.
The Department of Natural Resources will be provided with both a paper copy and an electronic copy of all project products and periodic reports on the progress of the project.
Grant Details
Lake Protection Grant
Date
2/1/1998
Waters Involved
Rocky Run Springs
Status
Complete
Town Of Hazelhurst: Lco-Hazelhurst Land & Water Protection Program: Town of Hazelhurst proposes to develop a comprehensive land use plan and implementation strategies to address the land and water issues in the Town. The Town proposes to work closely with Oneida County?s lake classification program to create a land use plan that matches appropriate land uses with the specific class of lakes in the watershed. An overall educational component for both citizens and local officials will be part of the project deliverables along with the following components; 1) a vision statement, 2) Socio- Economic profile, 3) assess housing characteristics, 4) inventory and map community facilities and services, 5) complete inventory of transportation systems, 6) research and analyze physical and biological characteristics of land and water resources, 7) complete an accurate land use inventory with future projections, 8) implementation strategies will be based on protection of the town?s nature resource base and encouraged to make the best use of that resource.
Grant Details
Lake Protection Grant
Date
2/1/1998
Waters Involved
Round Lake
Status
Complete
Town Of Hazelhurst: Lco-Hazelhurst Land & Water Protection Program: Town of Hazelhurst proposes to develop a comprehensive land use plan and implementation strategies to address the land and water issues in the Town. The Town proposes to work closely with Oneida County?s lake classification program to create a land use plan that matches appropriate land uses with the specific class of lakes in the watershed. An overall educational component for both citizens and local officials will be part of the project deliverables along with the following components; 1) a vision statement, 2) Socio- Economic profile, 3) assess housing characteristics, 4) inventory and map community facilities and services, 5) complete inventory of transportation systems, 6) research and analyze physical and biological characteristics of land and water resources, 7) complete an accurate land use inventory with future projections, 8) implementation strategies will be based on protection of the town?s nature resource base and encouraged to make the best use of that resource.
Grant Details
Lake Protection Grant
Date
2/1/1998
Waters Involved
Scott Springs
Status
Complete
Town Of Hazelhurst: Lco-Hazelhurst Land & Water Protection Program: Town of Hazelhurst proposes to develop a comprehensive land use plan and implementation strategies to address the land and water issues in the Town. The Town proposes to work closely with Oneida County?s lake classification program to create a land use plan that matches appropriate land uses with the specific class of lakes in the watershed. An overall educational component for both citizens and local officials will be part of the project deliverables along with the following components; 1) a vision statement, 2) Socio- Economic profile, 3) assess housing characteristics, 4) inventory and map community facilities and services, 5) complete inventory of transportation systems, 6) research and analyze physical and biological characteristics of land and water resources, 7) complete an accurate land use inventory with future projections, 8) implementation strategies will be based on protection of the town?s nature resource base and encouraged to make the best use of that resource.
Grant Details
Lake Protection Grant
Date
7/1/2000
Waters Involved
Second Lake
Status
Complete
Town Of Pine Lake: Lmi-Town Of Pine Lake Land & Water Protection Program: The Town of Pine Lake will develop a comprehensive land use plan with implementation strategies to address land and water issues in the town.
Activities associated with this project include; facilitated public meetings and workshop; town wide survey; draft and final reports; developmentof maps and exhibits for public informational meetings; development and mailing of a poster plan; project management/coordination.
Project deliverables for this project include copies of all maps, and a copy of the final comprehensive land use plan.
The Department of Natural Resources will be provided with both a paper copy and an electronic copy of all project products and periodic reports on the progress of the project.
Grant Details
Lake Protection Grant
Date
7/1/2000
Waters Involved
Shepard Lake
Status
Complete
Town Of Pine Lake: Lmi-Town Of Pine Lake Land & Water Protection Program: The Town of Pine Lake will develop a comprehensive land use plan with implementation strategies to address land and water issues in the town.
Activities associated with this project include; facilitated public meetings and workshop; town wide survey; draft and final reports; developmentof maps and exhibits for public informational meetings; development and mailing of a poster plan; project management/coordination.
Project deliverables for this project include copies of all maps, and a copy of the final comprehensive land use plan.
The Department of Natural Resources will be provided with both a paper copy and an electronic copy of all project products and periodic reports on the progress of the project.
Grant Details
Lake Protection Grant
Date
2/1/1998
Waters Involved
Silver Lake
Status
Complete
Town Of Hazelhurst: Lco-Hazelhurst Land & Water Protection Program: Town of Hazelhurst proposes to develop a comprehensive land use plan and implementation strategies to address the land and water issues in the Town. The Town proposes to work closely with Oneida County?s lake classification program to create a land use plan that matches appropriate land uses with the specific class of lakes in the watershed. An overall educational component for both citizens and local officials will be part of the project deliverables along with the following components; 1) a vision statement, 2) Socio- Economic profile, 3) assess housing characteristics, 4) inventory and map community facilities and services, 5) complete inventory of transportation systems, 6) research and analyze physical and biological characteristics of land and water resources, 7) complete an accurate land use inventory with future projections, 8) implementation strategies will be based on protection of the town?s nature resource base and encouraged to make the best use of that resource.
Grant Details
Lake Protection Grant
Date
7/1/2000
Waters Involved
Silver Lake
Status
Complete
Town Of Pine Lake: Lmi-Town Of Pine Lake Land & Water Protection Program: The Town of Pine Lake will develop a comprehensive land use plan with implementation strategies to address land and water issues in the town.
Activities associated with this project include; facilitated public meetings and workshop; town wide survey; draft and final reports; developmentof maps and exhibits for public informational meetings; development and mailing of a poster plan; project management/coordination.
Project deliverables for this project include copies of all maps, and a copy of the final comprehensive land use plan.
The Department of Natural Resources will be provided with both a paper copy and an electronic copy of all project products and periodic reports on the progress of the project.
Grant Details
Lake Protection Grant
Date
2/1/1998
Waters Involved
South Blue Lake
Status
Complete
Town Of Hazelhurst: Lco-Hazelhurst Land & Water Protection Program: Town of Hazelhurst proposes to develop a comprehensive land use plan and implementation strategies to address the land and water issues in the Town. The Town proposes to work closely with Oneida County?s lake classification program to create a land use plan that matches appropriate land uses with the specific class of lakes in the watershed. An overall educational component for both citizens and local officials will be part of the project deliverables along with the following components; 1) a vision statement, 2) Socio- Economic profile, 3) assess housing characteristics, 4) inventory and map community facilities and services, 5) complete inventory of transportation systems, 6) research and analyze physical and biological characteristics of land and water resources, 7) complete an accurate land use inventory with future projections, 8) implementation strategies will be based on protection of the town?s nature resource base and encouraged to make the best use of that resource.
Grant Details
Lake Protection Grant
Date
7/1/2000
Waters Involved
South Pine Lake
Status
Complete
Town Of Pine Lake: Lmi-Town Of Pine Lake Land & Water Protection Program: The Town of Pine Lake will develop a comprehensive land use plan with implementation strategies to address land and water issues in the town.
Activities associated with this project include; facilitated public meetings and workshop; town wide survey; draft and final reports; developmentof maps and exhibits for public informational meetings; development and mailing of a poster plan; project management/coordination.
Project deliverables for this project include copies of all maps, and a copy of the final comprehensive land use plan.
The Department of Natural Resources will be provided with both a paper copy and an electronic copy of all project products and periodic reports on the progress of the project.
Grant Details
Lake Protection Grant
Date
4/15/2015
Waters Involved
Squash Lake
Status
Complete
Squash Lake Assoc: Hlk-Squash Lake Healthy Lakes Initiative: Squash Lake Association will implement best practices described in Wisconsin\2019s 2014-2017 Healthy Lakes Implementation Plan. Practices include: fish sticks on 1 property and a 350 ft2 native planting, rain garden, and rock infiltration practice on 1 property.
The best practices require a contract to remain in effect for 10 years and must include minimum operation and maintenance requirements and data collection as described in grant condition #17. If best practice(s) are implemented on land owned by the grant Sponsor, this Lake Protection Grant Agreement serves as the contract. If best practice(s) are implemented on land other than the sponsor\2019s, a contract between the sponsor and landowner that abides by grant condition #17 is required.
The Department may require re-payment of project installation costs if the best practice is disturbed or removed. The Sponsor and/or the Department may perform site inspections and/or monitoring to ensure project success.
Deliverables: Best practice location and design information, if not included in the application; signed 10-year landowner contract; pre and post project installation photographs; summary of education activities and publicity/promotion of Healthy Lakes initiative, if applicable.
Special conditions: The state share of each best practice cannot exceed $1,000. The state share of grant administration and technical assistance costs may not exceed 10% of the grant award; technical assistance does not include implementation labor. Funding cannot be used for mitigation or regulatory compliance activities. Water regulation and/or county zoning permits must be issued before construction. The Healthy Lakes logo should be used for promotion and publicity, and DNR recognized as a funding source.
Grant Details
Lake Protection Grant
Date
2/1/1998
Waters Involved
Swartz Lake
Status
Complete
Town Of Hazelhurst: Lco-Hazelhurst Land & Water Protection Program: Town of Hazelhurst proposes to develop a comprehensive land use plan and implementation strategies to address the land and water issues in the Town. The Town proposes to work closely with Oneida County?s lake classification program to create a land use plan that matches appropriate land uses with the specific class of lakes in the watershed. An overall educational component for both citizens and local officials will be part of the project deliverables along with the following components; 1) a vision statement, 2) Socio- Economic profile, 3) assess housing characteristics, 4) inventory and map community facilities and services, 5) complete inventory of transportation systems, 6) research and analyze physical and biological characteristics of land and water resources, 7) complete an accurate land use inventory with future projections, 8) implementation strategies will be based on protection of the town?s nature resource base and encouraged to make the best use of that resource.
Grant Details
Lake Protection Grant
Date
7/1/2000
Waters Involved
Sylvan Lake
Status
Complete
Town Of Pine Lake: Lmi-Town Of Pine Lake Land & Water Protection Program: The Town of Pine Lake will develop a comprehensive land use plan with implementation strategies to address land and water issues in the town.
Activities associated with this project include; facilitated public meetings and workshop; town wide survey; draft and final reports; developmentof maps and exhibits for public informational meetings; development and mailing of a poster plan; project management/coordination.
Project deliverables for this project include copies of all maps, and a copy of the final comprehensive land use plan.
The Department of Natural Resources will be provided with both a paper copy and an electronic copy of all project products and periodic reports on the progress of the project.
Grant Details
Lake Protection Grant
Date
7/1/2000
Waters Involved
Third Lake
Status
Complete
Town Of Pine Lake: Lmi-Town Of Pine Lake Land & Water Protection Program: The Town of Pine Lake will develop a comprehensive land use plan with implementation strategies to address land and water issues in the town.
Activities associated with this project include; facilitated public meetings and workshop; town wide survey; draft and final reports; developmentof maps and exhibits for public informational meetings; development and mailing of a poster plan; project management/coordination.
Project deliverables for this project include copies of all maps, and a copy of the final comprehensive land use plan.
The Department of Natural Resources will be provided with both a paper copy and an electronic copy of all project products and periodic reports on the progress of the project.
Grant Details
Lake Protection Grant
Date
7/1/2000
Waters Involved
Thunder Lake
Status
Complete
Town Of Pine Lake: Lmi-Town Of Pine Lake Land & Water Protection Program: The Town of Pine Lake will develop a comprehensive land use plan with implementation strategies to address land and water issues in the town.
Activities associated with this project include; facilitated public meetings and workshop; town wide survey; draft and final reports; developmentof maps and exhibits for public informational meetings; development and mailing of a poster plan; project management/coordination.
Project deliverables for this project include copies of all maps, and a copy of the final comprehensive land use plan.
The Department of Natural Resources will be provided with both a paper copy and an electronic copy of all project products and periodic reports on the progress of the project.
Grant Details
Lake Protection Grant
Date
2/1/1998
Waters Involved
Tomahawk Lake
Status
Complete
Town Of Hazelhurst: Lco-Hazelhurst Land & Water Protection Program: Town of Hazelhurst proposes to develop a comprehensive land use plan and implementation strategies to address the land and water issues in the Town. The Town proposes to work closely with Oneida County?s lake classification program to create a land use plan that matches appropriate land uses with the specific class of lakes in the watershed. An overall educational component for both citizens and local officials will be part of the project deliverables along with the following components; 1) a vision statement, 2) Socio- Economic profile, 3) assess housing characteristics, 4) inventory and map community facilities and services, 5) complete inventory of transportation systems, 6) research and analyze physical and biological characteristics of land and water resources, 7) complete an accurate land use inventory with future projections, 8) implementation strategies will be based on protection of the town?s nature resource base and encouraged to make the best use of that resource.
Grant Details
Lake Protection Grant
Date
2/1/1998
Waters Involved
Twin Lakes
Status
Complete
Town Of Hazelhurst: Lco-Hazelhurst Land & Water Protection Program: Town of Hazelhurst proposes to develop a comprehensive land use plan and implementation strategies to address the land and water issues in the Town. The Town proposes to work closely with Oneida County?s lake classification program to create a land use plan that matches appropriate land uses with the specific class of lakes in the watershed. An overall educational component for both citizens and local officials will be part of the project deliverables along with the following components; 1) a vision statement, 2) Socio- Economic profile, 3) assess housing characteristics, 4) inventory and map community facilities and services, 5) complete inventory of transportation systems, 6) research and analyze physical and biological characteristics of land and water resources, 7) complete an accurate land use inventory with future projections, 8) implementation strategies will be based on protection of the town?s nature resource base and encouraged to make the best use of that resource.
Grant Details
Lake Protection Grant
Date
2/1/1998
Waters Involved
Un Spring
Status
Complete
Town Of Hazelhurst: Lco-Hazelhurst Land & Water Protection Program: Town of Hazelhurst proposes to develop a comprehensive land use plan and implementation strategies to address the land and water issues in the Town. The Town proposes to work closely with Oneida County?s lake classification program to create a land use plan that matches appropriate land uses with the specific class of lakes in the watershed. An overall educational component for both citizens and local officials will be part of the project deliverables along with the following components; 1) a vision statement, 2) Socio- Economic profile, 3) assess housing characteristics, 4) inventory and map community facilities and services, 5) complete inventory of transportation systems, 6) research and analyze physical and biological characteristics of land and water resources, 7) complete an accurate land use inventory with future projections, 8) implementation strategies will be based on protection of the town?s nature resource base and encouraged to make the best use of that resource.
Grant Details
Lake Protection Grant
Date
7/1/2000
Waters Involved
Un Spring
Status
Complete
Town Of Pine Lake: Lmi-Town Of Pine Lake Land & Water Protection Program: The Town of Pine Lake will develop a comprehensive land use plan with implementation strategies to address land and water issues in the town.
Activities associated with this project include; facilitated public meetings and workshop; town wide survey; draft and final reports; developmentof maps and exhibits for public informational meetings; development and mailing of a poster plan; project management/coordination.
Project deliverables for this project include copies of all maps, and a copy of the final comprehensive land use plan.
The Department of Natural Resources will be provided with both a paper copy and an electronic copy of all project products and periodic reports on the progress of the project.
Grant Details
Lake Protection Grant
Date
2/1/1998
Waters Involved
Unnamed
Status
Complete
Town Of Hazelhurst: Lco-Hazelhurst Land & Water Protection Program: Town of Hazelhurst proposes to develop a comprehensive land use plan and implementation strategies to address the land and water issues in the Town. The Town proposes to work closely with Oneida County?s lake classification program to create a land use plan that matches appropriate land uses with the specific class of lakes in the watershed. An overall educational component for both citizens and local officials will be part of the project deliverables along with the following components; 1) a vision statement, 2) Socio- Economic profile, 3) assess housing characteristics, 4) inventory and map community facilities and services, 5) complete inventory of transportation systems, 6) research and analyze physical and biological characteristics of land and water resources, 7) complete an accurate land use inventory with future projections, 8) implementation strategies will be based on protection of the town?s nature resource base and encouraged to make the best use of that resource.
Grant Details
Lake Protection Grant
Date
7/1/2000
Waters Involved
Unnamed
Status
Complete
Town Of Pine Lake: Lmi-Town Of Pine Lake Land & Water Protection Program: The Town of Pine Lake will develop a comprehensive land use plan with implementation strategies to address land and water issues in the town.
Activities associated with this project include; facilitated public meetings and workshop; town wide survey; draft and final reports; developmentof maps and exhibits for public informational meetings; development and mailing of a poster plan; project management/coordination.
Project deliverables for this project include copies of all maps, and a copy of the final comprehensive land use plan.
The Department of Natural Resources will be provided with both a paper copy and an electronic copy of all project products and periodic reports on the progress of the project.
Grant Details
Lake Protection Grant
Date
2/1/1998
Waters Involved
Upper Kaubashine Lake
Status
Complete
Town Of Hazelhurst: Lco-Hazelhurst Land & Water Protection Program: Town of Hazelhurst proposes to develop a comprehensive land use plan and implementation strategies to address the land and water issues in the Town. The Town proposes to work closely with Oneida County?s lake classification program to create a land use plan that matches appropriate land uses with the specific class of lakes in the watershed. An overall educational component for both citizens and local officials will be part of the project deliverables along with the following components; 1) a vision statement, 2) Socio- Economic profile, 3) assess housing characteristics, 4) inventory and map community facilities and services, 5) complete inventory of transportation systems, 6) research and analyze physical and biological characteristics of land and water resources, 7) complete an accurate land use inventory with future projections, 8) implementation strategies will be based on protection of the town?s nature resource base and encouraged to make the best use of that resource.
Grant Details
Lake Protection Grant
Date
3/15/2021
Waters Involved
Upper Post Lake
Status
Complete
Langlade County: Hlr - Langlade County Healthy Lakes 2021: Partnering with property owners, Langlade County is sponsoring a grant to implement best practices from Wisconsin\2019s 2019 Healthy Lakes & Rivers Action Plan. Best practices, including fish sticks, 350 sq. ft. native plantings, diversions, rock infiltration, and/or rain gardens, will be designed and installed according to program fact sheets, technical guidance and the grant application.
All funded best practices require contracts that must remain in place for 10 years and include the minimum operation and maintenance requirements described in the special conditions at the end of this agreement. If the landowner is the grant sponsor this Lake Protection Grant Agreement serves as the contract. If the best practice(s) will be implemented on land other than the sponsor\2019s, a contract between the sponsor and landowner describing the 10-year contract period, minimum operation and maintenance details, and data to be collected is required. The Department may perform site inspections and/or monitoring to ensure project success.
Deliverables include: a project summary including data requirements, pre/post photographs, and confirmation of completed design work and landowner contracts. A Healthy Lakes & Rivers Example Report is available to assist you.
Special conditions: Project management and technical assistance cash costs cannot exceed 10% of the state share of the grant award; this does not include implementation labor. Water regulation and/or county zoning permits must be issued before construction. Projects required for regulatory compliance purposes, including shoreland mitigation projects, are not eligible for reimbursement. The Healthy Lakes & Rivers logo should be used for promotion and publicity and DNR recognized as a funding source.
Grant Details
Lake Protection Grant
Date
3/15/2021
Waters Involved
Wolf River
Status
Complete
Langlade County: Hlr - Langlade County Healthy Lakes 2021: Partnering with property owners, Langlade County is sponsoring a grant to implement best practices from Wisconsin\2019s 2019 Healthy Lakes & Rivers Action Plan. Best practices, including fish sticks, 350 sq. ft. native plantings, diversions, rock infiltration, and/or rain gardens, will be designed and installed according to program fact sheets, technical guidance and the grant application.
All funded best practices require contracts that must remain in place for 10 years and include the minimum operation and maintenance requirements described in the special conditions at the end of this agreement. If the landowner is the grant sponsor this Lake Protection Grant Agreement serves as the contract. If the best practice(s) will be implemented on land other than the sponsor\2019s, a contract between the sponsor and landowner describing the 10-year contract period, minimum operation and maintenance details, and data to be collected is required. The Department may perform site inspections and/or monitoring to ensure project success.
Deliverables include: a project summary including data requirements, pre/post photographs, and confirmation of completed design work and landowner contracts. A Healthy Lakes & Rivers Example Report is available to assist you.
Special conditions: Project management and technical assistance cash costs cannot exceed 10% of the state share of the grant award; this does not include implementation labor. Water regulation and/or county zoning permits must be issued before construction. Projects required for regulatory compliance purposes, including shoreland mitigation projects, are not eligible for reimbursement. The Healthy Lakes & Rivers logo should be used for promotion and publicity and DNR recognized as a funding source.
Grant Details
Lake Protection Grant
Date
7/1/2000
Waters Involved
Wood Curt Lake
Status
Complete
Town Of Pine Lake: Lmi-Town Of Pine Lake Land & Water Protection Program: The Town of Pine Lake will develop a comprehensive land use plan with implementation strategies to address land and water issues in the town.
Activities associated with this project include; facilitated public meetings and workshop; town wide survey; draft and final reports; developmentof maps and exhibits for public informational meetings; development and mailing of a poster plan; project management/coordination.
Project deliverables for this project include copies of all maps, and a copy of the final comprehensive land use plan.
The Department of Natural Resources will be provided with both a paper copy and an electronic copy of all project products and periodic reports on the progress of the project.
Grant Details
Lake Protection Grant
Date
2/1/1998
Waters Involved
Yawkey Lake
Status
Complete
Town Of Hazelhurst: Lco-Hazelhurst Land & Water Protection Program: Town of Hazelhurst proposes to develop a comprehensive land use plan and implementation strategies to address the land and water issues in the Town. The Town proposes to work closely with Oneida County?s lake classification program to create a land use plan that matches appropriate land uses with the specific class of lakes in the watershed. An overall educational component for both citizens and local officials will be part of the project deliverables along with the following components; 1) a vision statement, 2) Socio- Economic profile, 3) assess housing characteristics, 4) inventory and map community facilities and services, 5) complete inventory of transportation systems, 6) research and analyze physical and biological characteristics of land and water resources, 7) complete an accurate land use inventory with future projections, 8) implementation strategies will be based on protection of the town?s nature resource base and encouraged to make the best use of that resource.
Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Alligator Lake
Status
Complete
Town Of Enterprise: Town Of Enterprise Land Use And Water Quality Mgmt Plan: The Town of Enterprise proposes to develop a land use plan with implementation strategies to address land and water issues in the Town. Project deliverables will include a Land Use and Water Quality Management Plan which will consider demographics, public participation planning, water management issues, planning considerations, and ordinance reviews. Other deliverables would include a poster plan version of the land use plan, and several maps for planning, to include a base map, existing and future land uses, soils, water resources, environmental sensitive areas, watershed boundaries, zoning and lake classifications, publicly owned lands, wetlands, floodplains, shorelands, and forest management.
Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Bass Lake
Status
Complete
Town Of Enterprise: Town Of Enterprise Land Use And Water Quality Mgmt Plan: The Town of Enterprise proposes to develop a land use plan with implementation strategies to address land and water issues in the Town. Project deliverables will include a Land Use and Water Quality Management Plan which will consider demographics, public participation planning, water management issues, planning considerations, and ordinance reviews. Other deliverables would include a poster plan version of the land use plan, and several maps for planning, to include a base map, existing and future land uses, soils, water resources, environmental sensitive areas, watershed boundaries, zoning and lake classifications, publicly owned lands, wetlands, floodplains, shorelands, and forest management.
Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Beaver Lake
Status
Complete
Town Of Enterprise: Town Of Enterprise Land Use And Water Quality Mgmt Plan: The Town of Enterprise proposes to develop a land use plan with implementation strategies to address land and water issues in the Town. Project deliverables will include a Land Use and Water Quality Management Plan which will consider demographics, public participation planning, water management issues, planning considerations, and ordinance reviews. Other deliverables would include a poster plan version of the land use plan, and several maps for planning, to include a base map, existing and future land uses, soils, water resources, environmental sensitive areas, watershed boundaries, zoning and lake classifications, publicly owned lands, wetlands, floodplains, shorelands, and forest management.
Grant Details
Large Scale Lake Planning
Date
4/1/2010
Waters Involved
Castle Rock Ditch
Status
Complete
Lake Alice Association, Inc: Lake Alice Stewardship Program Phase Ii - Understanding The Biota Of Lake Alice: Lake Alice Association is sponsoring phased large scale lake planning grants to study Lake Alice, in Lincoln County. The project will focus on developing and updating an Adaptive Lake Management Plan (LMP) for Lake Alice. Phase 2 was funded in this grant cycle and Phases 3-5 will be submitted for funding starting in 2011.
Project activities for Phase 2 include: 1) Educational program, meetings and educational events with lake association and Tomahawk High School students, written educational materials, news releases, and website updates; 2) Point-intercept (PI) aquatic plant survey; 3) Aquatic plant community and substrate mapping; 4) Water quality assessment; 5) Volunteer amphibian monitoring and angler survey; 6) Update LMP.
Project deliverables include: 1) Educational materials and news releases; 2) Aquatic plant community and substrate maps; 3) PI, water quality, amphibian, and angler data; 4) LMP.
Specific conditions for this project: LMP needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP, news releases, any other educational materials/products, all data, all maps from project, and all GIS data.
Grant Details
Large Scale Lake Planning
Date
4/1/2010
Waters Involved
Cruson Slough
Status
Complete
Lake Alice Association, Inc: Lake Alice Stewardship Program Phase Ii - Understanding The Biota Of Lake Alice: Lake Alice Association is sponsoring phased large scale lake planning grants to study Lake Alice, in Lincoln County. The project will focus on developing and updating an Adaptive Lake Management Plan (LMP) for Lake Alice. Phase 2 was funded in this grant cycle and Phases 3-5 will be submitted for funding starting in 2011.
Project activities for Phase 2 include: 1) Educational program, meetings and educational events with lake association and Tomahawk High School students, written educational materials, news releases, and website updates; 2) Point-intercept (PI) aquatic plant survey; 3) Aquatic plant community and substrate mapping; 4) Water quality assessment; 5) Volunteer amphibian monitoring and angler survey; 6) Update LMP.
Project deliverables include: 1) Educational materials and news releases; 2) Aquatic plant community and substrate maps; 3) PI, water quality, amphibian, and angler data; 4) LMP.
Specific conditions for this project: LMP needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP, news releases, any other educational materials/products, all data, all maps from project, and all GIS data.
Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Eagle Lake
Status
Complete
Town Of Enterprise: Town Of Enterprise Land Use And Water Quality Mgmt Plan: The Town of Enterprise proposes to develop a land use plan with implementation strategies to address land and water issues in the Town. Project deliverables will include a Land Use and Water Quality Management Plan which will consider demographics, public participation planning, water management issues, planning considerations, and ordinance reviews. Other deliverables would include a poster plan version of the land use plan, and several maps for planning, to include a base map, existing and future land uses, soils, water resources, environmental sensitive areas, watershed boundaries, zoning and lake classifications, publicly owned lands, wetlands, floodplains, shorelands, and forest management.
Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Gillette Lake
Status
Complete
Town Of Enterprise: Town Of Enterprise Land Use And Water Quality Mgmt Plan: The Town of Enterprise proposes to develop a land use plan with implementation strategies to address land and water issues in the Town. Project deliverables will include a Land Use and Water Quality Management Plan which will consider demographics, public participation planning, water management issues, planning considerations, and ordinance reviews. Other deliverables would include a poster plan version of the land use plan, and several maps for planning, to include a base map, existing and future land uses, soils, water resources, environmental sensitive areas, watershed boundaries, zoning and lake classifications, publicly owned lands, wetlands, floodplains, shorelands, and forest management.
Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
High Lake
Status
Complete
Town Of Enterprise: Town Of Enterprise Land Use And Water Quality Mgmt Plan: The Town of Enterprise proposes to develop a land use plan with implementation strategies to address land and water issues in the Town. Project deliverables will include a Land Use and Water Quality Management Plan which will consider demographics, public participation planning, water management issues, planning considerations, and ordinance reviews. Other deliverables would include a poster plan version of the land use plan, and several maps for planning, to include a base map, existing and future land uses, soils, water resources, environmental sensitive areas, watershed boundaries, zoning and lake classifications, publicly owned lands, wetlands, floodplains, shorelands, and forest management.
Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Hilderbrand Lake
Status
Complete
Town Of Enterprise: Town Of Enterprise Land Use And Water Quality Mgmt Plan: The Town of Enterprise proposes to develop a land use plan with implementation strategies to address land and water issues in the Town. Project deliverables will include a Land Use and Water Quality Management Plan which will consider demographics, public participation planning, water management issues, planning considerations, and ordinance reviews. Other deliverables would include a poster plan version of the land use plan, and several maps for planning, to include a base map, existing and future land uses, soils, water resources, environmental sensitive areas, watershed boundaries, zoning and lake classifications, publicly owned lands, wetlands, floodplains, shorelands, and forest management.
Grant Details
Large Scale Lake Planning
Date
4/1/2010
Waters Involved
Lake Du Bay
Status
Complete
Lake Alice Association, Inc: Lake Alice Stewardship Program Phase Ii - Understanding The Biota Of Lake Alice: Lake Alice Association is sponsoring phased large scale lake planning grants to study Lake Alice, in Lincoln County. The project will focus on developing and updating an Adaptive Lake Management Plan (LMP) for Lake Alice. Phase 2 was funded in this grant cycle and Phases 3-5 will be submitted for funding starting in 2011.
Project activities for Phase 2 include: 1) Educational program, meetings and educational events with lake association and Tomahawk High School students, written educational materials, news releases, and website updates; 2) Point-intercept (PI) aquatic plant survey; 3) Aquatic plant community and substrate mapping; 4) Water quality assessment; 5) Volunteer amphibian monitoring and angler survey; 6) Update LMP.
Project deliverables include: 1) Educational materials and news releases; 2) Aquatic plant community and substrate maps; 3) PI, water quality, amphibian, and angler data; 4) LMP.
Specific conditions for this project: LMP needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP, news releases, any other educational materials/products, all data, all maps from project, and all GIS data.
Grant Details
Large Scale Lake Planning
Date
10/1/2010
Waters Involved
Lake Pesobic
Status
Complete
Pesobic Lake Assoc: Pesobic Lake Management Planning Project, Phase 1: Pesobic Lake Association is sponsoring a phased lake planning grant project to study Pesobic Lake, in Lincoln County. The project will focus on developing a Lake Management Plan (LMP) for Pesobic Lake.
Phase 1 project activities include: 1) Stakeholder participation \2013 stakeholder survey, kick- off meeting, planning meetings (up to 2), wrap-up meeting, news release(s), and newsletter article; 2) Shoreline assessment; 3) Watershed assessment and P load modeling; 4) Professional Dreissena monitoring; 5) Develop LMP.
Project deliverables include: 1) Stakeholder survey, news release(s), and newsletter article; 2) Shoreland data; 3) Watershed maps and modeling data; 4) LMP.
Specific conditions for this project: 1) Draft of stakeholder survey needs to be submitted to Lakes Management Coordinator for review and approval before sending to public; 2) Draft of LMP needs Dept review and approval.
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP, news release(s), newsletter article, stakeholder survey, data from watershed assessment and shoreland assessment, all maps from project, and all GIS data.
Grant Details
Large Scale Lake Planning
Date
10/1/2010
Waters Involved
Lake Pesobic
Status
Complete
Pesobic Lake Assoc: Pesobic Lake Management Planning Project, Phase 2: Pesobic Lake Association is sponsoring phased lake planning grant project to study Pesobic Lake, in Lincoln County. The project will focus on developing a Lake Management Plan (LMP) for Pesobic Lake.
Phase 2 project activities include: 1) Point-intercept (PI) aquatic plant survey, community mapping and analysis; 2) Curly-leaf pondweed survey; 3) Water quality assessment; 4) Fisheries assessment; 5) Develop LMP.
Project deliverables include: 1) PI and water quality data; 2) Aquatic plant community maps; 3) Two sets of aquatic plant vouchers; 4) LMP.
Specific conditions for this project: Draft of LMP needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP, PI and water quality data, a set of aquatic plant vouchers, all maps from project, and all GIS data.
Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Little Bass Lake
Status
Complete
Town Of Enterprise: Town Of Enterprise Land Use And Water Quality Mgmt Plan: The Town of Enterprise proposes to develop a land use plan with implementation strategies to address land and water issues in the Town. Project deliverables will include a Land Use and Water Quality Management Plan which will consider demographics, public participation planning, water management issues, planning considerations, and ordinance reviews. Other deliverables would include a poster plan version of the land use plan, and several maps for planning, to include a base map, existing and future land uses, soils, water resources, environmental sensitive areas, watershed boundaries, zoning and lake classifications, publicly owned lands, wetlands, floodplains, shorelands, and forest management.
Grant Details
Large Scale Lake Planning
Date
4/1/2010
Waters Involved
Little Pine Creek
Status
Complete
Lake Alice Association, Inc: Lake Alice Stewardship Program Phase Ii - Understanding The Biota Of Lake Alice: Lake Alice Association is sponsoring phased large scale lake planning grants to study Lake Alice, in Lincoln County. The project will focus on developing and updating an Adaptive Lake Management Plan (LMP) for Lake Alice. Phase 2 was funded in this grant cycle and Phases 3-5 will be submitted for funding starting in 2011.
Project activities for Phase 2 include: 1) Educational program, meetings and educational events with lake association and Tomahawk High School students, written educational materials, news releases, and website updates; 2) Point-intercept (PI) aquatic plant survey; 3) Aquatic plant community and substrate mapping; 4) Water quality assessment; 5) Volunteer amphibian monitoring and angler survey; 6) Update LMP.
Project deliverables include: 1) Educational materials and news releases; 2) Aquatic plant community and substrate maps; 3) PI, water quality, amphibian, and angler data; 4) LMP.
Specific conditions for this project: LMP needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP, news releases, any other educational materials/products, all data, all maps from project, and all GIS data.
Grant Details
Large Scale Lake Planning
Date
9/29/1995
Waters Involved
Long Lake
Status
Complete
Long And Bass Lake Association: Long And Bass Lake Planning Grant: 1. Continue to develop and execute a quarterly association newsletter to promote association membership, leadership, education, and lake planning activities.
2. Develop flyers to promote lake association events and activities and develop reports to communicate lake management activities.
3. Send three delegates to the annual Wisconsin Lakes Convention during 1996-1999.
4. Prepare a final report including the results of the above tasks.
5. Disseminate project results to the public by newsletter mailing and summary report mailings.
Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Pelican Lake
Status
Complete
Town Of Enterprise: Town Of Enterprise Land Use And Water Quality Mgmt Plan: The Town of Enterprise proposes to develop a land use plan with implementation strategies to address land and water issues in the Town. Project deliverables will include a Land Use and Water Quality Management Plan which will consider demographics, public participation planning, water management issues, planning considerations, and ordinance reviews. Other deliverables would include a poster plan version of the land use plan, and several maps for planning, to include a base map, existing and future land uses, soils, water resources, environmental sensitive areas, watershed boundaries, zoning and lake classifications, publicly owned lands, wetlands, floodplains, shorelands, and forest management.
Grant Details
Large Scale Lake Planning
Date
4/1/2007
Waters Involved
Seven Island Lake
Status
Complete
Lincoln County: Seven Island Lake Management Planning Project Phase Ii: Lincoln County Land Conservation Department is sponsoring a large scale lake planning grant to study Seven Island Lake in Lincoln County with a study completion date of December 31, 2008. The project will focus on developing a Lake Management Plan (LMP) for Seven Island Lake. Completion of a LMP will allow for potential Aquatic Invasive Species (AIS) cost sharing grants and permits for Eurasian water-milfoil (EWM) control.
Project activities include:
1) Stakeholder participation - kick-off meeting, survey, planning meetings (up to 3), wrap-up meeting, news release, newsletter article, and progress report
2) Water quality sampling (Secchi, P, Chla, N, Conductivity, pH, Alkalinity, Total Suspended solids, Calcium, DO, and temp)
3) Curly-leaf pondweed survey
4) Aquatic plant community mapping
5) Fisheries assessment
6) Watershed assessment
7) Zebra mussel monitoring
8) Purchase DO meter
9) Develop LMP
Project deliverables include:
1) Stakeholder survey, news release, newsletter article, and progress report
2) Aquatic plant community and watershed maps
3) DO meter
4) LMP
Specific conditions for this project:
- Draft of stakeholder survey should be submitted to Lakes Management Coordinator for review before sending to public
- LMP needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP, news release, newsletter article, progress report, stakeholder survey, data from watershed assessment, and all maps from project.
Grant Details
Large Scale Lake Planning
Date
4/1/2007
Waters Involved
Seven Island Lake
Status
Complete
Lincoln County: Seven Island Lake Management Planning Project, Phase I: Lincoln County Land Conservation Department is sponsoring a large scale lake planning grant to study Seven Island Lake in Lincoln County with a study completion date of December 31, 2008. The project will focus on developing a Lake Management Plan (LMP) for Seven Island Lake. Completion of a LMP will allow for potential Aquatic Invasive Species (AIS) cost sharing grants and permits for Eurasian water-milfoil (EWM) control.
Project activities include:
1) Stakeholder participation - kick-off meeting, survey, planning meetings (up to 3), wrap-up meeting, news release, newsletter article, and progress report
2) Water quality sampling (Secchi, P, Chla, N, Conductivity, pH, Alkalinity, Total Suspended solids, Calcium, DO, and temp)
3) Curly-leaf pondweed survey
4) Aquatic plant community mapping
5) Fisheries assessment
6) Watershed assessment
7) Zebra mussel monitoring
8) Purchase DO meter
9) Develop LMP
Project deliverables include:
1) Stakeholder survey, news release, newsletter article, and progress report
2) Aquatic plant community and watershed maps
3) DO meter
4) LMP
Specific conditions for this project:
- Draft of stakeholder survey should be submitted to Lakes Management Coordinator for review before sending to public
- LMP needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP, news release, newsletter article, progress report, stakeholder survey, data from watershed assessment, and all maps from project.
Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Shingle Mill Lake
Status
Complete
Town Of Enterprise: Town Of Enterprise Land Use And Water Quality Mgmt Plan: The Town of Enterprise proposes to develop a land use plan with implementation strategies to address land and water issues in the Town. Project deliverables will include a Land Use and Water Quality Management Plan which will consider demographics, public participation planning, water management issues, planning considerations, and ordinance reviews. Other deliverables would include a poster plan version of the land use plan, and several maps for planning, to include a base map, existing and future land uses, soils, water resources, environmental sensitive areas, watershed boundaries, zoning and lake classifications, publicly owned lands, wetlands, floodplains, shorelands, and forest management.
Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Silver Lake
Status
Complete
Town Of Enterprise: Town Of Enterprise Land Use And Water Quality Mgmt Plan: The Town of Enterprise proposes to develop a land use plan with implementation strategies to address land and water issues in the Town. Project deliverables will include a Land Use and Water Quality Management Plan which will consider demographics, public participation planning, water management issues, planning considerations, and ordinance reviews. Other deliverables would include a poster plan version of the land use plan, and several maps for planning, to include a base map, existing and future land uses, soils, water resources, environmental sensitive areas, watershed boundaries, zoning and lake classifications, publicly owned lands, wetlands, floodplains, shorelands, and forest management.
Grant Details
Large Scale Lake Planning
Date
3/15/2024
Waters Involved
Tug Lake
Status
Complete
Tug Lake District: Tug Lake Comprehensive Management Plan Development: The Tug Lake District (TLD) is sponsoring a project which will focus on filling gaps in water quality data for the lake, working with farmers to create/update nutrient management plans, and creating a water quality focused lake management plan (LMP) for Tug Lake.
Activities:
1) Analyze and incorporate algae, water chemistry, and water level data into the lake nutrient budget report;
2) Collaborate with watershed farmers to create or update nutrient management plans;
3) Develop a LMP.
Deliverables:
1) Updated algae and water quality data;
2) Updated agricultural nutrient management plan(s);
3) A completed LMP.
Conditions:
1) All water quality monitoring shall follow DNR protocols.
2) Data for temperature/dissolved oxygen profiles and Secchi depths should be entered into the DNR SWIMS database.
3) DNR Lake Biologist will be provided with a copy of presentations, reports and/or management plans;
4) DNR Lake Biologist will be invited to management planning meetings.
This scope summarizes details provided in the application and does not negate tasks and/or deliverables described therein. Data, reports, surveys, and supporting information, including photos, maps and GIS data, must be submitted to the DNR Biologist in electronic format and in any other format they specify.
If a consultant provides a final report, it is recommended that the Grantee provide the DNR Biologist with a draft for comment on report adequacy prior to making a final payment to the consultant. Include electronic copy of the final report along with or prior to submission of grantee's final payment request.
Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Un Spring
Status
Complete
Town Of Enterprise: Town Of Enterprise Land Use And Water Quality Mgmt Plan: The Town of Enterprise proposes to develop a land use plan with implementation strategies to address land and water issues in the Town. Project deliverables will include a Land Use and Water Quality Management Plan which will consider demographics, public participation planning, water management issues, planning considerations, and ordinance reviews. Other deliverables would include a poster plan version of the land use plan, and several maps for planning, to include a base map, existing and future land uses, soils, water resources, environmental sensitive areas, watershed boundaries, zoning and lake classifications, publicly owned lands, wetlands, floodplains, shorelands, and forest management.
Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Unnamed
Status
Complete
Town Of Enterprise: Town Of Enterprise Land Use And Water Quality Mgmt Plan: The Town of Enterprise proposes to develop a land use plan with implementation strategies to address land and water issues in the Town. Project deliverables will include a Land Use and Water Quality Management Plan which will consider demographics, public participation planning, water management issues, planning considerations, and ordinance reviews. Other deliverables would include a poster plan version of the land use plan, and several maps for planning, to include a base map, existing and future land uses, soils, water resources, environmental sensitive areas, watershed boundaries, zoning and lake classifications, publicly owned lands, wetlands, floodplains, shorelands, and forest management.
Grant Details
Large Scale Lake Planning
Date
4/1/2007
Waters Involved
Unnamed
Status
Complete
Lincoln County: Seven Island Lake Management Planning Project Phase Ii: Lincoln County Land Conservation Department is sponsoring a large scale lake planning grant to study Seven Island Lake in Lincoln County with a study completion date of December 31, 2008. The project will focus on developing a Lake Management Plan (LMP) for Seven Island Lake. Completion of a LMP will allow for potential Aquatic Invasive Species (AIS) cost sharing grants and permits for Eurasian water-milfoil (EWM) control.
Project activities include:
1) Stakeholder participation - kick-off meeting, survey, planning meetings (up to 3), wrap-up meeting, news release, newsletter article, and progress report
2) Water quality sampling (Secchi, P, Chla, N, Conductivity, pH, Alkalinity, Total Suspended solids, Calcium, DO, and temp)
3) Curly-leaf pondweed survey
4) Aquatic plant community mapping
5) Fisheries assessment
6) Watershed assessment
7) Zebra mussel monitoring
8) Purchase DO meter
9) Develop LMP
Project deliverables include:
1) Stakeholder survey, news release, newsletter article, and progress report
2) Aquatic plant community and watershed maps
3) DO meter
4) LMP
Specific conditions for this project:
- Draft of stakeholder survey should be submitted to Lakes Management Coordinator for review before sending to public
- LMP needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP, news release, newsletter article, progress report, stakeholder survey, data from watershed assessment, and all maps from project.
Grant Details
Large Scale Lake Planning
Date
4/1/2007
Waters Involved
Unnamed
Status
Complete
Lincoln County: Seven Island Lake Management Planning Project, Phase I: Lincoln County Land Conservation Department is sponsoring a large scale lake planning grant to study Seven Island Lake in Lincoln County with a study completion date of December 31, 2008. The project will focus on developing a Lake Management Plan (LMP) for Seven Island Lake. Completion of a LMP will allow for potential Aquatic Invasive Species (AIS) cost sharing grants and permits for Eurasian water-milfoil (EWM) control.
Project activities include:
1) Stakeholder participation - kick-off meeting, survey, planning meetings (up to 3), wrap-up meeting, news release, newsletter article, and progress report
2) Water quality sampling (Secchi, P, Chla, N, Conductivity, pH, Alkalinity, Total Suspended solids, Calcium, DO, and temp)
3) Curly-leaf pondweed survey
4) Aquatic plant community mapping
5) Fisheries assessment
6) Watershed assessment
7) Zebra mussel monitoring
8) Purchase DO meter
9) Develop LMP
Project deliverables include:
1) Stakeholder survey, news release, newsletter article, and progress report
2) Aquatic plant community and watershed maps
3) DO meter
4) LMP
Specific conditions for this project:
- Draft of stakeholder survey should be submitted to Lakes Management Coordinator for review before sending to public
- LMP needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP, news release, newsletter article, progress report, stakeholder survey, data from watershed assessment, and all maps from project.
Grant Details
Large Scale Lake Planning
Date
4/1/2010
Waters Involved
Unnamed
Status
Complete
Lake Alice Association, Inc: Lake Alice Stewardship Program Phase Ii - Understanding The Biota Of Lake Alice: Lake Alice Association is sponsoring phased large scale lake planning grants to study Lake Alice, in Lincoln County. The project will focus on developing and updating an Adaptive Lake Management Plan (LMP) for Lake Alice. Phase 2 was funded in this grant cycle and Phases 3-5 will be submitted for funding starting in 2011.
Project activities for Phase 2 include: 1) Educational program, meetings and educational events with lake association and Tomahawk High School students, written educational materials, news releases, and website updates; 2) Point-intercept (PI) aquatic plant survey; 3) Aquatic plant community and substrate mapping; 4) Water quality assessment; 5) Volunteer amphibian monitoring and angler survey; 6) Update LMP.
Project deliverables include: 1) Educational materials and news releases; 2) Aquatic plant community and substrate maps; 3) PI, water quality, amphibian, and angler data; 4) LMP.
Specific conditions for this project: LMP needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP, news releases, any other educational materials/products, all data, all maps from project, and all GIS data.
Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Wickham Lake
Status
Complete
Town Of Enterprise: Town Of Enterprise Land Use And Water Quality Mgmt Plan: The Town of Enterprise proposes to develop a land use plan with implementation strategies to address land and water issues in the Town. Project deliverables will include a Land Use and Water Quality Management Plan which will consider demographics, public participation planning, water management issues, planning considerations, and ordinance reviews. Other deliverables would include a poster plan version of the land use plan, and several maps for planning, to include a base map, existing and future land uses, soils, water resources, environmental sensitive areas, watershed boundaries, zoning and lake classifications, publicly owned lands, wetlands, floodplains, shorelands, and forest management.
Grant Details
Large Scale Lake Planning
Date
4/1/2010
Waters Involved
Wisconsin River
Status
Complete
Lake Alice Association, Inc: Lake Alice Stewardship Program Phase Ii - Understanding The Biota Of Lake Alice: Lake Alice Association is sponsoring phased large scale lake planning grants to study Lake Alice, in Lincoln County. The project will focus on developing and updating an Adaptive Lake Management Plan (LMP) for Lake Alice. Phase 2 was funded in this grant cycle and Phases 3-5 will be submitted for funding starting in 2011.
Project activities for Phase 2 include: 1) Educational program, meetings and educational events with lake association and Tomahawk High School students, written educational materials, news releases, and website updates; 2) Point-intercept (PI) aquatic plant survey; 3) Aquatic plant community and substrate mapping; 4) Water quality assessment; 5) Volunteer amphibian monitoring and angler survey; 6) Update LMP.
Project deliverables include: 1) Educational materials and news releases; 2) Aquatic plant community and substrate maps; 3) PI, water quality, amphibian, and angler data; 4) LMP.
Specific conditions for this project: LMP needs Dept review and approval
WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP, news releases, any other educational materials/products, all data, all maps from project, and all GIS data.
Grant Details
Small Scale Lake Planning
Date
4/1/2001
Waters Involved
Long Lake
Status
Complete
Long And Bass Lake Association: Long/Bass Lake Feasibility Study: The Long and Bass Lake Association will conduct a project, which will be the preliminary steps to a Comprehensive Lake Management Plan. The project will be used to conduct a property owner survey, for the development of a feasibility and action plan for a comprehensive lakes plan, will communicate critical shoreline issues and water quality issues to the lake residents, and enhance the leadership and knowledge of the lakes association leadership. A sediment core sample will also be completed for a historical view of the lake.
Deliverables:
1. Information and Education through Association meetings and newsletters regarding findings of project
2. Sending one representative to Lake Leaders Institute.
3. Sending representatives to the WAL convention. (this deliverable has been eliminated as of scope amendment dated 07/05/2002)
4. A website active and running with a plan for updating/use
5. Core sample and analysis
6. Feasibility study and action plan for a Comprehensive Lake Management Plan.
The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.
Grant Details
River Protection Grant
Date
10/18/2000
Waters Involved
Prairie River
Status
Complete
Lincoln County: Prairie River Dells Scenic Area Land Acquisition: Lincoln County shall participate in the River Protection Program by acquiring 5 acres of land adjoining the Prairie River.